229
THE CITY Of ALEXANDRIA, LOUISIANA D. G. HUNTER ELECTRIC GENERATING STATION 85,000 KW UNIT 4 ENGINEERING SUMMARY
Transcript
Page 1: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

THE CITY Of ALEXANDRIA, LOUISIANA

D. G. HUNTER ELECTRIC GENERATING STATION

85,000 KW UNIT 4

ENGINEERING SUMMARY

Page 2: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

TABLE OF CONTENTS

PAGE I. INDEX TO ENGINEERING DOCUMENTS

A. Mechanical Documents I-1

B. Electrical Documents I-1

c. Structural Documents I-2

II. EQUIPMENT DATA II-1

A. Mechanical Equipment II-1 1. Turbine Generator II-1 2. Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air Compressor II-17 8. Piping II-17 9. Pipe Supports II-17

10. Insulation and Lagging II-17 11. Valves II-18 12. Control and Instrumentation II-19 13. Miscellaneous Equipment II-23

B. Electrical Equipment II-25 85 MW Unit 4 1. Motor Control Centers II-25 2. Dual Switchboard II-25 3. Secondary Unit Substation II-25 4. 4.16 kV Switchgear II-26 5. 4.16 kV Metal Enclosed Bus Duct II-26 6. Generator 4 Bus Duct II-26 7. Oil Circuit Breakers II-27 8. 138 kV Outdoor Substation II-27 9. 138-12.47 kV Tie Transformer 2 II-27

10. 12.5 kV Grounding Transformer II-28 11. Generator Transformer 4 II-28 12. Main Auxiliary Transformer 4 II-29 13. Reserve Auxiliary Transformer 4 II-29 14. Batteries II-30 15. Battery Chargers II-30 16. Dry Type Transformers II-30 17. A-C and D-C Panelboards II-31 18. Motor Starters II-31 19. Contactors II-31

i

Page 3: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

20. 21. 22. 23.

Push-button and Selector Switch Stations Grounding Resistors 12.47 kV Switchgear 2 Addition Essential Service Motor-Generator Control

Panel 24. 25. 26. 27. 28. 29. 30. 31.

Essential Service Motor-Generators Motors · Cables, Trays and Raceways Power Cable Control Cable Freezeproofing Materials Intercommunication System Lighting

Substation Transformer No. 2 Oil Circuit Breakers 12.47 kV Switchgear

Prescott 1. 2. 3. 4. 5. 6. 7. 8.

12.47 kV Metal Enclosed Bus Duct Dual Switchboard 138 kV Outdoor Substation Power Cable Control Cable

C. Structural Material and Equipment 1. Concrete Piling 2. Concrete 3. Masonry 4. Structural and Miscellaneous Metals 5. Roof Covering 6. Metal Wall Panels 7. Metal Doors 8. Painting 9. Floor Covering

10. Special Items 11. Hoisting Equipment 12. Heating, Ventilating and Air Conditioning 13. Piping 14. Fuel Oil Storage Tank 15. Raceway 16. Grounding 17. Cathodic Protection

III. MANUFACTURER'S PRINT INDEX

A. Mechanical Prints

B. Electrical Prints

C. Structural Prints

ii

PAGE

II-31 II-32 II-32 II-32

II-32 II-33 II-33 II-34 II-34 II-35 II-36 II-36

II-37 II-37 II-38 II-38 II-38 II-39 II-39 II-39

II-40 II-40 II-40 II-40 II-40 II-40 II-41 II-41 II-41 II-41 II-41 II-41 II-41 II-42 II-42 II-43 II-43 II-43

III-1

III-2

III-39

III-61

Page 4: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

IV. DRAWINGS

A. Plant Arrang~ents PA-002 Site Plan PA-101 BasE!ment Floor- El. 74 1-0" PA-102 Groqni! Floor - El. 85 '-01'

PA-103 Ope:cating Floor - El. 96 '-0" PA-104 Uppf!r Burner P:j.atform - El. 103 '-0",

T11nk Floor - El. 111' -0" PA-105 Upper Drum Platform- El. 127'-0",

Turbine Room Roof - El. 128 '-0" PA-106 Bo:i,ler Area Roof - El. 138'-0" PA-107 Longitudinal Section s-1 Plot Plan S-2 Unqerground Utilities S-3 Arqhitectural North, West, and South Elevations S-4 Arqhitectural East Elevation, Elevator, and Roof Plan

B. Electrical Qiagrams E-1 One-Line Diagram 138 kV, 14.4 kV, 12.47 kV and 4.16 kV E-2 One-Line Diagram 480 Volt and DC E-701 Prescott Substation Additions, One-Line Diagram,

and Modifications

C. Flow Diagra~s FD-1 FD-2 FD-3 FD-4 FD-5 FD-6 FD-7 FD-8 FD-9 FD-10 FD-11 FD-12 FD-13 FD-14 FD-15 FD-16 FD-17

Maip and Auxiliary Steam Extraction Steam Boiler Feedwater Conq.ensate Hea~er Vents and Drains and Condenser Air Cir~ulating Water Auxiliary Cooling Water Fuel Gas Fuel Oil Compressor Air Lubricating Oil Blowdown and Boiler Miscellaneous Piping Boiler Draft Piping Miscellaneous Turbine Piping Miscellaneous Equipment Drains Water Treatment, Sampling and City Water Plan~ Drains and Gas Piping

iii

Page 5: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

D. Logic A-1 A-2 A-3 A-4 A-5 A-6 A-7

B-1 B-2 B-3

C-1 C-2 C-3 C-4 C-5 C-6 C-7

D-1 D-2 D-3 D-5

E-1 E-2 E-3 E-4 E-5 E-6 E-7 E-8

F-1 F-2

G-1 G-2 G-3 G-4 G-5 G-6 G-7

H-1 H-2 H-3 H-4 H-5 H-6 H-7 H-8 H-9

Diagrams Main Steam Shutoff Valve - 4MOV-1 Main Steam Shutoff Drain Valve - 4 MOV-2 Superheater Desuperheater Spray Main Block Valve - 4MOV-3 Superheater Desuperheater Spray Block Valve - 4MOV-4 Superheater Desuperheater Spray Block Valve - 4MOV-5 Superheater Desuperheater Spray Control Valve - 4CRV-5 Superheater Desuperheater Spray Control Valve - 4CRV-6

Heater Shutoff Valve - Extraction Check Valve Heater Upstream Drain Valves Heater Downstream Drain Valves

Boiler Feed Pump 4A Boiler Feed Pump 4B Boiler Feed Pump 4A Auxiliary Oil Pump Boiler Feed Pump 4B Auxiliary Oil Pump Boiler Feed Pump 4A Discharge Valve - 4MOV-21 Boiler Feed Pump 4B Discharge Valve - 4MOV-22 Boiler Feed Pump Low Discharge Alarm

Condensate Pump 4A Condensate Pump 4B Condenser Exhauster 4A & 4B Heater Drain Pump 4

Circu!ating Water Pump 4A Circulating Water Pump 4B Circulating Water Pump 4A Shutoff Circulating Water Pump 4B Shutoff Cooling Tower Fan 4A Cooling Tower Fan 4B Cooling Tower Fan 4C Cooling Tower Fan 4D

Auxiliary Cooling Water Pump 4A Auxiliary Cooling Water Pump 4B

Functional Schematic Master Fuel Relay A Master Fuel Relay B Fuel Gas 4SSV-l and 4SRV-28 Pilot Gas 4SSV-2 Fuel Oil 4SSV-3 Purge Systems and Key Switch

Auxiliary Oil Pump 4 AC Bearing and Seal Oil Pump 4 DC Bearing and Seal Oil Pump 4 Turbine 4 Oil Pump Not in Auto

Valve Valve

Turning Gear 4 and Turning Gear 4 Clutch Turbine Oil Reservoir Vapor Extractor 4 Bearing Drain Enlargement Exhauster 4 Gland Exhauster 4 Lube Oil Purifier 4

iv

- 4MOV-25 - 4MOV-24

Page 6: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

J-1 Air Heater 4 and Air Heater 4 Air Motor J-2 Air Heater 4 Lube Oil Pump and Cooling Fan J-3 Flame Detector Cooling Fans 4A and 4B J-4 Boiler Chemical Feed Pumps

K-1 Forced Draft Fan Motor 4 K-2 Fuel Oil Pump 4

E. PERFORMANCE DATA

Boiler Feed Pump Characteristic Curves Condensate Pumps Performance Curves Circulating Water Pump Characteristic Curves Forced Draft Fan Performance Curves Condenser Performance Curves

100% Cleanliness Factor 85% Cleanliness Factor 80% Cleanliness Factor 70% Cleanliness Factor 60% Cleanliness Factor 50% Cleanliness Factor 50% Cleanliness Factor

v

Page 7: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

I. INDEX TO ENGINEERING DOCUMENTS

A. Mechanical Documents

1. Drawings

Mechanical Construction Plans (40 Sheets)

Mechanical Construction Flow Diagrams (19 Sheets)

Piping Hanger Schedule

Accessory Equipment Schedule

Logic Diagrams

2. Specifications

D-6 Mechanical Construction

K-4A Burner Control and Automation System

K-6A Control and Instrument Equipment

M-lOA Cooling Tower

M-16A Closed Feedwater Heaters

M-16B Deaerator

M-32A Boiler Feed Pumps

M-34A Steam Generator

M-36A Surface Condenser and Auxiliary Equipment

M-40A Turbine Generator

M-42A High Pressure and Motor Operated Valves

3. Manufacturers' Print Index

An Index of these Drawings is Included in Section III of this Engineering Summary.

