+ All Categories
Home > Documents > 7. Baker Hughes - Technologies

7. Baker Hughes - Technologies

Date post: 07-Jul-2018
Category:
Upload: mansur-damiev
View: 251 times
Download: 0 times
Share this document with a friend

of 27

Transcript
  • 8/19/2019 7. Baker Hughes - Technologies

    1/70

    1

    © 2

    0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    © 2015 BAKER HUGHES INCORPORATED. ALL RIGHTS RESERVED. TERMS AND CONDITIONS OF USE: BY ACCEPTING THIS DOCUMENT, THE RECIPIENT AGREES THAT THE DOCUMENT TOGETHER WITH ALL INFORMATION INCLUDED THEREIN IS THECONFIDENTIAL AND PROPRIETARY PROPERTY OF BAKER HUGHES INCORPORATED AND INCLUDES VALUABLE TRADE SECRETS AND/OR PROPRIETARY INFORMATION OF BAKER HUGHES (COLLECTIVELY "INFORM ATION"). BAKER HUGHES RETAINS AL L RI GH TS UN DE R CO PY RI GH T LA WS AN D TR AD E SE CR ET LA WS OF TH E UNI TE D ST AT ES OF AM ER IC A AN D OT HE R CO UN TR IE S. TH E RE CI PI EN T FU RT HE R AG RE ES TH AT TH E DO CU ME NT MA Y NO T BE DI ST RI BU TE D, TR AN SM IT TE D, CO PI ED ORREPRODUCED IN WHOLE OR IN PART BY ANY MEANS, ELECTRONIC, MECHANICAL, OR OTHERWISE, WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF BAKER HUGHES, AND MAY NOT BE USED DIRECTLY OR INDIRECTLY IN ANY WAY DETRIMENTALTO BAKER HUGHES’ INTEREST.

    Baker Hughes Drilling Services Overview

    Bob Sharpe – Business Development Manager – Drilling Services UKIain Sivers – Business Development Manager – Drilling Services UK

  • 8/19/2019 7. Baker Hughes - Technologies

    2/70

    2

    © 2

    0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    Agenda

    Directional Drilling• Motors• Rotary Steerable

    • Steerable Drilling Liner

    Formation Evaluation• MWD Platforms & Mud Pulse Telemetry• Directional / Gamma Ray / Resistivity• High Level Formation Evaluation Services

    Drill Bit Technology• PDC & Tri-cone technology

  • 8/19/2019 7. Baker Hughes - Technologies

    3/70

    3

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s

    e r v e

    d .

    HSE – Baker Hughes HSE Culture

    3

    The "Life Rules!" program targets 10 life-critical safety hazardswithin Baker Hughes.

  • 8/19/2019 7. Baker Hughes - Technologies

    4/70

    4

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    Baker Hughes Directional Drilling Solutions

    Ultra X-treme™Motors

    Automated Drilling Systems

    Vertical andLow Inclination

    Solutions

    3D Rotary SteerableSystems

    ConventionalDrilling Systems

    Steerable Motors

    Ultra™

    Motors

    X-treme™Motors

    Special DrillingSolutions

    Through-TubingRotary Drill ing

    AutoTrak™ eXact

    AutoTrak™ Curve

    AutoTrak™ eXpress

    AutoTrak™ G3

    AutoTrak™ X-treme

    AutoTrak™ V

    TruTrak™ CoilTrak™

    SureTrak™

  • 8/19/2019 7. Baker Hughes - Technologies

    5/70

    5

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    Drilling Technology Development

    SteerableMotor Technology

    Automated Sl ideDrilling Systems

    Rotary SteerableSystems

    Coiled Tubing BHA

    Orient Express

    New Gen Motor (7"Ultra XL45, 6 ¾"Ultra Curve & 5"X-treme eXtend

    VertiTrak

    TruTrak 4 ¾” (Jointed Pipe & Coil)

    AutoTrak 1.5

    AutoTrak 4-3/4”

