7 CHANNEL CENTER Meeting with The Fort Point Channel Landmark District Commission October 14, 2021
Transcript
Page 1: 7 CHANNEL CENTER

7 CHANNEL CENTERMeeting with The Fort Point Channel Landmark District Commission

October 14, 2021

Page 2: 7 CHANNEL CENTER

7 CHANNEL CENTERMeeting with The Fort Point Channel Landmark District Commission

October 14, 2021

AGENDA

• Project Overview

-Constructinga9-storybuildingforR&D&Officeuseswithfunctionalfloor-to-floorheights

- Retaining historic value

• Review existing conditions & context

• Discuss approach to renovating existing facades

- Maintain existing conditions of front (West) façade

- Shift rear (East) façade backward

- Adapting loading bays

- Replacement of windows

• Discuss approach to new construction above existing

- Set new façades back 12" from neighboring façades

Page 3: 7 CHANNEL CENTER

A st

reet

Cha

nnel

Cen

ter

stre

etM

edal

lion

Aven

ue

7 CHANNEL CENTER

CONVENTION CENTER

FORT POINT CHANNEL

FORT POINT CHANNEL LANDMARK DISTRICT

'A' STREET PROTECTION AREA

EXISTING CONDITIONS - PROJECT LOCATION.

3

Page 4: 7 CHANNEL CENTER

7 CHANNEL CENTER

CHANNEL CENTER ST

EXISTING CONDITIONS - AERIAL VIEW, FRONT OF BUILDING.

4

Page 5: 7 CHANNEL CENTER

7 CHANNEL CENTER9 CHANNEL CENTER 5 CHANNEL CENTER

EXISTING CONDITIONS - FRONT OF BUILDING ON CHANNEL CENTER ST.

5

Page 6: 7 CHANNEL CENTER

7 CHANNEL CENTER5 CHANNEL CENTER 9 CHANNEL CENTER

EXISTING CONDITIONS - REAR OF BUILDING ON MEDALLION AVE. 6

Page 7: 7 CHANNEL CENTER

BUILDING HISTORY

7 Channel Center• Constructed in 1914 by the Boston Wharf Company

• 5 Channel Center constructed in 1913 & 9 Channel Center in 1916; no historic internal connections between the buildings

• Designed by Boston Wharf Company staff architect Morton Safford• Purpose built as a 3-story warehouse, originally with a loading platform at the rear fronting a rail spur on

Medallion Avenue• A mezzanine level was added between 1923 and 1950, some windows have been replaced, and the

loading platform has been removed• First tenant of the building was Columbia Steel & Shafting of Pittsburgh, PA, makers of iron and steel

products including castings, sheet metal, steel wire and structural steel products (1914-1922), property used as a storage warehouse

• Later tenants include paint manufacturer Glidden Co. of Massachusetts (late 1920s-late 1930s), wholesale paper distributor Rutter & McNaught Inc. (late 1920s-mid 1950s), and Lyons Metal Products (mid 1950s-mid 1960s), among others.

7

Page 8: 7 CHANNEL CENTER

Future location of 7 Channel Center

1910 South Boston Atlas

N

BUILDING HISTORY

8

Page 9: 7 CHANNEL CENTER

1919 South Boston Atlas

Completed warehouse at 7 Channel Center

N

BUILDING HISTORY

9

Page 10: 7 CHANNEL CENTER

BUILDING HISTORY

1923 Sanborn Insurance Atlas

N

10

Page 11: 7 CHANNEL CENTER

BUILDING HISTORY

1950 Sanborn Insurance Atlas

N

11

Page 12: 7 CHANNEL CENTER

Ca. 1980 photograph (BLC Survey)

BUILDING HISTORY

Six-over-six divided lite windows in place

at first and third floors

12

Page 13: 7 CHANNEL CENTER

2’-9

GRADE

LEVEL 1

LEVEL 2

LEVEL 3

ROOF

9’-1

1/2

”10

’-2”

12’-

4”

BRICK PIER

STONE SILL

PAINTED METAL ROLLING DOOR

DOUBLE HUNG WINDOWS W/ DIVIDED LITE

DOUBLE HUNG WINDOWS

ORNAMENTAL STONE

STONE LOADING APRON

EXISTING FAÇADE - WEST (CHANNEL CENTER ST).

5 CHANNEL CENTER7 CHANNEL CENTER9 CHANNEL CENTER

13

Page 14: 7 CHANNEL CENTER

LEVEL 1

LEVEL 2

LEVEL 3

LEVEL 4

LEVEL 5

LEVEL 613

’-0

”12

’-0

”14

’-0

”14

’-0

”14

’-0

BRICK PIER

STONE SILL

NEW WINDOW W/ DIVIDED LITES

NEW DOUBLE HUNG WINDOWS W/ DIVIDED LITE

NEW DOUBLE HUNG WINDOWS

ORNAMENTAL STONE

* NOTE : CHANGES TO FLOOR LEVELS DO NOT RESULT IN CHANGES TO EXISTING WINDOW LINES

STONE LOADING APRON

FAÇADE OF ADDITIONAL FLOORS NOT SHOWN

STONE LOADING APRON REMOVED, NEW GLAZED ENTRY

7 CHANNEL CENTER 5 CHANNEL CENTER9 CHANNEL CENTER

PROPOSED FAÇADE RENOVATION - WEST (CHANNEL CENTER ST).

