MINING Over 65 years opening the way underground
Transcript
Page 1: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

PROJECT BOOKPROJECT BOOKOver 65 years opening the way underground

Page 2: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

PRESENTATIONOSSA, founded in 1952, is a leading company in the underground construction sector specializing in three business

areas: Construction, Energy and Mining.

Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

OSSA is a solid underground works partner for important industrial and construction groups internationally. At OSSA

we are highly commited to Quality, Health and safety, and Environment, and we invest in Research and Development

Projects at an international level. We promote a culture of respect and teamwork among our team.

OSSA has vast recent experience both in high speed railway tunnels with over 60 km of high speed rail tunneling projects

in the last five years, leading the Spanish market in this specialty, and also in underground power plants, having built

over fifteen underground plants with some of the largest underground caverns in the world. As a recent highlight, we are

participating in the design and construction of the Hong Kong to Shangai High Speed Rail Line.

Internationally OSSA has executed works in Hong Kong, Taiwan, Chile, Peru, Colombia, Panama, Costa Rica, Brasil and

Nicaragua and is recently focusing its tendering activity in North America, Central America, Asia, Canada and Great Britain.

After 65 years of success, our strategy is to continue expanding internationally, and to support large civil engineering and

mining industry clients at all levels, contributing our vast technical expertise and our equipment fleet, while prioritizing

health and safety and innovation in all our projects.

Page 3: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

SAFETYSafety is Obras Subterraneas, S.A.’s main asset from the time when its operations begin, demanded by the specialisation

required for the works carried out underground.

The company’s staff have a high degree of professionalism and specialisation, which has been achieved after many years

of training and the transfer of know how. Working in confined spaces with the presence of gas, dust, noise, low visibility

and the use of explosives means that the Obras Subterraneas, S.A.’s security department is the most relevant in the

company.

The use of cutting-edge, innovative techniques in the field of underground works requires the continuous training of the

company’s human resources.

Page 4: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

Project photos

Mining TunnelsSTRUCTURE

Región de AntofagastaPROVINCE

ChileCOUNTRY

CalamaPLACE

Construction of 10.5 km of ventilation shafts in the supply and extract systems which make up the development of the new mine. The sections are variable between 8.2 m x 8.1 m and 10.9 m x 8.1 m.

The excavation is by drilling and blasting and the support is with rock bolts, mesh, trusses and shotcrete.

LOCATIONANDADDITIONALINFORMATION

Cross section: 75 m²

Lenght: 10,500 mGEOMETRY

HeightOVERBURDEN

Drilling and BlastingMETHODOF TUNNELING

Amphibolite, Granodiorites and Elena Sur GranodioriteGEOLOGY ANDGEOTECHNICAL DATA

Atlas Copco XE3C and E2C JumbosAtlas Copco ST-1030 Underground LoaderPM-500 and PM-4210 ShotcreterHIMEC 9910 B-REX - Normet Elevated PlatformsCAT-980K Wheel LoadersCAT-323 DL BackhoesCAT 730 Trucks

TUNNEL EQUIPMENT

94,742,194,539 CLPBUDGET(EXCLUDING VAT)

mININg

Type Project

Owner: Codelco

CONSTRUCTION DATA SHEET

Start: 06/2016STATUS

End: Currently being executed

01

CC-013-2 MAIN VENTILATION INFRASTRUCTURE DEVELOPMENT IN THE CHUQUICAMATA MINE

Page 5: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

Project photos

Mine TunnelsSTRUCTURE

Antofagasta RegionPROVINCE

ChileCOUNTRY

CalamaPLACE

The project to be executed is located in the Chuquicamata New Underground Mine. It comprises constructing various galleries and shafts that form part of the main fresh air injection ventilation circuit for the future mine.The main work units to be executed are:

• An Emergency Ramp 1,637 m in length with an open cross-section of 10.74 m x 8.00 m.• Ventilation tunnels with a length of 3,821.6 m and an open cross-section of 10.74 m x 8.00 m.• An emergency connecting gallery between ventilators of 359.06 m with an open cross-section of 7.75 m x 5.6 m.• 6 ventilation shafts each 6 m in diameter and 181 m in length.