    AutoTrak 2.5

    AutoTrak G3.0

    AutoTrak X-treme

    Navi-Drill

    Ultra SeriesX-treme

    Ultra X-treme

    AutoTrak eXpress

    CoilTrak

    TruTrak

    AutoTrak V

    Rib Steered Motor

    1970 1990 20101980 2000

    AutoTrak Curve AutoTrak eXact

    2015

  • 8/19/2019 7. Baker Hughes - Technologies

    6/70

    6

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    Motors

  • 8/19/2019 7. Baker Hughes - Technologies

    7/70

    7

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    Motor offeringHS High SpeedTS Turbine Speed AD Air Dri ll ing/MudX Short Ultra Motor XL Extended LengthRF Reduced FlowRS Reduced SpeedLS Low SpeedVS Very Low SpeedIR Intermediate Radius

    UTR Ultra SeriesUXT Ultra X-treme SeriesXTR X-treme series

    Ultra

    Ultra-Xtreme

    X-treme

  • 8/19/2019 7. Baker Hughes - Technologies

    8/70

    8

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    0

    200

    400

    600

    800

    1000

    1200

    1985 1990 1995 2000 2005 2009

    P o w e r

    O u t p u

    t ( H P )

    4-3/4"

    6-3/4"

    9-1/2"

    Navi-Drill

    ULTRA

    X-treme ®Motor power output development

  • 8/19/2019 7. Baker Hughes - Technologies

    9/70

    9

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    Power Section Technology

    SteelElastomer

    Standard Power Section :steel tube with cylindrical IDdiff. rubber layer thickness

    X-treme Technology Power Section :pre-contoured Steel tube

    less leakage between the chambers

    Improved volumetric efficiencythin & “ equidistant” rubber layer

    less shrinking or swellingless heat is built upheat can be dissipated easier

  • 8/19/2019 7. Baker Hughes - Technologies

    10/70

    10

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    DuraMax High Performance Elastomer

    Ultra–HP motorsCost effective high performance solutionPrimary usage in US and Canada, >25,000 circ hrsSizes 4-¾”, 6-½”, 6 ¾” and 8”Delivers: – 50% higher torque than standard Ultra Series – Durability in difficult drilling environments – High reliabilityResults: – extended runs – significant increases in section ROPs

    NEW

  • 8/19/2019 7. Baker Hughes - Technologies

    11/70

    11

    ©

    2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    Further advances in Motor Technology – Significant developments in Vertical, Build and 6 inch motor capability.

    Vertical Sections

    Hi DLS Capabili ty - 21.5˚

    /100 ft

  • 8/19/2019 7. Baker Hughes - Technologies

    12/70

    12 ©

    2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    Comparisons

    700 hp

    Lamborghini Aventador LP-700

    1,025 hp

    9-1/2” X-tremeHigh SpeedMotor

    750 hp

    Formula One560 hp

    BWM M5 F10

  • 8/19/2019 7. Baker Hughes - Technologies

    13/70

    13 ©

    2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e

    s e r v e

    d .

    AutoTrak G3/ X-treme - Advanced RSS Services

    Advanced Automated Rotary Closed-Loop SteeringIntegrated Formation Evaluation SystemsReservoir Navigation Service

    High Resolution Imaging Services

    Petrophysical

    Geological

    Geophysical

    Reservoir Eng.

    Drilling/ Steering

    AutoTrak Steering UnitOnTrak ™ MWD/LWD including Telemetry

  • 8/19/2019 7. Baker Hughes - Technologies

    14/70

    14 ©

    2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e

    s e r v e

    d .

    AutoTrak G3/ X-treme - Advanced RSS Services

    Advanced Automated Rotary Closed-Loop SteeringIntegrated Formation Evaluation SystemsReservoir Navigation Service

    High Resolution Imaging Services

    Petrophysical

    Geological

    Geophysical

    Reservoir Eng.

