    6 - Project Time Management

    - 6Unit 6

    -6

  • 7/28/2019 6- Project Time Management

    2/91

    Agenda

    1. Define Activities .

    2. Sequence

    Activities.

    3. Estimate Activity

    Resources .

    4. Estimate Activity

    Durations.5. Develop Schedule.

    6. Control Schedule.

    .1.

    .2.

    .3. .4

    .

    .5.

    .6.

    2

  • 7/28/2019 6- Project Time Management

    3/91

    6 - Project Time Management

    - 66.1 Define Activities:

    The process of identifying the specific actions to be

    performed to produce the project deliverables.

    6.2 Sequence Activities:

    The process of identifying and documenting

    relationships among the project activities.

    6.3 Estimate Activity Resources:

    The process of estimating the type and quantities of

    material, people, equipment, or supplies required to

    perform each activity.

    6.4 Estimate Activity Durations:

    The process of approximating the number of work

    periods needed to complete individual activities with

    estimated resources.

    6.5 Develop Schedule:

    The process of analyzing activity sequences, durations,

    resource requirements, and schedule constraints to

    create the project schedule.

    6.6 Control Schedule:

    The process of monitoring the status of the project to

    update project progress and managing changes to the

    schedule baseline.

    1-6:

    .

    2-6:

    .

    3-6:

    .

    4-6:

    .

    5-6:

    .

    6-6:

    .

  • 7/28/2019 6- Project Time Management

    4/91

    4

    0.00

    0.05

    0.10

    0.15

    0.20

    0.25

    0.30

    0.35

    0.40

    Project Formation Early Phases Middle Phases End Phases

    Schedules

    Priorities

    Manpower

    Technical opinions

    Procedures

    Cost

    Personality

    conflicts

    20%

    17%

    14% 15% 13%10% 11%

    0.00%

    5.00%

    10.00%

    15.00%20.00%

    25.00%

    Schedules Priorities Manpow er Technical

    opinions

    Proc edures Cos t Pers onality

    conflicts

    15%

    17

    %

    23%

    27

    %

    20

    %

    17%

    14

    %

    15%

    13

    %

    10%

    11

    %

    Conflicts in Projects

  • 7/28/2019 6- Project Time Management

    5/91

    Reasons For Updating Examples

    - Controlling is monitoring, updating and corrective

    actions.

    Unforeseen events that causes delay.

    Errors in activities duration and

    network logic.

    New information available( e.g.,underground conditions).

    Procurement delays.

    Change in scope and/or design.

    Available for craftsmen.

    Accidents in equipment, employees,etc.

    Unexpected weather, flood, storm,

    etc.

    New people involved in the project.

    ,.

    .

    .

    ( . )

    .

    .

    .

    /.,,

    ....

    .

    5

  • 7/28/2019 6- Project Time Management

    6/91

    Frequency of Updating

    Three methods for defining

    Updating Intervals

    Uniform intervals (e.g., Monthly,

    Weekly):

    Advantages : Becomes routine & Fit

    easily with business reportingperiods( labor payment schedule,

    accounting periods, project status

    reports to owners).

    Project milestones:

    Disadvantage : milestones tend to be

    random & variable. Intervals of decreasing lengths:

    Reasons : Criticality of the project

    increases toward the end of the

    project.

    :

    ::

    (

    ,,,

    .)

    ()::

    .:

    :.

    6

  • 7/28/2019 6- Project Time Management

    7/91

    Planning & Scheduling

    Planning : What you want to do (

    Activities ).

    How you will do it ( Methods,Procedures, Materials,

    Sequence of Activities). Where you will do it.

    Who will do it ( Men,Machines ).

    Scheduling :

    When it will be done (Network or Bar Chart to ServeAs an Operating Time TableWith An Estimate ofCompletion Dates) .

    :(. )(,

    ,,.)

    .

    (. )

    :(

    ,(.

    .

    7

  • 7/28/2019 6- Project Time Management

    8/91

    6.1 Define Activities ( Planning )

    1-6()

    DefineActivities is theprocess ofidentifying thespecific actionsto be performed

    to produce theprojectdeliverables.

    .8

  • 7/28/2019 6- Project Time Management

    9/91

    Activities vs. WBS The Create WBS process

    identifies the deliverables at thelowest level in the WorkBreakdown Structure, the workpackage.

    Project work packages aretypically decomposed intosmaller components calledactivities that represent the worknecessary to complete the workpackage.

    Activities provide a basis forestimating, scheduling executing,and monitoring and controllingthe project work ( As Needed ) .

    ().

    ).)

    .

    9

  • 7/28/2019 6- Project Time Management

    10/91

    10

    6.1 Define Activities

    6-1

    1.Scope baseline

    2.Enterprise

    environmental

    factors

    3.Organizational

    process assets

    Inputs1.Decomposition

    2.Rolling wave

    planning

    3.Templates

    4.Expert judgment

    Tools & Techniques

    1.Activity list

    2.Activity

    attributes

    3.Milestone list

    Outputs

    Source: PMBOK Guide Fourth Edition, page 133

    .1. .2

    .

