6.1. urban Water Supply
6.1.1 ConclusionAn analysis of the current conditions of water and sewage facilities in cities of national status, oblast centers, cities and towns, and urban-type settlements enable the major conclusions presented below .
∆ Vodocanals have a high degree of consumption of fixed capital. Despite the activities underway on rehabilitation and development of water supply and water discharge systems, the conditions of systems in most settlements remain critical .
∆ Inadequate investments in water and sewage facilities. All sectors developed their own programs within the development of the sectoral program Drinking Waters . Accordingly, all program activities carried out were compiled along with the programs produced by regional and city administrations . However, the lack of qualified specialists in water supply and water discharge in the structure of settlement, regional, and oblast administrations disallowed a full identification of the list of necessary work, along with the scale and prioritization of activities for the improvement of water supply to the settlement . The programs that were developed fail to fully reflect the critical situation and the measures required to improve the population’s access level to drinking water �4 hours a day . The funds planned for the implementation of activities on the rehabilitation and reconstruction of urban water supply are not fully allocated by local budgets .
Hence, the socio-economic situation in the country at the time of the creation of the programs, the lack of feasibility studies (FS) with water departments of the reconstruction and development of urban water supply, and the lack of developed investment projects predetermined the subjectivity and underestimation of planned investments . An accurate evaluation of the necessary financing for rehabilitation, as well as reconstruction of old and construction of new water supply systems is nearly impractical without FSs, as chances are that the calculation error would be high .
The inadequacy of tariffs for water supply and water discharge services and enterprises’ costs caused a financial deficit despite the 100% collection rate of service fees .
∆ Vodocanals undergo serious financial crisis. The financing issues come down to deficient or absent public subsidies or subsidies to water departments over the past 15 years . The dependence on public subsidies was caused by incompliance with tariff policy, under which tariffs should not only be self-supporting, but they should generate the specific profit needed to develop water and sewage facilities (WSF) .
Inadequate investments in water and sewage facilities make it impractical to duly plan the activities on improvement of settlement water supply.
An analysis of the current conditions of water and sewage facilities in cities of national status, oblast centers, cities and towns, and urban-type settlements enable the major conclusions presented below.
6CoNCLuSIoN AND rECoMMENDATIoNS
76
UNDP ProjectNational Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
The water supply systems with 50%-70% deterioration should be prioritized.
∆ the operations of water providers are administered without serious centralized coordination. Local administrations, having deficient professional and technical knowledge of water department activities, as well as neither the advanced technologies of water and sewage facilities nor the foreign experience of water supply and water discharge operation, are unable to pursue the policy in this area . At the same time, water departments have no regulating national body authorized by the state . There is no one in charge either of the development of water and sewage sector strategy or of the sector’s overall coordination and regulation . Currently, the operation of water departments is distorted and decentralized .
∆ the activities of the sectoral program Drinking Waters, oblast programs taza su, Clean Water, and others fail to sufficiently facilitate the improvement of the rural water supply. The primary issue is the lack of due control by local administrations . The accounting system based on what has been explored, the low quality of work, incompletion of projects for construction and reconstruction of water supply systems, use of obsolete technologies and materials, and some other reasons prevent the attainment both of the goals set and expected oUTSomes .
∆ Insufficient autonomy restricts efficient water department management. Utilities are often considered an extension of the local political machine, but not because of the efficiency of their operation . Though water departments are in charge of the operation of water supply and water discharge systems, the decisions on a director’s appointment, subsidy allocation, investment recourse, reconstruction and development of the systems, and the inclusion of specific activities into the program of water supply improvement are made by local authorities . Moreover, pricing issues are tacitly regulated; that is, without the Akim’s approval, the Water Department would never file a request for a tariff increase .
6.1.2 recommendations To attain the financial sustainability of water departments, alternative financing should be provided . One option is to increase the subsidies of water departments from the state (national and local) budgets . Additional funds may also be obtained by grants and soft loans .
∆ there is a need to change the approach for achieving MDgs in the RK. Attention should not only be paid to settlements and cities currently without water supply sources or central water supply systems, but also to facilities with 50% -70% deterioration of existing networks .
Should urgent measures on rehabilitation and reconstruction of water supply networks not be implemented by �015, the number of the population with safe access to drinking water and sanitation will fall rather than rise .
∆ Institutional reforms. To increase the level of sectoral and regional programs’ performance in the field of drinking water supply, there is a need to improve institutional reforms in the following areas:
- public control: conduction of state policy through the nationally authorized body on water supply and water discharge to be stipulated by the Water Code of the Republic of Kazakhstan;
- adoption of a sectoral specialized law on Water Supply and Water Discharge to regulate relations between Consumer and Service Providers;
- development and adoption of the Concept (Strategy) of the development of the water and sewage sector in the Republic of Kazakhstan, endorsed by the government .
∆ When making investment projects in water supply and water
The inadequacy of tariffs for water supply and water discharge services and enterprises’ costs caused a financial deficit despite the 100% collection rate of service fees.
Poor accounting and control systems entails poor quality of works.
77
CONCLUSION AND RECOMMENDATIONS
discharge systems, there is a need for feasibility studies; hence, the national budget shall cover the costs of such development.
6.2. rural Water Supply
6.2.1 Conclusion
The analysis of contemporary water supply confirms that an extremely low level of the rural population has access to drinking water:
∆ the central water supply by most clustered water supply systems is not secured because of the improper technical conditions of the trunk lines and intra-settlement distribution networks. The high operating costs of long-distance water transportation increase the cost of supplied water . To ensure the collection of water payments, water is provided at supply points . This procedure has been introduced in all clustered water supply systems in North Kazakhstan oblast .
∆ the technical conditions of most local water pipelines are unacceptable. Most of them operate with frequent failures or water supply granted on an hourly basis .
∆ the existing system of water supply for 64% of the rural population is based on decentralized local sources. At the same time, drinking needs are satisfied by the use of in-yard and common wells, delivered water, and the surface water of rivers, lakes, and small channels .
∆ As a rule, wells are installed near septic facilities, cesspools, and places frequented by cattle. Wells conceal the great danger of bacterial water contamination and as a consequence, the outbreak of infections related to the aquatic transfer factor . The latter may be attributed to surface sources .
∆ Perched waters that feed wells with limited resources contribute to the issue of secure drinking water supply in sufficient quantity. The price of delivered water is comparable to tap water, or it is sometimes higher, but the costs of its use are regulated by an extremely low water consumption rate (10-15 l/day per person) .
∆ the lack of fresh water determines the use of mineralized water, which is harder and contains fluorine, iron, and other components at a level high enough to adversely affect human health.
∆ Due to poor water coverage, the level of sanitation and hygienic conditions in most settlements is low as well.
6.2.2 recommendations
∆ The solution to the issues of improved water supply and increasing the population’s access to drinking water should take into account local, natural, and existing economic conditions, the availability and technical conditions of existing systems, and water supply facilities .
∆ Water consumption rates should be based on flexible criteria of water use in view of the new socio-economic conditions .
∆ Delivered water should be eliminated as a water supply source to settlements, as it fails to ensure the required water consumption rates, it incapacitates the watering of subsidiary plots or the feeding of cattle, and causes poor sanitary conditions for settlements and their populations . As a result, settlement residents find themselves in extremely tough socio-economic conditions .
78
UNDP ProjectNational Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
∆ An increase in the share of safe access to drinking water should be attained over the long-term in the following areas: further rehabilitation and improvement of existing systems; construction of new systems in the regions the least provided for; exploration of new and development of alternative water supply sources; improvement of the quality of potable water and its efficient use; establishment as well as material and technical furnishing of companies for the operation of drinking water supply systems .
6.3. Social Survey
6.3.1 Conclusion
∆ Unsustainable water supply and scheduled water supply are the key issues for urban and rural residents of Kazakhstan. While 55% of Kazakhstan’s population uses water from a central supply system, only 17% have water �4 hours a day . An unsustainable water supply entails water contamination, deteriorates sanitary and hygienic conditions, and increases the population’s sickness rate . To illustrate, the chance of contracting intestinal disease doubles for people in households that have regular water cuts, as compared to those who have water �4 hours a day .
∆ A change of demand for bottled water can be considered an indicator either of the deterioration or improvement of water quality in Kazakhstan. The following connection is established: the more repondents’ opinion of the quality of drinking water is negative, the more bottled water they use for drinking .
∆ the distance to a water supply source is not a determining indicator of safe access to drinking water. The survey findings demonstrated that people with private in-yard standpipes had the highest chance of contracting intestinal diseases or hepatitis . In contrast, users of common standpipes have less chance of contracting infectious diseases; in addition, they treat water prior to drinking it more often . Furthermore, the safety of access to drinking water is defined by many other factors, such as climatic conditions, the age of the population, income, sanitary conditions, etc .
∆ sanitary and hygienic conditions are closely related to the quality of the water supply and the population’s health. Owners of individual standpipes often have unequipped toilets (cesspools, toilets with open pits, etc .) near wells, standpipes, and other individual sources of water supply . As a consequence, the danger of bacterial water contamination is high .
∆ the access level to drinking water affects the economic wellbeing of the population (especially the rural population). Since the subsidiary plot takes a large share of the rural population’s income, the uninterrupted operation of the water supply system is a determinant of their employment and means for living .
6.3.2 recommendations
∆ There is a need to provide water users with a centralized informational program on water treatment methods, water quality in specific settlements, the connection between sanitary conditions, water quality, and human health, safe methods of household waste and the utilization of waste products, and also on effective and planned government programs regarding the country’s water supply .
∆ The priorities of the Strategy’s development shall be the issues of sanitation, regular water supply, and water quality and its effect on human health . These are needed as the economic and social consequences of intestinal and other water-related diseases may be huge and irreversible .
79
FooTNoTESi UN Development Goals on the Threshold of the Millennium in Kazakhstan . UNDP . �00� .
ii Government Decree of the Republic of Kazakhstan of �� March �00� №9� “On the Sectoral Program ‘Drinking Waters’ for �00�-�010” .
iii Kazakhstan – �0�0 . The address of the president to the people of Kazakhstan, 1997 .
iv Government Regulation of the Republic of Kazakhstan of �1 .01 .�00� №71 “On the Development Concept of the Economic Water Sector and Water Policy of the Republic of Kazakhstan by �010” .
v Presidential Decree of the Republic of Kazakhstan of �� 17 .05 .�00� №1096 “On State Strategy of Industrial and Innovation Development of the Republic of Kazakhstan for �00�-�015” .
vi Water Code of the RK of 09 .07 .�00� №481 .
vii Sanitary Rules and Norms (SanPiN) � .1 .4 .559-96 “Drinking Water, Hygienic Requirements for the Water Quality of Central Drinking Water Supply Systems . Quality Control .”
viii Construction Rules and Norms of the RK (SNiP RK) 4 .01-0�-�001 “Water Supply . Public Utilities .”
ix Access to safe drinking water is assessed by the share of the population that uses improved water supply sources . Similarly, access to sanitation sewage technologies is assessed by the percent rate of the population that uses improved sewage services . The phrase ‘Improved sewage technologies’ often denotes the technologies that ensure frequent isolation and use of hygienic means . The phrase ‘Improved technologies of drinking water supply’ denotes the ways to supply safe drinking water, which cannot be attained with unimproved technologies .
x The term ‘improved’ is based on the following definitions provided by process methods:
• Improved water supply: household connections; public well, drilled well, protected well, protected spring, rain water collection;
• Improved sewage: connection to public sewage, connection to septic system, lavatory with flushing system, cesspool, ventilated lavatory;
• Unimproved water supply technology: unprotected well, unprotected spring, water delivered by supplier, bottled water, water transported in cisterns;
• Unimproved sewage: service lavatory or a latrine, public lavatories, lavatories with open pit .
Note. In Kazakhstan, the collection of rain (and ice) water has never been regarded and should not be regarded as improved water supply.
xi The Report on Balkhash-Alakol Research Stage can be found on www .voda .kz
xii The exhaustive questionnaire was created within the DfiD project on the management of the Nura-Ishim river basin . The questionnaire consisted of 8 modules focused on municipal, production, and agricultural water consumption . This questionnaire was also developed after the depth surveys and a series of interviews and focus groups were held with concerned parties from both river basins . Each module aimed at the study of specific aspects of water use in Kazakhstan and was developed in such a way as to enable CWR to have the prepared questionnaires as the basis for future surveys . The questionnaire was tested on two basins in March �00� . For that survey, we modified four modules on drinking water, water for household use, sanitation, and informational sources . A copy of the questionnaire may be found in the Report on the management of the Nura-Ishim river basin . The Final Report, volume 5, Social Surveys on Water Resource Management by DfiD, CWR . January �004 .
xiii Despite the fact that the total number of respondents amounted to 7,515, some information inevitably got lost in the data-processing stage . As a consequence, not all final figures would equal 7,515 .
xiv There is no data on household connections in rural settlements of Almaty oblast .
xv In some households, more than one resident got sick over this year . As a consequence, despite the fact that a total of 1,5�7 people suffered from intestinal diseases over the past 1� months, the number of households that reported such cases amounted to 1,�1� .
xvi This fact was confirmed by statistical values by applying the Chi-Square test .
80
reference literature 1 . Sectoral Program Potable Waters for �00�-�010 endorsed by the Government Decree of the Republic of
Kazakhstan of �� March �00� No . 9� .
� . State Rural Development Program of the Republic of Kazakhstan endorsed by the Presidential Decree of 10 July �00� No .1149 .
� . Water Code of the Republic of Kazakhstan of 1� June �001 .
4 . The Government Decree of the Republic of Kazakhstan of �� January �004 No . 75 “On Endorsement of the Rules of Attribution of a Water Object to Potable Water Supply Sources .”
5 . The Government Decree of the Republic of Kazakhstan of �� January �004 No .76 “On Endorsement of the Rules of Subsidizing Potable Water Supply from Critical Clustered Water Supply Systems which Are Non-Alternative State-Owned Water Supply Sources .”
6 . The Government Decree of the Republic of Kazakhstan of 1� December �00� “On Endorsement of the List of Critical Clustered Water Supply Systems which Are Non-Alternative Water Supply Sources .”
7 . The �004 collection of Regions of Kazakhstan . Agency for Statistics of the Republic of Kazakhstan .
8 . Water Resources of Kazakhstan in the New Millennium . UNDP in Kazakhstan publications series .
9 . Papers of the round table dedicated to the issue of the Progress of Implementation of the First Stage of the Potable Waters Sectoral Program held on 19 April �005 in the Parliament Mazhilis of the Republic of Kazakhstan .
10 . Speech of the president of Kazakhstan N . Nazarbaev at the opening session of the Second Civil Forum in the city of Astana on 1� September �005 .
11 . Papers of the seminars held by a group of UNDP projects within the project of the National Plan of Integrated Water Resource Management and Water Efficiency in Kazakhstan .
1� . Rural development in Kazakhstan: issues and prospects . UNDP National Human Development Report . The Atlas of Rural Development in Kazakhstan, Almaty �00� .
1� . CWR working papers: inquiry to the government on the progress of the Program’s implementation, annual reports of oblast public water management enterprises, and other documents related to the Drinking Waters Program .
ANNEX I
Access of urban population to Water and Sanitation in Kazakhstan; results of Technical Survey
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
8�
sum
mar
y ta
ble
on A
cces
s of
Urb
an P
opul
atio
n to
Wat
er s
uppl
y an
d se
wer
age
syst
ems
in th
e R
epub
lic
of K
azak
hsta
n
№
Adm
inis
trat
ive
Uni
t (O
blas
t, ci
ties
of
Alm
aty
and
Ast
ana)
Pop
ula-
tion,
(ps)
Leng
th o
f P
ipel
ine
(km
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
go
od q
ualit
y of
w
ater
(ps .
/%)
Num
ber
of
Pop
ulat
ion
havi
ng
inte
rrup
ted
(lim
ited)
acc
ess
to w
ater
(ps .
/%)
Type
of W
ater
Sup
ply
(ps .
/%)
Typ
e of
Sew
erag
e Sy
stem
(ps .
/%)
Length of Sewers (km)
wel
l de
liver
ed
wat
er
othe
r ce
ntra
lized
sy
stem
se
ptic
pit
outd
oor
toile
t
1A
kmol
a�5
0,16
61,
�59 .
0��
7,�0
9 /
64 .9
9�,5
4� /
�6 .
465
,��6
/ 1
8 .6
49,9
40 /
14
.�7,
000
/ � .
079
1 /
0 .�
160,
97�
/ 46
.014
,67�
/ 4
.017
�,5�
1 /
50 .0
518 .
0
�A
lmat
y47
0,�1
91,
808 .
6�7
6,46
4 /
80 .0
��0,
907
/ 70
.��6
,719
/ 5
.760
,995
/
1� .0
5,50
0 /
1 .�
640
/ 0 .
116
8,�9
� /
�5 .8
�,�0
0 /
0 .7
�98,
7�7
/ 6�
.576
� .8
�A
ktob
e�7
4,16
61,
�44 .
1�6
�,4�
� /
96 .8
�51,
4��
/ 9�
.911
,167
/ �
.057
6 /
0 .�
��6,
97�
/ 60
.7�,
99�
/ 1
14�,
�01
/ �8
.�58
4 .8
4A
tyra
u�6
0,04
�45
9 .9
168,
058
/ 64
.616
5,91
1 /
6� .8
61,6
0� /
�� .
74,
856
/ 1 .
9�5
,5�6
/ 9
.811
6,�5
9 /
44 .7
�,74
6 /
1 .5
1�9,
9�7
/ 5�
.8�0
1 .6
5Ea
st-
Kaz
akhs
tan
856,
79�
�,0�
� .8
794,
4�7
/ 9�
.77�
4,�1
7 /
85 .7
7,��
1 /
0 .9
54,6
55 /
6 .4
�80
/ 0 .
15�
1,94
� /
60 .9
14,8
9� /
1 .7
�19,
959
/ �7
.41,
141 .
�
6Zh
amby
l4�
0,16
�89
� .5
�86,
005
/ 89
.8�8
6,00
5 /
89 .8
�0,�
60 /
7 .0
7,61
� /
1 .8
6,�8
4 /
1 .5
14�,
085
/ ��
.�8,
488
/ � .
0�7
8,58
9 /
64 .7
418 .
7
7W
est-
Kaz
akhs
tan
�60,
575
55� .
1�5
�,50
8 /
96 .9
�5�,
508
/ 96
.9�,
751
/ 1 .
44,
�15
/ 1 .
619
5,55
0 /
75 .0
8,67
0 /
� .�
56,�
54 /
�1 .
7�4
� .0
8K
arag
anda
1,10
5,5�
5�,
819 .
61,
04�,
810
/ 94
.499
7,�6
9 /
90 .�
�6,7
48 /
� .4
��,0
�� /
� .9
1,51
0 /
0 .1
1,4�
� /
0 .1
817,
49�
/ 7�
.9�7
,�87
/ �
.4�5
0,64
5 /
�� .7
�,17
4 .�
9K
osta
nai
494,
7��
1,78
1 .5
44�,
468
/ 89
.6�6
7,86
8 /
74 .4
�8,0
5� /
7 .7
10,�
91 /
� .1
�,81
1 /
0 .6
��4,
515
/ 67
.6�0
,57�
/ 4
.�1�
9,6�
7 /
�8 .�
95� .
5
10K
yzyl
orda
�6�,
�18
8�8 .
6�5
8,��
� /
71 .1
8�,1
45 /
�� .
659
,97�
/ 1
6 .5
��,4
18 /
9 .�
11,6
06 /
� .�
105,
81�
/ �9
.1�,
�84
/ 1 .
0�5
4,0�
1 /
69 .9
�59 .
4
11M
angi
stau
�68,
619
54� .
817
�,40
1 /
64 .5
17�,
401
/ 64
.559
,506
/ �
� .�
�5,7
15 /
1�
.���
8,�9
6 /
85 .0
�,79
� /
1 .4
�6,4
�0 /
1� .
6�6
1 .�
1�P
avlo
dar
479,
�69
1,1�
7 .5
466,
608
/ 97
.��4
5,66
� /
7� .1
701
/ 0 .
111
,116
/ �
.�1,
464
/ 0 .
�41
0,77
6 /
85 .7
1,40
9 /
0 .�
67,1
65 /
14 .
084
6 .0
1�N
orth
-K
azak
hsta
n��
�,90
041
7 .8
�10,
4�9
/ 89
.919
0,58
9 /
81 .4
16,0
50 /
6 .9
6,41
1 /
� .7
146,
�04
/ 6�
.5�,
567
/ 1 .
185
,0�9
/ �
6 .4
�45 .
0
14So
uth-
Kaz
akhs
tan
818,
070
�,81
9 .�
571,
�68
/ 69
.855
�,11
8 /
67 .5
9�,4
01 /
11 .
�1�
9,96
8 /
15 .8
�4,4
�� /
� .0
�74,
�7�
/ ��
.116
,�94
/ �
.05�
7,40
� /
64 .9
748 .
9
15A
lmat
y ci
ty1,
�40,
000
�,�9
0 .0
1,��
5,14
8 /
99 .6
11,
��5,
148
/ 99
.61
4,85
� /
0 .�9
995,
100
/ 80
.�5
�44,
900
/ 19
.75
1,��
� .0
16A
stan
a ci
ty
514,
575
600 .
051
�,87
5 /
99 .9
51�,
875
/ 99
.970
0 /
0 .1
�84,
�88
/ 74
.71�
0,18
7 /
�5 .�
�50 .
0
Tota
l:8,
5�0,
���
��,4
68 .0
7,4
8�,�
�� /
87
.8
6,7
71,7
89 /
79
.4
499
,487
/ 5
.9
410
,96�
/
4 .8�
1
��,5
48 /
1 .
44
�,8
10 /
0 .
04
5,�
7�,4
99 /
6� .
1 of
peo
ple
has
acce
ss to
sew
erag
e sy
stem
�,
146,
7��
/ �6
.911
,1��
.5
8�
ANNExES
Dat
a on
Acc
ess
to D
rin
kin
g W
ater
of g
ood
Qua
lity
of U
rban
Pop
ulat
ion
in A
kmol
a o
blas
t
№P
opul
ated
Are
a
Pop
ulat
ion
havi
ng
acce
ss to
w
ater
supp
ly
(ps .
/%)
Pop
ulat
ion
havi
ng
perm
anen
t (�
4 hr
s)
acce
ss to
w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
inte
rmitt
ent
(lim
ited)
ac
cess
to
wat
er (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
dr
inki
ng w
ater
of
goo
d qu
ality
(p
s ./%
)
Type
of W
ater
Sup
ply
(ps .
/%)
Leve
l of
Serv
ice
Mai
n R
easo
n fo
r Lo
w L
evel
of
Ser
vice
ce
ntra
lized
co
mm
on
stan
d pi
pe
wel
lde
liver
edot
her
1�
�4
56
78
910
111�
1�
1A
stan
a 51
�,87
5 /
99 .9
051
�,87
5 /
99 .9
051
�,87
5 /
99 .9
051
�,87
5 /
99 .9
070
0 /
0 .10
high
�K
oksh
etau
106,
8�0
/ 84
.�0
106,
8�0
/ 84
.�0
75,0
04 /
59
.�0
�1,8
16 /
�5
.10
19,9
55 /
15
.70
med
ium
wea
r le
vel o
f net
wor
k re
ache
d 86
.�%
�St
epno
gors
k40
,�76
/
96 .9
040
,�76
/
96 .9
040
,�76
/ 9
6 .90
40,�
76 /
96
.90
1,�8
9 /
� .10
high
4A
kkol
, RC
*1�
,5�1
/
100 .
001�
,5�1
/
100 .
00�0
6� /
15 .
�511
,459
/
84 .7
5 m
ediu
mw
ater
ava
ilabl
e on
ly �
-4 h
rs
a da
y to
som
e pa
rt o
f peo
ple
5M
akin
sk, R
C*
1�,0
00 /
70
.90
1�,0
00 /
70
.90
7450
/ 4
44,
550
/ �6
.90
4,94
0 /
�9 .�
0 lo
wlo
ng d
ista
nce
till w
ater
so
uRC
*e, i
nter
rupt
ed w
ater
su
pply
6St
epny
ak, R
C*
�,81
0 /
65 .�
0�,
810
/ 65
.�0
�,81
0 /
65 .�
01,
500
/ �4
.80
low
high
leve
l of n
etw
ork
depr
ecia
tion,
inte
rrup
ted
wat
er s
uppl
y
7Ye
reim
anta
u,
RC
*9,
411
/ 75
.90
9,41
1 /
75 .9
09,
411
/ 75
.90
6,57
0 /
5� .0
0�,
841
/ ��
.90
�,98
� /
�4 .1
0 lo
whi
gh le
vel o
f net
wor
k de
prec
iatio
n, in
adeq
uate
qu
ality
of w
ater
8Es
il, R
C*
1�,4
08 /
10
0 .00
1�,4
08 /
10
0 .00
1�,4
08 /
100
.00
6,14
� /
49 .5
06,
�66
/ 50
.50
med
ium
100%
of w
ater
pip
e ne
twor
k is
wor
n ou
t
9D
erzh
avin
sk,
RC
*�0
0 /
4 .50
�00
/ 4 .
50�0
0 /
4 .50
6,��
0 /
95 .5
0 lo
w10
0% o
f net
wor
k is
wor
n ou
t, in
terr
upte
d w
ater
sup
ply
10A
tbas
ar, R
C*
�8,4
05 /
98
.90
�8,4
05 /
98
.90
11,4
87 /
40
.00
16,9
18 /
58
.90
�19
/ 1 .
10m
ediu
min
terr
upte
d w
ater
sup
ply
11Sc
huch
insk
, R
C*
�1,�
84 /
75
.60
�1,�
84 /
75
.60
17,5
87 /
4�
.50
1�,6
97 /
��
.10
10,0
97 /
�4
.50
med
ium
86 .9
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
1�A
rsha
ly, R
C*
5,�0
5 /
99 .4
05,
�05
/ 99
.40
5,�0
5 /
99 .4
0�,
580
/ 67
.00
1,7�
5 /
�� .4
0�0
/ 0
.60
med
ium
�5%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
84
1�
�4
56
78
910
111�
1�
1�Sh
orta
ndy,
RC
**4,
704
/ 85
.60
4,70
4 /
85 .6
04,
704
/ 85
.671
� /
1� .0
0�,
99�
/ 7�
.60
791
/ 14
.40
med
ium
�4%
wat
er p
ipe
netw
ork
and
70%
of s
ewer
net
wor
k ne
ed
repl
acem
ent
14St
ants
ionn
y�,
��0
/ 10
0 .00
�,��
0 /
100 .
00�,
��0
/ 10
0 .00
incl
uded
in
dat
a fo
r K
oksh
etau
incl
uded
in
dat
a fo
r K
oksh
etau
med
ium
wea
r le
vel o
f wat
er p
ipe
netw
ork
reac
hed
86,�
%
15Za
vods
koi
�,01
� /
76 .7
5�,
01�
/ 76
.75
�,01
� /
76 .7
5�,
01�
/ 76
.75
507
/ 1�
.9�
405
/ 10
.��
med
ium
81 .�
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
16A
ksy
5,50
0 /
100 .
005,
500
/ 10
0 .00
5,50
0 /
100 .
00lo
whi
gh le
vel o
f net
wor
k de
prec
iatio
n, in
terr
upte
d w
ater
sup
ply
17Za
ozer
ny49
0 /
100 .
0049
0 /
100
490
/ 10
0 .00
med
ium
high
leve
l of n
etw
ork
depr
ecia
tion,
inte
rrup
ted
wat
er s
uppl
y
18B
esto
be6,
8�8
/ 10
0 .00
low
nono
pera
tiona
l con
ditio
n of
w
ater
sup
ply
syst
em
19K
rasn
ogos
ky99
� /
100 .
0099
� /
100
99�
/ 10
0 .00
low
inte
rrup
ted
wat
er s
uppl
y
�0Sh
anto
be
4,51
8 /
100 .
004,
518
/ 10
0 .00
4,51
8 /
100 .
00�,
5�7
/ 78
.�0
981
/ �1
.70
high
�1Zh
olym
bet
4,45
0 /
100 .
004,
450
/ 10
0 .00
4,45
0 /
100 .
00�9
9 /
6 .70
4,14
9 /
9� .�
0m
ediu
m58
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
��Zl
elez
nodo
rojn
y /
/
/
��N
auch
ny1,
0��
/ 10
0 .00
1,0�
� /
100 .
001,
0��
/ 10
0 .00
�07
/ �0
.00
716
/ 70
.00
low
80%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
�4B
orov
oe�,
710
/ 70
.00
�,71
0 /
70 .0
0�,
710
/ 70
.00
1,87
6 /
�5 .4
01,
8�4
/ �4
.60
1,��
5 /
�5 .0
0�6
5 /
5 .00
med
ium
100%
of n
etw
ork
is w
orn
out
�5A
leks
eevk
a1,
�07
/ 10
0 .00
1,�0
7 /
100 .
001,
�07
/ 10
01,
�07
/ 10
0 .00
1,�0
7 /
100 .
00m
ediu
min
terr
upte
d w
ater
sup
ply
�6B
irle
stik
�88
/ 6�
.�0
�88
/ 6�
.�0
�88
/ 6�
.�0
�88
/ 6�
.�0
167
/ �6
.70
low
100%
of w
ater
pip
e ne
twor
k is
wor
n ou
t
Tota
l in
Obl
ast:
�9�,
4�5
/ 8�
.50
��7,
�09
/ 64
.90
65,�
�6 /
18
.60
9�,5
4� /
�6 .
4018
1,68
4 /
51 .9
011
0,75
1 /
�1 .6
049
,940
/
14 .�
07,
000
/ � .
0079
1 /
0 .�0
Tota
l in
Ast
ana
city
:51
�,87
5 /
99 .9
051
�,87
5 /
99 .9
051
�,87
5 /
99 .9
051
�,87
5 /
99 .9
0 of
peo
ple
has
acce
ss to
wat
er s
uppl
y sy
stem
700
/ 0 .
10
Not
e*: R
C* -
Ray
on C
ente
r
85
ANNExES
Data on Water Quality and tariffs of Urban Water supply in Akmola oblast
№ Populated Area Quality Grade* Problem Type Cause of Problem Length of
Pipelines (km)Water Tariff
(KZT/m�)Water Tariff
Collection Rate (%)
1 Astana � 600 .00 �0 .6� 100
� Kokshetau � biologicalpurification system
has technical trouble
�80 .90 �4 .70 100
� Stepnogorsk � 10� .60 18 .89 100
4 Akkol, RC* � �1 .50 �9 .�� 80-85
5 Makinsk, RC* � metalspurification system
has technical trouble
5 .90 41 .70 100
6 Stepnyak, RC* � 1� .50 �00 .00 95 .6
7 Yereimantau, RC* � other secondary pollution
of water 54 .00 55 .00 98
8 Esil, RC* � 110 .�0 �1 .58 80
9 Derzhavinsk, RC* 1 biological absence of water
purification facilities �� .00 57 .�0 100
10 Atbasar, RC* � metals secondary pollution of water 199 .80 4� .80 95
11 Schuchinsk, RC* � all absence of water purification facilities 97 .50 �� .8� 95
1� Arshaly, RC* � �7 .00 45 .00 – LLP/�500
people/; 40 .9� – JSC “Kazshpal”
70 .00 – “Arshaly vodservice”
LLP; 85 .00 -JSC “Kazshpal”
1� Shortandy, RC* � �� .70 5� .90 80
14 Stantsionny � �5 .�0 �4 .70 100
15 Zavodskoi � 17 .00 18 .89 100
16 Aksy 1 biological/metals
purification system has technical
trouble �9 .80 50 .00 100
17 Zaozerny � �5 .00 �00 .00 95 .6
18 Bestobe 0 metals absence of water purification facilities – 0 .00
19 Krasnogosky � 17 .�0 160 .00 60
�0 Shantobe � 90 .00 19 .07 94
�1 Zholymbet � other secondary pollution of water 4� .00 �0 .�0 50
�� Zleleznodorojny �
�� Nauchny � other secondary pollution of water � .00 7� .00 7�
�4 Borovoe � 6 .00 �0 .00 56
�5 Alekseevka � �0 .00 no more than 50 .00 80
�6 Birlestik � secondary pollution of water 5 .00 no more than 50 .00 46
Total in Oblast: 1,�59 .00
Total in Astana 600 .00 Note: * quality of water ranges from grade 0 to grade 3 where very poor water is deemed under grade 0 and water meeting standard refers to grade 3. ; RC* – Rayon Center
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
86
Data on Access to Urban sewerage system in Akmola oblast
№ Populated Area
Type of Sewerage Supply System (ps ./%) Water Tariff
(KZT/m�)
Availability of Sewerage Treatment*
Length of Sewers (km)centralized
system septic pit outdoor toilet
1 Astana �84,�88 / 74 .70
has access to sewerage system
1�0,187 / �5 .�0 14,6� M and B �50,00
� Kokshetau 75,004 / 59 .�0 5,�67 / 4 .�0 46,404 / �6 .60 ��,08 M and B �18,7�
� Stepnogorsk 40,151 / 96 .60 1�5 / 0 .�0 1,�89 / � .10 19,50 M and B 10�,6
4 Akkol, RC* �,900 / �1 .40 10,6�1 / 78 .6 4�,00 0 18,00
5 Makinsk, RC* 5,000 / �9 .50 11,940 / 70 .50 0 11,00
6 Stepnyak, RC* 4,�10 / 100 0,00 0 0,00
7 Yereimantau, RC* �,718 / �0 .00 8,676 / 70 ��,00 0 ��,00
8 Esil, RC* 1,11� / 9 .00 �,0�6 / �4 .50 8,�60 / 66 .50 ��,09 M and B 5,80
9 Derzhavinsk, RC* 6,615 / 100 0,00 0 100% – worn out
10 Atbasar, RC* 7,�9� / �5 .40 4,�00 / 14 .60 17,��1 / 60 .�0 1�,�0 0 60,80
11 Schuchinsk, RC* 15,518 / �7 .50 1,�41 / � .00 �4,6�� / 59 .50 �9,55 M and B 81,90
1� Arshaly, RC* 600 / 11 .�0 4,7�5 / 88 .80 М �,�0
1� Shortandy, RC* 550 / 10 .00 �5� / 4 .60 4,69� / 85 .40 �4,14 M �7,10
14 Stantsionnyaccounted in data for Kokshetau
accounted in data for Kokshetau
��,08 M and B 10,07
15 Zavodskoi �,560 / 65 .�� 45� / 11 .5� 91� / �� .�4 19,50 M and B 1�,60
16 Aksy 5,500 / 100 0,00 01� .00
– in emergency conditions
17 Zaozerny 490 / 100 0,00 0 100% – worn out
18 Bestobe 6,8�8 / 100 0,00 0 0,00
19 Krasnogosky 99� / 100 .00 60,00 0 �,50
�0 Shantobe �,5�7 / 78 .�0 981 / �1 .70 �1,9� M and B �0,00
�1 Zholymbet 4,450 / 100 0,00 0 0,00
�� Zleleznodorojny
�� Nauchny �16 / �1 .�0 807 / 78 .90 0,00 0 �,40
�4 Borovoe 1,8�0 / �4 .�0 �,480 / 65 .70 150,00 0 17,00
�5 Alekseevka 1,�07 / 100 0,00 0 0,00
�6 Birlestik 455 / 100 0,00 0 0,00
Total in Akmola Oblast: 160,97� / 46 .00 14,67� / 4 .00 17�,5�1 / 50 518,80
Total in Astana city: �84,�88 / 74 .70 has access to sewerage system 1�0,187 / �5 .� �50,00
Note*: M – availability of mechanical treatment facilities; B – availability of biological treatment facilities; RC* – Rayon Center
87
ANNExES
Dat
a on
Acc
ess
to D
rin
kin
g W
ater
of g
ood
Qua
lity
of U
rban
Pop
ulat
ion
in A
lmat
y o
blas
t
№P
opul
ated
A
rea
Pop
ulat
ion
havi
ng a
cces
s to
wat
er
supp
ly (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�
4 hr
s)
acce
ss to
w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
inte
rmitt
ent
(lim
ited)
ac
cess
to
wat
er (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
dr
inki
ng w
ater
of
goo
d qu
ality
(p
s ./%
)
Type
of W
ater
Sup
ply
(ps .
/%)
Leve
l of
Serv
ice
Mai
n R
easo
n fo
r Lo
w L
evel
of
Ser
vice
ce
ntra
lized
co
mm
on
stan
d pi
pe
wel
lde
liver
edot
her
1�
�4
56
78
910
111�
1�
1A
lmat
y1,
��5,
148
/ 99
.61
1�,�
5148
/
99 .6
11,
��5,
148
/ 99
.61
1,�0
7,6�
0 /
97 .4
0�7
,5�8
/ �
.�1
4,85
� /
0 .�9
high
�K
apsh
agai
�9,1
60 /
100
�9,1
60 /
100
�9,1
61 /
100
�8,9
�0 /
99
.40
�40
/ 0 .
60 m
ediu
m80
% o
f net
wor
k ne
eds
repl
acem
ent
�Ta
ldyk
orga
n96
,606
/ 9
0 .5
96,6
06 /
90
.50
96,6
06 /
90 .
5076
,858
/
7� .0
019
,748
/ 1
8 .5
10,1
41 /
9 .5
0 m
ediu
m40
% o
f net
wor
k ne
eds
repl
acem
ent
4Te
keli
16,7
�� /
70 .