    Drilling/ Steering

    AutoTrak Steering UnitOnTrak ™ MWD/LWD including Telemetry

    Advanced Inclination Hold Mode

    Adaptive Center Force Mode

  • 8/19/2019 7. Baker Hughes - Technologies

    15/70

    15 ©

    2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    AutoTrak – Steering System Features

    Rotatingdrive shaft

    Non rotating steerablestabilizer sleeve

    Steeringribs

    Microhydraulicmodules

    Control electronics

    and inclination sensors

    Mud LubricatedBearings

    Wireless Power andCommunication Link

    15

  • 8/19/2019 7. Baker Hughes - Technologies

    16/70

    16 ©

    2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    AutoTrak – Steering Principle

    High Side

    Steering Vector

    Direction

    16

    Click for animation

  • 8/19/2019 7. Baker Hughes - Technologies

    17/70

    17 ©

    2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    Reliable Steering in Dynamic Environments

    No loss of control in stick-slip situations

    The AutoTrak steering sleeve decouples

    the steering action from string rotation.No risk of hanging, sticking or damage

    Ribs can fully retract into the sleeve so

    it can freely rotate in the borehole C l

    e a r a n c e

    f o r

    f r e e r o

    t a

    t i o

    n

  • 8/19/2019 7. Baker Hughes - Technologies

    18/70

    18 ©

    2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    Easy Control with Automatic Downlinking System

    “Negative” mud pulse telemetry from surface to downhole

    Bypass actuator diverts 15% of mud flow in pulses

    Computer controlled automated operation

    Versatile commands while drilling ahead

    – MWD & LWD parameters

    – Steering Modes

    – Directional Targets

    Remote control from collaboration center possibleInlet ‐ To Standpipe

    Bypass Outlet

    – To Mud Pits

  • 8/19/2019 7. Baker Hughes - Technologies

    19/70

    19 ©

    2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    AutoTrak Capability...?

    Baker Hughes Solution and Results

    – Turn the wellpath 255° with a continuous5°/100ft DLS to enter the reservoir

    – Precisely steer a complex profile in aknown difficult drilling environment(harsh vibration conditions in chalk,unconsolidated reservoir sands)

    Baker Hughes Solution and ResultsExcellent verticality achieved with the AutoTrakrun with inclinations less than 0.04°.7912 feet MD drilled in one run at 48 ft/hr ROP

    VERTICAL

    DIRECTIONAL

  • 8/19/2019 7. Baker Hughes - Technologies

    20/70

    20 ©

    2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    AutoTrak X-treme - Integrated Motor Power

  • 8/19/2019 7. Baker Hughes - Technologies

    21/70

    21

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    AutoTrak™ Curve Rotary Steerable System

    Smooth, Fast Runs to Reduce Time on Wells in Unconventional Plays

  • 8/19/2019 7. Baker Hughes - Technologies

    22/70

    22

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    The Difference: Design

    • Directional control• Fewer components• Improved reliability• Rugged for harsh

    terrains• Optional battery

    • Integrated Baker HughesBit Technology

    • One-piece design

  • 8/19/2019 7. Baker Hughes - Technologies

    23/70

    23

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R

    e s e r v e

    d .

    The BHA deliverable meeting the market needs

    4.9 ft3.3 ft18 ft13.1 ft

    39.4 ft

    3.3ft

    Nonmag Spacing: 18 ft

    Dir. Sensor

    Dir. Ele

    Azi-Gamma

    H i g h B U R P D CB i t • HCC technology

    optimized designon bitcharacteristics forHigh BUR RSS

    M o d i f i e d S t e e r i n g U n i t • Higher steering forces delivered• Shorter drive sub & additional rib

    extension Updated sensor package fororiented kick from vertical

    • Diamond bearings• Greatly simplified & updated

    electronics

    F l e x A s s e m b l y • Length extended for more flexibility

    •Directional & Azi-Gamma sensor locatedin flex to be near-to-bitP o w e r a n d P u l s e r • Designed for LCM applications

    • Additional power overhead for resistivityin the future

    NB Inc.

    Gamma Sensor Spacing: 11 ft

  • 8/19/2019 7. Baker Hughes - Technologies

    24/70

    24

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R

    e s e r v e

    d .

    The Difference: The AutoTrak Legacy

    • Drills build rate of 15°/100’• Tolerates higher LCM content

    • Offers near bit gamma ray• Optional flow-off survey• Runs with a standard motor • Integrates Baker Hughes bit

    Steering Unit

    Directional MWD

    Pulser/ Power

    Near Bit Gamma Near Bit Inclination

  • 8/19/2019 7. Baker Hughes - Technologies

    25/70

    25

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R

    e s e r v e

    d .

