663 - Work Orders In Progress (7/1/05 - 10/31/05)WOID Status Request Date Requester Location
Description Completion Date Assigned To Area Type Area NumberAction Taken Priority
7/31/2005 Alfredo Holguin Alma Del Valle Daycare3982 Work In ProgressRomauldo ApodacaMonthly - Alma Del Valle Exit Sign Insp: Monthly -
Refer to PM schedule details. Medium
7/31/2005 Alfredo Holguin Alma Del Valle Daycare3981 Work In ProgressRomauldo ApodacaMonthly - Alma Del Valle Emer. Light Test:
Monthly - Refer to PM schedule details. Medium
7/31/2005 Alfredo Holguin Alma Del Valle Daycare3960 Work In ProgressRomauldo ApodacaMonthly - Alma Del Valle Monthly FE Inspection -
Refer to PM schedule details. Medium
7/6/2005 Alfredo Holguin Alma Del Valle Daycare3312 Work In ProgressRomauldo ApodacaYearly - Alma Del Valle Exit Sign Test: Annual -
Refer to PM schedule details. Medium
7/6/2005 Alfredo Holguin Alma Del Valle Daycare3308 Work In ProgressRomauldo ApodacaYearly - Alma Del Valle Emer. Light Test: Annual -
Refer to PM schedule details. Medium
7/19/2005 Aida Salcedo Anthony ES3661 Work In Progress4/26/2005 Carlos LujanNEED TO COMPLETE PERFORMANCE
INSPECTION ON ALL CUSTODIANS TO INCLUDE
CLOSET, MSDS, LABELED SPRAY BOTTLES &
SAFETY EQUIPMENT. HEAD CUSTODIANS NEED
TO INCLUDE INSPECTION ON YOUR OWN AREA. INSPECTION REPORTS ALONG WITH
COMPLETED WORK ORDER MUST BE
RETURNED AND RECEIVED BY US NO LATER
THAN AUGUST 5, 2005.
Medium
10/10/2005 Aida Salcedo Anthony ES6221 Work In ProgressJimmy CarbajalNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD
CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
10/4/2005 Carlos Lujan Anthony ES6148 Work In ProgressJimmy Carbajalvaccum need to be fix the screws came losse
and they got lost the screws Medium
10/2/2005 Alfredo Holguin Anthony ES6005 Work In ProgressHector VillalobosMonthly - Anthony ES Monthly FE Inspection -
Refer to PM schedule details. Medium
8/11/2005 Anthony ES4487 Work In ProgressGuadalupe Ontiverosplese grade and add crusher fine for neww
parking for parents and add parking curbs. Medium
11/1/2005 10:45:34 AM Page 1 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/2/2005 Anthony ES4097 Work In ProgressGuadalupe Ontiverosplease scrape and add crusher fine along with
parking curbs.see mike Medium
9/6/2005 Danny Orozco Anthony ES5285 Work In ProgressDanny Orozco CafeteriaKNIFE BROKE ON MIXERS BLADE ASSEMBLY
Medium
7/28/2005 Hector Villalobos Anthony ES3899 Work In ProgressMichael Munoz Classroomroom 201 bad capert half is bad replace with tile
Medium
8/8/2005 Hector Villalobos Anthony ES4255 Work In ProgressMichael Munoz Classroomroom 109 needs carpet repair
Medium
8/15/2005 Hector Villalobos Anthony ES4581 Work In ProgressJaime Gomez Classroomold main blg a/c motor burn out a 3 hp volts 230
Medium
8/22/2005 Hector Villalobos Anthony ES4742 Work In ProgressJaime Gomez Cafeterianeed a 3/4 hp motor cafeteira motor burn out
old cafeteria Medium
8/22/2005 Hector Villalobos Anthony ES4743 Work In ProgressJaime Gomez Cafeteriamild cafeteria burn motor 3/4 hp with a belt 4-L
660 or 670 Medium
8/11/2005 Hector Villalobos Anthony ES4478 Work In ProgressJaime Gomez ClassroomChapter bg p.e room replace 3/4 motor with a
1hp motor Medium
8/24/2005 Hector Villalobos Anthony ES4861 Work In ProgressJaime GomezNurse office refrigerator is not working water is
leaking from seal Medium
9/29/2005 Hector Villalobos Anthony ES5944 Work In ProgressJaime GomezOld main blg boiler room needs a thermocuple
size 56 inch Medium
9/30/2005 Hector Villalobos Anthony ES5992 Work In ProgressJaime Gomezupper primary boiler is leaking replace
Medium
10/20/2005 Hector Villalobos Anthony ES6586 Work In ProgressJose Ambriz Cafeteriaheater is not working need to replace parts
Medium
10/20/2005 Hector Villalobos Anthony ES6587 Work In ProgressJaime Gomez Mechanical RoomBoiler needs parts valve is leaking
Medium
10/20/2005 Hector Villalobos Anthony ES6588 Work In ProgressJaime Gomez ClassroomChapter blg p.e room heater needs parts
Medium
10/27/2005 Hector Villalobos Anthony ES6797 Work In ProgressHector Villalobos Parking LotIn all 4 praking lot put up sings
Medium
10/26/2005 Hector Villalobos Anthony ES6794 Work In ProgressDanny Miranda PortablesPortables replace broken boards on ramps and
deck 218 219 220 221 Medium
11/1/2005 10:45:34 AM Page 2 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/30/2005 Jacqueline Aguilar Anthony ES5090 Work In ProgressDanny Orozco Cafeterianew oven is completely down.
Becky S. SNP Mgr 882-3507
Medium
10/19/2005 Jacqueline Aguilar Anthony ES6556 Work In ProgressDanny Orozco Custodial2 - Freezers at AE4-6 Campus/Freezer #1 temp
is at 18 / Freezer #2 food is 1/2 frozen 1/2 thaw
Becky S. SNP Mgr 882-3507
Medium
8/1/2005 Margret Villalobos Anthony ES4059 Work In ProgressManny LozoyaDAYCARE - NEED TO ISSUE KEYS TO CORINA
VALDESPINO for (Krishna's Office). WILL BE
HERE AT 8:00 AM TOMORROW.
Medium
9/8/2005 Jacqueline Aguilar Berino ES5338 Work In ProgressDanny Orozco CafeteriaWALK - IN FREEZER IS LEAKING ALOT OF
WATER BETWEEN THE FREEZER AND REFRIG.
ELSA - 882-2417
Medium
7/11/2005 Jacqueline Aguilar Berino ES3434 Work In ProgressDanny Orozco CafeteriaWASHING MACHINE DOES NOT WORK ANY
MORE. (IT GAVE UP)
ELSA CHAIRZ - SNP MGR 882-2417
Medium
9/28/2005 Jimmy Cortez Berino ES5898 Work In ProgressManny LozoyaNeed 2 new keys for office gate and recut
master key for Mr Silva THANKS OFFICE KEY IS
ON YOUR KEY CHAIN ALREADY
Medium
9/19/2005 Jimmy Cortez Berino ES5585 Work In ProgressManny Lozoyaneed nemaster b key and 55key for new
custodian thanks a.s. p Medium
8/1/2005 Berino ES4055 Work In ProgressRamiro Holguinplease cut weeds and pick-up debre on east
side of rockwall. (i.e weeds bottles cinder
blocks.)
Medium
8/4/2005 Berino ES4208 Work In ProgressEnrique SoteloMOBILE HOME OCCUPANT WILL BE RECEIVING
NEW MOBILE HOME ON APPROXIMATELY 8-29-
05. PLEASE CONNECT ELECTRICAL. 28X54
Medium
10/2/2005 Alfredo Holguin Berino ES6023 Work In ProgressRamiro HolguinMonthly - Berino ES Roof Inspection - Refer to PM
schedule details. Medium
8/2/2005 Alfredo Holguin Berino ES4082 Work In ProgressManny LozoyaMonitoring Wells - I need a set of keys to the
monitoring well caps Medium
11/1/2005 10:45:34 AM Page 3 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/10/2005 Aida Salcedo Berino ES6222 Work In ProgressJimmy CortezNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
10/17/2005 Ramiro Holguin Berino ES6447 Work In ProgressDanny OrozcoDISHWASHER CHEMICAL DESPENSERS NOT
WORKING RIGHT HAS TO BE CHECK OUT Medium
10/31/2005 Alfredo Holguin Chaparral ES6863 Work In ProgressRicardo JacquezMonthly - DP-91 CES - Refer to PM schedule
details. Medium
8/12/2005 Chaparral ES4518 Work In ProgressJoe Ontiveros Mechanical Roomplease replace urinal and commode in mens
restrrom. Medium
10/2/2005 Alfredo Holguin Chaparral ES6123 Work In ProgressJuan VargasMonthly - Chaparral ES Emer. Light Test: Monthly -
Refer to PM schedule details. Medium
9/29/2005 Juan Vargas Chaparral ES5951 Work In ProgressEnrique Sotelo room 31 need change 8 fluorescent lighting
troffer Medium
10/18/2005 Juan Vargas Chaparral ES6502 Work In ProgressJaime Gomezroom 72 heating not work need help to fix
Medium
10/13/2005 Juan Vargas Chaparral ES6395 Work In ProgressGuadalupe Ontiveros north side nesesita que enparejar
Medium
10/14/2005 Juan Vargas Chaparral ES6415 Work In ProgressEnrique Sotelocafeteria exit sign need change
Medium
10/12/2005 Juan Vargas Chaparral ES6343 Work In ProgressGuadalupe Ontiveros las vanquetas need grabo a round
Medium
10/31/2005 Juan Vargas Chaparral ES6885 Work In ProgressRuben Ronquilloruben nesesito 5-galones pintura amarillan 2-
azul 1-blanca de para pintar el main parking Medium
10/25/2005 Juan Vargas Chaparral ES6728 Work In ProgressRuben Ronquilloruben nesesito 4 metal signs 1-principal 1-
secretary 2-assistant principal y tanbien los
tubos
Medium
7/26/2005 Juan Vargas Chaparral ES3846 Work In ProgressJaime Gomez07/26/05 j. gomes rooms 2 -20-21- 51-47-107-
44- 55-46- need replace A/C 6500 Medium
11/1/2005 10:45:34 AM Page 4 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
7/25/2005 Juan Vargas Chaparral ES3801 Work In ProgressGuadalupe Ontiveros5/25/05/ mike neseito que pongan sistema de
riego para los arboles Medium
7/25/2005 Juan Vargas Chaparral ES3800 Work In ProgressJaime Gomez07/25/05 jaime gomes main office need new
A/C two 4500 and one 6500 Medium
7/27/2005 Juan Vargas Chaparral ES3868 Work In ProgressRuben RonquilloROOMS 83-82-81-80-72-96-70 NEED WINDOWS
REPAIRED OR REPLACE 2-REPORT Medium
8/1/2005 Juan Vargas Chaparral ES4030 Work In ProgressJaime GomezRoom 47 need to instaled a/c ventilation
Medium
8/4/2005 Juan Vargas Chaparral ES4213 Work In ProgressMichael MunozRooms 101-102-60-62-61-54-70-96-72-73-97 80-
82-83 need carpet repace Medium
8/30/2005 Juan Vargas Chaparral ES5053 Work In ProgressMichael Munozneed to be replaced front area gate doors and
chain link fence as mr. cardona Medium
8/16/2005 Juan Vargas Chaparral ES4602 Work In ProgressJoe Ontiverosruben ronquillo need 10 pvc 45 elbows 6 inches
10 square grate basin 6 inches and 200 ft. 6
inches pvc pipe
Medium
7/5/2005 Juan Vargas Chaparral ES3284 Work In ProgressRuben Ronquillo07/05/05 mike munoz Mr. cardona quiere bertical
blind en su oficina size 82 width and 80 length Medium
8/22/2005 Danny Miranda Chaparral ES4797 Work In ProgressDanny Mirandarepair storage, boy,s , girl,s r.r. @ chaparral elem
Medium
9/14/2005 Daniel Ramirez Chaparral ES5498 Work In ProgressJimmy Carbajalsweeper/blower/not/working/choke/broken
Medium
10/25/2005 Daniel Ramirez Chaparral ES6714 Work In ProgressJimmy Carbajalvaccum/cleaner/motor/not/working
Medium
10/19/2005 Daniel Ramirez Chaparral ES6555 Work In ProgressJimmy Carbajalwheels/on/vaccum/cleaner/broken
Medium
10/18/2005 Jennifer Corral Chaparral ES6529 Work In ProgressRuben Ronquillo ClassroomHad done a work order before for Ms. Barrett
about fixing her windows needs a screen.She
says they still haven't done the work order.
Thanks
Medium
8/3/2005 Jennifer Corral Chaparral ES4110 Work In ProgressRuben Ronquillo ClassroomRm-72 Ms. Barret needs screens on her
windows. Says they were suppose to be put in
last year.
Medium
11/1/2005 10:45:34 AM Page 5 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
7/29/2005 Jennifer Corral Chaparral ES3945 Work In ProgressJaime Gomez ClassroomAir Conditioner smells like burn and is not cold in
rm-128 for Ms. Word Medium
7/29/2005 Jennifer Corral Chaparral ES3946 Work In ProgressJaime Gomez ClassroomAir Conditioner not working in rm-20 for Ms. Gary
Medium
7/27/2005 Jennifer Corral Chaparral ES3871 Work In ProgressManny Lozoya Classroomneed an extra key for Even start classroom,
Jeannette rm-118 Medium
7/22/2005 Jennifer Corral Chaparral ES3785 Work In ProgressManny Lozoya ClassroomNEED A KEY FOR ROOM 114,LEDESMA
REPRINT FOR MANNY - REGARDING E-MAIL
7/27/05 - MKV
Medium
7/5/2005 Jennifer Corral Chaparral ES3299 Work In ProgressManny Lozoya OfficeI need some keys for two of the new
administators who will be coming to this school.
They have requested main keys to the gate that
opens up the fence outside the school and also a
set of main keys for the building. If you can
please do as soon as possible. Keys for
Chaparral Elementary.
Medium
8/1/2005 Joe Ramirez Chaparral MS4042 Work In ProgressJoe OntiverosNeed sensor replaced in girls locker room
lavatory. Medium
7/20/2005 Joe Ramirez Chaparral MS3720 Work In ProgressJaime Gomez7/12/05.
need a/c replaced on portable 1 rm. 2 please. Medium
10/19/2005 Joe Ramirez Chaparral MS6558 Work In Progress10/21/2005 Ruben Ronquillo10/19/05.
we need propane tank filled for portable housing
rms. 1&2.
ATTEN. RUBEN.
Medium
10/10/2005 Joe Ramirez Chaparral MS6245 Work In Progress10/26/2005 Enrique SoteloNeed lightbulb replaced parking lot area, will
probably need Boom truck.
ASSINGED TO E.SOTELO
Medium
10/10/2005 Joe Ramirez Chaparral MS6246 Work In ProgressGuadalupe OntiverosNeed about 2 yards base coarse for use around
pond area. Medium
7/18/2005 Danny Miranda Chaparral MS3607 Work In ProgressJoe Ramirezneed to paint new door @ football storage rm.
Medium
7/18/2005 Danny Miranda Chaparral MS3608 Work In ProgressJoe Ramirezneed to paint new door @ rm. 86
Medium
10/13/2005 Johnny Acuna Chaparral MS6369 Work In ProgressJoe Ontiveros(CHAPARRAL MIDDLE SCHOOL) need snake to
unclogg drain to classroom sinks in the main
building. (science room #103)
Medium
11/1/2005 10:45:34 AM Page 6 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/2/2005 Mary Garcia Chaparral MS4072 Work In ProgressJoe Ramirez ClassroomRoom 208 - Mold on ceiling tiles.
(Nancy, Nurse @ site called in) - mkv
Margaret, Joe replied and said there where a
couple of ceiling tiles with small mold droppings on them. He replaced them. However still go
ahead and generate a w.o. for our records and
have him fill it out.
Mike
Medium
10/2/2005 Alfredo Holguin Chaparral MS6086 Work In ProgressJoe RamirezMonthly - Chaparral MS Emer. Light Test: Monthly
- Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Chaparral MS6084 Work In ProgressJoe RamirezMonthly - Chaparral MS Exit Sign Insp: Monthly -
Refer to PM schedule details. Medium
8/11/2005 Chaparral MS4485 Work In ProgressGuadalupe Ontiveros Portablesplease take a load of crusher fine so sewer line.
Ak David (plumbing) for the specifics. Medium
8/1/2005 Chaparral MS4031 Work In ProgressGuadalupe OntiverosPlease level around ponding and surronding
areas. Check with Mr.Diggs Medium
7/19/2005 Chaparral MS3648 Work In ProgressJoe Ramirez Football Fieldplease get with speedy and have him train you
on the sprikler system on football field and thru
out campus. Identify all valves and repair what is
needed. also ask him for a key for sprinkler box
and have him teach you the programs.
Medium
7/19/2005 Chaparral MS3649 Work In ProgressJoe Ramirezneed to cut weeds and grass behind library and
courtyard and surrounding areas tru -out
campus including pond. Also need to irrigate
these areas also.
High
7/19/2005 Chaparral MS3650 Work In ProgressJoe Ramirezplease paint railing on new portables that where
installed and modified and all railings that are in
need.
