+ All Categories
Home > Documents > 6424 HEAT MAP Fig 6 1 140213

6424 HEAT MAP Fig 6 1 140213

Date post: 29-Dec-2021
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
1
" ) ! . ! . ! . ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( " ) ! ( ! ( ! ( ! ( ! ( ! ( ! ( Carrick-on-Shannon Galway Tuam Knock Boyle Sligo Roosky Elphin Athenry Foxford Killala Athlone Ballina Collooney Loughrea Headford Cortober Swinford Westport Moycullen Castlerea Ballymote Kiltimagh Roscommon Castlebar Craughwell Oughterard Ballinrobe Tubbercurry Enniscrone Ballysadare Ballinasloe Claregalway Ballyhaunis Strokestown Charlestown Crossmolina Claremorris Ballaghaderreen Mayo Mayo Galway Galway Sligo Sligo Roscommon Roscommon Leitrim Leitrim Offaly Offaly Longford Longford Ulster Ulster Cavan Cavan Westmeath Westmeath Tipperary Tipperary 50000 .000000 50000 .000000 60000 .000000 60000 .000000 70000 .000000 70000 .000000 80000 .000000 80000 .000000 90000 .000000 90000 .000000 100000 .000000 100000 .000000 110000 .000000 110000 .000000 120000 .000000 120000 .000000 130000 .000000 130000 .000000 140000 .000000 140000 .000000 150000 .000000 150000 .000000 160000 .000000 160000 .000000 170000 .000000 170000 .000000 180000 .000000 180000 .000000 190000 .000000 190000 .000000 200000 .000000 200000 .000000 210000 .000000 210000 .000000 220000 .000000 220000 .000000 220000 .000000 220000 .000000 230000 .000000 230000 .000000 240000 .000000 240000 .000000 250000 .000000 250000 .000000 260000 .000000 260000 .000000 270000 .000000 270000 .000000 280000 .000000 280000 .000000 290000 .000000 290000 .000000 300000 .000000 300000 .000000 310000 .000000 310000 .000000 320000 .000000 320000 .000000 330000 .000000 330000 .000000 340000 .000000 340000 .000000 0 5 10 15 20 2.5 Kilometres THE GRID WEST PROJECT HEAT MAPPING OF THE STUDY AREA G.Fil M.Hogan February 2013 M.Garrick A 1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING 2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE 3. ENGINEER TO BE INFORMED OF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES 4. ALL LEVELS RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD NOTES A 22-02-13 ISSUED G.F M.H. Ordnance Survey Ireland Licence No EN 0016012 ©Ordnance Survey Ireland and Government of Ireland Scale @ A0: Issue Date Description By Chkd. Client: Project: Title: Prepared by: Checked: Date: Project Director: Consulting, Civil and Structural Engineers, Market Square, Castlebar, Co. Mayo, Ireland. tel: +353-(0)1-8030406 fax:+353-(0)1-8030409 e-mail: [email protected] www.tobin.ie No part of this document may be reproduced or transmitted in any form or stored in any retrieval system of any nature without the written permission of Patrick J. Tobin & Co. Ltd. as copyright holder except as agreed for use on the project for which the document was originally issued. 1:175,000 EXISTING BELLACORICK SUBSTATION EXISTING FLAGFORD SUBSTATION EXISTING CASHLA SUBSTATION Figure 6.1 Lough Carrowmore Lough Arrow Lough Key Lough Gara Lough Conn Lough Beltra Lough Feeagh Lough Carra Lough Mask Lough Corrib Upper N4 N5 N17 N84 N59 N59 Legend Proposed Study Area " ) City ! ( Town County Boundary National Roads Regional Road River Lakes ! . Substation Site Locations N60 M6 Motorway Lough Cullin Lough Corrib Lower HEAT MAP Value 2 3-9 9-19 19-49 49-380
Transcript

")

!.

!.

!.