Cross section: 10.74 x 8 m2

Lenght: Emergency ramp 1,637 m / Ventilation tunnels 3,821.6 m

GEOMETRY

MediumOVERBURDEN

NATM. Drill and blast and mechanical equipmentMETHODOF TUNNELING

Amphibolite, Granodiorite and South Elena GranodioriteGEOLOGY ANDGEOTECHNICAL DATA

Atlas Copco XE3C jumbosNormet Himec 9910 B-REX platform lifterPutzmeister PM-500 shotcrete robotCaterpillar model CAT-980K loadersCaterpillar model CAT-323 DL excavators

TUNNEL EQUIPMENT

109,000,000 €BUDGET(EXCLUDING VAT)

mININg

Type Project

Owner: Codelco

CONSTRUCTION DATA SHEET

Start: 10/2015STATUS

End: Currently being executed

EXTENSION OF CONTRACT FOR INJECTION TUNNELS. C003A. CHUQUICAMATA MINE

02

LOCATIONANDADDITIONALINFORMATION

Page 6: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

Type Project

Owner: Codelco

Project photos

Start: 11/2014

End: Currently being executedSTATUS

Mining TunnelsSTRUCTURE

Región de ValparaísoPROVINCE

ChileCOUNTRY

Saladillo / Comuna de Los Andes

PLACE

The Project is being carried out inside the facilities of the Andean Division (DAND) of CODELCO (Chile), located in the high and central part of the Andes mountain range, in the 5th (Valparaíso) Region, 50 km northeast of Santiago, currently working the Río Blanco (copper) mining deposits. The scope of this contract involves construction of the underground works for the Transfer Project, the object of which is to ensure (and even increase) production at the mine until 2022.The works to be carried out mainly comprise the following:

• Excavation and reinforcement by drill and blast of:• Haulage Tunnel III (4,833 m) which connects Sector 3,500 with the Cordillera Plant Sector• Tunnels, access and ventilation galleries, caverns and shafts (using raise boring) in Sector 3,500 and in the Cordillera Plant Sector• Draw points for fire protection and pedestrian shelters

• Contruction of:• Construction window portals• Paving of Haulage Tunnel III• Installation of the geomechanical monitoring system

MediumOVERBURDEN

NATM. Drill and blast and mechanical equipmentMETHODOF TUNNELING

Río Blanco granodiorite, rhyolitic pipe and andesitesGEOLOGY ANDGEOTECHNICAL DATA

Two and three boom jumboDrill rigLoaderShotcrete robotTelehandlerRaise boring equipment

TUNNEL EQUIPMENT

62,929,170,354 CLPBUDGET(EXCLUDING VAT)

CONSTRUCTION OF UNDERGROUND WORKS FOR NEW TRANSFER SYSTEM.ANDEAN DIVISION

Cross section: Haulage tunnel 3: 42 m2 (7.5x6), the rest ranging from 4x4 galleries to 15x16 m2 caverns. Raise borings with ND of 2 and 3 m

Lenght: 11,133 m of galleries and caverns (including 4,833 in Haulage tunnel 3) + 260 m of Raise Boring

GEOMETRY

CONSTRUCTION DATA SHEET mININg

03

LOCATIONANDADDITIONALINFORMATION

Page 7: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

Project photos

Height

Drill and blast

Amphibolite, granodiorite and Elena Sur granodiorite

Cross section: 10,74 x 8 m2

Length: 2 x 4.320 m

XE 3C Jumbos; NormetHimec 9910 B REX Platforms;Putzmeister PM-500 PC gunning robotwith h 30 m3/h; Boltec LC drilling systems.CAT -980K loaders; CAT 323 DL backhoe;Dumper 730

The work involves the execution of two parallel tunnels for air injection for the future Chuquicamata mine. The tunnels are of approximately 4,320 m each and a gauge, or thickness of 10.74 x 8 m2, with an incline of more than 14%. Both tunnels are connected by way of three passages each of 27 m and a gauge of 7.65 x 5.60m2.

Support elements used: reinforced concrete, resin bolts of 3, 4 and 6 m in length, wire mesh 150 x 150 x 7.5 mm, TH-21, TH-36 and HEB 200 trusses and forepoling.