416
,7��
/
70 .4
016
,7��
/ 7
0 .40
15,5
�6 /
65
.40
1,18
7 /
5 .00
7,0�
4 /
�9 .6
0 m
ediu
m7�
.5%
of n
etw
ork
need
s re
plac
emen
t
5Ta
lgar
, RC
*4�
,�50
/ 1
004�
,�50
/ 1
00�1
,�1�
/
7� .0
01�
,1�8
/
�8 .0
0lo
whi
gh le
vel o
f net
wor
k de
prec
iatio
n, p
erm
anen
t tr
oubl
e in
wat
er q
ualit
y
6U
shar
al, R
C*
9,��
9 /
51 .6
9,��
9 /
51 .6
09,
��9
/ 51
.60
�,09
5 /
11 .6
07,
��4
/ 40
.00
8,75
� /
48 .4
0m
ediu
m�0
% o
f net
wor
k ne
eds
repl
acem
ent
7Es
ik, R
C*
��,�
�0 /
80 .
���
,��0
/
80 .�
0��
,��0
/ 8
0 .�0
18,�
56 /
66
.00
�,96
4 /
14 .�
05,
500
/ 19
.80
med
ium
80%
of n
etw
ork
need
s re
plac
emen
t
8K
aske
len,
RC
*�7
,��0
/ 1
00�7
,��0
/ 1
00�7
,��0
/ 1
00�5
,540
/
95 .5
01,
680
/ 4 .
50m
ediu
m90
% o
f net
wor
k ne
eds
repl
acem
ent
9U
shto
be, R
C*
�,64
1 /
9 .4
�,64
1 /
9 .40
�,64
1 /
9 .40
�,60
4 /
9 .�0
�7 /
0 .1
0�5
,�59
/
90 .5
6lo
w47
,�%
of m
ain
pipe
line
need
s re
plac
emen
t, fr
eque
nt
emer
genc
ies
10Zh
arke
nt, R
C*
��,8
15 /
7� .
6��
,815
/
7� .6
0��
,815
/ 7
� .60
19,1
�5 /
61
.70
�,69
0 /
11 .9
8,�0
0 /
�6 .4
0hi
gh
11Sa
rkan
d, R
C*
15,�
47 /
100
15,�
47 /
100
15,�
47 /
100
�,�7
6 /
�� .0
011
,971
/
78 .0
0m
ediu
m61
% o
f net
wor
k ne
eds
repl
acem
ent
1�Zh
ansu
guro
v,
RC
*8,
8�0
/ 10
08,
8�0
/ 10
08,
8�0
/ 10
01,
895
/ �1
.50
6,9�
5 /
78 .5
0hi
gh
1�Sa
ryoz
ek, R
C*
1�,0
00 /
100
1�,0
00 /
100
1�,0
00 /
100
4,40
0 /
�6 .7
07,
600
/ 6�
.�m
ediu
m60
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t, fr
eque
nt
emer
genc
ies
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
88
1�
�4
56
78
910
111�
1�
14B
alpy
kbi
14,1
45 /
100
14,1
45 /
10
0�,
816
/ 19
.90
11,�
75 /
80
.10
med
ium
6�%
of n
etw
ork
need
s re
plac
emen
t, in
terr
upte
d su
pply
in s
umm
er
15K
arab
ulak
, R
C*
14,�
57 /
100
14,�
57 /
100
14,�
57 /
100
10,9
�0 /
76
.60
�,��
6 /
�� .4
0 m
ediu
m50
% o
f net
wor
k ne
eds
repl
acem
ent
16M
atai
�,60
0 /
100
�,60
0 /
100
1,89
5 /
7� .9
070
5 /
�7 .1
0m
ediu
m70
% o
f net
wor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
17M
ulal
y�5
0 /
100
�50
/ 10
0�5
0 /
100
med
ium
90%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
18D
osty
k�,
19�
/ 10
0�,
19�
/ 10
0�,
19�
/ 10
0�,
156
/ 98
.�0
�7 /
1 .7
0m
ediu
m50
% o
f net
wor
k ne
eds
repl
acem
ent
19U
lken
�,�0
7 /
100
�,�0
7 /
100
�,�0
7 /
100
med
ium
100%
of n
etw
ork
need
s re
plac
emen
t
�0B
oral
dai
9,84
� /
100
9,84
� /
100
9,84
� /
100
9,84
� /
100
med
ium
high
leve
l of n
etw
ork
depr
ecia
tion
�1P
ervo
mai
sky
7,49
9 /
100
7,49
9 /
100
7,49
9 /
100
med
ium
51%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y in
w
inte
r sea
son
��P
okro
vka
�,�6
6 /
100
�,�6
6 /
100
�,�6
6 /
100
�,09
7 /
9� .�
0�6
9 /
7 .80
med
ium
79%
of n
etw
ork
need
s re
plac
emen
t
��Le
psi
700
/ �4
.570
0 /
�4 .5
070
0 /
�4 .5
01,
516
/ 5�
.60
640
/ ��
.40
low
inte
rrup
ted
supp
ly –
4-5
hrs
a
day
�4R
udni
chny
1,04
9 /
100
1,04
9 /
100
1,04
9 /
100
1,0�
1 /
98 .�
018
/ 1
.70
high
�5O
tege
n B
atyr
17,�
6� /
100
17,�
6� /
100
17,�
6� /
100
15,9
16 /
9�
.�0
1,�4
6 /
7 .80
high
�6Tu
yuk
1,4�
5 /
100
1,4�
5 /
100
1,4�
5 /
100
low
70%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
Tota
l in
Alm
aty
Obl
ast:
40�,
18�
/ 85
.7�7
6,46
4 /
80 .0
0�6
,719
/
5 .70
��0,
907
/ 70
.�0
�08,
�47
/ 65
.50
94,8
�6 /
�0
.�0
60,9
95 /
1�
.00
5,50
0 /
1 .�0
640
/ 0 .
10
Tota
l in
Alm
aty
city
:1,
��5,
148
/ 99
.61
1,��
5,14
8 /
99 .6
11,
��5,
148
/ 99
.61
1,�0
7,6�
0 /
97 .4
0�7
,5�8
/ �
.�1
4,85
� /
0 .�9
89
ANNExES
Data on Water Quality and tariffs of Urban Water supply in Almaty oblast
№ Populated Area Quality Grade* Problem Type Cause of Problem Length of
Pipelines (km)Water Tariff
(KZT/m�)Water Tariff
Collection Rate (%)
1 Almaty � �,�90 .00 9 .�� 100 .0
� Kapshagai � secondary pollution ��� .70 11 .0� 75 .0
� Taldykorgan � �55 .10 �1 .16 100 .0
4 Tekeli � 1�1 .00 15 .00 96 .0
5 Talgar, RC* 1 allabsence of water
purification facilities
11� .�0 11 .�1 95 .0
6 Usharal, RC* � �7 .50 4� .65 40 .0
7 Esik, RC* � 1�8 .00 9 .7� 98 .0
8 Kaskelen, RC* � high mineralization shortage of water 77 .60 �� .1� 100 .0
9 Ushtobe, RC* � 84 .50 6� .79 65 .0
10 Zharkent, RC* � 94 .50 9 .51 95 .0
11 Sarkand, RC* � 77 .00 �5 .�1 87 .0
1� Zhansugurov, RC* � 78 .60 44 .�4 47 .0
1� Saryozek, RC* � 1�0 .00 �� .16 67 .0
14 Balpykbi � 5� .�0 �7 .5� 96 .0
15 Karabulak, RC* � �8 .00 �7 .�0 100 .0
16 Matai � 14 .�0 74 .15 40 .5
17 Mulaly � � .10 74 .15 85 .0
18 Dostyk � �1 .10 74 .15 100 .0
19 Ulken � biologicalpurification system
has technical trouble
�4 .60 600 .00 per
person/month for WS&S services
100 .0
�0 Boraldai � 47 .00 17 .�9 95 .0
�1 Pervomaisky � �5 .00 �� .�8 96 .1
�� Pokrovka � 10 .40 18 .�1 96 .0
�� Lepsi
ground – �,
surface – �
biological/metals
absence of water purification
facilities
�00 .00 per person/month for
WS&S services 100 .0
�4 Rudnichny � 15 .00 11 .4� 97 .0
�5 Otegen Batyr � �5 .00 18 .�1 96 .0
�6 Tuyuk � � .10 16 .15 75 .0
Total in Almaty Oblast: 1,808 .60
Total in Almaty city: �,�90 .00
Note: * quality of water ranges from grade 0 to grade 3; very poor water is deemed under grade 0 and water meeting standard refers to grade 3; RC* – Rayon Center
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
90
Data on Access to Urban sewerage system in Almaty oblast
№ Populated Area
Type of Sewerage Supply System (ps ./%) Water Tariff
(KZT/m�)
Availability of Sewerage Treatment*
Length of Sewers (km)centralized
system septic pit outdoor toilet
1 Almaty 995,100 / 80 .�5 �44,900 / 19 .75 5,9� M and B 1,��� .00
� Kapshagai �7,771 / 96 .50 600 / 1 .50 789 / � .00 10,06 M and B 1�9 .90
� Taldykorgan 5�,587 / 50 .�0 5�,160 / 49 .80 15,�� M and B ��7 .60
4 Tekeli 10,8�6 / 45 .60 1�,911 / 54 .40 1�,18 M and B �7 .60
5 Talgar, RC* 16,0�9 / �7 .00 �7,�11 / 6� .00 7,61 0 51 .50
6 Usharal, RC* 18,085 / 100 .00 0,00 0 –
7 Esik, RC* �,078 / 11 .00 �4,74� / 88 .90 6,11 M and B 51 .10
8 Kaskelen, RC* 10,488 / �8 .�0 �6,7�� / 71 .80 ��,79 0 75 .10
9 Ushtobe, RC* 1,158 / 4 .10 �6,84� / 95 .90 4�,00 М �9 .00
10 Zharkent, RC* �,048 / 6 .60 �8,967 / 9� .40 �,�5 0 �1 .00
11 Sarkand, RC* �,176 / 14 .�0 1�,171 / 85 .80 14,71 0 1� .00
1� Zhansugurov, RC* 1,596 / �8 .�0 7,��4 / 71 .80 0 10 .70
1� Saryozek, RC* 1�,000 / 100 .00 0,00 0 –
14 Balpykbi �0� / 1 .40 1�,889 / 98 .60 6,66 0 4 .60
15 Karabulak, RC* 1,710 / 1� .00 1�,547 / 88 .00 18,00 M and B 11 .90
16 Matai �,600 / 100 0,00 0 –
17 Mulaly �50 / 100 .00 0,00 0 –
18 Dostyk 1,096 / 50 .00 1,097 / 50 .00 0 � .80
19 Ulken �,�07 / 100 .00600 .00 per
ps for WS&S services
0 14 .00
�0 Boraldai 5,666 / 57 .60 4,177 / 4� .40 18,44 0 1� .00
�1 Pervomaisky �,040 / �7 .� 5,459 / 7� .80 18,95 M and B 7 .50
�� Pokrovka �,�66 / 100 .00 0,00 0 –
�� Lepsi �,856 / 100 .00 0,00 0 –
�4 Rudnichny �05 / 70 .90 744 / 70 .90 �1,70 М 7 .00
�5 Otegen Batyr 16,�89 / 95 .00 87� / 5 .00 18,89 M and B �7 .50
�6 Tuyuk 1,4�5 / 100 .00 0,00 0 –
Total in Almaty Oblast: 168,�9� / �5 .8 �,�00 / 0 .70 �98,7�7 / 6� .50 76� .80
Total in Almaty city: 995,100 / 80 .�5 �44,900 / 19 .75 1,��� .00
Note*: M – availability of mechanical treatment facilities; B – availability of biological treatment facilities; WS&S – water supply and sewerage; RC* – Rayon Center
91
ANNExES
Dat
a on
Acc
ess
to D
rin
kin
g W
ater
of g
ood
Qua
lity
of U
rban
Pop
ulat
ion
in A
ktob
e o
blas
t
№P
opul
ated
Are
a
Pop
ulat
ion
havi
ng a
cces
s to
wat
er s
uppl
y (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
inte
rmitt
ent
(lim
ited)
ac
cess
to
wat
er (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
dr
inki
ng w
ater
of
goo
d qu
ality
(p
s ./%
)
Typ
e of
Wat
er S
uppl
y (p
s ./%
)
Leve
l of
Serv
ice
Mai
n R
easo
n fo
r Lo
w
Leve
l of S
ervi
ce
cent
raliz
ed
com
mon
st
and
pipe
w
ell
delivered
othe
r
1A
ktob
e�5
0,61
4 /
100
�50,
614
/ 10
0�5
0,61
4 /
100
��0,
0�9
/ 87
.8�0
,575
/ 1
4 .�
med
ium
high
leve
l of
depr
ecia
tion
in te
rms
of
netw
ork
and
faci
littie
s
�A
lga,
RC
*1�
,418
/ 1
001�
,418
/ 1
001�
,418
/ 1
008,
18�
/ 65
.9�,
659
/ �9
.557
6 /
4 .6
med
ium
80%
of p
ipe
netw
ork
need
s re
plac
emen
t
�K
andy
agas
h, R
C*
�6,9
64 /
100
�6,9
64 /
100
�6,9
64 /
100
�6,9
64 /
100
med
ium
7�%
of p
ipe
netw
ork
need
s re
plac
emen
t
4K
hrom
tau,
RC
*17
,97�
/ 1
0017
,97�
/ 1
0017
,97�
/ 1
0015
,7�6
/ 8
7 .5
�,�4
6 /
1� .5
high
5Sh
alka
r, R
C*
�5,7
00 /
100
�5,7
00 /
100
�5,7
00 /
100
�,5�
6 /
1� .7
��,1
74 /
86 .
�m
ediu
m�5
% o
f pip
e ne
twor
k ne
eds
repl
acem
ent (
71
км)
6Te
mir
�,00
1 /
100
�,00
1 /
100
�,00
1 /
100
�,00
1 /
100
med
ium
100%
of w
ater
net
wor
k ne
eds
repl
acem
ent
7Em
ba1�
,8�9
/ 1
001�
,8�9
/ 1
001�
,8�9
/ 1
005,
00�
/ �9
7,8�
6 /
61lo
w87
% o
f pip
e ne
twor
k ne
eds
repl
acem
ent,
freq
uent
em
erge
ncie
s
8Sh
ubar
kudu
k,
RC
*11
,000
/ 1
0011
,000
/ 1
005,
170
/ 47
5,8�
0 /
5�m
ediu
m67
% o
f pip
e ne
twor
k ne
eds
repl
acem
ent
9Zh
em�,
500
/ 10
0�,
500
/ 10
0�,
500
/ 10
0�,
500
/ 10
0lo
w10
0% o
f wat
er n
etw
ork
need
s re
plac
emen
t, sh
orta
ge o
f wat
er
10K
enki
yak
11,1
67 /
100
11,1
67 /
100
6,89
� /
61 .7
4,�7
4 /
�8 .�
med
ium
6�,5
% o
f pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
Tota
l in
Obl
ast:
�7�,
590
/ 99
.8�6
�,4�
� /
96 .8
11,1
67 /
��5
1,4�
� /
9� .9
�95,
004
/ 78
.878
,585
/ �
1 .0
576
/ 0 .
�
Not
e*: R
C* –
Ray
on C
ente
r
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
9�
Data on Water Quality and tariffs of Urban Water supply in Aktobe oblast
№ Populated Area Quality Grade*
Problem Type Cause of Problem Length of
Pipelines (km)Water Tariff
(KZT/m�)Water Tariff
Collection Rate (%)
1 Aktobe � metals purification system has technical trouble 545 .70 �� .08 100
� Alga, RC* � 6� .00 �1 .89 9�
� Kandyagash, RC* � �� .00 �7 .70 100
4 Khromtau, RC* � �05 .00 18 .00 100
5 Shalkar, RC* � �84 .10 47 .51 85
6 Temir � other secondary pollution 8 .50 40 .�0 87
7 Emba � other sand penetration in well �� .70 140 .00 5�
8 Shubarkuduk, RC* � metals purification system has
technical trouble �4 .60 �5 .�0 95
9 Zhem � �6 .00 �0 .70
10 Kenkiyak � other absence of water purification facilities �� .50 �9 .00 100
Total in Oblast: 1,�44 .10
Note: * quality of water ranges from grade 0 to grade 3; very poor water is deemed under grade 0 and water meeting standard refers to grade 3; RC* – Rayon Center
Data on Access to Urban sewerage system in Aktobe oblast
№ Populated Area Type of Sewerage Supply System (ps ./%) Water Tariff
(KZT/m�)
Availability of Sewerage Treatment*
Length of Sewers (km)centralized system septic pit outdoor toilet
1 Aktobe 169,415 / 67 .6 751 / 0 .� 80,448 / �� .1 �0 .9� M and B �65 .0
� Alga, RC* 8,18� / 65 .9 4,��5 / �4 .� 19 .9� M �� .0
� Kandyagash, RC* 19,800 / 7� .4 600 / � .� 6,564 / �4 .� �� .�4 B �0 .0
4 Hromtau, RC* 11,741 / 65 .� �,64� / 14 .7 �,590 / �0 .0 19 .11 M and B 67 .1
5 Shalkar, RC* �,461 / 9 .6 ��,��9 / 90 .4 55 .8� M �7 .0
6 temir �,001 / 100 .0 0 .00 0 0 .0
7 Emba �,4�0 / 18 .9 10,410 / 81 .1 0 �� .0
8 Shubarkuduk, RC* �,870 / �5 .0 7,1�0 / 65 .0 �7 .00 M 7 .�
9 Zhem �,500 / 100 .0 0 �9 .0
10 Kenkiyak 5,58� / 50 .0 5,584 / 50 .0 �� .1� 0 15 .5
Total in Aktobe Oblast: ��6,97� / 60 .7 �,99� / 1 .0 14�,�01 / �8 .� 584 .8
Note*: M – availability of mechanical treatment facilities; B – availability of biological treatment facilities; RC* – Rayon Center
9�
ANNExES
Dat
a on
Acc
ess
to D
rin
kin
g W
ater
of g
ood
Qua
lity
of U
rban
Pop
ulat
ion
in A
tyra
u o
blas
t
№P
opul
ated
Are
a
Pop
ulat
ion
havi
ng a
cces
s to
wat
er s
uppl
y (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
inte
rmitt
ent
(lim
ited)
acc
ess
to w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hrs
) ac
cess
to d
rink
ing
wat
er o
f goo
d qu
ality
(ps .
/%)
Typ
e of
Wat
er S
uppl
y (p
s ./%
)
Leve
l of
Serv
ice
Mai
n R
easo
n fo
r Lo
w L
evel
of
Serv
ice
cent
raliz
ed
com
mon
sta
nd
pipe
w
ell
deliv
ered
1A
tyra
u14
9,77
6 /
100
149,
776
/ 10
014
9,77
6 /
100
1��,
116
/ 8�
.��6
,660
/ 1
7 .8
high
�K
ulsa
ry, R
C*
�8,9
18 /
58 .
4�8
,918
/ 5
8 .4
�6,6
40 /
5� .
8�,
�78
/ 4 .
6�0
,598
/ 4
1 .7
med
ium
59%
of n
etw
ork
need
s re
plac
emen
t, in
terr
upte
d w
ater
sup
ply
�In
derb
or, R
C*
7,96
4 /
69 .5
7,96
4 /
69 .5
7,54
4 /
65 .8
4�0
/ � .
7�,
504
/ �0
.5m
ediu
m58
% o
f net
wor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
4K
arat
onac
coun
ted
in
data
of K
ulsa
ry
tow
n
acco
unte
d in
da
ta o
f Kul
sary
to
wn
acco
unte
d in
dat
a of
K
ulsa
ry to
wn
acco
unte
d in
da
ta o
f Kul
sary
to
wn
med
ium
inte
rrup
ted
wat
er s
uppl
y
5K
osch
agyl
588
/ 16
.558
8 /
16 .5
588
/ 16
.5�,
97�
/ 8�
.5lo
w10
0% o
f net
wor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
6B
aish
onas
1,69
5 /
91 .0
1,69
5 /
91 .0
1,69
5 /
9116
8 /
9 .0
med
ium
50%
of n
etw
ork
need
s re
plac
emen
t
7D
osso
r9,
700
/ 10
0 9,
700
/ 10
0 9,
700
/ 10
0 m
ediu
m68
% o
f net
wor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
8Is
kene
n45
� /
100
45�
/ 10
045
� /
100
med
ium
50%
of n
etw
ork
need
s re
plac
emen
t
9K
omso
mol
78�
/ 10
078
� /
100
78�
/ 10
0 m
ediu
min
terr
upte
d w
ater
sup
ply
10K
oshk
ar5�
0 /
100
5�0
/ 10
05�
0 /
100
med
ium
inte
rrup
ted
wat
er s
uppl
y
11M
akat
, RC
*1�
,1�0
/ 1
001�
,1�0
/ 1
001�
,1�0
/ 1
00 m
ediu
min
terr
upte
d w
ater
sup
ply
1�B
alyk
shi
14,1
54 /
9� .
414
,154
/ 9
� .4
14,1
54 /
9� .
410
,057
/ 6
6 .4
4,09
7 /
�7 .0
1,00
0 /
6 .6
med
ium
high
leve
l of d
epre
ciat
ion
in
term
s of
wat
er p
ipie
net
wor
k
1�Zh
umys
ker
1,98
1 /
48 .1
1,98
1 /
48 .1
1,98
1 /
48 .1
1,50
8 /
�6 .6
47�
/ 11
.51,
884
/ 45
.7�5
6 /
6 .�
med
ium
high
leve
l of d
epre
ciat
ion
in
term
s of
wat
er p
ipie
net
wor
k
Tota
l in
Aty
rau
Obl
ast:
��9,
661
/ 88
.�16
8,05
8 /
64 .6
61,6
0� /
�� .
716
5,91
1 /
6� .8
195,
7��
/ 75
.���
,9�8
/ 1
�4,
856
/ 1 .
9�5
,5�6
/ 9
.8
Not
e: *R
C* –
Ray
on C
ente
r
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
94
Data on Water Quality and tariffs of Urban Water supply in Atyrau oblast
№ Populated Area Quality Grade* Problem Type Cause of Problem Length of
Pipelines (km)Water Tariff
(KZT/m�)Water Tariff
Collection Rate (%)
1 Atyrau � 176 .80 15 .�9 86 .00
� Kulsary, RC* � 67 .70 46 .95 70 .�0
� Inderbor, RC* � other purification system has technical trouble 55 .00 �� .6� 85 .00
4 Karaton � �� .00 46 .95 70 .00
5 Koschagyl � metals absence of water purification facilities 4 .�0 1� .40 40 .00
6 Baishonas � metals absence of water purification facilities 6 .�0 74 .51 per
person /month 100 .00
7 Dossor � �1 .00 79 .09 �8 .00
8 Iskinen � metals absence of water purification facilities � .00 74 .51 per
person /month 100 .00
9 Komsomol � 5 .�0 74 .09 �0 .00
10 Koshkar � 8 .10 74 .09 �0 .00
11 Makat, RC* � metals purification system has technical trouble 58 .�0 61 .70 70 .�0
1� Balykshi � �5 .00 15 .�9 86 .00
1� Zhumysker � 7 .�0 15 .�9 86 .00
Total in Atyrau Oblast: 459 .90
Note: * quality of water ranges from grade 0 to grade 3; very poor water is deemed under grade 0 and water meeting standard refers to grade 3; RC* – Rayon Center .
Data on Access to Urban sewerage system in Atyrau oblast
№ Populated Area Type of Sewerage Supply System (ps ./%) Water Tariff
(KZT/m�)
Availability of Sewerage Treatment*
Length of Sewers (km)centralized system septic pit outdoor toilet
1 Atyrau 76,5�5 / 51 .1 150 / 1 .0 7�,091 / 48 .8 40 .96 М 180 .�
� Kulsary, RC* �7,184 / 54 .9 891 / 1 .8 �1,440 / 4� .� �� .56 М 70 .8
� Inderbor, RC* �,��1 / �0 .0 �80 / � .� 7,767 / 67 .7 11 .74 M and B �� .0
4 Karaton accounted in data for Kulsary town
accounted in data for Kulsary town
accounted in data for Kulsary
town �� .56 М
accounted in data for
Kulsary town
5 Koschagyl �,560 / 100 0 .00 0 0
6 Baishonas 1,86� / 100 0 .00 0 0
7 Dossor 9,700 / 100 0 .00 0 0
8 Iskinen 45� / 100 0 .00 0 0
9 Komsomol 78� / 100 0 .00 0 0
10 Koshkar 5�0 / 100 0 .00 0 0
11 Makat, RC* 4,�16 / �� .9 914 / 7 .1 7,890 / 59 .9 50 .88 0 �� .7
1� Balykshi 5,00� / �� .0 1,40� / 9 .� 8,749 / 57 .7 17 .00 0 5 .8
1� Zhumysker 9 / 0 .� 4,11� / 99 .8 0 .00 0 0
Total in Atyrau Oblast: 116,�59 / 44 .7 �,746 / 1 .5 1�9,9�7 / 5� .8 �01 .6
Note*: M – availability of mechanical treatment facilities; B – availability of biological treatment facilities; RC* – Rayon Center
95
ANNExES
Dat
a on
Acc
ess
to D
rin
kin
g W
ater
of g
ood
Qua
lity
of U
rban
Pop
ulat
ion
in E
ast-
Kaz
akhs
tan
obl
ast
№P
opul
ated
Are
a
Pop
ulat
ion
havi
ng a
cces
s to
wat
er
supp
ly (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�
4 hr
s)
acce
ss to
w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
inte
rmitt
ent
(lim
ited)
ac
cess
to
wat
er (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
dr
inki
ng w
ater
of
goo
d qu
ality
(p
s ./%
)
Type
of W
ater
Sup
ply
(ps .
/%)
Leve
l of
Serv
ice
Mai
n R
easo
n fo
r Lo
w L
evel
of
Serv
ice
cent
raliz
ed
com
mon
st
and
pipe
w
ell
delivered
othe
r
1�
�4
56
78
910
111�
1�
1U
st-K
amen
ogor
sk�1
0,00
0 /
100
�10,
000
/ 10
0�1
0,00
0 /
100
�6�,
500
/ 85
46,5
00 /
15
med
ium
depr
ecia
tion
of n
etw
ork
and
faci
litie
s by
85%
�A
yago
z, R
C*
�8,0
97 /
100
�8,0
97 /
100
�8,0
97 /
100
�8,5
7� /
75
9,5�
4 /
�5m
ediu
m56
% o
f net
wor
k ne
eds
repl
acem
ent
�Za
isan
, RC
*9,
��0
/ 10
09,
��0
/ 10
09,
��0
/ 10
0�,
185
/ ��
.77,
045
/ 76
.�m
ediu
m80
% o
f net
wor
k ne
eds
repl
acem
ent
4Zy
ryan
ovsk
, RC
*41
,�00
/ 1
0041
,�00
/ 1
0041
,�00
/ 1
00�9
,507
/ 9
5 .7
1,79
� /
4 .�
med
ium
60%
of n
etw
ork
need
s re
plac
emen
t
5Se
mip
alat
insk
��4,
5�6
/ 89
.4��
4,5�
6 /
89 .4
��4,
5�6
/ 89
.418
9,�6
5 /
75 .4
�5,1
61 /
14
�6,6
�1 /
10
.6m
ediu
m60
% o
f net
wor
k ne
eds
repl
acem
ent,
perm
anen
t pro
blem
s w
ith q
ualit
y of
wat
er
6R
idde
r51
,�50
/ 1
0051
,�50
/ 1
0041
,�86
/ 8
0 .4
10,0
64 /
19 .
6 m
ediu
m84
% o
f net
wor
k ne
eds
repl
acem
ent
7Sh
emon
aiha
, RC
*17
,100
/ 1
0017
,100
/ 1
0017
,100
/ 1
005,
814
/ �4
11,�
86 /
66
high
8Se
rebr
yans
k10
,800
/ 1
0010
,800
/ 1
0010
,800
/ 1
006,
545
/ 60
.64,
�55
/ �9
.4m
ediu
m44
% o
f net
wor
k ne
eds
repl
acem
ent,
prob
lem
s w
ith q
ualit
y of
wat
er
9Sh
ar5,
98�
/ 6�
5,98
� /
6�5,
98�
/ 6�
�40
/ � .
55,
74�
/ 60
.5�,
515
/ �7
high
10K
uhat
ov, R
C*
9,90
0 /
100
9,90
0 /
100
9,90
0 /
100
9,40
0 /
9550
0 /
5m
ediu
m81
% o
f net
wor
k ne
eds
repl
acem
ent
11G
lubo
koe,
RC
*9,
400
/ 10
09,
400
/ 10
09,
400
/ 10
04,
5�5
/ 48
.14,
874
/ 51
.9hi
gh
1�A
ktog
ai1,
904
/ 40
.51,
904
/ 40
.51,
904
/ 40
.5�4
� /
7 .�
1,56
1 /
�� .�
�,79
6 /
59 .5
med
ium
50%
of n
etw
ork
need
s re
plac
emen
t
1�B
elag
ash
996
/ 10
099
6 /
100
188
/ 18
.980
8 /
81 .1
med
ium
inte
rrup
ted
wat
er s
uppl
y
14Zh
ezke
nt10
,500
/ 1
0010
,500
/ 1
0010
,500
/ 1
009,
706
/ 9�
.476
5 /
7 .6
high
50%
of n
etw
ork
need
s re
plac
emen
t
15A
ltai
�,��
0 /
100
�,��
0 /
100
�,��
0 /
100
�,��
0 /
100
high
16B
elou
sovk
a4,
956
/ 51
.6�
4,95
6 /
51 .6
�4,
956
/ 51
.6�
4,�8
0 /
45 .6
�57
6 /
64,
644
/ 5�
.�7
med
ium
high
dep
reci
atio
n of
ele
ctri
cal a
nd
pum
ping
equ
ipm
ent
17Ve
rhne
bere
zov
1,69
� /
60 .5
1,69
� /
60 .5
1,69
� /
60 .5
1,6�
� /
5870
/ �
.51,
107
/ �9
.5hi
gh
18A
uezo
v4,
656
/ 10
04,
656
/ 10
01,
956
/ 4�
�,70
0 /
58 m
ediu
min
terr
upte
d su
pply
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
96
1�
�4
56
78
910
111�
1�
19Zh
angi
stob
e0
/ 0
5,�0
0 /
100
�0Zh
arm
a1,
�79
/ 10
01,
�79
/ 10
01,
�79
/ 10
0 m
ediu
min
terr
upte
d su
pply
�1Su
ykbu
lak
0 /
091
/ 1
00lo
wno
nope
ratio
nal c
ondi
tion
of w
ater
su
pply
sys
tem
��N
ovay
a B
uhta
rma
5,00
0 /
6� .5
5,00
0 /
6� .5
�,97
8 /
49 .7
1,0�
� /
1� .8
�,00
0 /
�7 .5
med
ium
70%
of n
etw
ork
need
s re
plac
emen
t
��O
ktya
brsk
y�,
005
/ 10
0�,
005
/ 10
0�,
005
/ 10
0m
ediu
m10
0% o
f net
wor
k ne
eds
repl
acem
ent
�4P
ribr
ezhn
y1,
100
/ 10
01,
100
/ 10
099
0 /
9011
0 /
10m
ediu
m76
% o
f net
wor
k ne
eds
repl
acem
ent
�5Tu
gyl
7,45
0 /
100
7,45
0 /
100
7,45
0 /
100
1,�0
0 /
16 .1
6,�5
0 /
8� .9
med
ium
�9%
of n
etw
ork
need
s re
plac
emen
t
�6M
olod
ezhn
y, R
C*
�,�0
0 /
100
�,�0
0 /
100
�,�0
0 /
100
�,09
4 /
6� .5
1,�0
6 /
�6 .5
med
ium
60%
of n
etw
ork
need
s re
plac
emen
t
�7A
subu
lak
0 /
00
/ 0
0 /
0�,
780
/ 90
.8�8
0 /
9 .�
�8B
elog
orsk
y0
/ 0
0 /
00
/ 0
554
/ 10
0
�9O
gnye
vka
400
/ 4�
.140
0 /
4� .1
400
/ 4�
.15�
8 /
56 .9
low
57%
of n
etw
ork
need
s re
plac
emen
t, in
terr
upte
d su
pply
– �
hr
s in
a d
ay
�0P
ervo
mai
sky
5,�1
4 /
100
5,�1
4 /
100
5�14
/ 1
005�
14 /
100
med
ium
50%
of n
etw
ork
need
s re
plac
emen
t
�1U
st-T
alov
ka
10,0
00 /
100
10,0
00 /
100
10,0
00 /
100
10,0
00 /
100
high
��Zu
bovk
a1,
800
/ 7�
1,80
0 /
7�1,
800
/ 7�
1�0
/ 5 .
�1,
670
/ 66
.870
0 /
�8 m
ediu
m60
% o
f net
wor
k ne
eds
repl
acem
ent
��M
alee
vsk
0 /
00
/ 0
0 /
0�,
119
/ 10
0
�4U
lba
6,00
0 /
100
6,00
0 /
100
6,00
0 /
100
6,00
0 /
100
high
�5Sh
ulbi
nsk
�,50
0 /
100
�,50
0 /
100
�,50
0 /
100
�,50
0 /
100
high
Tota
l in
East
-K
azak
hsta
n O
blas
t: 80
1,75
8 /
9� .6
794,
4�7
/ 9�
.77,
��1
/ 0 .
97�
4,�1
7 /
85 .7
646,
967
/ 75
.415
4,79
1 /
18 .1
54,6
55 /
6 .4
�80
/ 0 .
1
97
ANNExES
Data on Water Quality and tariffs of Urban Water supply in East-Kazakhstan oblast
№ Populated Area Quality Grade* Problem Type Cause of Problem Length of
Pipelines (km)Water Tariff
(KZT/m�)
Water Tariff Collection Rate (%)
1 Ust-Kamenogorsk � 490 .50 9 .80 100 .00
� Ayagoz, RC* � other purification system has technical trouble 84 .15 18 .45 100 .00
� Zaisan, RC* � other purification system has technical trouble 58 .80 19 .00 95 .00
4 Zyryanovsk, RC* � 15� .40 1� .54 97 .00
5 Semipalatinsk 1 biological / metals secondary pollution �11 .00 8 .9� 84 .70
6 Ridder � metals purification system has technical trouble 1�4 .8� 6 .69 100 .00
7 Shemonaiha, RC* � 8� .50 9 .79 90 .00
8 Serebryansk � metals secondary pollution 54 .00 18 .5� 85 .00
9 Shar � 44 .54 �5 .00 7� .00
10 Kuhatov, RC* � other secondary pollution 99 .00 7 .70 90 .00
11 Glubokoe, RC* � �1 .00 9 .8� 90 .00
1� Aktogai � �5 .00 48 .�4 100 .00
1� Belagash � 194 .�1 97 .00
14 Zhezkent � 58 .80 �9 .66 100 .00
15 Altai � 6 .�0 8 .94 100 .00
16 Belousovka � �8 .70 9 .89 100 .00
17 Verhneberezovsky � �� .10 11 .77 100 .00
18 Auezov � 10 .00 18 .99 100 .00
19 Zhangistobe � - - -
�0 Zharma � - - -
�1 Suykbulak � - -
�� Novaya Buhtarma � mineralization purification system has technical trouble �6 .00 14 .48 78 .00
�� Oktyabrsky � biological / metals purification system has technical trouble 8 .00 14 .48 78 .00
�4 Pribrezhny � biological / other purification system has technical trouble �5 .00 99 .00 90 .00
�5 Tugyl � �4 .50 �5 .00
�6 Molodezhny, RC* � 4� .00 86 .00 per ps; 1� .00 per m� if water meter
installed 75 .00
�7 Asubulak � – – –
�8 Belogorsky � – – –
�9 Ognyevka 1 biological / metals /mineralization
absence of water purification facilities 9 .�0
�0 Pervomaisky � 64 .60 84 .64 70 .00
�1 Ust-Talovka � 8� .50 9 .79 100 .00
�� Zubovka � 14 .�0 11 .�1 100 .00
�� Maleevsk � – – –
�4 Ulba � 7 .50
�5 Shulbinsk � 15 .75 10 .50 89 .00
Total in East-Kazakhstan Oblast: �,0�� .76
Note: * quality of water ranges from grade 0 to grade 3; very poor water is deemed under grade 0 and water meeting standard refers to grade 3; RC* – Rayon Center
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
98
Data on Access to Urban sewerage system in East-Kazakhstan oblast
№ Populated area Type of Sewerage Supply System (ps ./%) Water Tariff
(KZT/m�)
Availability of Sewerage Treatment*
Length of Sewers (km)centralized system septic pit outdoor toilet
1 Ust-Kamenogorsk �6�,500 / 85 .00 46,501 / 15 .0 10 .55 M and B �98 .40
� Ayagoz, RC* 4,95� / 1� .00 1,905 / 5 .0 �1,��9 / 8� .0 � .10 M and B �0 .00
� Zaisan, RC* 9,��0 / 100 .0 0 .00 0 –
4 Zyryanovsk, RC* �7,0�0 / 65 .50 5,540 / 1� .4 8,740 / �1 .1 15 .�0 M and B 97 .50
5 Semipalatinsk 1��,10� / 54 .60 119,044 / 45 .4 7 .67 Мо �1� .�7
6 Ridder �4,559 / 67 .�0 4,�00 / 8 .� 1�,591 / �4 .5 6 .�� M and B 65 .10
7 Shemonaiha, RC* �,�51 / 19 .60 855 / 5 .0 1�,894 / 75 .4 8 .91 M and B 54 .70
8 Serebryansk 4,640 / 4� .00 6,160 / 57 .0 �� .41 M and B �6 .00
9 Shar 9,497 / 100 .0 0 .00 0 –
10 Kuhatov, RS* 9,894 / 99 .90 6 / 0 .1 8 .18 M and B 41 .50
11 Glubokoe, RC* 4,��� / 44 .90 5,178 / 55 .1 11 .48 M and B �6 .00
1� Aktogai 4,700 / 100 .0
1� Belagash 996 / 100 .0 0 .00 0 –
14 Zhezkent 7,065 / 67 .�0 �,4�5 / �� .7 11 .4� M and B �9 .40
15 Altai 1,848 / 79 .66 47� / �0 .�4 8 .60 M and B � .50
16 Belousovka �,654 / �8 .10 5,946 / 61 .9 11 .48 M and B 18 .90
17 Verhneberezovsky �,800 / 100 .0 0 .00 0 –
18 Auezov 1,956 / 4� .00 �,700 / 58 .0 0 8 .10
19 Zhangistobe 5,�00 / 100 .0 0 .00 0 –
�0 Zharma 1,�79 / 100 .0 0 .00 0 –
�1 Suykbulak 91 / 100 .0 0 .00 0 –
�� Novaya Buhtarma �,8�0 / 47 .90 4,170 / 5� .1 11 .75 M and B 18 .90
�� Oktyabrsky ��7 / 11 .� 1,778 / 88 .7 11 .75 0 –
�4 Pribrezhny �00 / �7 .�0 690 / 6� .7 110 / 10 .0 195 .00 Мо 4 .00
�5 Tugyl 500 / 6 .70 6,950 / 9� .� 0 � .00
�6 Molodezhny, RC* �,094 / 6� .50 1,�06 / �6 .5 86 .00/ps M and B 18 .00
�7 Asubulak 4,160 / 100 .0 0 .00 0 –
�8 Belogorsky 554 / 100 .0 0 .00 0 –
�9 Ognyevka 9�8 / 100 .0 0 .00 0 � .1 – do not operate
�0 Pervomaisky 1,460 / �8 1,105 / �1 .� �,649 / 50 .8 66 .�0 0 16 .50
�1 Ust-Talovka 10,000 / 100 8 .91 M and B 54 .70
�� Zubovka �,500 / 100 .0 0 .00 0 –
�� Maleevsk �,119 / 100 .0 0 .00 0 –
�4 Ulba �,777 / 46 .� �,��� / 5� .7 Мо 4 .60
�5 Shulbinsk �,�17 / 6� .�4 �64 / 10 .4 919 / �6 .�� 10 .56 M and B 18 .00
Total in East-Kazakhstan Oblast: 5�1,94� / 60 .9 14,89� / 1 .7 �19,959 / �7 .4 1,141 .�0
Note*: M – availability of mechanical treatment facilities; B – availability of biological treatment facilities; RC* – Rayon Center
99
ANNExES
Dat
a on
Acc
ess
to g
ood
Qua
lity
of D
rin
kin
g W
ater
of U
rban
Pop
ulat
ion
in z
ham
byl o
blas
t
№P
opul
ated
Are
a
Pop
ulat
ion
havi
ng a
cces
s to
wat
er s
uppl
y (p
s ./%
)
Pop
ulat
ion
havi
ng
inte
rmitt
ent
(lim
ited)
acc
ess
to
wat
er (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hrs
) ac
cess
to d
rink
ing
wat
er
of g
ood
qual
ity (p
s ./%
)
Type
of W
ater
Sup
ply
(ps .