Medium
7/19/2005 Chaparral MS3656 Work In ProgressJoe Ramirez Football Fieldplease put up fence where portables where
installed even if its on a temp bases. Medium
9/13/2005 Chaparral MS5463 Work In ProgressMichael Munoz Portablesneed to pour landing and sidewalks to portables
by football feild. Medium
9/4/2005 Alfredo Holguin Chaparral MS5204 Work In ProgressJoe RamirezMonthly - Chaparral MS Monthly FE Inpsection -
Refer to PM schedule details. Medium
11/1/2005 10:45:34 AM Page 7 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
7/31/2005 Alfredo Holguin Chaparral MS3990 Work In ProgressJoe RamirezMonthly - Chaparral MS Emer. Light Test: Monthly
- Refer to PM schedule details. Medium
7/31/2005 Alfredo Holguin Chaparral MS3988 Work In ProgressJoe RamirezMonthly - Chaparral MS Exit Sign Insp: Monthly -
Refer to PM schedule details. Medium
7/31/2005 Alfredo Holguin Chaparral MS3977 Work In ProgressJoe RamirezMonthly - Chapparral MS Roof Inspection - Refer
to PM schedule details. Medium
7/31/2005 Alfredo Holguin Chaparral MS3964 Work In ProgressJoe RamirezMonthly - Chaparral MS Monthly FE Inpsection -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Chaparral MS6008 Work In ProgressJoe RamirezMonthly - Chaparral MS Monthly FE Inpsection -
Refer to PM schedule details. Medium
9/4/2005 Alfredo Holguin Chaparral MS5229 Work In ProgressJoe RamirezMonthly - Chaparral MS Emer. Light Test: Monthly
- Refer to PM schedule details. Medium
9/4/2005 Alfredo Holguin Chaparral MS5227 Work In ProgressJoe RamirezMonthly - Chaparral MS Exit Sign Insp: Monthly -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Chaparral MS6048 Work In ProgressDanny OrozcoMonthly - Chaparral MS Fire Sprinkler Insp. -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Chaparral MS6057 Work In ProgressDanny OrozcoMonthly - Chaparral MS Fire Suppression Insp. -
Refer to PM schedule details. Medium
8/16/2005 Alma Terrell Chaparral MS4586 Work In ProgressDanny Orozco Cafeteriagarbage disposal is clogged up
Medium
8/22/2005 Alma Terrell Chaparral MS4772 Work In ProgressDanny Orozco Cafeteriawalk-in refrigerator/fan is making alot of noise
Sandra Diaz - SNP Manager 824-4376
Medium
7/6/2005 Alfredo Holguin Chaparral MS3307 Work In ProgressJoe RamirezMonthly - Chapparral MS Roof Inspection - Refer
to PM schedule details. Medium
7/6/2005 Alfredo Holguin Chaparral MS3336 Work In ProgressJoe RamirezYearly - Chaparral MS Exit Sign Test: Annual -
Refer to PM schedule details. Medium
7/3/2005 Alfredo Holguin Chaparral MS3243 Work In ProgressJoe RamirezMonthly - Chaparral MS Emergency Lighting Insp.
- Refer to PM schedule details. Medium
11/1/2005 10:45:34 AM Page 8 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
7/3/2005 Alfredo Holguin Chaparral MS3241 Work In ProgressJoe RamirezMonthly - Chaparral MS Exit Sign Insp. - Refer to
PM schedule details. Medium
7/3/2005 Alfredo Holguin Chaparral MS3191 Work In ProgressDanny OrozcoMonthly - Chaparral MS Fire Sprinkler Insp. -
Refer to PM schedule details. Medium
7/6/2005 Alfredo Holguin Chaparral MS3314 Work In ProgressJoe RamirezYearly - Chaparral MS Emer. Light Test: Annual -
Refer to PM schedule details. Medium
7/3/2005 Alfredo Holguin Chaparral MS3148 Work In ProgressJoe RamirezMonthly - Chaparral MS Monthly FE Inpsection -
Refer to PM schedule details. Medium
8/30/2005 Robert Gonzalez Chaparral MS5062 Work In ProgressJimmy CarbajalI NEED 1 MALE WATER HOSE CONNECTOR, 1 HX-
1 VINYL ANCHOR KIT AND 1 WEJIT DRY WALL
AUGER ANCHOR KIT SIZE 8. THANK YOU
Medium
7/13/2005 Robert Gonzalez Chaparral MS3499 Work In ProgressManny LozoyaWe need locks to be installed on the center pole
to the double doors in the front entrance,north
east doors and south east doors. This is the
oldest part of the school. the newer part of the
school already have locks on the center poles.
This old doors are the once that we use more
often. This locks will make it so much faster and easier. THANK YOU ROBERT
Medium
9/16/2005 Robert Gonzalez Chaparral MS5563 Work In ProgressJimmy CarbajalSTILL HAVING PROBLEMS WITH THE BURNISHER
THAT JOSE USES. VERY HARD TO PUSH.
THANK YOU
Medium
7/11/2005 Vickie Reed Chaparral MS3439 Work In ProgressManny Lozoya PortablesNEED KEYS FOR TWO NEW PORTABLES.
Medium
7/20/2005 Vickie Reed Chaparral MS3717 Work In ProgressLorenzo Hernandez PONDNEED BACKHOE TO CLEAN OUT POND AREA.
Medium
7/26/2005 Vickie Reed Chaparral MS3855 Work In ProgressManny Lozoya Classroom 204NEED TO REKEY CABINET.
Medium
8/17/2005 Vickie Reed Chaparral MS4639 Work In ProgressManny Lozoya Office VICKIE-KEYNEED 3 REPLACEMENT KEYS FOR 3 A-34'S
THAT DO NOT WORK. Medium
8/12/2005 Vickie Reed Chaparral MS4509 Work In ProgressManny Lozoya Classroom 104need to rekey file cabinets. 2
Medium
7/3/2005 Alfredo Holguin Desert Pride3185 Work In ProgressDavid AcostaMonthly - Desert Pride Monthly FE Inspection -
Refer to PM schedule details. Medium
11/1/2005 10:45:34 AM Page 9 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
7/6/2005 Alfredo Holguin Desert Pride3337 Work In ProgressDavid AcostaYearly - Desert Pride Exit Sign Test: Annual -
Refer to PM schedule details. Medium
7/6/2005 Alfredo Holguin Desert Pride3315 Work In ProgressDavid AcostaYearly - Desert Pride Emer. Light Test: Annual -
Refer to PM schedule details. Medium
7/3/2005 Alfredo Holguin Desert Pride3248 Work In ProgressDavid AcostaMonthly - Desert Pride Exit Sign Insp. - Refer to
PM schedule details. Medium
7/3/2005 Alfredo Holguin Desert Pride3244 Work In ProgressDavid AcostaMonthly - Desert Pride Emergency Lighting Insp. -
Refer to PM schedule details. Medium
10/10/2005 Aida Salcedo Desert Pride6223 Work In ProgressDavid AcostaNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD
CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
7/3/2005 Alfredo Holguin Desert Pride3165 Work In ProgressDavid AcostaMonthly - Desert Pride Roof Inspection - Refer to
PM schedule details. Medium
10/13/2005 David Acosta Desert Pride6368 Work In ProgressGuadalupe Ontiveros Parking Lotprincipal requests - to add crush fine to parking
lot and bus turn around to help keep the dust
down
Medium
9/29/2005 David Acosta Desert Pride5959 Work In ProgressJose Ambriz Classroom #1need to ckeck a/c blower . It stops blowing
Medium
9/6/2005 David Acosta Desert Pride5294 Work In ProgressCarlos Castillo ClassroomNEED OUTSIDE NIGHT LIGHT BETEEW LAST
PORTABLE AND END OF CAMPUS. ALSO NEED
LIGHT BULK FOR NIGHT LIGHT BETEEW 2ND
BUILDING AND PUMP HOUSE
Medium
9/8/2005 David Acosta Desert Pride5336 Work In ProgressManny Lozoya Classroom #6,7.Principals requests: for dead bolt locks for last
portable (where break-in occur ) Medium
8/17/2005 David Acosta Desert Pride4642 Work In ProgressManny Lozoya Classroom 3need one key for storage closet for teacher in
room #3 Medium
7/29/2005 David Acosta Desert Pride3942 Work In ProgressCarlos Castillo Officeneed emergency light and exit signs check out.
Medium
11/1/2005 10:45:34 AM Page 10 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/8/2005 David Acosta Desert Pride4304 Work In ProgressManny Lozoya Classroom #3,4need locks for two doors to the hall way, that
needs to be use as storage for science rooms. Medium
7/25/2005 David Acosta Desert Pride3791 Work In ProgressManny Lozoya Classroomneed plastic name plates(12)MS. S. VERLANDER,
MS. I. RAMIREZ, MS. BACH-HAGUE, MS. B.
COSTULIS, MS. C. MCDONALD, MR. C. VELA,
MR. P. WYMAN, MS. G. PARKER, MS. S.
GARCIA, MR. D. NEAL , MS. J. ZAPATA, MS. D.
DEAN
Medium
10/2/2005 Alfredo Holguin Desert Pride6025 Work In ProgressDavid AcostaMonthly - Desert Pride Roof Inspection - Refer to
PM schedule details. Medium
10/2/2005 Alfredo Holguin Desert Pride6045 Work In ProgressDavid AcostaMonthly - Desert Pride Monthly FE Inspection -
Refer to PM schedule details. Medium
9/4/2005 Alfredo Holguin Desert Pride5218 Work In ProgressDavid AcostaMonthly - Desert Pride Monthly FE Inspection -
Refer to PM schedule details. Medium
9/4/2005 Alfredo Holguin Desert Pride5230 Work In ProgressDavid AcostaMonthly - Desert Pride Emer. Light Test: Monthly -
Refer to PM schedule details. Medium
9/4/2005 Alfredo Holguin Desert Pride5234 Work In ProgressDavid AcostaMonthly - Desert Pride Exit Sign Insp: Monthly -
Refer to PM schedule details. Medium
7/31/2005 Alfredo Holguin Desert Pride3979 Work In ProgressDavid AcostaMonthly - Desert Pride Monthly FE Inspection -
Refer to PM schedule details. Medium
7/31/2005 Alfredo Holguin Desert Pride3995 Work In ProgressDavid AcostaMonthly - Desert Pride Exit Sign Insp: Monthly -
Refer to PM schedule details. Medium
7/31/2005 Alfredo Holguin Desert Pride3991 Work In ProgressDavid AcostaMonthly - Desert Pride Emer. Light Test: Monthly -
Refer to PM schedule details. Medium
8/29/2005 Desert Pride4992 Work In ProgressGuadalupe Ontiverosplease remove marquee sign from desertveiw
and install at desert pride. please be careful
when removing.see mike
Medium
10/2/2005 Alfredo Holguin Desert Pride6091 Work In ProgressDavid AcostaMonthly - Desert Pride Exit Sign Insp: Monthly -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Desert Pride6087 Work In ProgressDavid AcostaMonthly - Desert Pride Emer. Light Test: Monthly -
Refer to PM schedule details. Medium
11/1/2005 10:45:34 AM Page 11 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/10/2005 Mary Telles Desert Pride4460 Work In ProgressManny Lozoya OfficeI need an office key for Ms. Maes, Clerk at Desert
Pride Academy Medium
10/31/2005 Johnny Acuna Desert Trail Intermediate6884 Work In ProgressEnrique Sotelo Marquee Light not working properly. (vice-
principal) Medium
10/31/2005 Johnny Acuna Desert Trail Intermediate6886 Work In ProgressEnrique Soteloneed (2) security lights fixed: One in the parking
lot and the other in the playground area closest
to mobile home.
Medium
10/31/2005 Johnny Acuna Desert Trail Intermediate6883 Work In ProgressManny Lozoyaneed a lock (J-11) for new gate that was
installed located in the fence between CH. ELEM
and CH. DESERT TRAIL closest to Lisa ST. (To
be locked during LOCK DOWN events). Thank
You !!!!!!!!
Medium
10/28/2005 Johnny Acuna Desert Trail Intermediate6841 Work In ProgressLorenzo Solisneed a heating and cooling t-stat for portable
#408 unit. Medium
10/28/2005 Johnny Acuna Desert Trail Intermediate6846 Work In ProgressManny Lozoyafire-proof filing cabinet inside vault: please fix or
replace lock. Medium
9/12/2005 Johnny Acuna Desert Trail Intermediate5426 Work In ProgressJaime Gomezneed a replacement heating coil (Boiler System)
in the Cafeteria/Gym. (Old one Leaks) Medium
10/4/2005 Johnny Acuna Desert Trail Intermediate6170 Work In ProgressManny Lozoyaplease repair or replace door knob in the kitchen
going outdoors in the back:(door jams and is hard
to open) Thank You !!!!!!!!!!!!!!!!!!
Medium
7/21/2005 Johnny Acuna Desert Trail Intermediate3739 Work In ProgressManny LozoyaDIAG/PSYCH ROOM NEED (2) CLASSROOM
KEYS MADE. CORE IS: J-53 Medium
7/18/2005 Johnny Acuna Desert Trail Intermediate3619 Work In ProgressManny LozoyaMENS RESTROOM (NW HALL) : PLEASE
CHANGE DOOR CYLINDER WHERE KEY ENTERS
TO OPEN UP DOOR. STUDENTS STUFFED IN
CYLINDER WITH CLAY AND HARDENED. THANK
YOU !!!!!!
Medium
7/18/2005 Johnny Acuna Desert Trail Intermediate3620 Work In ProgressManny LozoyaNEED NAME PLATES TO BE MADE: (1)
PRINCIPAL, (1) ASSISTANT PRINCIPAL, (1)
COMPUTER LAB
Medium
8/3/2005 Johnny Acuna Desert Trail Intermediate4116 Work In ProgressJoe Ontiverosneed a replacement single knob water faucet for
room #112. Medium
11/1/2005 10:45:34 AM Page 12 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/15/2005 Johnny Acuna Desert Trail Intermediate4558 Work In ProgressMichael MunozMrs. Bonham (Asst. Principal) requesting
concrete slab to be installed between portable
#412 and #413 art studio.
Medium
10/11/2005 Carlos Vigil Desert Trail Intermediate6266 Work In ProgressEnrique SoteloRUSH ! or as soon as possible or Monday even.
Could I get a line locate for Desert Trails
Portables?
Medium
10/11/2005 Johnny Acuna Desert Trail Intermediate6294 Work In ProgressGuadalupe Ontiverosneed help with scraping in back, front, and
fencelines of desert trail school grounds. Thank
You !!!!!!!!
Medium
9/13/2005 Desert Trail Intermediate5462 Work In ProgressMichael Munoz Cafeterianeed to demo and repour concrete to sectioned
area by cafeteria. Medium
9/4/2005 Alfredo Holguin Desert Trail Intermediate5233 Work In ProgressJohnny AcunaMonthly - Desert Trail Emer. Light Insp: Monthly -
Refer to PM schedule details. Medium
9/4/2005 Alfredo Holguin Desert Trail Intermediate5228 Work In ProgressJohnny AcunaMonthly - Desert Trail Exit Sign Insp: Monthly -
Refer to PM schedule details. Medium
9/4/2005 Alfredo Holguin Desert Trail Intermediate5205 Work In ProgressJohnny AcunaMonthly - Desert Trail Monthly FE Inpsection -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Desert Trail Intermediate6026 Work In ProgressJohnny AcunaMonthly - Desert Trail Roof Inpsection - Refer to
PM schedule details. Medium
7/3/2005 Alfredo Holguin Desert Trail Intermediate3166 Work In ProgressJohnny AcunaMonthly - Desert Trail Roof Inpsection - Refer to
PM schedule details. Medium
10/10/2005 Aida Salcedo Desert Trail Intermediate6224 Work In ProgressGuillermo HernandezNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD
CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
8/3/2005 Alma Terrell Desert View ES4149 Work In ProgressManny Lozoya Cafeteriakey cylinder to walk-in refrigerator doesn't lock,
key continously goes round and round, please
repair as soon as possible, groceries and
commodities are stored in there.
Medium
11/1/2005 10:45:34 AM Page 13 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/10/2005 Aida Salcedo Desert View ES6225 Work In ProgressMiguel AguilarNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
7/6/2005 Alfredo Holguin Desert View ES3317 Work In ProgressPatricio AguilarYearly - Desert View ES Emer. Light Test:
Annual - Refer to PM schedule details. Medium
7/6/2005 Alfredo Holguin Desert View ES3339 Work In ProgressPatricio AguilarYearly - Desert View ES Exit Sign Test: Annual -
Refer to PM schedule details. Medium
9/19/2005 Margarita Terrazas Desert View ES5616 Work In ProgressManny Lozoya 5055891180REQUESTING (2) "R" KEYS, ONE FOR NEW
COUNSELOR, Mr. David Gonzalez and the other
one to replace Ms. Esther Maldonado's "R" key.
(Bended Key) Please pick up bended key with
Margarita Terrazas at the front office
Medium
8/2/2005 Margarita Terrazas Desert View ES4083 Work In ProgressManny LozoyaTEACHER DESK WITH LOCKING DRAWER, DOES
NOT LOCK. ROOM#19, LOWER GRADE SIDE. MRS. GRISWOLD
Medium
9/8/2005 Jacqueline Aguilar Desert View ES5340 Work In ProgressMargret Villalobos CafeteriaMOUSE PROBLEM. MOUSE GOT ON THE TABLE
WHILE EATING
MARTHA FLORES - 589-2425
HELP PLEASE
Medium
10/17/2005 Patricio Aguilar Desert View ES6477 Work In ProgressGuadalupe Ontiverossecond requist on wo 123783 12/15/04
wo 115914 7/22/04
play grounds need 10 truck louds of play ground
sand
need 4 trucks of pressure crush
need rain drains cleaned out
need sand moved from rock wall
need sand moved off drive way and
back up hill
Medium
10/26/2005 Patricio Aguilar Desert View ES6788 Work In ProgressCarlos Castilloelectrician
frount school grounds
need the elect line repaired to maeqee
Medium
10/24/2005 Patricio Aguilar Desert View ES6697 Work In ProgressCarlos Castilloelectrician
frount school grounds
need the elect line repaired to marqee
Medium
11/1/2005 10:45:34 AM Page 14 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/22/2005 Patricio Aguilar Desert View ES4781 Work In ProgressMichael Munozpat aguilar
rock wall
(safety consern) 6 rock wall metal gates need to
be replacedrusted throw
Medium
10/17/2005 Miguel Aguilar Desert View ES6455 Work In ProgressGuadalupe OntiverosNeed heavy amounts of sand/dirt removed from
road leading to backside of school parking lot,
mud and debri causing a hazard. Hard rains
exposed many water pipes and created many
deep crevices, also a hazard for students.
Medium
9/1/2005 Miguel Aguilar Desert View ES5145 Work In ProgressManny LozoyaUrgent: Need center pole repaired in exterior
double door on east side of school repaired, pole
fell and struck teacher. Door cannot be fully
secured and will compromise security after
school hours.
Medium
9/1/2005 Miguel Aguilar Desert View ES5146 Work In ProgressManny LozoyaNeed copies (3) made of padlocks on hall doors,
need for sub keys and replacement. Medium
8/4/2005 Mary Garcia GAC4182 Work In ProgressMargret VillalobosB-Wing - Human Resources Dept
Please spray Lucy Garcia's & Ms. Browder's
office for bugs (crickets, centerpedes, etc.)
Medium
7/12/2005 Mary Garcia GAC3460 Work In ProgressCarlos Castillo Office A WINGAS PER JULIE HERNANDEZ, NEED ELECTRICIAN
TO CONNECT WIRES WITH AN END CONNECTION
TO BE ABLE TO PLUG CONNECTION TO THE
WALL. (CALL JULIE @ 6417 BEFORE COMING)
Medium
8/25/2005 Mary Garcia GAC4925 Work In ProgressMargret VillalobosC Wing- Having problems with mice.
