6030 Bid Addendum Page 1 of 2 Addendum No.: 2 Date Of Addendum: May 22, 2018 CT DAS - 6030 (Rev. 02.01.18) 6000 – Bid Phase Forms CT DAS l Construction Services l Office of Legal Affairs, Policy, and Procurement GBCMHC Parking Garage Repairs 1635 Central Avenue Bridgeport, CT BI – MH – 121 Original Bid Due Date / Time: June 20 th 2018 1:00 PM Previous Addendums: Addendum #1 dated 5/7/2018 TO: Prospective Bid Proposers: This Addendum forms part of the “Contract Documents” and modifies or clarifies the original “Contract Documents” for this Project dated 12/1/17. Prospective Bid Proposers shall acknowledge receipt of the total number the Addenda issued for this Project on the space provided on Section 00 41 00 Bid Proposal Form. Failure to acknowledge receipt of the total number the Addenda issued for this Project on the space provided on Section 00 41 00 Bid Proposal Form shall subject Bid Proposers to disqualification. The following clarifications are applicable to drawings and specifications for the project referenced above. Item 1: A mandatory pre-bid meeting was held on May 17 th 2018 at 10:30am and the attendance log is attached. Item 2: Question: What are the allowable work hours for the project? Answer: Per Article 37 of the General Conditions section 00 72 13 37.1 No person shall be employed to work or be permitted to work more than eight (8) hours in any Day or more than forty (40) hours in any week for any Work provided in the Contract, in accordance with Connecticut General Statute Section 31-57. 37.2 The operation of such limitation of hours of work may be suspended during an emergency, upon the approval of the Commissioner, in accordance with Connecticut General Statute Section 31-57. The allowable construction activity time for construction in the City of Bridgeport is 7:00am to 6:00pm. Item 3: Question: Who is the contact person for the City of Bridgeport for all work performed in the City of Bridgeport streets? Answer: All work performed on city property is under the jurisdiction of City of Bridgeport. The contact person for the City of Bridgeport is Jon Urquidi – City Engineer: [email protected] Item 4: Question: Who is the contact person for the Bridgeport Water Pollution Control Authority (WPCA) for all work performed in the City of Bridgeport streets? Answer: All work performed on city property is under the jurisdiction of City of Bridgeport and all storm and sewer work connecting to the city system is under the jurisdiction of the Bridgeport WPCA. The contact person for the Bridgeport WPCA is Ravi Keerthy – WPCA Manager of Field Operations: [email protected]
Transcript
Page 1: 6030 Bid Addendum...6030 Bid Addendum Page 1 of 2 Addendum No.: 2 Date Of Addendum: May 22, 2018 CT DAS - 6030 (Rev. 02.01.18) 6000 – Bid Phase Forms CT DAS l Construction Services

6030 Bid Addendum

Page 1 of 2

Addendum No.: 2 Date Of Addendum: May 22, 2018

CT DAS - 6030 (Rev. 02.01.18) 6000 – Bid Phase Forms

CT DAS l Construction Services l Office of Legal Affairs, Policy, and Procurement GBCMHC Parking Garage Repairs

1635 Central Avenue Bridgeport, CT BI – MH – 121

Original Bid Due Date / Time: June 20th 2018 1:00 PM

Previous Addendums: Addendum #1 dated 5/7/2018

TO: Prospective Bid Proposers: This Addendum forms part of the “Contract Documents” and modifies or clarifies the original “Contract Documents” for this Project dated 12/1/17. Prospective Bid Proposers shall acknowledge receipt of the total number the Addenda issued for this Project on the space provided on Section 00 41 00 Bid Proposal Form.

Failure to acknowledge receipt of the total number the Addenda issued for this Project on the space provided on Section 00 41 00 Bid Proposal Form shall subject Bid Proposers to disqualification.

The following clarifications are applicable to drawings and specifications for the project referenced above.

Item 1: A mandatory pre-bid meeting was held on May 17th 2018 at 10:30am and the attendance log is attached.

Item 2: Question: What are the allowable work hours for the project?

Answer: Per Article 37 of the General Conditions section 00 72 13 37.1 No person shall be employed to work or be permitted to work more than eight (8) hours in any Day or more than forty (40) hours in any week for any Work provided in the Contract, in accordance with Connecticut General Statute Section 31-57.

37.2 The operation of such limitation of hours of work may be suspended during an emergency, upon the approval of the Commissioner, in accordance with Connecticut General Statute Section 31-57.

The allowable construction activity time for construction in the City of Bridgeport is 7:00am to 6:00pm.

Item 3: Question: Who is the contact person for the City of Bridgeport for all work performed in the City of Bridgeport streets?

Answer: All work performed on city property is under the jurisdiction of City of Bridgeport.

The contact person for the City of Bridgeport is Jon Urquidi – City Engineer: [email protected]

Item 4: Question: Who is the contact person for the Bridgeport Water Pollution Control Authority (WPCA) for all work performed in the City of Bridgeport streets?

Answer: All work performed on city property is under the jurisdiction of City of Bridgeport and all storm and sewer work connecting to the city system is under the jurisdiction of the Bridgeport WPCA.

The contact person for the Bridgeport WPCA is Ravi Keerthy – WPCA Manager of Field Operations: [email protected]

Page 2: 6030 Bid Addendum...6030 Bid Addendum Page 1 of 2 Addendum No.: 2 Date Of Addendum: May 22, 2018 CT DAS - 6030 (Rev. 02.01.18) 6000 – Bid Phase Forms CT DAS l Construction Services
Page 3: 6030 Bid Addendum...6030 Bid Addendum Page 1 of 2 Addendum No.: 2 Date Of Addendum: May 22, 2018 CT DAS - 6030 (Rev. 02.01.18) 6000 – Bid Phase Forms CT DAS l Construction Services
Page 4: 6030 Bid Addendum...6030 Bid Addendum Page 1 of 2 Addendum No.: 2 Date Of Addendum: May 22, 2018 CT DAS - 6030 (Rev. 02.01.18) 6000 – Bid Phase Forms CT DAS l Construction Services
Page 5: 6030 Bid Addendum...6030 Bid Addendum Page 1 of 2 Addendum No.: 2 Date Of Addendum: May 22, 2018 CT DAS - 6030 (Rev. 02.01.18) 6000 – Bid Phase Forms CT DAS l Construction Services
Page 6: 6030 Bid Addendum...6030 Bid Addendum Page 1 of 2 Addendum No.: 2 Date Of Addendum: May 22, 2018 CT DAS - 6030 (Rev. 02.01.18) 6000 – Bid Phase Forms CT DAS l Construction Services
Page 7: 6030 Bid Addendum...6030 Bid Addendum Page 1 of 2 Addendum No.: 2 Date Of Addendum: May 22, 2018 CT DAS - 6030 (Rev. 02.01.18) 6000 – Bid Phase Forms CT DAS l Construction Services

Recommended