B. Electrical Documents

1. Drawings

Electrical Construction Plans (38 Sheets)

Substation Construction Plans (5 Sheets)

I-1

Page 8: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Circuit and Raceway Schedules

Schematic and Wiring Diagrams

2. Specifications

D-8 Electrical Construction

D-10 Substation Construction (Prescott Substation)

E-lOA Electrical Equipment (Prescott Substation)

E-12A Isolated Phase Bus Duct

E-14A Motor Control Centers

E-lSA Dual Switchboards

E-20A Secondary Unit Substation

E-22A Metalclad Switchgear and Bus Duct

E-24A Substation Equipment

~28A Power Transformer Equipment

3. Manufacturers' Print Index

An Index of these Drawings is Included in Section III of this Engineering Summary.

C. Structural Documents

1. Drawings

Foundation Construction Plans (17 Sheets)

General Construction Plans (33 Sheets)

2. Specifications

D-2 Foundation Construction

D-4 General Construction

3. Manufacturers' Print Index

An Index of these Drawings is Included in Section III of this Engineering Summary.

I-2

Page 9: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

II. EQUIPMENT DATA

A. Mechanical Equipment

1. Turbine Generator

Manufacturer

Serial No.

Type

Nominal Rating (kW)

Speed (rpm)

Number of Extractions

Generator

Exciter

(a) Performance Data (Design)

Generator Output (kW)

Throttle Steam Pressure (psig)

Throttle Steam Temperature (F)

Exhaust Steam Pressure (in. hg abs)

Exhaust Flow (#/hr)

Throttle Steam Flow (II /hr)

Turbine Cycle Heat Rate (Btu/kWhr)

II-1

General Electric

Turbine 197605 Generator 161X492

Single casing, single flow

83,492

Five

100,000 kVA, 0.85 Power Factor, 30 psig Hydrogen, 14,400 Volts, Wye Connected, 60 Cycles

Direct Driven, 210 kW, 250 Volts 840 amps Air Cooled

45,001 83,492 90,630

1,250 1,250 1,313

950 950 950

2.0 2.5 3.0

276,762 508,060 557,627

369,484 724,968 800,566

9,239 9,149 9,188

Page 10: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Oil Reservoir

Storage Capacity (gallons)

~(c) _Oil Cooler

Number of Units

Type

Design Water Pressure (psig)

(d) Auxiliary Oil Pump

Number of Pumps

Serial No.

Capacity (gpm)

Head (psig)

Motor Size (hp)

Motor Serial No.

(e) AC Motor Driven Bearing and Seal Oil Pump

Capacity (gpm)

Head (psig)

Motor Size (hp)

Motor Serial No.

II-2

2600

Two

Tube and Shell

125

1

8-L-15

360

185

60

MHJ1213107

300

78

20

GHJ719365

Page 11: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

(f) DC Motor Driven Bearing and Seal Q:!1. Pump

Serial No.

Capacity (gpm)

Head (psig)

Motor Size (hp)

(g) Turning ~ Motor

Number of Units

Serial No.

Size (hp)

Model No.

(h) Reservoir Vapor Extractor

Number of Units

Serial No,

Motor Size (hp)

(i) Gland Exhaust Vacuum Pump

Serial No.

Motor Size (hp)

2. Steam Generator

Manufacturer

Type

Continuous Rating (II s team/hr)

Design Pressure (psig)

Superheater Outlet Conditions

Pressure (psig)

Temperature (F)

Water Capacity (Normal Level) (lb)

Il-3

10723810

274

60

15

1

5

5KG215BN302

1

724723

3/4

72U-5132

10

Combustion Engineering

VU-60

800,566

1,675

1,350

955

192,000 !,

Page 12: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

(a) Performance Data (Design)

Steam Flow, lb per hr X 1,000

Superheater Outlet

Pressures, psi

Superheater Outlet

Drum Pressure

Temperatures, F

Feed Water to Boiler

Superheater Outlet Steam

Air to FD Fit,ns (60% RR)

Air to Burners

Gas Leaving Furnace (HVT)

Gas Entering Air Heater

Gas Leaving Regenerative Air Heater (uncorr)

Gas Leaving Regenerative Air Heater (corr)

430.8

1,286

1.325

38'1

955

80

586

2,150

695

263

250

A!!. Friction Los.ses, .!!h !!.2Q

Burner and Wind Box

Regenerative Air Heater

Dampers, Venturi, Ducts

Total Air Friction Loss

2.00

1.90

0.15

4.05

11-4

725.0 800.6

1,350 1,435

1,445 1,540

453 463

'155 955

80 80

613 628

2.390 2,440

750 775

296 308

280 291

3.50 4.00

4.00 4.70

0.40 0.50

7.90 9.20

Page 13: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Flow Measuring Section Differential

Gas Friction Losses, In. g2g_

Furnace to Economizer Outlet

Regenerative Air Heater

Gas Ducts

Gas Duct & Stack

Total Gas Friction Losses

Total Gas and Air Fricti~Loss, in. !!a.Q.

H:eat Balance, %

Excess Air

Dry Gas Loss

Loss Due to Hz and H2o in Fuel

Loss Due to H20 in Air

Loss Due to Unburned Combustibles

Loss Due to Radiati.on

Unaccounted Losses

Total H:eat Loss

Efficiency

(b) Forced Draft Fan

Number of fans

Serial No, Motors

Type Fan

0.15

2.70

2.75

0.10

1.20

6.75

10.95

15

3.43

10.52

0.09.

0

0.45

1.00 1 15.49

84.51

One

lS79P577

0.40

6.25

5.65

0.25

3.0

15.15

23.45

10

3.88

10.65

0.11

0

0.27

1.00

15.<n

84.09

0.50

7.30

0.30

3.30

17.55

27.25

10

4.09

10.68

0.11

0

0.26

1.00

16.12

83.88

Green Fuel Economizer Co. No. 900 Type A 6183BDTX884H, Double Inlet Air foil Type, 1160 rpm, with Outlet Damper

II-5

Page 14: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Air Inlet Temperature (F)

Air Flow (M lb/hr)

Air Flow (Mcfm)

Fan System Res.istance (in. H20)

Fan Static ~ressure

(c) Regenerative~ Reater

Manufacturer

Serial No.

Type

Rotor Drive

Air Motor Drive

3. Condenser. ~·Auxiliaries

(a) Condens.er

Manufacturer

Serial No.

Type

Condensing Surface (ft2)

Tube Material

Tube Size (in. OD)

Tube Length (ft)

Cooling Water Required (gpm)

II-6

-/--

80 80 80

520 788.5 858.5 'J·

120.5 182.3v 198.8

10.95 23.45 27.25

10.95 23.45 27.25

Air Preheater Corp.

5765

24HRX-39.5

Philadelphia 4RR Speed Reducer with 7-1/2 hp GE Motor, Frame /1213Z, 1,800 rpm, 230/460V

Chicago Pneumatic Air Motor 8046 RSM

Southwestern Engineering Company

28382

IB2-RB6-29-8125 Rorizontal, Two Pass, Surface Type, Divided Water Boxes, with Full, Deaerating Horizontal Rot Well

55,000

Stainless Steel

One

30' -0"

56,000

Page 15: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Steam Condensed (lb/hr)

(b) Condensate Pumps

Manufacturer

Number of Pumps

Serial Nos.

Model

Type

Capacity (gpm)

Total Head (ft of water]

Motor Manufacturer

Motor Size

Serial Nos.

(c) Circulating Water Pumps

Manufacturer

Number of Pumps.

Serial NO.

Model

Type

Capacity (gpm)

Total Head (ft)

Efficiency (%)

Motor Manufacturer

Motor Size

Serial No.

510,000

Ingersoll-Rand Company

Two

017294 and 017295

14APH.C-6

Vertical Wet Suct:ton "Can"Type

1,150

470

Wes ting!wuse

200

7208 and 7208

Ingersoll-Rand Company

Two

1171-79, 1171-78

24LFV

H.orizontal Split Case, Double Suction

30,500

74

86

Westinghouse

700

lS-72, 2S-72

II-7

Page 16: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

(d) Condenser Exhaust Units

Manufacturer

Number of Units

Serial No. Units

Type

H:olding Capacity, scfm Free Dry Air in a Satu­rated Air Vapor Mixture at 1.0 Inch H:g and 71.5 F

H:ogging Capacity, cfm Dry Air at 15 Inches Jill

Cooling Water, at 95 F Flow, gpm

Cooling water, at 95 F Pressure Drop, psi

Vacuum Pump, power requirements hp at Rated Holding Capacity

Vacuum Pump, Power Requirement~ hp Maximum

Motor (Vacuum Pump) Size, hp

Motor (Vacuum Pump) rpm

Motor (Seal Pump) Size hp

Motor (Seal Pump) rpm

(e) Auxiliary Water Coolers

Manufacturer

Number of Units

II-8

Nash Engineering

Two

72U38968 and 72U3937

CL-705 and Air Jet - rotary water sealed centrifugal dis­placement vacuum pump

5

420

60

1.5

25

29

30

880

3/4

3,520

Hughes-Anderson Engineering Corp.

