32
7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario
Transcript
Page 1: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

7-Year Pavement Warranties

TEA, OmahaSeptember 24, 2009

Paul Sosney

Head Capital Award

Ministry of Transportation Ontario

Page 2: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Thunder Bay

North BaySudbury

Windsor

KingstonToronto

Ottawa

Hamilton

London

Nebraska

Texas

Ontario

Page 3: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Topography

Page 4: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.
Page 5: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Downsview

Page 6: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

QEW/Redhill Creek Expressway

Page 7: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Southern Rural Highway (Hwy 6)

Page 8: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Northern Freeway (Hwy 69)

Page 9: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Northern Highway (2-Lane)

Page 10: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

LT Warranty Concept

Page 11: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Why 7-Year Pavement Warranties?

• Move toward performance specifications• Reduce contract administration, pay items,

inspection and testing costs• Encourage innovation • Reduce overall project and lifecycle costs• “7” years provides confidence that the 18 -

20-year service life will be achieved

Page 12: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Project Selection

• 2 lane and 4 lane rural highways with less than 5,000 AADT/design lane

• Uniform pavement performance without extensive problematic soils/swamp conditions left untreated

• Normally less than 100 km from a permanent HMA plant

Page 13: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Categories of Warranty Projects

• Two Categories– Rehabilitation– Reconstruction

Page 14: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Pavement “Rehabilitation”

• Treatment of some or all the existing materials from the top to the bottom of the existing bituminous layers

Includes:

– Partial or full depth asphalt removal with resurfacing

– Cold in-place recycling with asphalt resurfacing

Page 15: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Pavement “Reconstruction”• Treatment of all existing bituminous layers and a

minimum of 150 mm of the underlying granular materialIncludes:– removal of all bituminous layers and some or all of the

granular material and replacement with new or recycled materials

– full depth in-place reclamation to a minimum depth of 150 mm into the granular, with or without milling or stabilization, with asphalt resurfacing

Page 16: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

MTO Design Responsibilities

• The usual ground survey and geotechnical field data is collected

• MTO designs:– the alignment and final cross-section of the hwy– special treatments to widen the roadway subgrade or

stabilise shoulders and embankments– ditches, culverts, frost heave treatments – any other non-pavement work included in the project

Page 17: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Principles of Pavement Warranty Projects• The contractor is responsible for the pavement design,

materials and workmanship

• The warranty is on pavement performance for a fixed period of 7 years

• Minimal material requirements are specified. Standard specifications are not specified

• MTO’s pavement design is for internal use only

• The Contractor’s design is reviewed for compliance

Page 18: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Principles cont’d• One “Pavement with Warranty” lump sum item includes

all costs within pavement design envelope

• Info provided to Bidders: traffic level for design, surveys, soil borings, pavement cores, X–sections if applicable, past contracts if available

• Soils and pavement data is not guaranteed to be sufficient

• Field investigation by bidders allowed, preferably with no snow in ditches, during minimum 6 week advertising period

Page 19: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

LT Warranties – Estimating Cost

Page 20: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Warranty - Estimating Template

Refer to Notes page for additional definitions

Designer to provide values in blue cells  

Contract Number 2009-xxxx

Highway 419

Length of Contract (kms) 10

Date Prepared January 12,

2009

Page 21: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

$65,000.00 Sub Total -

Design/Engineering 

 

$ 0.00 Additional Requirements 

Expenses which contractor is responsible for under the Special Provision for the Tender Item - Pavement with Warranty.

$35,000.00Default value of $35,000Pavement Design Report 

Allowable expenses for additional Geotechnical Investigation either before or after award.

$30,000.00$3,000.00

Enter per kilometre value ($3,000 or $5,000) based on pavement condition -

Geotechnical Investigation 

Design/Engineering (Contractor)

Page 22: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

$18,000.00 Sub Total - Quality Control 

 Insert estimated number of working

days in Cell F22  

$18,000.00$400.0045.001.00 Additional QC 

Allowable expenses for

additional Quality Control

to ensure completed work complies with

pavement design.

 Rate/dayWorking

DaysAdditional

Staff    

Additional Quality Control - (Design Consultant employed by Contractor)

Page 23: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Construction Value - (Based on Region's Original Pavement Design Report)  

Item Code Item Description Unit Quantity Revised

Quantity*

Estimators Unit Price

Extension

0206-0010 Earth Excavation M3 28175.00 29583.75 $11.24 $332,521.35

0313-1370 Hot Mix Misc. M2 2700.00 2835.00 $14.18 $40,200.30

0313-1372 Superpave 9.5 T 67.00 70.35 $244.98 $17,234.34

0313-1373 Superpave 12.5 T 12075.00 12678.75 $102.77 $1,302,995.14

0313-1376 Superpave 19.0 T 44300.00 46515.00 $80.63 $3,750,504.45

0313-1380 Tack Coat M2 205000.00 215250.00 $0.29 $62,422.50

0314-0071 Granular A T 72500.00 76125.00 $18.68 $1,422,015.00

0314-0400 Granular B, Type III T 35200.00 36960.00 $15.17 $560,683.20

0330-0010Full depth reclamation with expanded asphalt stabilization

M2 77750.00 81637.50 $1.80 $146,947.50

0341-0010 Rout and Seal M 1300.00 1365.00 $7.50 $10,237.50

0510-3133 Removal of Asphalt Paving (Full Depth) M2 4260.00 4473.00 $6.60 $29,521.80

0510-3134Removal of Asphalt from Concrete (Bridges)

M2 420.00 441.00 $14.00 $6,174.00

0510-3137 Removal of Asphalt (Partial Depth) M2 76130.00 79936.50 $2.20 $175,860.30

* Overrun factor on Quantities 5% This value used to calculate "Revised Quantity" column

  Sub Total - Items   $7,285,327.09

** Inflation Factor 3%If Applicable - Value not required if estimate is finalized near Tender

Opening Date$218,559.81

  Sub Total - Construction Value   $7,503,886.90

Page 24: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Contractor Initiated Improvements on Design (Additional quantity added by contractor )      

 Comments / Reference

     

  Item   Unit  Quantity Adj. Quant.