    In January 2012

    $9.75mm saved

    In December 2012

    SLB Archer (450,000 ft as of October 2012)

    BH AutoTrak Curve 2.2 million ft - October 2012and 3 million ft - December 2012

    In April 2013 678 Wells Drilled, 4,000,000 ft

    Q1 2015 – Over 15,000,000 feet Drilled…

    The Proof: Actual Time and Cost Savings

  • 8/19/2019 7. Baker Hughes - Technologies

    26/70

    26

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R

    e s e r v e

    d .

    AutoTrak™ eXact Rotary Steerable System

  • 8/19/2019 7. Baker Hughes - Technologies

    27/70

    27

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R

    e s e r v e

    d .

    AutoTrak™ eXact Rotary Steerable System• Continued development from AutoTrak and AutoTrak Curve

    New Modular RSS incl. Advanced LWD▪ Higher BUR capability up to 12°/100’

    ▪ New Steering Unit design

    – New Steering pad setup – Rugged with fewer components (no rotary seals in the steering unit). – Higher WOB capability.

    Baker Hughes system approach – Available in 6 ¾” and 4 ¾” tools

  • 8/19/2019 7. Baker Hughes - Technologies

    28/70

  • 8/19/2019 7. Baker Hughes - Technologies

    29/70

    29

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    AutoTrak™ eXact Rotary Steerable System

    • Continued development from AutoTrak and AutoTrak Curve

    Developed in the Celle Technology Centre, Germany• Currently being used in KSA, UAE, USA, China & Oman

    Planned application• 6 ¾”tools will replace the AutoTrak ™ G3 steering unit fleet.

    4 ¾” Tools

    • Currently being deployed in KSA as a solution to the harsh drillingconditions.

  • 8/19/2019 7. Baker Hughes - Technologies

    30/70

  • 8/19/2019 7. Baker Hughes - Technologies

    31/70

    31

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    SureTrakTM

    Steerable Drilling Liner Service

  • 8/19/2019 7. Baker Hughes - Technologies

    32/70

    32

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    System Overview

    Flexible system that can circulate, rotate, drill, log and set liner in one runSizes: – 9 5/8” SureTrakTM: 8 ½” x 12 ¼”

    – 7” SureTrakTM: 6” x 8 ½”Benefits & Features: – Flexible Stick-out BHA length – Provides required LWD/MWD – Drill 3D wells & horizontal sections – Doesn’t require any rig modification – Retrievable BHA

    Turn the irrecoverable reserves into recoverable

  • 8/19/2019 7. Baker Hughes - Technologies

    33/70

    33

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    System Overview

    Outer String: – Liner – Setting Tool – Reamer Bit

    Inner String: – Drill Pipe – Inner BHA

    Motor driven components – Reamer Bit – Pilot BHA

    Stick out / Pilot BHA

    – Directional – FE tools

  • 8/19/2019 7. Baker Hughes - Technologies

    34/70

    34

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    System Overview

    SmartBattery Sub

    BCPM

    ModularMotor

    ReamerDrive Sub

    Pilot BHAThruster Reamer BitLiner

    SettingTool

    System Components• Standard• Modified• New Developments

  • 8/19/2019 7. Baker Hughes - Technologies

    35/70

    35

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    System Overview

    Rotation• Liner can be rotated from surface• Pilot BHA rotates with motor RPM (+ string RPM)• Reamer Bit rotates with motor RPM if connected (+ string RPM)

  • 8/19/2019 7. Baker Hughes - Technologies

    36/70

    36

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    System Overview

    Flow Path• Setting Tool provides metal seal between inner and outer string• Approx. 95% of flow rate exits at Pilot Bit• Approx. 5% exit at Modular Motor Lower Bearing. This hinders

    cuttings from entering liner string

    SettingTool

    Pilot BitModular Motor

  • 8/19/2019 7. Baker Hughes - Technologies

    37/70

    40

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s

    R e s e r v e

    d .