!( !(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

")

!(

!(

!(!(

!(

!(

!(

Carrick-on-Shannon

Galway

Tuam

Knock

Boyle

Sligo

RooskyElphin

Athenry

Foxford

Killala

Athlone

Ballina

Collooney

Loughrea

Headford

Cortober

Swinford

Westport

Moycullen

Castlerea

Ballymote

Kiltimagh

Roscommon

Castlebar

Craughwell

Oughterard

Ballinrobe

Tubbercurry

Enniscrone Ballysadare

Ballinasloe

Claregalway

BallyhaunisStrokestown

Charlestown

Crossmolina

Claremorris

Ballaghaderreen

M a y oM a y o

G a l w a yG a l w a y

S l i g oS l i g o

R o s c o m m o nR o s c o m m o n

L e i t r i mL e i t r i m

O f f a l yO f f a l y

L o n g f o r dL o n g f o r d

U l s t e rU l s t e r

C a v a nC a v a n

W e s t m e a t hW e s t m e a t h

T i p p e r a r yT i p p e r a r y

50000.000000

50000.000000

60000.000000

60000.000000

70000.000000

70000.000000

80000.000000

80000.000000

90000.000000

90000.000000

100000.000000

100000.000000

110000.000000

110000.000000

120000.000000

120000.000000

130000.000000

130000.000000

140000.000000

140000.000000

150000.000000

150000.000000

160000.000000

160000.000000

170000.000000

170000.000000

180000.000000

180000.000000

190000.000000

190000.000000

200000.000000

200000.000000

210000.000000

210000.000000

220000.000000

220000.000000

22

00

00

.00

00

00

22

00

00

.00

00

00

23

00

00

.00

00

00

23

00

00

.00

00

00

24

00

00

.00

00

00

24

00

00

.00

00

00

25

00

00

.00

00

00

25

00

00

.00

00

00

26

00

00

.00

00

00

26

00

00

.00

00

00

27

00

00

.00

00

00

27

00

00

.00

00

00

28

00

00

.00

00

00

28

00

00

.00

00

00

29

00

00

.00

00

00

29

00

00

.00

00

00

30

00

00

.00

00

00

30

00

00

.00

00

00

31

00

00

.00

00

00

31

00

00

.00

00

00

32

00

00

.00

00

00

32

00

00

.00

00

00

33

00

00

.00

00

00

33

00

00

.00

00

00

34

00

00

.00

00

00

34

00

00

.00

00

00

0 5 10 15 202.5

Kilometres

THE GRID WEST PROJECT

HEAT MAPPING OF THE STUDY AREA

G.Fil M.Hogan February 2013

M.Garrick

A

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING

2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE

3. ENGINEER TO BE INFORMED OF ANY DISCREPANCIES BEFORE ANY

WORK COMMENCES

4. ALL LEVELS RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD

NOTES

A 22-02-13 ISSUED G.F M.H.

Ordnance Survey Ireland Licence No EN 0016012 ©Ordnance Survey Ireland and Government of Ireland

Scale @ A0:

Issue Date Description By Chkd.

Client:

Project:

Title:

Prepared by: Checked: Date:

Project Director:

Consulting, Civil and Structural Engineers,Market Square, Castlebar,Co. Mayo, Ireland.tel: +353-(0)1-8030406fax:+353-(0)1-8030409e-mail: [email protected]

No part of this document may be reproduced or transmitted in any form or stored in any retrieval system of any nature without the written permission of Patrick J. Tobin & Co. Ltd. as copyright holder except as agreed for use on the project for which the document was originally issued.

1:175,000

EXISTING BELLACORICK SUBSTATION

EXISTING FLAGFORD SUBSTATION

EXISTING CASHLA SUBSTATION

Figure 6.1

Lough Carrowmore

Lough Arrow

Lough Key

Lough Gara

Lough Conn

Lough Beltra

Lough Feeagh

Lough Carra

Lough Mask

Lough Corrib Upper

N4

N5

N17

N84

N59

N59

Legend

Proposed Study Area

") City

!( Town

County Boundary

National Roads

Regional Road

River

Lakes

!. Substation Site Locations

N60

M6

Motorway

Lough Cullin

Lough Corrib Lower

HEAT MAP

Value

2

3-9

9-19

19-49

49-380

Recommended