+ All Categories
Home > Documents > 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H...

6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H...

Date post: 12-Jun-2018
Category:
Upload: hakiet
View: 213 times
Download: 0 times
Share this document with a friend
16
©Hawkins\Brown December 2011 29 6.0 Design Proposals
Transcript
Page 1: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 29

6.0 Design Proposals

Page 2: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 30

SPRING BRIDGE ROAD

Extg. Classroom

52.5sq.m

Extg. Classroom

52.9sq.mExtg. Classroom

24.5sq.m

Extg. Classroom

54.5sq.m

Extg. Storage

4sq.m

Extg. Storage

4sq.m

Extg. Cloak

4sq.m

Extg. Store18.7sq.m

Extg. Plant11.5sq.m

Extg. Girls

Changing

22sq.mExtg. Boys

Changing

28sq.m

Extg. ICT /

Library

82.5sq.m

Extg.

Classroom

55sq.m

Extg.

Kitchen

12.7sq.m

Extg.

Classroom

56.6sq.m

Extg. Hall

154sq.m

Extg. Store

3.1sq.m

Extg. Staff

WC4.5sq.m

Extg. Storage

31.7sq.m

Extg. DWC4.5sq.m

Repro10sq.m

Extg. Staff

WC9.9sq.m

Extg.

DWC4sq.m

Extg.

Medical

10.2sq.m

Extg. Staff Room

31.4sq.m

Extg. HT

Office15.3sq.m

Extg. Office

7.1sq.m

Extg.

General

Office13.8sq.m

Extg.

Entrance /

Reception

16.3sq.m

Extg. S

tore

1.8sq.m

Extg. Store

1.4sq.m

Extg. B

oiler

2.2sq.m

Extg. Circ9.9sq.m

Extg. Store

3.8sq.m

Extg. Boys

Toilet 14sq.m

Extg. Girls

Toilet 19sq.m

Extg. Circ

94sq.m Extg.

Store1sq.m

Extg. Store

1sq.m

Extg. Circ

8.4sq.m

NEW BROADWAY

6.1 Use and Amount: Existing Buildings6.0 Design Proposals

Plan of Existing Buildings and Site, Scale: 1.500 @ A3

Christ the Saviour Church

1

3

4

2

4

Areas of demolition:

GIA: 452 sqm

1. Existing cottage

2. Existing 1 storey toilet block

3. Existing 1 storey library and ICT suite

4. Existing staff block

Page 3: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 31

Copyright Hawkins\Brown Architects

No implied license exists. This drawing should not be used to calculate areas for the purposes of valuation. Do not scale this drawing. All dimensions to be checked on site by the contractor and such dimensions to be their responsibility. All work must comply with relevant British Standards and Building Regulations requirements. Drawing errors and omissions to be reported to the architect.

Revisions Project

Drawing

Drawn by Checked by

StatusJob Number

DateScale at A1 (A3)

RevDrawing No.

1:250 ( 1:500)

PlanningKey Stage 02 Site

PZ

December 2011

Proposed Site PlanPC

Christ the Saviour C of E Primary School�

1261

1261_DWG_PL_KS02-100

ColdWater

StoragePlant

BoilerPlant

+31190

+31220

+31220

Main

School

Entrance

NewBuilding

Entrance

1200

Hall Store

13sqm

Assembly Hall

226sqm

StagePrep. /

GroupSpace

20sqm

Reception

/General

Office

31sqm

Store

Kitchen

57sqm

Kitchen

Changing

/ Office

DWC

Year Two Classroom

(existingclassroom)

Library(existing

classroom)

Specialist Space

(existingclassroom)

Year Two Classroom

(existingclassroom)

SEN 29sqm

Existing Hall

195 sqm

3500

HotWater

StoragePlant

Covered External Area

Covered External Area

Covered External Area

Covered External Area

Covered External Area

Male Pupils W

C

Female Pupils WC

Servery

Application Boundary

Sp

ring Brid

ge Road

*refer to Landscape Masterplan

0 1 5 10m

6.1 Use and Amount: Proposed Buildings6.0 Design Proposals

Ground Floor Plan 1.500 @ A3

Ground Floor New build GIA 502m2

Refurbishment GIA (staff / entrance/ kitchen areas) 100m2

First FloorNew build GIA (main building) 331m2New build GIA (stair core ext.) 27m2