Medium
8/17/2005 Mary Garcia GAC4655 Work In ProgressManny Lozoya Office WHOLE
BUILDINGAS PER ANN STEINHOFF-NEEDS 1 MORE GRAND
MASTER KEY FOR HER SECRETARY AT PRE-K Medium
9/23/2005 Mary Garcia GAC5796 Work In ProgressManny Lozoya Computer Lab DATA CENTER-
TECHNOLOGYAS PER CORA-NEEDS THE DOOR LOCK TO THE
DATA CENTER SWITCHED OUT FROM SWIPE
CARD TO A COMBINATION LOCK. (MANNY,
PLEASE SEE CORA BEFORE CHANGING OUT)
Medium
10/25/2005 Mary Garcia GAC6743 Work In ProgressRuben Ronquillo PARKING AREAAS PER MS. BERRY-NEEDS 3 SIGNS THAT SAY
SLOW CHILDREN TO PUT IN THE ENTRANCE AND PARKING AREA.
TALKED WITH RUBEN RONQUILLO AND KNOW
WHICH SIGNS TO ORDER
Medium
11/1/2005 10:45:34 AM Page 15 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/27/2005 Mary Garcia GAC6811 Work In ProgressCarlos Castillo OfficeAS PER GLORIA SAENZ- LIGHTS ARE NOT
TURNING ON
MANNY PROSPERO IS ALREADY AWARE OF
WHICH LIGHTS
Medium
7/8/2005 Mary Garcia GAC3408 Work In ProgressManny Lozoya Office ALL SCHOOLSAS PER CARLOS VIGIL-NEEDS A GRAND
MASTER 7, ASAP. (HIS BROKE IN HALF)
ALREADY TALKED WITH MANNY LOZOYA
Medium
7/11/2005 Mary Garcia GAC3432 Work In ProgressManuel Prospero Office C WINGAS PER LINDA REYES-NEED FURNITURE FROM 3
OFFICES & BOXES ALONG WITH THIS TO BE
MOVED A.S.A.P. TO NEW AREA IN C-WING.
STAFF WILL START WORKING IN THESE NEW
OFFICES BY TOMORROW.
Medium
9/15/2005 Manuel Prospero GAC5557 Work In ProgressDavid BoydTHE A/C IN THE CAFETERIA IN PRE-K IN NOT
WORKING AND IN ON WARANTY.
AS PER MR. DAVID BOYD.
Medium
10/18/2005 Manuel Prospero GAC6525 Work In ProgressJose AmbrizI NEED 3 EXOST MOTOR FOR C WING V 115 HZ
60 PH 1 HP 1/20 AO AMPS 1.7 NO.7108-5136
RPM 1500. AND AIR FILTERS 20X20XX2.
16X20X2. 16X20X1. 20X25X2. 16X25X2.
AS PER JOSE AMBRIZ.
Medium
8/9/2005 Manuel Prospero GAC4377 Work In ProgressDanny MirandaNEED NEW R. R. PARTITIONS IN "A" WING
AS PER MENNY PROSPERO Medium
9/26/2005 Jimmy Carbajal GAC5824 Work In ProgressSal Acuna CustodialNEED A WATERHOSE AND ALSO A HOSE ROLL
A WAY.2 WATERHOSE ONE FOR THE PATIO
AND ONE FOR THE PRE KINDER AREA I ONLY
HAVE ONE AND I USE IT FOR THE FRONT
AREA,THE HOSE ROLL A WAYS I NEED ONE
FOR EACH HOSE THANK YOU FOR YOUR
CONTINUED SUPPORT YOU ARE THE BEST!!!!
Medium
7/5/2005 Alfredo Holguin GAC3282 Work In ProgressManuel ProsperoC-WING - TAKE OFF TILE AND INSTALL NEW
TILE (TILE HAS BEEN DELIVERED), ALSO FINISH
PAINTING. WILL SEND GERRY MARQUEZ TO
ASSIST.
Medium
10/2/2005 Alfredo Holguin GAC6050 Work In ProgressDanny OrozcoMonthly - GAC Fire Sprinkler Insp. - Refer to PM
schedule details. Medium
10/2/2005 Alfredo Holguin GAC6061 Work In ProgressDanny OrozcoMonthly - GAC Fire Suppression Insp. - Refer to
PM schedule details. Medium
11/1/2005 10:45:34 AM Page 16 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/27/2005 GAC6802 Work In Progress
AS PER GINGER BERRY, REQUESTED TO
BORROW MINI STAGE FROM GH -CHIRSTINA
MUNOZ. NEED TO PICK UP, DEL & SET UP IN
CAFETERIA. ALSO NEED TO HELP SET UP CAFETERIA TABLES INTO BENCHES. NEED TO
PICK UP STAGE ON 10/28/05 A.M.
Medium
7/14/2005 GAC3546 Work In ProgressCarlos CastilloTechnology Server Room-Install Battery powered
Emergency lighting in this room Medium
10/10/2005 Aida Salcedo GAC6226 Work In ProgressRalph LaraNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD
CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
10/11/2005 Carlos Vigil GAC6270 Work In ProgressDanny OrozcoI would like to request a 120v outlet to be
installed above kitchen (dock entrance side) door
for door horn.
Medium
8/16/2005 Carlos Vigil Gadsden HS4612 Work In ProgressDanny Orozco Football FieldNeed a bucket operator and a bucket truck at
GHS football field some time this week. Medium
8/17/2005 Fernando Moncayo Gadsden HS4626 Work In ProgressJose AmbrizAttn. JOSE AMBRIZ; This w/o is for the pilow
block bearings that I, called for.Need two more 1
3/16 THANK YOU!!!
Medium
8/30/2005 Fernando Moncayo Gadsden HS5101 Work In ProgressJose AmbrizATTN. JOSE AMBRIZ need about ten three pole
contactors for the a/c's nigth set back system in
the ACADEMIC BLDG.
Some burned out by the power outage.Thank
you!!
Medium
8/25/2005 Fernando Moncayo Gadsden HS4902 Work In ProgressManny LozoyaAG BLDG entry door,won't open or lock key just
turns;Also WOOD SHOP entry door new lock
dosn't work
Medium
8/8/2005 Fernando Moncayo Gadsden HS4305 Work In ProgressMichael MunozNORTH bus entrance gate keep falling, bottom rail
all bend;Also needs new roller bearings for both
gates thank you !!! [safety hazard]
Medium
8/5/2005 Fernando Moncayo Gadsden HS4240 Work In ProgressRuben RonquilloNeed six wheels for large gates in NORTH
parking lot THANK YOU!!
8/11 - Route to Ruben as per Mike
Medium
11/1/2005 10:45:34 AM Page 17 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/8/2005 Fernando Moncayo Gadsden HS4307 Work In ProgressJose AmbrizRoom 244-245 HVAC unit not working properly
too many problems. m#d136090g20025b-
s#nlsm361523
Medium
8/8/2005 Fernando Moncayo Gadsden HS4311 Work In ProgressFernando MoncayoPANTHER HUT porch entrance too dark security
ligth dosen't work Medium
7/20/2005 Fernando Moncayo Gadsden HS3726 Work In ProgressMichael Mc DermottAttn electrician need a better security ligths by
CONCESSION STAND to control vandalism Medium
7/15/2005 Fernando Moncayo Gadsden HS3593 Work In ProgressMichael Mc DermottNeed to repair or replace electrical conduit
outside of CONCESSION STAND by GIRL'S GYM Medium
10/20/2005 Fernando Moncayo Gadsden HS6607 Work In ProgressDavid VillalobosLIBRARY EAST wall;There is a, wall keyed hose
bib that is leaking Medium
10/20/2005 Fernando Moncayo Gadsden HS6609 Work In ProgressMichael Mc DermottNeed to install flouresent ligth lamps in ANNEX
CORRIDOR, is too dark Medium
10/17/2005 Fernando Moncayo Gadsden HS6489 Work In ProgressDavid VillalobosVARSITY GYM; girl's BASKETBALL locker
room,water heater is leaking from bottom of tank Medium
10/26/2005 Fernando Moncayo Gadsden HS6756 Work In ProgressRuben RonquilloATTN.RUBEN RONQUILLO;Please order four
signs with 8in letters.for outside restrooms.
2-women
2-men
THANK YOU!!
Medium
9/19/2005 Fernando Moncayo Gadsden HS5622 Work In ProgressManny LozoyaAttn. MANNY LO TOYA , need four pad locks for
new electrical panels at SWIMMING POOL and
storages under bleechers ASAP please!! THANK
YOU!!
Medium
9/28/2005 Fernando Moncayo Gadsden HS5943 Work In ProgressMichael MunozAttn. MIKE MUNOZ need about ten parking
stops[parking curb]on refrence from w/o# 5464
thank you!!
Medium
11/1/2005 10:45:34 AM Page 18 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/10/2005 Aida Salcedo Gadsden HS6227 Work In ProgressJesus EstradaNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
7/3/2005 Alfredo Holguin Gadsden HS3168 Work In ProgressMario ApodacaMonthly - Gadsden HS Roof Inspection - Refer to
PM schedule details. Medium
7/6/2005 Alfredo Holguin Gadsden HS3319 Work In ProgressJoe OntiverosYearly - Gadsden HS Emer. Light Test: Annual -
Refer to PM schedule details. Medium
7/3/2005 Alfredo Holguin Gadsden HS3141 Work In ProgressJoe OntiverosMonthly - Gadsden HS Monthly FE Inspection -
Refer to PM schedule details. Medium
9/29/2005 Gadsden HS5962 Work In ProgressFernando Moncayoplease install a couple of l-brackets to desk
where new electrical was installed. see
mr.carrasco in auto shop
Medium
8/25/2005 Gadsden HS4916 Work In ProgressDanny Mirandaplease check and repair leak & secure drop
ceiling in rm 142. possible safety hazard. Medium
9/13/2005 Gadsden HS5464 Work In ProgressMichael Munoz Parking LotNeed to paint stripings for student parking lot and
east of Auto Shop. Medium
9/13/2005 Gadsden HS5458 Work In ProgressMichael Munoz Parking Lotneed to restripe all parking lines ,handi-cap-
arrowa etc. Medium
8/10/2005 Gadsden HS4448 Work In ProgressMichael MunozTelescope observatory locate on the west side
of the baseball field - Installl fencing around it to
prevent vandalism
Medium
7/19/2005 Gadsden HS3659 Work In ProgressMario Apodaca StairwayPLease install stair treads when they come in.
Old english stair ways. I will order. See Mike
INstall from main to old english stairs.
FAXED PO 8/4/05 - MKV
Medium
10/2/2005 Alfredo Holguin Gadsden HS6097 Work In ProgressMario ApodacaMonthly - Gadsden HS Exit Sign Insp: Monthly -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Gadsden HS6028 Work In ProgressMario ApodacaMonthly - Gadsden HS Roof Inspection - Refer to
PM schedule details. Medium
11/1/2005 10:45:34 AM Page 19 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/2/2005 Alfredo Holguin Gadsden HS6001 Work In ProgressJoe OntiverosMonthly - Gadsden HS Monthly FE Inspection -
Refer to PM schedule details. Medium
9/22/2005 Mario Apodaca Gadsden HS5768 Work In ProgressDavid VillalobosNEED A NEW FAUCET AT ROOM 229 FOR MR
PALMER LAB SINK Medium
9/26/2005 Mario Apodaca Gadsden HS5842 Work In ProgressRuben RonquilloNEED A NEW GLASS PUT ON CONCESSION
STAND WINDOW AT FOOTBALL FIELD
(VANDALISM) 23X23 ASAP
Medium
9/21/2005 Mario Apodaca Gadsden HS5708 Work In ProgressMichael Mc DermottTHE OUTSIDE OUTLET NEED TO BE FIX AT
WEIGHT ROOM Medium
10/11/2005 Mario Apodaca Gadsden HS6308 Work In ProgressRuben RonquilloNEED SCISSOR LIFT TO FIX SCOREBOARD AT V-
GYM FOR CARLOS V ON 10-13-05 Medium
10/18/2005 Mario Apodaca Gadsden HS6526 Work In Progress10/19/2005 David VillalobosNEED TOO RUN SEWER SNAKE AT WOOD SHOP
BLDG
unclog main sewer line to woodshop
Medium
10/20/2005 Mario Apodaca Gadsden HS6595 Work In ProgressMichael Mc Dermott Restroom (Boys)OUTSIDE CONDUIT AT ROOM 233 NEED TO
BEREPAIR SO IT CAN'T BE PULL OFF THE WALL
ON MORE AND THE KID CAN'T USE THE CONDUIT
AS A LADDER TO GATING UP TO THE ROOF TOP
Medium
10/14/2005 Mario Apodaca Gadsden HS6425 Work In ProgressMichael Mc Dermott CustodialNEED TO REMOVE ALL OUTLET AT ROOM 126
AT ARE ON BOOK SHEVING FLOOR AND
RELOCA OUTLETS
Medium
10/26/2005 Mario Apodaca Gadsden HS6777 Work In ProgressRuben RonquilloGLASS AT CAFETERIA 24X60 TINT NEED TOBE
REPLACES VANDALISM Medium
8/11/2005 Mario Apodaca Gadsden HS4502 Work In ProgressMichael Mc DermottNEED TO LAMPES AT WOOD SHOP SAME ARE
BURNED OUT Medium
8/31/2005 Mario Apodaca Gadsden HS5108 Work In ProgressMichael Mc DermottNEED TO PUT NEW BALLAST AT WOOD SHOP
LAMPES Medium
8/23/2005 Mario Apodaca Gadsden HS4849 Work In ProgressDanny OrozcoNEED A NEW THERMOSTAT FOR BIG PAN
Medium
11/1/2005 10:45:34 AM Page 20 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/26/2005 Mario Apodaca Gadsden HS4970 Work In ProgressRuben RonquilloGLASS AT MAIN BLDG HALLWAY 40X18 NEED
TOBE REPLACES VANDALISM Medium
8/26/2005 Mario Apodaca Gadsden HS4976 Work In ProgressRuben RonquilloNEED ALL WINDOW BLINDSON OLD ENGLISH
BLDG 40 EA 40WX90L Medium
7/14/2005 Mario Apodaca Gadsden HS3524 Work In ProgressMichael Mc DermottNEED TO FIX FOOTBALL FIELD SCOREBOARD
BREAKER BOX Medium
7/14/2005 Mario Apodaca Gadsden HS3525 Work In ProgressMichael Mc DermottNEED TO CK ALL FOOTBALL FIELD LAMPS
Medium
7/19/2005 Jacqueline Aguilar Gadsden HS3645 Work In ProgressDanny Orozco CafeteriaBOTH OVENS ARE DOWN.
LYDIA M. SNP MGR 882-5522
Medium
7/12/2005 Hector Lozoya Gadsden HS3479 Work In ProgressManny LozoyaAll Campus - Need to replace old door knobs
w/new levers. Medium
8/4/2005 Danny Miranda Gadsden HS4212 Work In ProgressDanny Mirandaneed metal door @ frame for dugout storage
Medium
8/19/2005 Jesus Estrada Gadsden HS4726 Work In ProgressJimmy CarbajalRoyal vacuum is missing bag and brush, belt
serial No.H93266101B GISD tag 014131 Medium
9/28/2005 Jesus Estrada Gadsden HS5915 Work In ProgressMargret Villalobos Football FieldPressbox - There is a Bee Hive in pressbox.
Having a game tomorrow. Please send someone
out today.
(Open PO) as per A. Holguin.
Medium
8/23/2005 Velia Alarcon Gadsden HS4814 Work In ProgressFernando MoncayoRequested by Ms. Greene-Wall Rm. 505 Annex
Building-Air conditiorer still does not work. No air
is coming out of vents, very hot. Wires hanging
into light fixture and a piece of ceiling tile (broken)
is in one of the air conditioning vents. (room was
damaged over summer)
Medium
8/23/2005 Velia Alarcon Gadsden HS4811 Work In ProgressManny LozoyaRequested by Mr. Cordova Storage Room in
Varsity Gym Stage-The door needs to be re-
keyed to an off master key, light board room. 4
keys are needed.
Medium
8/23/2005 Velia Alarcon Gadsden HS4812 Work In ProgressManny LozoyaRequested by Lt. Dickerson Rm. 202 North
Building-His HEM key has broken, 3 HEM keys are
needed. One for him and two for the key box.
Medium
11/1/2005 10:45:34 AM Page 21 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/23/2005 Velia Alarcon Gadsden HS4815 Work In ProgressManny LozoyaRequested by Priscilla Martinez Rm. 605
Business Building-Two HJ masters are needed,
one for Priscilla and one for key box.
Medium
8/23/2005 Velia Alarcon Gadsden HS4816 Work In ProgressManny LozoyaRequested by Ms. L. Melendrez Rm. 331
Academic Building-I have been having trouble
opening my front door for over a year, and now I
am having trouble opening the back door. It's not
my key it's the door handle and deadbolts. Both
back doors are very difficult to open.
Medium
8/23/2005 Velia Alarcon Gadsden HS4817 Work In ProgressManny LozoyaRequested by Mr. S. Perez Weight Room-Boys
locker room door handle needs repair does not
open. West side Weight Room door needs
repairs does not lock.
Medium
8/23/2005 Velia Alarcon Gadsden HS4819 Work In ProgressJose AmbrizRequested by Mr. S. Perez Weight Room-Water
fountain does not give cold water. Medium
8/23/2005 Velia Alarcon Gadsden HS4810 Work In ProgressMario ApodacaRequested by Ms. L. Chavez Rm. 245 Classroom
Over Varsity Gym-Re-place several burned out
light bulbs.
RE-ROUTE TO BUILDING MECHANIC as per Mike
Mc Dermott 9/19/05
Medium
8/23/2005 Velia Alarcon Gadsden HS4820 Work In ProgressMario ApodacaRequested by Luis Saucedo Rm. 507 & 509
Annex Building-Install door stops on each of
these doors.
Medium
8/23/2005 Velia Alarcon Gadsden HS4821 Work In ProgressMario ApodacaRequested by Mr. Whitener Rm. 566 Ag. Shop-
The boys bathroom door handle is very loose,
needs to be tightened.
Medium
8/23/2005 Velia Alarcon Gadsden HS4822 Work In ProgressMario ApodacaRequested by Ms. Zapien Rm. 154 Old English
Building-The blinds are completely broken, the
curtain is hanging.
Medium
8/25/2005 Velia Alarcon Gadsden HS4905 Work In ProgressManny LozoyaRequested by Mr. Milligan Rm. 143 Old English
Building-Four keys are needed of HX2. Three for
the assistant coaches and one for key box.
Medium
8/25/2005 Velia Alarcon Gadsden HS4908 Work In ProgressManny LozoyaRequested by Mr. Myers Rm. 506 Annex Building-
Front door needs adjustment, it will not lock unless it is slammed.