/%)
Leve
l of
Serv
ice
Mai
n R
easo
n fo
r Lo
w L
evel
of
Serv
ice
cent
raliz
ed
com
mon
sta
nd
pipe
w
ell
deliv
ered
othe
r
1Ta
raz
��6,
�10
/ 10
0��
6,�1
0 /
100
18�,
�1�
/ 56
14�,
998
/ 44
med
ium
high
leve
l of d
epre
ciat
ion
of
netw
ork
and
faci
litie
s
�Zh
anat
as, R
C*
16,7
66 /
100
16,7
66 /
100
14,8
71 /
88 .
71,
895
/ 11
.� m
ediu
min
terr
upte
d w
ater
sup
ply
�K
arat
au, R
C*
9,�6
8 /
86 .7
9,�6
8 /
86 .7
10,9
96 /
56 .
16,
�7�
/ ��
�,��
� /
11 .9
med
ium
47,5
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t, in
terr
upte
d w
ater
sup
ply
4Sh
u�6
,70�
/ 1
00�6
,70�
/ 1
00�0
,85�
/ 5
6 .8
15,8
50 /
4� .
� m
ediu
m60
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
5G
vard
eisk
y0
/ 0
0 /
05,
51�
/ 10
0 m
ediu
m n
onop
erat
iona
l con
ditio
n of
w
ater
sup
ply
syst
em
6Lu
govo
i9,
69�
/ 10
09,
69�
/ 10
01,
851
/ 18
.67,
84�
/ 81
.4hi
gh
7G
rano
togo
rsk
1,4�
0 /
100
1,4�
0 /
100
1,4�
0 /
100
high
8O
ital
�,88
0 /
100
�,88
0 /
100
�,88
0 /
100
high
9A
kbak
ai0
/ 0
0 /
01,
�84
/ 10
0lo
ww
ater
impo
rted
by
vehi
cles
10A
ksue
k0
/ 0
0 /
01,
468
/ 10
0lo
ww
ater
impo
rted
by
vehi
cles
11M
irny
0 /
00
/ 0
1,10
0 /
100
low
wat
er im
port
ed b
y ve
hicl
es
1�M
ynar
al71
� /
100
71�
/ 10
071
� /
100
low
inte
rrup
ted
wat
er s
uppl
y
1�H
anta
u98
0 /
100
980
/ 10
098
0 /
100
med
ium
inte
rrup
ted
wat
er s
uppl
y
14Sh
igan
ak�,
5��
/ 10
0�,
5��
/ 10
0�,
5��
/ 10
0lo
w65
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t, in
terr
upte
d w
ater
sup
ply
15Ta
sotk
el0
/ 0
0 /
088
0 /
100
low
nono
pera
tiona
l con
ditio
n of
w
ater
sup
ply
syst
em
16K
okta
l0
/ 0
0 /
01,
��0
/ 10
0lo
wno
nope
ratio
nal c
ondi
tion
of
wat
er s
uppl
y sy
stem
Tota
l in
Zham
byl O
blas
t: 41
6,�6
5 /
96 .8
�0,�
60 /
7�8
6,00
5 /
89 .8
��1,
88�
/ 5�
.918
4,�8
� /
4� .9
7,61
� /
1 .8
6,�8
4 /
1 .5
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
100
Data on Water Quality and tariffs of Urban Water supply in zhambyl oblast
№ Populated Area Quality Grade* Problem Type Cause of Problem Length of
Pipelines (km)Water Tariff
(KZT/m�)Water Tariff
Collection Rate (%)
1 Taraz � 416 .6 8 .�8 81
� Zhanatas, RC* � other secondary pollution of water 141 .1 7� .40 100
� Karatau, RC* � 96 .0 10 .50 75
4 Shu � 1�� .0 17 .80 95
5 Gvardeisky � 0 .0 0 .00 0
6 Lugovoi � �4 .4 �9 .00 68
7 Granotogorsk � 11 .6 74 .68 75
8 Oital � 5 .5 74 .68 75
9 Akbakai � 0 .0
10 Aksuek � 40 .0 1�0 .00 100
11 Mirny � 0 .0
1� Mynaral 1 biological/mineralization/metals
absence of water purification facilities 1 .8
1� Hantau � � .5
14 Shiganak � biological/mineralization/metals
absence of water purification facilities 19 .0
15 Tasotkel � 0 .0 0 .00 0
16 Koktal � 0 .0 0 .00 0
Total in Zhambyl Oblast: 89� .5
Note: * quality of water ranges from grade 0 to grade 3; very poor water is deemed under grade 0 and water meeting standard refers to grade 3; RC* – Rayon Center.
Data on Access to Urban sewerage system in zhambyl oblast
№ Populated areaType of Sewerage Supply System (ps ./%) Water Tariff
(KZT/m�)
Availability of Sewerage Treatment*
Length of Sewers (km)centralized system septic pit outdoor toilet
1 Taraz 99,�88 / �0 .4 ��7,0�� / 69 .6 4 .00 0 �6� .7
� Zhanatas, RC* 14,871 / 88 .7 1,895 / 11 .� 4� .70 M and B 55 .�
� Karatau, RC* 9,878 / 50 .4 �00 / 1 .0 9,5�� / 48 .6 4 .84 M and B 46 .0
4 Shu 19,048 / 51 .9 8,�88 / �� .6 9,�66 / �5 .5 15 .60 M 54 .7
5 Gvardeisky 5,51� / 100 0 .00 0 0 .0
6 Lugovoi 9,69� / 100 0 .00 0 0 .0
7 Granotogorsk 1,4�0 / 100 0 .00 0 0 .0
8 Oital �,880 / 100 0 .00 0 0 .0
9 Akbakai 1,�84 / 100 0 .00 0 0 .0
10 Aksuek 1,468 / 100 0 .00 0 0 .0
11 Mirny 1,100 / 100 0 .00 0 0 .0
1� Mynaral 714 / 100 0 .00 0 0 .0
1� Hantau 980 / 100 0 .00 0 0 .0
14 Shiganak �,5�� / 100 0 .00 0 0 .0
15 Tasotkel 880 / 100 0 .00 0 0 .0
16 Koktal 1,��0 / 100 0 .00 0 0 .0
Total in Zhambyl Oblast: 14�,085 / �� .� 8,488 / � .0 �78,589 / 64 .7 418 .7
Note*: M – availability of mechanical treatment facilities; B – availability of biological treatment facilities; RC* – Rayon Center
101
ANNExES
Dat
a on
Acc
ess
to g
ood
Qua
lity
of D
rin
kin
g W
ater
of U
rban
Pop
ulat
ion
in W
est-
Kaz
akhs
tan
obl
ast
№P
opul
ated
Are
a
Pop
ulat
ion
havi
ng a
cces
s to
wat
er s
uppl
y (p
s ./%
)
Pop
ulat
ion
havi
ng
inte
rmitt
ent
(lim
ited)
acc
ess
to w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hrs
) ac
cess
to d
rink
ing
wat
er o
f goo
d qu
ality
(ps .
/%)
by T
ype
of W
ater
Sup
ply
(ps .
/%)
Leve
l of
Serv
ice
Mai
n R
easo
n fo
r Lo
w L
evel
of
Ser
vice
ce
ntra
lized
co
mm
on s
tand
pi
pe
wel
lde
liver
edot
her
1U
rals
k19
9,4�
7 /
100
199,
4�7
/ 10
018
4,07
1 /
9� .�
15,�
56 /
7 .7
med
ium
high
leve
l of d
epre
ciat
ion
in te
rms
of n
etw
ork
and
faci
litie
s
�A
ksai
, RC
*�4
,��0
/ 1
00�4
,��0
/ 1
00�1
,48�
/ 9
��,
7�8
/ 8
high
�D
erku
l5,
075
/ 10
05,
075
/ 10
0�,
10�
/ 61
.11,
97�
/ �8
.9 m
ediu
mhi
gh le
vel o
f dep
reci
atio
n in
te
rms
of n
etw
ork
4Za
chag
ansk
1�,7
86 /
100
1�,7
86 /
100
10,8
46 /
78 .
7�,
940
/ �1
.� m
ediu
mhi
gh le
vel o
f dep
reci
atio
n in
te
rms
of n
etw
ork
5K
rugl
ooze
rnoe
�,54
� /
100
�,54
� /
100
�,54
� /
100
low
80%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
6B
urlin
�08
/ 6 .
9�0
8 /
6 .9
�08
/ 6 .
9�,
799
/ 9�
.1lo
w40
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t, in
terr
upte
d w
ater
sup
ply
7Zh
elay
evo
0 /
00
/ 0
1,51
6 /
100
low
non
oper
atio
nal c
ondi
tion
of w
ater
sup
ply
syst
em
Tota
l in
Wes
t-K
azak
hsta
n O
blas
t �5
6,�5
9 /
98 .�
�,75
1 /
1 .4
�5�,
508
/ 96
.9��
9,70
9 /
88 .�
�6,5
50 /
10 .
� 4,
�15
/ 1 .
6
Not
e*: R
C* –
Ray
on C
ente
r
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
10�
Data on Water Quality and tariffs of Urban Water supply in West-Kazakhstan oblast
№ Populated Area Quality Grade*
Problem Type Cause of Problem Length of
Pipelines (km)Water Tariff
(KZT/m�)Water Tariff
Collection Rate (%)
1 Uralsk � �44 .0 14 .0 100 .0
� Aksai, RC* � 11� .7 41 .6 95 .0
� Derkul � �9 .0 14 .0 100 .0
4 Zachagansk � 48 .8 14 .0 100 .0
5 Krugloozernoe � 4 .6 subsidy 100 .0
6 Burlin � � .0 �4 .0 100 .0
7 Zhelayevo � other no agency responsible for water quality monitoring 0 .0 0 .0 0 .0
Total in West-Kazakhstan Oblast: 55� .1
Note: * quality of water ranges from grade 0 to grade 3; very poor water is deemed under grade 0 and water meeting standard refers to grade 3; RC* – Rayon Center .
Data on Access to Urban sewerage system in West-Kazakhstan oblast
№ Populated Area
Type of Sewerage Supply System (ps ./%) Water Tariff
(KZT/m�)
Availability of Sewerage Treatment*
Length of Sewers (km)centralized system septic pit outdoor toilet
1 Uralsk 169,707 / 85 .1 1,�10 / 0 .6 �8,510 / 14 .� 1� .18 M and B �06
� Aksai, RC* 16,4�6 / 48 .0 7,460 / �1 .8 10,��4 / �0 .� �1 .00 M and B �7
� Derkul �,004 / �9 .5 �,071 / 60 .5 1� .18 M and Baccounted in the assets of
State Communal Enterprise “Oral Su Arnasy”
4 Zachagansk 7,41� / 5� .8 6,�7� / 46 .� 1� .18 M and Baccounted in the assets of
State Communal Enterprise “Oral Su Arnasy”
5 Krugloozernoe �,54� / 100 0 .00 0 0
6 Burlin �,007 / 100 0 .00 0 0
7 Zhelayevo 1,516 / 100 0 .00 0 0
Total in West-Kazakhstan Oblast: 195,550 / 75 .0 8,670 / � .� 56,�54 / �1 .7 �4�
Note*: M – availability of mechanical treatment facilities; B – availability of biological treatment facilities; RC* – Rayon Center
10�
ANNExES
Dat
a on
Acc
ess
to D
rin
kin
g W
ater
of g
ood
Qua
lity
of U
rban
Pop
ulat
ion
in K
arag
anda
obl
ast
№P
opul
ated
Are
a
Pop
ulat
ion
havi
ng a
cces
s to
wat
er s
uppl
y (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
inte
rmitt
ent
(lim
ited)
acc
ess
to w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hrs
) ac
cess
to d
rink
ing
wat
er o
f goo
d qu
ality
(ps .
/%)
Typ
e of
Wat
er S
uppl
y (p
s ./%
)
Leve
l of
Serv
ice
Mai
n R
easo
n fo
r Lo
w L
evel
of
Serv
ice
cent
raliz
ed
com
mon
sta
nd
pipe
w
ell
delivered
other
1�
�4
56
78
910
111�
1�
1K
arag
anda
4�9,
507
/ 99
.84�
9,50
7 /
99 .8
4�9,
507
/ 99
.84�
9,50
7 /
99 .8
860
/ 0 .
�m
ediu
mhi
gh le
vel o
f dep
reci
atio
n in
te
rms
of n
etw
ork
and
faci
litie
s
�A
bai,
RC
*�4
,�00
/ 1
00 .0
�4,�
01 /
100
.0��
,900
/ 9
8 .8
�00
/ 1 .
�lo
whi
gh le
vel o
f dep
reci
atio
n in
te
rms
of n
etw
ork
and
faci
litie
s,
inte
rrup
ted
wat
er s
uppl
y
�K
arka
ralin
sk, R
C*
10,5
10 /
100
.010
,510
/ 1
00 .0
10,5
10 /
100
.0�,
101
/ �0
8,40
9 /
80hi
gh
4B
alkh
ash
5�,�
04 /
100
.05�
,�04
/ 1
00 .0
5�,�
04 /
100
.050
,749
/ 9
5 .�
�,55
5 /
4 .8
med
ium
15 .4
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t – 6
� km
5Zh
eska
zgan
74,4
70 /
100
.074
,470
/ 1
00 .0
74,4
70 /
100
.070
,1�0
/ 9
4 .�
4,�5
0 /
5 .8
high
6K
araz
hal
9,�0
0 /
87 .6
9,�0
0 /
87 .6
6,50
0 /
61 .9
�,70
0 /
�5 .7
1,�0
0 /
1� .4
med
ium
80%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
7Sa
ran
47,�
00 /
100
.047
,�00
/ 1
00 .0
47,�
00 /
100
.046
,401
/ 9
8 .1
899
/ 1 .
9hi
gh
8Sa
tpae
v67
,�04
/ 1
00 .0
67,�
04 /
100
.067
,�04
/ 1
00 .0
64,8
61 /
96 .
4�,
44�
/ � .
6hi
gh
9Te
mir
tau
170,
000
/ 10
0 .0
170,
000
/ 10
0 .0
170,
000
/ 10
0 .0
14�,
650
/ 84
.5�6
,�50
/ 1
5 .6
med
ium
high
leve
l of d
epre
ciat
ion
in
term
s of
net
wor
k an
d fa
cilit
ies
10Sc
hakh
tinsk
5�,5
61 /
100
.05�
,561
/ 1
00 .0
51,1
94 /
97 .
41,
�67
/ � .
6m
ediu
m�6
.6%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent –
�7 .
7 km
11P
rioz
ersk
19,�
41 /
98 .
919
,�41
/ 9
8 .9
18,6
41 /
95 .
860
0 /
� .1
�10
/ 1 .
1m
ediu
m70
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
1�A
tasu
, RC
*5,
0��
/ �0
.95,
0��
/ �0
.95,
0��
/ �0
.94,
608
/ �8
.�4�
5 /
� .6
11,�
7�
/ 69
.1m
ediu
m4�
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
1�K
ievk
a, R
C*
0 /
06,
810
/ 10
0 .0
14O
saka
rovk
a, R
C*
7,98
9 /
100 .
07,
989
/ 10
0 .0
7,98
9 /
100 .
05,
59�
/ 70
�,�9
7 /
�0m
ediu
m77
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
15Iz
umru
dny
400
/ 10
0 .0
400
/ 10
0 .0
400
/ 10
0 .0
400
/ 10
0 .0
400
/ 10
0 .0
med
ium
inte
rrup
ted
wat
er s
uppl
y
16K
arab
as a
ccou
nted
in
data
of A
bai
tow
n
acc
ount
ed in
da
ta o
f Aba
i to
wn
acc
ount
ed in
da
ta o
f Aba
i to
wn
med
ium
high
leve
l of d
epre
ciat
ion
in
term
s of
net
wor
k
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
104
1�
�4
56
78
910
111�
1�
17Ti
par
9,70
0 /
100 .
09,
700
/ 10
0 .0
9,70
0 /
100 .
0
9,70
0 /
100 .
0 ha
s ac
cess
to
wat
er s
uppl
y sy
stem
18Yu
zhny
�,90
0 /
100 .
0�,
900
/ 10
0 .0
�,90
0 /
100 .
0�,
900
/ 10
0 .0
med
ium
70%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
19Sa
rysh
agab
5,10
0 .0
/ 10
0 .0
5,10
0 .0
/ 10
0 .0
5,10
0 .0
/ 10
0 .0
med
ium
inte
rrup
ted
wat
er s
uppl
y
�0Sh
ashu
bai
1,96
9 /
100 .
01,
969
/ 10
0 .0
1,96
9 /
100 .
0m
ediu
min
terr
upte
d w
ater
sup
ply
�1K
usho
ky4,
�00
/ 10
0 .0
4,�0
0 /
100 .
04,
�00
/ 10
0 .0
4,07
5 /
971�
5 /
�hi
gh
��G
. Mus
tafin
�,19
8 /
100 .
0�,
198
/ 10
0 .0
�,19
8 /
100 .
0�0
6 /
1� .9
1,89
� /
86 .1
high
��K
yzyl
zhar
�74
/ 18
.��7
4 /
18 .�
�74
/ 18
.��7
4 /
18 .�
1,��
6 /
81 .7
low
70%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
�4K
arag
aily
5,�0
4 /
100 .
05,
�04
/ 10
0 .0
5,�0
4 /
100 .
041
6 /
84,
788
/ 9�
high
�5Sh
ubar
kol
701
/ 10
0 .0
701
/ 10
0 .0
701
/ 10
0 .0
med
ium
�6M
olod
ezhn
y6,
400
/ 10
0 .0
6,40
0 /
100 .
06,
400
/ 10
0 .0
6,40
0 /
100 .
0m
ediu
m65
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
�7A
ktas
acc
ount
ed
in d
ata
of
Kar
agan
da c
ity
acc
ount
ed
in d
ata
of
Kar
agan
da c
ity
acc
ount
ed in
dat
a of
Kar
agan
da c
ity
acc
ount
ed
in d
ata
of
Kar
agan
da c
ity
acc
ount
ed
in d
ata
of
Kar
agan
da c
ity
med
ium
inte
rrup
ted
wat
er s
uppl
y
�8Zh
ezdi
4,89
8 /
100 .
04,
898
/ 10
0 .0
4,89
8 /
100 .
01,
76�
/ �6
.0
�,1�
5 /
64 .0
hi
gh
�9K
aras
akpa
i�,
00�
/ 10
0 .0
�,00
� /
100 .
0�,
00�
/ 10
0 .0
�,00
� /
100 .
0m
ediu
m70
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
�0A
gady
r8,
170
/ 10
0 .0
8,17
0 /
100 .
08,
170
/ 10
0 .0
1,89
5 /
�� .�
6,�7
5 /
76 .8
med
ium
6�%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
�1A
kzha
l�,
878
/ 10
0 .0
�,87
8 /
100 .
0�,
909
/ 75
969
/ �5
med
ium
40%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
��A
kcha
tau
/
1,4�
�/
100 .
0lo
w n
onop
erat
iona
l con
ditio
n of
w
ater
sup
ply
syst
em
��D
aryi
nsky
865
/ 10
0 .0
865
/ 10
0 .0
865
/ 10
0 .0
med
ium
81%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
�4N
izhn
i Kai
rakt
y91
� /
100 .
091
� /
100 .
091
� /
100 .
0m
ediu
mhi
gh le
vel o
f dep
reci
atio
n in
te
rms
of fa
cilit
ies
105
ANNExES
1�
�4
56
78
910
111�
1�
�5Ve
rhni
Kai
rakt
y60
9 /
100 .
060
9 /
100 .
060
9 /
100 .
060
9 /
100 .
0m
ediu
mhi
gh le
vel o
f dep
reci
atio
n in
te
rms
of fa
cilit
ies
�6M
oiyn
ty�,
180
/ 10
0 .0
�,18
0 /
100 .
0�,
180
/ 10
0 .0
med
ium
70%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
�7S .
Sei
fulli
n0
/ 0
0 /
00
/ 0
1,�0
0 /
100 .
0lo
ww
ater
sup
ply
syst
em h
as n
ot
been
put
into
ope
ratio
n
�8G
ulsh
at70
0 /
100 .
070
0 /
100 .
070
0 /
100 .
070
0 /
100 .
0m
ediu
mhi
gh le
vel o
f dep
reci
atio
n in
te
rms
of n
etw
ork
�9K
onyr
at4,
170
/ 10
0 .0
4,17
0 /
100 .
04,
170
/ 10
0 .0
�,��
6 /
808�
4 /
�0m
ediu
mhi
gh le
vel o
f dep
reci
atio
n in
te
rms
of n
etw
ork
40Sa
yak
�,70
0 /
100 .
0�,
700
/ 10
0 .0
�,70
0 /
100 .
0�,
960
/ 80
740
/ �0
med
ium
high
leve
l of d
epre
ciat
ion
in
term
s of
net
wor
k
41Sh
ugys
Kon
yrat
400
/ 10
0 .0
400
/ 10
0 .0
400
/ 10
0 .0
400
/ 10
0 .0
med
ium
high
leve
l of d
epre
ciat
ion
in
term
s of
net
wor
k
4�Zh
aire
m9,
800
/ 10
0 .0
9,80
0 /
100 .
09,
800
/ 10
0 .0
9,80
0 /
100 .
0hi
gh
4�Zh
amby
l0
/ 0
0 /
00
/ 0
�09
/ 10
0 .0
44A
ktas
�4�
/ 10
0 .0
�4�
/ 10
0 .0
�4�
/ 10
0 .0
med
ium
inte
rrup
ted
wat
er s
uppl
y
45Zh
eska
zgan
acc
ount
ed in
da
ta o
f Sat
paev
to
wn
acc
ount
ed in
da
ta o
f Sat
paev
to
wn
acc
ount
ed in
dat
a of
Sat
paev
tow
n
acc
ount
ed in
da
ta o
f Sat
paev
to
wn
acc
ount
ed in
da
ta o
f Sat
paev
to
wn
high
46A
ktau
5,��
8 /
87 .�
5,��
8 /
87 .�
5,��
8 /
87 .�
4,05
4 /
66 .�
1,�8
4 /
�178
5 /
1� .8
med
ium
7�%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
47D
olin
sky
0 /
00
/ 0
0 /
04,
050
/ 10
0 .0
low
adeq
uate
wat
er q
ualit
y co
ntro
l is
not
ava
ilabl
e
48N
ovod
olin
sky
�,�9
8 /
�4 .8
�,�9
8 /
�4 .8
�,�9
8 /
�4 .8
4,�0
� /
65 .�
low
100 .
0% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
49B
otak
ara
(Uly
anov
sky)
746
/ 10
0 .0
746
/ 10
0 .0
746
/ 10
0 .0
746
/ 10
0 .0
high
50Sh
akha
n8,
88�
/ 88
.88,
88�
/ 88
.88,
88�
/ 88
.81,
118
/ 11
.�m
ediu
m85
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t, in
terr
upte
d w
ater
sup
ply
Tota
l in
Kar
agan
da
Obl
ast:
1,07
0,55
8 /
96 .8
1,01
�,5�
7 /
91 .�
58,0
18 /
5 .4
997,
�69
/ 90
.�98
7,56
� /
89 .�
8�,9
96 /
7 .5
��,0
��
/ � .
91,
510
/ 0 .
11,
4��
/ 0 .
1
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
106
Data on Water Quality and tariffs of Urban Water supply in Karaganda oblast
№ Populated Area Quality Grade* Problem Type Cause of Problem Length of Pipelines
(km)Water Tariff
(KZT/m�)
Water Tariff Collection Rate (%)
1 � � 4 5 6 7 8
1 Karaganda � 1,0�� .00 �7 .7 98 .�
� Abai, RC* � biological/metals
secondary pollution of water 57 .80 �0 .� 78 .9
� Karkaralinsk, RC* � �9 .10 54 .1 100 .0
4 Balkhash � 165 .00 14 .� 100 .0
5 Zheskazgan � mineralization purification system has technical trouble �97 .�0 1� .5 100 .0
6 Karazhal � 1�8 .00 6� .� 100 .0
7 Saran � ��5 .00 �0 .8 100 .0
8 Satpaev � 511 .00 8 .� 100 .0
9 temirtau � �01 .00 18 .58 -LLP ”Nijni Byef”; �1 .88 – LLP
“Okzhetpes”98 .�
10 Schakhtinsk � 104 .60 �7 .6 98 .7
11 Priozersk � other purification system has technical trouble �0 .60 84 .8 100 .0
1� Atasu, RC* � 57 .70 �4 .7 100 .0
1� Kievka, RC* � �5 .00 0 .0 0 .0
14 Osakarovka, RC* � 79 .00 �5 .0 50 .0
15 Izumrudny � 6 .00 14 .0 9� .0
16 Karabas � biological/metals
secondary pollution of water 10 .00 15 .4 80 .0
17 Tipar � �0 .00 1� .4 100 .0
18 Yuzhny � 19 .00 14 .5 100 .0
19 Saryshagab � 15 .50 11 .4
�0 Shashubai � 16 .50 16 .8
�1 Kushoky � 47 .00 �1 .8 100 .0
�� Gabiden Mustafin � 9 .60 11 .� 100 .0
�� Kyzylzhar � 5 .00 44 .7 100 .0
�4 Karagaily � 1� .80 60 .0 100 .0
�5 Shubarkol �
�6 Molodezhny � �8 .40 �9 .0 95 .0
�7 Aktas � accounted in assets of Karaganda city �7 .7 98 .�
�8 Zhezdi � �� .00 8 .� 100 .0
�9 Karasakpai � 15 .00 �7 .5 90 .0
�0 Agadyr � 60 .00 �0 .5 100 .0
�1 Akzhal � �0 .00 9 .� 100 .0
�� Akchatau � metals absence of water purification facilities – 0 .0 0 .0
�� Daryinsky � 5 .50 48 .� 76 .0
107
ANNExES
1 � � 4 5 6 7 8
�4 Nizhni Kairakty � biological/other
absence of water purific ation facilities � .00 �� .� 100 .0
�5 Verhni Kairakty � 6 .00 48 .� 100 .0
�6 Moiynty � 56 .40 1�6 .6 76 .0
�7 S . Seifullin � – 0 .0 0 .0
�8 Gulshat � �0 .1 100 .0
�9 Konyrat � �1 .00 �0 .1 100 .0
40 Sayak � 18� .00 �0 .1 100 .0
41 Shugys Konyrat � �0 .1 100 .0
4� Zhairem � 170 .�0 �6 .� 100 .0
4� Zhambyl � – 0 .0 0 .0
44 Aktas � � .00 �� .� 100 .0
45 Zheskazgan � accounted in assets of Satpaev city 8 .� 100 .0
46 Aktau � �� .40 4� .� 8� .0
47 Dolinsky � – 0 .0 0 .0
48 Novodolinsky � metals/ other secondary pollution of water �1 .50 �8 .0 90 .0
49 Botakara � 7 .50 �� .0 100 .0
50 Shakhan � metals/ other secondary pollution of water �1 .�0 49 .6 97 .0
Total in Karaganda Oblast: �,819 .60
Note: * quality of water ranges from grade 0 to grade 3; very poor water is deemed under grade 0 and water meeting standard refers to grade 3; RC* – Rayon Center
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
108
Data on Access to Urban sewerage system in Karaganda oblast
№ Populated Area Type of Sewerage Supply System (ps ./%) Water
Tariff (KZT/m�)
Availability of Sewerage Treatment*
Length of Sewers (km)centralized system septic pit outdoor toilet
1 � � 4 5 6 7 8
1 Karaganda �67,965 / 85 .5 1�,771 / � .� 48,6�8 / 11 .� �1 .7� M and B 6�� .00
� Abai, RC* ��,900 / 98 .8 �00 / 1 .� 19 .49 M and B 5� .70
� Karkaralinsk, RC* 1,577 / 15 .0 5�4 / 5 .0 8,409 / 80 .0 5� .60 0 11 .80
4 Balkhash 48,5�4 / 91 .0 �,555 / 4 .8 �,��5 / 4 .� 7 .99 0 157 .00
5 Zheskazgan 6�,517 / 8� .9 11,95� / 16 .1 4 .95 M and B �5� .75
6 Karazhal 5,�50 / 50 .0 �,100 / �0 .0 �,150 / �0 .0 18 .66 0 8� .�0
7 Saran 4�,1�8 / 91 .� 4,16� / 8 .9 �� .�9 M and B 60 .70
8 Satpaev 60,�45 / 89 .5 95� / 1 .4 6,106 / 9 .1 7 .�8 М �69 .00
9 temirtau 1�6,694 / 74 .5 4�,�06 / �5 .6 �1 .7� M and B �88 .70
10 Schakhtinsk 19,55� / �7 .� 1,787 / � .4 �1,��1 / 59 .4 �7 .84 M and B 96 .�0
11 Priozersk 18,641 / 95 .8 810 / 4 .� 101 .44 0 4� .50
1� Atasu, RC* �,609 / 16 .0 1�,697 / 84 .0 40 .7� М 10 .00
1� Kievka, RC* 6,810 / 100 .0 0 .00 0 –
14 Osakarovka, RC* 8� / 1 .0 �,196 / 40 .0 4,711 / 59 .0 0 11 .40
15 Izumrudny 400 / 100 .0 0 .00 0 –
16 Karabas �,400 / 100 .0 0 .00 0 –
17 Tipar / / /
18 Yuzhny �,900 / 100 .0 0 .00 0 –
19 Saryshagab / / /
�0 Shashubai / / /
�1 Kushoky 1,175 / �8 .0 �0,�5 / 7� .0 10 .44 0 7 .00
�� Gabiden Mustafin �06 / 1� .9 1,89� / 86 .1 0 � .�0
�� Kyzylzhar 1,500 / 100 .0 0 .00 0 –
�4 Karagaily �60 / 5 .0 156 / � .0 4,788 / 9� .0 �� .00 0 1� .00
�5 Shubarkol / / /
�6 Molodezhny 5,600 / 87 .5 800 / 1� .5 0 4� .15
�7 Aktas accounted in data of Karaganda city
accounted in data of Karaganda city
accounted in data of Karaganda city �1 .7� M and B accounted in assets
of Karaganda city
�8 Zhezdi accounted in data of Satpaev town
accounted in data of Satpaev town
accounted in data of Satpaev town 7 .�8 M accounted in assets
of Satpaev town
�9 Karasakpai �,00� / 100 .0 0 .00 0 –
�0 Agadyr 1,705 / �0 .8 487 / 6 .0 5,978 / 7� .� 19 .�0 M 17 .50
�1 Akzhal �,909 / 75 .0 969 / �5 .0 11 .�5 0 �5 .00
�� Akchatau 1,4�� / 100 .0 0 .00 0 –
�� Daryinsky 865 / 100 .0 0 .00 0 –
�4 Nizhni Kairakty 91� / 100 .0 0 .00 0 –
�5 Verhni Kairakty 609 / 100 .0 0 .00 0 –
�6 Moiynty �,180 / 100 .0 0 .00 0 –
�7 S . Seifullin 1,�00 / 100 .0 0 .00 0 –
109
ANNExES
1 � � 4 5 6 7 8
�8 Gulshat 700 / 100 .0 0 .00 0 –
�9 Konyrat �,��6 / 80 .0 8�4 / �0 .0 7 .99 B �5 .00
40 Sayak �,960 / 80 .0 740 / �0 .0 8 .99 B 1� .00
41 Shugys Konyrat 400 / 100 .0 0 .00 0 –
4� Zhairem 5,500 / 56 .0 4,�00 / 44 .0 16 .�1 0 �� .80
4� Zhambyl �09 / 100 .0 0 .00 0 –
44 Aktas �4� / 100 .0 0 .00 0 –
45 Zheskazgan accounted in data of Satpaev town
accounted in data of Satpaev town
accounted in data of Satpaev town 7 .�8 M accounted in assets
of Satpaev town
46 Aktau �,515 / 57 .4 1,658 / �7 .1 950 / 15 .5 18 .66 M and B 1� .40
47 Dolinsky 4,050 / 100 .0 0 .00 0 –
48 Novodolinsky 1,88� / �8 .5 �,709 / 41 �,009 / �0 .5 5� .�9 0 9 .�0
49 Botakara (Ulyanovsky) 746 / 100 .0 0 .00 0 –
50 Shakhan 7,650 / 76 .5 �,�50 / �� .5 18 .66 M and B �0 .00
Total in Karaganda Oblast: 817,49� / 7� .9 �7,�87 / � .4 �50,645 / �� .7 � 174 .�0
Note*: M – availability of mechanical treatment facilities; B – availability of biological treatment facilities, RC* – Rayon Center
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
110
Dat
a on
Acc
ess
to D
rin
kin
g W
ater
of g
ood
Qua
lity
of U
rban
Pop
ulat
ion
in K
osta
nai
obl
ast
№P
opul
ated
Are
a
Pop
ulat
ion
havi
ng a
cces
s to
wat
er
supp
ly (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
inte
rmitt
ent
(lim
ited)
acc
ess
to w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hrs
) ac
cess
to d
rink
ing
wat
er o
f goo
d qu
ality
(ps .
/%)
Typ
e of
Wat
er S
uppl
y (p
s ./%
)
Leve
l of
Serv
ice
Mai
n R
easo
n fo
r Lo
w L
evel
of
Ser
vice
ce
ntra
lized
co
mm
on
stan
d pi
pe
wel
lde
liver
ed
other
1�
�4
56
78
910
111�
1�
1K
osta
nai
�0�,
559
/ 10
0�0
,�55
9 /
100
�0�,
559
/ 10
016
9,1�
7 /
8� .5
��,4
�� /
16 .
5m
ediu
mhi
gh le
vel o
f dep
reci
atio
n in
term
s of
net
wor
k an
d fa
cilit
ies
�Zh
etik
ara,
RC
*�5
,0�5
/ 7
9 .�
�5,0
�5 /
79 .
��5
,0�5
/ 7
9 .�
��,�
45 /
74
1,68
0 /
5 .�
6,50
0 /
�0 .7
med
ium
60,7
% o
f wat
er
pipe
net
wor
k ne
eds
repl
acem
ent
�A
rkal
yk�7
,859
/ 1
00�7
,859
/ 1
0017
,�08
/ 6
1 .8
10,6
51 /
�8 .