Two

Page 17: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Size

Serial Nos,

Type

Heat Exchan~e Surface (ft )

No. of Water Passes

No, of Condensate Passes

Tube Material

Size (in. OD)

Gage

Design Pressure (J?sig)

Pressure Drop (!lsi)

Tube Side

Shell Side

4. Pumps

(a) Boiler Feed Pumps

Manufacturer

No. of Units

Serial Nos.

Type

Capacity (gpm)

Total Head (ft)

Shutoff Head (ft)

Speed (rpm)

Power Required (Design hp)

II-9

31" X 34 1

70-G-249-lA and 70-G-249-lB

Horizontal, Single Pass, Installed in Condenser Shell

3,172

One

One

Stainless Steel

One

22 BWG

150

5.1

9.1

Pacific Pumps Division

Two

48026 and 48027

4" S-BFIC 10 stage di,ffuser type

890

4,100

5,320

3,570

1,069

Page 18: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Max Power Required (hp)

Motor Manufacturer

Motor Size

Serial Nos.

1,215

Westinghouse

1,250 hp

lS-72 and 25-72

(b) Auxiliary Cooling Water Pumps

Manufacturer

Number of Units

Serial Nos.

Type

Capacity (gpm)

Total Dynamic Head (ft)

Motor Manufacturer

Motor Size

Serial Nos.

(c) .!:.\!& Q!l Pump

Manufacturer

Number of Units

Serial No. Pump

Serial No. Motor

Type

Capacity (gpm)

Total Head (psi)

Speed (Max rpm)

II-10

Ingersoll-RAnd

Two

1072-665, 1072-664

8 X 14SD Horizontall Split Case Centrifugal

1,700

113

Westinghouse

60 hp

1MA458694-Gl-EY and 1MA458694-G2-EY

DeLaval

Two

508726-1, 508726-2

7302

A6DB-218 Positive Displacement Gear

120

400

3,600

Page 19: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

(d) Chemical Feed Pumps

Manufacturer

Number of Units

Serial No.

Type

Capacity (gph)

Total Read (psig)

Motor Manufacturer

Motor Data

Portable Mixers

Mixer Serial Nos

5 • Heat Exchangers

(a) LP Heater 4-1

Manufacturer

Serial No.

Type

Total Effective Tube Surface (ft2)

No. of Tubes

No. of Passes

Active Tube Length

Tube Size (in.)

Tube Gage

II-11

Milton Roy Company

Two

113354-1, 113354-2

Milroyal Model DMRl-22 for Hydrazine Feed Pump 4

Milroya1 Model DMRl-44 for Phosphate Feed Pump 4

5.7 Rydrazine Feed Pump 4 2.4 Phosphate Feed Pump 4

250 Hydrazine Feed Pump 4 2000 Phosphate Feed Pump 4

Reliance

1/4 hp - Rydrazit~.e )'eel Pump 4 1/2 hp - Phosphate Feed Pump 4

Eastern Industries Model R-0

705433-DY

Yuba Heat Transfer Division

71-R-676-1

Shell and U-Tube, Vertical Mounted with Channel End Up

1,845

568

Four

9'-4"

5/8

18 BWG

Page 20: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Tube Material

Tube Design Pressure (Psig)

Shell Design Pressure (psig)

Pressure Drop at Design Flow (psi)

(b) .!!!: Heater 4-2

Manufacturer

Serial No.

Type

Total Effec~ive Tube Surface (ft )

No. of Tubes

No. of Passes

Active Tube Length

Tube Size (in.)

Tube Gage

Tube Material

Tube Design Pressure (psig)

Shell Design Pressure (psig)

Pressure Drop at Design Flow (psi)

(c) .!!!: Heater 4-4

Manufacturer

Serial No.

Type

Total Effective Tube Surface (ft2)

Inhibited Admiralty

250

50 & 30" Hg Yac.

6.7

Yuba Heat Transfer Diyision

71-H-676-2

Shell and U-Tube, Vertical Mounted with Channel End Vp

836

332

Four

14'-8"

3/4

18 BWG

Inhibited Admiralty

50 & 30" Hg Vac

10.0

Yuba Heat Transfer Divisiun

71-H-576-4

Shell and U-Tube, Vertical Mounted, with Channel End Up

2,610

Il-12

Page 21: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

No. of Tubes

No. of Passes

Active Tube Length

Tube Size (in,)

Tube Gage

Tube Material

Tube Design Pressure (psi g)

Shell Design Pressure (psig)

Pressure Drop at Desgin Flow (psi)

(d) HP Heater !t:i

Manufacturer

Serial No.

Type

Total Effective Tube Surface (ft2)

No. of Tubes

No. of Passes

Active Tube Length

Tube Size (in.)

Tube Gage

Tube Material

Tube Design Pressure (psig)

Shell Design Pressure (psig)

Pressure Drop at Design Flow (ps.i)

670

Four

12'-10"

5/8

18 BWG

70/30 CuNi DSR

2,400

300

10.0

Yuba lfeat Tranafer Division

71-H-676-5

She.ll and U-Tube, Vertical Mounted, with Channel End Up

2,865

710

Four

13' -9"

5/8

18 BWG

70/30 CuNi DSR

2,400

550

10.0

II-13

Page 22: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

(e) Deaerating Heater 4-3

Manufacturer

Serial No.

Type

Rated capacity (#/hr)

,Storage capacity (gal)

Oxygen content (cc/liter)

Design Pressure (psig

(f) Cooling Tower

Manufacturer

Serial No.

Type

Number of Cells

Material

Fans

6. Tanks .l!!!4. Mr. Receivers

Manufacturer

Number

Design Pressure

Type

Serial No.

Size

Chicago Heater Co.

726947

Horizontal Cylindrical Shell, direct contact tray with integral vent condenser

724,968

24,000

0.005

125

The Marley Company

12-102-72

Cross-Flow, Class 600, Model 6515-4-04

4

Treated Fir & Glass' Reinforced Polyester

Four - 28 ft dia

Chicago Bridge & Iron Co.

1

Atmospheric

Vertical Cylindrical

72-3663U

60'-0" Dia x 24'-0" High x 1/ 4" shell thickness

(b) Auxiliary Cooling Water Tank

Manufacturer Rothschild Boiler & Tank Works

Number of Units One

Type Horizontal Cylindrical

II-14

Page 23: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Design Pressure

Size

Atmospheric

8'-0" Diameter x 18'-0" long x 3/8" shell thickness

(c) Demineralized Water Storage Tanks

Manufacturer Owens Corning

Model No. 122AMCWX

Number of Units Three

Type Vertical Cylindrical

Material Filament wound fiberglass

Design Pressure Atmospheric

Size 11'-8" Diameter x 33'-1-1/2" high

(d) Miscellaneous Drain Receiver

Manufacturer

Number of Units

Type

Design Pressure

Size.

(e) Lube Oil Dump Tank

Manufacturer

Number of Units

Type

Design Pressure

Size

Il-15

Rothschild Boiler & Tank Work

One

Vertical Cylindrical

Atmospheric

2'-6" Diameter 5'-10" Long x 3/8" Shell Thickness

Rothschild Boiler & Tank works

One

Rectangular

Atmospheric

13'-6" Long x 7'-0" Wide X 4'-911 Hi.gh X 1/2" Shell Side Thickness x 1/4" Top and Bottom Thickness

Page 24: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Design Pressu10e

Size

(f) Control and Service Air Receivers --

Manufacturer

Serial Nos .•

Number of Units

Type

Design Pressure (psig)

Design Temperature (F)

Size

(g) Blowdown Tank

Manufacturer

Serial No.

Number of Units

Type

Design Pressure (psig)

Design Temperature (F)

Size

(h) Chemical ~ Tanks

Manufacturer

Number of Units

Type

Material

Capacity Each (gal)

Il-16

Atmosphedc

13'-6" Long i< 71 -0" Wide x 4 1 -9" High x 1/2" Shell Side Thickness x 1/4" Top and Bottom Thickness

Rothschild Hoi'le.r & Tanlt Works

25979 & 25980

Two

Vertical Cylindrical

150

500

4'-0" Diameter x 7'-9" High x 3/8" .Shell Thickness

Rothschild Boiler & Tank Works

25981

One

Vertical Cylindrical

150

500

4'-6" Diameter x 10'-0" Long x 1/2" Shell Thickness

Milton Roy Company

Two

Rectangular

10 Gauge Type 304 Stainless Steel

50

Page 25: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Size

7. Control~ Compressor

Manufacturer

Serial No.