    .3

    .

    Inputs

    .1.

    .2.

    .3.

    .4.

    Tools & Techniques

    .1. .2.

    .3(. )

    Outputs

  • 7/28/2019 6- Project Time Management

    11/91

    6.1 Define Activities

    6-1

    1. Scope baseline

    2. Enterpriseenvironmental factors

    3. Organizationalprocess assets:

    Existing formal andinformal activityplanning-relatedpolicies, proceduresand guidelines.

    Lessons learnedknowledge base.

    .1.

    .2.

    .3.

    .

    .

    11

  • 7/28/2019 6- Project Time Management

    12/91

    6.1 Define Activities

    6-1

    1. Decomposition

    2. Rolling waveplanning

    3. Templates

    4. Expertjudgment

    .1.

    .2 .

    .3.

    .4.

    12

  • 7/28/2019 6- Project Time Management

    13/91

    6.1 Define Activities

    1- 6

    1. Activity list

    2. Activityattributes

    3. Milestonelist

    .

    .

    (.)

    13

  • 7/28/2019 6- Project Time Management

    14/91

    Activity List The activity list is a

    comprehensive listincluding all scheduleactivities required on theproject.

    The activity list includesthe activity identifier anda scope of workdescription for each

    activity in sufficient detailto ensure that projectteam membersunderstand what work isrequired to be completed.

    .

    .

    14

  • 7/28/2019 6- Project Time Management

    15/91

    Activity List,

    533

    () 1 . 2 02 . 3 203 . 4 754 . 5 305 . 6 106 . 7 57 . 8 208 . 9,12 259 . 10 35

    10 . 11 3011 . 12 2012 . 13,14,15 9013 . 19 2014 . 19 2015 . 16,19 2016 . 17 1017 . 18 2518 . 23 2019 . 20,22 12020 . 21,22 12021 . 22 522 23 10

    23 - 0

  • 7/28/2019 6- Project Time Management

    16/91

    Activity Attributes Responsibility (who will

    do the work).

    Geographic Area (where

    the work will beperformed).

    Activity Type (summary

    or detailed).

    WBS Classification (for

    ordering and sorting).

    (.)

    (. )

    (. )

    (

    . )16

  • 7/28/2019 6- Project Time Management

    17/91

    Milestones list()

    A milestone is a

    significant point or event

    in the project.

    A milestone list identifiesall milestones and

    indicates whether the

    milestone is mandatory,

    such as those required bycontract, or optional,

    such as those based upon

    historical information.

    ()

    .

    .17

  • 7/28/2019 6- Project Time Management

    18/91

    Milestones list()

    Significant events within the project

    schedule .

    They are not work activities .

    There are no duration for the Milestone ,

    duration = 0 .

    Summary of project milestones included

    in the project charter .

    The customer , sponsor and project

    manager may impose milestone (s) .

    Uses as checkpoints to control the project

    .

    When works goes well that means themilestone related to that work has been

    meet .

    A list of milestones becomes part of the

    PM plan and is included in the project

    scope management plan and WBS

    dictionary .

    .

    .,=0.

    .,,

    ..

    .

    .18

  • 7/28/2019 6- Project Time Management

    19/91

    Scheduling Techniques

    Bar Chart(Gantt Chart).

    Milestone Chart: For reporting to Management.

    Milestones is Important eventand has no duration.

    Networking : Arrow Diagramming

    Method(ADM).

    Precedence DiagrammingMethod(PDM).

    Program Evaluation and Review

    Technique(PERT). Graphical Evaluation and

    Review Technique(GERT) (Allowfor looping, repetition, andconditional branches).

    .

    :.

    .:

    .

    .

    (. )

    (( ),,. )

    19

  • 7/28/2019 6- Project Time Management

    20/91

    Bar Chart Gantt Chart

    - :

    ...

    .

    :(

    . )

    :..

    20

    Advantages: Easy to understand.

    Easy to prepare.

    Easy to update.

    Shows Progress or statusbetter than networks.

    Example: Comparesplanned & actual activitiesbar (Project Progress).

    Disadvantages : Unclear relationships.

    Weak project control.

  • 7/28/2019 6- Project Time Management

    21/91

    Bar Chart Gantt Chart

    -

    21

    654321

    DurationActivity

    2A3B

    3C

    1D

  • 7/28/2019 6- Project Time Management

    22/91

    Milestones

    22

    ACTIVITY Q3 Q4 Q1 Q2 Q3 Q4 Q1

    ConceptEn ineerinProcurementConstruction

    MCClosin

    20072006

  • 7/28/2019 6- Project Time Management

    23/91

    Arrow Diagramming Method

    Arrow relationships or activityon arrow

    .