Medium
11/1/2005 10:45:34 AM Page 22 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/25/2005 Velia Alarcon Gadsden HS4915 Work In ProgressMichael Mc DermottRequested by Mr. Myers Rm. 506 Annex Building-
The room needs more electrical outlets on the
east and north walls. For computer setup-plugs
on floor are a safety issue.
Medium
8/25/2005 Velia Alarcon Gadsden HS4914 Work In ProgressFernando MoncayoRequested by Mr. Myers Rm. 506 Annex Building-
There is no air coming out of the vents of the A.C. Medium
8/25/2005 Velia Alarcon Gadsden HS4904 Work In ProgressGuadalupe OntiverosRequested by Mr. D. Gallegos Rm. 403-Please
install water fountains with hose bibs, between
soccer canopies for Athletic events and
Gadsden High School P.E. classes.
Medium
8/25/2005 Velia Alarcon Gadsden HS4897 Work In ProgressManny LozoyaRequested by Velia Rm. 112 Front Office-Two
HE27 are needed for key box. Medium
8/30/2005 Velia Alarcon Gadsden HS5066 Work In ProgressMario ApodacaRequested by Ms. Anderson Rm. 233 North
Building(Panther Hut)-Clothes Dryer takes
several hours to dry clothes. Order new heating
element or check and see if vent is clogged.
9/23 - Route to Mario as per Mike.
Medium
8/30/2005 Velia Alarcon Gadsden HS5068 Work In ProgressMichael Mc DermottRequested by Ms. Anderson Rm. 233 North
Building (Panther Hut)-Replace circuit breakers with ones that can handle the load of appliances
in the kitchen so we don't constantly trip them.
Note from Mr. Chambers: Question? Check and
see if appliances can be re-routed to another
outlet? Too many appliances on one outlet will
cause fire.
Medium
8/30/2005 Velia Alarcon Gadsden HS5083 Work In ProgressManny LozoyaRequested by Mr. Martin Rm. 551 Wood Shop-
Hall lock will no unlock, 2nd Notice. Medium
8/30/2005 Velia Alarcon Gadsden HS5076 Work In ProgressDanny OrozcoRequested by Ms. Anderson Rm. 233 North
Building (Panther Hut)-Pastry refrigerator has
severe condensation dripping.
Medium
8/30/2005 Velia Alarcon Gadsden HS5084 Work In ProgressJose AmbrizRequested by Velia Press Box-Safety Hazard;
need to re-duct and install new air conditioner
were it can be serviced.
FERNANDO, JOSE WILL LOOK INTO ORDERING
UPDRAFT UNIT AND SHEETMETAL. AS PER OUR
CONVERSATION YOU AND MARIO WILL FORM AND POUR CONCRETE FOR SMALL PAD FOR
A/C STAND. IN THE MEAN TIME SERVICE WHAT
IS THERE. - M. MUNOZ 9/1/05-MKV
XC: WO TO FERNANDO
Medium
11/1/2005 10:45:34 AM Page 23 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/26/2005 Velia Alarcon Gadsden HS4947 Work In ProgressMargret VillalobosOld English Bldg - Heating is turning on and on
the computer it states that it is off. Teachers
have been complaining on a daily basis that it is
too hot. Need your help!
Medium
8/12/2005 Velia Alarcon Gadsden HS4516 Work In ProgressFernando MoncayoRequested by Ms. Anderson Rm. 233 Panther
Hut-New water heater for kitchen area of
Panther Hut.
Route to Bldg Mechanic as per Mike 8/15/05
Check to see whats wrong with the H2o heater
they have new one in small mech. room.
Medium
8/12/2005 Velia Alarcon Gadsden HS4521 Work In ProgressManny LozoyaRequested by Ms. Greene-Wall Rm. 505 Annex
Building-Need a lock and spare keys on the new
filing cabinet.
Medium
8/12/2005 Velia Alarcon Gadsden HS4519 Work In ProgressMichael Mc DermottRequested by Mr. Grace Rm. 603 Business
Building-Electrical outlets by teacher's desk and
west wall do not work. Also, need electrical
outlets by television disconnected from light
switch.
Medium
8/9/2005 Velia Alarcon Gadsden HS4380 Work In ProgressManny LozoyaRequested by Velia Rm. 112 Front Office-Five
D49 are needed, key to men's restroom in the
Main Building.
Medium
8/9/2005 Velia Alarcon Gadsden HS4381 Work In ProgressManny LozoyaRequested by Velia Rm. 112 Front Office-Five DX
are needed, key to women's restroom in the Main
Building.
Medium
8/9/2005 Velia Alarcon Gadsden HS4385 Work In ProgressMichael Mc DermottRequested by Mr. Whitener Rm. 566 Ag. Shop-
Two large shop lights are burned out. Medium
8/9/2005 Velia Alarcon Gadsden HS4386 Work In ProgressMichael Mc DermottRequested by Mr. Whitener Rm. 566 Ag. Shop-
220 Volt Electric extension cord needed with a
new female end, current ones puts people at risk
of electrocution.
Medium
8/9/2005 Velia Alarcon Gadsden HS4387 Work In ProgressMichael MunozRequested by Mr. Whitener Rm. 566 Ag. Shop-
Need a new oil pressure gauge for air
compressor. (0-30 PSI) Current gauge leaks
compressor oil out of crankcase and on to the
floor. Need a new air pressure gauge for air
compressor, current gauge is to small. Need a 0-150PSI gauge.
Medium
11/1/2005 10:45:34 AM Page 24 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/9/2005 Velia Alarcon Gadsden HS4359 Work In ProgressManny LozoyaRequested by Velia Rm. 112 Front Office-Two
additional key are needed of HJ13, one for the
floating teacher and one for the Key Box. For
room number 609.
Medium
8/9/2005 Velia Alarcon Gadsden HS4360 Work In ProgressManny LozoyaRequested by Velia Rm. 112 Front Office-Two
additional keys are needed of HJ7, one for the
floating teacher and one for the Key Box. For
room number 753.
Medium
8/9/2005 Velia Alarcon Gadsden HS4361 Work In ProgressManny LozoyaRequested by Velia Rm. 112 Front Office-Two
additional keys are needed of HK1, one for the
floating teacher and one for the Key Box. For the
Auto Shop.
Medium
8/9/2005 Velia Alarcon Gadsden HS4362 Work In ProgressManny LozoyaRequested by Velia Rm. 112 Front Office-We
need 5 additional keys of HE1. For the Gyms. Medium
8/9/2005 Velia Alarcon Gadsden HS4363 Work In ProgressManny LozoyaRequested by Velia Rm. 112 Front Office-Two
additonal keys are needed of HK5, one for the
I.A. in the classroom and one for the key box. For
room number 569.
Medium
8/10/2005 Velia Alarcon Gadsden HS4429 Work In ProgressManny LozoyaRequested by Velia Rm. 112 Front Office-Three
HE keys are needed for Key Box. Medium
8/17/2005 Velia Alarcon Gadsden HS4633 Work In ProgressDanny MirandaRequested by ISS Rm. 800 Old Counseling
Center-Door frame falling off portable door
leading to the old counseling center.
Medium
8/17/2005 Velia Alarcon Gadsden HS4629 Work In ProgressManny LozoyaRequested by Mr. Dixon Rm. 600 Business
Building-Two keys of M114 for the Varsity Gym
bathrooms. One for Mr. Dixon and one for key
box.
Medium
8/17/2005 Velia Alarcon Gadsden HS4630 Work In ProgressManny LozoyaRequested by Mr. Dixon Rm. 600 Business
Building-Needs an F3 gate key. Medium
8/15/2005 Velia Alarcon Gadsden HS4563 Work In ProgressMario ApodacaRequested by Ms. Moreno Rm. 126 Main Building-
Install white board. Medium
8/15/2005 Velia Alarcon Gadsden HS4562 Work In ProgressFernando MoncayoRequested by Ms. Klein Rm. 504 Annex Building-
Air conditioner not working and appears to be
leaking.
Medium
11/1/2005 10:45:34 AM Page 25 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/15/2005 Velia Alarcon Gadsden HS4564 Work In ProgressFernando MoncayoRequested by Ms. Nanez Library-Install plywood
baks to magazine shelves. Medium
8/17/2005 Velia Alarcon Gadsden HS4627 Work In ProgressManny LozoyaRequested by Velia Rm. 112 Front Office-Work
order #3911 was not asked to me made off
master, also three keys were asked for not two.
An additional 4 keys are needed as soon as
possible.
Medium
8/17/2005 Velia Alarcon Gadsden HS4631 Work In Progress9/16/2005 Ruben RonquilloRequested by Ms. M. Gonzalez Rm. 140 Old
English Building-I would like to request a door
stop for the new door and blinds fo one of my
windows. The room gets "very" warm
escpecially 4th period.
Receive measurements from Bldg Mechanic and
re-route to Ruben for ordering.
4 ea - 43" W x 90' L
Medium
8/8/2005 Velia Alarcon Gadsden HS4288 Work In ProgressMichael Mc DermottRequested by Mr. Whitener Rm. 566 Ag. Shop-
Lights are burned out in the shop. Medium
8/8/2005 Velia Alarcon Gadsden HS4272 Work In ProgressManny LozoyaRequested by Ms. Klein Rm. 504 Annex Building-
Having a hard time locking and opening door,
appears to be locked but stays unlocked.
Medium
8/8/2005 Velia Alarcon Gadsden HS4279 Work In ProgressManny LozoyaRequested by Ms. Littlefield Rm. 226 North
Building-The lock on my podium and one storage
cabinet is brocken and lost.
Medium
8/8/2005 Velia Alarcon Gadsden HS4283 Work In ProgressManny LozoyaRequested by Mr. Myers Rm. 509 Annex Building-
Key will not open storage door. HJ10 is the key
that should open door.
Medium
8/8/2005 Velia Alarcon Gadsden HS4286 Work In ProgressManny LozoyaRequested by Mr. Villa Rm. 510 Band Room-Need
two HK13 keys made. Medium
8/8/2005 Velia Alarcon Gadsden HS4268 Work In ProgressFernando MoncayoRequested by Ms. Hunt Rm. 105 Main Building-
Roof leaks.
8/11 - Route to Fernie as per Mike
Medium
8/8/2005 Velia Alarcon Gadsden HS4271 Work In ProgressFernando MoncayoRequested by Ms. Kalkwarf Rm. 750 Barracks-
Floor tiles are broken and coming off the floor. Medium
8/8/2005 Velia Alarcon Gadsden HS4285 Work In ProgressFernando MoncayoRequested by Mr. Villa Rm. 510 Band Room-
Security light in the center of the room does not
work.
Medium
11/1/2005 10:45:34 AM Page 26 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/5/2005 Velia Alarcon Gadsden HS4248 Work In ProgressManny LozoyaRequested by Ms. Gutierrez Rm. 823 Barracks-
New cylinder is needed for new filing cabinet, 3
keys are needed.
Medium
8/5/2005 Velia Alarcon Gadsden HS4243 Work In ProgressMario ApodacaRequested by Ms. Bradley Rm. 602 Business
Building-Handle on window has broken off,
needs to be replaced.
Medium
8/8/2005 Velia Alarcon Gadsden HS4282 Work In ProgressMichael MunozRequested by Mr. Martinez Rm. 227 North
Building-Replace carpet in Attendance Office
area. One edge of the carpet is lifting, our
concern is that a person may trip and fall.
Medium
8/8/2005 Velia Alarcon Gadsden HS4269 Work In ProgressRuben RonquilloRequested by Ms. Jacquez Rm. 752 Barracks-
Window is unhinged and needs to be repaired. Medium
8/4/2005 Velia Alarcon Gadsden HS4199 Work In ProgressManny LozoyaRequested by Mr. Chambers Rm. 110 Front
Office-Re-key doors, make cylinders off D
Master, 4 keys will be needed. Have had several
items stolen from office, please re-key as soon
as possible.
Medium
8/4/2005 Velia Alarcon Gadsden HS4222 Work In ProgressDanny MirandaRequested by Mr. Grubaugh Rm. 275C Library-
The door to the video room has swollen and will
not shut properly unless its slammed.
Medium
8/4/2005 Velia Alarcon Gadsden HS4204 Work In ProgressMichael MunozRequested by Cathy Cano Parking Lot-Over Fall
Break, have the lines in the North Parking Lot
painted.
Medium
8/3/2005 Velia Alarcon Gadsden HS4166 Work In ProgressFernando MoncayoRequested by Mr. Donaldson Rm. 554 Wood
Shop-Replace ceiling tile in storeroom and office. Medium
8/3/2005 Velia Alarcon Gadsden HS4153 Work In ProgressManny LozoyaRequested by Mary Barreras Rm. 130 Old English
Building-Need the new key to new lock to Sp. Ed.
storage room for files and equipment. Key # M260
Medium
7/21/2005 Velia Alarcon Gadsden HS3754 Work In ProgressManny LozoyaRequested by Velia Rm. 800 Old Counseling
Center Portable-Doors need to be re-keyed as
soon as possible. This portable will be used as
the ISS classroom, 4 keys are needed.
Medium
7/20/2005 Velia Alarcon Gadsden HS3715 Work In ProgressManny LozoyaRequested by Mr. Pawloski Rm. 109A Main
Building (Sp.Ed. Office)-Please remove the lock in
my file cabinet, replace, and re-key it with a new
one.
Medium
11/1/2005 10:45:34 AM Page 27 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
7/20/2005 Velia Alarcon Gadsden HS3716 Work In ProgressManny Lozoya***URGENT***Requested by Velia Library-All the
doors in the library need to be secured. They
have changed all the door knobs and the
cylinders need to be installed. URGENT library has alot of equipment that needs to me locked
and secured!
Medium
7/28/2005 Velia Alarcon Gadsden HS3910 Work In ProgressFernando MoncayoRequested by Isela Martinez New Counseling
Center Portable-Bracket needed for N.M. Flag. Medium
7/28/2005 Velia Alarcon Gadsden HS3902 Work In ProgressManny LozoyaRequested by Ms. Marquez New Counseling
Portable-Two filing cabinets need to be keyed. Medium
7/28/2005 Velia Alarcon Gadsden HS3920 Work In ProgressManny LozoyaRequested by Velia Front Office-The cylinder for
room #107 will not open with a D Master or key
assigned to door. This classroom is the Day Care
on our campus and the building custodian can
not open the classroom to clean. Please fix as
soon as possible.
Medium
7/28/2005 Velia Alarcon Gadsden HS3908 Work In ProgressMario ApodacaRequested by Isela Martinez New Counseling
Center Portable-Dr. Pockets to be placed in
Marie's copy to be placed on wall.
Medium
7/28/2005 Velia Alarcon Gadsden HS3909 Work In ProgressMario ApodacaRequested by Isela Martinez New Counseling
Center Portable-Install clock on wall. Medium
7/12/2005 Velia Alarcon Gadsden HS3493 Work In ProgressDanny MirandaRequested by Pamela Holguin Rm. 228 North
Building-A door frame is needed. Will have an old
door installed, left over from doors that are being
replaced in North Building. Also, a door knob that
will not lock is needed.
Medium
7/12/2005 Velia Alarcon Gadsden HS3494 Work In ProgressManny LozoyaRequested by Marie New Counceling Center
Portable-New portable needs to be keyed
HE134. Change old cylinder to doors of new
portable doors.
Medium
9/19/2005 Velia Alarcon Gadsden HS5601 Work In ProgressJose AmbrizRequested by Ms. Thornley Rm. 660 Business
Building-No heat/A.C. in lounge. Please attempt to
tie into the ducting in my classroom (it has it's
own system and is immediately adjacent) so that
our lounge can be more comfortable.
Medium
9/23/2005 Velia Alarcon Gadsden HS5798 Work In ProgressFernando MoncayoRequested by Mr. D. Gallegos Rm. 406 Boys Gyn-
Roof leaks, air conditioner condensation. Medium
11/1/2005 10:45:34 AM Page 28 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
9/12/2005 Velia Alarcon Gadsden HS5412 Work In ProgressDavid VillalobosRequested by D. Gallegos Rm. 403 Boys Gym-
Install threaded end on faucet or shower in
volleyball and boys basketball lockers to allow
for a water hose connection.
Medium
9/12/2005 Velia Alarcon Gadsden HS5414 Work In ProgressFernando MoncayoRequested by Mr. G. Holguin Rm. 342 Academic
Building-Cabinets in room need to be stabilized. Medium
9/12/2005 Velia Alarcon Gadsden HS5416 Work In ProgressMario ApodacaRequested by Mrs. Klein Rm. 504 Annex Building-
Roof is leaking, one spot has mold, and one panel
is buldging down.
Medium
9/12/2005 Velia Alarcon Gadsden HS5405 Work In ProgressManny LozoyaRequested by Velia Rm. 112 Front Office-HG3 is
needed for key box. Medium
9/12/2005 Velia Alarcon Gadsden HS5406 Work In ProgressManny LozoyaRequested by Velia Rm. 112 Front Office-Two
SA16 are needed, one for Ms. Dominguez and
one for key box.
Medium
9/12/2005 Velia Alarcon Gadsden HS5407 Work In ProgressManny LozoyaRequested by Marie School Registrar Storage
Room East Wing of the Cafeteria-The new vault
needs to be re-keyed. The cylinder from the old
vault can be placed on the door of the East Wing of the Cafeteria were her new vault is located
now.
Medium
9/12/2005 Velia Alarcon Gadsden HS5409 Work In ProgressManny LozoyaRequested by Marie Storage Room in the East
Wing of the Cafeteria-In the move from the old
vault to the storage room one of the fire prove
filing cabinet's locks broke. The filing cabinet
remained locked, needs to be fixed as soon as
possible as the Registrar needs access to these
files on a daily basis.
Medium
10/28/2005 Velia Alarcon Gadsden HS6833 Work In ProgressMichael Mc DermottRequesed by Luis Saucedo Main Building-East
and west hallways the light switchs are broken.
Having a problem turning on the lights every
morning. Light switches on each corner.
Medium
10/28/2005 Velia Alarcon Gadsden HS6843 Work In ProgressManny LozoyaRequested by Velia Rm. 112 Front Office-On
8/23/05 Work Order # 4812 was entered, Lt.
Dickerson's HEM key had broken and an
additional two keys were needed for key box. Lt. Dickerson did recieve his new key from
Manny the locksmith, but the two additional keys
were not cut or issued to me. Luis Saucedo's
(Custodian) HEM key has worn out and needs
replacing. Pleace have Manny complete Work
Order # 4812.
Medium
11/1/2005 10:45:34 AM Page 29 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/28/2005 Velia Alarcon Gadsden HS6832 Work In ProgressDavid VillalobosRequested by Ms. Pena Rm. 128 North Building-
Plugged kitchen sink. Medium
10/28/2005 Velia Alarcon Gadsden HS6834 Work In ProgressDavid VillalobosRequested by Luis Saucedo Rm. 502 Weight
Room-2ND REQUEST Both sinks are loose from
the base and the water drains to slow and the
urinal has a leak in the base.