Number of Units

Type

Discharge Pressure (psig)

Capacity (scfm)

Motor Manufacturer

Motor Size

Serial Nos,

8. Piping

(a) Fabricated Piping

Supplier,

Piping Included

(b) Miscellaneous Piping

Supplier

(c) Circulating Water Piping

Supplier

9. Pipe Supports

Manufacturer

10. Insulation and Lagging

Manufacturer of Insulation

Manufacturer of Lagging

II-17

2'-6" Long x 1'-2" Wide x 3 '-6" High

Elliott Company

M-11045

One

Model 100 MS25 multistage centrifugal

105

800

Westinghouse

200

7302

ITT Grinnell Industrial Piping Inc.

2-1/2" and Larger Other Than Circulating Water

ITT Grinnell Industrial Piping, Inc.

Continental Boiler & Sheet Iron Works

ITT Grinnell Industrial Piping, Inc.

Johns-Manville

Childers

Page 26: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

11. Valves

(a) General Service

Manufacturer

2 inches and smaller

600 lb.

1500 lb.

2-1/2 Inches and larger

150 lb. 300 lb

Brass and Bronze Body Valves

Lubricated Plug Valves

Ball Valves

Diaphram Valves

Instrument Valves

Butterfly Valves

(b) Special Service Valves

Manufacturer

Extraction Check. Valves

Relief Valves

(c) Control Valves

Manufacturer 4CRV-l, 4CRV-2

Manufacturer

4CRV-3, 4CRV-4, 4CRV-7, 4CRV-8, 4CRV-9, 4CRV-10, 4CRV-ll. 4CRV-12, 4CRV-13, 4CRV-14, 4CRV-15, 4CRV-16, 4CRV-17, 4CRV-18, 4CRV-19 4CRV-20, 4CRV-21, 4CRV-22, 4CRV-23, 4CRV-24, 4CRV-25, 4CRV-27, 4CRV-29, 4CRV-30 4CRV-31, 4SSV-2, 4SSV-3 4SRV-28

Manufacturer 4SSV-l

Hancock

Hancock

Crane

Jenkins or Hancock

Rockwell

James bury

Grinnell-Saunders

Edwards

Pratt

Atwood & Merrill

Consolidated

Control Components Inc.

Fisher

E!W Systems Inc.

Page 27: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

(d) High Pressure and Motor Operated Valves

Manufacturer

12. Control and Instrumentation

(a) Combustion Control

Manufacturer

Type

(b) Steam Temperature Control

Manufacturer

Type

(c) Feed Water Control

Manufacturer

Type

II-19

Crane

Bailey Meter Company

TWo element (steam flow, throttle steam pressure) to maintain constant steam pressure by regulation of BTU input to the furnace along with regulation of air flow for good and safe combustion. Safe fuel-air ratio is main­tained on a per burner basis as well as on a totalized basis. Provision is made for firing of two fuels simulta­neously with one fuel on automatic and the other on manual control.

Bailey Meter Company

Two element control (air flow and final steam temperature) to maintain constant steam temperature leaving the super­heater outlet by regulating the amount of spray water flow. Spray water flow is controlled by means of two air operated valves.

Bailey Meter Company

Three element control (drum level, steam flow, feed water flow) to maintain constant drum level. Feed water is controlled by means of two air operated valves (start­and main feed water valves).

Page 28: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

(d) Boiler Feed Pump Recirculation Control

Manufacturer

Type

(e) Condensate System Control

Manufacturer

Type

(f) Condensate Pump Recirculation Control

Manufacturer

Type

(g) Hotwell Make-Up Control

Manufacturer

Type

(h) Heater Level Control

Manufacturer

Type

II-20

Yarway Corporation

Self-contained mechan~cal auto-recirculation valves to maintain a safe minimpm flow through the boiler feed pumps.

Bailey Meter Company

Three element control (feed water flow, condensate flow and deaerator level) to maintain a constant deaerator level. A single air operated valve regulates cond~nsate flow.

Bailey Meter Company

A recirculation control system consisting of an on-off condensate flow controller and air operated valve are used to maintain a safe minimum flow through the condensate pumps.

Bailey Meter Company

Remote manual positioning of an air operated valve to provide demineralized water to the hotwell. The make-up valve is operated from a manual loader on the control panel.

Fisher Control Company

Individual heater levels are maintained by use of a dis­placement type level controller

Page 29: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

(i) Miscellaneous Local Control Systems

Turbine Lube Oil Temperature Control

Generator Hydrogen Temperature Control

Auxiliary Steam Supply Control Deaerator Overflow Control Heater Drain Pump Recirculation

Control Auxiliary Cooling Water Tank

Control

Manufacturers

Type

(j) Boiler Safety System

Manufacturer

Type

II-21

and two air operated valves. A valve designated as a normal drain valve provides regulation for maintaining a constant heater level, while a valve designated as an emergency drain valve provides protection against heater flooding.

Bailey Meter Company Fisher Company

, Single element consisting of a local mounted temperature, flow, pressure, differential pressure, or level controller and an air operated valve.

Bailey Meter Company

AC de-energized to trip relay type. Fuel trip is achieved by coincident requirement of two independent safety inter­lock systems. Coincident actuation of two 3-way solenoid valves assembled with the air operated fuel safety shutoff valves results in blockage of all fuel to the furnace. Main system components consist of field sensors, fuel safety valves, relay panel mounted master fuel relay logic and a system control and monitor sub­panel mounted on the control panel.

Page 30: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

(k) Burner Control System

Manufacturer

Type

(1) Annunciator

Manufacturer

Type

(m) Temperature Monitor

Manufacturer

Type

II-22

Bailey Meter Company

Bailey Mod.el 762 sdlid state logic. The burner control system provides the following functions: Furnace purge and seq~ence monitoring on either gas or oil, monitor and control on gas firing burners, manage­ment of fuel air registers, testing of burners and provides trip commands to the boiler safety system. The main components of the system are field sensors, local burner control stations, burner valves, burner automation logic cabinets, and remote burner control stations mounted on the control panel.

Rochester Instrument Company

Rochester's Model 800 N re­cording annunciator and Model ANlOO visual display annunciator. Main components of the system are the annunciator logic cabinet, alarm printer and the visual alarm display units mounted on the control panel.

Howell Instruments Company

Howell Model H4200 temperature monitor. The monitor consists of scanner, limit comparators, digital indicator, control selectors and printer all mounted in a free standing cabinet.

Page 31: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

(n) Oxygen Analyzer

Manufacturer

Type

(o) Control Panel

Manufacturer

Type

(p) Relay Panel

Manufacturer

Type

13. Miscellaneous Equipment

(a) Air Dryer

Manufacturer

Number of Units

Capacity

(b) Turbine Oil Purifier

Manufacturer

Type

Capacity (gph)

Purifying Capacity (gph)

II-23

Hagan/Westinghouse

Model 115 probe type. Oxygen analyzer. The analyzer consists of an insertion probe, tem­perature controller, amplifier and reference gas set.

Bailey Meter Company

Freestanding, single break steel benchboard type. Control panel contains the main monitor and control instrumentation.

Bailey Meter Company

Freestanding vertical steel cabinet type with access doors on both sides. Relay panel contains electrical relays for major control systems.

Hankinson

One

Model F-100

100 cfm at 105 psig

DeLaval Separator Co.

Model 65-03

450

350

Page 32: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Motor Manufacturer

Motor Data

(c) Flue Gas Analyzer

Manufacturer

Type

Serial No.

II-24

Westinghouse Electric Corp.

Hagan Model 115-218

Page 33: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B. Electrical Equipment

85 MW Unit!

1. Motor Control Centers

Manufacturer

Type

Number of Buses

Type of Circuit Breakers

Size of Control Transformers,

2.

Size 1 Starters Size 2 Starters Size 3 Starters Size 4 Starters

Type of Supports

Dual Switchboard

Manufacturer

Watthour Meters

Instrument and Control Switches

Relays

Instruments

3. Secondary Unit Substation

Manufacturer

Circuit Breakers

II-25

Allis-Chalmers Corp.

Value-Line Mark II

Three

Type HFB, KA and LA

150 Volt-Amperes 150 Volt-Amperes 300 Volt-Amperes 300 Volt-Amperes

Glass filled polyester

Westinghouse

Westinghouse Type D4B2F

Westinghouse Type W

Westinghouse Type C0-8, MG-6, COV, HU, KLF-1, KF, and COQ, CVE-1 and WL General Electric Type CFVB and CFD

Westinghouse Type K-241

General Electric Co.

Three, removable, 1600 amp, air circuit breakers, Type AK-2 electrically operated; Five 600 amp, Type AK-2, electrically operated; Two 1600 amp, Type AK-2, manually operated

Page 34: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Transformers

Bus

4. 4.16 kV Switchgear

Manufacturer

Circuit Breakers

Main Bus

Closing Mechanism

Bus Supports

Bus Insulation

Current Transformers

Potential Transformers

Relays

Control Switches

Number of Units

5. 4.16 kV Metal Enclosed Bus Duct

Manufacturer

Type

Insulation

Nominal Rating

6. Generator 4 Bus Duct

Manufacturer

Type

Supports

Number and Size of Bars

II-26

Two 1000/1120 kVA, OA, 4160-480 volts, 3 phase, 60 hertz

1600 ampere

Allis-Chalmers Corp.