37.617.985.593 CLP 58.834.530 €

Calama

Región Antofagasta

Chile

Mining Tunnels

End: 09/2015

Start: 03/2012

AIR INJECTION TUNNELS, CHUQUICAMATA MINE

Owner: Codelco

Type Project

STATUS

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET mININg

04

LOCATIONANDADDITIONALINFORMATION

Page 8: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

Project photos

Start: 02/2014

End: 08/2014STATUS

Mining TunnelsSTRUCTURE

Región de AntofagastaPROVINCE

ChileCOUNTRY

Comuna de Sierra GordaPLACE

The work involves the execution of the project and the excavation and support of a 71 m mine tunnel under a coarse ore stockpile.

Cross section: 17 m²

Lenght: 71 mGEOMETRY

LowOVERBURDEN

NATM. Mechanical excavationMETHODOF TUNNELING

Silty gravels with sandsGEOLOGY ANDGEOTECHNICAL DATA

Atlas Copco two-boom jumboLoaders

TUNNEL EQUIPMENT

7,600,961 USD.BUDGET(EXCLUDING VAT)

Type Project

ESPERANZA MINE

Owner: Metso Mineral, S.A.

CONSTRUCTION DATA SHEET mININg

05

LOCATIONANDADDITIONALINFORMATION

Page 9: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

Project photos

Start: 03/2013

End: 09/2013STATUS

Mining TunnelsSTRUCTURE

Minas GeraisPROVINCE

BrazilCOUNTRY

São Domingos do PrataPLACE

The work consists of excavating a mining tunnel with a 1% gradient along its whole length. The tunnel will be excavated with mechanical excavation, applying the NATM technique. The supports applied in the tunnel use shotcrete, reticular trusses and bolt umbrellas.

Cross section: Excavation of 21 m2

Lenght: 262 mGEOMETRY

MediumOVERBURDEN

Excavation with mechanical excavation. NATM SystemMETHODOF TUNNELING

Clays and clays with sand bandsGEOLOGY ANDGEOTECHNICAL DATA

Atlas Copco 282 Jumbo (2-boom)ST-1030 loaderManitouPM-500 shotcrete robot

TUNNEL EQUIPMENT

4,064,670 €BUDGET(EXCLUDING VAT)

Type Project

SEM PEIXES II TUNNEL

Owner: Anglo American Minerio de Ferro Brasil, S.A.

CONSTRUCTION DATA SHEET mININg

06

LOCATIONANDADDITIONALINFORMATION

Page 10: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg TOQUEPALA MINE TUNNEL

Start: 02/2011

End: 06/2012

Owner: Southern Perú Cooper Corporation (SPCC), Grupo México

350 m

Drill and blast

Andesite and rhyolites (volcanic intrusion).Seismicity 0.4 g.

Mining Tunnels

Peru

Tacna

Departamento de Tacna

18,000,000 $

Primary crusher and conveyor belt transportation tunnel. Length of 2 km Tunnel section 35.08 m² with width extensions every 200 m. The mine area is at 3,600 m above sea level, resulting in snowed areas.The mine deposit at Toquepala contains copper and molybdenum. Rocks with predominant RMR (Rock Mass Rating) of between 30 and 40.Extension of tunnel secondary section of 160 ml underpass industrial railway of 60 ml and rectangular 8x4.62,000 m3 of tunnel excavation 250,000 m3 of portal excavation.7,000 m of 1” diameterhelical bolts L=10’.470 HEB trusses 160. 30 cm gunite thickness

Atlas Copco Jumbos XL2C, Robots PM500,CAT 320 backhoes, Manitou platforms

Type Project

Project photos

Horseshoe section tunnel 7,20 x 5.30 m² (35.08 m³/ml)

1 tubeSTATUS

STRUCTURE

PROVINCE

COUNTRY

PLACE

GEOMETRY

OVERBURDEN

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

07

LOCATIONANDADDITIONALINFORMATION

Page 11: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Section: Diverse sections from 12 to 15 m2

Length: 1,976 m

Slate and carboniferous sandstone

AM-75 roadheader Wagner ST-8A loader800 mm wide conveyor beltJumbo DHCavo excavator, Salzgitter excavatorLocomotives

1,976 m of 15 m² gauge and 416 ml with 12 m² gauge. A well of 812 m in length and at a slope of 38O

20,585,046 €

La Robla

León

Well galleries

End: 12/2011

Start: 06/2006

Owner: Hullera Vasco Leonesa, S.A.