�m
ediu
m70
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
4Li
sako
vsk
�8,�
54 /
100
�8,�
54 /
100
�8,�
54 /
100
med
ium
60%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
5R
udny
9�,9
76 /
100
9�,9
76 /
100
9�,9
76 /
100
88,9
57 /
95 .
74,
019
/ 4 .
�m
ediu
m11
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t – �
7 .6
km
6K
arab
alyk
, RC
*11
,768
/ 1
0011
,768
/ 1
0011
,768
/ 1
008,
00�
/ 68
�,76
6 /
��m
ediu
m56
.1%
of w
ater
pi
pe n
etw
ork
need
s re
plac
emen
t
7Za
tobo
lsk,
RC
*�1
,000
/ 1
00�1
,000
/ 1
00�1
,000
/ 1
008,
400
/ 40
1�,6
00 /
60
med
ium
70%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
8B
orov
sky,
RC
*10
,859
/ 9
0 .5
10,8
59 /
90 .
5�,
159
/ 18
8,70
0 /
7� .5
1,15
0 /
9 .5
med
ium
80%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
9Sa
ryko
l, R
C*
10,�
50 /
100
10,�
50 /
100
10,�
50 /
100
med
ium
inte
rrup
ted
wat
er s
uppl
y vi
a di
stri
butio
n ce
nter
s
10Fe
doro
vka,
RC
*6,
064
/ 99
6,06
4 /
996,
064
/ 99
560
/ 9 .
15,
504
/ 89
.960
/ 1
med
ium
77%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
11A
man
kara
gai,
RC
*8,
00�
/ 10
08,
00�
/ 10
04,
80�
/ 60
�,�0
1 /
40m
ediu
min
terr
upte
d w
ater
sup
ply
111
ANNExES
1�
�4
56
78
910
111�
1�
1�K
ushm
urun
8840
/ 1
008,
840
/ 10
05�
04 /
60
�5�6
/ 4
0m
ediu
min
terr
upte
d w
ater
sup
ply
1�P
rigo
rodn
yac
coun
ted
in d
ata
of
Zhet
ikar
a ci
ty
acco
unte
d in
dat
a of
Zh
etik
ara
city
acco
unte
d in
dat
a of
Zh
etik
ara
city
acco
unte
d in
dat
a of
Zh
etik
ara
city
med
ium
60%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
14To
bol
4,84
9 /
64 .4
4,84
9 /
64 .4
4,84
9 /
64 .4
�,68
� /
48 .9
1,16
7 /
15 .5
�,68
1 /
�5 .6
med
ium
high
leve
l of d
epre
ciat
ion
in te
rms
of w
ater
inta
ke
faci
litie
s
15Tr
oebr
atsk
y0
/ 0
0 /
00
/ 0
�,67
0 /
100
low
high
leve
l of d
epre
ciat
ion
in te
rms
of w
ater
inta
ke
faci
litie
s, 1
00%
of w
ater
pi
pe n
etw
ork
need
s re
plac
emen
t
16O
ktya
brsk
y�,
6�7
/ 96
.��,
6�7
/ 96
.��,
6�7
/ 96
.��,
�56
/ 89
.1�7
1 /
7 .�
141
/ � .
7m
ediu
m67
.7%
of w
ater
pi
pe n
etw
ork
need
s re
plac
emen
t
17K
acha
r9,
487
/ 10
09,
487
/ 10
09,
487
/ 10
0m
ediu
m70
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
Tota
l in
Kos
tana
i Obl
ast:
481,
5�0
/ 97
.�44
�,46
8 /
89 .6
�8,0
5� /
7 .7
�6,7
868
/ 74
.4�8
�,65
� /
77 .�
98,8
67 /
�0
10�9
1 /
� .1
�,81
1 /
0 .6
Not
e*: R
C* –
Ray
on C
ente
r
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
11�
Data on Water Quality and tariffs of Urban Water supply in Kostanai oblast
№ Populated Area Quality Grade*
Problem Type Cause of Problem Length of Pipelines
(km)Water Tariff
(KZT/m�)Water Tariff
Collection Rate (%)
1 Kostanai � 4�0 .60 16 .40 100 .00
� Zhetikara, RC* � 94 .91 19 .16 100 .00
� Arkalyk � biological / metals
purification system has technical trouble �08 .10 �1 .75 100 .00
4 Lisakovsk � other secondary pollution of water 96 .80 19 .55 100 .00
5 Rudny � biological / metals
secondary pollution of water �60 .80 16 .05 100 .00
6 Karabalyk, RC* � 159 .50 107 .00 9� .00
7 Zatobolsk, RC* � �9 .50 45 .10 96 .00
8 Borovsky, RC* � 4� .00 �9 .00 90 .00
9 Sarykol, RC* � 19 .80 �50 .00 100 .00
10 Fedorovka, RC* � 5� .70 66 .00 77 .00
11 Amankaragai, RC* � 11 .00 6� .60 88 .00
1� Kushmurun � 50 .00 6� .60 88 .00
1� Prigorodny � 7 .�0 19 .16 100 .00
14 Tobol � 58 .00 5� .�� 80 .00
15 Troebratsky � biological / metals
�0 .00 do not operate due to emergency
conditions
16 Oktyabrsky � �7 .58 19 .55 100 .00
17 Kachar � biological / other
purification system has technical trouble 9� .00 16 .05 100 .00
Total in Kostanai Oblast 1 781 .50
Note: * quality of water ranges from grade 0 to grade 3; very poor water is deemed under grade 0 and water meeting standard refers to grade 3; RC* – Rayon Center
11�
ANNExES
Data on Access to Urban sewerage system in Kostanai oblast
№ Populated AreaType of Sewerage Supply System (ps ./%) Water Tariff
(KZT/m�)
Availability of Sewerage Treatment*
Length of Sewers (km)centralized system septic pit outdoor toilet
1 Kostanai 14�,007 / 70 .6 10,5�� / 5 .� 49,019 / �4 .� 15 .9� М �00 .9
� Zhetikara, RC* �1,5�0 / 68 .� 1,945 / 6 .� 8,050 / �5 .5 1� .0� M and B 70 .6
� Arkalyk 17,�08 / 61 .8 1,846 / 6 .6 8,805 / �1 .6 1� .19 М 148 .1
4 Lisakovsk �8,�54 / 100 .0 �� .58 M and B 7� .�
5 Rudny 86,�07 / 9� .8 4,�88 / 4 .7 �,�81 / � .5 15 .�5 M and B ��8 .1
6 Karabalyk, RC* 11,768 / 100 .0 0 0 0 .0
7 Zatobolsk, RC* 6,800 / �� .4 14,�00 / 67 .6 55 .�� М �7 .4
8 Borovsky, RC* 1�,009 / 100 .0 0 0 0 .0
9 Sarykol, RC* 10,�50 / 100 .0 0 0 0 .0
10 Fedorovka, RC* 6,1�4 / 100 .0 0 0 0 .0
11 Amankaragai, RC* �,44� / 4� .0 4,56� / 57 .0 45 .�� М �7 .0
1� Kushmurun �,801 / 4� .0 5,0�9 / 57 .0 46 .�� М accounted in assets of Amankarai village
1� Prigorodny accounted in data of Zhetikara town
accounted in data of
Zhetikara town
accounted in data of
Zhetikara town 1� .0� M and B accounted in assets
of Zhetikara town
14 Tobol �,547 / �� .8 1,071 / 14 .� �,91� / 5� .0 �� .49 M and B �6 .5
15 Troebratsky �,670 / 100 .0 0 0 0 .0
16 Oktyabrsky �,169 / 57 .6 780 / �0 .7 819 / �1 .7 �� .58 B 8 .�
17 Kachar 9,449 / 99 .6 9 / 0 .1 �9 / 0 .� 15 .�5 M and B 44 .4
Total in Kostanai Oblast: ��4,515 / 67 .6 �0,57� / 4 .� 1�9,6�7 / �8 .� 95� .5
Note*: M – availability of mechanical treatment facilities; B – availability of biological treatment facilities, RC* – Rayon Center
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
114
Dat
a on
Acc
ess
to D
rin
kin
g W
ater
of g
ood
Qua
lity
of U
rban
Pop
ulat
ion
in K
yzyl
orda
obl
ast
№P
opul
ated
Are
a
Pop
ulat
ion
havi
ng a
cces
s to
wat
er
supp
ly (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
inte
rmitt
ent
(lim
ited)
acc
ess
to w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hrs
) ac
cess
to d
rink
ing
wat
er o
f goo
d qu
ality
(ps .
/%)
Typ
e of
Wat
er S
uppl
y (p
s ./%
)
Leve
l of
Serv
ice
Mai
n R
easo
n fo
r Lo
w L
evel
of
Serv
ice
cent
raliz
ed
com
mon
st
and
pipe
w
ell
deliv
ered
other
1K
yzyl
orda
159,
�00
/ 10
015
9,�0
0 /
100
14�,
�84
/ 88
.916
,916
/ 1
1 .1
med
ium
hig
h le
vel o
f dep
reci
atio
n in
te
rms
of n
etw
ork
and
faci
litie
s
�A
rals
k, R
C*
��,�
�8 /
75 .
7��
,��8
/ 7
5 .7
7,76
9 /
�5 .�
15,5
69 /
50 .
57,
491
/ �4
.�m
ediu
mde
prec
iatio
n of
net
wor
k by
80
%; i
nter
rupt
ed w
ater
sup
ply
�K
azal
insk
8,00
0 /
100
8,00
0 /
100
9�4
/ 11
.57,
076
/ 88
.5m
ediu
m40
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t, in
terr
upte
d w
ater
sup
ply
4Zh
laga
sh, R
C*
1�,8
16 /
98 .
71�
,816
/ 9
8 .7
1,0�
5 /
7 .4
1�,7
81 /
91 .
�18
4 /
1 .�
med
ium
inte
rrup
ted
wat
er s
uppl
y
5Zh
anak
orga
n,
RC
*7,
�40
/ ��
.47,
�40
/ ��
.47,
�40
/ ��
.414
,460
/
66 .6
med
ium
�0%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
6A
iteke
bi,
RC
*16
,877
/ 5
6 .1
16,8
77 /
56 .
116
,877
/ 5
6 .1
9,08
7 /
�0 .�
4,11
5 /
1� .7
med
ium
60%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
7Zh
osal
y, R
C*
15,0
80 /
77 .
515
,080
/ 7
7 .5
15,0
80 /
77 .
515
,080
/ 7
7 .5
4,�6
7 /
�� .5
high
8Te
reno
zek,
RC
*10
,800
/ 1
0010
,800
/ 1
0010
,800
/ 1
0010
,800
/ 1
00 m
ediu
m4�
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
9Sh
ieli,
RC
*�0
,7�7
/ 1
00�0
,7�7
/ 1
00�0
,7�7
/ 1
0010
,0��
/ �
� .6
�0,7
04 /
67 .
4 m
ediu
m9�
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
10Zh
aksy
kyly
sh5,
6�0
/ 10
05,
6�0
/ 10
05,
6�0
/ 10
0�,
840
/ 68
.�1,
780
/ �1
.7 m
ediu
m48
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
11Sa
ksau
l�,
8�9
/ 10
0�,
8�9
/ 10
0�,
8�9
/ 10
0�,
8�9
/ 10
0hi
gh
1�Sh
alki
ya1,
500
/ 10
01,
500
/ 10
01,
500
/ 10
01,
500
/ 10
0hi
gh
1�B
elko
l�,
901
/ 10
0�,
901
/ 10
0�,
901
/ 10
087
1 /
�0�,
0�0
/ 70
med
ium
4 .5
km o
f net
wor
k w
ere
cons
truc
ted
as te
mpo
rary
fa
cilit
ies
how
ever
are
m
aint
aine
d on
per
man
ent b
asis
14Ta
sbug
et1�
,668
/ 7
5 .�
1�,6
68 /
75 .
�1�
,668
/ 7
5 .�
5,84
8 /
�4 .7
6,8�
0 /
40 .5
4,18
8 /
�4 .8
med
ium
100%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
15To
reta
m7,
578
/ 87
7,57
8 /
877,
578
/ 87
1,1�
� /
1�lo
w81
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t, in
terr
upte
d w
ater
sup
ply
Tota
l in
Kyz
ylor
da
Obl
ast:
�18,
194
/ 87
.6�5
8,��
� /
71 .1
59,9
7� /
16 .
58�
,145
/ �
� .6
�08,
900
/ 57
.510
9,�9
4 /
�0 .1
��,4
18 /
9 .�
11,6
06 /
� .�
Not
e*: R
C* –
Ray
on C
ente
r
115
ANNExES
Data on Water Quality and tariffs of Urban Water supply in Kyzylorda oblast
№ Populated Area Quality Grade*
Problem Type Cause of Problem Length of
Pipelines (km)Water Tariff
(KZT/m�)Water Tariff
Collection Rate (%)
1 Kyzylorda � biological / metals
purification system has technical trouble �56 .� �4 .84 9�
� Aralsk, RC* � biological / other
purification system has technical trouble 79 80 .96 65
� Kazalinsk � �6 .4 7� .4� 70
4 Zhlagash, RC* � 4� .4 �� .5 80
5 Zhanakorgan, RC* � �7 .6 �9 .� 100
6 Aiteke bi, RC* � other secondary pollution of water 180 .� 7� .4� �0
7 Zhosaly, RC* � 55 45 .08 70
8 Terenozek, RC* � 17 .5 �4 .17 80
9 Shieli, RC* � biological secondary pollution of water �5 6� .�6 60
10 Zhaksykylysh � �5 .5 69 .7 98
11 Saksaul � 11 .� 76 .� 8�
1� Shalkiya � 14 �� .8 �0
1� Belkol � 11 .91 �7 .6 60
14 Tasbuget � �4 .5 �0 .�5 56
15 Toretam � �1 .� 5� .88 86
Total in Kyzylorda Oblast: 8�8 .61
Note: * quality of water ranges from grade 0 to grade 3; very poor water is deemed under grade 0 and water meeting standard refers to grade 3; RC* – Rayon Center
Data on Access to Urban sewerage system in Kyzylorda oblast
№ Populated Area Type of Sewerage Supply System (ps ./%) Water Tariff
(KZT/m�)Availability of Sewe-
rage Treatment* Length of
Sewers (km)centralized system septic pit outdoor toilet
1 Kyzylorda 96,894 / 61 .� 6�,�06 / �8 .8 1� .00 0 198 .00
� Aralsk, RC* �0,8�9 / 100 .0 0 .00 0 0 .00
� Kazalinsk 9�4 / 11 .5 7,076 / 88 .5 0 19 .40
4 Zhlagash, RC* 14,000 / 100 .0 0 .00 0 0 .00
5 Zhanakorgan, RC* �1,700 / 100 .0 0 .00 0 0 .00
6 Aiteke bi, RC* �0,079 / 100 .0 0 .00 0 0 .00
7 Zhosaly, RC* 19,447 / 100 .0 0 .00 0 0 .00
8 Terenozek, RC* 10,800 / 100 .0 0 .00 0 0 .00
9 Shieli, RC* 41� / 1 .� �0,��4 / 98 .7 16 .�4 М 11 .06
10 Zhaksykylysh 5,6�0 / 100 .0 0 .00 0 0 .00
11 Saksaul �,8�9 / 100 .0 0 .00 0 0 .00
1� Shalkiya 1,000 / 66 .7 500 / �� .� �5 .�0 М 9 .00
1� Belkol 7�4 / �5 .� 76 / � .6 �,091 / 7� .1 �7 .�0 0 9 .9�
14 Tasbuget 5,848 / �4 .7 �,�08 / 19 .6 7,700 / 45 .7 0 1� .00
15 Toretam 8,710 / 100 .0 0 .00 0 0 .00
Total in Kyzylorda Oblast: 105,81� / �9 .1 �,�84 / 1 .0 �54,0�1 / 69 .9 �59 .�8
Note*: M – availability of mechanical treatment facilities; B – availability of biological treatment facilities, RC* – Rayon Center
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
116
Dat
a on
Acc
ess
to D
rin
kin
g W
ater
of g
ood
Qua
lity
of U
rban
Pop
ulat
ion
in M
angi
stau
obl
ast
№P
opul
ated
Are
a
Pop
ulat
ion
havi
ng a
cces
s to
wat
er s
uppl
y (p
s ./%
)
Pop
ulat
ion
havi
ng
inte
rmitt
ent
(lim
ited)
acc
ess
to w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hrs
) ac
cess
to d
rink
ing
wat
er o
f goo
d qu
ality
(ps .
/%)
by T
ype
of W
ater
Sup
ply
(ps .
/%)
Leve
l of
Serv
ice
Mai
n R
easo
n fo
r Lo
w L
evel
of S
ervi
ce
cent
raliz
ed
com
mon
st
and
pipe
w
ell
deliv
ered
other
1A
ktau
17�,
�87
/ 10
017
�,�8
7 /
100
17�,
�87
/ 10
0m
ediu
m79
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
�Fo
rt-S
hevc
henk
o,
RC
*89
� /
�4 .6
89�
/ �4
.689
� /
�4 .6
�,7�
8 /
75 .4
med
ium
95%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
�Zh
anao
zen
48,5
�0 /
100
48,5
�0 /
100
48,5
�0 /
100
med
ium
10%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
4Zh
etyb
ai0
/ 0
0 /
09,
700
/ 10
0lo
ww
ater
impo
rted
by
vehi
cles
5M
unai
shy
�,48
6 /
100
�,48
6 /
100
�,48
6 /
100
med
ium
100%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
6B
autin
o1�
� /
� .4
1��
/ � .
41�
� /
� .4
�,47
8 /
96 .6
med
ium
95%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
7M
angi
stau
0 /
00
/ 0
15,4
06 /
100
low
wat
er im
port
ed b
y ve
hicl
es
8K
yzyl
sai
0 /
00
/ 0
4,40
0 /
100
low
wat
er im
port
ed b
y ve
hicl
es
9Te
nge
7,50
0 /
100
7,50
0 /
100
7,50
0 /
100
med
ium
inte
rrup
ted
wat
er s
uppl
y
Tota
l in
Man
gist
au O
blas
t: ��
�,90
7 /
86 .7
59,5
06 /
�� .
�17
�,40
1 /
64 .5
���,
907
/ 86
.7�5
,715
/ 1
� .�
Not
e*: R
C* –
Ray
on C
ente
r
117
ANNExES
Data on Water Quality and tariffs of Urban Water supply in Mangistau oblast
№ Populated Area Quality Grade*
Problem Type Cause of Problem Length of Pipelines
(km) Water Tariff (KZT/m�)Water Tariff Collection Rate (%)
1 Aktau � �6� .1 �4 .66 100
� Fort-Shevchenko, RC* � �� .0�6 .00 if water meter
installed; 7� .00 per ps if water meter not available
9�
� Zhanaozen � other secondary pollution of water 99 .8 6� .8� 7�
4 Zhetybai � 9 .564 .87 if water distributed from standpipe; 5�7 .07
for imported water 100
5 Munaishy � 4 .4 65 .�� 9�
6 Bautino �accounted in the
assets of Fort-Shevchenko
�6 .00 if water meter installed; 7� .00 per ps . 9�
7 Mangistau � 45 .0 �89 .00 100
8 Kyzylsai � 0 .0 100
9 Tenge � other secondary pollution of water
accounted in the assets of Zhanaozen 6� .8� 7�
Total in Mangistau Oblast: 54� .8
Note: * quality of water ranges from grade 0 to grade 3; very poor water is deemed under grade 0 and water meeting standard refers to grade 3; RC* – Rayon Center
Data on Access to Urban sewerage system in Mangistau oblast
№ Pop[ulated Area Type of Sewerage Supply System (ps ./%) Water Tariff
(KZT/m�)
Availability of Sewerage Treatment*
Length of Sewers (km)centralized system septic pit outdoor toilet
1 Aktau 168,594 / 97 .8 �,79� / � .� �� .0�M and B (80%
of waste water is treated)
�7� .9
� Fort-Shevchenko, RC* �76 / 10 .4 �,�44 / 89 .6 М 11 .1
� Zhanaozen 48,5�0 / 100 .0 16 .90 M and B 67 .7
4 Zhetybai 9,700 / 100 .0 0 .00 0 0 .0
5 Munaishy �,486 / 100 .0 0 .00 0 0 .0
6 Bautino �,600 / 100 .0 0 .00 0 0 .0
7 Mangistau �,406 / �� .1 1�,000 / 77 .9 0 9 .5
8 Kyzylsai 4,400 / 100 .0 0 .00 0 0 .0
9 Tenge 7,500 / 100 .0 16 .90 M and Baccounted in assets of
Zhanaozen town
Total in Mangistau Oblast: ��8,�96 / 85 .0 �,79� / 1 .4 �6,4�0 / 1� .6 �61 .�
Note*: M – availability of mechanical treatment facilities; B – availability of biological treatment facilities; RC* – Rayon Center
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
118
Dat
a on
Acc
ess
to D
rin
kin
g W
ater
of g
ood
Qua
lity
for
Urb
an P
opul
atio
n in
Pav
loda
r o
blas
t
№P
opul
ated
A
rea
Pop
ulat
ion
havi
ng a
cces
s to
wat
er
supp
ly (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
inte
rmitt
ent
(lim
ited)
ac
cess
to
wat
er (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
goo
d qu
ality
dri
nkin
g w
ater
(ps .
/%)
Type
of W
ater
Sup
ply
(ps .
/%)
Leve
l of
Serv
ice
Mai
n re
ason
of l
ow le
vel o
f se
rvic
e ce
ntra
lized
co
mm
on
stan
d pi
pe
wel
lde
liver
ed
other
1P
avlo
dar,
RC
*�9
6,40
0 /
100 .
0�9
6,40
0 /
100 .
0�9
6,40
0 /
100 .
0�7
�,57
7 /
9� .�
��,8
�� /
7 .7
high
�A
ksu
�7,9
8� /
97 .
7�7
,98�
/ 9
7 .7
�7,9
8� /
97 .
7�5
,798
/ 9
� .1
�,18
5 /
5 .6
906
/ � .
�hi
gh
�Ek
ibas
tuz
111,
965
/ 99
.911
1,96
5 /
99 .9
10�,
06�
/ 91
.98,
90�
/ 8
��5
/ 0 .
1
m
ediu
m49
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t – �
0� k
m
4M
aika
in8,
980
/ 99
.�8,
980
/ 99
.�5,
180
/ 57
.��,
800
/ 4�
.067
/ 0
.8m
ediu
m80
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
5Sh
opty
kol
0 /
060
0 /
100 .
0m
ediu
mw
ater
impo
rted
by
vehi
cles
, �4
hrs
acce
ss to
wat
er s
tand
pip
e
6Le
nins
ky0
/ 0
7,�5
� /
90 .0
780
/ 10
.0m
ediu
mw
ater
impo
rted
by
vehi
cles
7A
ksu
acco
unte
d in
da
ta o
f Aks
u to
wn
acco
unte
d in
da
ta o
f Aks
u to
wn
acco
unte
d in
dat
a of
Aks
u to
wn
acco
unte
d in
da
ta o
f Aks
u to
wn
acco
unte
d in
da
ta o
f Aks
u to
wn
acco
unte
d in
da
ta o
f Aks
u to
wn
high
8K
alka
man
619
/ 19
.561
9 /
19 .5
619
/ 19
.561
9 /
19 .5
�,56
1 /
80 .5
med
ium
19%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
9To
rtku
duk
701
/ 89
.�70
1 /
89 .�
�65
/ 46
.5��
6 /
4� .8
84 /
10 .
7lo
w10
0% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t,int
erru
pted
w
ater
sup
ply
10So
lnec
hny
8,�5
8 /
99 .9
8,�5
8 /
99 .9
8,�5
8 /
99 .9
8,�5
8 /
99 .9
5 /
0 .1
high
11Sh
ider
ty�,
40�
/ 10
0 .0
�,40
� /
100 .
0�,
40�
/ 10
0 .0
�,��
� /
9� .5
181
/ 7 .
5m
ediu
m�0
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
Tota
l in
Pav
loda
r O
blas
t: 46
7,�0
9 /
97 .4
466,
608
/ 97
.�70
1 /
0 .1
�45,
66�
/ 7�
.14�
9,08
� /
89 .4
�8,�
�7 /
8 .0
11,1
16 /
� .�
1,46
4 /
0 .�
Not
e*: R
C* –
Ray
on C
ente
r
119
ANNExES
Data on Water Quality and tariffs of Urban Water supply in Pavlodar oblast
№ Populated Area Quality Grade* Problem Type Cause of Problem Length of
Pipelines (km)Water Tariff
(KZT/m�)Water Tariff
Collection Rate (%)
1 Pavlodar, RC* � 441 .10 11 .8� 100
� Aksu � 90 .40 �0 .56 9�
� Ekibastuz � other purification system has technical trouble 44� .�0 �6 .0� 9�
4 Maikain � other purification system has technical trouble 55 .50 54 .65 9�
5 Leninsky � – 100
6 Aksu � �� .00 �0 .56 9�
7 Kalkaman � 4� .00 44 .18 100
8 Tortkuduk � 4 .40
9 Solnechny � other purification system has technical trouble 8 .50 16 .80 71
10 Shiderty � �1 .40 15 .84 7�
Total in Pavlodar Oblast: 1 1�7 .50
Note: * quality of water ranges from grade 0 to grade 3; very poor water is deemed under grade 0 and water meeting standard refers to grade 3; RC* – Rayon Center
Data on Access to Urban sewerage system in Pavlodar oblast
№ Populated Area Type of Sewerage Supply System (ps ./%) Water
Tariff (KZT/m�)
Availability of Sewerage Treatment*
Length of Sewers (km)centralized system septic pit outdoor toilet
1 Pavlodar, RC* �61,4�5 / 88 .� �4,975 / 11 .8 9 .54 M and B �71 .0
� Aksu �5,808 / 9� .1 810 / � .1 �,�71 / 5 .8 15 .6� M and B 160 .4
� Ekibastuz 98,1�9 / 88 .1 9� / 0 .1 1�,�48 / 11 .8 1� .61 M and B �67 .�
4 Maikain �,840 / 4� .4 196 / � .� 5,011 / 55 .4 1� .00 0 1� .0
6 Leninsky 8,1�� / 100 .0 0 .00 0 0 .0
7 Aksu accounted in data of Aksu town
accounted in data of Aksu town
accounted in data of Aksu town 15 .6� M and B accounted in assets
of Aksu town
8 Kalkaman �54 / 8 .0 �,9�6 / 9� .0 0 11 .�
9 Tortkuduk �0� / �5 .7 58� / 74 .� 0 � .1
10 Solnechny 8,�58 / 99 .9 5 / 0 .1 16 .90 6 .�
11 Shiderty �,079 / 86 .5 �05 / 1� .7 19 / 0 .8 1� .50 0 14 .8
Total in Pavlodar Oblast: 410,776 / 85 .7 1,409 / 0 .� 67,165 / 14 .0 846 .0
Note*: M – availability of mechanical treatment facilities; B – availability of biological treatment facilities, RC* – Rayon Center
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
1�0
Dat
a on
Acc
ess
to D
rin
kin
g W
ater
of g
ood
Qua
lity
of U
rban
Pop
ulat
ion
in N
orth
-Kaz
akhs
tan
obl
ast
№P
opul
ated
Are
a P
opul
atio
n ha
ving
ac
cess
to w
ater
su
pply
(ps .
/%)
Pop
ulat
ion
havi
ng
inte
rmitt
ent
(lim
ited)
acc
ess
to
wat
er (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hrs
) ac
cess
to d
rink
ing
wat
er o
f goo
d qu
ality
(ps .
/%)
by T
ype
of W
ater
Sup
ply
(ps .
/%)
Leve
l of
Serv
ice
Mai
n R
easo
n fo
r Lo
w L
evel
of
Ser
vice
ce
ntra
lized
co
mm
on s
tand
pi
pe
wel
lde
liver
edot
her
1P
etro
pavl
ovsk
190,
589
/ 98
,619
0,58
9 /
98 .6
149,
764
/ 77
.540
,8�5
/ �
1 .1
1,61
1 /
0 .8
med
ium
50%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent –
109
km
�B
ulay
evo,
RC
*1�
,000
/ 1
00 .0
1�,0
00 /
100
.057
0 /
5 .0
11,4
�0 /
95 .
0lo
w�0
km
out
of 4
0 km
do
not
oper
ate
due
to e
mer
genc
y co
nditi
ons
�M
amly
utka
, RC
*7,
850
/ 10
0 .0
7,85
0 /
100 .
07,
850
/ 10
0 .0
low
wat
er im
port
ed b
y ve
hicl
es
4Se
rgee
vka,
RC
*7,
850
/ 10
0 .0
7,85
0 /
100 .
078
5 /
10 .0
7,06
5 /
90lo
w70
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t, по
дача
in
terr
upte
d w
ater
sup
ply
5Ta
iyns
ha, R
C*
8,�0
0 /
6� .0
8,�0
0 /
6� .0
1,�0
0 /
9 .�
7,00
0 /
5� .8
4,80
0 /
�6 .9
med
ium
100%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
Tota
l in
Nor
th-
Kaz
akhs
tan
Obl
ast:
��6,
489
/ 96
.84�
,�11
/ 1
5 .4
190,
589
/ 81
.415
�,�1
9 /
65 .1
74,1
70 /
�1 .
76,
411
/ � .
7
Not
e*: R
C* –
Ray
on C
ente
r
1�1
ANNExES
Data on Water Quality and tariffs of Urban Water supply in North-Kazakhstan oblast
№ Populated Area Quality Grade* Problem Type Cause of
Problem Length of
Pipelines (km)Water Tariff (KZT/
m�)Water Tariff
Collection Rate (%)
1 Petropavlovsk � �0� .8 16 .15 100
� Bulayevo, RC* ��0 km of pipe
operate out of 45 km
1�5 .00 98
� Mamlyutka, RC* � �5 .0�50-500 (depending
on distance to standpipe)
100
4 Sergeevka, RC* � 4� .0 1�5 .00 100
5 Taiynsha, RC* � � .0 1�5 .00 100
Total in North-Kazakhstan Oblast: 417 .8
Note: * quality of water ranges from grade 0 to grade 3; very poor water is deemed under grade 0 and water meeting standard refers to grade 3; RC* – Rayon Center
Data on Access to Urban sewerage system in North-Kazakhstan oblast
№ Populated area
Type of Sewerage Supply System (ps ./%) Water Tariff
(KZT/m�)
Availability of Sewerage Treatment*
Length of Sewers (km)centralized
system septic pit outdoor toilet
1 Petropavlovsk 145,519 / 75 .� �,567 / 1 .� 45,114 / �� .4 1�,9� M and B ��5
� Bulayevo, RC* 1�,000 / 100 .0 0 0 0
� Mamlyutka, RC* 7,850 / 100 .0 0 0 0
4 Sergeevka, RC* 785 / 10 .0 7,065 / 90 .0 0 �0
5 Taiynsha, RC* 1�,000 / 100 .0 0 0 0
Total in North-Kazakhstan Oblast: 146,�04 / 6� .5 �,567 / 1 .1 85,0�9 / �6 .4 �45
Note*: M – availability of mechanical treatment facilities; B – availability of biological treatment facilities, RC* – Rayon Center
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
1��
Dat
a on
Acc
ess
to D
rin
kin
g W
ater
of g
ood
Qua
lity
of U
rban
Pop
ulat
ion
in s
outh
-Kaz
akhs
tan
obl
ast
№P
opul
ated
A
rea
Pop
ulat
ion
havi
ng a
cces
s to
wat
er
supp
ly (p
s ./%
)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
inte
rmitt
ent
(lim
ited)
acc
ess
to w
ater
(ps .
/%)
Pop
ulat
ion
havi
ng
perm
anen
t (�4
hr
s) a
cces
s to
goo
d qu
ality
dri
nkin
g w
ater
(ps .
/%)
Type
of W
ater
Sup
ply
(ps .
/%)
Leve
l of
Serv
ice
Mai
n re
ason
of l
ow le
vel o
f ser
vice
ce
ntra
lized
co
mm
on
stan
d pi
pe
wel
lde
liver
ed
other
1Sh
ymke
nt�1
7,�1
8 /
75 .7
4�1
7,�1
8 /
75 .7
4�1
7,�1
8 /
75 .7
4�6
8,67
� /
77 .6
�1,0
18 /
4 .4
84,9
�6 /
17
.9�8
4 /
0 .06
high
�A
rys,
RC
*�7
,850
/ 1
00�7
,850
/ 1
00��
,410
/ 8
0 .5
5,44
0 /
19 .5
med
ium
45 .5
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t, in
terr
upte
d w
ater
sup
ply
�Zh
etys
ai, R
C*
�0,9
05 /
74 .
��0
,905
/ 7
4 .�
�0,9
05 /
74 .
�10
,7�8
/
�5 .8
med
ium
7�%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
4Sa
ryag
ash,
R
C*
5,96
1 /
�� .8
5,96
1 /
�� .8
5,96
1 /
�� .8
11,6
76 /
66
.� m
ediu
m10
0% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t, in
terr
upte
d w
ater
sup
ply
5Le
nger
, RC
*��
,000
/ 1
00��
,000
/ 1
00��
,000
/ 1
00��
,000
/ 1
00 m
ediu
m80
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
6Sh
arda
ra,
RC
*19
,150
/ 6
819
,150
/ 6
815
,06�
/ 5
� .5
4,08
8 /
14 .5
8,99
0 /
�� m
ediu
m66
.�%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
7K
enta
u47
,�16
/ 8
4 .1
47,�
16 /
84 .
147
,�16
/ 8
4 .1
4�,1
66 /
76 .
64,
050
/ 7 .
57,
000
/ 1�
.9 m
ediu
m79
.4%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent
8Tu
rkes
tan
79,4
75 /
89 .
679
,475
/ 8
9 .6
79,4
75 /
89 .
6�6
,7��
/ 4
1 .4
4�,7
4� /
48 .
�9,
��5
/ 10
.6 m
ediu
m�0
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t, in
terr
upte
d w
ater
sup
ply
9A
syka
ta�,
700
/ ��
.6�,
700
/ ��
.6�,
500
/ ��
.71,
�00
/ 10
.97,
150
/ 65
150
/ 1 .
4 m
ediu
min
terr
upte
d w
ater
sup
ply
10A
take
nt�,
07�
/ �4
.5�,
07�
/ �4
.51,
5�7
/ 18
.�5�
5 /
6 .�
6,�5
4 /
75 .5
med
ium
inte
rrup
ted
wat
er s
uppl
y
11M
yrza
kent
�,65
5 /
�5�,
655
/ �5
1,59
� /
151,
06�
/ 10
6,�7
� /
601,
594
/ 15
med
ium
50%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y1�
Kok
tere
k6�
7 /
100
6�7
/ 10
06�
7 /
100
6�7
/ 10
0hi
gh
1�Sa
stob
e5,
57�
/ 10
05,
57�
/ 10
05,
015
/ 90
557
/ 10
med
ium
50%
of w
ater
pip
e ne
twor
k ne
eds
repl
acem
ent,
inte
rrup
ted
wat
er s
uppl
y
14Ty
ulku
bas,
R
C*
10,�
88 /
100
10,�
88 /
100
10,�
88 /
100
high
15N
aury
z /
/
16K
yzym
shek
�,�9
8 /
100
�,�9
8 /
100
�,�6
6 /
96 .1
1��
/ � .
9m
ediu
m40
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t, in
terr
upte
d w
ater
sup
ply
17A
chis
ai�,
100
/ 10
0�1
00 /
100
�100
/ 1
00�,
100
/ 10
0
18B
ayal
dyr
acco
unte
d in
dat
a of
K
enta
u to
wn
acco
unte
d in
da
ta o
f Ken
tau
tow
n
acco
unte
d in
dat
a of
Ken
tau
tow
n
acco
unte
d in
dat
a of
K
enta
u to
wn
acco
unte
d in
dat
a of
K
enta
u to
wn
acco
unte
d in
dat
a of
K
enta
u to
wn
med
ium
79 .4
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
19H
anta
gyac
coun
ted
in d
ata
of
Ken
tau
tow
n
acco
unte
d in
da
ta o
f Ken
tau
tow
n
acco
unte
d in
dat
a of
Ken
tau
tow
n
acco
unte
d in
dat
a of
K
enta
u to
wn
acco
unte
d in
dat
a of
K
enta
u to
wn
acco
unte
d in
dat
a of
K
enta
u to
wn
med
ium
79 .4
% o
f wat
er p
ipe
netw
ork
need
s re
plac
emen
t
Tota
l in
Sout
h-K
azak
hsta
n O
blas
t: 66
�,66
9 /
81 .1
571,
�68
/ 69
.89�
,401
/ 1
1 .�
55�,
118
/ 67
.558
1,08
8 /
71 .1
8�,5
81 /
10 .
11�
9,96
8 /
15 .8
�4,4
�� /
� .