    Case History

    7” SureTrak TM application Offshore North Sea

    Location: Offshore North SeaOperator: StatoilDate: September 2012Hole Size: 6” x 8 ½”Liner Length/Size:250 m (820 ft) of 7” Liner.Well Type: 3D, horizontal Averaged ROP: 17m/hr (56 ft/hr)Drilled distance: 250 m (820 ft)

    Max. Inclination: 92°

  • 8/19/2019 7. Baker Hughes - Technologies

    38/70

    41

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s

    R e s e r v e

    d .

    The next step…?

    • Dual position option

    Phase 1 development – Q4 2015, Dual position with ‘retractable’ PilotBHA

    Phase 2 development – 2017, One Trip system, Drill Run Liner andCement

  • 8/19/2019 7. Baker Hughes - Technologies

    39/70

    42

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s

    R e s e r v e

    d .

    Modular System Example – Penta Combo BHA

    AutoTrak Modular Motor CoPilot

    OnTrak / AziTrakBCPM

    LithoTrak ORDCCNTesTrak

    SoundTrakMagTrak

  • 8/19/2019 7. Baker Hughes - Technologies

    40/70

    43

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s

    R e s e r v e

    d .

    Baker Hughes Formation Evaluation Portfolio

    • OnTrak™ – Resistivity, gamma imaging, dynamics• AziTrak™ – Deep azimuthal resistivity

    • VisiTrak ™ – Extra Deep Azimuthal Resistivity• ZoneTrak™ – Resistivity & Gamma Ray at bit• StarTrak™ – High definition electrical imaging• LithoTrak™ – Porosity, imaging, caliper, Pe

    • SoundTrak™ – Advanced acoustic logging• TesTrak™ – Formation pressure testing• FASTrak™ – Fluid Analysis and Sampling• MagTrak™ – LWD magnetic resonance logging

    • SeismicTrak™ - Seismic While Drilling

  • 8/19/2019 7. Baker Hughes - Technologies

    41/70

    44

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s

    R e s e r v e

    d .

    Formation Evaluation Service Expansion at Baker Hughes

    TelecoMWD

    Resistivity Gamma

    Triple Combo MPR

    SoundTrakLithoTrak

    TesTrakCo-Pilot

    Sara IIMagTrak

    StarTrakDeepTrak

    Azimuthal Propagation Resistivity

    BCPM II

    Azimuthal Caliper

    FASTrakSeismicTrak

    Wired Pipe

    ZoneTrak

    Directional Gamma

    1975 1980 1985 1990 1995 2000 2005 2010 2015

    AutoTrak Curve

    OnTrak 175

    AutoTrak eXpress

    X-treme AutoTrak

    AutoTrak eXact

    VisiTrak

    SureTrak

    T l t

  • 8/19/2019 7. Baker Hughes - Technologies

    42/70

    45

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s

    R e s e r v e

    d .

    TelemetryHigh Definition LWD Electrical Imaging

    • Probe Base SystemsNaviTrak (Discrete Pulse)TeleTrak (Discrete Pulse)EMTrak (Electromagnetic)

    • Collar Based SystemsBCPM - (Discrete Pulse)BCPM II – (Discrete Pulse & Continuous Wave)

    Wired Pipe

    Risk MitigationCost ReductionEvaluation

    BCPM2

    Wired Pipe

  • 8/19/2019 7. Baker Hughes - Technologies

    43/70

    46

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s

    R e s e r v e

    d .

    11 00 11

    PSKPSK

    11 00 11

    CW

    Mud-Pulse Telemetry – Signal Types

    11 00 11 00 11 00

    DiscreteDiscrete

    11 00 11 00 11 00

    DiscreteDiscrete

    • Oscillating Shear Valve Mud Pulser (BCPM2)Discrete pulses & continuous wavesLow and high frequency signal < 60 HzMax. data rate of 40 bps

    • Cone Valve Mud Pulser (BCPM, NaviTrak)

    Discrete pulsesLow frequency signal < 20 HzMax. data rates of 6 bps

    Telemetry

  • 8/19/2019 7. Baker Hughes - Technologies

    44/70

    AziTrak

  • 8/19/2019 7. Baker Hughes - Technologies

    45/70

    48

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s

    R e s e r v e

    d .