    23

    1

    2

    3

    4

    5

    6

    7

    Activity

    A

    B D

    C

    E

    G

    FEVENT

    Allow One Relationship

    Finishto Start (FS)

    Dummy Activity

    (FS)

  • 7/28/2019 6- Project Time Management

    24/91

    Precedence Diagramming Method

    Precedence relationships or Activity on Node Method.

    24

    Allow Activities overlapping by having 3 or

    more relationships :

    1. Start-to-Start (SS).

    2. Finish-to-finish (FF).

    3. Start-to-Finish (SF).

    4. Finish-to-Start (FS).

    A

    2

    B

    3

    C

    3

    D

    3

    E

    5

    F

    7

    G

    5

    FS3 (or Lag=3)

    FF 2

    SS1

    FS

    Activity

    :

    .1.

    .2.

    .3.

    .4.

  • 7/28/2019 6- Project Time Management

    25/91

    6.2 Sequence Activities ( Planning )2.6()

    SequenceActivities is theprocess of

    identifying anddocumentingrelationships

    among theprojectactivities.

    .

    25

  • 7/28/2019 6- Project Time Management

    26/91

    26

    6.2 Sequence Activities2.6

    1. Activity list

    2. Activity attributes

    3. Milestone list

    4. Project scope

    statement

    5. Organizational process

    assets

    Inputs1. Precedence

    diagramming method

    (PDM)

    2. Dependency

    determination

    3. Applying leads and

    lags4. Schedule network

    templates

    Tools & Techniques

    1. Project schedule

    network diagrams

    2. Project document

    updates

    Outputs

    Source: PMBOK Guide Fourth Edition, page 136

    .1.

    .2.

    .3(.)

    .4.

    .5.

    Inputs

    .1

    (PDM). .2(. ).3

    .

    .4.

    Tools & Techniques

    .1

    .

    .2.

    Outputs

  • 7/28/2019 6- Project Time Management

    27/91

    6.2 Sequence Activities2.6

    1. Activity list

    2. Activityattributes

    3. Milestone list

    4. Project scopestatement

    5. Organizationalprocess assets

    .1.

    .2.

    .3(.)

    .4.

    .5.

    27

  • 7/28/2019 6- Project Time Management

    28/91

    6.2 Sequence Activities2.6

    1. Precedencediagrammingmethod (PDM) .

    2. Dependencydetermination .

    3. Applying leads

    and lags .4. Schedule

    networktemplates

    .

    .1(PDM).

    .2 (. )

    .3

    ..4

    .28

  • 7/28/2019 6- Project Time Management

    29/91

    Precedence Diagramming Method (PDM)

    (PDM).

    PDM is a method used inCritical Path Methodology(CPM) for constructing aproject schedule networkdiagram.

    It uses boxes or rectangles,

    referred to as nodes, torepresent activities, andconnects them with arrowsthat show the logicalrelationships that existbetween them.

    This technique is calledActivity-On-Node (AON) and isthe method used by mostproject management softwarepackages.

    (CPM)

    .

    .

    (AON)

    .

    29

  • 7/28/2019 6- Project Time Management

    30/91

    30

    Precedence Diagramming MethodPDM or AON

    (PDM)(AON)

    START

    A B

    C

    FINISH

    D

  • 7/28/2019 6- Project Time Management

    31/91

    Task Dependencies()

    Finish-to-start (FS) : The initiation of the successor activity

    depends upon the completion of the

    predecessor activity.

    Finish-to-finish (FF) : The completion of the successor activity

    depends upon the completion of the

    predecessor activity.

    Start-to-Start (SS) : The initiation of the successor activity

    depends upon the initiation of thepredecessor activity.

    Start-to-finish (SF) : The completion of the successor activity

    depends upon the initiation of the

    predecessor activity.

    (FS: )

    .

    (FF):

    (SS):

    .

    (SF):

    .

    31

  • 7/28/2019 6- Project Time Management

    32/91

    32

    Task Dependencies()

    Type of interdependency or Precedence Relationship() Description

    Finish to start (FS)

    Task 1 has to finish for Task 2 to start

    (FS)

    ()12Start to Start (SS)

    Task 1 has to start for Task 2 to start

    (SS)

    ()12

    Finish to Finish (FF)

    Task 1 has to finish for Task 2 to finish(FF)

    ()12

    Start to Finis h (SF)

    Task 1 has to start for Task 2 to finish

    -((SF)

    ()12

    1

    2

    1

    2

    1

    2

    1

    2

  • 7/28/2019 6- Project Time Management

    33/91

    Dependency Determination()

    Three types ofdependencies areused to define the

    sequence amongthe activities:

    Mandatorydependencies

    Discretionarydependencies

    Externaldependencies

    :

    ..

    .33

  • 7/28/2019 6- Project Time Management

    34/91

    Dependency Determination()

    Mandatory Dependencies (HardLogic): Are inherent in the nature of

    work(Can involve physicallimitations).