E. VALLE MINING INFRASTRUCTURE

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

08

LOCATIONANDADDITIONALINFORMATION

Page 12: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Mechanical methods

Section: 40 m2

Length: 425 m

Potash

Alpine AM 75 roadheader25 Tn. trucksWagner ST8 B loaders

Execution of mining tunnels and galleries in the potash mines of Iberpotash, S.A. in Suria

1,850,000 €

Suria

Barcelona

End: 06/2009

Tunnels and mining galleries

Start: 03/2007

Owner: Iberpotash, S.A.

CABANASA–SURIA INFRASTRUCTURE

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

09

LOCATIONANDADDITIONALINFORMATION

Page 13: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Mechanical methods

Section: 40 m2

Length: 3,500 m

Potash

AM-75 roadheader H-125 Jumbo Drill ST-5 ST-8A Wagner Loaderpk-6000 Dumper GHH MK 25

Execution of mining tunnels and galleries in the potash mines of Iberpotash, S.A. in Suria.

Contract for the operation and maintenance of shafts.

10,257,734 €

Suria

Barcelona

Mining works.Galleries and shafts

End: 06/2009

Start: 01/1991

Owner: Iberpotash, S.A.

SURIA MINES

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

10

LOCATIONANDADDITIONALINFORMATION

Page 14: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Type

Fotografías singulares

Project

Portugal

Height

Section: Variable

Length: 13.974 m

Drill and blast

Minimatic Tamrock Jumbo, low profile hoes such as Toro 400 and Toro 500.

Excavation of tank of 800 m in depth and 23 m2 gauge.

Passages with lengths of 554 m, 7,591 m, 5,829 m with gauges of 12 m, 18 m, 25 m and 21 m respectively.

An 850 ml and 21 m2 gauge passage was restored and an access ramp of 625 ml and 30m2 gauge. A 3.5 m diameter and 380 ml deep chimney was also recovered.

75.561.956 €

Castroverde

Alentejo

Passages and tanks

End: 2008

Start: 1989

Owner: SOMINCOR (Rio Tinto – Gobierno Portugués)

NERVES CORVO MINE

STATUS

STRUCTURE

PROVINCE

COUNTRY

GEOMETRY

OVERBURDEN

TUNNEL EQUIPMENT

METHODOF TUNNELING

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

11

LOCATIONANDADDITIONALINFORMATION

Page 15: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Section: 20 m2

Length: 1,150 m

Limestone

DH BTR-2 Jumbo drillM-412 DH electro-hydraulic loader T-50 and T-80 draft engines3 m3 carsJumbo 305

3 galleries on different levels: at a height of 195 m, 321 ml was undertaken with a gauge of 53.4 m², at 165 m, 205,7 m was excavated with a gauge of 25 m², and at 195 m, 272 m was excavated with a gauge of 53.4 m².

Seven tranversal galleries were also constructed, with gauges ranging from 22.5 to 27 m².

Initial units: 21,853 m³ of shotcrete, 789 units of bolts of 4 m in length and 25 mm diameter; 608 ml of 32 mm-diameter steel bar and 11,364 kg of TH21 truss.

3,476,625 €

Lemoa

Bizkaia

Mining chambers

End: 03/2007

Start: 12/2005

Owner: Lemona Industrial, S.A.

APARIO QUARRY

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

12

LOCATIONANDADDITIONALINFORMATION

Page 16: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Mechanical methods

Section: 28 m2

Length: 3,753 m

Potash

GHH LF-12 loaderGHH MK 25 DumperMining machines

3,753 m of galleries inside the Potasas Mine. Maintenance, machinery and chain work was also undertaken in Well IV.

2,999,828 €

Suria

Barcelona

Well IV entrance and maintenance galleries

End: 07/2006

Start: 11/2005

Owner: Iberpotash, S.A.

SHAFT IV GALLERY

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

13

LOCATIONANDADDITIONALINFORMATION

Page 17: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Section: 25 m2

Length: 2,600 m

Lime

Wagner ST-8A loaders800 mm wide conveyor belt25 Tn. mining trucksJumbo 2-booms Minimatic-205Raise Borer

365 ml of 2.2 m-diameter well.

Initial works: 2,248 units of expanding bolts measuring 2.4 m and 14,339 m³ of shotcrete.

6,972,057 €

Monesterio

Badajoz

Mining galleries and shafts

End: 10/2005

Start: 07/2004

Owner: Río Narcea Recursos, S.A.