New build (external w’ways) 48m2+70m2

Refurbishment GIA (staff area) 82m2

Second FloorNew build GIA (main building) 331m2New build GIA (stair core ext.) 22m2

New build (external w’ways) 36m2+60m2

Third FloorNew build GIA (main building) 331m2New build GIA (stair core ext.) 16m2

New build (external w’ways) 36m2

Fourth FloorNew build GIA (main building core) 28m2New build (stair core ext.) 14m2

New build roof deck (external) 306m2

New build (stair core ext.) 14m2New build (external w’ways) 36m2

N

Site Boundary

New Building

Refurbishment Work

Page 4: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 32

+35030+35220

+34870

+35030

Year Two Classroom(existing classroom)

Year Three(existing classroom)

Year Three(existing classroom)

Year Two Classroom(existing classroom)

Year FourClassroom

55sqm

Year FourClassroom

55sqm

Year FourClassroom

55sqm

Year FourClassroom

55sqm

DWC

1:1 Space /Small Group

10sqm

Sto

re /

Clo

ak

Sto

re /

Clo

ak

Sto

re /

Clo

ak

Sto

re /

Clo

ak

Ref

uge

Staff Room60sqm

PD Space22sqm

SpecialistSpace (extg.music room)

Storage

+35030

Copyright Hawkins\Brown Architects

No implied license exists. This drawing should not be used to calculate areas for the purposes of valuation. Do not scale this drawing. All dimensions to be checked on site by the contractor and such dimensions to be their responsibility. All work must comply with relevant British Standards and Building Regulations requirements. Drawing errors and omissions to be reported to the architect.

Revisions Project

Drawing

Drawn by Checked by

StatusJob Number

DateScale at A1 (A3)

RevDrawing No.

1:100 ( 1:200)

Planning

Key Stage 02 Site

JOD

December 2011

First Floor PlanJT

Christ the Saviour C of E Primary School

1261

1261_DWG_PL_KS02-201

111220 Planning Issue P1

KeyNew build

Refurbishment

External Learning Space308sqm

Copyright Hawkins\Brown Architects

No implied license exists. This drawing should not be used to calculate areas for the purposes of valuation. Do not scale this drawing. All dimensions to be checked on site by the contractor and such dimensions to be their responsibility. All work must comply with relevant British Standards and Building Regulations requirements. Drawing errors and omissions to be reported to the architect.

Revisions Project

Drawing

Drawn by Checked by

StatusJob Number

DateScale at A1 (A3)

RevDrawing No.

1:100 ( 1:200)

Planning

Key Stage 02 Site

JOD

December 2011

Fourth Floor PlanJT

Christ the Saviour C of E Primary School

1261

1261_DWG_PL_KS02-204

111220 Planning Issue P1

KeyNew build

Refurbishment

Copyright Hawkins\Brown Architects

No implied license exists. This drawing should not be used to calculate areas for the purposes of valuation. Do not scale this drawing. All dimensions to be checked on site by the contractor and such dimensions to be their responsibility. All work must comply with relevant British Standards and Building Regulations requirements. Drawing errors and omissions to be reported to the architect.

Revisions Project

Drawing

Drawn by Checked by

StatusJob Number

DateScale at A1 (A3)

RevDrawing No.

1:100 ( 1:200)

Planning

Key Stage 02 Site

JOD

December 2011

Roof PlanJT

Christ the Saviour C of E Primary School

1261

1261_DWG_PL_KS02-205

111220 Planning Issue P1

KeyNew build

Refurbishment

Year Three(existing classroom)

Year Three(existing classroom)

Year FiveClassroom

55sqm

Year FiveClassroom

55sqm

Year FiveClassroom

55sqm

Year FiveClassroom

55sqm

DWC

1:1 Space /Small Group

10sqm

Sto

re /

Clo

ak

Sto

re /

Clo

ak

Sto

re /

Clo

ak

Sto

re /

Clo

ak

Ref

uge

+35030

External Learning Space

Copyright Hawkins\Brown Architects

No implied license exists. This drawing should not be used to calculate areas for the purposes of valuation. Do not scale this drawing. All dimensions to be checked on site by the contractor and such dimensions to be their responsibility. All work must comply with relevant British Standards and Building Regulations requirements. Drawing errors and omissions to be reported to the architect.