    Example #1: Putting up a dry wallbefore painting it.

    Example #2: Design a product thenmanufacture it.

    Discretionary Dependencies(Soft Logic or preferred logic): Are fully documented since they

    can create arbitrary total floatvalues and can limit laterscheduling options.

    Are defined by the projectmanagement team(Example: BestPractices).

    Example : Procurement can begin atany time after the preparation of thebill of materials.

    (:)

    (. )1:.

    2:.

    (: )

    .

    (:. )

    :.

    34

  • 7/28/2019 6- Project Time Management

    35/91

    Dependency Determination()

    External Dependencies : Involves a relationship

    between project activitiesand non - project activities(that are not under thedirect control of theproject manager).

    Example : Testing of a software

    depends on the delivery of

    a hardware from anexternal source.

    A subcontractors activityon your Critical PathMethod Network.

    :

    (

    .)

    :

    .

    .

    35

  • 7/28/2019 6- Project Time Management

    36/91

    Leads and Lags()

    A lead allows anacceleration of

    the successoractivity.

    A lag directs a

    delay in thesuccessoractivity.

    .

    .

    36

  • 7/28/2019 6- Project Time Management

    37/91

    37

    Lag Time Lag Time : is a delay between a task and its predecessor. It is

    usually expressed using a specific amount of time.

    :()..

    1

    2FS = +2 Days

  • 7/28/2019 6- Project Time Management

    38/91

    38

    Lead Time : is an overlap between a task and its predecessor. Inproject management software, lead time may be expressed as anegative number in the lag field.

    :().,.

    1

    2

    FS = - 2 Days

    Lead Time

  • 7/28/2019 6- Project Time Management

    39/91

    Relationships Between Activities according to Lag and Lead

    39

    Activity A

    Activity B

    Activity A

    Activity B

    Activity A

    Activity B

    Activity A

    Activity B

    Activity A

    Activity B

    Activity A

    Activity B

    Activity A

    Activity B

    Activity A

    Activity B

    Activity A

    Activity B

    FS = 0

    FS = +?

    FS = -?

    SS = 0

    SS = +?

    SS = -?

    FF = 0

    FF = +?

    FF = -?

  • 7/28/2019 6- Project Time Management

    40/91

    6.2 Sequence Activities2.6

    1. Project schedule

    network diagrams

    2. Project document

    updates

    Activity lists

    Activity

    attributes

    Risk register

    .

    .

    .40

  • 7/28/2019 6- Project Time Management

    41/91

    6.3 Estimate Activity Resources ( Planning )

    6-3()

    Estimate ActivityResources is theprocess ofestimating the typeand quantities ofmaterial, people,equipment or

    supplies required toperform eachactivity.

    .

    41

  • 7/28/2019 6- Project Time Management

    42/91

    42

    6.3 Estimate Activity Resources6-3

    1. Activity list

    2. Activity attributes

    3. Resource calendars

    4. Enterprise

    environmental factors

    5. Organizational process

    assets

    Inputs1. Expert judgment

    2. Alternatives analysis

    3. Published estimating

    data

    4. Bottom-up estimating

    5. Project management

    software

    Tools & Techniques1. Activity resource

    requirements

    2. Resource breakdown

    structure

    3. Project document

    updates

    Outputs

    Source: PMBOK Guide Fourth Edition, page 142

    .1.

    .2.

    .3.

    .4.

    .5.

    Inputs

    .1.

    .2.

    .3

    .4(. )

    .5.

    Tools & Techniques

    .1.

    .2.

    .3.

    Outputs

  • 7/28/2019 6- Project Time Management

    43/91

    6.3 Estimate Activity Resources6-3

    1. Activity list

    2. Activity attributes

    3. Resourcecalendars

    4. Enterpriseenvironmental

    factors

    5. Organizationalprocess assets

    .1.

    .2.

    .3.

    .4

    ..5

    .43

  • 7/28/2019 6- Project Time Management

    44/91

    6.3 Estimate Activity Resources6-3

    1. Expert judgment .

    2. Alternativesanalysis .

    3. Publishedestimating data .

    4. Bottom-upestimating .

    5. Projectmanagementsoftware .

    .1.

    .2.

    .3.

    .4(

    . ).5

    .44

  • 7/28/2019 6- Project Time Management

    45/91

    6.3 Estimate Activity Resources6-3

    1. Activityresourcerequirements

    2. Resourcebreakdownstructure

    3. Projectdocumentupdates

    .1.

    .2.

    .3.

    45

  • 7/28/2019 6- Project Time Management

    46/91

    Activity Resource Requirements Identifies the types andquantities of resources

    required for each activity in awork package.

    These requirements can thenbe aggregated to determinethe estimated resources for

    each work package. The amount of detail and thelevel of specificity of theresource requirementsdescriptions can vary byapplication area.