GALLERIES AND SHAFTS FOR AGUABLANCA MINE

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

14

LOCATIONANDADDITIONALINFORMATION

Page 18: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Diameter: 5 m

Length: 200 m

Carnalite potash

Small machinery and tools from the Maintenance workshop

200 m long shaft for Suria K, S.A.

5,103,244 €

Suria

Barcelona

Shaft maintenance

End: 12/1999

Start: 01/1991

Owner: Suria K, S.A.

SURIA SHAFT

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

15

LOCATIONANDADDITIONALINFORMATION

Page 19: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Section: 15 m2

Length: 16,000 m

Slate and carboniferous sandstone

D.H. BTR. 2 Jumbo drillM-412 electro-hydraulic loader T-50 and T-80 draft engines800 mm wide conveyor belts3 m3 wagonsAliva 500 mining robotAliva 252 guniting machine

16,000 m of mining tunnels and galleries in the Nueva Mina mine for Hullera Vasco Leonesa, S.A.

58,081,809 €

Santa Lucía de Gordón

León

Tunnels and mining galleries

End: 06/1999

Start: 06/1995

Owner: Hullera Vasco Leonesa, S.A.

NUEVA MINA MINE

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

16

LOCATIONANDADDITIONALINFORMATION

Page 20: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Diameter: 5 m

Length: 350 m shafts/4,819 m horizontal works

Slate, sandstone, and conglomerate

T-50 – T-80 Electrical draft engineSalzgitter TL-800 Loader“Panzer” ELFO Conveyor belt800 mm wide conveyor belts

350 m of shafts and 4,819 m of horizontal works for Hunosa

9,574,122 €

Mieres

Asturias

Mining works.Galleries and shafts

End: 05/1999

Start: 04/1991

Owner: Hunosa

SAN NICOLÁS SHAFT

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

17

LOCATIONANDADDITIONALINFORMATION

Page 21: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Width: 20 m Height: 6 m

Length: 200 m

Slate

Jumbo H-352Wagner ST-6 and ST-8 loaderGHH MK 25 Dumper Dry Way Aliva Gunner

200 m of mining chambers in Riodolas Underground Quarry for Pizarras Expiz, S.A.

1,466,469 €

Riodolas

Orense

Mining chambers for the excavation of inner slate

End: 03/1999

Start: 06/1998

Owner: Pizarras Expiz, S.A.

RIODOLAS UNDERGROUND QUARRY

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

18

LOCATIONANDADDITIONALINFORMATION

Page 22: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Drill and blast

Section: 25 m2.

Length: 1,200 m

Granadiorites. Calcium silicate skarn

L2C Jumbo Smaller Normet PK-6000 trucksWagner ST-6Putzmeister WKM-103 Robot

Excavation of the main access ramp to the deposit formed by skarn with mineralisation giving gold and copper.

From this access galleries surveys are performed of all of the mineral mass.

9,000,000 €

Arnea, Escuries

Halkidiki

Greece

Mining tunnel

End: 1998

Start: 1997

Owner: TVX

SKOURIES MINE

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

19

LOCATIONANDADDITIONALINFORMATION

Page 23: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Gallery pilot and pyramid cut.Drill and blast

Section: 160 m2

Length: 596 m

Slate

H352 Jumbo drillST-8 loaderPK 6000 DumperWagner ST-6 loaderGHH MK 25 Dumper Dry Way Aliva Gunner

596 m of mining chambers in Odollo Underground Quarry for Pizarras Expiz, S.A.

2,373,998 €

Puente Domingo Flores

León

Mining chamber for the excavation of inner slate

End: 08/1998

Start: 10/1997

Owner: Pizarras Expiz, S.A.

ODOLLO UNDERGROUND QUARRY

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

20

LOCATIONANDADDITIONALINFORMATION

Page 24: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Width: 20 m Height: 6 m

Length: 150 m

100% slate with high silica contentwith subhorizontal location < 100

Smaller machineryST6 and ST8 loadersMK25 Dumpers Dry method guniting3 m3 automatic concrete mixersJumbos H-352

150 m of mining chambers in Odollo Underground quarry for Pizarras Expiz, S.A.

450,000,000/600,000,000 €

La Cabrera

León

Mining chamber for the excavation of inner slate

End: 04/1998

Start: 10/1997

Owner: Pizarras Expiz, S.A.