0
Not
e*: R
C* –
Ray
on C
ente
r
1��
ANNExES
Data on Water Quality and tariffs of Urban Water supply in south-Kazakhstan oblast
№ Populated Area Quality Grade* Problem Type Cause of Problem Length of Pipelines
(km)Water Tariff
(KZT/m�)Water Tariff
Collection Rate (%)
1 Shymkent � 1,5�6 .�0 �� .75 99 .48
� Arys, RC* � biological, mineralization
purification system has technical trouble 107 .40 �� .45 80
� Zhetysai, RC* � 1,18� .00 15 .08 8� .7
4 Saryagash, RC* � mineralization purification system has technical trouble �4 .�0 �� .49 �0
5 Lenger, RC* � biological, metals
purification system has technical trouble 14� .00 �1 .0� 9�
6 Shardara, RC* � biological, metals
purification system has technical trouble 79 .00 �8 .87 80
7 Kentau � �86 .00 15 .8� 90
8 Turkestan � mineralizationapproved by SES**,
secondary pollution of water
14� .70 15 .4� 90
9 Asykata � 40 .00 1� .9� 100
10 Atakent � 65 .40 15 .16 85
11 Myrzakent � biological, other
secondary pollution of water 66 .50 �4 .18 50
1� Kokterek � �5 .00 11 .40 100
1� Sastobe � �� .00 1� .00 100
14 Tyulkubas, RC* � accounted in assets of Tyulkubas village 11 .40 100
15 Nauryz
16 Kyzymshek � 7� .00 19 .90 90
17 Achisai � 5 .40 11 .4� 90
18 Bayaldyr � 1 .50 15 .8� 90
19 Hantagy � 8 .70 15 .8� 90
Total in South-Kazakhstan Oblast: �,819 .�0
Note: * quality of water ranges from grade 0 to grade 3; very poor water is deemed under grade 0 and water meeting standard refers to grade 3; ** SES – Sanitary and Epidemiological Service
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
1�4
Data on Access to Urban sewerage system in south-Kazakhstan oblast
№ Populated Area
Type of Sewerage Supply System (ps ./%) Water Tariff (KZT/m�)
Availability of Sewerage Treatment*
Length of Sewers (km)centralized system septic pit outdoor toilet
1 Shymkent �1�,�7� / 44 .9� �61,5�7 / 55 .0� 11 .75 M and B 498 .�
� Arys, RC* �,65� / 7 .� �4,197 / 9� .9 �4 .80 M 17 .9
� Zhetysai, RC* 41,6�� / 100 0 .00 0 0 .0
4 Saryagash, RC* 17,6�7 / 100 0 .00 0 0 .0
5 Lenger, RC* 6,�40 / �7 .� 16,760 / 7� .7 5 .41 M �7 .0
6 Shardara, RC* 4,468 / 15 .9 ��,67� / 84 .1 �� .5� Sewerage Pland does not operate �0 .0
7 Kentau ��,641 / 41 .8 16,�94 / �6 .9 15,��1 / �1 .� 8 .46 M and B 97 .0
8 Turkestan 17,940 / �0 .� 70,760 / 79 .8 �4 .�0 0 5� .�
9 Asykata 11,000 / 100 0 .00 0 0 .0
10 Atakent �,799 / �� .� 5,6�7 / 66 .8 �0 .1� M 9 .5
11 Myrzakent 10,6�� / 100 0 .00 0 0 .0
1� Kokterek 6�7 / 100 0 .00 0 0 .0
1� Sastobe 5,57� / 100 0 .00 0 0 .0
14 Tyulkubas, RC* 10,�88 / 100 0 .00 0 0 .0
15 Nauryz
16 Kyzymshek 99� / �� �,108 / 68 0 .00 0 0 .0
17 Achisai �,�66 / 96 .1 1�� / � .9 19 .90 M 17 .0
18 Bayaldyr accounted in data of Kentau town
accounted in data of Kentau
town
accounted in data of Kentau town 8 .46 M and B
accounted in assets of
Kentau town
19 Hantagy accounted in data of Kentau town
accounted in data of Kentau
town
accounted in data of Kentau town 8 .46 M and B
accounted in assets of
Kentau town
Total in South-Kazakhstan Oblast: �74,�7� / �� .1 16,�94 / � 5�7,40� / 64 .9 748 .9
Note*: M – availability of mechanical treatment facilities; B – availability of biological treatment facilities, RC* – Rayon Center
1�5
ANNEX IІ
Access to Water and Sanitation in rural Areas of Kazakhstan; results of Technical Survey
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
1�6
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in th
e R
epub
lic
of K
azak
hsta
n
№O
blas
t/P
rovi
nce
Num
ber
of
Sett
lem
ents
(it
ems)
Pop
ulat
ion,
(‘0
00 p
s .)
Cen
tral
ized
Wat
er S
uppl
y Sy
stem
Lo
cal W
ater
Sou
rces
D
eliv
ered
Wat
er
Leng
th o
f W
ater
Pip
e ne
twor
k, k
m
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
with
ac
cess
to d
rink
ing
wat
er (‘
000
ps .)
Gro
und
Wat
er
Surf
ace
Wat
er
Num
ber
of
Sett
lem
ents
P
opul
atio
n,
(‘000
ps .
)N
umbe
r of
Se
ttle
men
ts
Pop
ulat
ion
(‘000
ps .
)N
umbe
r of
Se
ttle
men
ts
Pop
ulat
ion
(‘000
ps .
)
1A
kmol
a 7
05
�99
.78
�78
1
78 .4
6 �
57
197
�1
6 .�6
4918
.5�
�,4
51 .0
0
�A
ktob
e 4
�6
�0�
.60
71
98 .
�5
�51
�
0�
00
40 .
94 5
�0 .�
5
�A
lmat
y 8
11
1,1
06 .4
7 �
91
57�
.4�
�5�
5
08
55��
.04
1�� .
�5 �
,�14
.01
4A
tyra
u 1
95
196
.1�
50
68 .
79
61
6�
10 .
4�8�
64 .8
9 5
81 .9
0
5Ea
st-K
azak
hsta
n 8
18
598
.�9
���
1
64 .�
� 4
89
40�
67
�� .�
5�
0 .��
1,�
01 .9
0
6Zh
amby
l �
67
54�
.95
109
1
76 .�
5 �
51
�64
1
0 .4�
61 .
98 1
,17�
.4�
7W
est-K
azak
hsta
n 4
98
�44
.�8
81
10�
.61
�59
�
0�
44�1
.75
148 .
11 4
48 .0
0
8K
arag
anda
496
�
�1 .9
0 1
��
91 .
68
�59
1
�6
00
144 .
54 9
�� .4
1
9K
osta
nai
750
4
18 .1
� 1
16
1�0
.4�
5��
�
56
�110
.41
7��1
.68
1,6
11 .5
0
10K
yzyl
orda
�70
�
45 .8
� 1
18
1�7
.8�
1��
1
16
111 .
709
0 .65
6��
.05
11M
angy
stau
44
8� .
91
1�
�0 .
94
��
46
00
87 .
�6 4
� .�0
1�P
avlo
dar
449
�
6� .0
� 9
� 8
5 .�8
�
�7
168
�5
8 .51
�0 .
69 5
69 .5
0
1�N
orth
-Kaz
akhs
tan
740
4
�7 .5
6 1
84
1�9
.05
551
�
84
176 .
�0��
8 .�1
660
.�0
14So
uth-
Kaz
akhs
tan
871
1
,�8�
.57
�1�
�
7� .0
6 4
9�
757
54
48 .5
111
�10
6 .�5
1,7
81 .7
5
TOTA
L: 7
,440
6
,4��
.51
�,0
7�
�,�
19 .�
6 4
,646
�
,688
��
716
9 .48
414
�56 .
59 1
4,8�
0 .�9
1�7
ANNExES
Acc
ess
to D
rin
kin
g W
ater
in A
kmol
a o
blas
t: P
rese
nt a
nd
futu
re C
ondi
tion
s
№N
ame
of R
ayon
Pop
ulat
ion
as o
f 1 .
01 .�
004
(ps .
)
Pop
ulat
ion
with
acc
ess
to d
rink
ing
wat
er a
s of
1 .
01 .�
005
(ps .
)
Acc
ess
of P
opul
atio
n to
Dri
nkin
g W
ater
(in
% o
f tot
al p
opul
atio
n)
as o
f 1 .
01 .�
005
incr
emen
t fo
r �0
05
(ps .
)
as o
f 1 .
01 .�
006
incr
emen
t fo
r �0
06
(ps .
)
as o
f 1 .
01 .�
007
incr
emen
t fo
r �0
07(p
s .)
as o
f 1 .
01 .�
008
incr
emen
t fo
r �0
08
(ps .
)
as o
f 1 .
01 .�
009
incr
emen
t fo
r �0
09
and
�010
(p
s .)
as o
f 1 .
01 .�
011
1A
kkol
16,
96�
1,7
7�
10,
45
500
1
� .�9
7
,50�
5
7 .6�
�
4�
59 .
05
� 4
18
7� .
�0
�50
7
5 .�6
�A
rsha
ly �
0,04
4 1
1,87
� 5
9,��
�
50
60 .
98
1,1
47
66 .
70
�,6
11
79 .
7�
915
8
4 .�9
�
50
85 .
54
�A
stra
han
�9,
489
16,
619
56,
�6
–
56 .
�6
�,�
49
64 .
��
1,5
�1
69 .
48
� 7
68
78 .
87
950
8
� .09
4A
tbas
ar �
6,16
7 1
1,�4
6 4
�,98
1
,450
4
8 .5�
�
,7��
5
8 .9�
6
�6
61 .
�6
48�
6
� .�0
�
�50
7
� .18
5B
ulan
dy �
0,�5
7 8
,499
4
1,75
–
4
1 .75
4
,9��
6
5 .9�
1
,0�6
7
1 .0�
1
09�
7
6 .�8
6
50
79 .
57
6Eg
indi
kol
7,9
�9
4,1
8�
5�,
74
56�
5
9 .8�
6
�7
67 .
86
660
7
6 .19
–
7
6 .19
7
50
85 .
65
7En
beks
hind
el 1
4,97
1 5
16
�,4
5 �
50
5 .7
8 5
,180
4
0 .�8
1
,���
4
9 .�8
4
�0
5� .
09
950
5
8 .4�
8Er
eim
enta
u �
�,67
4 5
,��7
�
�,08
�
,540
�
7 .0�
5
,844
6
1 .7�
�
,46�
7
6 .�4
6
�0
79 .
00
��0
8
0 .�5
9Es
il 1
9,71
� 1
�,87
8 7
0,40
1
,�6�
7
6 .80
–
7
6 .80
–
7
6 .80
–
7
6 .80
1
50
77 .
56
10Zh
aksy
n �
6,65
� 1
�,94
4 4
8,56
5
40
50 .
59
1,4
99
56 .
��
1,8
4�
6� .
1�
1 8
89
70 .
��
1 �
00
75 .
09
11Zh
arka
in 1
�,5�
4 4
,15�
�
0,70
1
,1�9
�
9 .05
9
86
46 .
�4
1,7
90
59 .
58
1 6
�6
71 .
60
1 �
00
80 .
47
1�Ze
rend
y 4
1,�7
6 1
1,80
0 �
8,59
1
,1��
�
1 .�1
�
,915
�
8 .�7
�
,476
4
4 .�7
�
�68
4
9 .86
5
500
6
� .19
1�K
orga
lzhy
1�,
999
8,9
94
69,
19
–
69 .
19
688
7
4 .48
5
15
78 .
44
9�0
8
5 .5�
5
�0
89 .
5�
14Sa
ndyk
tau
�5,
���
17,
�69
68,
84
1,4
50
74 .
58
797
7
7 .74
1
,1�4
8
� .�0
4
70
84 .
06
7��
8
6 .96
15Ts
elin
ogra
d 4
0,87
1 1
7,68
6 4
�,�7
�
,948
5
0 .49
5
,��4
6
� .54
7
,046
8
0 .78
�
�18
8
6 .�0
8
59
88 .
�0
16Sh
orta
ndy
18,
��0
1�,
�71
67,
90
–
67 .
90
1,4
85
76 .
05
1,6
81
85 .
�7
711
8
9 .18
�
50
90 .
55
17Sc
huch
insk
y �
0,��
8 1
�,97
6 4
�,91
4
99
44 .
56
1,5
09
49 .
55
1,8
44
55 .
65
1 1
�9
59 .
�9
� 5
60
67 .
85
18K
oksh
etau
(u .a
)*
9,�
�5
6,0
19
64,
48
–
64 .
48
–
64 .
48
–
64 .
48
–
64 .
48
1 9
00
84 .
8�
19St
epno
gors
k (u
.a)*
� 1
��
�40
1
6,0�
–
1
6 .0�
6
79
48 .
0�
6�8
7
8 .09
–
7
8 .09
1
50
85 .
16
Tota
l in
Obl
ast
�99
,777
1
78,4
6�
44,
64
15,
70�
48 .
57
46,
196
60 .
1�
�0,
457
67 .
74
19
956
7� .
7�
�1
691
78 .
16
Not
e*: R
C* –
Ray
on C
ente
r
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
1�8
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in A
kmol
a o
blas
t
№N
ame
of R
ayon
Num
ber
of
Sett
lem
ents
(it
ems)
Pop
ulat
ion
(ps .
)
Ava
ilabi
lity
of W
ater
Sup
ply
from
:
cent
raliz
ed w
ater
sup
ply
syst
emlo
cal w
ater
sou
rces
Del
iver
ed w
ater
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Leng
th o
f W
ater
Pip
e N
etw
ork
(km
)
%
grou
nd w
ater
surf
ace
wat
erN
umbe
r of
Se
ttle
men
tsP
opul
atio
n%
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
%N
umbe
r of
Se
ttle
men
tsP
opul
atio
n%
1A
kkol
�416
,96�
41,
77�
1410
.4�7
1�,�
1778
.5�
80�
4 .7
11,
07�
6 .�
�A
rsha
ly�5
�0,0
44�4
11,8
7��4
059
.�5
6,86
5�4
.��
9�9
4 .6
4�7
81 .
9
�A
stra
han
40�9
,489
1416
,619
1��
56 .4
199,
818
�� .�
51,
985
6 .7
�1,
067
� .6
4A
tbas
ar4�
�6,1
6716
11,�
4611
74�
.0�1
1�,0
4849
.90
-0 .
05
1,87
�7 .
�
5B
ulan
dy�8
�0,�
5718
8,49
9��
741
.718
10,6
4�5�
.�0
-0 .
0�
1,�1
66 .
0
6Eg
indi
kol
147,
9�9
104,
18�
��5�
.7�
�,�0
141
.60
-0 .
0�
446
5 .6
7En
beks
hind
el47
14,9
711
516
�� .
446
14,4
5596
.60
-0 .
00
-0 .
0
8Er
eim
enta
u�7
��,6
741�
5,��
716
0��
.1�5
18,4
4777
.90
-0 .
00
-0 .
0
9Es
il�1
19,7
1��0
1�,8
78�1
770
.41
5,8�
5�9
.60
-0 .
00
-0 .
0
10Zh
aksy
n4�
�6,6
5�18
1�,9
4417
�48
.6�1
1�,9
�948
.5�
�90
1 .5
��8
01 .
4
11Zh
arka
in��
1�,5
�410
4,15
�86
�0 .7
95,
��1
�9 .�
71,
655
1� .�
6�,
�96
17 .7
1�Ze
rend
y81
41,�
7617
11,8
001�
7�8
.661
�8,�
1768
.40
-0 .
0�
1,�5
9� .
1
1�K
orga
lzhy
�61�
,999
1�8,
994
9669
.�7
�,�9
4�5
.��
499
� .8
��1
�1 .
6
14Sa
ndyk
tau
47�5
,���
�817
,�69
160
68 .8
177,
�89
�8 .9
0-
0 .0
�57
4� .
�
15Ts
elin
ogra
d57
40,8
71�0
17,6
86�1
54�
.��5
18,1
4444
.40
-0 .
01�
5,04
11�
.�
16Sh
orta
ndy
��18
,��0
��1�
,�71
�19
67 .9
84,
600
�5 .�
0-
0 .0
�1,
�49
6 .9
17Sc
huch
insk
y60
�0,�
�818
1�,9
7619
04�
.94�
17,�
6�57
.10
-0 .
00
-0 .
0
18K
oksh
etau
(u .a
)*
�9,
��5
�6,
019
1964
.50
�,��
5�4
.70
-0 .
01
810 .
9
19St
epno
gors
k (u
.a)*
5�,
1��
1�4
0�5
16 .0
�50
5��
.80
-0 .
01
1,�7
760
.�
Tota
l in
Obl
ast
705
�99,
777
�78
178,
46�
�,45
144
.6�5
719
6,5�
449
.��1
6,�6
01 .
649
18,5
�14 .
6
Not
e*: R
C* –
Ray
on C
ente
r
1�9
ANNExES
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Akm
ola
obl
ast (
Un
it: K
zt m
ln)
№N
ame
of R
ayon
�005
�006
�007
�008
�009
-�01
0
Grand Total
Total in �005
Sour
ces
of F
inan
cing
Total in �006
Sour
ces
of F
inan
cing
Total in �007
Sour
ces
of F
inan
cing
Total in �008
Sour
ces
of F
inan
cing
Total in �009-�011
Sour
ces
of
Fina
ncin
g
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
1A
kkol
�0 .0
�057
�5�
1 .6�
41 .7
1041
.7�1
.70
�0�1
�19
� .00
�0�1
�187
8
�A
rsha
ly18
.08 .
0010
�15
�1� .
661 .
7016
� .�
15� .
�010
96�6
.00
60�7
�75�
0
�A
stra
han
10 .0
10�1
517
5 .00
4047
9 .5
479 .
505�
65�
6 .00
5555
1,�9
5
4A
tbas
sar
1� .0
� .95
1095
64 .6
5�0
90 .0
60 .0
0�0
9555
.00
4048
48�4
1
5B
ulan
dy10
.010
445
445 .
101�
0 .0
100 .
00�0
1�0
100 .
00�0
�8�8
7��
6El
indy
kol
5 .0
590
60 .0
0�0
100 .
080
.00
�01
�010
0 .00
�015
15��
0
7En
beks
hild
er�4
.611
.000
� .64
1019
61�
6 .�0
6090
.040
.00
5095
�5 .0
070
�8�8
4�4
8Er
eim
enta
u70
.070
454
4�� .
99�0
.7�
10�0
8 .0
�98 .
0010
1�8
88 .0
050
4444
1,01
4
9Es
il14
.09 .
0�5
551
11 .0
4060
.060
5050
�6�6
�1�
10Zh
aksy
15 .8
8 .59
0� .
�05
111
7� .7
04 .
9� .
00�0
144 .
510
4 .50
4089
69 .0
0�0
4949
409
11Zh
arka
in71
.560
6 .50
05
1�5
70 .5
014
.050
4�5 .
0�8
5 .00
50�1
0�1
0 .00
�5�5
876
1�Ze
rend
insk
y47
.7�7
.670
10�6
8��
8 .�7
40��
9 .5
199 .
5040
1�0
70 .0
050
7676
75�
1�K
orga
lzhy
�0 .0
�076
�6 .0
040
�05 .
017
5 .00
�01�
989
.00
50�4
�446
4
14Sa
ndyk
tau
19 .0
� .00
017
.00
�16
176 .
60� .
017
.00
�015
� .0
11� .
0040
107
107 .
�647
4754
1
15Ts
elin
ogra
d��
.817
.000
5 .80
�78
�60 .
�06 .
0� .
0010
459 .
�45
9 .�0
16�
16� .
4076
761,
099
16Sh
orta
ndy
10 .0
10�1
�19
1 .68
-0 .
�0�0
��1 .
0�1
1 .00
�017
717
7 .�6
�4�4
664
17Sc
huch
insk
y1�
.�1 .
�00
1 .00
1017
814
� .70
� .�
1 .40
�016
8 .0
1�8 .
00�0
119
98 .8
0�0
5656
5��
18K
oksh
etau
(u .a
.)5 .
05
�0�0
�0 .0
�0�0
�017
178�
19St
epno
gors
k (u
.a .)
5 .0
5�0
�076
.056
.00
�010
104
411
5
�0N
urin
sky
Gro
up
Pip
elin
e1�
0 .0
1�0
��0
��0 .
0018
5 .0
185 .
0018
018
0 .00
705
�1Se
letin
sky
Gro
up P
ipel
ine
50 .0
5096
95 .7
417
0 .0
170 .
0018
018
0 .00
496
Tota
l in
Obl
ast:
58� .
7�0
09�
.085
40 .5
915
04�
64�,
6�4 .
818�
.946
.0�
500
�,9�
7 .7
�,4�
7 .70
00
510
�977
�,47
6 .7�
00
500
740
00
074
01�
,50�
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
1�0
Acc
ess
to D
rin
kin
g W
ater
in A
tyra
u o
blas
t: P
rese
nt a
nd
futu
re C
ondi
tion
s
№N
ame
of
Ray
on
Pop
ulat
ion
as o
f 1 .
01 .�
004
(ps .
)
Pop
ulat
ion
with
acc
ess
to d
rink
ing
wat
er a
s of
1 .
01 .�
005
(ps .
)
Acc
ess
of P
opul
atio
n to
Dri
nkin
g W
ater
(in
% o
f tot
al p
opul
atio
n)
as o
f 1 .
01 .�
005
incr
emen
t fo
r �0
05
(ps .
)
as o
f 1 .
01 .�
006
incr
emen
t fo
r �0
06
(ps .
)
as o
f 1 .
01 .�
007
incr
emen
t fo
r �0
07(p
s .)
as o
f 1 .
01 .�
008
incr
emen
t fo
r �0
08
(ps .
)
as o
f 1 .
01 .�
009
incr
emen
t fo
r �0
09
and
�010
(p
s .)
as o
f 1 .
01 .�
011
1K
urm
anga
zy57
,849
14,8
9��5
.78�
��7
.�9,
9�8
44 .4
�,�0
548
.��,
�94
5� .�
�,10
�55
.9
�Is
atai
��,�
0�9,
5�6
40 .9
40 .9
�,95
55�
.64,
�76
7� .0
�,17
881
.�1,
6�5
88 .�
�In
der
18,�
��5,
551
�0 .5
�0 .5
�,76
�45
.6�,
4�4
64 .4
�,16
176
.�1,
478
84 .4
4K
yzyl
kuga
�1,7
5714
,51�
45 .7
�,98
055
.11,
861
60 .9
5,�0
077
.�1,
4�4
81 .8
�,00
088
.1
5M
aham
bet
�8,0
�05,
860
�0 .9
1,�5
0�5
.4�,
�00
�� .�
�,67
54�
.8�,
750
56 .1
4,15
070
.9
6M
akat
7Zh
ylyo
i9,
�05
7,0�
075
.41,
000
86 .�
1,08
497
.897
.897
.897
.8
8A
tyra
u (u
.a)*
�7,6
5�11
,417
41 .�
�,58
554
.�7,
948
8� .0
�,08
194
.194
.194
.1
Tota
l in
Obl
ast:
196,
117
68,7
90�5
.19,
648
40 .0
�8,7
4954
.7�0
,961
65 .�
11,8
0771
.411
,�56
77 .�
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
1�1
ANNExES
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in A
tyra
u o
blas
t
№N
ame
of
Ray
on
Num
ber
of
Sett
lem
ents
(it
ems)
Pop
ulat
ion
(ps .
)
Ava
ilabi
lity
of W
ater
Sup
ply
from
:
cent
raliz
ed w
ater
sup
ply
syst
emlo
cal w
ater
sou
rces
deliv
ered
wat
er
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Leng
th o
f W
ater
Pip
e N
etw
ork
(km
)
%
grou
nd w
ater
surf
ace
wat
erN
umbe
r of
Se
ttle
men
tsP
opul
atio
n%
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
%N
umbe
r of
Se
ttle
men
tsP
opul
atio
n%
1K
urm
anga
zy57
57
849
8 1
4 89
� 11
�,8
�5,7
�6 �
8 99
7 67
,41
4�1
0,7
1� �
5�8
6,
1
�Is
atai
�1 �
� �0
� 5
9 5
�6
�0,6
40,9
4 7
7�
�,�
00
0,0
1� 1
� 99
4 55
,8
�In
der
16 1
8 ��
� 8
5 5
51
40,8
�0,5
0 –
0,
00
00,
08
1�
671
69,5
4K
yzyl
kuga
�1 �
1 75
7 9
14
51�
195,
745
,71�
10
54�
��,�
00
0,0
10 6
70�
�1
,1
5M
aham
bet
�6 �
8 0�
0 �
5 8
60
�9,�
�0,9
0 –
0,
00
00,
0�4
��
170
79,1
6M
akat
–
–
0 –
7Zh
ylyo
i15
9 �
05
5 7
0�0
81
75,4
0 –
0,
00
00,
010
� �
85
�4,6
8A
tyra
u (u
.a)*
�9 �
7 65
� 1�
11
417
91,8
41,�
9 1
1 69
9 4�
,�0
0,0
7 4
5�6
16
,4
Tota
l in
Obl
ast:
195
196
117
50
68
790
581,
9�5
,161
6�
010
�1,6
14�
10,
�8�
64
886
��,1
Not
e: *
u.a.
- urb
an a
gglo
mer
ate
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
1��
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Aty
rau
obl
ast (
Un
it: K
zt m
ln)
№N
ame
of
Ray
on
�005
�006
�007
�008
�009
– �
010
Total in �005
Sour
ces
of F
inan
cing
Total in �006
Sour
ces
of F
inan
cing
Total in �007
Sour
ces
of F
inan
cing
Total in �008
Sour
ces
of F
inan
cing
Total in �009-�011
Sour
ces
of F
inan
cing
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
1K
urm
anga
zy 1
00 .0
0 1
00 .0
00
759 .
784
759 .
784
400
400
441
441
150
150
�Is
atai
69 .
�0
69 .
�00
60�
60�
��9
��9
�68
�68
0
�In
der
–
�� .1
�� .1
1��
1��
110 .
711
0 .7
40 .9
40 .9
4K
yzyl
kuga
��0
.79
��0
.786
11
4 .48
114 .
4854
054
085
585
575
075
0
5M
aham
bet
–
1�1 .
71�
1 .7
�7�
�7�
�00
�00
�9� .
8�9
� .8
6M
akat
–
00
00
7Zh
ylyo
i 1
08 .6
0 1
08 .6
00
00
00
8A
tyra
u (u
.a)*
181
.00
181
7�6 .
587
460 .
587
�76
1�4
1�4
00
Tota
l in
Obl
ast:
779
.59
598
.586
–
1
81 .0
0 –
�,
�57 .
65�,
081 .
65–
�76 .
00–
1,80
81,
808
––
–1,
975
1,97
5–
––
1,��
41,
��4
––
–
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
1��
ANNExES
Acc
ess
to D
rin
kin
g W
ater
in A
lmat
y o
blas
t: P
rese
nt a
nd
futu
re C
ondi
tion
s
№N
ame
of R
ayon
Pop
ulat
ion
as o
f 1 .
01 .�
004
(ps .
)
Pop
ulat
ion
with
acc
ess
to d
rink
ing
wat
er a
s of
1 .
01 .�
005
(ps .
)
Acc
ess
of P
opul
atio
n to
Dri
nkin
g W
ater
(in
% o
f tot
al p
opul
atio
n)
as o
f 1 .
01 .�
005
incr
emen
t fo
r �0
05
(ps .
)
as o
f 1 .
01 .�
006
incr
emen
t fo
r �0
06
(ps .
)
as o
f 1 .
01 .�
007
incr
emen
t fo
r �0
07(p
s .)
as o
f 1 .
01 .�
008
incr
emen
t fo
r �0
08
(ps .
)
as o
f 1 .
01 .�
009
incr
emen
t fo
r �0
09
and
�010
(p
s .)
as o
f 1 .
01 .�
011
1A
ksu
�8,�
0�6,
01�
�1 .�
�,9�
8�1
.6�1
.61,
858
�8 .�
�,0�
148
.9�,
500
61 .�
�A
lako
l59
,�68
17,4
���9
.41,
048
�1 .�
�1 .�
5,19
��9
.9�,
968
46 .6
6,�5
057
.�
�B
alkh
ash
�0,5
015,
904
19 .4
4,0�
4��
.57,
718
57 .9
1,70
76�
.51,
051
66 .9
1,�0
070
.8
4En
beks
hika
zakh
17�,
19�
107,
965
6� .�
11,�
�768
.84,
469
71 .4
5,�5
974
.49�
975
.075
.0
5Es
keld
y�1
,775
�5,�
7979
.679
.679
.6�5
480
.71,
755
86 .�
86 .�
6Zh
amby
l10
6,�4
�49
,180
46 .�
1,65
447
.81,
601
49 .�
8,0�
656
.910
,�85
66 .6
4,50
070
.9
7Ili
80,5
894�
,794
5� .1
�,54
056
.�14
,��9
74 .0
74 .0
�,14
076
.7�,
1�0
80 .6
8K
aras
ai1�
�,49
484
,1�8
68 .1
1,51
169
.�8,
�50
76 .0
6,50
�81
.�10
,105
89 .5
89 .5
9K
arat
al��
,�55
6,�1
7�7
.0�7
.0�7
.01,
500
�� .5
�,98
050
.55,
500
74 .1
10K
erbu
lak
40,1
57��
,1�1
57 .6
57 .6
�,56
764
.01,
7�9
68 .�
160
68 .7
�,�0
074
.�
11K
oksu
�7,�
4114
,�00
51 .9
51 .9
51 .9
1,5�
�57
.5�,
500
66 .7
�,64
076
.�
1�P
anfil
ov8�
,85�
40,0
9548
.448
.41,
�11
49 .9
1,��
�51
.55,
0�8
57 .5
4,50
06�
.0
1�R
aiym
bek
80,�
985�
,950
67 .1
1,15
868
.585
669
.6�,
414
7� .9
5,09
180
.�55
080
.9
14Sa
rkan
d�7
,0��
5,40
9�0
.0�0
.0�0
.01,
419
�5 .�
�,47
1�8
.15,
900
59 .9
15Ta
lgar
9�,�
194�
,�99
45 .5
6,4�
85�
.41�
,��5
66 .6
1�,9
9780
.54,
875
85 .7
�50
86 .1
16U
igur
6�,8
67�8
,�65
59 .9
�00
60 .�
4,��
066
.88,
071
79 .5
�,�7
78�
.�55
084
.1
17K
apsh
agai
(u .a
)*1�
,��0
5,0�
��8
.0�8
.06,
600
87 .9
450
91 .�
�50
94 .0
500
97 .7
18Ta
ldyk
orga
n (u
.a .)*
�1,5
5�5,
944
�7 .6
�7 .6
�7 .6
�,�0
0�7
.8�,
150
5� .4
�,90
070
.5
Tota
l in
Obl
ast:
1,10
6,46
857
�,41
751
.8��
,7�8
54 .8
65,0
5660
.76�
,554
66 .4
64,�
567�
.�45
,160
76 .�
Not
e: *
u.a.
- urb
an a
gglo
mer
ate
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
1�4
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in A
lmat
y o
blas
t
№N
ame
of R
ayon
Num
ber
of
Sett
lem
ents
(it
ems)
Pop
ulat
ion
(ps .
)
Ava
ilabi
lity
of W
ater
Sup
ply
from
:
cent
raliz
ed w
ater
sup
ply
syst
emlo
cal w
ater
sou
rces
deliv
ered
wat
er
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Leng
th o
f W
ater
Pip
e N
etw
ork
(km
)
%
grou
nd w
ater
surf
ace
wat
erN
umbe
r of
Se
ttle
men
tsP
opul
atio
n%
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
%N
umbe
r of
Se
ttle
men
tsP
opul
atio
n%
1A
ksu
5��8
,�0�
86,
01�
�9 .�
0�1
.�41
�1,1
1074
.6�
1,18
04 .
�0
–0 .
0
�A
lako
l58
59,�
681�
17,4
��11
5 .80
�9 .4
�6�7
,9�7
64 .0
6�,
57�
4 .�
�1�
�6� .
�
�B
alkh
ash
�4�0
,501
65,
904
� .00
19 .4
�7�4
,5��
80 .4
164
0 .�
0–
0 .0
4En
beks
hika
zakh
7917
�,19
�54
107,
965
556 .
406�
.���
65,0
91�7
.6�
1�7
0 .1
0–
0 .0
5Es
keld
y�7
�1,7
75��
�5,�
7945
.10
79 .6
146,
496
�0 .4
0–
0 .0
0–
0 .0
6Zh
amby
l61
106,
�4�
�649
,180
9� .1
646
.��8
56,0
415�
.74
67�
0 .6
�44
80 .
4
7Ili
�080
,589
�54�
,794
�70 .
605�
.14
�7,5
8146
.60
–0 .
01
�14
0 .�
8K
aras
ai66
1��,
494
6084
,1�8
184 .
1068
.16
�9,�
66�1
.90
–0 .
00
–0 .
0
9K
arat
al49
��,�
556
6,�1
744
.90
�7 .0
4�16
,�01
69 .4
18�
7� .
60
–0 .
0
10K
erbu
lak
6540
,157
�6��
,1�1
166 .
9057
.6�5
14,7
78�6
.84
��58
5 .6
0–
0 .0
11K
oksu
�8�7
,�41
1814
,�00
90 .0
551
.9�0
1�,1
4148
.10
–0 .
00
–0 .
0
1�P
anfil
ov44
8�,8
5���
40,0
9511
� .50
48 .4
114�
,758
51 .6
0–
0 .0
0–
0 .0
1�R
aiym
bek
5680
,�98
�95�
,950
164 .
4067
.11�
�1,�
�7�6
.515
5,11
16 .
40
–0 .
0
14Sa
rkan
d�6
�7,0
���
5,40
91�
.00
�0 .0
1�1�
,98�
51 .7
157,
�85
�7 .�
6�5
50 .
9
15Ta
lgar
609�
,�19
4�4�
,�99
144 .
7045
.517
50,8
�054
.50
–0 .
00
–0 .
0
16U
igur
�66�
,867
1��8
,�65
1�5 .
6059
.99
��,7
80�5
.74
�,8�
�4 .
40
–0 .
0
17K
apsh
agai
(u .a
)*11
1�,�
�0�
5,0�
�19
.60
�8 .0
88,
198
6� .0
0–
0 .0
0–
0 .0
18Ta
ldyk
orga
n (u
.a .)*
9�1
,55�
�5,
944
�5 .0
0�7
.67
15,6
087�
.40
–0 .
00
–0 .
0
Tota
l in
Obl
ast:
811
1,10
6,46
8�9
157
�,41
7��
14 .0
151
.8�5
�50
7,75
945
.955
��,0
�9� .
11�
��5�
0 .�
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
1�5
ANNExES
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Alm
aty
obl
ast (
Un
it: K
zt m
ln)
№N
ame
of R
ayon
�005
�006
�007
�008
Total in �005
Sour
ces
of F
inan
cing
Total in �006
Sour
ces
of F
inan
cing
Total in �007
Sour
ces
of F
inan
cing
Total in �008
Sour
ces
of F
inan
cing
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
1A
ksu
15 .8
�15
.8�
–�0
.00
10 .0
010
.00
87 .0
017
.070
.00
�A
lako
l46
.��
46 .�
�–
4� .0
0��
.00
�0 .0
01�
9 .00
40 .0
019
.080
.00
�B
alkh
ash
8� .6
4�9
.01
4� .6
�1�
� .�0
1�� .
�056
.85
�� .�
5�4
.50
67 .0
017
.050
.00
4En
beks
hika
zakh
169 .
175
115 .
�75
5� .9
140 .
0014
0 .00
117 .
0090
.00
�7 .0
018
.00
18 .0
5Es
keld
y0
–15
.50
15 .5
0�6
.00
16 .0
10 .0
0
6Zh
amby
l1�
.�4
1� .�
419
.70
19 .7
085
.16
65 .0
0�0
.16
169 .
0010
5 .00
14 .0
50 .0
0
7Ili
45 .�
6�6
.46
8 .9
1�4 .
60�6
.8�
97 .7
70 .
00�8
.00
18 .0
10 .0
0
8K
aras
ai5�
.65
5� .6
514
0 .79
109 .
99�0
.80
61 .5
061
.50
150 .
5050
.00
10 .5
0
9K
arat
al0
–��
.69
�� .6
91�
0 .00
1�0 .
00
10K
erbu
lak
050
.66
45 .1
15 .
55�6
.00
16 .0
0�0
.00
17 .0
017
.0
11K
oksu
0–
16 .8
016
.80
46 .0
016
.0�0
.00
1�P
anfil
ov0
1� .0
01�
.00
14 .0
014
.00
61 .6
740
.0�1
.67
1�R
aiym
bek
66 .7
566
.75
�� .5
7��
.57
�0 .0
0�0
.00
88 .0
050
.00
18 .0
�0 .0
0
14Sa
rkan
d0
–41
.00
�1 .0
0�0
.00
86 .5
016
.570
.00
15Ta
lgar
46 .�
�46
.��
8� .0
�54
.90
�7 .1
�17
� .50
1�9 .
5044
.00
65 .5
065
.5
16U
igur
1010
�� .1
4��
.14
68 .�
068
.�0
16 .0
016
.0
17K
apsh
agai
(u .a
)*0
��9 .
40�0
9 .�7
�0 .0
�10
.00
10 .0
0�0
.00
�0 .0
0
18Ta
ldyk
orga
n (u
.a .)*
0–
�0 .0
0�0
.00
45 .0
045
.00
Tota
l in
Obl
ast:
547 .
�85
��7 .
065
�10 .
��0
01,
108 .
1969
6 .�0
411 .
990
085
1 .�
�16 .
85�9
1 .66
014
� .69
1,�6
0 .�
�45
408 .
5–
606 .
67
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
1�6
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Alm
aty
obl
ast (
Un
it: K
zt m
ln)
№N
ame
of R
ayon
�009
-�01
0
Gra
nd
Tota
lTo
tal i
n
�009
-�0
10
Sour
ces
of F
inan
cing
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
1A
ksu
140 .
00�0
.00
110 .
00�6
� .8�
0
�A
lako
l14
0 .00
40 .0
010
0 .00
�68 .