    AziTrakHigh Definition LWD Electrical Imaging

    • Deep reading Azimuthal Resistivity• OnTrak with orthogonal receiver • Direction & distance to bed boundaries (up to 17ft / 5m)• Reservoir Navigation Service

    Risk MitigationCost ReductionEvaluation

    T R

    AziTrak Ri k Mi i i

  • 8/19/2019 7. Baker Hughes - Technologies

    46/70

    49

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s

    R e s e r v e

    d .

    AziTrakHigh Definition LWD Electrical Imaging

    Risk MitigationCost ReductionEvaluation

    Significant difference between planned anddrilled wellpaths – average 23ft above plan

    Drilled on average 7ft TVD below Top UCSAchieved 98% N:G

    Completion interval ~ 5000ft MD

    Well came on production above the P90

    estimates

    Signalamplitude

    Resistivity

    GR

    APR imageGR image

    Model surfacecurtain

    UpDown

    Distance to Bed (%)

    0.0 5.0 10.0 15.0 20.0 25.0 30.0

    shale

    0-2ft

    2 - 4ft

    4 - 6ft

    6 - 8ft

    8 - 10ft

    10 - 12ft

    12 - 14ft

    > 14ft

    D i s t a n c e t o

    B e d

    Percentage of Lateral (%)

    Lateral C44 Lateral C44z

    Tracking very close toroof down to TVD limit

    Implement lateral & TVDgeosteering decision

    Dip in well =KOP for pilothole

    Drilled above(>32ft TVD)planned wellpath

    TD in roof –very shallow dip

    VisiTrak - Extra Deep Azimuthal Resistivity

    Ri k Mitig ti

  • 8/19/2019 7. Baker Hughes - Technologies

    47/70

    50

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s

    R e s e r v e

    d .

    VisiTrak - Extra Deep Azimuthal ResistivityHigh Definition LWD Electrical Imaging

    • Based on proven DeepTrak and AziTrak technologies.

    • Orthogonal transmitter array allows detection of multiplebed boundaries at up to 30 m (20kHz and 50kHz)

    • ApplicationsQuantifying reserves / confirming fluid contactsIncreased depth of detection when landing wells.Identifying multiple boundaries, remote sands, additional

    reservoir levels.Understanding gross reservoir architecture.Detecting changes in reservoir thickness.Maximising reservoir contact.

    Risk MitigationCost ReductionEvaluation

    6 ¾“ Vi iT k D h l

  • 8/19/2019 7. Baker Hughes - Technologies

    48/70

    51

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    6 ¾“ VisiTrak Downhole system

    D th f D t ti MPR T h l i

  • 8/19/2019 7. Baker Hughes - Technologies

    49/70

    52

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    0 50 100

    Azimuthal

    Non ‐Azimuthal

    Maximum depth of detection (ft)

    VisiTrak ‐ 100 ft

    OnTrak ‐ 9 ft

    DeepTrak ‐ 50 ft

    AziTrak ‐ 17 ft

    Depth of Detection MPR Technologies

    VisiTrak E tra Deep A im thal Resisti it

  • 8/19/2019 7. Baker Hughes - Technologies

    50/70

    53

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    VisiTrak – Extra Deep Azimuthal Resistivity

    10 Ohmm Reservoir to 1 Ohmm Boundary

    Extra Deep Azimuthal Resistivity (EDAR) Risk Mitigation

  • 8/19/2019 7. Baker Hughes - Technologies

    51/70

    54

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    Extra Deep Azimuthal Resistivity (EDAR)High Definition LWD Electrical Imaging

    Risk MitigationCost ReductionEvaluation

    ZoneTrak / ZoneTrak G

    Risk Mitigation

  • 8/19/2019 7. Baker Hughes - Technologies

    52/70

    55

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    High Definition LWD Electrical Imaging

    • Resistivity & Gamma Ray Geostopping ToolCasing point selectionCore point selectionGeological interpretation with seismic correlationSalt drilling applications – exit and entry

    • Oil & Water Based Mud

    • 4 ¾” Gamma Ray integrated into 4 ¾” AutoTrak

    gCost ReductionEvaluation

    ZoneTrak – Resistivity at Bit - Geostopping

  • 8/19/2019 7. Baker Hughes - Technologies

    53/70

    56

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    ZoneTrak – Resistivity at Bit - Geostopping

    Formation Change !!!