ODOLLO AND RIODOLAS UNDERGROUND QUARRY

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

21

LOCATIONANDADDITIONALINFORMATION

Page 25: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Section: 25 m2

Length: 1,000 m

Calcium magnesites and carbonated limestone

Tamrock Minimatic Jumbo Wagner ST-6 loaderDumper GHH

1,000 m drainage gallery in the Río Narcea Drainage Gallery for Río Narcea Gold Mines, S.A.

1,424,399 €

Boinas

Asturias

Deepening of the well on slopes

End: 09/1997

Start: 02/1997

Owner: Río Narcea Gold Mines, S.A.

RÍO NARCEA DRAINAGE GALLERY

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

22

LOCATIONANDADDITIONALINFORMATION

Page 26: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Length: 251 m

Section: 15 m2

Slate and carboniferous sandstone

Boomer 352 JumboAliva 252 guniting machineGHH MK 25 trucks

251 m drainage gallery in the La Robla Drainage Gallery for Hullera Vasco Leonesa, S.A.

1,730,915 €

La Robla

León

Gallery drainage

End: 05/1997

Start: 02/1996

Owner: Hullera Vasco Leonesa, S.A.

LA ROBLA DRAINAGE GALLERY

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

23

LOCATIONANDADDITIONALINFORMATION

Page 27: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Section: 14 m2

Length: 300 m shaft/6,623 m horizontal works

Coal

T-50 – T-80 Electrical draft engineSalzgitter TE-800 loader“Panzer” EKF-0 Conveyor beltZitron winch800 mm wide conveyor belts

300 m shaft and 6,623 m of horizontal works for Hunosa

12,483,021 €

Moreda Aller

Asturias

Mining works.Galleries and shafts

End: 05/1997

Start: 07/1990

Owner: Hunosa

SAN ANTONIO SHAFT

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

24

LOCATIONANDADDITIONALINFORMATION

Page 28: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Section: Rectangular

Length: 180 m

Pyrite

Wagner ST-6C and ST-8A loadersAliva 252 guniting machine

180 m deep Shaft for Minas de Riotinto, S.A.

84,145 €

Riotinto

Huelva

Repairsto shaft loaders

End: 11/1995

Start: 08/1995

Owner: Minas de Riotinto, S.A.

ALFREDO SHAFT

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

25

LOCATIONANDADDITIONALINFORMATION

Page 29: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Section: 15 m2

Length: 100 m

Coal

Panzer EKFO600 mm wide conveyor beltSalpilterr TL-800 loader

100 m of mining tunnels and galleries in Pedraforca mines for Minas de Pedraforca, S.A.

138,234 €

Pedraforca

Barcelona

Coal exploitation

End: 06/1995

Start: 01/1994

Owner: Minas de Pedraforca, S.A.

PEDRAFORCA MINES

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

26

LOCATIONANDADDITIONALINFORMATION

Page 30: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Diameter: 6.5 m

Length: 1,360 m

Coal

1000 kw extraction machineryD.H. 3 boomer jumbo drill800 l loading polyp 4 m3 cage

Several different shafts for a total length of 1,360 m for Hullera Vasco Leonesa, S.A.

40,249,780 €

La Pola de Gordón

León

Shaft

End: 03/1995

Start: 11/1991

Owner: Hullera Vasco Leonesa, S.A.

SANTA LUCÍA/TABLIZA SHAFTS

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

27

LOCATIONANDADDITIONALINFORMATION

Page 31: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Mechanical methods

Section: 40 m2

Length: 2,416 m

Potash

AM-75 roadheader H-125 Jumbo drillST-5 ST-8A Wagner Loaderpk-6000 Dumper GHH MK 25

Execution of mining tunnels and galleries in the Sallent mines for Potasas Llobregat, S.A.

7,170,074 €

Sallent

Barcelona

Tunnels and mining galleries

End: 08/1994

Start: 07/1992

Owner: Potasas Llobregat, S.A.

SALLENT MINES

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

28

LOCATIONANDADDITIONALINFORMATION

Page 32: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Mechanical methods

Length: 569 m

Section: 40 m2

Potash

AM-75 roadheader H-125 Jumbo ST-5 ST-8A Wagner Loaderpk-6000 Dumper GHH MK 25

Creation of mining tunnels and galleries in the Balsareny mines for Potasas Llobregat, S.A.