��0
�B
alkh
ash
40 .0
010
.00
�0 .0
0�6
9 .79
0
4En
beks
hika
zakh
–44
4 .17
5
5Es
keld
y�0
.00
�0 .0
071
.500
6Zh
amby
l60
.00
10 .0
050
.00
�46 .
100
7Ili
�0 .0
0�0
.00
��7 .
960
8K
aras
ai–
405 .
440
9K
arat
al16
0 .00
�0 .0
01�
0 .00
�1� .
690
10K
erbu
lak
70 .0
0�0
.00
50 .0
017
� .66
0
11K
oksu
75 .0
0�0
.00
55 .0
01�
7 .80
0
1�P
anfil
ov80
.00
�0 .0
050
.00
167 .
670
1�R
aiym
bek
40 .0
010
.00
�0 .0
0�5
7 .��
0
14Sa
rkan
d84
.67
�0 .0
054
.67
�1� .
170
15Ta
lgar
10 .0
010
.00
�77 .
�60
16U
igur
10 .0
010
.00
1�7 .
�40
17K
apsh
agai
(u .a
)10
.00
10 .0
0�8
9 .40
0
18Ta
ldyk
orga
n (u
.a .)
70 .0
0�0
.00
40 .0
014
5 .00
0
Tota
l in
Obl
ast:
1,0�
9 .67
––
�90 .
0074
9 .67
4,80
6 .51
5
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
1�7
ANNExES
Acc
ess
to D
rin
kin
g W
ater
in E
ast –
Kaz
akhs
tan
obl
ast:
Pre
sen
t an
d fu
ture
Con
diti
ons
№N
ame
of R
ayon
Population as of 01 .01 .�004 (ps .)
Population with access to drinking
water as of 01 .01 .�005 (ps .)
Acc
ess
of p
opul
atio
n to
dri
nkin
g w
ater
(in
% o
f tot
al p
opul
atio
n)
as o
f 1 .
01 .�
005
incr
emen
t fo
r �0
05
(ps .
)
as o
f 1 .
01 .�
006
incr
emen
t fo
r �0
06
(ps .
)
as o
f 1 .
01 .�
007
incr
emen
t fo
r �0
07(p
s .)
as o
f 1 .
01 .�
008
incr
emen
t fo
r �0
08
(ps .
)
as o
f 1 .
01 .�
009
incr
emen
t fo
r �0
09
(ps .
)
as o
f 1 .
01 .�
010
incr
emen
t fo
r �0
10
(ps .
)
as o
f 1 .
01 .�
011
1U
st-
Kam
enog
orsk
(u
.a .)*
10,5
46�,
11�
�9 .5
1,�7
541
.61,
048
51 .5
–51
.5–
51 .5
�00
54 .4
1,00
06�
.9
�R
idde
r (u
.a .)*
�,4�
850
�14
.6�6
5��
.��0
0�1
.0–
�1 .0
�00
�9 .8
500
54 .�
�00
6� .0
�Se
mip
alat
insk
(u
.a .)*
��,8
077,
961
�� .4
1,9�
541
.6–
41 .6
�,0�
850
.1��
176�
.61,
774
71 .1
–71
.1
4A
bai
16,8
704,
775
�8 .�
–�8
.�–
�8 .�
5,19
�59
.1�0
060
.950
06�
.81,
�00
70 .9
5A
yago
z�5
,4�4
148
0 .4
–0 .
4–
0 .4
�,77
98 .
�6,
9�7
�7 .8
�,58
8�8
.05,
000
5� .1
6B
eska
raga
i �5
,851
�,84
614
.94�
�16
.61,
485
�� .�
400
�� .8
4,01
��9
.41,
000
4� .�
�,50
05�
.9
7B
orod
ulih
insk
y��
,177
1�,6
�741
.15,
500
57 .7
1,60
06�
.5�,
99�
74 .5
�00
75 .1
�00
75 .7
500
77 .�
8G
lubo
kovs
ky40
,759
1�,0
�6��
.0�,
550
40 .7
1,��
04�
.94,
94�
56 .1
5,51
669
.6�0
070
.1�0
070
.8
9Zh
arm
in�5
,985
11,8
06��
.81,
5��
�7 .1
5,6�
15�
.75,
010
66 .6
1,00
069
.4�,
795
80 .0
–80
.0
10Za
isan
��,9
7�10
,�78
45 .�
1,16
�50
.�1,
500
56 .8
�,1�
166
.0�,
141
75 .4
1,�1
481
.1–
81 .1
11Zy
ryan
ovsk
y�4
,446
6,66
5�7
.�16
9�8
.0–
�8 .0
–�8
.04,
589
46 .7
1,�0
051
.61,
500
57 .8
1�K
aton
-Kar
agai
41,8
6�1�
,811
�� .0
�,4�
��8
.8�,
�87
46 .9
�48
47 .5
6,06
�61
.91,
000
64 .�
1,80
068
.6
1�K
okpe
kty
41,0
5710
,580
�5 .8
�,60
7��
.1�0
0��
.85,
�19
45 .6
���
46 .1
800
48 .1
�,50
054
.�
14K
urch
um40
,8�4
11,5
70�8
.��,
�00
�6 .4
8,56
157
.4�,
197
6� .8
1,06
565
.4�0
065
.9�0
066
.6
15Ta
rbag
atai
55,0
8411
,405
�0 .7
�00
�1 .1
46�
�1 .9
8,��
8�6
.9�,
507
4� .�
�,77
750
.1�,
000
5� .7
16U
lan
�4,�
109,
�7�
�7 .�
575
�9 .0
–�9
.04,
147
41 .1
4,17
55�
.�80
055
.6�,
500
6� .9
17U
rdja
r88
,994
��,8
8��6
.8�,
000
�0 .�
�,89
5�4
.6�8
,091
66 .1
11,1
8�78
.71,
798
80 .7
�00
81 .0
18Sh
emon
aihi
nsky
��,9
7�7,
851
�4 .�
1,00
0�8
.5–
�8 .5
500
40 .7
1,00
045
.11,
500
51 .6
1,5�
058
.�
Tota
l in
Obl
ast:
598,
�89
164,
��0
�7 .5
�8,9
�7��
.��9
,499
�7 .�
75,1
�649
.855
,4�6
59 .0
�4,�
466�
.1��
,1�0
67 .0
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
1�8
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in E
ast-
Kaz
akhs
tan
obl
ast
№N
umbe
r of
Set
tlem
ents
(it
ems)
Pop
ulat
ion
(ps .
)P
opul
atio
n (p
s .)
Ava
ilabi
lity
of W
ater
Sup
ply
from
:
cent
raliz
ed w
ater
sup
ply
syst
emlo
cal w
ater
sou
rces
deliv
ered
wat
ergr
ound
wat
ersu
rfac
e w
ater
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Leng
th o
f W
ater
Pip
e N
etw
ork
(km
)
Num
ber
of
sett
lem
ents
Pop
ulat
ion
Num
ber
of
sett
lem
ents
Pop
ulat
ion
Num
ber
of
sett
lem
ents
Pop
ulat
ion
1U
st-K
amen
ogor
sk (u
.a .)*
710
,546
5�,
11�
�4 .0
0�
7,4�
�0
–0
0
�R
idde
r (u
.a .)*
18�,
4�8
150
�–
17�,
9�6
0–
00
�Se
mip
alat
insk
(u .a
.)*�7
��,8
0717
7,96
15 .
8��0
15,8
460
–0
0
4A
bai
1016
,870
64,
775
59 .6
74
1�,0
950
–0
0
5A
yago
z64
�5,4
�4�
148
5 .00
6��5
,�86
0–
00
6B
eska
raga
i �0
�5,8
515
�,84
6��
.00
59,
�40
�01�
,765
00
7B
orod
ulih
insk
y65
��,1
77�1
1�,6
�759
.00
4�19
,550
0–
00
8G
lubo
kovs
ky40
40,7
59�1
1�,0
�615
6 .00
19�7
,7��
0–
00
9Zh
arm
in77
�5,9
851�
11,8
0650
.50
65�4
,179
0–
00
10Za
isan
4���
,97�
1�10
,�78
77 .7
0�9
1�,0
��7
50�
169
11Zy
ryan
ovsk
y47
�4,4
46�4
6,66
55�
.90
��17
,65�
11�
90
0
1�K
aton
-Kar
agai
6441
,057
810
,580
85 .0
056
�1,�
8�0
–0
0
1�K
okpe
kty
6140
,8�4
611
,570
1�4 .
10�5
15,6
81�0
1�,8
060
0
14K
urch
um54
41,8
6��5
1�,8
119�
.90
17�6
,548
1�1
71
�48
15Ta
rbag
atai
6855
,084
1111
,405
�6 .9
05�
4�,6
790
–0
0
16U
lan
44�4
,�10
��9,
�7�
�8 .0
0��
�4,9
�70
–0
0
17U
rdja
r50
88,9
9417
��,8
8�18
8 .00
1961
,681
4�,
4�0
00
18Sh
emon
aihi
nsky
40��
,97�
�77,
851
111 .
409
1�,7
�04
1,40
10
0
Tota
l in
Obl
ast
818
598,
�89
���
164,
��0
1,�0
1 .89
489
401,
50�
67��
,�50
��1
7
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
1�9
ANNExES
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Eas
t-K
azak
hsta
n o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of R
ayon
�005
�006
�007
�008
Total in �005
Sour
ces
of F
inan
cing
Total in �006
Sour
ces
of F
inan
cing
Total in �007
Sour
ces
of F
inan
cing
Total in �008
Sour
ces
of F
inan
cing
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
1U
st-K
amen
ogor
sk (u
.a .)*
�� .6
50
�� .6
50
0-
00
00
5� .5
00
50 .0
00
� .50
10 .0
00
00
10 .0
0
�R
idde
r (u
.a .)*
� .89
0� .
890
09 .
600
9 .60
00
1 .00
00
01 .
00� .
000
00
� .00
�Se
mip
alat
insk
(u .a
.)*19
.51
019
.51
00
-0
00
0�9
.50
0��
.00
07 .
508�
.00
057
.00
0�5
.00
4A
bai
00
00
0-
00
00
4� .5
0�5
.00
00
7 .50
17 .0
00
00
17 .0
0
5A
yago
z0
00
00
-0
00
070
.50
50 .0
010
.00
010
.50
�74 .
00�0
0 .00
�9 .0
00
�5 .0
0
6B
eska
raga
i 7 .
960
7 .96
00
19 .6
00
19 .6
00
07 .
500
00
7 .50
48 .6
00
�1 .6
00
�7 .0
0
7B
orod
ulih
insk
y50
.00
50 .0
00
00
4�9 .
704�
9 .70
00
044
� .00
44� .
000
00 .
005 .
000
00
5 .00
8G
lubo
kovs
ky��
.49
0��
.49
00
4 .�0
04 .
�00
055
.50
04�
.00
01�
.50
70 .0
00
�0 .0
00
40 .0
0
9Zh
arm
in87
.46
70 .0
017
.46
00
�04 .
80�5
0 .00
54 .8
00
01�
0 .00
1�0 .
000
00
50 .0
00
45 .0
00
5 .00
10Za
isan
1� .4
50
1� .4
50
044
.�0
044
.�0
00
�0 .5
00
�� .0
00
7 .50
65 .0
00
4� .0
00
�� .0
0
11Zy
ryan
ovsk
y6 .
000
6 .00
00
-0
00
07 .
500
00
7 .50
45 .0
00
�0 .0
00
�5 .0
0
1�K
aton
-Kar
agai
9 .50
09 .
500
09 .
560
9 .56
00
�4 .5
00
1� .0
00
1� .5
07�
.00
0�8
.00
045
.00
1�K
okpe
kty
�8 .0
�0
�8 .0
�0
0-
00
00
4� .5
00
�0 .0
00
1� .5
057
.00
01�
.00
045
.00
14K
urch
um18
.00
018
.00
00
51 .1
00
51 .1
00
047
.50
0�5
.00
01�
.50
59 .4
00
17 .4
00
4� .0
0
15Ta
rbag
atai
5 .��
05 .
��0
09 .
400
9 .40
00
161 .
5010
0 .00
45 .0
00
16 .5
015
7 .00
47 .0
055
.00
055
.00
16U
lan
9 .85
09 .
850
0-
00
00
5� .5
04�
.00
00
10 .5
01�
5 .00
090
.00
0�5
.00
17U
rdja
r40
.7�
40 .7
�0
00
16� .
5016
� .50
00
0�1
� .00
160 .
001�
0 .00
0��
.00
5�1 .
1��6
� .1�
85 .0
00
84 .0
0
18Sh
emon
aihi
nsky
99 .�
�8�
.��
17 .0
00
0-
00
00
7 .50
00
07 .
50��
.00
00
0��
.00
Tota
l in
Obl
ast:
456 .
05�4
� .04
�1� .
010
010
44 .6
684
� .�0
�0� .
460
015
�0 .0
096
0 .00
400 .
000
160 .
0016
95 .1
�60
9 .1�
54� .
000
544 .
00
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
140
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Eas
t-K
azak
hsta
n o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of R
ayon
�009
-�01
0
Total in �009-�010
Sour
ces
of F
inan
cing
cental state budget
local budget
legal entity
foreign grants and loans
1U
st-K
amen
ogor
sk (u
.a .)*
88 .0
0�0
.00
5 .00
10 .0
04�
.00
�R
idde
r (u
.a .)*
�� .0
09 .
007 .
00� .
001�
.00
�Se
mip
alat
insk
(u .a
.)*��
7 .50
70 .0
055
.00
�� .5
090
.00
4A
bai
171 .
0050
.00
�5 .0
016
.00
70 .0
0
5A
yago
z�8
� .00
65 .0
040
.00
�� .0
014
5 .00
6B
eska
raga
i �4
9 .50
140 .
0080
.00
�4 .5
010
5 .00
7B
orod
ulih
insk
y6 .
40-
-0
6 .40
8G
lubo
kovs
ky44
8 .50
140 .
0010
0 .00
�8 .5
017
0 .00
9Zh
arm
in18
5 .00
-18
0 .00
05 .
00
10Za
isan
��7 .
0060
.00
50 .0
0��
.00
95 .0
0
11Zy
ryan
ovsk
y�0
8 .00
110 .
0080
.00
�� .0
095
.00
1�K
aton
-Kar
agai
484 .
5017
0 .00
105 .
00�9
.50
170 .
00
1�K
okpe
kty
47� .
0016
5 .00
100 .
00�9
.00
168 .
00
14K
urch
um45
� .50
160 .
0090
.00
�8 .5
016
5 .00
15Ta
rbag
atai
500 .
001�
8 .00
90 .0
05�
.00
��0 .
00
16U
lan
��4 .
5010
7 .00
60 .0
0��
.50
1�5 .
00
17U
rdja
r49
4 .00
�0 .0
0�0
.00
84 .0
0�6
0 .00
18Sh
emon
aihi
nsky
��8 .
0066
.00
55 .0
0��
.00
95 .0
0
Tota
l in
Obl
ast:
5,�1
� .40
1500
.00
1,16
� .00
500 .
00�,
150 .
40
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
141
ANNExES
Acc
ess
to D
rin
kin
g W
ater
in W
est-
Kaz
akhs
tan
obl
ast:
Pre
sen
t an
d fu
ture
Con
diti
ons
№N
ame
of
Ray
on
Pop
ulat
ion
as o
f 01
.01 .
�004
(p
s .)
Pop
ulat
ion
with
acc
ess
to d
rink
ing
wat
er a
s of
01
.01 .
�005
(p
s .)
Acc
ess
of p
opul
atio
n to
dri
nkin
g w
ater
(in
% o
f tot
al p
opul
atio
n)
as o
f 1 .
01 .�
005
incr
emen
t fo
r �0
05
(ps .
)
as o
f 1 .
01 .�
006
incr
emen
t fo
r �0
06
(ps .
)
as o
f 1 .
01 .�
007
incr
emen
t fo
r �0
07(p
s .)
as o
f 1 .
01 .�
008
incr
emen
t fo
r �0
08
(ps .
)
as o
f 1 .
01 .�
009
and
�010
incr
emen
t fo
r �0
09
and
�010
(p
s .)
as o
f 1 .
01 .�
011
1U
ral (
u .a .
)*1,
979
�94
14 .8
1,61
196
.�–
96 .�
–96
.�–
96 .�
–96
.�
�A
kzha
ik46
,01�
1�,4
80�7
.1�,
�69
�� .1
4,57
64�
.09,
7��
6� .1
–6�
.1�,
550
70 .8
�B
urlin
sky
17,7
995,
645
�1 .7
477
�4 .4
791
�8 .8
–�8
.8��
8�57
.��,
500
76 .9
4D
zhan
galy
��,5
�05,
744
�4 .4
�,47
5�9
.�5,
644
6� .�
–6�
.�1�
0068
.�1,
680
75 .4
5Zh
anib
ek18
,��8
8,76
447
.864
�51
.�65
954
.9–
54 .9
191�
65 .4
�,�5
08�
.1
6Ze
leno
vsky
5�,5
8916
,005
�9 .9
�,�7
0�4
.�4,
957
4� .5
4,51
65�
.055
�06�
.�5,
8�8
7� .1
7K
azta
lovs
ky�6
,565
7,�7
919
.9�,
�7�
�8 .9
�,87
4�6
.74,
99�
50 .4
469�
6� .�
�,84
971
.0
8K
arab
ota
19,6
9�6,
709
�4 .1
7�5
�7 .8
1,11
04�
.4�,
�40
54 .8
�405
67 .0
�,�4
979
.0
9B
okei
orda
18,4
�84,
�18
�� .9
4,0�
�44
.7–
44 .7
–44
.7–
44 .7
4,70
070
.�
10Sy
rym
�6,9
117,
��4
�7 .�
1,71
0��
.64,
408
50 .0
–50
.0�4
5�6�
.84,
�9�
78 .7
11Ta
skal
y19
,197
1�,1
956�
.51,
�78
70 .�
1,��
676
.677
580
.7�4
181
.9–
81 .9
1�Te
rekt
y4�
,767
9,99
8��
.41,
91�
�7 .9
�,80
1�6
.75,
080
48 .6
–48
.65,
�79
61 .0
1�Sh
ingy
rlau
19,4
955,
95�
�0 .5
�,98
845
.9�,
�00
57 .1
–57
.1�6
8870
.91,
�8�
77 .5
Tota
l in
Obl
ast:
�44,
�8�
10�,
606
�9 .8
�6,7
6��7
.6��
,�56
46 .9
�7,�
�554
.9�5
�94
6� .�
�8,5
607�
.5
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
14�
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in W
est-
Kaz
akhs
tan
obl
ast
№N
ame
of R
ayon
Number of Settlements (items)
Population (ps .)
Ava
ilabi
lity
of W
ater
Sup
ply
from
:
cent
raliz
ed w
ater
sup
ply
syst
emlo
cal w
ater
sou
rces
deliv
ered
wat
ergr
ound
wat
ersu
rfac
e w
ater
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Leng
th o
f W
ater
Pip
e N
etw
ork
(km
)%
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
%N
umbe
r of
Se
ttle
men
tsP
opul
atio
n%
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
%
1U
ral (
u .a .
)5
1,97
91
�94
�14
.84
41,
685
85 .�
0–
00
–0 .
0
�A
kzha
ik57
46,0
1�5
1�,4
80�6
.8�7
.1�
�417
,195
�7 .4
1816
,��8
�5 .5
10
–0 .
0
�B
urlin
sky
�417
,799
85,
645
�4�1
.7�
�410
,645
59 .8
0–
0 .00
�1,
509
8 .5
4D
zhan
galy
�8��
,5�0
45,
744
1� .9
�4 .4
��
5,��
���
.��1
11,0
9847
.19
11,
445
6 .1
5Zh
anib
ek�0
18,�
�8�
8,76
47
47 .8
�17
9,56
45�
.�0
–0 .
000
–0 .
0
6Ze
leno
vsky
785�
,589
1716
,005
71�9
.87
56�5
,8�0
66 .8
0–
0 .00
51,
764
� .�
7K
azta
lovs
ky59
�6,5
65�
7,�7
9�1
19 .9
154
�6,�
5�71
.8�
�,0�
�8 .
�00
–0 .
0
8K
arab
ota
�519
,69�
66,
709
17 .5
�4 .0
716
11,�
��57
.00
–0 .
00�
1,76
08 .
9
9B
okei
orda
�518
,4�8
�4,
�18
47��
.89
191�
,581
68 .�
0–
0 .00
�1,
6�9
8 .8
10Sy
rym
�9�6
,911
67,
��4
�� .4
�7 .�
���
19,5
877�
.80
–0 .
000
–0 .
0
11Ta
skal
y�5
19,1
978
1�,1
9574
.56�
.5�
�77,
00�
�6 .5
0–
0 .00
0–
0 .0
1�Te
rekt
y60
4�,7
6711
9,99
857
.9��
.�8
48��
,54�
76 .1
1��
60 .
5�0
–0 .
0
1�Sh
ingy
rlau
��19
,495
65,
95�
���0
.5�
�51�
,489
64 .1
�1,
054
5 .41
0–
0 .0
Tota
l in
Obl
ast:
498
�44,
�8�
8110
�,60
644
8�9
.80
�59
�01,
8�0
58 .6
44�1
,749
9 .��
148,
107
� .4
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
14�
ANNExES
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Wes
t-K
azak
hsta
n o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of
Ray
on
�005
�006
�007
�008
�009
-�01
0
Grand Total
Total in �005
Sour
ces
of F
inan
cing
Total in �006
Sour
ces
of F
inan
cing
Total in �007
Sour
ces
of F
inan
cing
Total in �008
Sour
ces
of F
inan
cing
Total in �009-�011
Sour
ces
of
Fina
ncin
g
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
1U
ral (
u .a .
)*0
00
16 .9
516
.95
00
00
00
00
00
16 .9
5
�A
kzha
ik56
.95
50 .�
56 .
71�
4 .76
5�6
.565
98 .�
1�9 .
068
1�9 .
068
00
00
600
60�9
0 .78
�
�B
urlin
sky
�6 .8
�51 .
84�
.877
�7 .0
7716
.80
00
100 .
40
100 .
470
070
�51 .
077
4D
zhan
galy
151 .
756
151 .
756
084
.19�
84 .1
9�0
00
0�9
�90
800
80�5
4 .94
8
5Zh
anib
ek9 .
80
9 .8
17 .8
017
.80
00
100 .
�0
100 .
�70
070
197 .
9
6Ze
leno
vsky
��9 .
18�
��4 .
18�
5�1
� .4�
5�9
4 .6�
518
.811
� .49
58�
.595
�8 .9
115 .
10
115 .
16�
.50
6� .5
84� .
71�
7K
azta
lovs
ky10
8 .�9
910
8 .�9
90
1�4 .
078
1�4 .
078
016
0 .56
1�1 .
86�8
.718
7 .95
168 .
1519
.8�5
0�5
605 .
987
8K
arab
ota
44 .0
8�9
.68
4 .4
54 .8
���0
.7��
�4 .1
97 .4
4771
.747
�5 .7
106 .
670
.5�6
.1��
.60
�� .6
��6 .
55
9B
okei
orda
11� .
9611
� .96
00
00
00
00
00
800
8019
� .96
10Sy
rym
5 .9
05 .
9��
7 .17
��7 .
170
00
019
8 .1
1�7 .
570
.699
.10
99 .1
6�0 .
�7
11Ta
skal
y4�
.14�
.10
�0 .�
�5�0
.��5
07�
.10
7� .1
86 .9
686
.96
00
00
��� .
485
1�Te
rekt
y�8
.4��
.75 .
7��
9 .4
0��
9 .4
�� .9
0��
.90
011
00
110
411 .
7
1�Sh
ingy
rlau
118 .
10
118 .
110
7 .1
010
7 .1
00
056
.�0
56 .�
5� .�
05�
.���
4 .6
Tota
l in
Obl
ast:
955 .
4�7
798 .
0�7
157 .
40
01,
49� .
915
961 .
715
5�� .
�0
061
6 .57
416 .
�7�0
0 .�
00
990 .
6149
� .11
498 .
50
07�
� .4
0�6
� .4
470
04,
789 .
9��
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
144
Acc
ess
to D
rin
kin
g W
ater
in K
yzyl
orda
obl
ast:
Pre
sen
t an
d fu
ture
Con
diti
ons
№N
ame
of R
ayon
Pop
ulat
ion
as o
f 1 .
01 .�
004
(ps .
)
Pop
ulat
ion
with
acc
ess
to d
rink
ing
wat
er a
s of
1 .
01 .�
005
(ps .
)
Acc
ess
of p
opul
atio
n to
dri
nkin
g w
ater
(in
% o
f tot
al p
opul
atio
n)
as o
f 1 .
01 .�
005
incr
emen
t fo
r �0
05
(ps .
)
as o
f 1 .
01 .�
006
incr
emen
t fo
r �0
06
(ps .
)
as o
f 1 .
01 .�
007
incr
emen
t fo
r �0
07(p
s .)
as o
f 1 .
01 .�
008
incr
emen
t fo
r �0
08
(ps .
)
as o
f 1 .
01 .�
009
and
�010
incr
emen
t fo
r �0
09 a
nd
�010
(ps .
)
as o
f 1 .
01 .�
011
1K
yzyl
orda
(u .a
)*16
,9�5
6,97
041
.�4�
44�
.74�
.74�
.74�
.74,
��4
69 .�
�A
ral
�6,5
5510
,675
40 .�
�,46
049
.549
.549
.549
.54,
5�8
66 .6
�Zh
alag
ash
�6,0
�917
,680
67 .9
1,65
474
.�74
.�74
.�74
.�95
077
.9
4Zh
anak
orga
n 47
,759
�0,6
9864
.��,
654
69 .8
69 .8
69 .8
69 .8
500
70 .9
5K
azal
y�9
,6�4
4,81
516
.�4,
�15
�0 .5
5,00
047
.44,
076
61 .1
4,�0
775
.�1,
�15
79 .4
6K
arm
aksh
y�1
,�15
1�,6
6�64
.11,
761
7� .4
1�0
7� .0
156
7� .7
�50
74 .9
1,08
780
.0
7Sy
rdar
ya�0
,4�5
19,7
6465
.01,
08�
68 .5
110�
7� .1
750
74 .6
5�4
76 .4
645
78 .5
8Sh
yili
47,1
86��
,566
49 .9
�,4�
�55
.157
6467
.��,
569
7� .7
�,84
�80
.9�,
��0
87 .7
Tota
l in
Obl
ast:
�45,
8�8
1�7,
8�1
5� .0
16,6
8�58
.811
,997
6� .7
7,55
166
.78,
8��
70 .�
16,4
7977
.0
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
145
ANNExES
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in K
yzyl
orda
obl
ast
№N
ame
of R
ayon
Number of Settlements (items)
Population (ps .)
Ava
ilabi
lity
of W
ater
Sup
ply
from
:
cent
raliz
ed w
ater
sup
ply
syst
emlo
cal w
ater
sou
rces
deliv
ered
wat
ergr
ound
wat
ersu
rfac
e w
ater
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Leng
th o
f W
ater
Pip
e N
etw
ork
(km
)%
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
%N
umbe
r of
Se
ttle
men
tsP
opul
atio
n%
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
%
1K
yzyl
orda
(u .a
)*18
16,9
�58
6,97
0�6
.541
.�10
9,96
558
.80
–0 .
00
–0 .
0
�A
ral
58�6
,555
1910
,675
48 .8
540
.��0
1�,6
7�51
.5�
1575
5 .9
66�
�� .
4
�Zh
alag
ash
17�6
,0�9
1517
,681
67 .5
67 .9
�8,
�48
�� .1
0–
0 .0
0–
0 .0
4Zh
anak
orga
n �7
47,7
59�5
�0,6
98�0
8 .6
64 .�
1�17
,061
�5 .7
0–
0 .0
0–
0 .0
5K
azal
y57
�9,6
�44
4,81
547
.�16
.�44
�4,6
968�
.46
9�0 .
��
�10 .
1
6K
arm
aksh
y�8
�1,�
1510
1�,6
6�57
.�64
.116
7,6�
5�5
.8�
�70 .
10
–0 .
0
7Sy
rdar
ya16
�0,4
�514
19,7
645�
65 .0
�10
,661
�5 .0
0–
0 .0
0–
0 .0
8Sh
yili
�947
,186
����
,566
115
49 .9
16��
,6�0
50 .1
0–
0 .0
0–
0 .0
Tota
l in
Obl
ast:
�70
�45,
8�8
118
1�7,
8��
6�� .
055�
.01�
�11
5,64
847
.011
1695
0 .7
965
�0 .
�
Not
e: *
u.a.
- urb
an a
gglo
mer
ate
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
146
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Kyz
ylor
da o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of R
ayon
�005
�006
�007
�008
�009
– �
010
Total in �005
Sour
ces
of F
inan
cing
Total in �006
Sour
ces
of F
inan
cing
Total in �007
Sour
ces
of F
inan
cing
Total in �008
Sour
ces
of F
inan
cing
Total in �009-�011
Sour
ces
of F
inan
cing
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
1K
yzyl
orda
(u .a
)*7 .
197 .
190
00
7070
�A
ral
18 .8
618
.86
00
070
70
�Zh
alag
ash
�� .�
���
.��
00
0�5
�5
4Zh
anak
orga
n �6
.�7
�6 .�
70
00
�0�0
5K
azal
y44
0 .55
40�
�7 .5
588
488
450
050
01,
799 .
501,
799 .
50�0
�0
6K
arm
aksh
y�5
.�17
.�18
�50
�50
�00
�00
�97 .
�0�9
7 .�0
�0�0
7Sy
rdar
ya�8
.9�8
.994
.�7
94 .�
70
–�0
�0
8Sh
yili
�1� .
9418
6 .�
�6 .6
465
5 .74
6�� .
�8��
.�6
1,0�
7 .��
1,01
0 .�0
�7 .0
�1,
050 .
001,
011 .
00�9
�,00
1 .0
1,9�
5 .�
75 .8
Tota
l in
Obl
ast:
80� .
��60
6 .6
195 .
7�0
01,
884 .
011,
850 .
65��
.�6
00
1,8�
7 .��
1,81
0 .�0
�7 .0
�0
0�,
146 .
80�,
107 .
80�9
00
�,�8
6 .0
1,9�
5 .�
�60 .
80
0
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
147
ANNExES
Acc
ess
to D
rin
kin
g W
ater
in N
orth
-Kaz
akhs
tan
obl
ast:
Pre
sen
t an
d fu
ture
Con
diti
ons
№N
ame
of R
ayon
Pop
ulat
ion
with
acc
ess
to d
rink
ing
wat
er a
s of
1 .
01 .�
005
(ps .
)
Acc
ess
of p
opul
atio
n to
dri
nkin
g w
ater
(in
% o
f tot
al p
opul
atio
n)
as o
f 1 .
01 .�
005
incr
emen
t fo
r �0
05
(ps .
)
as o
f 1 .
01 .�
006
incr
emen
t fo
r �0
06
(ps .
)
as o
f 1 .
01 .�
007
incr
emen
t fo
r �0
07(p
s .)
as o
f 1 .
01 .�
008
incr
emen
t fo
r �0
08
(ps .
)
as o
f 1 .
01 .�
009
incr
emen
t fo
r �0
09
(ps .
)
as o
f 1 .
01 .�
010
incr
emen
t fo
r �0
10
(ps .
)
as o
f 1 .
01 .�
011
1P
etro
pavl
ovsk
(u
.a .)*
–0
–0
–0
00
600
69 .4
�64
100 .
00
100 .
0
�A
iyrt
au�9
�0 .
6�,
000
6 .�
4,00
01�
.94,
54�
�� .6
7,86
0�7
.75,
000
47 .�
8,80
064
.0
�A
kzha
r1�
,9�6
59 .�
�,11
�68
.�80
071
.7�,
500
8� .4
800
85 .8
1,00
090
.080
09�
.4
4Zh
umab
aev
1�,7
6�61
.180
064
.6–
64 .6
1,�0
070
.01,
800
77 .9
�,00
086
.8�,
400
97 .5
5Es
il 11
,589
�� .4
�,18
0�8
.5�,
��8
44 .7
�,19
05�
.64,
6�0
66 .5
1,50
070
.7�,
500
77 .7
6Zh
amby
l9,
�14
�6 .9
1,15
0�0
.��,
160
�6 .4
�,50
046
.55,
500
6� .4
�,10
068
.4�,
000
77 .1
7K
yzyl
zhar
�8,�
4876
.1�,
100
81 .8
�,00
087
.1�,
�50
9� .�
1,10
096
.1�0
096
.780
098
.8
8M
amly
u�4
,469
50 .0
�,49
055
.15,
�69
65 .8
5,66
077
.4�,
160
81 .8
1,�0
084
.51,
700
87 .9
9Sh
al A
kyn
4,40
1��
.��7
1�5
.��,
800
40 .0
�,77
054
.61,
000
59 .9
1,00
065
.�90
069
.9
10A
kkai
yn�,
156
5 .�
4,00
014
.98,
000
�4 .4
�,00
041
.74,
600
5� .8
1,�0
055
.7�,
500
61 .8
11Ta
iyns
hy�,
809
7 .9
6,50
0�1
.41,
876
�5 .�
5,00
0�5
.66,
540
49 .�
7,00
06�
.76,
700
77 .6
1�Ti
mir
yaze
vsky
10,7
1658
.9�,
��0
71 .7
500
74 .4
800
78 .8
1,00
084
.�1,
�00
90 .9
1,40
098
.6
1�U
alik
han
�,�1
11�
.4�,
9�0
�5 .6
1,�7
6�1
.�6,
500
58 .5
1,00
06�
.6�,
000
71 .0
�,00
08�
.5
14M
usre
pov
�,04
814
.41,
8�6
�� .0
1,�4
8�8
.9�,
500
40 .7
�,�0
055
.81,
500
6� .9
1,50
070
.0
Tota
l in
Obl
ast:
1�9,
051
�0 .�
�1,7
90�7
.6��
,�57
45 .�
4�,4
1�55
.�41
,780
65 .1
�7,�
6471
.5�6
,000
79 .9
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
148
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in N
orth
-Kaz
akhs
tan
obl
ast
№N
ame
of R
ayon
Num
ber
of
Sett
lem
ents
(it
ems)
Pop
ulat
ion
(ps .
)
Ava
ilabi
lity
of W
ater
Sup
ply
from
:
cent
raliz
ed w
ater
sup
ply
syst
em
from
loca
l sou
rces
deliv
ered
wat
erW
ater
Tar
iff,
KZT
/m�
grou
nd w
ater
su
rfac
e w
ater
Num
ber
of
Sett
lem
ents
P
opul
atio
n %
N
umbe
r of
Se
ttle
men
ts
Pop
ulat
ion
Num
ber
of
Sett
lem
ents
P
opul
atio
n N
umbe
r of
Se
ttle
men
ts
Pop
ulat
ion
1P
etro
pavl
ovsk
(u .a
.)*5
864
00
05
864
00
00
�A
iyrt
au88
5�,�
07�
�9�
0 .6
865�
,015
00
00
up to
75
�A
kzha
r�9
��,4
8814
1�,9
�659
.��0
9,55
�0
00
075
-150
4Zh
umab
aev
�5��
,5��
�81�
,76�
61 .1
�48,
770
00
00
>150
5Es
il 60
�5,8
0�8
11,5
89��
.455
�4,�
1�0
00
0
6Zh
amby
l6�
�4,6
7411
9�14
�6 .9
5��5
,�60
00
00
7K
yzyl
zhar
71�7
,��5
50�8
,�48
76 .1
�08,
�06
00
168
1>1
50
8M
amly
u7�
48,9
5��9
�4,4
6950
.041
��,8
690
0�
615
up to
75
9Sh
al A
kyn
4�18
,9�8
644
01��
.�18
7,��
�16
5,88
4�
1,4�
1
10A
kkai
yn7�
41,1
88�
�,15
65 .
�65
�6,7
��0
05
�,�9
975
-150
11Ta
iyns
hy98
48,�
�88
�,80
97 .
98�
4�,0
9�1
�16
61,
011
up to
75
1�Ti
mir
yaze
vsky
�718
,196
1510
,716
58 .9
97,
19�
00
��8
7up
to 7
5
1�U
alik
han
����
,978
5�,
�11
1� .4
�618
,777
00
�1,
990
14M
usre
pov
4��1
,178
6�,
048
14 .4
�718
,1�0
00
00
up to
75
Tota
l in
Obl
ast:
740
4�7,
561
184
1�9,
051
�0 .�
551
�8�,
996
176,
�00
��8,
�14
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
149
ANNExESEx
pect
ed In
vest
men
ts to
Wat
er s
uppl
y Im
prov
emen
t in
Rur
al A
reas
of N
orth
-Kaz
akhs
tan
obl
ast (
Un
it: K
zt m
ln)
№N
ame
of R
ayon
Population
�005
�006
�007
Total in �005
Sour
ces
of F
inan
cing
Total in �006
Sour
ces
of F
inan
cing
Total in �007
Sour
ces
of F
inan
cing
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
1P
etro
pavl
ovsk
(u .a
.)*86
40
00
00
00
00
00
00
00
�A
iyrt
au5�
,�07
�4 .9
90
14 .9
90
�0 .0
0�6
0 .40
018
5 .40
017
5 .00
146 .
100
�6 .1
00
1�0 .
00
�A
kzha
r��
,488
57 .�
0�4
.47�
1� .7
�0
10 .0
0�4
.00
00
0�4
.00
1�� .
9410
1 .94
�� .0
00
0
4Zh
umab
aev
�7,�
�5�8
.00
0�8
.00
00
00
00
69 .0
00
51 .0
00
18 .0
0
5Es
il �5
,80�
148 .
