7/24/2019 796 Heliport Pad Restoration on Petrobras PRA1 Platform
1/6
2008Sponge-JetInc.Allrightsreserved.
1
PRA-1Project:
Resurfacing heliport floor
critical to transport of
resources
Shutdown time as
short as possible
Project enclosed entire
heliport perimeter
Heliport Pad Restoration on Petrobras PRA-1 Platform
Project 796
7/24/2019 796 Heliport Pad Restoration on Petrobras PRA1 Platform
2/6
2008Sponge-JetInc.Allrightsreserved.
2
Heliport Pad Restoration on Petrobras PRA-1 Platform
Substrate: Aluminum
Specifications:Project Size: 358m (3853 ft)
Preparing Containmentusted luminum Deck
Profile: 40-85microns(2-3mils)
Sponge Media Used:Silver 30 Sponge Media abrasives
7/24/2019 796 Heliport Pad Restoration on Petrobras PRA1 Platform
3/6
2008Sponge-JetInc.Allrightsreserved.
3
PRA-1
Considered:
Substrate was previously
cleaned with water blasting;
paint was still present
Specifications:
Profile:
50-80 microns(2-3mils)Cleanliness level:
SSPC SP-7/ SA1
Commercial Brush Off Blasting
Equipment: (1) 400-HP
and (1) 100-HP Feed Unit
working simultaneously
Safety: Initially, management was
uncomfortable with two Feed
Units blasting side by side
Heliport Pad Restoration on Petrobras PRA-1 Platform
7/24/2019 796 Heliport Pad Restoration on Petrobras PRA1 Platform
4/6
2008Sponge-JetInc.Allrightsreserved.
4
PRA-1
Reason for choosing
Sponge-Jet?
Ordinary blasting would require
a more complex containment
structure
Heliport Pad Restoration on Petrobras PRA-1 Platform
7/24/2019 796 Heliport Pad Restoration on Petrobras PRA1 Platform
5/6
2008Sponge-JetInc.Allrightsreserved.
5
PRA-1
Heliport Pad Restoration on Petrobras PRA-1 Platform
TWO BL STERS
7/24/2019 796 Heliport Pad Restoration on Petrobras PRA1 Platform
6/6
2008Sponge-JetInc.Allrightsreserved.
6
PRA-1
Outcome:
Plant managmentrecognized this as a
new, safe and efficient
solution
Contracting two more
Petrobras platformheliports
Operators doubled
production, using two
Feed Units at the same
time - 358m (3,853 ft)
in 1 days
Heliport Pad Restoration on Petrobras PRA-1 Platform
BEFORE FTER