631,063 €

Sallent

Barcelona

Tunnels and mining galleries

End: 09/1992

Start: 01/1992

Owner: Potasas Llobregat, S.A.

BALSARENY MINES

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

29

LOCATIONANDADDITIONALINFORMATION

Page 33: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Diameter: 6 m excavation/5 m free

Length: 193 m

Coal

Zitron ZEHZ 150/46/180 WinchJVF 3boomer Jumbo drill1.2 m3 cage300 litre loading polyp

193 m long shaft for Hunosa

Deepening of existing shaft from level -520 to level -740 m.

4,357,338 €

Sama de Langreo

Asturias

Mining works.Galleries and shafts

End: 09/1992

Start: 07/1990

Owner: Hunosa

FONDÓN SHAFT

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

30

LOCATIONANDADDITIONALINFORMATION

Page 34: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Section: 12 - 20 m2

Length: 2,085 m

Sandstone and coal

T-50 – T-80 Electrical draft engineSalzgitter TE-800 loader“Panzer” EKF-0 Conveyor beltZitron winch1.200 mm wide conveyor belts

2,085 m of mining tunnels and galleries in Grupo Paulina Mine for Minero Siderúrgica de Ponferrada, S.A.

A 500-metre slope at 45%.

4,159,004 €

Caboalles de Arriba (Villablino)

León

Tunnels and mining galleries

End: 02/1992

Start: 06/1989

Owner: Minero Siderúrgica de Ponferrada, S.A.

PAULINA GROUP MINE

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

31

LOCATIONANDADDITIONALINFORMATION

Page 35: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Type

Project photos

Spain

Drill and blast

Section: Works with a section of 12 to 20 m2

Length: 3,480 m

Coal

T-50 – T-80 Electrical draft engine“Panzer” EKF-0 Conveyor beltSalzgitter EL 600 excavatorCT-2500 low-profile excavator1200 mm bandwidth conveyor belt

3,480 m of mining tunnels and galleries in Carrasconte Mine for Minero Siderúrgica, S.A.

A 500-metre slope at 45%.

TH-21 and TH-29 metal frames used.

7,031,841 €

Villablino

León

Tunnels and mining galleries

End: 01/1992

Start: 09/1987

Owner: Minero Siderúrgica de Ponferrada, S.A.

CARRASCONTE MINE

Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

32

LOCATIONANDADDITIONALINFORMATION

Page 36: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Start: 08/1989

End: 09/1991

Well digging with slopes

Asturias

Mieres

137 m long shaft for Hunosa

2,674,503 €

Salzgitter TE-800 excavatorPanzer EKF-0 chain transporter800 m chain width

Coal

Length: 137 m

Diameter: 6 m

Owner: Hunosa

SAN NICOLÁS – SHAFT No. 1

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

33

LOCATIONANDADDITIONALINFORMATION

Page 37: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

NATM. Drill and blast

Section: 25 m2

Length: 1,580 m

Sulphur

Minimatic 207 Jumbo Drill; Wagner ST-8 and ST-6 loaders; PK-6000 dumper; Jumbo Atlas Copco H-135; Pala F.Loader CT-1000; dumper GHH MK 25.2; transformers 1,500 kVA; pumps between 20 and 200 kW

Gallery of 1,200 m and 380 m. Mineral mass and experimental exploitation chamber.

4,928,299 €

Aznalcollar

Sevilla

Mine ramp

End: 06/1991

Start: 08/1989

Owner: Andaluza de Piritas, S.A.

AZNALCOLLAR MINES

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

34

LOCATIONANDADDITIONALINFORMATION

Page 38: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Type

Project photos

Project

Spain

Drill and blast

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

Section: Works with a section of 12 to 20 m2

Length: 11,318 m

Limestone

Tamrock Paramatic Jumbo drillATLAS H-125 Jumbo drillWagner ST-8 and ST-6 loadersToro 500GHH LF-12GHH DUMPER

11,318 m of mining tunnels and galleries in Bodovalle Mines for Agrupación Minera, S.A.

11,611,554 €

Gallarta

Vizcaya

Tunnels and mining galleries

End: 12/1990

Start: 05/1987

Owner: Agrupación Minera, S.A.