�59�
.00
41 .�
50
15 .0
016
1 .57
70 .0
0�0
.��
071
.�4
181 .
6567
.00
�4 .0
00
90 .6
5
6Zh
amby
l�4
,674
11� .
4480
.00
14 .4
40
18 .0
0�6
7 .6�
176 .
6�0
091
.00
�40 .
671�
5 .67
�5 .0
00
80 .0
0
7K
yzyl
zhar
48,9
5���
0 .00
��0 .
000
00
��1 .
5915
0 .00
�1 .5
90
60 .0
0�0
0 .00
�00 .
000
00
8M
amly
u18
,9�8
�06 .
0718
� .60
160
6 .00
�0� .
601�
0 .00
47 .6
00
�5 .0
0�4
� .00
�8� .
000
060
.00
9Sh
al A
kyn
�1,1
78�1
.00
016
.00
5 .00
�00 .
00�0
0 .00
00
0�1
0 .00
�00 .
000
010
.00
10A
kkai
yn��
,5��
�80 .
00�8
0 .00
00
0�9
6 .�0
�00 .
0096
.�0
00
�4 .1
00
�4 .1
00
0
11Ta
iyns
hy48
,��8
144 .
�077
.�0
�7 .0
0�0
.00
1�8 .
490
�� .4
90
105 .
0016
6 .00
066
.00
010
0 .00
1�Ti
mir
yaze
vsky
18,1
96�5
7 .70
�55 .
�40
0� .
�6�7
.00
0��
.00
04 .
00��
.00
0��
.00
00
1�U
alik
han
��,9
7875
.14
47 .1
418
.00
10 .0
0�7
1 .�1
��9 .
06��
.15
0�0
.00
195 .
9418
0 .94
00
15 .0
0
14M
usre
pov
41,1
8874
.4�
0�1
.4�
04�
.00
16� .
590
64 .5
90
98 .0
011
6 .�0
0�4
.�0
08�
.00
Tota
l in
Obl
ast:
4�7,
561
1,75
9 .5�
1,�6
9 .75
��0 .
410
159 .
�6�,
458 .
�71,
�55 .
685�
9 .�5
067
� .�4
�,�6
0 .60
1,�7
0 .55
�14 .
400
575 .
65
N
ote:
* u
.a . –
urb
an a
gglo
mer
ate
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
150
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Nor
th-K
azak
hsta
n o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of R
ayon
�008
�009
– �
010
Total in �008
Sour
ces
of F
inan
cing
Total in �009-�011
Sour
ces
of F
inan
cing
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
fore
ign
gran
ts
and
loan
s
1P
etro
pavl
ovsk
(u .a
.)*5 .
000
5 .00
00
7 .00
07 .
000
0
�A
iyrt
au�1
0 .00
050
.00
016
0 .00
�1� .
000
�0 .0
00
18� .
00
�A
kzha
r��
.00
0��
.00
00
90 .0
00
90 .0
00
0
4Zh
umab
aev
51 .0
00
51 .0
00
067
4 .50
674 .
500
00
5Es
il 18
8 .41
70 .0
0�4
.10
084
.�1
77 .7
�0
50 .0
00
�7 .7
�
6Zh
amby
l��
� .�0
�18 .
�0�5
.00
090
.00
�14 .
90�6
5 .90
00
49 .0
0
7K
yzyl
zhar
�10 .
0015
0 .00
00
60 .0
067
1 .50
6�5 .
500
046
.00
8M
amly
u14
0 .00
1�0 .
000
010
.00
561 .
0055
0 .00
00
11 .0
0
9Sh
al A
kyn
�0 .0
00
00
�0 .0
066
.40
61 .4
00
05 .
00
10A
kkai
yn�7
4 .10
�40 .
00�4
.10
00
60 .0
00
60 .0
00
0
11Ta
iyns
hy��
6 .00
60 .0
066
.00
010
0 .00
14� .
000
80 .0
00
6� .0
0
1�Ti
mir
yaze
vsky
�8 .0
00
�8 .0
00
01�
� .70
1�� .
700
00
1�U
alik
han
1� .0
00
00
1� .0
015
.00
015
.00
00
14M
usre
pov
�75 .
0015
0 .00
4� .0
00
8� .0
08�
.00
0�0
.00
05�
.00
Tota
l in
Obl
ast:
�,14
4 .81
11,5
8 .�0
�68 .
�00
618 .
�1�,
098 .
7��,
�00 .
00�6
� .00
04�
6 .7�
151
ANNExES
Acc
ess
to D
rin
kin
g W
ater
in A
ktob
e o
blas
t: P
rese
nt a
nd
futu
re C
ondi
tion
s
№N
ame
of
Ray
on
Pop
ulat
ion
as o
f 1 .
01 .�
004
(ps .
)
Pop
ulat
ion
with
acc
ess
to d
rink
ing
wat
er a
s of
1 .
01 .�
005
(ps .
)
Acc
ess
of p
opul
atio
n to
dri
nkin
g w
ater
(in
% o
f tot
al p
opul
atio
n)
as o
f 1 .
01 .�
005
incr
emen
t fo
r �0
05
(ps .
)
as o
f 1 .
01 .�
006
incr
emen
t fo
r �0
06
(ps .
)
as o
f 1 .
01 .�
007
incr
emen
t fo
r �0
07(p
s .)
as o
f 1 .
01 .�
008
incr
emen
t fo
r �0
08
(ps .
)
as o
f 1 .
01 .�
009
incr
emen
t fo
r �0
09
(ps .
)
as o
f 1 .
01 .�
010
incr
emen
t fo
r �0
10
(ps .
)
as o
f 1 .
01 .�
011
1A
ktob
e (u
.a .)*
�0,5
�118
,95�
6� .1
–6�
.15,
�55
79 .�
1,00
08�
.64�
984
.080
086
.680
089
.�
�A
iteke
bi�1
,615
10,�
6848
.098
95�
.51,
500
59 .5
–59
.51,
500
66 .4
�,50
078
.0�,
000
87 .�
�A
lgyn
sky
��,7
�44,
555
1� .9
–1�
.9�0
014
.5–
14 .5
4,00
0�6
.74,
000
�9 .0
6,00
057
.�
4B
aiga
ny�4
,097
9,95
141
.�–
41 .�
1,66
�48
.�–
48 .�
1,50
054
.4�,
000
6� .7
�,00
071
.0
5Ir
giz
15,5
085,
10�
�� .9
–��
.971
5�7
.5�,
���
51 .9
�,40
467
.41,
100
74 .5
1,�0
08�
.9
6K
arga
ly18
,��0
7,98
74�
.6–
4� .6
81�
48 .0
�,0�
�64
.550
067
.�1,
�00
7� .8
1,40
081
.4
7K
obdy
�4,9
��5,
�56
�1 .1
1,5�
��7
.��0
0�8
.01,
066
�� .�
1,50
0�8
.��,
500
48 .4
�,�0
061
.�
8M
artu
k�0
,144
5,9�
119
.71,
000
�� .0
�,00
0��
.95,
�88
50 .5
800
5� .1
1,��
�57
.��,
500
65 .5
Mug
alzh
ar��
,748
7,�6
6�0
.6–
�0 .6
–�0
.6–
�0 .6
1,00
0�4
.8�1
9�6
.��,
800
5� .�
10Te
mir
�0,1
9�6,
847
�� .9
800
�7 .9
�,10
65�
.��,
968
67 .9
�,57
�80
.740
08�
.760
085
.6
11U
il19
,10�
1,67
�8 .
8–
8 .8
–8 .
8–
8 .8
8,18
751
.6�,
000
6� .1
1,50
069
.9
1�K
hrom
tau
�1,�
�15,
�97
�5 .4
–�5
.4–
�5 .4
�,�7
��6
.11,
500
4� .�
481
45 .5
�,00
054
.9
1�Sh
alka
r�0
,4�7
8,96
74�
.9–
4� .9
–4�
.9–
4� .9
1,50
051
.��,
500
6� .4
�,00
078
.1
Tota
l in
Obl
ast:
�0�,
60�
98,�
5���
.54,
���
�� .9
16,4
51�9
.�17
,849
45 .�
�7,�
9�54
.��1
,0��
61 .�
�0,1
0071
.�
Not
e: *
u.a.
- urb
an a
gglo
mer
ate
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
15�
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in A
ktob
e o
blas
t
№N
ame
of
Ray
on
Num
ber
of
Sett
lem
ents
(it
ems)
Pop
ulat
ion
(ps .
)
cent
raliz
ed w
atre
r su
pply
sys
tem
: lo
cal s
ourc
es:
deliv
ered
wat
er
Leng
th o
f w
ater
pip
e ne
twor
k (k
m)
Num
ber
of
Sett
lem
ents
P
opul
atio
n (p
s .)
%
grou
nd w
ater
surf
ace
wat
er
Num
ber
of
Sett
lem
ents
P
opul
atio
n (p
s .)
Num
ber
of
Sett
lem
ents
(it
ems)
Pop
ulat
ion
(ps .
)N
umbe
r of
Se
ttle
men
tsP
opul
atio
n (p
s .)
1A
ktob
e (u
.a .)*
���0
,5�1
7�4
,041
18,9
5�15
11,5
780
00
070
.9
�A
iteke
bi�7
��,7
�48
14,�
1�10
,�68
�7��
,119
00
��4
750
.0
�A
lgyn
sky
���1
,615
44,
9�4
4,55
5�9
17,0
600
00
0��
.6
4B
aiga
ny�8
�4,0
97�
1�,0
179,
951
��1�
,450
00
�69
6�9
.�
5Ir
giz
�015
,508
�6,
�06
5,10
�18
10,4
060
00
0��
.0
6K
arga
ly��
18,�
�09
11,6
067,
987
1410
,�4�
00
00
9� .7
7K
obdy
40�4
,9��
�7,
086
5,�5
6�7
19,6
760
00
0�5
.0
8M
artu
k48
�0,1
448
7,�6
05,
9�1
40�4
,�1�
00
00
4� .8
9M
ugal
zhar
4���
,748
67,
744
7,�6
6�6
16,4
8�0
00
0��
.0
10Te
mir
�619
,10�
�7,
8�7
6,84
7��
1�,�
560
00
054
.0
11U
il��
�0,1
9�1
5,57
91,
67�
��18
,5�0
00
00
10 .0
1�K
hrom
tau
40�1
,��1
87,
669
5,�9
7��
15,8
�40
00
0�5
.9
1�Sh
alka
r44
�0,4
�79
9,74
�8,
967
�511
,470
00
00
49 .�
Tota
l in
Obl
ast:
4�6
�0�,
60�
711�
5,91
498
,�5�
�51
�0�,
407
00
494
��4
4 .5
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
15�
ANNExESEx
pect
ed In
vest
men
ts to
Wat
er s
uppl
y Im
prov
emen
t in
Rur
al A
reas
of A
ktob
e o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of
Ray
on
Population
�005
�006
�007
Total in �005
Sour
ces
of F
inan
cing
Total in �006
Sour
ces
of F
inan
cing
Total in �007
Sour
ces
of F
inan
cing
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental gvmt state
local budget
legal entity
foreign grants and loans
1A
ktob
e (u
.a .)*
�0,5
�10
00
00
1�9 .
0070
.00
59 .0
00
010
0 .00
100 .
000
00
�A
iteke
bi�1
,615
00
00
05 .
000
5 .00
00
00
00
0
�A
lgyn
sky
��,7
�499
.7�
99 .7
�0
00
70 .0
070
.00
00
070
.00
70 .0
00
00
4B
aiga
ny�4
,097
00
00
051
.90
51 .9
00
00
00
00
0
5Ir
giz
15,5
080
00
00
�4 .8
00
�4 .8
00
0�4
0 .00
�00 .
0040
.00
00
6K
arga
ly18
,��0
00
00
070
.00
70 .0
00
00
116 .
8010
6 .80
10 .0
00
0
7K
obdy
�4,9
��11
� .78
11� .
780
00
100 .
000
100 .
000
017
� .00
017
� .00
00
8M
artu
k�0
,144
�0 .0
0�0
.00
00
011
1 .85
111 .
850
00
��� .
0018
0 .00
5� .0
00
0
9M
ugal
zhar
��,7
480
00
00
0 .00
00
00
0 .00
00
00
10Te
mir
�0,1
9�68
.00
50 .0
018
.00
00
185 .
6�18
5 .6�
00
019
5 .60
019
5 .60
00
11U
il19
,10�
00
00
00 .
000
00
00 .
000
00
0
1�K
hrom
tau
�1,�
�10
00
00
0 .00
00
00
�1 .8
00
�1 .8
00
0
1�Sh
alka
r�0
,4�7
00
00
00 .
000
00
00 .
000
00
0
Tota
l in
Obl
ast:
�0�,
60�
�11 .
51�9
� .51
18 .0
00
076
4 .48
559 .
�8�0
5 .10
00
1,16
0 .�0
656 .
8050
� .40
00
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
154
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Akt
obe
obl
ast (
Un
it: K
zt m
ln)
№N
ame
of
Ray
on
�008
�009
– �
010
Total in �008
Sour
ces
of F
inan
cing
Total in �009-�011
Sour
ces
of F
inan
cing
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
1A
ktob
e (u
.a .)*
64 .7
054
.70
010
.00
018
0,00
100,
0080
,00
-0
�A
iteke
bi�0
.00
00
�0 .0
00
�00,
0010
0,00
100,
00-
0
�A
lgyn
sky
108 .
0010
8 .00
00
015
0,00
-1�
0,00
�0,0
00
4B
aiga
ny45
.00
00
45 .0
00
�10,
001�
0,00
80,0
0-
0
5Ir
giz
�40 .
00�0
0 .00
40 .0
00
01�
0,00
-10
0,00
�0,0
00
6K
arga
ly10
.00
00
10 .0
00
1�5,
0090
,00
40,0
05,
000
7K
obdy
10 .0
00
010
.00
018
0,00
1�0,
0050
,00
-0
8M
artu
k10
.00
00
10 .0
00
110,
00-
100,
0010
,00
0
9M
ugal
zhar
50 .0
00
10 .0
040
.00
011
0,00
80,0
0�0
,00
10,0
00
10Te
mir
158 .
000
158 .
000
01�
5,00
-1�
0,00
5,00
0
11U
il16
6 .00
110 .
0056
.00
00
1�5,
00�0
,00
100,
005,
000
1�K
hrom
tau
40 .0
00
040
.00
01�
0,00
100,
0010
,00
10,0
00
1�Sh
alka
r1�
1 .00
01�
1 .00
00
175,
0050
,00
1�0,
005,
000
F/S
00
-0
Tota
l in
Obl
ast:
1,06
� .70
47� .
70�9
5 .00
195 .
000
1,95
0,00
810,
001,
040,
0010
0,00
0
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
155
ANNExES
Acc
ess
to D
rin
kin
g W
ater
in z
ham
byl o
blas
t: P
rese
nt a
nd
futu
re C
ondi
tion
s
№N
ame
of
Ray
on
Pop
ulat
ion
as o
f 1 .
01 .�
004
(ps .
)
Pop
ulat
ion
with
ac
cess
to
drin
king
w
ater
as
of
1 .01
.�00
5 (p
s .)
Acc
ess
of p
opul
atio
n to
dri
nkin
g w
ater
(in
% o
f tot
al p
opul
atio
n)
as o
f 1 .
01 .�
005
incr
emen
t fo
r �0
05
(ps .
)
as o
f 1 .
01 .�
006
incr
emen
t fo
r �0
06
(ps .
)
as o
f 1 .
01 .�
007
incr
emen
t fo
r �0
07
(ps .
)
as o
f 1 .
01 .�
008
incr
emen
t fo
r �0
08
(ps .
)
as o
f 1 .
01 .�
009
incr
emen
t fo
r �0
09
(ps .
)
as o
f 1 .
01 .�
010
incr
emen
t fo
r �0
10
(ps .
)
as o
f 1 .
01 .�
011
1B
aiza
k7�
,�78
14,8
94�0
.�50
0�1
.0�,
601
�5 .9
5,09
���
.87,
961
4� .7
6,89
05�
.11�
,000
69 .4
�Zh
amby
l *7�
,481
17,�
860 .
0�,
779
�7 .�
600
�8 .1
6,81
0�7
.48,
979
49 .6
4,50
055
.71�
,000
7� .4
�Zh
ualy
n50
,��8
11,0
81��
.1-
�� .1
1,85
6�5
.85,
614
�6 .9
7,47
�51
.84,
47�
60 .7
6,17
�7�
.0
4K
orda
i10
1,89
�5�
,0�9
51 .1
-51
.1�,
8�4
54 .8
5,�1
860
.07,
9�8
67 .8
6,9�
874
.69,
9�8
84 .4
5Tu
rar
Rys
kulo
v51
,�56
�7,�
415�
.�1,
�94
56 .0
�,45
060
.7�,
461
65 .5
�,94
871
.��,
948
77 .0
4,94
886
.6
6M
erke
66,7
�4�4
,571
51 .8
-51
.8�,
545
55 .6
1,75
558
.�5,
185
66 .0
4,18
57�
.�7,
185
8� .1
7M
oiyn
kum
�5,1
�78,
7�8
�4 .7
1,5�
�40
.81,
�41
46 .�
1,55
15�
.��,
4�6
6� .0
1,�5
067
.4�,
010
75 .4
8Sa
rysu
�1,�
89�,
�68
11 .1
1,�0
916
.8�,
�0�
�7 .6
�,00
941
.7�,
0�7
56 .0
1,�0
061
.61,
750
69 .8
9Ta
las
��,8
191,
490
6 .5
1,8�
914
.61,
900
�� .9
�,4�
���
.61,
941
4� .1
1,75
049
.8�,
500
60 .7
10Sh
u56
,649
6,46
�11
.41,
9�4
14 .8
�,69
��1
.�5,
�81
�0 .8
9,14
947
.0�,
500
51 .4
5,65
061
.4
Tota
l in
Obl
ast
54�,
954
176,
�50
�� .5
11,1
77�4
.5�4
,11�
�9 .0
�9,4
�546
.�57
,0�7
56 .7
�6,7
�46�
.565
,144
75 .5
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
156
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in z
ham
byl o
blas
t
№ .
Nam
e of
R
ayon
Num
ber
of
Sett
lem
ents
(it
ems)
Pop
ulat
ion
(ps .
)
Ava
ilabi
lity
of W
ater
Sup
ply
from
:
cent
raliz
ed w
ater
sup
ply
syst
emlo
cal w
ater
sou
rces
deliv
erad
wat
ergr
ound
wat
ersu
rfac
e w
ater
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Leng
th
of W
ater
P
ipe
Net
wor
k (k
m)
%N
umbe
r of
Se
ttle
men
tsP
opul
atio
n%
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
%N
umbe
r of
Se
ttle
men
tsP
opul
atio
n%
1B
aiza
k4�
7�,�
784
14,8
9440
.86
�0 .�
0�8
58,4
8479
.70
00
00
-0
�Zh
amby
l *46
7�,4
8114
17,�
8665
.15
�� .5
���
56,1
9576
.48
00
00
-0
�Zh
ualy
n5�
50,�
�814
11,0
8170
.�4
�� .0
6�8
�9,1
4777
.94
00
00
-0
4K
orda
i40
101,
89�
�15�
,0�9
4�0 .
951
.06
1949
,864
48 .9
40
00
0-
0
5Tu
rar
Rys
kulo
v4�
51,�
56�1
�7,�
41�1
1 .8
5� .�
4�1
�4,0
1546
.76
00
00
-0
6M
erke
4�66
,7�4
19�4
,571
169 .
4751
.80
���1
,740
47 .5
61
4�4
0 .6
0-
0
7M
oiyn
kum
���5
,1�7
�8,
7�8
76 .5
�4 .7
�16
14,6
��58
.�0
00
05
1,77
67 .
06
8Sa
rysu
�5�1
,�89
4�,
�68
�511
.1�
�018
,7�1
87 .9
40
00
1�0
00 .
94
9Ta
las
����
,819
11,
490
18 .�
6 .5�
�1�1
,��9
9� .4
70
00
0-
0
10Sh
u��
56,6
499
6,46
�54
.�11
.41
�450
,187
88 .5
90
00
-0
Tota
l in
Obl
ast
�67
54�,
954
109
176,
�50
1,17
� .4�
�� .4
6�5
1�6
4,�0
567
.10
14�
40 .
086
1,97
60 .
�6
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
157
ANNExES
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f zha
mby
l obl
ast (
Un
it: K
zt m
ln)
№N
ame
of
Ray
on
�005
�006
�007
�008
�009
-�01
0
Total in �005
Sour
ces
of F
inan
cing
Total in �006
Sour
ces
of F
inan
cing
Total in �007
Sour
ces
of F
inan
cing
Total in �008
Sour
ces
of F
inan
cing
Total in �009-�011
Sour
ces
of F
inan
cing
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
cental state budget
local budget
legal entity
foreign grants and loans
1B
aiza
k55
550
00
�60 .
0�9
�56 .
981
� .05
80
068
.65�
068
.65�
00
116 .
�85
54 .�
�66�
.149
00
�50
180
170
�Zh
amby
l *51
.8�9
051
.8�9
00
4 .56
80
4 .56
80
0��
9 .78
157 .
157�
.6�
00
�14 .
9�1
�09 .
909
105 .
0��
00
�55
1�5
1�0
�Zh
ualy
n0
00
00
550
550
090
090
00
107 .
�84
010
7 .�8
40
041
018
0��
0
4K
orda
i0
00
00
101 .
175
010
1 .17
50
01�
� .88
�0
1�� .
88�
00
�08 .
677
71 .7
�81�
6 .9�
90
047
5��
5�5
0
5Tu
rar
Rys
kulo
v5�
.5�7
05�
.5�7
00
59 .�
450
59 .�
450
0�4
� .17
�17
6 .19
166
.981
00
1�5 .
194
�7 .9
�787
.�57
00
��0
1�0
110
6M
erke
00
00
098
.49
098
.49
00
89 .9
1�0
89 .9
1�0
015
4 .7�
�64
.�19
90 .4
0�0
0�7
018
019
0
7M
oiyn
kum
68 .6
10
68 .6
10
0�7
.7�4
0�7
.7�4
00
175 .
9��
1�9 .
�99
�6 .6
�40
011
5 .88
8� .1
47��
.7��
00
8545
40
8Sa
rysu
64 .4
650
64 .4
650
061
.051
�5 .0
�1�6
.0�
00
79 .5
1859
.��8
�0 .�
90
07�
.�08
�8 .�
68��
.94
00
1�5
7560
9Ta
las
�17 .
6818
� .45
��5
.��8
00
1�9 .
508
1�� .
4�6
6 .07
�0
01�
7 .95
458
.0�
79 .9
�40
01�
7 .64
��5
.�58
11� .
�84
00
7545
�0
10Sh
u4�
.��
04�
.��
00
1�7 .
�79
6� .1
5965
.��
00
1�5 .
5��
46 .5
5878
.974
00
��5 .
�47
74 .7
68�5
0 .47
90
0�1
510
511
0
Tota
l in
Obl
ast
55� .
��1
��7 .
45�
�15 .
879
00
9�4 .
189
477 .
597
446 .
59�
00
1�64
6�6 .
456
7�7 .
870
01,
678 .
�765
9 .68
1,01
8 .59
00
�,60
01,
�90
1,�1
0
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
158
Acc
ess
to D
rin
kin
g W
ater
in K
arag
anda
obl
ast:
Pre
sen
t an
d fu
ture
Con
diti
ons
№N
ame
of R
ayon
Pop
ulat
ion
as o
f 1 .
01 .�
004
(ps .
)
Pop
ulat
ion
with
acc
ess
to d
rink
ing
wat
er a
s of
1 .
01 .�
005
(ps .
)
Acc
ess
of p
opul
atio
n to
dri
nkin
g w
ater
(in
% o
f tot
al p
opul
atio
n)
as of 1 .01 .�005
increment for �005
(ps .)
as of 1 .01 .�006
increment for �006
(ps .)
as of 1 .01 .�007
increment for �007
(ps .)
as of 1 .01 .�008
increment for �008
(ps .)
as of 1 .01 .�009
increment for �009
(ps .)
as of 1 .01 .�010
increment for �010
(ps .)
as of 1 .01 .�011
1K
arag
anda
(u .a
.)*16
0-
0-
0-
0-
016
010
0 .0
-10
0 .0
-10
0 .0
�Zh
ezka
zgan
(u .a
.)*4,
80�
�,�9
747
.8�0
054
.1�0
058
.�10
060
.���
565
.�50
075
.680
09�
.�
�Sa
tpae
v (u
.a .)*
�7�
�7�
100 .
0-
100 .
0-
100 .
0-
100 .
0-
100 .
0-
100 .
0-
100 .
0
4A
bai
14,4
486,
7�8
46 .6
500
50 .1
1,��
459
.�-
59 .�
-59
.�1,
�00
68 .�
1500
78 .7
5A
ktog
ai14
,740
4,��
5�9
.41,
000
�6 .�
1,46
�46
.11,
000
5� .9
-5�
.91,
500
6� .1
1�00
71 .�
6B
ukha
r Zh
yrau
49,7
96�4
,519
49 .�
1,50
05�
.�1,
840
55 .9
4,98
�66
.0�,
591
71 .�
-71
.�-
71 .�
7Zh
anaa
rka
14,�
�5-
0�,
018
14 .1
1,00
0�1
.1-
�1 .1
-�1
.1�,
000
�5 .0
�000
55 .9
8K
arka
raly
�4,7
704,
916
14 .1
1,�1
�17
.667
019
.6�,
17�
�5 .8
1,50
0�0
.1�,
000
�8 .7
6000
56 .0
9N
ura
�6,6
451�
,���
45 .9
�,00
05�
.4�4
�066
.�1,
�69
71 .1
�,69
�81
.�-
81 .�
-81
.�
10O
saka
rovs
ky�5
,�46
17,0
��67
.41,
101
71 .8
990
75 .7
66�
78 .�
�,00
090
.�-
90 .�
-90
.�
11U
lyta
u11
,1�8
5,50
149
.450
05�
.9�0
056
.654
561
.5-
61 .5
1,00
070
.41�
0081
.�
1�Sh
etsk
y�5
,548
1�,8
4554
.�90
157
.719
�565
.�1,
59�
71 .5
1,07
975
.71,
500
81 .6
�000
89 .4
Tota
l in
Obl
ast
��1,
901
91,6
7841
.�11
,0��
46 .�
1�,1
615�
.�1�
,���
57 .8
11,�
576�
.810
,800
67 .7
1570
074
.8
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
159
ANNExES
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in K
arag
anda
obl
ast
№N
ame
of R
ayon
Num
ber
of
Sett
lem
ents
(it
ems)
Pop
ulat
ion
(ps .
)
Ava
ilabi
lity
of W
ater
Sup
ply
from
:
cent
raliz
ed w
ater
sup
ply
syst
emlo
cal w
ater
sou
rces
deliv
erad
wat
er
Wat
er
Tari
ff .
KZT
/m�
grou
nd w
ater
surf
ace
wat
er
Num
ber
of
sett
lem
ents
Pop
ulat
ion
%Le
ngth
of
wat
er p
ipe
netw
ork .
km
Num
ber
of
sett
lem
ents
Pop
ulat
ion
Num
ber
of
sett
lem
ents
Pop
ulat
ion
Num
ber
of
sett
lem
ents
Pop
ulat
ion
1K
arag
anda
(u .a
.)*1
160
0-
0-
116
00
00
-up
to 7
5
�Zh
ezka
zgan
(u .a
.)*18
4,80
��
�,�9
747
.8-
16�,
506
00
0-
up to
75
�Sa
tpae
v (u
.a .)*
1�7
�1
�7�
100 .
0-
0-
00
0-
up to
75
4A
bai
�914
,448
1�6,
7�8
46 .6
40 .9
1�6
7,71
00
00
-up
to 7
5
5A
ktog
ai44
14,7
404
4,��
5�9
.4�8
,764
.00
4010
,405
00
0-
6B
ukha
r Zh
yrau
7449
,796
�4�4
,519
49 .�
�81 .
0046
�4,6
610
04
616
up to
75
7Zh
anaa
rka
4�14
,��5
0-
0-
4�14
,��5
00
0-
up to
75
8K
arka
raly
71�4
,770
�4,
916
14 .1
�8,7
8� .0
069
�9,8
540
00
-up
to 7
5
9N
ura
50�6
,645
181�
,���
45 .9
1�5 .
00�9
1�,5
840
0�
1,8�
8up
to 7
5
10O
saka
rovs
ky55
�5,�
46�5
17,0
��67
.4�6
0 .00
146,
67�
00
61,
551
up to
75
11U
lyta
u41
11,1
�87
5,50
149
.490
.00
��5,
09�
00
154
5up
to 7
5
1�Sh
etsk
y59
�5,5
4817
1�,8
4554
.�9�
.00
4�11
,70�
00
0-
up to
75
Tota
l in
Obl
ast:
496
��1,
901
1��
91,6
7841
.�78
,405
.00
�59
1�5,
68�
00
144,
540
Not
e: *
u.a.
- urb
an a
gglo
mer
ate
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
160
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Kar
agan
da o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of R
ayon
�005
�006
�007
Tota
l in
�005
Sour
ces
of F
inan
cing
Tota
l in
�006
Sour
ces
of F
inan
cing
Tota
l in
�007
Sour
ces
of F
inan
cing
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
1K
arag
anda
(u .a
.)*-
--
--
--
-0
0-
--
00
�Zh
ezka
zgan
(u .a
.)*�0
.00
--
-�0
.00
17 .0
0-
-0
17 .0
080
.00
-80
.00
00
�Sa
tpae
v (u
.a .)*
--
--
--
--
00
--
-0
0
4A
bai
88 .1
0-
48 .1
0-
40 .0
094
.90
�0 .6
014
.�0
050
.00
--
-0
0
5A
ktog
ai80
.00
--
-80
.00
144 .
9084
.90
-0
60 .0
060
.00
-60
.00
00
6B
ukha
r Zh
yrau
100 .
00-
--
100 .
0061
0 .80
400 .
�080
.50
01�
0 .00
975 .
00�7
0 .00
705 .
000
0
7Zh
anaa
rka
71 .1
7��
.17
--
�9 .0
074
.00
--
074
.00
--
-0
0
8K
arka
raly
145 .
0050
.00
--
95 .0
015
8 .90
18 .1
0��
.80
011
7 .00
�18 .
00-
�18 .
000
0
9N
ura
7� .0
0-
--
7� .0
0�5
5 .00
�85 .
00-
070
.00
�95 .
00�5
0 .00
45 .0
00
0
10O
saka
rovs
ky11
4 .08
44 .0
8-
-70
.00
�48 .
�0-
16� .
�00
85 .0
0�6
0 .00
�70 .
0090
.00
00
11U
lyta
u�0
.00
--
-�0
.00
91 .5
0�1
.50
-0
60 .0
01�
0 .00
1�0 .
00-
00
1�Sh
etsk
y80
.00
50 .0
0-
-�0
.00
�11 .
901�
4 .00
101 .
900
86 .0
0�0
1 .00
�1 .0
017
0 .00
00
Tota
l in
Obl
ast
801 .
�517
6 .�5
48 .1
0-
577 .
0097
4 .40
�8� .
800
749 .
00�,
419 .
001,
051 .
001,
�68 .
000
0
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
161
ANNExES
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Kar
agan
da o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of R
ayon
�008
�009
-�01
0
Tota
l in
�008
Sour
ces
of F
inan
cing
Tota
l in
�00
9-�0
11
Sour
ces
of F
inan
cing
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
1K
arag
anda
(u .a
.)*5 .
00-
5 .00
00
--
--
0
�Zh
ezka
zgan
(u .a
.)*80
.00
-80
.00
00
�5 .0
0-
�0 .0
05 .
000
�Sa
tpae
v (u
.a .)*
--
-0
0-
--
-0
4A
bai
--
-0
0�9
0 .00
1�0 .
001�
0 .00
40 .0
00
5A
ktog
ai-
--
00
��0 .
0011
0 .00
100 .
00�0
.00
0
6B
ukha
r Zh
yrau
415 .
0040
.00
�75 .
000
0-
--
-0
7Zh
anaa
rka
--
-0
0��
0 .00
160 .
001�
0 .00
40 .0
00
8K
arka
raly
446 .
00-
446 .
000
0�4
0 .00
1�0 .
0010
0 .00
10 .0
00
9N
ura
60� .
00�5
0 .00
�5� .
000
0-
--
-0
10O
saka
rovs
ky49
0 .00
180 .
00�1
0 .00
00
--
--
0
11U
lyta
u-
--
00
1�0 .
0060
.00
50 .0
010
.00
0
1�Sh
etsk
y50
.00
-50
.00
00
��5 .
0010
5 .00
90 .0
0�0
.00
0
Tota
l in
Obl
ast
�,08
9 .00
470 .
001,
619 .
000
01,
460 .
0069
5 .00
610 .
0015
5 .00
0
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
16�
Acc
ess
to D
rin
kin
g W
ater
in K
osta
nai
obl
ast:
Pre
sen
t an
d fu
ture
Con
diti
ons
№N
ame
of R
ayon
Pop
ulat
ion
as o
f 1 .
01 .�
004
(ps .
)
Pop
ulat
ion
with
acc
ess
to d
rink
ing
wat
er a
s of
1 .
01 .�
005
(ps .
)
Acc
ess
of p
opul
atio
n to
dri
nkin
g w
ater
(in
% o
f tot
al p
opul
atio
n)
as o
f 1 .
01 .�
005
incr
emen
t fo
r �0
05
(ps .
)
as o
f 1 .
01 .�
006
incr
emen
t fo
r �0
06
(ps .
)
as o
f 1 .
01 .�
007
incr
emen
t fo
r �0
07(p
s .)
as o
f 1 .
01 .�
008
incr
emen
t fo
r �0
08
(ps .
)
as o
f 1 .
01 .�
009
and
�010
incr
emen
t fo
r �
009
and
�010
(p
s .)
as o
f 1 .
01 .�
011
1A
ltyns
arin
17,1
765,
149
�0 .0
-�0
.0�,
00�
47 .5
-47
.51,
086
5� .8
1,70
16�
.7
�A
man
geld
y�0
,44�
6,46
4�1
.6-
�1 .6
1,10
0�7
.0-
�7 .0
-�7
.05,
647
64 .6
�A
ulie
kol
�6,1
4816
,859
46 .6
-46
.696
�49
.��,
�75
55 .6
-55
.64,
15�
67 .1
4D
enis
ovsk
y�5
,008
14,6
6658
.6-
58 .6
�,57
168
.91,
495
74 .9
1,49
480
.96�
48�
.4
5D
zhan
geld
y18
,�8�
�,69
8�0
.1-
�0 .1
�,57
0�4
.1�,
�60
46 .4
-46
.4�,
558
60 .�
6Zh
etik
ar16
,465
11,5
�570
.176
074
.790
080
.150
08�
.��0
085
.045
087
.7
7K
amys
18,7
486,
064
�� .�
-��
.�1,
511
40 .4
�,76
460
.5-
60 .5
1,10
066
.�
8K
arab
alyk
�9,�
0��,
004
10 .�
-10
.�-
10 .�
-10
.�-
10 .�
10,4
0045
.9
9K
aras
u��
,68�
19,5
6759
.9-
59 .9
815
6� .4
1,�5
566
.��,
�06
7� .�
�,00
08�
.4
10K
osta
nai
45,7
574,
8�7
10 .6
-10
.65,
775
�� .�
�,77
1�1
.44,
95�
4� .�
7,74
�59
.�
11M
endy
kar
�7,7
0�1,
055
� .8
-� .
81,
948
10 .8
-10
.8-
10 .8
10,�
4848
.�
1�N
aurz
um15
,�19
-0 .
0-
0 .0
-0 .
0-
0 .0
-0 .
07,
700
50 .6
1�Sa
ryko
l19
,16�
7,00
1�6
.5-
�6 .5
-�6
.580
140
.71,
500
48 .5
�,45
066
.5
14Ta
rano
vsky
��,7
7510
,�1�
4� .4
-4�
.4-
4� .4
-4�
.4-
4� .4
5,9�
068
.�
15U
zunk
ol�9
,01�
�,�8
911
.�1,
700
17 .�
�,50
0�9
.�5,
�64
47 .4
-47
.46,
067
68 .�
16Fe
doro
vsky
�6,7
77�,
��9
8 .7
-8 .
7�,
494
18 .0
-18
.0-
18 .0
9,5�
55�
.6
17A
rkal
yk (u
.a .)*
14,5
98�,
858
�6 .4
965
�� .0
1,58
74�
.9�,
075
58 .1
1,47
�68
.�1,
750
80 .�
18Li
sako
vsk
(u .a
.)*1,
1�6
-0 .
0-
0 .0
-0 .
0-
0 .0
-0 .
089
078
.�
19R
udny
(u .a
.)*7�
�7�
�10
0 .0
-10
0 .0
-10
0 .0
-10
0 .0
-10
0 .0
-10
0 .0
Tota
l in
Obl
ast
418,
1�9
1�0,
4��
�8 .8
�,4�
5�9
.6�8
,7�6
�6 .5
��,4
604�
.11�
,110
45 .�
8�,0
4665
.1
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
16�
ANNExES
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in K
osta
nai
obl
ast
№N
ame
of R
ayon
Number of Settlements (items)
Pop
ulat
ion
(ps .