MA250-C

1200 ampere

Springcharged-Stored Energy

Glass polyester

Phenolic tubing

Type MKS-3

Allis-chalmers Type DP

General Electric, IAC, PJC, IAV, IJD, HGA

Allis-Chalmers Type 210

Ten

Calvert Company

Non-segregated group phase

Fiberglass

1200 ampere

General Electric Company

Isolated Phase

Porcelain

4000 amp - One .35" x 6.5" Round aluminum 1500 amp -One .35" x 6.5" Round Aluminum

Page 35: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

7. Oil Circuit Breakers

1200 Ampere, Three Tank

Manufacturer

Number of Units

Rating

Type of Mechanism

Type of Breaker

Maximum Symmetrical Current Rating

Three Second Rating

Bushings

8. 138 kV Outdoor Substation

Steel Structures

Group Operated Switches -1200 Ampere

Bus and Switch Insulators

Potential Devices

Suspension Insulators

9. 138 - 12.4 7 kV Tie Transformer 2

Manufacturer

Class

Rating

II-27

McGraw-Edison

Two

1200 amperes at 138 kV, 3 pst, 60 hertz, 650 kV BIL Class

Pneumatic

AHE-54-138-5000

22,000 amperes, 5000 MVA

22,000 amperes

McGraw-Edison PA-138-12

Arthur Tatman & Associates Inc.

Two insulator, side break, 61,000 amperes momentary, 138 kV, Allis-Chalmers Type "SSB", two with Type CM-3 motor operators

I-T-E Type Vl797

General Electric Type CD31

ASA 52-3

Westinghouse

OA/FA/FA

13.5/18/22.5 MVA at 55 C rise, 25.2 MVA at 65 C rise 138,000-12,470 volts, 3 phase, 60 hertz, oil immersed

Page 36: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

High Voltage Windings

Low Voltage Windings

Load Tap Changer

Bushings

High Voltage

Low Voltage

High Voltage Arrester

10. 12.5 kV Grounding Transformer

Manufacturer

Rating

Class

Bushings

Ten Second Rating

Continuous Rating

11. Generator Transformer 4

Manufacturer

Class

Rating

High Voltage Windings

II-28

138,000 volts, 550 kV BIL, wye connected with four 2-1/2 per cent full capacity taps below rated voltage

12,470 volts, 110 kV BIL, Delta connected

10 per cent above and 10 per cent below normal voltage, 32 equal 5/8 per cent taps

Cover mounted 550 kV BIL

Wall mounted 110 kV BIL

Westinghouse SVS 120 kV

Westinghouse

Zigzag connected, 12,470 volts, 110 kV BIL, 3 phase, 60 hertz, oil immersed

OA

Wall mounted 110 kV BIL

5000 amperes

500 amperes

Westinghouse

OA/FOA/FOA

54/72/90 MVA at 55 C rise, 100.8 MVA at 65 C rise, 138,000-14,400 volts, 3 phase, 60 hertz, oil immersed

138,000 volts, 550 kV BIL, wye connected with two 2-1/2 per cent full capacity taps below rated voltage and two 2-1/2 per cent full capacity taps above rated voltage

Page 37: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Low Voltage Windings

Bushings

High Voltage

Low Voltage

High Voltage Arrester

12. Main Auxiliary Transformer 4

Manufacturer

Class

Rating

High Voltage Windings

Low Voltage Windings

Bushings

High Voltage

Low Voltage

13. Reserve Auxiliary Transformer 4

Manufacturer

Class

Rating

II-29

14,400 volts, 110 kV BIL, Delta connected

Cover mounted 650 kV BIL

Cover mounted 150 kV BIL

Westinghouse SVS 120 kV

Westinghouse

OA/FA

7500/9375 kVA, at 55 C rise, 10,500 kVA at 65 C rise, 14,400-4360 volts, 3 phase, 60 hertz oil immersed

14,400 volts, 110 kV BIL, Delta connected with two 2-1/2 per cent full capacity taps below rated voltage and two 2-1/2 per cent full capacity taps above rated voltage

4360/2520 volts, 75 kV BIL class, wye connected

Cover mounted, 110 kV BIL

Wall mounted in an air filled junction box

Westinghouse

OA/FA

7500/9375 kVA at 55 C rise, 10,500 MVA at 65 C rise, 12,470-4360 volts, 3 phase, 60 hertz oil immersed

Page 38: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

High Voltage Windings

Low Voltage Windings

Bushings

High Voltage

Low Voltage

14. Batteries

(a) Station Battery,

Manufacturer

Description

(b) Station Battery,

Manufacturer

Description

15. Battery Chargers

Manufacturer

Description

16. Dry ~ Transformers

Manufacturer

Description

Mounting

Unit i

Units 1 & 2 ---

II-30

12,470 volts, 110 kV BlL, Delta connected with two 2-1/2 per cent full capacity tap below rated voltage and two 2-1/2 per cent full capacity taps above rated voltage

4360/2520 volts, 75 kV BIL Class, wye connected

Wall mounted in air filled junction box, 110 kV BIL

Wall mounted in air filled junction box, 110 kV BIL

C&D Batteries

60 cell Type 60 KCU-15

C&D Batteries

60 cell Type 60 KCU-7

C&D Batteries

Two supplied, rated at 50 amperes, 480 volts, 3 phase ac input, self­regulating, Type ARR130HKSO

Square D Company

One -45 kVA and five-30 kVA, Type STD-3-S 480-208Y/120 volts, 3 phase; One-15 kVA, Type STD-3E-S, 480/208Y/120 volts, 3 phase; One-7.5 kVA, Type STD-3E-S, 480-120/240 volts, single phase

Wall

Page 39: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

17. AC and DC Panelboards

Manufacturer

Description

18. Manual Motor Starters

Manufacturer

Description

19. Contactors

Manufactur~r

Emergency Lighting Contactor

Intercom Power Transfer Switch

20. Push-button and Selector Switch Stations

Manufacturer

TYPe

II-31

Square D Company

Five-208Y/120 volt, 3 phase, 4 wire, surface mounted, 100 ampere bus, AlB frame circuit breakers; one 120/240 volt, single phase, surface mounted, 100 ampere bus, AlB frame circuit breakers; two 208Y/120 volt, 3 phase, surface mounted, 225 ampere bus, AlB frame circuit breakers; one-125 volt de, surface mounted, 225 ampere bus, KA frame and AlB frame circuit breakers; one -125 volt de, surface mounted, 100 ampere bus, AlB frame circuit breakers

Allen-Bradley

Toggle type, single pole, with neon pilot light, Catalog No. 600TKX216

Automatic Switch Co.

Two pole, 30 amperes, 120 volts de, 120 volt ac holding coil. Catalog No. 4664C

Two pole, 30 amperes, 120 volt ac, Catalog No. 9043C

Square D C?mpany

Type K

Page 40: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

21. Grounding Resistors

Manufacturer

Description

22. 12.47 kV Switchgear £Addition

Manufacturer

Description

23. Essential Service Motor Generators Control Panel

Manufacturer

Description

24. Essential Service Motor-Generators

Manufacturer

Motor Rating and Type

Generating Rating

II-32

General Electric

One supplied for grounding the Main Auxiliary Transformer 4 4.16 kV winding and one for grounding the Reserve Auxiliary Transformer 4 4.16 kV winding; rated 4 ohms, 600 amperes for ten seconds

Westinghouse

One section Type 150DH500 switchgear for Reserve Aux­iliary Transfo.rmer 4, 1200 ampere, with auxiliary bus tie compartment

Kato Engineering Co.

Freestanding cabinet with the following control equipment

2 - Start-Stop Push-buttons 6 - Indicating Lights 2 - Voltmeters 2 - Ammeters 2 - A-C Panelboards

Kato Engineering Co.

10 hp, 440 volt, 3 phase, 60 hertz, low slip, 1800 rpm, with common open dripproof enclosure with generator

5 kW, 6.25 kVA,,8 pf, 120 volt, single phase, 60 hertz, 4 pole, 1800 rpm, revolving field brush­less generator with separate rotating brushless exciter

Page 41: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

25. Motors

Boiler ~eed Pumps

Condensate Pumps

Circulating Water Pumps

FD Fan

Auxiliary Cooling Water Pumps

Fuel Oil Pump

Air Compressor

Cooling Tower Fans

26. Cables, Trays and Raceways

Cable Tray

Wireway

II-33

Westinghouse, Frame 6809-H, Model HSDP, 1250 hp, 3579 rpm, 4000 volt, 3 phase, 60 hertz Style 72F36436, Serial Nos. lS-72 and 28-72.