Unit Price

Extension  These costs are to cover an additional 50 mm lift of binder and 100 mm of Granular 'A' that the contractor may include during initial construction phase to insure that pavement structure will not crack over the 7 year warranty period.

 0313-1373  SuperPave 12.5    T  6,037 $107.00 $645,959.00

0313-1380 Tack Coat

  M2  68,333 $0.29  $19,816.67 

 0314-0071 Granular A     T  11,892 $12.71  $151,147.32

      

     $816,922.99

 

Page 25: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

$156,314.40 Sub Total - Rout and Seal 

Insert Regional Estimate if available

in cell H85.

$0.00 1.00LSRegional Estimate (to be used instead of calculation if available)

Estimated

Region's Estimated Value

$24,000.00$24,000.00$20,000.001.00LSTraffic Control*

$132,314.40$8.16$6.8016215.00mRegional Historical Repair Quantity

*Traffic Control = Number of days x

$3,000/day + $5,000 for signs and

barrels

ExtensionInflated

Unit PriceBase Unit

PriceQuantityUnitsDescription of Item & Notes

 5Number of days to complete work 

4Year the work will be done => Values only

required if using "Calculated Value"

Values used to calculate Inflated Unit Price

5%Inflation per Year => 

Calculated Value

Warranty Repair - Rout and Seal: (Use only one - Calculated or Region's Estimated Value.)

Page 26: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

   $490,207.60     Sub Total Mill and Pave 

 $40,000.00$40,000.00 1  LS Traffic Control 

 $1,840.00$2.00 920  m Pavement Marking 

  $2,401.20$0.35 6,900  

m2

 Tack Coat

 

 $443,966.40$246.65 1,800  t Superpave 12.5

 

  $2,000.00$2.00 1,000  t Reclaim Asphalt Pavement - partial depth 50 mm 

           

 7 Year the work will be done 5%Inflation

per year  Selective Resurfacing - Year 7

 

 Comments / Reference

 Warranty Repair - Mill & Pave 

Page 27: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

$60,000.00 Sub Total - Warranty Work 

$25,000.00

Road side inspection, re-testing of QA testing to confirm results. Also

includes as-built drawings and final verification.

Final Inspection 

Reasonable expenses contractor

may incur over warranty period

$35,000.00Assume $5,000 per year for road side

inspection and QC testing.Warranty Administration 

Administration During Warranty Period

Page 28: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

$375,194.35 Sub Total - Unknowns and Risk 

Acceptable allowance for unforeseen expenses that

contractor may incur and/or Acceptable Premium for new

tendering concept.

Note: % is only applied to warranty items

5%Enter value up to 5% of warranty

work 

Unknowns and Contractor Risk

Page 29: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

$8,178,395.65TOTAL VALUE FOR TENDER ITEM 

$375,194.35Unknowns or Risk 

$60,000.00Administration 

$0.00Mill & Pave 

$156,314.40Rout & Seal 

$7,503,886.90Contract Work 

$18,000.00Additional QC 

Total Value of Tender Item for Pavement with Warranty shall

be entered in Regional's HiCo Estimate prior to

submission to CRO. (Attach

Spreadsheet to the Tender Item -

"Pavement with Warranty" in HiCo.)

$65,000.00Design Costs 

Summary: Tender Item - Pavement with Warranty

Page 30: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Contracts to Date

Page 31: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Contract Estimate Low Bid Estimate to Low Bid % Treatment

1 $11,013,974.53 $ 14,907,101.21 -26.1% Full Depth Pulverizing

2 $12,793,430.77 $ 12,354,417.67 3.6% Cold In Place

3 $ 4,846,866.33 $ 6,551,821.00 -26.0% Full Depth Pulverizing

4 $ 3,058,105.57 $ 2,611,000.00 17.1% Rem Asphalt, Add Gran, Pave

5 $ 4,731,906.35 $ 4,969,000.00 -4.8% In Place FD Recl

6 $ 7,415,152.54 $ 6,953,000.00 6.6%Pulverize existing asphalt to 115mm

7 $ 8,765,683.63 $ 11,420,000.00 -23.2% In Place FD Recl

8 $ 5,529,769.51 $ 7,919,011.00 -30.2%Cold In Place Recl w/Expanded Asp

 Average Estimate to Low Bid % = -8.1%

Page 32: 7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.

Contract Low BidEstimate to Low

Bid % 2nd Bidder 3rd BidderNo. of

Bidders

1 $14,907,101.21 -26.1% $19,715,495.00 2

2 $12,354,417.67 3.6% $12,538,138.25 $12,562,138.25 5

3 $ 6,551,821.00 -26.0% $ 6,657,127.00 $ 7,738,767.14 3

4 $ 2,611,000.00 17.1% $ 2,639,000.00 $ 3,463,116.00 3

5 $ 4,969,000.00 -4.8% $ 7,514,005.00 $ 9,378,000.00 3

6 $ 6,953,000.00 6.6% $ 7,890,000.00 $ 8,104,266.00 4

7 $11,420,000.00 -23.2% $15,497,699.00 $19,496,459.44 3

8 $ 7,919,011.00 -30.2% $ 8,443,680.00 $10,916,000.00 5