Revisions Project

Drawing

Drawn by Checked by

StatusJob Number

DateScale at A1 (A3)

RevDrawing No.

1:100 ( 1:200)

Planning

Key Stage 02 Site

JOD

December 2011

Second Floor PlanJT

Christ the Saviour C of E Primary School

1261

1261_DWG_PL_KS02-202

111220 Planning Issue P1

KeyNew build

Refurbishment

Year SixClassroom

55sqm

Year SixClassroom

55sqm

Year SixClassroom

55sqm

Year SixClassroom

55sqm

DWC

1:1 Space /Small Group

10sqm

Sto

re /

Clo

ak

Sto

re /

Clo

ak

Sto

re /

Clo

ak

Sto

re /

Clo

ak

Ref

uge

+35030

Copyright Hawkins\Brown Architects

No implied license exists. This drawing should not be used to calculate areas for the purposes of valuation. Do not scale this drawing. All dimensions to be checked on site by the contractor and such dimensions to be their responsibility. All work must comply with relevant British Standards and Building Regulations requirements. Drawing errors and omissions to be reported to the architect.

Revisions Project

Drawing

Drawn by Checked by

StatusJob Number

DateScale at A1 (A3)

RevDrawing No.

1:100 ( 1:200)

Planning

Key Stage 02 Site

JOD

December 2011

Third Floor PlanJT

Christ the Saviour C of E Primary School

1261

1261_DWG_PL_KS02-203

111220 Planning Issue P1

KeyNew build

Refurbishment

Site Boundary

New Building

Refurbishment Work

First Floor Plan; 1.250 @ A3 Second Floor Plan; 1.250 @ A3 Third Floor Plan; 1.250 @ A3

Roof Plan; 1.250 @ A3 Roof Plan; 1.250 @ A3

N

Page 5: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 33

The proposal comprises:

01 New Classroom Building New 4 storey classroom building with new hall, resource spaces, staff accommodation and roof top play

02 Entrance and Reception The existing Victorian tower will be reinstated as the focal point, front-door and main visitor entrance / reception. Associated internal refurbishment works to convert existing WC / kitchen areas into new entrance and reception.

03 Dining Hall The existing Victorian hall will be used as a refectory

04 Kitchen A new fully cooking kitchen will be built as part of the proposals

05 Galleried cloister New cloistered courtyard at heart of scheme with walkways which link new with existing and unify the buildings

06 Landscape Landscaping to whole site including new M.U.G.A., cycle parking, relocating the bin store and disabled parking bay.

07 Cycle Parking Covered and secure cycle parking at entrance to site.

The proposals have been developed to compliment the existing Victorian school buildings, not compete with them.

The intention is that the new classroom building will sit as a brick building, between the existing brick Victorian school buildings and the newer 60s brick buildings completing a more robust ‘outer shell’ to the quiet and protected playspace within.

New walkways provide solar shading to south facing existing classrooms whilst connecting both new and existing buildings and importantly, unifying the existing and disparate buildings giving a new identity for the newly amalgamated school.

Spring B

ridge R

oad

6.2 Layout and Scale6.0 Design Proposals

Site Boundary

Existing Building

New Building

21

3

5

7

7

76

4

Page 6: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 34

Section FF 1.200 @ A3

111115_1261_10_04_HB Markup_001

The section below shows how the proposed classroom building takes datums from the height of the existing school tower with a lightweight mesh playdeck screen on top of the building.

The section also explains the proposals in the context of the adjacent Christ the Saviour Church.

6.2 Layout and Scale6.0 Design Proposals

Grand Hall with stage and organ staircore / lift green link office entrance

Page 7: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 35

Section JJ 1.200 @ A3

Section JJ 1.500 @ A3

The sections below and adjacent show how the proposed classroom building relates to the committed Dicken’s Yard development.