Medium
10/28/2005 Velia Alarcon Gadsden HS6830 Work In ProgressFernando MoncayoRequested by Velia Rm. 127 Main Building-When
the sound system contractors installed the wiring
in Ms. Garcia's classroom. They placed it on a
wall Ms. Garcia used for her projector. Once
they removed the wiring and placed it on another
wall, they left the wall scrated and paint peeled.
Wall needs to be repaired and painted.
Medium
10/28/2005 Velia Alarcon Gadsden HS6831 Work In ProgressManny LozoyaRequested by Ms. L. Chavez Rm. 402 B.Gym
Girls Basketball Office-A SA16 key is need for
Coach S. Alvarado. A work order has been
placed for this key already (Work Order # 5406),
but only two keys were asked for. A total of
three keys are needed now.
Medium
10/28/2005 Velia Alarcon Gadsden HS6835 Work In ProgressManny LozoyaRequested by Luis Saucedo Rm. 507 Annex
Building-The door knob turns around and around
with the key inside.
Medium
10/25/2005 Velia Alarcon Gadsden HS6713 Work In ProgressFernando MoncayoRequested by Ms. Trich Library-Please replace
blown light bulbs, especially in Librarian's office,
room 275b.
Medium
10/25/2005 Velia Alarcon Gadsden HS6710 Work In ProgressMario ApodacaRequested Ms. Nanez Library-Backs to shelves
need to be installed. Backs are in library,
however, they need to be cut down to fit.
Medium
10/25/2005 Velia Alarcon Gadsden HS6704 Work In ProgressMargret VillalobosRequested by Mr. Lawrence Rm. 402 Boys Gym
(Offices)-Please fumigate, roach infestation. Medium
10/25/2005 Velia Alarcon Gadsden HS6711 Work In ProgressJose AmbrizRequested by Ms. A. Torres Rm. 200 North
Building-Do not turn off A.C. Teacher has student
with special needs, if temparture is not low
student becomes ill and A.C. unit is currently not
cooling.
Medium
10/11/2005 Velia Alarcon Gadsden HS6289 Work In ProgressDavid VillalobosRequested by Ms. Trich Rm. 275a Library-Please
flush trap or pump sewage to eliminate the odor
of raw sewage in the girl's bathroom.
Medium
11/1/2005 10:45:34 AM Page 30 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/11/2005 Velia Alarcon Gadsden HS6280 Work In ProgressMario ApodacaRequested by Mr. Donaldson Rm. 554 Woodshop-
Replace or repair ceiling tile in office. Second
Request
Medium
10/11/2005 Velia Alarcon Gadsden HS6282 Work In ProgressMario ApodacaRequested by Mr. Donaldson Rm. 554 Woodshop-
Paint (or provide paint)for repainting the tool room
and paint room. Second Request
Medium
10/11/2005 Velia Alarcon Gadsden HS6286 Work In ProgressMichael Mc DermottRequested by Mr. Donaldson Rm. 554 Woodshop-
Install circuit with sufficient amperage to run
Drum Sander. Second Request
Medium
10/11/2005 Velia Alarcon Gadsden HS6287 Work In ProgressMichael Mc DermottRequested by Mr. Donaldson Rm. 554 Woodshop-
Route stationery power tools through central
emergency shut off. Second Request
Medium
10/11/2005 Velia Alarcon Gadsden HS6288 Work In ProgressMichael Mc DermottRequested by Mr. Donaldson Rm. 554 Woodshop-
Replace burned out transformer for overhead
lights. Second Request
Medium
10/11/2005 Velia Alarcon Gadsden HS6274 Work In ProgressMichael MunozRequested by Mr. Chambers Varsity Gym-
Varsity Gym floor is showing large space and
boards are coming loose, needs repair a.s.a.p. SAFETY ISSUE
Medium
10/11/2005 Velia Alarcon Gadsden HS6272 Work In ProgressDavid VillalobosRequested by Velia Rm. 112 Main Building-Sink is
leaking, the base is warped and growing mold. Medium
10/11/2005 Velia Alarcon Gadsden HS6273 Work In ProgressFernando MoncayoRequested by Velia Rm. 100 Main Building-All of
the doors and drawers need to be tightened,
they're all off their tracks or broken.
Medium
10/11/2005 Velia Alarcon Gadsden HS6285 Work In ProgressFernando MoncayoRequested by Mr. Donaldson Rm. 554 Woodshop-
Replace burned out lights in paint room. Medium
10/17/2005 Velia Alarcon Gadsden HS6454 Work In ProgressFernando MoncayoRequested by Mr. Chambers Football Restrooms-
Paint large letters on restroom indicating men's
and women's sides, or hang large signs
indicating directions.
Medium
10/17/2005 Velia Alarcon Gadsden HS6460 Work In ProgressManny LozoyaRequested by Mr. Whitener Rm. 563 Ag. Shop-
Install a hydralic door closer on the new front
door to the building.
Medium
11/1/2005 10:45:34 AM Page 31 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/17/2005 Velia Alarcon Gadsden HS6459 Work In ProgressMario ApodacaRequested by Ms. A. Torres Rm. 200 North
Building-A new device was placed in my room
and needs help putting it together.
Medium
10/17/2005 Velia Alarcon Gadsden HS6457 Work In ProgressDavid VillalobosRequested by Ms. Littlefield Rm. 226 North
Building-Sink faucet needs to be fixed. Faucet is
leaking and she will be having labs soon.
Medium
8/29/2005 Margret Villalobos Gadsden MS5119 Work In ProgressEnrique SoteloPower Outage - El Paso Electric
Medium
10/13/2005 Rudy Arreola Gadsden MS6384 Work In ProgressEnrique SoteloLight by main entrance is not working.
Medium
10/13/2005 Rudy Arreola Gadsden MS6386 Work In ProgressEnrique SoteloLight on the westside of the bandroom doesnt
turn on. Medium
9/16/2005 Rudy Arreola Gadsden MS5569 Work In ProgressEnrique Sotelo ClassroomVOC BLDG RM#306 - Need some assistance
changing out ballast already replaced lamps high
ceiling.
Medium
9/23/2005 Rudy Arreola Gadsden MS5793 Work In ProgressDanny Miranda Restroom (Boys){{{GYM LOBBY}}} Wall needs to be secured.
Medium
9/28/2005 Rudy Arreola Gadsden MS5918 Work In ProgressManny LozoyaDoor handle is broken off boys lockerroom
Medium
9/7/2005 Rudy Arreola Gadsden MS5317 Work In ProgressJoe Ontiveros ClassroomNeed to cap of water lines and drain removed
already removed sink and counters. RM#188. Medium
9/30/2005 Rudy Arreola Gadsden MS5985 Work In ProgressGuadalupe OntiverosWe can borrow the 935 to cut around bus turn
around and behind annex and football field. Medium
8/4/2005 Rudy Arreola Gadsden MS4218 Work In ProgressJaime Gomez ClassroomCoil in not cooling cleaned out strainer and
checked valve. RM 156 Medium
8/4/2005 Rudy Arreola Gadsden MS4220 Work In ProgressJaime Gomez ClassroomRm 157/158 Unit is not cooling at all cleaned out
strainer and checked valves. Medium
8/19/2005 Rudy Arreola Gadsden MS4725 Work In ProgressRudy Arreola PortablesPortable 500/501 really leak bad right in the
center of the room. Medium
8/12/2005 Rudy Arreola Gadsden MS4528 Work In ProgressJaime GomezWe need 2 water fountains replaced in cafeteria.
Medium
7/18/2005 Ricardo Jacquez Gadsden MS3616 Work In ProgressDanny Mirandareplace door at pump room
Medium
11/1/2005 10:45:34 AM Page 32 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/24/2005 Jimmy Carbajal Gadsden MS4867 Work In ProgressJimmy Carbajal Hallway/CorridorTHE PAD HOLDER IS WORN OUT AND WONT
HOLD THE PAD AT ALL. Medium
7/15/2005 Lorenzo Hernandez Gadsden MS3582 Work In Progress8/2/2005 Enrique SoteloIRRIGATION CTRL PANEL - IRRIGATION
BOOSTER PUMP IS NOT WORKING. PLEASE
TROUBLESHOOT BUS TURNAROUND AREA.
ROUTED TO ENRIQUE AS PER RICK 8/2/05
Medium
8/2/2005 Gadsden MS4095 Work In ProgressRudy Arreolaplease fiil hole that is in front of entrance to band
room. Will need a backking before gravel is
applied. see mike
High
9/29/2005 Gadsden MS5961 Work In ProgressRudy Arreolaplease reomve and replaced stained ceiling tiles
in Mr.Lowenburgs office. Medium
10/14/2005 Gadsden MS6424 Work In ProgressEnrique SoteloWE NEED LIGHTS IN THE BOYS & GIRLS RR IN
MAIN BLDG, ALSO WE NEED THE LIGHTS IN
HALLWAYS AS PER PM 6095.
Medium
10/18/2005 Gadsden MS6500 Work In ProgressGuadalupe Ontiveros Football Fieldplease cut weeds around and inside tennis
courts Medium
10/18/2005 Gadsden MS6499 Work In ProgressRudy Arreola Portablesplease order and install gutters, on east portable
mold is growing please remove as per trainging. Medium
10/10/2005 Aida Salcedo Gadsden MS6228 Work In ProgressJuan AcostaNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD
CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
8/22/2005 Dana Hamel Gadsden MS4778 Work In ProgressManny Lozoya Office2nd request for an "A" master for GMS Campus
Medium
8/22/2005 Dana Hamel Gadsden MS4777 Work In ProgressRudy Arreola OfficeThe three locks on the office front window are
broken, mostly poor design. The front office is
wide open until these are repaired or replaced
Medium
8/17/2005 Dana Hamel Gadsden MS4643 Work In ProgressManny LozoyaNeed a copy of fire alarm key (See Mr. Hamel for
his key). Medium
8/12/2005 Dana Hamel Gadsden MS4522 Work In ProgressDanny Miranda PortablesDoor broken in room 500, and window shattered
Medium
11/1/2005 10:45:34 AM Page 33 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/26/2005 Dana Hamel Gadsden MS4982 Work In ProgressJaime Gomez ClassroomWhole south side of annex does not have any
air, class temperatures are above 95 degrees.
The classes opposite hallway have conditioning,
Please fix ASAP
Medium
8/24/2005 Dana Hamel Gadsden MS4863 Work In ProgressManny Lozoya OfficeNeed extra keys to Key storage cabinet
Medium
7/19/2005 Dana Hamel Gadsden MS3651 Work In ProgressMargret Villalobos OfficeMice in Gloria Hernandez office in C Wing. Need
control as soon as possible
1) HAD JUAN CHECK FOR ANY FOOD AROUND,
2) REQUESTED THAT THEY ASK R. RONQUILLO
FOR MICE TRAPS (W/GLUE) 3) FAXED FOR
PRICE QUOTE AS PER M. MUNOZ FOR THE
WHOLE C-WING.
Medium
7/19/2005 Dana Hamel Gadsden MS3652 Work In ProgressMargret Villalobos Hallway/CorridorCockroach issues for the total school, need a
monthly spraying
Faxed PO - 8/4/05 -mkv
Medium
7/19/2005 Dana Hamel Gadsden MS3653 Work In ProgressRudy Arreola Gympaint the columns on outside of gym
Medium
7/19/2005 Dana Hamel Gadsden MS3654 Work In ProgressRudy Arreola Restroom (Boys)paint over the scratchouts in boys black
restrooms Medium
7/19/2005 Dana Hamel Gadsden MS3655 Work In ProgressRudy Arreolapaint the front columns of the school to remove
tagging Medium
9/8/2005 Dana Hamel Gadsden MS5347 Work In ProgressManny LozoyaMr. Hamel needs an "A" master for GMS campus
3rd request Medium
9/14/2005 Dana Hamel Gadsden MS5499 Work In ProgressManny Lozoya Electrical RoomChange M4 key to a G key in all electrical room on
campus, we have no "m" master Medium
9/14/2005 Dana Hamel Gadsden MS5500 Work In ProgressManny Lozoya Mechanical Roomchange A3 key to a "g" key in storage room in
annex Medium
9/14/2005 Dana Hamel Gadsden MS5501 Work In ProgressManny Lozoya Hallway/CorridorRepair the outside doors locks "w" master will
not open doors to lobby Medium
9/14/2005 Dana Hamel Gadsden MS5502 Work In ProgressManny Lozoyarequest 3 new "G" keys for principal and
custodians Medium
9/26/2005 Dana Hamel Gadsden MS5834 Work In ProgressDanny Miranda Restroom (Boys)replace the stalls in restroom by nurses office
(urinals) Medium
11/1/2005 10:45:34 AM Page 34 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
9/26/2005 Dana Hamel Gadsden MS5832 Work In ProgressManny Lozoya OfficeKey both locks in registrar area (Gloria
Hernandez) to the A 53 key Medium
9/29/2005 Dana Hamel Gadsden MS5975 Work In ProgressManny LozoyaNeed 1 each of the following keys for box,
A88,A86,WA83, WA88,WA148, WA25, WA8 and
three O2 keys (Mr. Hamel also)
Medium
10/10/2005 Dana Hamel Gadsden MS6241 Work In ProgressDavid Boyd ClassroomThe new roof on the vocational building leaked
badly over vacation and the insulation in the old
woodshop is falling. Serious problem with
students returning tomorrow could fall at any
time.
Medium
8/4/2005 Yolie Jacquez Gadsden MS4195 Work In ProgressMichael MunozGate by canel road still needs to be replaced.
Gate not secure and needs to be replaced.
(chain is not strong enough).
Medium
10/10/2005 Aida Salcedo La Mesa ES6229 Work In ProgressArmando DiazNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD
CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
8/31/2005 Alma Terrell La Mesa ES5116 Work In ProgressMargret Villalobos Cafeteriacockroach problem
Laura Benavidez - SNP Manager 233-2646
Medium
9/7/2005 Alma Terrell La Mesa ES5309 Work In ProgressDanny Orozco CafeteriaMilk Cooler was at 60 degrees this morning 9/7/05
Medium
8/5/2005 Frank Lara La Mesa ES4229 Work In ProgressGuadalupe Ontiveroslupe ontiv.
need helped to cut large branch by picnic table
safety issue
Medium
8/10/2005 Frank Lara La Mesa ES4446 Work In ProgressDanny OrozcoDANNY
NEED BUCKET TO BRING ROPE DOWN TO TIE
OTHER
END, CAME OF
Medium
8/9/2005 Frank Lara La Mesa ES4378 Work In ProgressManny Lozoyalocksmith
need three keys for supply rm.
key no F 49
8/23- Debra needs status on this work order
submitted on 8/9/05 - mkv
Medium
11/1/2005 10:45:34 AM Page 35 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/31/2005 Santos Galindo La Union ES5117 Work In ProgressCarlos CastilloLights in computer room keeps going out; breaker
needs to be checked. Medium
8/24/2005 Santos Galindo La Union ES4853 Work In ProgressDavid VillalobosSINK AT CUSTODIAL CLOSET AT OLD BLDG. IS
CLOGGED UP. Medium
9/12/2005 Santos Galindo La Union ES5425 Work In ProgressMargret VillalobosWe need Vector Control to come in and spray.
Medium
8/23/2005 Santos Galindo La Union ES4825 Work In ProgressManny LozoyaNeed keys for room #100, #106, and room #108;
plus keys for a file cabinet in the nurse's office. Medium
8/22/2005 Santos Galindo La Union ES4775 Work In ProgressSalvador GonzalezParking lanes need to be repaint in yellow and
bus lane also needs to be repaint but in red.
Route to Sal Gonzalez as per Mike 9/13/05 -mkv
Medium
8/19/2005 Santos Galindo La Union ES4695 Work In ProgressCarlos CastilloAUGUST 31 IS OPEN HOUSE WOULD LIKE ALL
LIGHTS OUT SIDE TO BE CHECKED BEFORE
THEN.
Medium
8/9/2005 Santos Galindo La Union ES4356 Work In ProgressCarlos Castilloin room 202 there is no outlet for refrigeration unit
a.s.p. Medium
8/10/2005 Santos Galindo La Union ES4408 Work In ProgressCarlos Castilloa light next to my office need to be looked at
cause it buzzes all day long. Medium
8/10/2005 Santos Galindo La Union ES4410 Work In ProgressCarlos CastilloThey need to check lighting from building cause
several lights are off. And some stay on 24 hrs
out side.
Medium
8/5/2005 Santos Galindo La Union ES4223 Work In ProgressCarlos Castilloneed an electrical outlet by computer hookups
room 203. Medium
8/9/2005 Santos Galindo La Union ES4372 Work In ProgressJose Ambrizneed a fan motor in electrical storage room.
Medium
9/7/2005 Santos Galindo La Union ES5312 Work In ProgressLorenzo SolisAfter last nights rainfall, leaks were discovered
in rooms #208, #209, and the library. Medium
9/9/2005 Santos Galindo La Union ES5371 Work In ProgressSalvador Gonzalez In the women's restroom, in the southwing, the
toilet is constantly flushy. Medium
10/25/2005 Santos Galindo La Union ES6719 Work In ProgressMichael Munoz Officeneed floor tile in lounge
Medium
11/1/2005 10:45:34 AM Page 36 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/25/2005 Santos Galindo La Union ES6718 Work In Progress10/26/2005 Carlos Castillo Officeneed electrical outlet on north wall
Medium
10/14/2005 Santos Galindo La Union ES6403 Work In ProgressRuben RonquilloNEED CORK STRIP INFRONT OF THE OFFICE IN
HALLAWAY. Medium
10/14/2005 Salvador Gonzalez La Union ES6418 Work In ProgressAngel GonzalesWork Truck - need to repair broken tial-light.
Medium
10/28/2005 Salvador Gonzalez La Union ES6840 Work In ProgressRuben Ronquillo OfficeOFFICE - NEED GLUE BOARD OR MICE TRAPS.
Medium
9/23/2005 Salvador Gonzalez La Union ES5786 Work In ProgressManny LozoyaUpper hinge on door at JTP needs to be repair.
Might need to be weld Medium
9/14/2005 Salvador Gonzalez La Union ES5503 Work In ProgressCarlos CastilloOld emergency light fixtures (the complete
system) are not working can you check them
please. thank you
Medium
9/29/2005 Salvador Gonzalez La Union ES5949 Work In ProgressCarlos CastilloMusic Room needs a new circuit installation.