    The resource requirementsdocumentation for eachactivity can include the basisof estimate for each resource,as well as the assumption thatwere made in determiningwhich types of resources areapplied, their availability andwhat quantities are used.

    .

    .

    .

    .46

    kd

  • 7/28/2019 6- Project Time Management

    47/91

    Resource Breakdown Structure The Resource Breakdown

    Structure is a hierarchicalstructure of the identifiedresources by resourcecategory and resource type.

    Resource categories include

    labor, material, equipment,and supplies.

    Resource types can include theskill level, grade level or otherinformation as appropriate tothe project.

    The resource breakdownstructure is useful fororganizing and reportingproject schedule data withresource utilizationinformation.

    .

    .

    .

    .

    47

    j d

  • 7/28/2019 6- Project Time Management

    48/91

    Project Document Updates Activity list .

    Activityattributes .

    Resourcecalendars .

    .

    .

    48

  • 7/28/2019 6- Project Time Management

    49/91

    6.4 Estimate Activity Durations ( Planning )6-4()

    Estimate Activity

    Durations is the

    process of

    approximating thenumber of work

    periods needed to

    complete individualactivities with

    estimated resources.

    .

    49

    6 4 E i A i i D i

  • 7/28/2019 6- Project Time Management

    50/91

    50

    1. Activity list

    2. Activity attributes

    3. Activity resource

    requirements

    4. Resource calendars

    5. Project scope statement

    6. Enterprise environmental

    factors7. Organizational process

    assets

    Inputs1. Expert judgment

    2. Analogous estimating

    3. Parametric estimating

    4. Three-point estimates

    5. Reserve analysis

    Tools & Techniques

    1. Activity duration estimates

    2. Project document updates

    Outputs

    Source: PMBOK Guide Fourth Edition, page 146

    6.4 Estimate Activity Durations6-4

    .1.

    .2. .3.

    .4.

    .5.

    .6.

    .7.

    Inputs

    .1.

    .2.

    .3.

    .4.

    .5.

    Tools & Techniques

    .1.

    .2.

    Outputs

    A i i D i C d Eff

  • 7/28/2019 6- Project Time Management

    51/91

    Activity Duration Compared to Effort Elapsed time

    The time that shows onthe calendar. Includesthe holidays and weekends.

    Duration The number of working

    days. It does notinclude holidays orweek ends.

    Working time (Effort) The actualaggregated time. Itadds the working timeof all the involvedresource.

    :

    (. )

    .

    :.

    .(: )

    .

    . 51

  • 7/28/2019 6- Project Time Management

    52/91

    6.4 Estimate Activity Durations6-4

    1. Activity list2. Activity attributes

    3. Activity resourcerequirements

    4. Resource calendars

    5. Project scopestatement

    6. Enterprise

    environmental factors7. Organizational

    process assets

    .1.

    .2.

    .3.

    .4.

    .5.

    .6 .

    .7.

    52

  • 7/28/2019 6- Project Time Management

    53/91

    6.4 Estimate Activity Durations6-4

    1. Expert judgment

    2. Analogousestimating

    3. Parametricestimating

    4. Three-point

    estimates5. Reserve analysis

    .1.

    .2.

    .3.

    .4

    ..5.

    53

    A l E ti ti

  • 7/28/2019 6- Project Time Management

    54/91

    Analogous Estimating

    Actual duration of a

    previous, similar activity

    is basis for estimating the

    future activity.

    A form of expert

    judgment.

    Most reliable when:

    Activities are really similar. Individuals preparing the

    estimates have needed

    expertise.

    .

    .

    :

    .

    ().

    54

    P t i E ti ti

  • 7/28/2019 6- Project Time Management

    55/91

    Parametric Estimating Parametric estimating uses a

    statistical relationshipbetween historical data andother variables to calculate anestimate for activityparameters, such as cost,budget and duration.

    Activity durations can bequantitatively determined bymultiplying the quantity ofwork to be performed by laborhours per unit of work.

    This technique can produce

    higher levels of accuracydepending upon thesophistication and underlyingdata built into the model.

    ()

    .

    .

    .

    55

    Th P i t E ti t

  • 7/28/2019 6- Project Time Management

    56/91

    Three-Point Estimates

    This concept originatedwith the ProgramEvaluation and ReviewTechnique (PERT). PERTuses three estimates todefine an approximaterange for an activitysduration: Most likely . Optimistic . Pessimistic .

    PERT analysis calculatedan expected activityduration using a weightedaverage of these threeestimates.

    .(PERT)-(

    .)PERT

    .

    .

    .

    .

    PERT

    .