Dicken’s Yard Proposed Classroom Building Existing School Buildings with Proposed WalkwaysSchool Lane

Section JJ 1.200 @ A3

Section JJ 1.500 @ A3

top lit specialist space and central

resource area

stair core new walkways

6.2 Layout and Scale6.0 Design Proposals

Page 8: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 36

6.0 Design Proposals6.3 Design Principles: Site Wide

Key Design Principles:

1. Create new ‘front-door’ and visitor entrance

2. Create new pupil entrance across church curtilage

3. New wide and varied playspace

4. Classroom building completes outer shell to Dicken’s Yard. New classroom building is pulled off existing Victorian tower.

5. Walkways connect existing and new buildings whilst providing much needed solar shading to south facing classrooms

1.

2.

3.

4.

5.

Page 9: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 37

6.0 Design Proposals6.3 Design Principles : Concept

‘U’ shaped organisation: a robust outer shell to Dicken’s Yard and the new town square

An animated courtyard: a softer inner shell Teaching and playspaces organised around central courtyard

Page 10: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 38

6.0 Design Proposals6.3 Design Principles: Extracting a motif from context

Hall clerestory windows

+

+

=

=

Hall end window

Tower windowGothic hall windows

Arched hall windows Huggenbergerfries Architekten; Clinic using prefab brick panels

Sergison Bates; Housing, Canning Town Brick with contrasting reveals

Maccreanor Lavington: PPC metal laser cut balustrade

Page 11: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 39

The building concept has been carefully derived from site analysis and the design principles outlined in section 6.3.

•Thenewwalkwaysprovidemuchneededsolarshading,hori-zontal circulation and importantly unify the existing and new eleva-tions. The balustrades pick up on the patterns found on the Gothic windows of the existing hall windows.

•Theproposedclassroombuildingrelatestotheadjacentbrickbuildings. Brighter window reveals animate the elevation and take clues from the existing Victorian school buildings.

01. Existing store reveals02. Huisip, Sergison Bates03. Existing store reveals 04. Illustrate metalwork pattern

01

02

6.4 Appearance - Concept6.0 Design Proposals

03

04

Page 12: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 40

01

6.5 Appearance - Materials6.0 Design Proposals

01 Classroom Building Facing brickwork to tone with existing brick buildings

02 New Windows & Doors 03 Walkways Perforated steel balustrades

04 MUGA / Playdeck Fencing Perforated PPC aluminium

05 Roof Playdeck area: refer Section 07

06 Photovoltaics On existing roof

04

0502

01

01 0401

01

03

04

04

05

06

06

Page 13: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 41

6.6 Sustainability6.0 Design Proposals

exhaust air/high level

mechanically vented classrooms

existing trees retained

proposed location of photovoltaic panels

proposed location of secured cycle storage

proposed location of mini CHP

Sustainability is a key issue and a fundamental part of the design. How the new buildings impact on the environment, their performance and maintenance will all be critical to the school’s success. The following measures will be integrated into the design:

Building PerformanceEnergy loss minimised by thermally efficient, well insulated •buildingsNatural ventilation is provided through actuated louvres•Good distribution of daylighting, reducing reliance on lighting •energyThe new classroom building is designed to achieve a BREEAM •‘very good’ rating

Construction waste and materials‘Considerate Constructors’ scheme•Specification of ‘green’ materials•

Waste minimisation and recycling (during building occupation)Space will be provided for segregated storage in classroom •and office areas (waste, recyclables etc)

Water usageWater saving toilets and taps•

BiodiversityRefer to Landscape Architect’s information for details•

Sustainable energyOn-site photovoltaics and a mini CHP will be used to achieve •carbon emission savings of 20% for the new classroom building

Bicycles

Provision for safe, weather-proof and secure storage for cycles•

The above should be read in conjunction with the Energy Statement by Hoare Lea which has been submitted in support of this application.

Page 14: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 42

6.7 Indicative Images: View of new visitor entrance and classroom building6.0 Design Proposals

Page 15: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 43

6.0 Design Proposals6.7 Indicative Images: View of new galleried courtyard

Indicative view of new courtyard in heart of school site

Page 16: 6.0 Design Proposals · 2015-06-30 · 12.7 s q.m E x tg . C l a ssr oo m 5 6 .6 s q .m E x g . H al 154 sq . m Extg . Sto r e ... Bridge Road *refer to Landscape Masterplan 0 1 5

©Hawkins\Brown December 2011 44

6.7 Indicative Images: View from new pupil entrance6.0 Design Proposals

Patterned metal balustrades


Recommended