BODOVALLE MINES

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEETCONSTRUCTION DATA SHEET

35

LOCATIONANDADDITIONALINFORMATION

Page 39: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Diameter: Works with a section of 12 to 20 m2

Length: 200 m shaft/2,470 m horizontal works

Coal

T-50 – T-80 Electrical draft engineSalzgitter TL-800 Loader“Panzer” Conveyor belt800 mm wide conveyor beltsCavo excavators; JVF jumbo cover; Extractor winch; Loading fork; Raise Borer

200 m shaft and 2,470 m of horizontal works for Hunosa

4,507,590 €

Carbayin

Asturias

Shafts

End: 06/1990

Start: 01/1988

Owner: Hunosa

CANDÍN II SHAFT

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

36

LOCATIONANDADDITIONALINFORMATION

Page 40: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Type

Project photos

Project

Spain

STATUS GEOMETRY

Drill and blastMETHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

Section: Developments with a section of 12 to 20 m2

Length: 1,424 m

Sandstone, slate and coal

“Panzer” EKF-O Conveyor belt800 mm wide Conveyor beltSalzgittler EL 600 loaderT-50 and T-80 electric locomotiveCavo excavatorCT-2500 low-profile excavator

1,424 m of mining tunnels and galleries in La Miranda Mine for Minero Siderúrgica de Ponferrada, S.A.

TH-21 and TH-29 metal frames used.

2,596,372 €

Villablino

León

Tunnels and mining galleries

End: 12/1989

Start: 08/1986

Owner: Minero Siderúrgica de Ponferrada, S.A.

LA MIRANDA MINE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

37

LOCATIONANDADDITIONALINFORMATION

Page 41: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Type

Project photos

Spain

Drill and blast

Section: Works with a section of 12 to 20 m2

Length: 1,856 m

Anthracite

T-50 – T-80 Electrical draft engineSalzgitter TE-800 loader“Panzer” EKF-0 Conveyor beltZitron winch1.200 mm wide conveyor beltsCavo excavator

1,856 m of mining tunnels and galleries in Lumaco Mine for Minero Siderúrgica de Ponferrada, S.A.

Slopes executed.

2,782,686 €

Villablino

León

Tunnels and mining galleries

End: 11/1989

Start: 10/1987

Owner: Minero Siderúrgica de Ponferrada, S.A.

LUMAJO MINE

Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

38

LOCATIONANDADDITIONALINFORMATION

Page 42: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Section: 12 - 20 m2

Length: 147 m

Sandstone and coal

T-50 – T-80 Electrical draft engineSalzgitter TE-800 loader“Panzer” EKF-0 Conveyor beltZitron winch800 mm wide conveyor belts

147 m of mining tunnels and galleries in Grupo Lumajo mines for Minero Siderúrgica de Ponferrada, S.A.

1,870,420 €

Lumajo (Villablino)

León

Mining works.Galleries and shafts

End: 06/1989

Start: 05/1988

Owner: Minero Siderúrgica de Ponferrada, S.A.

LUMAJO GROUP MINES

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

39

LOCATIONANDADDITIONALINFORMATION

Page 43: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

mININg

Project photos

Spain

Drill and blast

Diameter: 9 - 12 m2

Length: 134 m

Coal

Zitron ZEHZ 150/46/180 WinchJVF 3boomer Jumbo drill 1.2 m3 cage300 litre loading polyp

134 m long shaft for Hunosa

4,507,590 €

Sama de Langreo

Asturias

Deepening of existing shaft

End: 02/1989

Start: 12/1988

Owner: Hunosa

MARÍA LUISA SHAFT

Type Project

STATUS GEOMETRY

METHODOF TUNNELING

TUNNEL EQUIPMENT

GEOLOGY ANDGEOTECHNICAL DATA

STRUCTURE

COUNTRY

PROVINCE

PLACE

BUDGET(EXCLUDING VAT)

CONSTRUCTION DATA SHEET

40

LOCATIONANDADDITIONALINFORMATION

Page 44: 6 Mineria ING - Home - OSSA Construction, Energy and Mining. Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,

OSSA, Obras Subterráneas

Calle Isla Graciosa 1, 2ª Planta - Puerta 428703 San Sebastián de los Reyes (Madrid)Spain

T. +34 91 782 34 00F. +34 91 562 42 98

www.ossaint.com