Westinghouse, Frame 445VPZ, Model TBDP, 200 hp, 1775 rpm, 460 volts, 3 phase, 60 hertz. Serial Nos. 1-7208 and a-7208

Westinghouse, Frame 6808-L, Model HSDP, 700 hp, 712 rpm, 4160 volts, 3 phase, 60 hertz. Style 71Fl9747. Serial Nos. lS-72 and 2S-72

Westinghouse, Frame CS-FA-W4A, 2000 hp, 1192 rpm, 4000 volts, 3 phase, 60 hertz. Serial No. 1S79P567

Reliance, Type P, Frame 364TS, 60 hp, 1770 rpm, 460 volts, 3 phase, 60 hertz. I.D. Nos. 1MA458694-Gl-EY and 1MA458694-G2-EY

Westinghouse, Style 72B50731, 50 hp, 3560 rpm, 460 volts, 3 phase, 60 hertz. Serial No. 7302

Westinghouse, Frame 445TS, Model TBDP, 250 hp, 3550 rpm, 460 volts, 3 phase, 60 hertz. Serial No. 7302

General Electric, Type K, Frame 445TS, Model 5K445BK2096, 150 hp, 1775 rpm, 460 volts, 3 phase, 60 hertz. Serial Nqs. AJ041032 through AJ041035

Globe, aluminum

Hoffman

Page 42: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

27. Power Cable

~ Voltage Size Stranding Insulation Jacket

A 15 kV 750 MCM 61 0.215 EP 0.11 PVC

B 5 kV 350 MCM 37 0.090 EP 0. 080 PVC

B 5 kV 114/0 19 0.090 EP 0.080 PVC

B 5 kV · 111/0 19 0.090 EP 0.060 PVC

D 600 v 750 MCM 61 0.109 CSP

D 600 v 500 MCM 37 0.094 CSP

D 600 v 350 MCM 37 0.094 CSP

D 600 v 111/0 19 0.078 CSP

D 600 v 114 7 0.063 CSP

D 600 v 118 7 0.063 CSP

E 600 v 118 7 0.063 CSP 0.045 PVC

E 600 v 1112 7 0.047 CSP 0.060 PVC

28. Control Cable

Type F 600 volt, multiconductor with 20 mils polyethylene conductor insulation and 10 mils densheath (PVC). Manufactured by Anaconda Wire and Cable Co.

Conductor Number Overall Jacket Size Conductors Thickness-Inches

12/10 2 0.045 12 3 0.045 10 4 0.060 12 5 0.045 12 7 0.060 12 9 0.060 12 12 0.060

Type G TWo, six or fourteen con-ductor twisted pair, 16 AWG, with 30 mils PVC insulation, aluminum-mylar tape shield and an 18 AWG 7 strand copper drain wire, and overall jacket of 45 mils PVC for single pair and 60 mils PVC for three and seven pair cables

II-34

Page 43: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Type K

Type KX

Type L

Type M

29. Freezeproofing Materials

Manufacturer

Description - Heating Cable

II-35

Single pair 16 AWG chromel­alumel thermocouple extension cable, ISA Type KX with 30 mils PVC, .35 x .5 mil aluminum­mylar tape shield and an 16 AWG solid copper drain wire, and an overall jacket of 45 mils PVC, manufactured by Samuel Moore & Co.

Single pair 20 AWG high tem­perature thermal extension cable with a fluorocarbon poly­imide composite primary in­sulation and an overall jacket of fluorocarbon composite manufactured by Samuel Moore & Co,

Seven 14 and 18 AWG conductors rated 600 volts with 30 mils PVC insulation and overall jacket of 50 mils PVC, manufactured by Gai-Tronics

Multipair 16 AWG chromel-alumel thermocouple extension cable, !SA Type KX with a pair shield­ing of .35 mil aluminum x .5 mil mylar tape and 22 AWG solid bare copper drain wire, cable shielding of 2.35 mils aluminum­mylar tape shield and an 20 AWG 7-strand bare copper drain wire and an overall jacket of 80 mils PVC, manufactured by Samuel Moore & Co.

Thermon Manufacturing Co.

Econotrace parallel resistance type heater cable, two conductor with Nichrome heating wires connected to alternate bus wires every 12 to 24 inches.

Page 44: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

30. Intercommunication System

Manufacturer

Type

31. Lighting

Manufacturer, Incandescent

Manufacturer, Flourescent

Manufacturer, Substation

Manufacturer, Miscellaneous

Manufacturer, High Bay

II-36

GAI-Tronics Corporation

GTC, transistorized system with page and party lines

Spero, Type D514, DOB-514

Crescent, industrial V Turrettite

Revere, Series 1100 wide beam mercury floodlight

Holophane, Appleton, Crouse­Hinds

Hubbell, Type HB-1

Page 45: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Prescott Substation

1. Transformer No. 2

Manufacturer

Class

Rating

High Voltage Windings

Low Voltage Windings

Load Tap Changer

Bushings

High Voltage

Low Voltage

High Voltage Arrester

2. Oil Circuit Breakers

1200 Ampere, Three Tank

Manufacturer

Number of Units

Rating

Type of Mechanism

II-37

Allis-Chalmers

OA/FA/FA

13.5/18/22.5 MVA at 55 C rise, 25.2 MVA at 65 C rise 138,000-12,470 volts, 3 phase, 60 hertz, oil immersed

138,000 volts, 650 kV BIL, delta connected with two 2-1/2 per cent full capacity taps below rated voltage and two 2-1/2 per cent full capacity taps above rated voltage

12,470 volts, 110 kV BIL, WYe connected

Ten per cent above and 10 per cent below normal voltage, 32 equal 5/8 per cent taps

Cover mounted 650 kV BIL

Wall mounted 110 kV BIL

120 kV

Allis-Chalmers

Two

1200 amperes @ 138 kV, 3 pst, 60 hertz, 650 kV BIL class

Pneumatic

Page 46: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

Type of Breaker

Maximum Symmetrical Current Rating

Three Second Rating

Bushings

3. 12.47 kV Switchgear

Manufacturer

Circuit Breakers

Main Bus

Closing Mechanism

Bus Supports

Bus Insulation

Current Transformers

Potential Transformers

Relays

Control Switches

Number of Units

4. 12.47 ll Metal Enclosed ~Duct

Manufacturer

Type

Insulation

Nominal Rating

5. Dual Switchboard

Manufacturer

Instrument and Control Switches

II-38

BZ0-138-5000-4

20,000 amperes, 5000 MVA

20,000 amperes

Ohio Brass

Westinghouse

150 DHP500

1200 ampere

Springcharged-stored energy

Porcelain

Impregnated epoxy

Type RCT-15MR

Westinghouse PTM-5

Westinghouse, CO, HU, MG-6, WL, SG

Type W-2

Six

Westinghouse

Non-segregated group phase

Impregnated epoxy

1200 ampere

Keystone Electrical Manuf.

General Electric Type SB-1

Page 47: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

6.

Relays

Instruments

138 kV Outdoor Substation ----Steel Structures

Group Operated Switches -1200 ampere

Bus and Switch Insulators

Potential Devices

7. Power Cable

Voltage

A 15 kV

c 600 v

c 600 v

8. Control Cable

TypeD

Conductor Size

12 10 12 12 12

Size

500 MCM

{f2

liB

Number Conductors

2 4 5 9

12

II-39

Stranding

37

7

7

Westinghouse HCB-1, PM-23, PMG-13, CR, CRP, CVE-1, SGR-12, KC-4

Westinghouse Type K-241

Dis-Tran Products, Inc.

Two insulator, side break, 40,000 amperes momentary, 138 kV, I-T-E Type A7U-55-12

I-T-E Type V-1797

Westinghouse Type PCA-5

Insulation Jacket

0.215 XLP 0.080 PVC

0.080 XLP

0.080 XLP

600 volt, multiconductor with 20 mils polyethylene conductor insulation and 10 mils synthinol (PVC)

Overall Jacket . Thickness-Inches

0.045 0.060 0.045 0.060 0.060

Page 48: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

C. Structural Material and Equipment

1. Concrete Piling

Type

Shell Manufacturer

2. Concrete

Supplier

Reinforcing Steel Fabricator

3. Masonry

Masonry Contractor

Cast Stone Contractor

Precast Architectural Concrete Manufacturer

Precast Architectural Concrete Erector

4. Structural and Miscellaneous Metals

Steel Fabricator

Steel Erector

Miscellaneous Steel Fabricator

Grating and Stair Tread Manufacturer

Handrail Fabricator

Metal Deck Manufacturer

Metal Deck Erector

5. Roof Covering

Roofing Subcontractor

Sheet Metal Fabricator

Roofing Materials

II-40

Raymond Step-taper

Raymond Concrete Pile Co.

Louisiana Industries

Mosher Steel Co.

Justin Breithaupt

Jackson Stone

Jackson Stone

Brown Erection

Fabricators Steel Co.

Brown Erection

Fabricators Steel Co.

Blaw-Knox

Fabricators Steel Co.

Rollform Inc.

Schueck Steel Products

Nichols Roofing Co.

Nichols Roofing Co.

Celotex

Page 49: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

15.

16.

17.

Raceway

Rigid Steel Conduit

Steel Conduit Fittings

Grounding

Ground Rods

Thermite Weld Materials

Flush Ground Plates

Bare Cable

Insulated Cable

Cathodic Protection

Magnesium Anodes

Connection Boxes

Thermite Weld Materials

Insulating Bushings

Holloway Shunts

Cable

II-43

J&L

T&B

Weaver-Sectional

Cadweld HD

Cadweld S-330

Anaconda - Copper

Anaconda - THW

Dow Chemical Co. 32DS

C.P. Test Service Type NM4

Cadweld HD

Central Plastic

Holloway RS

Anaconda

'

Page 50: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

6. Metal Wall Panels

Metal Panel Fabricator

Metal Panel Erector

7. Metal Doors

Door Manufacturer

Hardware Manufacturer

Glass Manufacturer

8. Painting

Paint Manufacturer

Painting Contractor

9. Floor Coverings

Quarry Tile Manufacturer

Resilient Tile Manufacturer

Deck Coating Manufacturer

10. Special Items

Wire Mesh Partition Manufacturer

Roof Hatch Manufacturer

Aluminum Letter Manufacturer

Water Chillers

11. Hoisting Equipment

Elevator Contractor

Hoists & Trolleys Supplier

12. Heating, Ventilating and Air Conditioning

Propeller Fans

Vaneaxial

Power Roof Ventilators Type 1

II-41

Inland Steel Co.