    21 ft

    © 2009 Baker Hughes Incorporated. All Rights Reserved.

    StarTrak

    Risk Mitigation

  • 8/19/2019 7. Baker Hughes - Technologies

    54/70

    57

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    High Definition LWD Electrical Imaging

    • High resolution resistivity imager 120 sectors in memory / 16, 32 or 64 sectors realtime

    0.25 inch x 0.25 inch pixel size

    • ApplicationsWellbore Placement

    Structural dip and dip azimuth for steering

    Reservoir CharacterizationBedding, Faults & Fractures

    Wellbore Integrity (NPT)Breakouts and drilling induced fracturesECD management

    Cost ReductionEvaluation

    LithoTrak

    Risk Mitigation

  • 8/19/2019 7. Baker Hughes - Technologies

    55/70

    58

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    High Definition LWD Electrical Imaging

    • ServicesBulk Density (Azimuthal)Neutron PorosityCaliper (Azimuthal)Photoelectric Effect (Azimuthal)

    • ApplicationsIdentification of gas filled porosityStructural characterisation & Reservoir Navigation

    Borehole size, shape & orientationSynthetic seismograms

    Cost ReductionEvaluation

    Images Risk Mitigation

  • 8/19/2019 7. Baker Hughes - Technologies

    56/70

    59

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    High Definition LWD Electrical Imaging Cost ReductionEvaluation

    OnTrak/AziTrak

    Gamma RayImage

    LithoTrak Bulk

    DensityImage

    StarTrakHR ElectricalImage

    structural bedding

    thin bed detail

    SoundTrak

    Risk MitigationC R d i

  • 8/19/2019 7. Baker Hughes - Technologies

    57/70

    60

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h

    t s R e s e r v e

    d .

    High Definition LWD Electrical Imaging

    • Realtime compressional slowness (12, 11 & 4 kHz)Monopole measurement

    40-190 μsec/ft

    • Post run shear slowness (8, 4, 3 & 2 kHz)Quadrupole measurement

    Shear in slow formations (90-520μsec/ft)

    • ApplicationsPore Pressure Predication

    Synthetic SeismogramPorosity Indicator Rock Strength

    Cost ReductionEvaluation

    Monopole Dipole Quadrupole

    TesTrak

    Risk MitigationC t R d ti

  • 8/19/2019 7. Baker Hughes - Technologies

    58/70

    61

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h

    t s R e s e r v e

    d .

    High Definition LWD Electrical Imaging

    • Formation Pressure Tester SmarTest & SmartPad technology

    • ApplicationsFormation pressuresCalibrate realtime PPPControl overbalance / ECDNear wellbore mobilityGas / Oil / Water contact identification

    Depletion monitoringReservoir connectivity

    Cost ReductionEvaluation

    TesTrak Real-Time Information

  • 8/19/2019 7. Baker Hughes - Technologies

    59/70

    62

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    2000

    2500

    3000

    3500

    4000

    4500

    90 110 130 150 170Time [s]

    P

    r e s s u r e

    [ p s

    i ]

    – Annulus Pressures

    – Formation Pressures

    – Draw Down Pressures

    – Mobility (downhole FRA)

    – Quality Indicator Final Build Up CriteriaFRA Correlation

    – Temperature Change

    – Tool Face

    FASTrakHi h D fi i i LWD El i l I i

    Risk MitigationCost Reduction

  • 8/19/2019 7. Baker Hughes - Technologies

    60/70

    63

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    High Definition LWD Electrical Imaging

    • Downhole Fluid Analysis

    Temperature

    Density

    Viscosity

    Sound Speed

    Oil / Gas Ratio

    • Downhole Fluid Sampling

    Sixteen Nitrogen buffered samples in single phasetanks

    Sample over-pressurisation for preservation

    Built on TesTrak & Wireline RCI technology

    Cost ReductionEvaluation

    LWD Sampling

  • 8/19/2019 7. Baker Hughes - Technologies

    61/70

    64

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    p g

    Power Module

    Pump and Analyzer Module

    Tank Modules4 x 4 tanks

    TerminationModule

    Draw Down Pump

    Quartz Pressure Gauge

    Sealing Element

    Sampling Tanks

    Exit to Wellbore

    Fluid Analyzer

    Sample Pressure Gauge

    Realtime Fluid Analysis

  • 8/19/2019 7. Baker Hughes - Technologies

    62/70

    65

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    33333333333

    3344333344333334455

    1 250 3501 600 700

    2 275 3752 627 754

    3 225 3753 659 643

    Mud FiltrateTransition ZoneFormationFluid

    Contamination vs. Time

  • 8/19/2019 7. Baker Hughes - Technologies

    63/70

    66

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    • Volumes and times matched