)
Ava
ilabi
lity
of W
ater
Sup
ply
from
:
cent
raliz
ed w
ater
sup
ply
syst
emlo
cal w
ater
sou
rces
deliv
ered
wat
ergr
ound
wat
ersu
rfac
e w
ater
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Leng
th o
f W
ater
Pip
e N
etw
ork
(km
)%
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
%N
umbe
r of
Se
ttle
men
tsP
opul
atio
n%
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
%
1A
ltyns
arin
�717
,176
85,
149
1� .5
�0 .0
�11�
,0�7
70 .0
0-
00
-0 .
0
�A
man
geld
y46
�0,4
4�8
6,46
459
.4�1
.6�0
11,8
8058
.14
1,47
77 .
�14
6�1
� .0
�A
ulie
kol
45�6
,148
916
,859
��4 .
�46
.6�6
19,�
895�
.40
-0
0-
0 .0
4D
enis
ovsk
y45
�5,0
0817
14,6
66�1
8 .8
58 .6
�810
,�4�
41 .4
0-
00
-0 .
0
5D
zhan
geld
y�5
18,�
8�1
�,69
8�0
�0 .1
75,
0�7
�7 .4
�58,
179
44 .5
�1,
468
8 .0
6Zh
etik
ar��
16,4
651�
11,5
�5�0
570
.18
4,0�
4�4
.50
-0
�89
65 .
4
7K
amys
��18
,748
�6,
064
50��
.��8
1�,6
�967
.40
-0
�44
0 .�
8K
arab
alyk
59�9
,�0�
6�,
004
�7 .�
710
.�50
�6,0
1789
.10
-0
�18
�0 .
6
9K
aras
u57
��,6
8��0
19,5
67�8
�59
.917
6,7�
0�0
.60
-0
�06,
�87
19 .5
10K
osta
nai
6045
,757
�4,
8�7
55 .1
10 .6
5��7
,�6�
81 .4
0-
04
�,65
78 .
0
11M
endy
kar
58�7
,70�
11,
055
� .5
� .8
56�5
,�01
91 .�
0-
01
1,�4
64 .
9
1�N
aurz
um�5
15,�
190
-0
0 .0
��1�
,�48
87 .0
0-
0�
1,97
11�
.0
1�Sa
ryko
l41
19,1
6�7
7,00
114
� .�
�6 .5
�87,
914
41 .�
0-
06
4,�4
8��
.�
14Ta
rano
vsky
5���
,775
1�10
,�1�
116 .
44�
.4�9
1�,4
6�56
.60
-0
0-
0 .0
15U
zunk
ol56
�9,0
1��
�,�8
9�4
.511
.�50
�1,0
097�
.40
-0
44,
715
16 .�
16Fe
doro
vsky
70�6
,777
��,
��9
158 .
758
�0,7
�177
.40
-0
10�,
717
1� .9
17A
rkal
yk (u
.a .)*
1714
,598
4�,
858
�5 .5
�6 .4
87,
560
51 .8
�75
45 .
��
�,4�
716
.6
18Li
sako
vsk
(u .a
.)*�
1,1�
60
-0
0 .0
�1,
1�6
100 .
00
-0
0-
0 .0
19R
udny
(u .a
.)*1
7��
17�
�10
100 .
00
-0 .
00
-0
0-
0 .0
Tota
l in
Obl
ast:
750
418,
1�9
116
1�0,
4��
1,61
1 .5
�8 .8
5��
�55,
617
61 .1
�110
,410
� .5
7��1
,680
7 .6
Not
e: *
u.a.
- urb
an a
gglo
mer
ate
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
164
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Kos
tan
ai o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of R
ayon
�005
�006
�007
Tota
l in
�005
Sour
ces
of F
inan
cing
Tota
l in
�006
Sour
ces
of F
inan
cing
Tota
l in
�007
Sour
ces
of F
inan
cing
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
1A
ltyns
arin
00
48 .7
980
48 .7
980
00
�A
man
geld
y0
01 .
690
1 .69
00
0
�A
ulie
kol
00
5� .7
960
5� .7
96�9
.819
0�9
.819
4D
enis
ovsk
y0
0�9
.79
�6 .�
9� .
580
080
5D
zhan
geld
y0
095
.409
94 .4
��0 .
977
6060
0
6Zh
etik
ar18
018
0��
5 .80
1�7
5 .80
150
500
50
7K
amys
00
�� .6
0��
.61�
7 .1
01�
7 .1
8K
arab
alyk
00
00
00
00
9K
aras
u0
061
.�66
061
.�66
�67 .
55�5
017
.55
10K
osta
nai
00
�10 .
�11
148 .
8��
61 .�
8886
.55
086
.55
11M
endy
kar
00
�0 .7
640
�0 .7
640
00
1�N
aurz
um0
00
00
00
0
1�Sa
ryko
l0
00 .
50
0 .5
��4 .
5�0
0�4
.5
14Ta
rano
vsky
00
00
00
00
15U
zunk
ol50
50�4
��0
04�
�4� .
697
�7� .
697
70
16Fe
doro
vsky
00
0 .80
40
0 .80
40
00
17A
rkal
yk (u
.a .)*
150
150
464 .
��6
454
10 .�
�6�8
8 .78
�80
8 .78
18Li
sako
vsk
(u .a
.)*0
00
00
00
0
19R
udny
(u .a
.)*0
00
00
00
0
Tota
l in
Obl
ast:
�80
�80
00
01,
587 .
761,
�09 .
�46
�78 .
409
00
1,66
7 .99
61,
16� .
697
504 .
�99
00
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
165
ANNExES
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Kos
tan
ai o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of R
ayon
�008
�009
-�01
0
Tota
l in
�008
Sour
ces
of F
inan
cing
Tota
l in
�00
9-�0
11
Sour
ces
of F
inan
cing
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
1A
ltyns
arin
�8�8
050
050
�A
man
geld
y0
00
100
080
�0
�A
ulie
kol
00
050
050
4D
enis
ovsk
y7�
.404
07�
.404
�00
�0
5D
zhan
geld
y0
00
400
40
6Zh
etik
ar60
060
1�� .
840 .
001�
� .84
7K
amys
00
0�0
0�0
8K
arab
alyk
00
0�0
00
1�0
70
9K
aras
u56
441
514
959
757
7�0
10K
osta
nai
11�
�885
80 .5
060
.5�0
11M
endy
kar
00
0�6
00
180
80
1�N
aurz
um0
00
180
8070
�0
1�Sa
ryko
l�5
0�5
00
817
787
�0
14Ta
rano
vsky
00
090
090
15U
zunk
ol0
00
1�0
01�
0
16Fe
doro
vsky
00
015
00
1�0
�0
17A
rkal
yk (u
.a .)*
�08 .
14�0
08 .
14�0
0�0
18Li
sako
vsk
(u .a
.)*0
00
�00
�0
19R
udny
(u .a
.)*0
00
00
0
Tota
l in
Obl
ast:
1,�9
5 .54
410
�1�7
4 .54
40
0�,
967 .
�44
1444
1,�8
� .�4
�40
0
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
166
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in M
angi
stau
obl
ast
№N
ame
of R
ayon
Number of Settlements (items)
Population (ps .)
Ava
ilabi
lity
of W
ater
Sup
ply
from
:
cent
raliz
ed w
ater
sup
ply
syst
emlo
cal w
ater
sou
rces
deliv
ered
wat
ergr
ound
wat
ersu
rfac
e w
ater
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Leng
th o
f W
ater
Pip
e N
etw
ork
(km
)%
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
%N
umbe
r of
Se
ttle
men
tsP
opul
atio
n%
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
%
1A
ktau
(u .a
.)*1
5�9
15�
90 .
010
0 .0
0-
0 .0
00
0 .00
0-
0 .0
�Zh
anao
zen
(u .a
.)*1
�,8�
41
�,06
70 .
080
.00
-0 .
00
00 .
0076
7�0
.0
�B
eine
u10
��,�
095
17,1
65�7
.�5�
.15
15,1
4446
.90
00 .
000
-0 .
0
4K
arak
iyan
811
,494
1�,
015
0 .0
17 .5
�6,
465
56 .�
00
0 .00
4�,
014
�6 .�
5M
angi
stau
�0�8
,46�
45,
900
1� .0
�0 .7
1�18
,986
66 .7
00
0 .00
4�,
576
1� .6
6Tu
pkar
agan
47,
�69
1�,
�57
� .0
�1 .0
�5,
01�
69 .0
00
0 .00
0-
0 .0
Tota
l in
Obl
ast:
448�
,907
1��0
,94�
4� .�
�6 .9
��45
,607
54 .4
00
0 .00
87,
�57
8 .8
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
Acc
ess
to D
rin
kin
g W
ater
in M
angi
stau
obl
ast:
Pre
sen
t an
d fu
ture
Con
diti
ons
№N
ame
of R
ayon
Pop
ulat
ion
as o
f 1 .
01 .�
004
(ps .
)
Pop
ulat
ion
with
acc
ess
to d
rink
ing
wat
er a
s of
1 .
01 .�
005
(ps .
)
Acc
ess
of p
opul
atio
n to
dri
nkin
g w
ater
(in
% o
f tot
al p
opul
atio
n)
as o
f 1 .
01 .�
005
incr
emen
t fo
r �0
05
(ps .
)
as o
f 1 .
01 .�
006
incr
emen
t fo
r �0
06
(ps .
)
as o
f 1 .
01 .�
007
incr
emen
t fo
r �0
07(p
s .)
as o
f 1 .
01 .�
008
incr
emen
t fo
r �0
08
(ps .
)
as o
f 1 .
01 .�
009
and
�010
incr
emen
t fo
r �
009
and
�010
(p
s .)
as o
f 1 .
01 .�
011
1A
ktau
(u .a
.)*5�
95�
910
0 .0
-10
0 .0
-10
0 .0
-10
0 .0
-10
0 .0
-10
0 .0
�Zh
anao
zen
(u .a
.)*�,
8�4
�,06
780
.0-
80 .0
-80
.0-
80 .0
-80
.0-
80 .0
�B
eine
u��
,�09
17,1
655�
.1�,
�51
6� .5
5,�4
�79
.7�,
000
85 .9
��4
86 .6
�,08
99�
.1
4K
arak
iyan
11,4
94�,
015
17 .5
874
�5 .1
�,94
759
.566
565
.�1,
500
78 .�
1,��
689
.8
5M
angi
stau
�8,4
6�5,
900
�0 .7
�,4�
9�9
.��,
8�5
4� .7
5,80
�6�
.15,
8�0
8� .6
149
84 .1
6Tu
pkar
agan
7,�6
9�,
�57
�1 .0
1,57
85�
.8-
5� .8
565
60 .5
�,51
595
.1-
95 .1
Tota
l in
Obl
ast:
8�,9
07�0
,94�
�6 .9
8,��
�46
.71�
,014
6� .�
9,0�
�7�
.010
,079
85 .0
�,56
489
.�
167
ANNExES
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in M
angi
stau
obl
ast
№N
ame
of R
ayon
Number of Settlements (items)
Population (ps .)
Ava
ilabi
lity
of W
ater
Sup
ply
from
:
cent
raliz
ed w
ater
sup
ply
syst
emlo
cal w
ater
sou
rces
deliv
ered
wat
ergr
ound
wat
ersu
rfac
e w
ater
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Leng
th o
f W
ater
Pip
e N
etw
ork
(km
)%
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
%N
umbe
r of
Se
ttle
men
tsP
opul
atio
n%
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
%
1A
ktau
(u .a
.)*1
5�9
15�
90 .
010
0 .0
0-
0 .0
00
0 .00
0-
0 .0
�Zh
anao
zen
(u .a
.)*1
�,8�
41
�,06
70 .
080
.00
-0 .
00
00 .
0076
7�0
.0
�B
eine
u10
��,�
095
17,1
65�7
.�5�
.15
15,1
4446
.90
00 .
000
-0 .
0
4K
arak
iyan
811
,494
1�,
015
0 .0
17 .5
�6,
465
56 .�
00
0 .00
4�,
014
�6 .�
5M
angi
stau
�0�8
,46�
45,
900
1� .0
�0 .7
1�18
,986
66 .7
00
0 .00
4�,
576
1� .6
6Tu
pkar
agan
47,
�69
1�,
�57
� .0
�1 .0
�5,
01�
69 .0
00
0 .00
0-
0 .0
Tota
l in
Obl
ast:
448�
,907
1��0
,94�
4� .�
�6 .9
��45
,607
54 .4
00
0 .00
87,
�57
8 .8
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Man
gist
au o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of R
ayon
�005
�006
�007
Tota
l in
�005
Sour
ces
of F
inan
cing
Tota
l in
�006
Sour
ces
of F
inan
cing
Tota
l in
�007
Sour
ces
of F
inan
cing
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
1A
ktau
(u .a
.)*0 .
00 –
–
�Zh
anao
zen
(u .a
.)*
�B
eine
u8�
.�1
51 .
51
�0 .
80
1��
.50
100
.00
�� .
50
�4 .
60
�4 .
60
4K
arak
iyan
�1 .0
0 �
1 .00
5
4 .80
5
4 .80
�
.50
� .5
0
5M
angi
stau
59 .5
0 4
9 .50
1
0 .00
9
� .��
�
� .00
6
0 .��
8
0 .8�
7
� .50
7
.��
6Tu
pkar
agan
�� .5
0 �
� .50
–
1
0 .00
1
0 .00
Tot
al in
Obl
ast:
19
5 .�1
0 .00
154
.51
40 .
80
–
�70
.6�
100
.00
110
.�0
60 .
��
–
1�7
.9�
–
86 .
00
41 .
9�
–
№N
ame
of R
ayon
�008
�009
-�01
0
Gra
nd
Tota
lTo
tal i
n �0
08
Sour
ces
of F
inan
cing
Tota
l in
�00
9-�0
11
Sour
ces
of F
inan
cing
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
1A
ktau
(u .a
.)* –
–
–
�Zh
anao
zen
(u .a
.)* –
�B
eine
u 5
.00
5 .0
0 �
0 .00
�
0 .00
�
74 .4
1
4K
arak
iyan
�4 .
00
�4 .
00
17 .
00
17 .
00
119
.�0
5M
angi
stau
�7 .
6�
17 .
80
9 .8
� �
.50
� .5
0 �
6� .7
9
6Tu
pkar
agan
10 .
00
10 .
00
–
5� .
50
Tot
al in
Obl
ast:
6
6 .6�
–
5
6 .80
9
.8�
–
49 .
50
–
47 .
00
� .5
0 –
7
10 .0
0
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
168
Acc
ess
to D
rin
kin
g W
ater
in P
avlo
dar
obl
ast:
Pre
sen
t an
d fu
ture
Con
diti
ons
№N
ame
of R
ayon
Population as of 01 .01 .�004 (ps .)
Population with access to drinking water as of
01 .01 .�005 (ps .)
Acc
ess
of p
opul
atio
n to
dri
nkin
g w
ater
(in
% o
f tot
al p
opul
atio
n)
as o
f 1 .
01 .�
005
incr
emen
t fo
r �0
05
(ps .
)
as o
f 1 .
01 .�
006
incr
emen
t fo
r �0
06
(ps .
)
as o
f 1 .
01 .�
007
incr
emen
t fo
r �0
07(p
s .)
as o
f 1 .
01 .�
008
incr
emen
t fo
r �0
08
(ps .
)
as o
f 1 .
01 .�
009
incr
emen
t fo
r �0
09
(ps .
)
as o
f 1 .
01 .�
010
incr
emen
t fo
r �0
10
(ps .
)
as o
f 1 .
01 .�
011
1P
avlo
dar
(u .a
.)*9,
�90
4,�0
046
.�77
454
.67�
66�
.4-
6� .4
�,5�
489
.6-
89 .6
486
94 .8
�A
ksu
(u .a
.)*�0
,�77
5,1�
7�5
.�74
0�9
.01,
711
�7 .4
1,�5
54�
.6�,
686
61 .8
�,60
074
.6�,
586
87 .4
�Ek
ibas
tuz
(u .a
.)*8,
588
8�1
9 .6
-9 .
6-
9 .6
-9 .
6-
9 .6
�,�0
048
.0�,
�54
87 .0
4A
ktog
ai18
,910
4,56
0�4
.1-
�4 .1
1,60
9��
.6�,
464
45 .7
�,05
556
.5�,
�00
68 .�
�,�1
079
.8
5B
ayan
aul
��,0
806,
600
�9 .9
�98
�1 .7
-�1
.71,
690
�9 .�
�,71
�56
.��,
500
7� .0
�,65
588
.6
6Zh
elez
insk
y��
,995
8,6�
9�7
.6-
�7 .6
�,50
05�
.8�,
846
69 .5
866
7� .�
1,�9
079
.�1,
�99
85 .4
7Ir
tysh
�8,7
�911
,5�6
40 .1
1,68
046
.01,
94�
5� .7
1,59
�58
.�5,
650
77 .9
1,50
08�
.11,
�98
88 .0
8K
achi
rsky
�6,5
7�14
,8�1
55 .8
1,07
859
.81,
000
6� .6
1,75
170
.�1,
010
74 .0
�,�0
08�
.��,
800
9� .8
9le
byaz
hins
ky17
,680
5,78
4��
.7-
�� .7
95�
�8 .1
1,65
�47
.4�,
0�1
58 .9
�,80
074
.7�,
799
90 .5
10M
aisk
y14
,55�
600
4 .1
-4 .
11,
811
16 .6
�,9�
1�6
.6�,
888
6� .4
�,00
077
.1�,
100
91 .5
11P
avlo
dars
ky�9
,940
11,7
�5�9
.�-
�9 .�
�,41
847
.�1,
56�
5� .5
�,��
159
.94,
100
7� .6
5,�0
091
.0
1�U
spen
sky
16,7
767,
�6�
4� .9
-4�
.91,
90�
55 .�
1,09
461
.71,
071
68 .1
1,50
077
.11,
654
86 .9
1�Sc
herb
aktin
sky
�5,6
18�,
�99
1� .�
-1�
.��,
000
�1 .1
�,�8
4�0
.0�,
740
44 .6
4,80
06�
.�4,
8��
8� .1
Tota
l in
Obl
ast:
�6�,
018
85,�
84��
.54,
670
�4 .�
19,5
7441
.8��
,11�
50 .�
��,4
546�
.6�1
,890
74 .8
�4,4
6�88
.0
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
169
ANNExES
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in P
avlo
dar
obl
ast
№N
ame
of R
ayon
Num
ber
of
Sett
lem
ents
(it
ems)
Pop
ulat
ion
(ps .
)
Ava
ilabi
lity
of W
ater
Sup
ply
from
:
cent
raliz
ed w
ater
sup
ply
syst
emlo
cal w
ater
sou
rces
deliv
ered
wat
er
Num
ber
of
Sett
lem
ents
Num
ber
of
sett
lem
ents
w
here
sys
tem
do
es n
ot o
pera
te
Pop
ulat
ion
of w
hich
do
not h
ave
acce
ss to
dr
inki
ng w
ater
grou
nd w
ater
surf
ace
wat
er
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
1P
avlo
dar
(u .a
.)*6
10,1
���
18,
�00
4,�0
04
5,8�
�
�A
ksu
(u .a
.)*��
�1,0
1�7
�9,
84�
5,1�
7�6
15,8
76
�Ek
ibas
tuz
(u .a
.)*�5
8,44
61
08�
18�
1��
7,41
7�
�08
4A
ktog
ai�7
18,�
085
06,
560
4,56
0��
1�,7
48
5B
ayan
aul
7���
,080
8�
9,4�
06,
600
558,
968
18 6
51�
6Zh
elez
insk
y4�
�1,8
6014
�1�
,779
8,6�
9�9
1�,�
�1
7Ir
tysh
�5�7
,156
80
15,4
7811
,5�6
�01�
,6�0
7 �
000
8K
achi
rsky
4��6
,416
101
17,�
5014
,8�1
��11
,595
9le
byaz
hins
ky�8
18,�
�65
08,
716
5,78
4��
1�,5
4�
10M
aisk
y�4
15,�
797
67,
�14
600
1714
,679
11P
avlo
dars
ky41
�1,�
4114
0�0
,�54
11,7
�5�7
19,5
06
1�U
spen
sky
��16
,�8�
60
9,1�
97,
�6�
168,
4�6
148
5
1�Sc
herb
aktin
sky
40�5
,489
61
11,8
9��,
�99
�4��
,090
Tota
l in
Obl
ast:
449
�6�,
018
9�15
1�8,
865
85,�
84��
716
7,5�
9�5
8 5
1�
�69
�
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
170
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Pav
loda
r o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of R
ayon
�005
�006
�007
Tota
l in
�005
Sour
ces
of F
inan
cing
Tota
l in
�006
Sour
ces
of F
inan
cing
Tota
l in
�007
Sour
ces
of F
inan
cing
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal e
ntity
fo
reig
n gr
ants
an
d lo
ans
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
1P
avlo
dar
(u .a
.)*1�
.0�
8 .��
4 .80
00
� .40
0� .
400
0�0
.00
00
0�0
.00
�A
ksu
(u .a
.)*10
.16
10 .1
60
00
50 .0
�19
.�5
�0 .7
80
089
.47
79 .4
70
010
.00
�Ek
ibas
tuz
(u .a
.)*0
00
00
00
00
0�0
.00
00
0�0
.00
4A
ktog
ai1 .
500
1 .50
00
1�� .
601�
� .60
00
016
8 .90
100 .
0068
.90
00
5B
ayan
aul
00
00
054
.�7
17 .5
7�6
.70
0 .00
0 .00
189 .
851�
0 .�9
59 .5
60
0
6Zh
elez
insk
y�4
.00
0�4
.00
00
156 .
511�
� .�7
�4 .1
40
018
6 .6�
1�0 .
4556
.18
00
7Ir
tysh
105 .
0�80
.95
�4 .0
70
014
1 .17
80 .0
061
.17
00
�14 .
7117
� .1
41 .6
10
0
8K
achi
rsky
16� .
��1�
� .0�
�0 .1
90
0�7
� .18
�55 .
1�17
.05
00
�48 .
0��1
5 .0�
�� .0
00
0
9le
byaz
hins
ky0
00
00
14� .
6110
8 .�6
�4 .�
50
010
8 .�7
108 .
�70
00
10M
aisk
y0
00
00
�5 .1
��5
.1�
00
01�
0 .00
100 .
000
0�0
.00
11P
avlo
dars
ky��
.40
0��
.40
00
1�5 .
9511
9 .�5
16 .6
00
01�
6 .19
55 .8
950
.�0
0�0
.00
1�U
spen
sky
85 .7
085
.70
00
07�
.87
40 .0
0��
.87
00
11� .
�140
.00
5� .�
10
�0 .0
0
1�Sc
herb
aktin
sky
1� .6
10
1� .6
10
010
0 .00
80 .0
0�0
.00
00
160 .
0010
0 .00
�0 .0
00
40 .0
0
F/S
�4 .0
00
�4 .0
00
0�0
.00
�0 .0
00
0�0
.00
�0 .0
00
Tota
l in
Obl
ast:
47� .
64�1
8 .07
154 .
570
01,
�16 .
711,
009 .
75�0
6 .96
00
1,89
5 .45
1,��
� .59
40� .
860 .
0016
0 .00
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
171
ANNExES
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f Pav
loda
r o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of R
ayon
�008
�009
-�01
0
Tota
l in
�008
Sour
ces
of F
inan
cing
Tota
l in
�00
9-�0
11
Sour
ces
of F
inan
cing
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal
entit
y
fore
ign
gran
ts
and
loan
s
1P
avlo
dar
(u .a
.)*91
,00
061
,00
0�0
,00
100,
000
00
100,
00
�A
ksu
(u .a
.)*15
4,��
70,0
044
,��
040
,00
167,
500
47,5
00
1�0,
00
�Ek
ibas
tuz
(u .a
.)*70
,00
00
070
,00
1�0,
000
00
1�0,
00
4A
ktog
ai15
1,54
100,
0051
,54
019
0,00
040
,00
015
0,00
5B
ayan
aul
�14,
5710
0,00
64,5
70,
0050
,00
�00,
000
00
�00,
00
6Zh
elez
insk
y88
,11
054
,11
0�4
,00
150,
000
00
150,
00
7Ir
tysh
500,
0050
0,00
00
�750
,00
�750
,00
00
0
8K
achi
rsky
�69,
0815
�,�8
�16,
700
1�0,
000
00
1�0,
00
9le
byaz
hins
ky11
5,00
055
,00
060
,00
�14,
800
14,8
00
�00,
00
10M
aisk
y�9
6,00
�50,
000
046
,00
�60,
400
00
�60,
40
11P
avlo
dars
ky17
0,84
080
,84
090
,00
�70,
000
00
�70,
00
1�U
spen
sky
85,4
�16
,1�
�90
40,0
018
0,00
00
018
0,00
1�Sc
herb
aktin
sky
416,
68�7
�,��
59,�
50
84,0
0�8
0,00
00
0�8
0,00
F/S
00
Tota
l in
Obl
ast:
�,7�
�,47
1,46
1,8�
716,
640
544,
006,
00�,
70�,
750,
0010
�,�0
0�,
150,
40
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
17�
Acc
ess
to D
rin
kin
g W
ater
in s
outh
-Kaz
akhs
tan
obl
ast:
Pre
sen
t an
d fu
ture
Con
diti
ons
№N
ame
of R
ayon
Population as of 01 .01 .�004 (ps .)
Population with access to drinking
water as of 01 .01 .�005 (ps .)
Acc
ess
of p
opul
atio
n to
dri
nkin
g w
ater
(in
% o
f tot
al p
opul
atio
n)
as of 1 .01 .�005
increment for �005 (ps .)
as of 1 .01 .�006
increment for �006 (ps .)
as of 1 .01 .�007
increment for �007(ps .)
as of 1 .01 .�008
increment for �008 (ps .)
as of 1 .01 .�009
increment for �009 (ps .)
as of 1 .01 .�010
increment for �010 (ps .)
as of 1 .01 .�011
1K
enta
u (u
.a .)
1�,0
4797
78 .
10
8 .1
�00
10 .6
500
14 .8
1,40
0�6
.4�,
000
4� .0
4,70
�8�
.0
�Tu
rkes
tan
(u .a
.)94
,4�0
16,1
6117
.150
017
.65,
000
�� .9
8,80
0��
.�17
,000
50 .�
17,7
0069
.01�
,110
81 .8
�A
rys
�5,8
�71�
,996
50 .�
400
51 .8
1,00
055
.71,
100
60 .0
4,00
075
.5�,
000
8� .�
�,00
094
.8
4B
aidi
bek
5�,4
179,
68�
18 .5
�000
�4 .�
9,80
04�
.9�,
400
49 .4
9,�0
066
.95,
800
78 .0
6,00
089
.4
5K
azyg
urt
94,4
����
,�17
�� .5
1000
�4 .6
8,00
0��
.14,
900
�8 .�
1�,�
0051
.�1�
,000
65 .0
1�,8
0079
.7
6M
ahta
aral
189,
516
57,�
00�0
.�11
00�0
.81�
,000
�7 .7
6,50
041
.1�4
,500
54 .0
4�,5
0076
.5�0
,000
87 .0
7O
rdab
asyn
8�,�
19�1
,785
�8 .1
500
�8 .7
7,50
047
.81,
500
49 .6
8,00
059
.�8,
000
68 .8
8,00
078
.4
8O
trar
55,1
958,
059
14 .6
9000
�0 .9
15,0
0058
.1�,
000
61 .7
4,00
069
.01,
500
71 .7
�,00
075
.�
9Sa
iram
��9,
77�
110,
506
48 .1
�000
49 .0
5,00
051
.110
,000
55 .5
�9,0
0068
.119
,000
76 .4
17,0
008�
.8
10Sa
ryag
ash
199,
�09
�8,0
0114
.055
0016
.87,
000
�0 .�
8,50
0�4
.6�7
,780
4� .5
41,5
0064
.4�8
,�70
78 .5
11Su
zak
4�,0
7�11
,6�5
�7 .7
�000
�4 .8
7,00
051
.45,
700
65 .0
5,60
078
.��,
500
84 .�
�,40
089
.9
1�To
lebi
i88
,0��
�1,8
86�6
.�10
00�7
.4�,
000
40 .8
11,0
005�
.�18
,000
7� .7
6,�0
080
.911
,000
9� .4
1�Ty
ulku
bas
74,6
85��
,074
�0 .9
800
�� .0
�,00
0�6
.06,
800
45 .1
1�,5
006�
.�11
,000
77 .9
10,1
5091
.5
14Sh
arda
ra4�
,517
7,77
618
.�10
00�0
.64,
500
�1 .�
6,50
046
.59,
000
67 .7
5,00
079
.44,
�5�
89 .4
Tota
l in
Obl
ast:
1,�8
�,57
1�7
�,05
6�9
.0�8
800
�1 .�
89,1
00�8
.�77
,�00
44 .�
19�,
�80
59 .�
177,
800
7� .1
14�,
684
84 .�
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
17�
ANNExES
Pre
sen
t sit
uati
on w
ith
Rur
al W
ater
sup
ply
in s
outh
-Kaz
akhs
tan
obl
ast
№N
ame
of R
ayon
Num
ber
of
Sett
lem
ents
(it
ems)
Pop
ulat
ion
(ps .
)
Ava
ilabi
lity
of W
ater
Sup
ply
from
:
cent
raliz
ed w
ater
sup
ply
syst
emlo
cal w
ater
sou
rces
deliv
ered
wat
erW
ater
Tar
iff,
KZT
/m�
grou
nd w
ater
surf
ace
wat
er
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Leng
th o
f wat
er
pipe
net
wor
k (k
m)
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
Num
ber
of
Sett
lem
ents
Pop
ulat
ion
1K
enta
u (u
.a .)*
41�
,047
�97
70
110
,0�0
11,
040
0-
up to
75
�Tu
rkes
tan
(u .a
.)*�9
94,4
�07
16,1
6186
.5�1
77,5
�80
-1
7�1
up to
75
�A
rys
�5�5
,8�7
1�1�
,996
61 .6
1�1�
,��4
151
70
-up
to 7
5
4B
aidi
bek
5�5�
,417
89,
68�
118 .
�4�
4�,�
�41
500
0-
up to
75
5K
azyg
urt
6094
,4��
19��
,�17
177 .
00�9
56,�
0010
9,��
4�
6,79
�up
to 7
5
6M
ahta
aral
177
189,
516
�757
,�00
1�4 .
81�
111
7,�8
70
-�9
14,9
�9up
to 7
5
7O
rdab
asyn
598�
,�19
17�1
,785
11� .
�4�
51,5
�40
-0
-up
to 7
5
8O
trar
4�55
,195
108,
059
78 .1
���7
,�7�
1�,
074
1016
,790
up to
75
9Sa
iram
7���
9,77
���
110,
506
4�5 .
640
117,
7�8
0-
11,
5�8
up to
75
10Sa
ryag
ash
151
199,
�09
15�8
,001
�7� .
5�7
71,6
48�9
�4,0
8670
65,5
74up
to 7
5
11Su
zak
�54�
,07�
1111
,6�5
74 .�
�4�0
,4�7
0-
0-
up to
75
1�To
lebi
i70
88,0
���0
�1,8
8615
7 .�
4056
,1�6
0-
0-
up to
75
1�Ty
ulku
bas
5974
,685
19��
,074
65 .6
5�9
51,5
461
650
-up
to 7
5
14Sh
arda
ra�4
4�,5
17�
7,77
6�6
.00
�1�4
,741
0-
0-
up to
75
Tota
l in
Obl
ast:
871
1,�8
�,57
1�1
��7
�,05
61,
781 .
7549
�75
6,65
554
48,5
0611
�10
6,�5
4up
to 7
5
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
174
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f sou
th-K
azak
hsta
n o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of R
ayon
�005
�006
�007
Tota
l in
�005
Sour
ces
of F
inan
cing
Tota
l in
�006
Sour
ces
of F
inan
cing
Tota
l in
�007
Sour
ces
of F
inan
cing
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal e
ntity
fo
reig
n gr
ants
an
d lo
ans
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal e
ntity
fo
reig
n gr
ants
an
d lo
ans
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal e
ntity
fo
reig
n gr
ants
an
d lo
ans
1K
enta
u (u
.a .)*
00
00
0�0
.00
00
0�0
.00
�� .0
00
00
�� .0
0
�Tu
rkes
tan
(u .a
.)*18
00
018
.00
170 .
000
160 .
000
10 .0
016
0 .00
01�
0 .00
040
.00
�A
rys
100
00
10 .0
0�0
.00
00
0�0
.00
�0 .0
00
00
�0 .0
0
4B
aidi
bek
450
45 .0
00
0�5
8 .50
10� .
50�4
5 .00
010
.00
11� .
600
96 .0
00
17 .6
0
5K
azyg
urt
150
00
15 .0
0�1
6 .00
151 .
0014
0 .00
0�5
.00
190 .
0014
0 .00
00
50 .0
0
6M
ahta
aral
�00
00
�0 .0
044
7 .00
184 .
0017
9 .00
084
.00
�80 .
00�0
0 .00
00
80 .0
0
7O
rdab
asyn
150
00
15 .0
015
0 .00
50 .0
070
.00
0�0
.00
70 .0
00
00
70 .0
0
8O
trar
�69 .
0�5
��6 .
��5
4� .8
00
017
5 .00
60 .0
090
.00
0�5
.00
80 .0
00
00
80 .0
0
9Sa
iram
68 .4
5447
.454
00
�1 .0
017
7 .70
9� .7
00
084
.00
�67 .
5016
7 .50
00
100 .
00
10Sa
ryag
ash
148 .
847
1�� .
847
�5 .0
00
040
� .10
�11 .
9040
.00
050
.�0
714 .
0069
4 .00
00
�0 .0
0
11Su
zak
640
64 .0
00
0�0
4 .00
180 .
001�
4 .00
00
�97 .
00�0
0 .00
97 .0
00
0
1�To
lebi
i�4
.90
� .00
0��
.90
80 .0
00
00
80 .0
0��
6 .00
97 .0
0�1
4 .00
015
.00
1�Ty
ulku
bas
�6 .4
01 .
400
�5 .0
01�
0 .00
70 .0
0�0
.00
0�0
.00
�6� .
001�
0 .00
9� .0
00
50 .0
0
14Sh
arda
ra47
.�0
47 .�
00
0�0
0 .00
�00 .
000
00
675 .
�067
5 .�0
00
0
Tota
l in
Obl
ast:
771 .
8�6
�97 .
5�6
��7 .
40
146 .
9�,
050 .
�01,
504 .
101,
078 .
000
468 .
�0�,
588 .
40�,
�9� .
8061
9 .00
057
5 .60
Not
e: *
u.a.
- urb
an a
gglo
mer
ate
175
ANNExES
Expe
cted
Inve
stm
ents
to W
ater
sup
ply
Impr
ovem
ent i
n R
ural
Are
as o
f sou
th-K
azak
hsta
n o
blas
t (U
nit
: Kzt
mln
)
№N
ame
of R
ayon
�008
�009
-�01
0
Tota
l in
�008
Sour
ces
of F
inan
cing
Tota
l in
�00
9-�0
11
Sour
ces
of F
inan
cing
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal e
ntity
fo
reig
n gr
ants
an
d lo
ans
cent
al
stat
e bu
dget
loca
l bu
dget
le
gal e
ntity
fo
reig
n gr
ants
an
d lo
ans
1K
enta
u (u
.a .)*
�6 .�
00
5 .50
0�0
.70
50 .0
00
00
50 .0
0
�Tu
rkes
tan
(u .a
.)*��
8 .00
019
5 .00
0��
.00
��7 .
700
��7 .
700
0
�A
rys
�50 .
007�
.00
164 .
000
14 .0
0�4
9 .70
6� .0
018
6 .70
00
4B
aidi
bek
��1 .
000
�11 .
000
10 .0
0�6
0 .00
0�5
0 .00
010
.00
5K
azyg
urt
�87 .
1011
6 .00
�48 .
100
�� .0
066
4 .�0
�0� .
504�
4 .70
0�7
.00
6M
ahta
aral
1,19
0 .00
�64 .
007�
6 .00
0�0
0 .00
��67
.00
607 .
001,
709 .
000
51 .0
0
7O
rdab
asyn
��5 .
000
�08 .
000
17 .0
06�
4 .00
85 .0
054
9 .00
00
8O
trar
160 .
000
59 .4
00
100 .
6010
0 .70
00
010
0 .70
9Sa
iram
1,09
� .50
607 .
5044
5 .00
040
.00
�,0�
8 .50
980 .
0099
6 .50
05�
.00
10Sa
ryag
ash
1,08
� .00
�50 .
0065
� .00
080
.00
1,�0
7 .10
01,
��� .
100
75 .0
0
11Su
zak
�99 .
001�
5 .00
164 .
000
0�1
� .00
60 .0
0�5
� .00
00
1�To
lebi
i51
0 .40
1�4 .
00�4
6 .40
040
.00
71� .
80�9
6 .00
�56 .
800
61 .0
0
1�Ty
ulku
bas
461 .
�016
� .00
�69 .
�00
�0 .0
060
� .10
�44 .
00�5
9 .10
00
14Sh
arda
ra75
5 .10
6�5 .
�01�
9 .80
00
�99 .
500
�99 .
50
0
Tota
l in
Obl
ast:
7,09
7 .60
�,45
5 .80
4,0�
� .50
061
8 .�0
9,8�
7 .�0
�,6�
7 .50
6,75
� .10
0 .00
4�6 .
70
Not
e: *
u.a.
– u
rban
agg
lom
erat
e
UNDP Project National Plan for Integrated Water Resources Management and Water Efficiency in Kazakhstan
ACCEss to DRINKINg WAtER AND sANItAtIoN IN thE REPUblIC of KAzAKhstAN
176