    56

    h ( b b l )

  • 7/28/2019 6- Project Time Management

    57/91

    Three-Point Estimates (Probabilistic Estimate)()

    57

    (ET) = OT + 4MT + PT

    6

    OT = Optimistic time PT = Pessimistic Time

    MT = Most likely time ET = Estimated time

    S.D. = Standard Deviation

    S.D. = PT OT

    6

    Final Time Estimat (FTE) = ET + -/ S.D

    h i i ( b bili i i )

  • 7/28/2019 6- Project Time Management

    58/91

    Three-Point Estimates (Probabilistic Estimate)()

    58

    (ET) = OT + 4MT + PT

    6

    OT = PT =

    MT = ET =

    S.D. =

    S.D. = PT OT

    6

    = ) ET( +\-

    Reserve Analysis

  • 7/28/2019 6- Project Time Management

    59/91

    Reserve Analysis

    Also called time buffer,

    reserve, or contingency.

    Added by project team toan activity as a recognitionof project risk.

    Either a percent ofestimated duration, or fixedduration.

    Should be documented.

    As more precise informationabout the project becomesavailable, the contingencyreserve may be

    .

    .

    %,.

    .

    .

    .

    59

    6 4 E i A i i D i

  • 7/28/2019 6- Project Time Management

    60/91

    6.4 Estimate Activity Durations6-4

    1. Activity

    duration

    estimates .2. Project

    documentupdates.

    .

    .

    60

    6 5 Develop Schedule ( Planning )

  • 7/28/2019 6- Project Time Management

    61/91

    6.5 Develop Schedule ( Planning )

    5-6() Develop Schedule is

    the process of analyzingactivity sequences,durations, resource

    requirements, andschedule constraints tocreate the projectschedule.

    Developing an

    acceptable projectschedule is often aniterative process.

    .

    .

    61

    6 5 Develop Schedule

  • 7/28/2019 6- Project Time Management

    62/91

    62

    6.5 Develop Schedule5-6

    1. Activity list

    2. Activity attributes

    3. Project schedule network

    diagrams

    4. Activity resource requirements

    5. Resource calendars

    6. Activity duration estimates

    7. Project scope statement8. Enterprise envi. factors

    9. Organizational process assets

    Inputs1. Schedule network analysis

    2. Critical path method

    3. Critical chain method

    4. Resource leveling

    5. What-if analysis

    6. Applying leads and lags

    7. Schedule compression

    8. Scheduling tool

    Tools & Techniques1. Project schedule

    2. Schedule baseline

    3. Schedule data

    4. Project Document Updates

    Outputs

    Source: PMBOK Guide Fourth Edition, page 152

    .1..2.

    .3.

    .4.

    .5(. )

    .6.

    .7.

    .8

    .9

    Inputs

    .1.

    .2.

    .3.

    .4.

    .5.

    .6.

    .7.

    .8.

    Tools & Techniques.1

    .

    .2.

    .3.

    .4.

    Outputs

    Schedule Constraints

  • 7/28/2019 6- Project Time Management

    63/91

    Schedule Constraints()

    Two categories ofconstraints aredirectly related to

    scheduleddevelopment:

    Imposed dates.

    Key events andmajormilestones.

    :

    (. )

    .63

    6 5 D l S h d l

  • 7/28/2019 6- Project Time Management

    64/91

    6.5 Develop Schedule

    6-5

    1. Activity list2. Activity attributes3. Project schedule network

    diagrams4. Activity resource

    requirements5. Resource calendars6. Activity duration

    estimates7. Project scope statement

    8. Enterprise environmentalfactors9. Organizational process

    assets

    .1.

    .2.

    .3.

    .4.

    .5(. )

    .6.

    .7.

    .8

    .9.

    64

    Calendars

  • 7/28/2019 6- Project Time Management

    65/91

    Calendars Project and

    resource calendarsidentify when workis allowed.

    Project calendarsaffect all resources.

    Resource calendars

    affect only thatresource or groupof resources.

    (

    . )

    .

    .

    65

    6 5 D l S h d l

  • 7/28/2019 6- Project Time Management

    66/91

    6.5 Develop Schedule

    6-5

    1. Schedule networkanalysis

    2. Critical path method

    3. Critical chain method

    4. Resource leveling5. What-if analysis

    6. Applying leads andlags

    7. Schedule compression8. Scheduling tool

    .1.

    .2.

    .3.

    .4.

    .5.

    .6.

    .7.

    .8.

    66

    Schedule Network Analysis

  • 7/28/2019 6- Project Time Management

    67/91

    Schedule Network Analysis Schedule Network Analysis is a

    technique that generates the

    project schedule.

    To calculate the early and late

    start and finish dates for the

    uncompleted portions of projectactivities.

    It employs various analytical

    techniques, such as:

    Critical path method

    Critical chain method

    What-if analysis

    Resource leveling

    .

    .

    :

    67

    Critical Path Method

  • 7/28/2019 6- Project Time Management

    68/91

    Critical Path Method

    The critical path method calculatesthe theoretical early start and finishdates, and late start and finish dateswithout regard for any resourcelimitations.