Schueck Steel Products

Tex-Steel

Sargent

Pittsburgh Plate Glass

Benjamin Moore

Mid-South Painting

Summitville

Rubberoid

Des co

Acorn Wire & Iron

Bilco

Wonderly-Concord Ind.

Halsey Taylor

Otis Elevator Co.

Wright

Western Engineering

Western Engineering

Western Engineering

Page 51: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

13.

14.

Power Roof Ventilators Type 2

Electric Unit Heaters

Electric Duct Heaters

Electric Fin Type Radiator

Condensing Unit

Air Handling Unit

Temperature Control System

Dampers

Registers

Diffusers

Duct Insulation

Louvers

Louver Operators

Piping

Steel Pipe

Fiberglass Reinforced Plastic

Fitting Manufacturer

Steel

Fiberglass

Fuel Oil Storage Tank

Tank Fabricator

Tank Size

Capacity

Inside Diameter

Straight Side Height

II-42

Trane

ILG

Indeeco

Trane

Trane

Trane

Honeywell

Ruskin

Honeywell

Titus

Amermostat

Johns-Mansville

Ruskin

Honeywell

Armco

Fiber cast

Grinnel

Fiber cast

Chicago Bridge & Iron Co.

500,000 Gallons

60'-0"

24'-0"

Page 52: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

III. MANUFACTURERS' PRINT INDEX ---The following pages list manufacturer's prints which were furnished for this job. Black & Veatch numbers are a convenient means of filing drawings and are found stamped on the outside of each drawing. The series of numbers refer to classifications of equipment as follows:

Prefix

Mechanical M Mechanical Construction D6 Control K

Electrical E Electrical Construction D8 Prescott Substation Construction DlO

Structural S Foundation Construction D2 General Construction D4

Page 53: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

D6-l ITT Grinnell

D6-2 ITT Grinnell

D6-3 ITT Grinnell

D6-4 ITT Grinnell

D6-5 ITT Grinnell

D6-6 ITT Grinnell

D6-7 ITT Grinnell

D6-8 ITT Grinnell

D6-9 ITT Grinnell

D6-10 ITT Grinnell

D6-ll ITT Grinnell

D6-12 ITT Grinnell

D6-l3 ITT Grinnell

D6-14 ITT Grinnell

D6-15 ITT Grinnell

D6-16 ITT Grinnell

D6-17 ITT Grinnell

D6-18 ITT Grinnell

D6-19 ITT Grinnell

D6-20 ITT Grinnell

D6-2l ITT Grinnell

06-22 ITT Grinnell

D6-23 ITT Grinnell

Drawing No.

Al2ll

April 1971

4498C23

0203 3 s

0201-5414-52,

SDD 12659

8704682

D 3188

D 3190

D 3191

D 3192

D 3193

B-915

B-4 SH 1-7

B/M

B-3365

M6A

2938

4ESV-l

4ESV-2

4ESV-3 & 4

4ESV-5

4ESV-6

III-2

Description

Demineralized Water Tanks

Installation Instructions

Layout 42" Dia. Hydro­darco

Unitized Dual F-100 Ref. Ass.

Wiring Schematic w/Manual Motor

Fuel Oil Pumps

Lube Oil Purifier

Lube Oil Storage Tank

Misc. Drains Receiver

Service & Control Air Receivers

Aux. Cooling Water Tank

Blowdown Tank

Aux. Cooling Water

Welding Procedures De­mineralized H2G System

Puel Oil Pump Relief Valve

Fuel Oil Pump Relief Valve

Fuel Oil Installation Procedure

20988 D

20976 D

20976 D

20976 D

21070 D

Page 54: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

D6-24 ITT Grinnell

D6-25 ITT Grinnell

D6-26 ITT Grinnell

D6-27 ITT Grinnell

D6-28 ITT Grinnell

D6-29 ITT Grinnell

D6-30 ITT Grinnell

D6-31 ITT Grinnell

D6-32 ITT Grinnell

D6-33 ITT Grinnell

D6-34 ITT Grinnell

D6-35 ITT Grinnell

D6-36 ITT Grinnell

D6-37 ITT Grinnell

D6-38 ITT Grinnell

D6-39 ITT Grinnell

D6-40 ITT Grinnell

D6-41 ITT Grinnell

D6-42 ITT Grinnell

D6-43 ITT Grinnell

D6-44 ITT Grinnell

D6-45 ITT Grinnell

D6-46 ITT Grinnell

Drawing No.

20084 F

X-862027

W-805519

Y-870074

S-890000

P-64D

P3515F060

Pl096C052

P-1096C

P7965A

P61E

A-VR4-0224

1915A

2141

W-4SKL500Xl

70665-1

F-SP-12194

W-246134

730-20

KC 3172-A

40563

6Xl450-A

III-3

Description

Test Valve

Air Compressor Outline

Wiring Diagram - Air Compressor

Air Comp. Legend Sheet

Air Comp. Lube Oil Schematic

Air Comp. Check Valve

Air Comp. Inlet Air Filter

Air Comp. after Cooler/ Separator Assembly

Air Comp. after Cooler

Air Comp. Moisture Separator

Air Comp. Gate Valve

Air Comp. Silencer

Air Compressor - Auxiliary Oil Pump Motor Data Sheet

Air Compressor Motor Data Sheet

Air Comp, Performance Curves

Aux. c. w. Pump Cross Section

General Arrg't Aux. c. W. Pump

Shaft Seal - Aux. C. W. Pumps

Heater Drn. Pump Gen. Arrg't

Heater Drn. pump Cross Section

Heater Drn. Pump Characteristic Curve

Heater Drn. Pump Torque curve

Heater Drain Pump Charac­teristic Curve

Page 55: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

D6-47 ITT Grinnell

D6-i;8 ITT Grinnell

D6-49 ITT Grinnell

D6-50 ITT Grinnell

D6-51 ITT Grinnell

D6-52 ITT Grinnell

D6-53 ITT Grinnell

D6-54 ITT Grinnell

D6-55 ITT Grinnell

D6-56 ITT Grinnell

D6-57 ITT Grinnell

D6-58 ITT Grinnell

D6-59 ITT Grinnell

D6-60 ITT Grinnell

D6-61 ITT Grinnell

D6-62 ITT Grinnell

D6-63 ITT Grinnell

D6-64 ITT Grinnell

D6-65 ITT Grinnell

D6-66 ITT Grinnell

D6-67 ITT Grinnell

Drawing No.

Data Sheet

705 000

ACS 10

4 EJ 3, 4 & 5

102-0762-010 (ll3354-l)

102-0762-0ll (113354-2)

600 701-3

600 701-4

B 36351

B 39724 AB

B 104275 A

B 42585 G

B 42815 W

B 104272 A

B 95558 A

57976 A

58002 A

PC 143236

214609

B 52756 Q

A 522484

III-4

Description

Aux. C. W. Pump and Htr. Drain Pump

4 JE 5

4 JE 3 & 4

Installation and Manufac­turing lnst.

Pump

Pump

Motor

Motor

300# Cast Stell Swing Check Valved 197-l/2X

300# Cast Stell Globe Valve 151-1/ZX

Welding End Outside Screw & Yoke 33-l/2XUF, 33-l/2UF5

150# Cast Steel Swing Check Val. 147 l/2X 8" & Under

150# Cast Steel Globe Val. 143 1/2W

Welding End Outside Screw & Yoke 47 l/2XUF &-5

150# Cast Stell Swing Check Valves 197X 10" & Up

Dimension Dwg. f/fig. 143 Flanged W.O. Model 59 #143

Dimension Dwg. Type 149 Weatherproof

Chart of List 323B F.G. Tilting Disc.

Hancock valves 5580

Hancock Valves 950-3

Hancock Vals. Globe 7l50W-l Ang. 7190W-l.

Page 56: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

D6-68 ITT Grinnell

D6-69 ITT Grinnell

D6-70 ITT Grinnell

D6-71 ITT Grinnell

D6-72 ITT Grinnell

D6-73 ITT Grinnell

D6-74 ITT Grinnell

D6-75 ITT Grinnell

D6-76 ITT Grinnell

D6-77 ITT Grinnell

D6-78 ITT Grinnell

D6-79 ITT Grinnell

D6-80 ITT Grinnell

D6-81 ITT Grinnell

D6-82 ITT Grinnell

D6-83 ITT Grinnell

D6-84 ITT Grinnell

D6-85 ITT Grinnell

D6-86 ITT Grinnell

D6-87 ITT Grinnell

D6-88 ITT Grinnell

Drawing No.