Medium
8/24/2005 Selma Nevarez La Union ES4864 Work In ProgressManny Lozoya JTPJTP- Rosaro Ruedas needs a L201 key.
Medium
9/12/2005 Margret Villalobos La Union ES5447 Work In ProgressAlfredo HolguinStudent Cross Walk - Path on the west side there
is a tree that is in the way. Students have to
scoot over onto the street.
Medium
7/15/2005 Arturo Nunez La Union ES3572 Work In ProgressCarlos CastilloNEED LIGHT BULBS FOR RECESSED LIGHTS AT
LA UNION ELEM. THE MAJORITY ARE BURNED
OUT. THANK YOU.
Medium
7/6/2005 Alfredo Holguin La Union ES3322 Work In ProgressEddie BaezaYearly - La Union ES Emer. Light Test: Annual -
Refer to PM schedule details. Medium
10/10/2005 Aida Salcedo La Union ES6230 Work In ProgressSantos GalindoNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD
CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
11/1/2005 10:45:34 AM Page 37 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/17/2005 La Union ES6476 Work In ProgressDavid VillalobosLUJTP - INSTALL DRYER (NEED VENT DIRECTED
OUT OF BLDG - OKAYED BY MR. ALVAREZ).
PLEASE CALL MR. CASVANTES @ 589-3009 IF
YOU NEED ANY INFORMATION.
Medium
8/25/2005 La Union ES4917 Work In ProgressMichael Munozplease repair asphalt where other water line
was repired. Medium
7/6/2005 Alfredo Holguin La Union ES3344 Work In ProgressEddie BaezaYearly - La Union ES Exit Sign Test: Annual -
Refer to PM schedule details. Medium
7/6/2005 Alfredo Holguin Loma Linda ES3345 Work In ProgressMichael Mc DermottYearly - Loma Linda ES Exit Sign Test: Annual -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Loma Linda ES6051 Work In ProgressDanny OrozcoMonthly - Loma Linda ES Fire Sprinkler Insp. -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Loma Linda ES6066 Work In ProgressDanny OrozcoMonthly - Loma Linda ES Fire Suppression Insp. -
Refer to PM schedule details. Medium
9/16/2005 Loma Linda ES5568 Work In ProgressManny LozoyaAs per Mike Munoz issue a 6 & 7 Grand Master
keys to Mike Mc Dermott. Medium
10/24/2005 Grace Alvarado Loma Linda ES6686 Work In ProgressEnrique SoteloINSTALL ELECTRICAL CIRCUIT IN ROOM 208 FOR
MICROWAVE AND FRIDGE. Medium
10/24/2005 Grace Alvarado Loma Linda ES6665 Work In ProgressGuadalupe OntiverosNEEDS TO REPAIR DUMPSTER PAD THAT WAS
BUILT. REPLACE TWO BENCHES ON
PLAYGROUND. AND LEVEL PLAYGROUND
AREA WITH SCRAPER
Medium
10/28/2005 Grace Alvarado Loma Linda ES6829 Work In ProgressMichael Mc DermottATTN: MIKE
LIGHTS IN ROOM 208, SPLITTING??????? Medium
10/31/2005 Grace Alvarado Loma Linda ES6888 Work In ProgressManny LozoyaNEEDING STORAGE CABINETT REPAIRED.
PREFERRABLY A LATCH AND LOCK.
SOMETHING TO KEEP CABINETT CLOSED
Medium
10/12/2005 Grace Alvarado Loma Linda ES6342 Work In ProgressMichael Mc DermottNEEDING COAT RACK MOVED IN ROOM 202
Medium
11/1/2005 10:45:34 AM Page 38 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
7/26/2005 Grace Alvarado Loma Linda ES3829 Work In ProgressManny LozoyaMR. TRUJILLO IS WANTING NEW KEYS MADE
FOR DESKS, CABINETTS AND FILE CABINETS.
ALSO NEEDING NAME PLATE FOR NEW
TEACHERS. MS. BERARD, CHAVEZ-FISHER, GRIEGO, DESANTIAGO, HUGHES, MARKHAM,
MEDINA, MERRICK, MONTES, PINA, PRICE, RIOS-
ALVILLAR,
Medium
8/8/2005 Grace Alvarado Loma Linda ES4315 Work In ProgressManny LozoyaMANNY LOZOYA, FIX LOCK IN 212
Medium
8/8/2005 Grace Alvarado Loma Linda ES4316 Work In ProgressManny LozoyaMANNY LOZOYA: KEY MADE FOR PORTABLES
WILL NOT OPEN STORAGE ROOM. MASTER
WILL NOT OPEN STORAGE ROOM. NEEDING
STORAGE ROOM OPENED AS SOON AS
POSSIBLE.
Medium
8/8/2005 Grace Alvarado Loma Linda ES4317 Work In ProgressManny LozoyaMANNY LOZOYA: NEEDING KEYS FOR BOOK
ROOM, ROOM #208, AND KEY #44 Medium
8/8/2005 Grace Alvarado Loma Linda ES4330 Work In ProgressRuben RonquilloNEEDING COAT RACK HOOKS IN ROOM #203 &
207& 201 Medium
8/16/2005 Grace Alvarado Loma Linda ES4593 Work In ProgressMichael MunozMIKE MUNOZ, REPLACE EAST FENCE
Medium
7/6/2005 Alfredo Holguin Loma Linda ES3323 Work In ProgressMichael Mc DermottYearly - Loma Linda ES Emer. Light Test: Annual -
Refer to PM schedule details. Medium
10/24/2005 Armando Diaz Loma Linda ES6684 Work In ProgressAida SalcedoNEED BROKEN DOLLY WHEEL TO BE REPLACED
A.S.A.P. Medium
10/10/2005 Aida Salcedo Loma Linda ES6231 Work In ProgressLuis SolisNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD
CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
9/13/2005 Michael Mc Dermott Loma Linda ES5466 Work In ProgressMichael Munoz Cafeteria store roomattn; mike munoz- we need to have kitchen
store room tiled with non slip tile like rest of
kitchen. francis would really enjoy it. thank you.
Medium
11/1/2005 10:45:34 AM Page 39 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
9/6/2005 Michael Mc Dermott Loma Linda ES5284 Work In ProgressMichael Munoz Athletic Field9-6-5 TO MIKE MUNOZ. MR. T. NEEDS TO
TALK WITH YOU ABOUT PUTTING A FENCE
ALONG NORTH SIDE OF SCHOOL. K-3 KIDS
ARE A CONCERN ABOUT GOING INTO VACANT AREA. THANK YOU.
Medium
9/6/2005 Michael Mc Dermott Loma Linda ES5283 Work In ProgressGuadalupe Ontiveros Athletic Field9-6-5 attn; lupe b. mr. truillo at loma linda would
like to meet with you about moving play ground
equpt. to grass area. thank you.
Medium
10/10/2005 Michael Munoz Loma Linda ES6217 Work In ProgressGuadalupe OntiverosNEED TO (PER ATTACHED DRAWING):
1. CUT CURB
2. DIG DIRT 4"
3. ADD CRUSH FINE / CEMENT
4. MOVE DUMPSTER INSIDE THE CURB
Medium
10/18/2005 David Villalobos Loma Linda ES6538 Work In ProgressAngel GonzalesNeed Ditch Witch delivered to Loma Linda
tomorrow. Medium
9/7/2005 Luis Solis Loma Linda ES5311 Work In ProgressAida SalcedoA.S.A.P PLEASE NEED A CORD LESS DRILL , IF
POSIBLE A TWO PACK BATTERIAS. ( THANK
YOU )
Medium
10/26/2005 Ruben Solis Mesquite ES6778 Work In ProgressJimmy Carbajal CustodialWE NEED TWO ADJUST O RIGHTCAP AND FOUR
WHEEL RETAINERS Medium
10/13/2005 Ricardo Jacquez Mesquite ES6356 Work In ProgressEnrique Sotelowire new pump on lift station #2
Medium
10/18/2005 Romauldo Apodaca Mesquite ES6506 Work In ProgressDavid Boyddavid boyd.need 2 sets of plans for the 1995
addition,per ms. phillips and all hazard team.thank
you.
Medium
10/18/2005 Romauldo Apodaca Mesquite ES6509 Work In ProgressGuadalupe Ontiveroslupe ontiveros.need play sand for play structures
and alma del valle.thanx. Medium
10/18/2005 Romauldo Apodaca Mesquite ES6508 Work In ProgressJaime Gomezjaime need to assist w/ boilers to change over to
heating,also need gas valve for heater in old
office.thanx.
Medium
10/18/2005 Romauldo Apodaca Mesquite ES6507 Work In Progress10/18/2005 Romauldo Apodacakiki, 5 rms w/ out lights need assistance.thanks.
ARREGLAR PROBLEMA EN ALAMBRADO DE LUCES EN SALONES DE OLD WING.
Medium
10/26/2005 Romauldo Apodaca Mesquite ES6779 Work In ProgressEnrique SoteloNO LIGHTS IN B. WING,WORK RM.,RM. 110 AND
112.THANX. Medium
11/1/2005 10:45:34 AM Page 40 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/26/2005 Romauldo Apodaca Mesquite ES6780 Work In ProgressGuadalupe OntiverosNEED 3 LOADS OF PLAY SAND FOR PLAY
STRUCTURES IN MESQUITE.THANX. PLUS 5
BUBBLERS FOR TREES. THANX.
Medium
10/26/2005 Romauldo Apodaca Mesquite ES6783 Work In ProgressRicardo JacquezNEED TO ORDER CLAMP FOR FILTERS TANK IN
BOILER RM.BOLT IS STIPPED. THANX. Medium
10/25/2005 Romauldo Apodaca Mesquite ES6700 Work In ProgressJaime Gomezjames need to assist on checking for carbon
monoxide on c and b wings and in
barracks.thanx.
Medium
9/29/2005 Romauldo Apodaca Mesquite ES5952 Work In ProgressRuben Ronquilloattention ruben ronquillo,need 6 tires for
gates.thanx. Medium
7/14/2005 Romauldo Apodaca Mesquite ES3558 Work In ProgressJaime Gomezneed compresor changed out on armstrong unit
in rm. 608.thanx. Medium
7/29/2005 Romauldo Apodaca Mesquite ES3955 Work In ProgressManny LozoyaDINING AREA - NEED TO WELD HINGES ON
DOOR FALLING DOWN. Medium
8/9/2005 Romauldo Apodaca Mesquite ES4340 Work In ProgressManny Lozoyamanny need to assist w/ 2 doors in porables
having hard time tpo close safety issue. also
need lever handle.
Medium
8/19/2005 Romauldo Apodaca Mesquite ES4699 Work In ProgressManny Lozoyamanny need your assistance w/ doors that are
hard to open and close. thanx. Medium
10/10/2005 Aida Salcedo Mesquite ES6232 Work In ProgressRuben SolisNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD
CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
7/6/2005 Alfredo Holguin Mesquite ES3324 Work In ProgressRomauldo ApodacaYearly - Mesquite ES Emer. Light Test: Annual -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Mesquite ES6067 Work In ProgressDanny OrozcoMonthly - Mesquite ES Fire Suppression Insp. -
Refer to PM schedule details. Medium
7/6/2005 Alfredo Holguin Mesquite ES3346 Work In ProgressRomauldo ApodacaYearly - Mesquite ES Exit Sign Test: Annual -
Refer to PM schedule details. Medium
11/1/2005 10:45:34 AM Page 41 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
7/31/2005 Alfredo Holguin Mesquite ES4005 Work In ProgressRomauldo ApodacaMonthly - Mesquite ES Emer. Light Test: Monthly -
Refer to PM schedule details. Medium
7/31/2005 Alfredo Holguin Mesquite ES3971 Work In ProgressRomauldo ApodacaMonthly - Mesquite ES Monthly FE Inpsection -
Refer to PM schedule details. Medium
7/31/2005 Alfredo Holguin Mesquite ES4015 Work In ProgressRomauldo ApodacaMonthly - Mesquite ES Exit Sign Insp: Monthly -
Refer to PM schedule details. Medium
7/12/2005 Alfredo Holguin Physical Plant Complex3461 Work In ProgressManny LozoyaNeed a copy of control key (core) to keep here at
the Maintenance Dept - as per A. Holguin. Medium
7/31/2005 Alfredo Holguin Physical Plant Complex4017 Work In ProgressRudy ArreolaMonthly - Physical Plant Exit Sign Insp: Monthly -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Physical Plant Complex6046 Work In ProgressRudy ArreolaMonthly - Physical Plant FE Inspection - Refer to
PM schedule details. Medium
9/15/2005 Physical Plant Complex5526 Work In ProgressManny LozoyaNEED A "CB4" KEY FOR GUILLERMO - TO HAVE
ACCESS TO ENERGY OFFICE TO CLEAN. Medium
7/7/2005 Physical Plant Complex3379 Work In ProgressRestroom (Boys)Mens Restroom in Custodial Warehouse -Install
new privacy lockset Low
7/7/2005 Physical Plant Complex3380 Work In ProgressFred Appelzoller Restroom (Boys)Mens Restroom in Custodial Warehouse- Replace
toilet tank cover with appropriate size for unit. Medium
10/2/2005 Alfredo Holguin Physical Plant Complex6113 Work In ProgressRudy ArreolaMonthly - Physical Plant Exit Sign Insp: Monthly -
Refer to PM schedule details. Medium
7/3/2005 Alfredo Holguin Physical Plant Complex3186 Work In ProgressRudy ArreolaMonthly - Physical Plant FE Inspection - Refer to
PM schedule details. Medium
10/28/2005 Carlos Castillo Physical Plant Complex6824 Work In ProgressJoe Ontiveros Electrical RoomUrinal has slow drain and water lever gets stuck
creating water overrun Medium
8/16/2005 Carlos Castillo Physical Plant Complex4585 Work In ProgressJoe Ontiveros Electrical RoomNeed to replace water heater,its giving out an
extremeley bad odor.Health issue. Medium
9/12/2005 Danny Miranda Physical Plant Complex5432 Work In ProgressManny LozoyaAuto Shop - need to install new door knob to
new door at Angel's Office. Medium
11/1/2005 10:45:34 AM Page 42 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/25/2005 Danny Miranda Physical Plant Complex6716 Work In ProgressDanny Mirandaneed to check water leak @ warehouse mail
room Medium
7/29/2005 Marta Jacquez Physical Plant Complex3940 Work In ProgressJaime GomezMARTA JACQUEZ - A/C UNIT IS NOT WORKING
AT ALL. Medium
8/29/2005 Margret Villalobos Physical Plant Complex5121 Work In ProgressEnrique SoteloPower Outage - El Paso Electric
Medium
9/22/2005 Maritza Gonzalez Physical Plant Complex5735 Work In ProgressManny LozoyaAS PER ALFREDO I NEED A COPY OF KEY TO
CUSTODIAL OFFICE.
THANK YOU.
Medium
8/29/2005 Danny Miranda Riverside ES4998 Work In ProgressDanny MirandaNEED TO ORDER 2 R.R. PARTITIONS FOR
RIVERSIDE ELEM. Medium
8/30/2005 Olga Arias Riverside ES5058 Work In ProgressMichael MunozCarpet (Doorway) to Data clerk office is coming
loose. Plastic edge is picking-up.. Thanks Medium
8/30/2005 Olga Arias Riverside ES5057 Work In ProgressManny LozoyaWe need a new Door Knob placed in the Data
Clerk office. (office area) At this time the door
doesn't lock.
Medium
9/19/2005 Olga Arias Riverside ES5614 Work In ProgressMichael MunozCarpet and plastic cover (edge) into Room 17 is
picking-up and is coming loose and you please
check it and repair it.
Medium
9/19/2005 Olga Arias Riverside ES5609 Work In ProgressMargret VillalobosHaving prolems with Roaches and Black insect
(Ticks) in rooms and Hallways, Storage area
etc.. could we have the Whole building
extremitied during intersession. We have no
students at this time.
10/11 - WAITING ON PURCHASE ORDER - MKV
Medium
7/6/2005 Alfredo Holguin Riverside ES3326 Work In ProgressAdan DuranYearly - Riverside ES Emer. Light Test: Annual -
Refer to PM schedule details. Medium
10/10/2005 Aida Salcedo Riverside ES6233 Work In ProgressJimmy CarbajalNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD
CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
11/1/2005 10:45:34 AM Page 43 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
7/8/2005 Adan Duran Riverside ES3414 Work In ProgressManny LozoyaMR LOZOYA MRS ARIAS IS HAVING TROUBLE
WITH THE STORAGE ROOM LOCK WOULD LIKE
FOR YOU TO LOOK AT IT THANK YOU SIR
Medium
7/8/2005 Adan Duran Riverside ES3415 Work In ProgressJose AmbrizMR JOSE AMBRIZ THE LITTLE ROOM WHERE
WATER HEATER IS IN THE NEW WING IS
GETTING HOT SETTING OFF ALARM NEED
EXHUST FAN TO DRAW HEAT OUT THANK YOU
SIR
Medium
7/19/2005 Adan Duran Riverside ES3690 Work In ProgressManny LozoyaMR MANNY LOZOYA FILE CABINET NEW
PORTABLE RM B NEEDS REPAIR WILL NOT
LOCK PARTS MISSING THANK YOU SIR
Medium
7/22/2005 Adan Duran Riverside ES3778 Work In ProgressDavid VillalobosMR DAVID VILLALOBOS WE HAVE SOME
LEAKING FUACTS NEW WING NEED REPAIR KIT
OR REPLACEMENT THANK YOU SIR
Medium
8/9/2005 Adan Duran Riverside ES4388 Work In ProgressJose AmbrizMR JOSE AMBRIZ SIR WE NEED TO HOOK BACK
UP THE AIR IN WHAT USE TO BE MRS FLORES
OFFICE IT WAS REMOVE AT HER REQUEST AND
ITS KIND OF WARM IN THERE THANK YOU SIR
Medium
8/11/2005 Adan Duran Riverside ES4473 Work In ProgressManny Lozoya PortablesMR MANNY LOZOYA SIR THE DOOR ON NEW
PORTABLE IS STUCK IN LOCK CAN NOT GET IT
TO UNLOCK PORTABLE B IN BACK THANK
YOU SIR
Medium
8/16/2005 Adan Duran Riverside ES4596 Work In ProgressManny LozoyaMR MANNY LOYZOA SIR NEED TO CHANGE
OUT DOOR HANDLE BY MRS ARIAS OFFICE
THE ONE THERE DO NOT LOCK NEED ONE THAT
CAN BE LOCKED THANK YOU SIR
Medium
8/31/2005 Adan Duran Riverside ES5115 Work In ProgressGuadalupe OntiverosMR LUPE ONTIVEROS SIR WILL NEED THE USE
OF THE BACKHOE TO MOVE SOCCOR GOAL
POST AWAY FROM PARKING AREA UNSAFE
FOR KIDS THANK YOU SIR
Medium
10/17/2005 Adan Duran Riverside ES6456 Work In ProgressGuadalupe OntiverosFRONT OF SCHOOL - SOME SPRINKLER HEADS
WERE REMOVED BY VANDALS (ONE WAS
BROKEN).