    This is done by performing a forwardand backward pass analysis through

    the schedule network. The resulting early and late start and

    finish dates are notnecessarily the

    project schedule; rather, they

    indicate the time periods within

    which the activity could be

    scheduled, given activity durations,

    logical relationships, leads, lags, and

    other known constraints.

    .

    .

    .

    68

    Float

  • 7/28/2019 6- Project Time Management

    69/91

    Float()

    Total Float: The amount oftime that an activity may be

    delayed from its early start

    without delaying the project

    finish date. Free Float: The amount of

    time that an activity can be

    delayed without delaying

    the early start of anyimmediately following

    activities.

    :

    .:

    ().

    69

    Calculating Path and Float

  • 7/28/2019 6- Project Time Management

    70/91

    Calculating Path and FloatForward Pass: Early Start (ES) = Total of task

    durations for all precedent(necessary) tasks

    Early Finish (EF) = ES + Task

    DurationBackward Pass:

    Late Finish (LF) = Last day ofproject Duration of sequential(necessary) tasks to end ofproject

    Late Start (LS) = LF TaskDuration

    Float

    = LF ES Task Duration

    :(ES= )

    (\)

    .

    (EF= )ES+ .(\: )

    (EF= )

    .

    (LS= )(EF).

    (F= )- ES LF

    70

    Task Coding Convention

  • 7/28/2019 6- Project Time Management

    71/91

    Task Coding Convention

    Early Start = ES

    =ES Early Finish= EF

    =EF Late Start = LS

    =LS Late Finish= LF

    =LF

    Duration = DU

    =DU

    71

    A

    EF

    LS LF

    ES

    DU

    1- Construct the Network Diagram

  • 7/28/2019 6- Project Time Management

    72/91

    72

    1- Construct the Network Diagram

    1

    CB

    A

    FE

    D

    G

    2- Apply the Task Duration

  • 7/28/2019 6- Project Time Management

    73/91

    73

    2 Apply the Task Duration

    2

    C1

    B3

    A1

    F6

    E6

    D3

    G2

    3- Calculate the Forward Pass

  • 7/28/2019 6- Project Time Management

    74/91

    74

    3 Calculate the Forward Pass

    3

    C

    54

    1

    B

    41

    3

    A

    10

    1

    F

    137

    6

    E

    71

    6

    D

    107

    3

    G

    1513

    2

    4- Calculate the Backward Pass

  • 7/28/2019 6- Project Time Management

    75/91

    75

    4 Calculate the Backward Pass

    4()

    C

    5

    9 10

    4

    1

    B

    4

    6 9

    1

    3

    A

    1

    0 1

    0

    1

    F

    13

    7 13

    7

    6

    E

    7

    1 7

    1

    6

    D

    10

    10 13

    7

    3

    G

    15

    13 15

    13

    2

    5- Calculate Floats

  • 7/28/2019 6- Project Time Management

    76/91

    76

    5 Calculate Floats

    5()

    C

    5

    9 10

    4

    1

    B

    4

    6 9

    1

    3

    A

    1

    0 1

    0

    1

    F

    13

    7 13

    7

    6

    E

    7

    1 7

    1

    6

    D

    10

    10 13

    7

    3

    G

    15

    13 15

    13

    2

    TF=5FF=0

    TF=0

    FF=0

    TF=0

    FF=0

    TF=0

    FF=0

    TF=5FF=2

    TF=3FF=3

    TF=0

    FF=0

    6- Determine The Critical Path

  • 7/28/2019 6- Project Time Management

    77/91

    77

    6 Determine The Critical Path

    6

    C

    5

    9 10

    4

    1

    B

    4

    6 9

    1

    3

    A

    1

    0 1

    0

    1

    F

    13

    7 13

    7

    6

    E

    7

    1 7

    1

    6

    D

    10

    10 13

    7

    3

    G

    15

    13 15

    13

    2

    TF=5FF=0

    TF=0

    FF=0

    TF=0

    FF=0

    TF=0

    FF=0

    TF=5FF=2

    TF=3FF=3

    TF=0

    FF=0

    Resource Leveling

  • 7/28/2019 6- Project Time Management

    78/91

    Resource Leveling

    Resource Leveling is

    necessary when resources areover-allocated such as whenthe resource is: Assigned to two or more

    activities during the same time

    period. Shared or critical required

    resources are only available atcertain times.

    Only available in limitedquantities.

    Resource leveling can oftencause the original critical pathto change.

    It mostly results in extendedschedule.

    :

    .

    (. )

    .

    .

    .

    78

    Resource Leveling

  • 7/28/2019 6- Project Time Management

    79/91

    79

    Resource Leveling

    2

    2

    3 Days

    2

    2

    4 Days

    BeforeAfter

    Resource Leveling

  • 7/28/2019 6- Project Time Management

    80/91

    80

    Resource Leveling

    2

    2

    3 Days

    2

    2

    4 Days

    What-If Scenario Analysis

  • 7/28/2019 6- Project Time Management

    81/91

    What If Scenario Analysis

    Calculation of multiple project

    durations with different sets of

    activity assumptions.

