Operating Manual
testing device For water ‑ rmg 790
2
testing device For water ‑ rmg 790
A
E
3
1
2
4
5
6
7 8
9
10
C
D
B
Operating Manual
Water
Gas
100 bar 16 bar
3
testing device For water sav rmg 790
CONNECTION: TO: TYPE OF CONNECTION:
A Gas – Inlet Auxiliary energy, gas
Pipe connection DIN 2353light-duty seriesouter diameter of pipes B Gas – Outlet Outdoor line
C Water – Outlet Heat exchanger
D Water – Inlet Funnel Quick coupling
E Water – Overflowvalve Collector Hosenipple12mmwithcock
COMPONENTS:
1 Pressure vessel
2Funnelwithquickcoupling
3 Gas stop ball valve at inlet
4 Water stop ball valve at outlet
5 Adjustable inlet control valve
6 Adjustable outlet control valve
7 Fixed control valve
8Safetyblow-offvalve,setto12bar
9 Pressure gauge, gas
10Pressuregauge,water
TECHNICAL SPECIFICATIONS:
Inlet pressure, max.: pe max = 100 bar
Operating pressure, max.: pe max = 16 bar
Water tank: V ~ 6.5
Operating Manual
4
testing device For water ‑ rmg 790
•ClosestopvalvesbetweenheatingandRMG790inflowandreturnpipes.
•ConnectwateroutletconnectionCofthetestingdevicetotestconnectionI(heatexchangerside!)ofanRMG790 or directly to the heat exchanger.
•Openstopballvalve4.Compensatepressurebetweenheatexchangerandtestingdevice.
•Observewaterpressuregauge10 .
caution. Tank1isunderpressure!DonotopenconnectionDbyinsertingwaterfunnel2.
Operating Manual
1. Filling with water
caution. Depending on application, it may be necessary to use antifreeze or similar agents.
•Insertfunnel2withquickcoupling.ConnectionDisopen.
•Openoutletcontrolvalve6.
•Closestopballvalves3and4.
•OpenoverflowvalveEabit.(Releaseairwhenfillingpressurevessel1.)
•Fillwithwater.
•Removefunnel2,connectionDisclosed.
•CloseoverflowvalveE.
2. connect to sav rmg 790 or heat exchanger
It is also possible to connect di-
rectly to the heat exchanger.
Heat exchanger
Flowpipes
Returnpipes Stop valve
Stop valve
Test connection ITest connection II
Test connection II Test connection I
Test connection
5
testing device For water sav rmg 790
4. connect auxiliary energy (gas).
•Closestopballvalve3.
•Closeoutletcontrolvalve5.
•Openoutletcontrolvalve6.
•Connectauxiliaryenergy.(ph > ps SAV)
5. testing
•Openstopballvalve3.
•Adjusttestpressureadjustingcontrolvalves5and6. By applying the test pressure to the pressure vessel on the gas side, the pressure in the heat exchanger is raised simultaneouslysothatthetestingdeviceonRMG790opensassoonasthesetvalueisreached.Youwillnoticeasmallamountofwaterleakingfromthetestingdevice. AfurtherincreaseinthepressurewillclosetheSAVs.ThepressureatthepressuregaugeofSAVtestconnectionIIwillfallbacktothesetvalueofthetestingdevice.Next,youmustraisethetestpressureanadditional2to3bars(butnotbeyond10bar).Trapthepressureintheheatexchangerbyclosingtheconnectionofthetestingdevice.Ifthepressureremainsstable,theconnectionistightandtheRMG790worksproperly.
•Whileapplyingthepressureandcarryingoutthetest,keepaneyeonpressuregauges9(gas)and10(water)onthe testing device. Both pressure gauges must indicate the same pressure.
6. completing the test
•Closestopballvalve3.
•Openoutletcontrolvalve6.Reducegaspressure.
•Closestopballvalve4.
•OpenoverflowvalveE.Reducewaterpressure.
•Removetestingdeviceconnection.
•Drainingthewaterfromtestingdevice: Openstopballvalve4anddrainpressurevessel1usingwateroverflowconnectionE. Rememberantifreeze,ifnecessary(collector).
Operating Manual
3. connect outlet connection b to outdoor pipe.
serving the gas industry worldwide
www.rmg.com
RMGisyourworldwidepartnerforgascontrolequipment,ranging from exploration to consumer supply. The com-prehensiverangeofRMGproductsandsystemsprovidesyouwithatotalsolutionforallyourgasandmeasurementneeds.Modernmanufacturingtechniquescombinedwithourexpertiseandspecialistknowledgeinthedesignand
buildofgascontrolequipment,includingfullyautomatedstations,hasearnedRMGaworldwidereputationforsup-plyofsave,accurateandreliableequipment.RMG…Welcomestheopportunitytomeetyourbusinessrequirements.
Lastupdate11/2007TestingdeviceforSAVRMG790Technicalmodificationsreserved
WÄGAWÄRME-GASTECHNIKGMBHOsterholzstraße 45D-34123Kassel(Germany)Tel +49(0)561.5007-0Fax+49(0)561.5007-207
RMG-GASELANREGEL+MESSTECHNIKGMBHJulius-Pintsch-Ring3D-15517Fürstenwalde(Germany)Tel +49(0)3361.356-60Fax+49(0)3361.356-836
CANADA
BRYANDONKINRMGCANADALTD.50 Clarke Street South, WoodstockOntario N4S 7Y5, CanadaTel +1. 519 53 98 531 Fax +1. 519 53 73 339
GERMANY
RMGREGEL+MESSTECHNIKGMBHOsterholzstraße 45D-34123Kassel(Germany)Tel +49(0)561.5007-0Fax+49(0)561.5007-107
RMGMESSTECHNIKGMBHOtto-Hahn-Straße 5D-35510Butzbach(Germany)Tel +49(0)6033.897-0Fax+49(0)6033.897-130ebersberg location:-Softwaredevelopment-Anzinger Straße 5D-85560Ebersberg(Germany)Tel +49(0)8092.2097-0Fax+49(0)8092.2097-10
ENGLAND
BRYANDONKINRMGGASCONTROLSLTD.EnterpriseDrive,HolmewoodChesterfieldS425UZ,EnglandTel +44. 12 46 501-501 Fax +44. 12 46 501-500
POLAND
GAZOMETSP.ZO.O.ul.Sarnowska263-900Rawicz,PolandTel +48. 65 546 24 01 Fax +48. 65 546 24 08