14

Page 15: 7 CHANNEL CENTER

7 CHANNEL CENTER

5 CHANNEL CENTER

9 CHANNEL CENTER

REAR FAÇADE - EXISTING LOCATION

EXISTING WEST FAÇADE ALIGNED WITH

NEIGHBORING FAÇADES

EXISTING EAST FAÇADE SET BACK ±7’-6”

FROM NEIGHBORING FAÇADES

15

Page 16: 7 CHANNEL CENTER

7 CHANNEL CENTER

5 CHANNEL CENTER

9 CHANNEL CENTER

EXISTING WEST FAÇADE ALIGNED WITH

NEIGHBORING FAÇADES

EAST FAÇADE RECONSTRUCTED & SET

BACK 12” FROM NEIGHBORING FAÇADES

REAR FAÇADE - PROPOSED LOCATION16

Page 17: 7 CHANNEL CENTER

3’-6

GRADE

LEVEL 1

LEVEL 2

LEVEL 3

ROOF

9’-1

1/2

”10

’-2”

12’-

4”

PAINTED STEEL SILL

PAINTED METAL ROLLING DOOR

PAINTED STEEL LINTEL

DOUBLE HUNG WINDOWS

DIVIDED LITE WINDOWS

SHUTTER HINGES

STONE SILL

INTERIOR VIEW OF 2ND FLOOR WINDOWS

9 CHANNEL CENTER7 CHANNEL CENTER5 CHANNEL CENTER

EXISTING FAÇADE - EAST (MEDALLION AVE).

17

Page 18: 7 CHANNEL CENTER

PROPOSED FAÇADE RENOVATION - EAST (MEDALLION AVE)

LEVEL 1

LEVEL 2

LEVEL 3

LEVEL 4

LEVEL 5

LEVEL 6

13’-

0”

12’-

0”

14’-

0”

14’-

0”

14’-

0”

NEW PAINTED STEEL SILL

NEW WINDOW W/ DIVIDED LITE

NEW PAINTED METAL ROLLING DOOR

NEW PAINTED STEEL LINTEL

NEW DOUBLE HUNG WINDOWS

NEW DIVIDED LITE WINDOWS

SHUTTER HINGES

STONE SILL

* NOTE : CHANGES TO FLOOR LEVELS DO NOT RESULT IN CHANGES TO EXISTING WINDOW LINES

9 CHANNEL CENTER7 CHANNEL CENTER5 CHANNEL CENTER

FAÇADE OF ADDITIONAL FLOORS NOT SHOWN

18

Page 19: 7 CHANNEL CENTER

CHANNEL CENTER ST BUILDING HEIGHTS

±80' BUILDING HEIGHT

±125' BUILDING HEIGHT

CHANNEL CENTER ST

A ST

19

7 CC EXISTING

Page 20: 7 CHANNEL CENTER

CHANNEL CENTER ST BUILDING HEIGHTS

±80' BUILDING HEIGHT

±125' BUILDING HEIGHT

CHANNEL CENTER ST

A ST

20

7 CC EXISTING

7 CC NEW CONSTRUCTION

Page 21: 7 CHANNEL CENTER

NEW GLASS CURTAIN WALL W/ DARK METAL MULLIONS

NEW DARK METAL CLADDING

NEW METAL EQUIPMENT SCREEN

LEVEL 1

ROOF = 125’-0”

MECH. PENTHOUSE

LEVEL 2

LEVEL 3

13’-

0”

12’-

0”

14’-

0”

TYP.

LEVEL 4

LEVEL 5

LEVEL 6

LEVEL 7

LEVEL 8

LEVEL 9

IRON ST5 CHANNEL CENTER9 CHANNEL CENTER 7 CHANNEL CENTER

PROPOSED WEST (CHANNEL CENTER ST) ELEVATION - PREFERRED DESIGN

REN

OVA

TED

NEW

21

Page 22: 7 CHANNEL CENTER

REN

OVA

TED

NEW

NEW GLASS CURTAIN WALL W/ DARK METAL MULLIONS

NEW DARK METAL CLADDING

NEW METAL EQUIPMENT SCREENROOF = 125’-0”

MECH. PENTHOUSE

IRON ST 9 CHANNEL CENTER5 CHANNEL CENTER 7 CHANNEL CENTER

PROPOSED EAST (MEDALLION AVE.) ELEVATION - PREFERRED DESIGN 22

Page 23: 7 CHANNEL CENTER

12" SETBACK FROM EXISTING FACADE

12" SETBACK FROM EXISTING FACADE12" SETBACK FROM EXISTING FACADE

VIEW LOOKING NORTHWEST

VIEW LOOKING NORTHEAST23

Page 24: 7 CHANNEL CENTER

3’-0

LEVEL 1

FLOOD ELEV.

LEVEL 2

LEVEL 3

8’5’

-6”

LEVEL 4

13’-

0”

12’-

0”

14’-

0”

SECTION DIAGRAM 1/8”=1’-0”

EAST FACADE WEST FACADESECTION

7 CHANNEL CENTER

24

Page 25: 7 CHANNEL CENTER

NEW GLASS CURTAIN WALL W/ DARK METAL MULLIONS

NEW DARK METAL CLADDING

NEW METAL EQUIPMENT SCREEN

LEVEL 1

ROOF = 125’-0”

MECH. PENTHOUSE

LEVEL 2

LEVEL 3

13’-

0”

12’-

0”

14’-

0”

TYP.

LEVEL 4

LEVEL 5

LEVEL 6

LEVEL 7

LEVEL 8

LEVEL 9

IRON ST5 CHANNEL CENTER7 CHANNEL CENTERSECTION

SECTION DIAGRAM - 1/16" = 1'-0"

REN

OVA

TED

NEW

25

Page 26: 7 CHANNEL CENTER

26

THANK YOU


Recommended