    What-if analysis using the logic

    in the network diagram.

    Monte Carlo Analysis:

    The most common technique.

    Distribution of probable results is

    defined for each activity, then

    used to determine the

    distribution of probable resultsfor the total project.

    Also used in Project Risk

    Management.

    .

    .

    :.

    ,.

    .

    81

    Schedule Compression

  • 7/28/2019 6- Project Time Management

    82/91

    Schedule Compression

    Fast tracking:A schedule

    compression technique inwhich phases or activitiesnormally performed insequence are performed in

    parallel.

    Crashing: A schedulecompression technique inwhich cost and schedule

    tradeoffs are analyzed todetermine how to obtainthe greatest amount ofcompression for the leastincremental cost.

    (:)

    .

    :

    .82

    6 5 Develop Schedule

  • 7/28/2019 6- Project Time Management

    83/91

    6.5 Develop Schedule

    6-5

    1. Project schedule: Milestones charts Bar charts Project schedule

    network diagrams

    2. Schedule baseline3. Schedule data4. Project document

    updates: Activity resource

    requirements

    Activity attributes Calendar Risk register

    .1:(.)(

    .).

    .2.

    .3.

    .4:.

    ..

    .

    83

    6.6 Control Schedule ( Controlling )

  • 7/28/2019 6- Project Time Management

    84/91

    6.6 Control Schedule ( Controlling )6-6()

    Control Scheduleis the process of

    monitoring the

    status of theproject to update

    project progress

    and managechanges to the

    schedule baseline.

    .

    84

    6.6 Control Schedule

  • 7/28/2019 6- Project Time Management

    85/91

    85

    6.6 Control Schedule6-6

    1. Project management plan

    2. Project schedule

    3. Work performance

    information

    4. Organizational process

    assets

    Inputs

    1. Performance reviews

    2. Variance analysis

    3. PM software

    4. Resource leveling

    5. What-if analysis

    6. Adjusting leads and lags

    7. Schedule compression

    8. Scheduling tool

    Tools & Techniques

    1. Work performance

    measurements

    2. Organizational process

    assets updates

    3. Change requests

    4. PM plan updates

    5. Project documents updates

    Outputs

    Source: PMBOK

    Guide Fourth Edition, page 160

    .1.

    .2 .

    .3.

    .4.

    Inputs

    .1.

    .2.

    .3.

    .4.

    .5

    .6.

    .7.

    .8.

    Tools & Techniques

    .1.

    .2 .

    .3.

    .4.

    .5.

    Outputs

    6.6 Control Schedule

  • 7/28/2019 6- Project Time Management

    86/91

    6.6 Control Schedule6-6

    1. Projectmanagementplan

    2. Project schedule3. Work

    performance

    information4. Organizationalprocess assets

    .1.

    .2

    ..3.

    .4.

    86

    6.6 Control Schedule

  • 7/28/2019 6- Project Time Management

    87/91

    6.6 Control Schedule6-6

    1. Performance reviews2. Variance analysis

    3. PM software

    4. Resource leveling5. What-if analysis

    6. Adjusting leads andlags

    7. Schedule compression8. Scheduling tool

    .1.

    .2.

    .3.

    .4. .5

    .6.

    .7.

    .8.

    87

    Performance Reviews

  • 7/28/2019 6- Project Time Management

    88/91

    Performance Reviews measure,compare, and analyze scheduleperformance such as actual startand finish dates, percentcomplete, and remainingduration for work in progress.

    If earned value management(EVM) is utilized the schedulevariance (SV) and scheduleperformance index (SPI) are usedto assess the magnitude ofschedule variations.

    An important part of schedulecontrol is to decide if theschedule variation requirescorrective action or not.

    .

    -EVM-(SV)

    (SPI).

    .

    88

    Variance Analysis

  • 7/28/2019 6- Project Time Management

    89/91

    y

    Schedule performancemeasurements (SV, SPI) are

    used to assess themagnitude of variation tothe original schedulebaseline.

    The total float variance is

    also an essential planningcomponent to evaluateproject time performance.

    Important aspects schedulecontrol include determiningthe cause and degree ofvariance relative to the

    schedule baseline anddeciding whether correctiveor preventive action isrequired.

    ((SPISV))

    .

    .

    .

    89

    6.6 Control Schedule

  • 7/28/2019 6- Project Time Management

    90/91

    6-6

    1. Work performancemeasurements :

    SV

    SPI

    2. Organizational process

    assets updates : Causes of variances

    Corrective action chosenand the reasons

    Other types of lessonslearned from project

    schedule control3. Change requests .

    4. PM plan updates .

    5. Project documentsupdates .

    .1.SVSPI

    .2..

    .

    .

    .3.

    .4.

    .5.

    90

  • 7/28/2019 6- Project Time Management

    91/91