    MagTrakHigh Definition LWD Electrical Imaging

    Risk MitigationCost Reduction

  • 8/19/2019 7. Baker Hughes - Technologies

    64/70

    67

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    High Definition LWD Electrical Imaging

    • Magnetic Resonance While DrillingT2 Distribution realtime

    • Motion insensitive measurement due to:Stabilisation of the sensor Near zero magnetic field gradient – vibration tolerant

    Very short interecho time (TE)

    • Applications

    Where are the fluids? – Porosity

    What is the fluid type? – Fluid Differentiation

    How much is producible? – Movable vs. Bound

    How easy is it to produce? – Permeability Index

    Evaluation

    E h T i T Di t ib ti

    MagTrak – Nuclear Magnetic Resonance (NMR)

  • 8/19/2019 7. Baker Hughes - Technologies

    65/70

    68

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    Echo Train

    E c h o

    A m p

    l i t u d e

    0 400300200100Time (ms)

    20

    15

    10

    5

    500

    Matrix RockDryClay

    Clay-

    boundwater Movable water

    Capillary

    boundwater

    T 2 Distribution

    0

    1

    2

    3

    4

    0.1

    P a r t

    i a l P o r o s

    i t y

    1 10 100 1000T 2 (ms)

    Decomposition

    Multi-Exponential

    T 2 cutoffsPorosity

    Volumetrics

    HeavyOil

    HeavyOil

    MediumOil

    MediumOil

    LightOil

    LightOil

    SeismicTrakHigh Definition LWD Electrical Imaging

    Risk MitigationCost Reduction

  • 8/19/2019 7. Baker Hughes - Technologies

    66/70

    69

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g h t s R e s e r v e

    d .

    g g g

    • Checkshot measurement (CS)First arrival – Formation velocity

    • Vertical Seismic Profile (VSP)Near / below well seismic imaging

    • ApplicationsReduce seismic uncertaintyControl parameters in high risk zonesOverpressure / Depleted / Salt Rubble ZonesCasing point selection

    Avoid unnecessary sidetracksReduce operating costs

    Evaluation

    SeismicTrak - Measurement Principle

  • 8/19/2019 7. Baker Hughes - Technologies

    67/70

    70

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g

    h t s R e s e r v e

    d .

    TVD [m]

    T i m e

    [ m s ]

    Vertical Seismic Profiling – VSPCheckshot – CS

    1 st Break

    © 2011 HM

    SeismicTrakHigh Definition LWD Electrical Imaging

    Risk MitigationCost ReductionE l i

  • 8/19/2019 7. Baker Hughes - Technologies

    68/70

    71

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g

    h t s R e s e r v e

    d .

    Evaluation

    VSP Upwaves CorridorStack SdTk

    SyntheticSeismogram

    Surface SeismicTime-Depth

    Pairs

    Look-Ahead

    BEACONHigh Definition LWD Electrical Imaging

    Risk MitigationCost ReductionE l ti

  • 8/19/2019 7. Baker Hughes - Technologies

    69/70

    72

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g

    h t s R e s e r v e

    d .

    • Remote Operations Centre

    Realtime monitoring & operationsWellLink RTWellLink Data ServicesWellLink Performance24/7 Technical SupportDrilling OptimisationReservoir Navigation Services

    Evaluation

  • 8/19/2019 7. Baker Hughes - Technologies

    70/70

    73

    © 2 0 1 5 B a

    k e r

    H u g

    h e s

    I n c o r p o r a

    t e d

    . A l l R i g

    h t s R e s e r v e

    d .

    Thank You

    Questions


Recommended