Medium
10/19/2005 Adan Duran Riverside ES6559 Work In ProgressCarlos CastilloMR CARLOS CASTILLO MR CASTILLO THE
LIGNTS ON THE OUT SIDE NORTH EAST SIDE
ARE OUT NEED TO REPLACE VERY DARK ON
THAT SIDE THANK YOU SIR
Medium
11/1/2005 10:45:34 AM Page 44 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/28/2005 Adan Duran Riverside ES6854 Work In ProgressDavid VillalobosMR DAVID VILLALOBOS SIR RELIEF VALUE BIG
WATER HEATER IN NEW WING IS LEAK NEED TO
REPLACE THANK YOU SIR
Medium
10/26/2005 Adan Duran Riverside ES6786 Work In ProgressJose AmbrizMR JOSE AMBRIZ SIR ONE OF THE BOILER
PUMPS IS STUCK NEED TO BREAK IT LOSE
WILL NOT TURN NEED YOUR HELP!!!!!! THANK
YOU SIR
Medium
10/24/2005 Adan Duran Riverside ES6689 Work In ProgressCarlos CastilloMR CARLOS CASTILLO CALLI MR LORENZO
SPEEDY REPORTED SOME OF THE LIGNTS ON
BACK POLE AND ONE ON NORTH SIDE PARKING
POLE ARE NOT COMING ON WILL NEED THE
HIGH LIFT TO CHANGE THANK YOU SIR
Medium
9/19/2005 Riverside ES5592 Work In ProgressDanny Orozco Cafeteriaplease see what can be done to repair or
remove electrical outlet on floor on serving line.
Outlet has a can over it and could be a trip
hazard.
Medium
7/6/2005 Alfredo Holguin Riverside ES3348 Work In ProgressAdan DuranYearly - Riverside ES Exit Sign Test: Annual -
Refer to PM schedule details. Medium
10/13/2005 Raul Romero Riverside ES6362 Work In ProgressJimmy Carbajal ClassroomI NEED VACUUM BELTS PLEASE.
Medium
7/22/2005 Raul Romero Riverside ES3768 Work In ProgressJimmy Carbajal ClassroomNEED APPLIANCE TRUCK TO MOVE SOME
FIREPROOF CABINETS. Medium
10/2/2005 Alfredo Holguin San Miguel ES6035 Work In ProgressDanny VegaMonthly - San Miguel ES Roof Inpsection - Refer
to PM schedule details. Medium
10/2/2005 Alfredo Holguin San Miguel ES6017 Work In ProgressDanny VegaMonthly - San Miguel ES Monthly FE Inpsection -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin San Miguel ES6116 Work In ProgressDanny VegaMonthly - San Miguel ES Exit Sign Insp: Monthly -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin San Miguel ES6104 Work In ProgressDanny VegaMonthly - San Miguel ES Emer. Light Test: Monthly
- Refer to PM schedule details. Medium
10/31/2005 Alfredo Holguin San Miguel ES6879 Work In ProgressRicardo JacquezDP 1088 Monitoring Data Due In This Office
Before Nov. 30,2005 Scheduled
11/1/2005 10:45:34 AM Page 45 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/10/2005 Aida Salcedo San Miguel ES6234 Work In ProgressCervando PadillaNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
7/3/2005 Alfredo Holguin San Miguel ES3175 Work In ProgressDanny VegaMonthly - San Miguel ES Roof Inpsection - Refer
to PM schedule details. Medium
8/11/2005 Barbara Cardenas San Miguel ES4489 Work In ProgressManny Lozoya Classroom 25, 49,50Need an extra key for these rooms.
Medium
10/21/2005 Cervando Padilla San Miguel ES6621 Work In ProgressJimmy Carbajal3 vacuum cleaner broken/do not have spare
need loaner today before 2:00 pm 10-21-05 asap
thank you
Medium
10/20/2005 Danny Vega San Miguel ES6584 Work In ProgressEnrique SoteloNEED LOCK-OUT DEVICE FOR DISCONNECT
BOX/PORTABLE 28-29/POWER SHUT-OFF
DAILY-ASAP
Medium
10/13/2005 Danny Vega San Miguel ES6367 Work In ProgressJaime Gomezrm#32 day&night type furnance/pilot wont stay
on-needs thermo-couple Medium
10/11/2005 Danny Vega San Miguel ES6301 Work In ProgressJaime Gomezneed additional ventilation in cafeteria/exhaust
Medium
10/26/2005 Danny Vega San Miguel ES6785 Work In ProgressJaime Gomezboiler is not heating/please ck it out/class rooms
are cold in the morning Medium
10/21/2005 Danny Vega San Miguel ES6617 Work In ProgressJaime Gomezj.gomez/need to start and go thru check list on
boiler unit/before 10-28-05 (.you can do it) Medium
10/21/2005 Danny Vega San Miguel ES6618 Work In ProgressGuadalupe Ontiverosneed two loads playground sand asap
Medium
9/6/2005 Danny Vega San Miguel ES5270 Work In ProgressJoe OntiverosNEED LDO 2QT/FLUSH VALVE
KIT/DIAPRAHMS/TUB&SINK
SEALER/ELONGATED TIOLET SEAT
Medium
9/7/2005 Danny Vega San Miguel ES5315 Work In ProgressDanny Orozco Cafeterianeed replacement faucets for double sinks
/kitchen .please stop by asap/ Medium
11/1/2005 10:45:34 AM Page 46 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
9/7/2005 Danny Vega San Miguel ES5307 Work In ProgressJaime Gomezportable #28 refrig unit not cooling/please check
it out asap Medium
9/22/2005 Danny Vega San Miguel ES5750 Work In ProgressGuadalupe Ontiverosneed tractor&scraper to remove goat-head
stickers by play ground area.weeds also by
fence line
Medium
8/10/2005 Danny Vega San Miguel ES4445 Work In ProgressManny Lozoya PortablesPortable 29 - Needs to be secured by the end of
the day. Medium
8/10/2005 Danny Vega San Miguel ES4447 Work In ProgressManny Lozoyaprincipals office door hard to open/door needs to
be shaved.stop by asap Medium
9/2/2005 Danny Vega San Miguel ES5177 Work In ProgressJaime GomezNEED FILTERS 12X24X1
Medium
9/2/2005 Danny Vega San Miguel ES5176 Work In ProgressJoe OntiverosCAFETERIA GIRLS RR/SINK FAUCET BROKEN -
OFF /PLEASE REPLACE/HOT-COLD TYPE Medium
7/26/2005 Danny Vega San Miguel ES3834 Work In ProgressJaime GomezA/C UNIT NOT WORKING IN HIGH SPEED
PORTABLE#58 Medium
8/1/2005 Danny Vega San Miguel ES4051 Work In ProgressJaime Gomezportable #30/rheem a/c unit not woking.stop by
asap Medium
9/8/2005 Jacqueline Aguilar San Miguel ES5337 Work In ProgressDanny Orozco CafeteriaDISHWASHER LEAKING WATER.
EVA MIRANDA - 233-2860
Medium
8/3/2005 Gerardo Marquez Santa Teresa ES4152 Work In ProgressManny LozoyaATTN MANNY.
MANNY, WE STILL NEED FOR YOU TO MAKE US
ANOTHER KEY TO THE MAIL BOX. THANKS.
Medium
8/3/2005 Gerardo Marquez Santa Teresa ES4154 Work In ProgressGuadalupe OntiverosATTN LUPE,
LUPE, WE STILL NEED THE COBBLESTONE TO
KEEP CHECK THE RAIN ERROSION. ALSO NEED
FOR BETO AND MANNY TO REDIG TRENCH AT
BACK FENCE TO KEEP RAIN FROM FLOODING
GROUNDS AND CLASS RMS.
Medium
7/19/2005 Gerardo Marquez Santa Teresa ES3657 Work In ProgressManny LozoyaATTN. Manny .
NEED FOR YOU TO DUPLICATE A KEY TO THE
MAIL BOX .
THANKS .
Medium
11/1/2005 10:45:34 AM Page 47 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/17/2005 Gerardo Marquez Santa Teresa ES6450 Work In ProgressGerardo Marquez10/3/05
1-insp. bldg.and grnds. picked up trash.
1-tried to fix broken stop sign at bus pick up exit.
1-fixed bus exit gate. (was knocked down over the wk. end)
4-mowed grass.
10/3 - 7
Medium
9/27/2005 Gerardo Marquez Santa Teresa ES5872 Work In ProgressDavid VillalobosATTN. DAVID VILLALOBOS;
DAVE , NEED FOR YOU TO CHECK OUT
TOILETS IN RM. 107, AND ALSO THE ONE IN THE
MENS FACULTY RR. FLOATS ARE STICKING.
Medium
9/22/2005 Gerardo Marquez Santa Teresa ES5725 Work In Progress10/26/2005 Carlos CastilloATTN; CALICASTILLO
CALI COULD YOU PLEASE ORDER ME FOUR
BOXES OF 4 FOOT FLOURECENT LAMPS.
THANKS.
supplied J.MARQUEZ WIHT LAMPS.
Medium
10/17/2005 Alma Terrell Santa Teresa ES6491 Work In ProgressDanny Orozco Cafeteriawalk - in freezer is at -32 degrees
Pat Sanchez - SNP Manager
Medium
10/10/2005 Aida Salcedo Santa Teresa ES6235 Work In ProgressPablo DiazNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD
CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
10/2/2005 Alfredo Holguin Santa Teresa ES6105 Work In ProgressGerardo MarquezMonthly - Santa Teresa ES Emer Light Test:
Monthly - Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Santa Teresa ES6117 Work In ProgressGerardo MarquezMonthly - Santa Teresa ES Exit Sign Insp: Monthly
- Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Santa Teresa ES6002 Work In ProgressGerardo MarquezMonthly - Santa Teresa ES Monthly FE Inspection
- Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Santa Teresa ES6038 Work In ProgressLorenzo SolisMonthly - Santa Teresa ES Roof Inspection -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Santa Teresa ES6071 Work In ProgressDanny OrozcoMonthly - Santa Teresa ES Fire Suppression
Insp. - Refer to PM schedule details. Medium
11/1/2005 10:45:34 AM Page 48 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
7/31/2005 Alfredo Holguin Santa Teresa ES3958 Work In ProgressGerardo MarquezMonthly - Santa Teresa ES Monthly FE Inspection
- Refer to PM schedule details. Medium
7/31/2005 Alfredo Holguin Santa Teresa ES4009 Work In ProgressGerardo MarquezMonthly - Santa Teresa ES Emer Light Test:
Monthly - Refer to PM schedule details. Medium
7/31/2005 Alfredo Holguin Santa Teresa ES4021 Work In ProgressGerardo MarquezMonthly - Santa Teresa ES Exit Sign Insp: Monthly
- Refer to PM schedule details. Medium
7/6/2005 Alfredo Holguin Santa Teresa HS3351 Work In ProgressArturo NunezYearly - Santa Teresa HS Exit Sign Test: Annual -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Santa Teresa HS6052 Work In ProgressDanny OrozcoMonthly - Santa Teresa HS Fire Sprinkler Insp. -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Santa Teresa HS6036 Work In ProgressArturo NunezMonthly - Santa Teresa HS Roof Inspection -
Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Santa Teresa HS6018 Work In ProgressArturo NunezMonthly - Santa Teresa HS Monthly FE Inspection
- Refer to PM schedule details. Medium
9/4/2005 Alfredo Holguin Santa Teresa HS5214 Work In ProgressArturo NunezMonthly - Santa Teresa HS Monthly FE Inspection
- Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Santa Teresa HS6118 Work In ProgressJoel HerreraMonthly - Santa Teresa HS Exit Sign Insp:
Monthly - Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Santa Teresa HS6107 Work In ProgressJoel HerreraMonthly - Santa Teresa HS Emer Light Test:
Monthly - Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Santa Teresa HS6072 Work In ProgressDanny OrozcoMonthly - Santa Teresa HS Fire Suppression
Insp. - Refer to PM schedule details. Medium
8/11/2005 Santa Teresa HS4484 Work In ProgressJose Ambrizplease install venting system and exhaust hood
in the metal shop. See Joe Angelo. Medium
11/1/2005 10:45:34 AM Page 49 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/10/2005 Aida Salcedo Santa Teresa HS6236 Work In ProgressLuis MurilloNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
10/25/2005 Alma Terrell Santa Teresa HS6724 Work In ProgressGuillermo Hernandez CafeteriaAS PER MR. GIOVAS - CONSTRUCTION WILL BE
COMPLETED WITHIN 2 WEEKS. NEED TO
INSTALL PAPER TOWEL DISPENSORS IN
CAFETERIA. PLEASE LET MARY KNOW WHEN
COMPLETED SO THAT WE CAN CALL ALMA
AND LET HER KNOW.
Medium
9/28/2005 Alma Terrell Santa Teresa HS5903 Work In ProgressDanny Orozco CafeteriaDue to gas lines being broken yesterday-when
Manager turned on Ovens this morning she is
having problems (one oven is not heating up
enough and the other one-- the blower is not
working).
Olga Bustamante - SNP Manager 589-5332
Medium
7/3/2005 Alfredo Holguin Santa Teresa HS3158 Work In ProgressArturo NunezMonthly - Santa Teresa HS Monthly FE Inspection
- Refer to PM schedule details. Medium
7/6/2005 Alfredo Holguin Santa Teresa HS3329 Work In ProgressArturo NunezYearly - Santa Teresa HS Emer. Light Test:
Annual - Refer to PM schedule details. Medium
7/3/2005 Alfredo Holguin Santa Teresa HS3176 Work In ProgressArturo NunezMonthly - Santa Teresa HS Roof Inspection -
Refer to PM schedule details. Medium
10/26/2005 Arturo Nunez Santa Teresa HS6759 Work In ProgressJose AmbrizNEED THE FOLLOWING SUPPLIES: 18 INCH
THERMOCOULS (3 EA.) 24V. HEATING T'STATS
(3 EA.) BELT DRESSING ( 2 CANS) THANK YOU.
Medium
10/18/2005 Arturo Nunez Santa Teresa HS6517 Work In ProgressRuben RonquilloAS PER MR. GALLEGOS HE IS REQUESTING THE
USE OF THE DISTRICT SCAFFLING, FOR A PLAY
THAT MRS. BRENDA SMITH IS DOING . SHE
WOULD LIKE TO USE IT FROM OCTOBER 24-
DECEMBER 16, 2005. SHE NEEDS ONE SECTION
WITH 4 OR 5 PLANKS. REFER TO E-MAIL
DATED OCTOBER 18 THANK YOU........
Medium
8/9/2005 Arturo Nunez Santa Teresa HS4346 Work In ProgressMargret VillalobosNEED TO FUMIGATE VOC. SHOPS TO MANNY
CRIKETS, ANTS, ETC,ETC. Medium
11/1/2005 10:45:34 AM Page 50 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
8/11/2005 Arturo Nunez Santa Teresa HS4465 Work In ProgressDavid VillalobosNEED 1/4 INCH GAS VALVE TO PILOT , ON
BOILER #1 ON NEW SYSTEM REPLACED,
LEAKING REAL BAD,
Medium
7/15/2005 Arturo Nunez Santa Teresa HS3571 Work In ProgressJose AmbrizNEED CONDENSER MTR. FOR SNACK ROOM
A.C. UNIT, MTR. IS FROZEN UNIT IS DOWN. Medium
8/16/2005 Carlos Vigil Santa Teresa HS4613 Work In ProgressDanny Orozco Football FieldNeed a bucket operator and a bucket truck at
STHS football field some time this week. Medium
8/4/2005 Jacqueline Aguilar Santa Teresa HS4186 Work In ProgressDanny Orozco CafeteriaMilk Cooler not cooling at all.
Olga B. Snp Manager 589-5332
Medium
9/28/2005 Joel Herrera Santa Teresa HS5923 Work In ProgressMichael MunozMIKE MUNOZ WE NEED BARRIER FENCE ON
WEST SIDE AT SOCCER FIELD TO RETAIN
BALLS OUT IT PLAY . ALSO NEED FENCE FROM
20 YARD LINE TO 20 YARD LINE IN FRONT OF
FOOTBALL VISITORS SEATING AREA. SEE R
GALLEGOS THANK YOU MIKE...
Medium
10/19/2005 Joel Herrera Santa Teresa HS6567 Work In ProgressDavid VillalobosBROKEN TOILER SET AT ISS CLASS ROOM AND
WE NEED REPLACE IT Medium
8/23/2005 Joel Herrera Santa Teresa HS4807 Work In ProgressManny LozoyaMANNY MY MASTER KEY IS BROKEN IT
DOESN'T WORK NO MORE. Medium
8/30/2005 Joel Herrera Santa Teresa HS5102 Work In ProgressManny LozoyaWE NEED REPLACE MA 51 AND TREE LOCKS AT
R.0.T.C CLASS ROOMS. Medium
8/26/2005 Joel Herrera Santa Teresa HS4966 Work In ProgressJoel HerreraRUBEN WE NEED REPAIR THE WINDOWS AT
DAYCAREBUILDING IT DOESN'T OPEN THANK
YOU
Route to Joel as per Mike 9/12/05 - mkv
Medium
8/11/2005 Joel Herrera Santa Teresa HS4463 Work In ProgressDavid VillalobosSENSER ON SINCK AT GIRLS REST ROOM IT
DOESN'T WORK WE REPLACE IT . Medium
8/1/2005 Joel Herrera Santa Teresa HS4454 Work In ProgressRuben RonquilloSMASHED WINDOW ON DOOR - STOLEN LARGE
SCREEN TV.
DISCOVERED BY MR. BUCKLEY
Medium
8/8/2005 Joel Herrera Santa Teresa HS4306 Work In ProgressRuben Ronquillo8-08-05 RUBEN RONQUILLO I NEED TWO
BATTERYS FOR MY CORDLESS SIZE 14.4 V MY
BATTERYS NOT GOOD NO MORE THANK YOU
RUBEN
Medium
11/1/2005 10:45:34 AM Page 51 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/21/2005 Luis Murillo Santa Teresa HS6624 Work In ProgressJimmy CarbajalWHEEL FROM BURNISHER MACHAINE KEEPS
FAILING OFF NEEDS TO BE REPAIR . THANK
YOU JIMMY
Medium
10/25/2005 Luis Murillo Santa Teresa HS6717 Work In ProgressJimmy Carbajal JIMMY NEED A BRUSH FOR ROYAL
VACUUM CLEANER BEARING FROM SIDE
NEEDS TO BE REPLACE THANK YOUUUUUUU.
Medium
10/18/2005 Luis Murillo Santa Teresa HS6519 Work In ProgressGuillermo HernandezNEED 4-PR*S OF BLACK RUBBER BOOTS FOR
SCRUBBING FLOORS SIZES 11, 7, 7, N 9
THANK YOU GUILLERMO.
Medium
8/19/2005 Laura Parra Santa Teresa MS4720 Work In ProgressJaime Mijarez Classroom ROOM # 52POWER STRIP ON WEST SIDE OF ROOM IS NOT
WORKING
IN ROOM 52
Medium
8/31/2005 Laura Parra Santa Teresa MS5113 Work In ProgressJose Ambriz ClassroomAIR CONDITIONER DOES NOT TURN ON THE
LEFT SIDE OF THE ROOM FACING CHALK
BOARD
ROOM 3 MR. DORANTES
Medium
8/12/2005 Lorenzo Solis Santa Teresa MS4506 Work In ProgressJose AmbrizNeed to replace all condensate pumps for all
geothermo units,trough all school.
Medium
7/7/2005 Jaime Mijarez Santa Teresa MS3387 Work In ProgressMichael MunozRm 1. N. bldg lower level Removal of carpet is
going to require tile installation. Alfredo H.
requested a work order for contractor.
Medium
7/8/2005 Jaime Mijarez Santa Teresa MS3412 Work In ProgressMichael MunozS.bldg upper level. Because of the shortage of
classrooms Mrs. wiiliams has to move the
teachers lounge to a storage rm. The floor has
no tile, can you include this room with the area's
that the contractor will be installing floor tile. Attn:
Alfredo holguin.
Medium
7/6/2005 Jaime Mijarez Santa Teresa MS3364 Work In ProgressManny LozoyaS.bldg custodial storage. please make 2ea. A-7
keys for principal and building mechanic. Medium
7/12/2005 Jaime Mijarez Santa Teresa MS3465 Work In ProgressRuben RonquilloN.bldg home ec rm 10. Ruben Ronquillo I am going
to need a Miter saw to cut legs on ten of the
tables. please make sure it has a good blade. I am planning this project for next week ( 7/18/05.)
The wood is oak.
Medium
11/1/2005 10:45:34 AM Page 52 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
9/1/2005 Jaime Mijarez Santa Teresa MS5149 Work In ProgressMichael MunozN.bldg Rm 3. Mrs. williams would like to have a
sidewalk that goes from Rm 3 exit door out to the
fence. This way when there is a fire drill the
special ed students on wheel chairs can be moved away from the building in case of an
actual emergency.
Medium
8/23/2005 Jaime Mijarez Santa Teresa MS4806 Work In ProgressJose AmbrizNorth and South bldgs. Condensation pumps are
starting to give out. I am going to need help to
start replacing them. I have been getting call after
call of water spilling into classroom which
requires changing damaged ceiling tiles. Attn: Joe
A.
Medium
10/12/2005 Jaime Mijarez Santa Teresa MS6314 Work In ProgressJose AmbrizRms 43 and 38. Please order 2 ea. Bell & Gosset
circulating pumps. Medium
10/12/2005 Jaime Mijarez Santa Teresa MS6317 Work In ProgressJose AmbrizGeothermal condensate pumps. Please order
parts and 2x2 metal grills for condensate
replacement pumps. See me on this.
Medium
10/12/2005 Jaime Mijarez Santa Teresa MS6333 Work In ProgressMargret VillalobosS.bldg administration area. I have been having
problems with mice eating on communication
wire and now on one of the condensate pumps in the lobby. They are completely eating the
plastic condensate water tubing and electrical
wiring to pumps. I don't know how many are up
on the ceiling but they are causing alot of
damage. They have already damage 2 pumps
and ceiling tiles on this heat pump so far. I know
that the pest control company has little bags that
they throw on the on ceilings to kill the mice. Do
think that we can get the pest control to take
care of this problem before it gets worse.
Medium
10/12/2005 Jaime Mijarez Santa Teresa MS6321 Work In ProgressDavid VillalobosSecond Request. Mrs. williams wants to know
status on broken urinal at S.bldg lower level boys
restroom by ramp.
Medium
10/14/2005 Jaime Mijarez Santa Teresa MS6417 Work In ProgressJose AmbrizMetal portable Castanedas rm. Carrier cooling
and electric heating unit. Fan did not start for
heating and caused some wiring and other parts
to melt. Attn: Joe Ambriz
Medium
10/27/2005 Jaime Mijarez Santa Teresa MS6800 Work In ProgressGuadalupe OntiverosFence materials. As per Alfredo H. He wants all
fencing removed from grounds storage including
goal post. Please take to physical plant or
grounds dept.
Medium
11/1/2005 10:45:34 AM Page 53 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/27/2005 Jaime Mijarez Santa Teresa MS6798 Work In ProgressManuel BarrientosSchool grounds. Can we have Manny blade the
grounds. There is some erosion caused by rain,
and students walk through. Requested by Mrs.
williams. Can he also blade the weeds.
Medium
9/9/2005 Jaime Mijarez Santa Teresa MS5363 Work In ProgressJose AmbrizN.bldg maintenance and custodial. Would like a
duct and register installed on heat pump. Medium
9/8/2005 Jaime Mijarez Santa Teresa MS5329 Work In ProgressMargret VillalobosNorth & South - I lost communication to both
buildings and i am getting constant calls of hot
areas. I am getting a message of an error on the
IP address.
Medium
9/7/2005 Ismael Rodriguez Santa Teresa MS5308 Work In ProgressManny Lozoya CustodialI NEED A KEY A7 FOR THE PRINCIPAL TO HAVE
ACCESS TO MY STORAGE ROOM. THANK
YOU.SEE MR. RODRIGUEZ.
Medium
8/17/2005 Ismael Rodriguez Santa Teresa MS4641 Work In ProgressDavid Villalobos Restroom (Boys)THERE A BOYS URINAL THAT IS CRACK FROM
THE BOTTOM AND EVERY TIME THEY FLUSH IT
WATER COMES OUT.SEE MR. RODRIGUEZ.
Medium
7/1/2005 Ismael Rodriguez Santa Teresa MS3118 Work In ProgressManny LozoyaI NEED FOR GYM KEY CYLINDERS TOO TO BE
CHANGE BEFORE 7/13/05.CONT.MR.RODRIGUEZ. Medium
7/6/2005 Alfredo Holguin Santa Teresa MS3330 Work In ProgressJaime MijarezYearly - Santa Teresa MS Emer. Light Test:
Annual - Refer to PM schedule details. Medium
10/10/2005 Aida Salcedo Santa Teresa MS6237 Work In ProgressIsmael RodriguezNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD
CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
10/10/2005 Aida Salcedo Santa Teresa MS6218 Work In ProgressMichael MunozDUE TO WATER OVER FLOW, GYM FLOOR HAS
BUBBLED BY FLOODING. NEED VENDOR TO DO
A RECOMMENDATION AND QUOTE US.
Medium
10/2/2005 Alfredo Holguin Santa Teresa MS6073 Work In ProgressDanny OrozcoMonthly - Santa Teresa MS Fire Suppression
Insp. - Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Santa Teresa MS6109 Work In ProgressJaime MijarezMonthly - Santa Teresa MS Emer Light Test:
Monthly - Refer to PM schedule details. Medium
11/1/2005 10:45:34 AM Page 54 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/2/2005 Alfredo Holguin Santa Teresa MS6119 Work In ProgressJaime MijarezMonthly - Santa Teresa MS Exit Sign Insp:
Monthly - Refer to PM schedule details. Medium
10/14/2005 Santa Teresa MS6437 Work In ProgressDavid Villalobos Officeplease replace h20 fountain and unclog drain.
Medium
10/18/2005 Santa Teresa MS6503 Work In ProgressGuadalupe Ontiverosplease remove all the debre ( i.e trash, tree limbs,
fence etc) from where fill dirt if being applied on
the arroyo.Also please bring back to the plant
fencing and poles behind bldg mech shop.
Medium
10/2/2005 Alfredo Holguin Santa Teresa MS6019 Work In ProgressJaime MijarezMonthly - Santa Teresa MS Monthly FE Inspection
- Refer to PM schedule details. Medium
10/2/2005 Alfredo Holguin Santa Teresa MS6037 Work In ProgressJaime MijarezMonthly - Santa Teresa MS Roof Inspection -
Refer to PM schedule details. Medium
7/6/2005 Alfredo Holguin Santa Teresa MS3353 Work In ProgressJaime MijarezYearly - Santa Teresa MS Exit Sign Test: Annual -
Refer to PM schedule details. Medium
7/31/2005 Alfredo Holguin Santa Teresa MS3975 Work In ProgressJaime MijarezMonthly - Santa Teresa MS Monthly FE Inspection
- Refer to PM schedule details. Medium
7/31/2005 Alfredo Holguin Santa Teresa MS4013 Work In ProgressJaime MijarezMonthly - Santa Teresa MS Emer Light Test:
Monthly - Refer to PM schedule details. Medium
7/31/2005 Alfredo Holguin Santa Teresa MS4023 Work In ProgressJaime MijarezMonthly - Santa Teresa MS Exit Sign Insp:
Monthly - Refer to PM schedule details. Medium
7/10/2005 Alfredo Holguin Sunland Park ES3423 Work In ProgressSebastian DiazYearly - Sunland Park ES Emer. Light Test:
Annual - Refer to PM schedule details. Medium
7/6/2005 Alfredo Holguin Sunland Park ES3355 Work In ProgressSebastian DiazYearly - Sunland Park ES Exit Sign Test: Annual -
Refer to PM schedule details. Medium
10/10/2005 Aida Salcedo Sunland Park ES6238 Work In ProgressLarry FloresNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD
CUSTODIAN NEEDS TO ALSO INCLUDE INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
11/1/2005 10:45:34 AM Page 55 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
7/3/2005 Alfredo Holguin Sunland Park ES3160 Work In ProgressSebastian DiazMonthly - Sunland Park ES Monthly FE Inspection -
Refer to PM schedule details. Medium
7/3/2005 Alfredo Holguin Sunland Park ES3278 Work In ProgressSebastian DiazMonthly - Sunland Park ES Exit Sign Insp. - Refer
to PM schedule details. Medium
7/3/2005 Alfredo Holguin Sunland Park ES3268 Work In ProgressSebastian DiazMonthly - Sunland Park ES Emergency Lighting
Insp. - Refer to PM schedule details. Medium
7/3/2005 Alfredo Holguin Sunland Park ES3179 Work In ProgressSebastian DiazMonthly - Sunland Park ES Roof Inspection -
Refer to PM schedule details. Medium
8/24/2005 Irene Trujillo Sunland Park ES4868 Work In ProgressMargret VillalobosBLACK WIDOW SPIDERS, SCORPIONS, ETC.
HAVE BEEN FOUND INTHE CLASSROOMS,
PLAYGROUND, AND HALLS OF THIS SCHOOL.
PLEASE SEND SOMEONE TO SPRAY.
FAXED PO
9/1/05
Medium
8/3/2005 Irene Trujillo Sunland Park ES4171 Work In ProgressCarlos CastilloROOM #25 lIGHTS IN THE CLASSROOM DO NOT
TURN OFF. Medium
7/27/2005 Irene Trujillo Sunland Park ES3875 Work In ProgressManny LozoyaNEED REPLACEMENT KEYS FOR NURSE'S
OFFICE DORR AND FILE CABINET Medium
9/12/2005 Irene Trujillo Sunland Park ES5422 Work In ProgressGuadalupe OntiverosNEED TO REMOVED DEAD TREES.
Medium
9/21/2005 Irene Trujillo Sunland Park ES5687 Work In ProgressMargret VillalobosWe have a mice problem throughout the school.
Please help! Medium
10/28/2005 Irene Trujillo Sunland Park ES6836 Work In ProgressManny LozoyaNeed two additional keys for TA32
Medium
10/31/2005 Irene Trujillo Sunland Park ES6882 Work In ProgressManny LozoyaNeed 2 additional keys for TA64
Medium
10/31/2005 Irene Trujillo Sunland Park ES6878 Work In ProgressCarlos CastilloADD NEW ELECTRICL OUTLET TO TEACHER'S
LOUNGE. Medium
10/25/2005 Irene Trujillo Sunland Park ES6727 Work In ProgressMargret VillalobosRoaches in classroom #25.
Medium
10/17/2005 Irene Trujillo Sunland Park ES6465 Work In ProgressGuadalupe OntiverosTHE GROUNDS NEED TO BE SMOOTHED OUT
AFTER THE RAIN. THE SAND WAS WASHED
AWAY IN SOME AREAS.
Medium
11/1/2005 10:45:34 AM Page 56 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/11/2005 Irene Trujillo Sunland Park ES6279 Work In ProgressDavid VillalobosI need to replace camode in room #25. It is
broken. Medium
10/27/2005 Larry Flores Sunland Park ES6805 Work In ProgressJimmy CarbajalVacuums need to be repaired.
Medium
10/21/2005 Larry Flores Sunland Park ES6625 Work In ProgressMargret VillalobosNeed Heavy Duty Dolly for fire proof file cabinet
on Monday October 24, 2005 Medium
10/24/2005 Sebastian Diaz Sunland Park ES6692 Work In ProgressRuben RonquilloNeed 4 metal blinds for portable F 46"X 52"
thank you. Medium
9/27/2005 Sebastian Diaz Sunland Park ES5888 Work In Progress9/28/2005 Guadalupe Ontiveros9/27/05
Need to fix water line sprinkler under the
sidewalk in the new playground thank you
Medium
9/2/2005 Sebastian Diaz Sunland Park ES5195 Work In ProgressGuadalupe Ontiveros9/2/05
Lupe Ontiveros
Need the heavy tractor to remove the weeds
around the school thank you
Medium
7/14/2005 Joanne Munoz Sunrise ES3533 Work In ProgressJaime Gomez ClassroomCould you turn the air conditioning on we have
teachers coming in to get a head start on their
rooms. It is very hot and we would greatly
appreciate it. Since we are a year round school
the teachers need to report on Monday.
Thank-you
Medium
7/27/2005 Paul Quinones Sunrise ES3876 Work In ProgressJaime GomezRM.307,BAD CIRCULATING PUMP NEED TO
REPLACE Medium
7/12/2005 Paul Quinones Sunrise ES3477 Work In ProgressLorenzo HernandezI NEED SAND FOR THE PLAY
GROUNDS,THANKS. Medium
7/12/2005 Paul Quinones Sunrise ES3469 Work In ProgressMichael MunozFENCING AREA IN BACK OF SCHOOL NEAR LIFT
STATION
NEEDS TO BE REPAIRED,AND ROLL
GATE.PROBABLE HIGH
WINDS ON 7-11-05 CAUSED THE DAMAGE.NO
SIGNS OF
VANDILISM ON SCHOOL PROPERTY
Medium
10/26/2005 Paul Quinones Sunrise ES6781 Work In ProgressJaime GomezREQUESTING SEAL KITS ,AND GASKETS.FOR
CIRCULATING
PUMPS GEO THERMAL UNITS. UNIT LEAKING
FROM SEAL
RM.210
Medium
11/1/2005 10:45:34 AM Page 57 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
10/26/2005 Paul Quinones Sunrise ES6782 Work In ProgressJaime GomezSTERLING HEATING UNIT IN KITCHEN AREA.WILL
NOT TURN ON ,MIXED AIR CONTROL NOT
WORKING PROPERLY
Medium
10/27/2005 Paul Quinones Sunrise ES6803 Work In ProgressEnrique SoteloG.F.CI OUTLET TRIPPING BOILER IN WING
A.MORE THAN
USUAL.RESET AT LEAST TWICE A WEEK
Medium
10/19/2005 Paul Quinones Sunrise ES6570 Work In ProgressJaime GomezWATER LEAKING FROM PUMP SEAL,NEED TO
REPLACE IN RM.
210. THANKS
Medium
10/17/2005 Paul Quinones Sunrise ES6449 Work In ProgressPaul Quinones10-14-05
2.0,REMOVE SAND GRAVEL FROM BACK
SIDEWALK
ENTRANCE
4.5,ASSIST ENRIQUE W/ELECTRICAL PROBLEM
RM.201
1.5,VISUAL INSPECT PLAYGROUNDS
10/14 - 8
Medium
9/2/2005 Richard Chavez Sunrise ES5190 Work In ProgressMargret VillalobosAs per Nurse Creegan & Mr. Chavez request
would like the 2 rooms fumigated where they had
the infestation.
(Spoke to Daniel he said they could send someone out on Tuesday.
Medium
10/10/2005 Aida Salcedo Sunrise ES6239 Work In ProgressRamon DominguezNEED TO COMPLETE BUILDING PERFORMANCE
INSPECTION REPORTS ON ALL CUSTODIANS, TO
INCLUDE CLOSETS, MSDS BOOKS, LABELED
SPRAY BOTTLES & SAFETY EQUIPMENT. HEAD
CUSTODIAN NEEDS TO ALSO INCLUDE
INSPECTION ON YOUR OWN AREA. INSPECTION
REPORTS ALONG WITH COMPLETED WORK
ORDER MUST BE RETURNED TO US NO LATER
THAN OCTOBER 28, 2005.
Medium
8/25/2005 Alfredo Holguin Sunrise ES4920 Work In ProgressMargret VillalobosInfestation of bug at school site office.
(Health Issue) Medium
10/31/2005 Sunrise ES6887 Work In ProgressRicardo JacquezThe Wastwater Flow Meter needs to be checked
for proper calibtration ASAP High
9/8/2005 Alfredo Holguin Sunrise ES5331 Work In ProgressMargret VillalobosTreat inside and outside of perimeter for insects.
Note: Service setup w/principal on 9/9/05 at
3:00pm) - B. Watson
Open Purchase Order!
Medium
11/1/2005 10:45:34 AM Page 58 of 59
WOID Status Request Date Requester LocationDescription Completion Date Assigned To Area Type Area NumberAction Taken Priority
7/18/2005 Sunrise ES3629 Work In ProgressPaul Quinonesplease cut and weedeat in and aroud lift station.
weeds are growing rapid and are going to end
up on the playing fields.
Medium
8/19/2005 David Boyd Vado ES4722 Work In ProgressManny LozoyaNeeds 2 master keys for Vado Elementary.
Medium
8/17/2005 David Boyd Vado ES4628 Work In ProgressManny LozoyaNeed to meet contractor on Monday - to rekey
school site. Medium
11/1/2005 10:45:34 AM Page 59 of 59