B 52878-L

1125-1 SH 1

1125-1 S-2

1125-1 Pl

1125-1 P2

1975

1970

Caps

1900P

1900N

Q 515 7ATL

45333

12 034500KA

11 142000 DA

Form 210

C 24 7 0712 OYY

y 870110

X 862155

1248 VR 42

20 700090 00

III-5

Description

Hancock Vals. GL-5500-1; Ang. 5510-1

Electrical Gen. Station Sample Table Struct. Details

Electrical Generating Station Sample Table Struct. Dt.

Elect. Gen. Sta. Sample Table Piping Details

Elect. Gen. Sta. Sample Table Piping Details

Relief Valves 4SRV-6, 7, 22-27, 29 & 30

Relief Valves 4SRV 31, 32

Relief Valves 4SRV 31, 32

B&V Tag 4SRV16 & 17

Tag No. 4SRV-5

Vent Seals - Flexible Metal Hose

Electrode Holder 2" AE2, Rods

Case & Cover Ass'y 6 x 6 x 4 NEMA 12

Type D Liquid Level Control Relay

Special 50 Gal. Rectangular Tank

Electrical Schematic

Control Panel Wiring

Unloading Mute Vent Silencer

Outline Dimension Dwg. Waterproof Enclosure

Page 57: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

D6-89 ITT Grinnell

D6-90 ITT Grinnell

D6-91 ITT Grinnell

D6-92 ITT Grinnell

D6-93 ITT Grinnell

D6-94 ITT Grinnell

D6-95 ITT Grinnell

D6-96 ITT Grinnell

D6-97 ITT Grinnell

D6-98 ITT Grinnell

D6-99 ITT Grinnell

D6-100 ITT Grinnell

D6-101 ITT Grinnell

D6-102 ITT Grinnell

D6-103 ITT Grinnell

D6-104 ITT Grinnell

D6-105 ITT Grinnell

D6-300 ITT Grinnell

D6-301 ITT Grinnell

D6-302 ITT Grinnell

06-303 ITT Grinnell

D6-304 ITT Grinnell

D6-305 ITT Grinnell

D6-306 ITT Grinnell

Drawing No. Description

Dimn. Sh. 2938 P. 6 Main Motor Outline

HVA 172 076 2 Way Solenoid Valve

141 8A1371 Model BR-41 Silencer

141 8Al370 Model BR-31 Silencer

5622 D71 Heater Drain Pump Motor

668 59TQTEG 6593 4ST 3 & 4

I 730110 A Plug Type Duplex Strainer

8903 PVC TYPG 1 Ball Valves

Form 371-2 Bus Duct

DO 102347 R5 Bus Duct

WD 531033 R4 Bus Duct

Form 37110 Bus Duct

OD 10 2171 Bus Duct

ll25 Sampling Table Nameplate Sch A

ll25 E Sampling Table Wiring Dia.

10Al700 Instruction Bulletin

55AR1000 The Vibration Proof Ratolarm

DWO 26-1

Al26-l thru 7

Al 01.1 Thru 06

12 MS pl

Al 13.1 Thru 12 Al ll-13, 14

2 1/2 CW VD 10~ 130 CWV 13-24

III-6

Demin. Water Star. Tks. Over fl. & Dr.

Demin. Water Tanic Piping

Main Steam Fabrication Sketches

Main Steam Isonietrics

Cond. Wtr. Box Vent Fab. Sketches

Cond. Wtr. Box Vent & Dr. I so.

Page 58: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

D6-307 ITT Grinnell

D6-308 ITT Grinnell

D6-309 ITT Grinnell

D6-310 ITT Grinnell

D6-311 ITT Grinnell

D6-312 ITT Grinnell

D6-313 ITT Grinnell

D6-314 ITT Grinnell

D6-315 ITT Grinnell

D6-316 ITT Grinnell

D6-317 ITT Grinnell

D6-318 ITT Grinnell

D6-319 ITT Grinnell

D6-320 ITT Grinnell

D6-321 ITT Grinnell

D6-3;22 ITT Grinnell

D6-323 ITT Grinnell

D6-324 ITT Grinnell

D6-325 ITT Grinnell

Drawing No.

CDD 0712

CDR 07 14

ACM 07 15

AI07 - 6 Thru 28

AI 07-1 thru 5

AL 07-29 thru 35

CDD 0713

AS-06-02

Al-06-1 thru 14

DD0-07-16

CAE-18-19

BFD-04-07

BFD-04-0S

AL-07-36 thru 45

AL-18-1 thru 7

AL-04-1 thru 36

BFW-04-10

AL 05-1 Thru 11-1

20 ESA/12ESB-Ol ESA/B 05-03

III-7

Description

Condensate Pump Discharge Isometrics

Condensate Recirculation Isometrics

Aux C. W. Makeup Isometrics

Condensate Pump Disch. Fab. Sketch

Condensate Recirculation Fab. Sketches

Aux. C.W. Makeup Fab. Sketches

Condensate Pump Discharge Isometrics

Aux. Steam Isometric

Aux. Steam Fabrication Sketches

Deaerator Drain, Overflow & Vent Isometrics.

Condensate Air Extraction Isometrics

Boiler Feed Discharge Isometrics - Sheet 1

Boiler Feed Discharge Isometrics - Sheet 2

Deaerator Drain, Overflow & Vent Fabrication Sketches

Condenser Air Fabrication Sketches

Boiler Feed Discharge Fab. Sketches

Desuperheating Water Isometrics

Extraction Steam Fab. Sketches

ISO Extraction Steam (L.P.)

Page 59: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

D6-326 ITT Grinnell

D6-327 ITT Grinnell

D6-328 ITT Grinnell

D6-329 ITT Grinnell

D6-330 ITT Grinnell

D6-331 ITT Grinnell

D6-332 ITT Grinnell

D6-333 ITT Grinnell

D6-334 ITT Grinnell

D6-335 ITT Grinnell

D6-336 ITT Grinnell

D6-337 ITT Grinnell

D6-338 ITT Grinnell

D6-339 ITT Grinnell

D6-340 ITT Grinnell

D6-34l ITT Grinnell

D6-342 ITT Grinnell

D6-343 ITT Grinnell

D6-344 ITT Grinnell

D6-345 ITT Grinnell

Drawing No.

lOESC-01 ESC 05-04

8 ESD I ESE -01 ESD I E 05-05

AL 10-16

6 HDD-01 10-22

4HDE-01 10-23

AL 04-37

BRF 01 04-09

AL 07 46-55

14 BFS Ol; 07-06

AL 07-56

10 CDS 01; 07-11

AL 10-1 Thru 9

1014 HD SPA 01 HDA 10-20

AL 10 10-15

83 HDB 01 HDB 10-21

AL 2217

AL 22-36

A1 22-51

10AWS 021 22-26

III-8

Description

ISO Extraction Steam (Deaerator Htr.)

ISO Extraction Steam (H.P.)

H. P. Heater #4D Drains Fab. Sketches

H.P. Heater #4D Drain ISO

H. P. Heater 4 EDRS Fab. Sketches

H. P. Heater 4E Drs. ISO

Boiler Feed Recirc. Fab. Sketches

ISO Boiler Feed Recirc.

Boiler Feed Pump Suction Fab. Sketches

ISO Boiler Feed Suction

Cond. Pump Suction Fab. Sketch

ISO Condensate Pump Suction

L. p, Heater 4A Drs Fab. Sketches

ISO Htr 4A Dr & Htr. Dr. Pump PS & D

L. P. Heater 4B Drs Fab. Sketches

ISO L. P. Heater #48 Drn.

Aux. Cool. Wtr. Supp. Fab. Sketches Pt. 1

Aux. Cool Wtr. Fab. Sketches Pt. 2

Aux. Cool Wtr. Fab. Sketches Pt. 3

ISO Aux. Cooling Wtr Sh. 1

Page 60: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V NO. Manufacturer

D6-346 ITT Grinnell

D6-347 ITT Grinnell

D6-348 ITT Grinnell

D6-349 ITT Grinnell

D6-350 ITT Grinnell

D6-351 ITT Grinnell

D6-352 ITT Grinnell

D6-353 ITT Grinnell

D6-354 ITT Grinnell

D6-355 ITT Grinnell

D6-356 ITT Grinnell

D6-357 ITT Grinnell

D6-358 ITT Grinnell

D6-359 ITT Grinnell

D6-360 ITT Grinnell

D6-361 ITT Grinnell

D6-362 ITT Grinnell

D6-363 ITT Grinnell

D6-364 ITT Grinnell

D6-365 ITT Grinnell

D6-366 ITT Grinnell

D6-367 ITT Grinnell

D6-368 ITT Grinnell

Drawing No.

10 AWS-03/22-27

6/4 AWS 04/22-28

AWS 22-25

AWR-22-29

AL 59-1 Thru 12

AL 59-13 Thru 34

BRD 59-38

BRD 59-38

AWR-22-30

AWR 22-31

16S 32-34

AL-22-62 Thru 77

AL-22-78 Thru 92

AL 22-93 Thru 111

Description

ISO Aux. Cooling Wtr.

ISO Aux. Cooling Wtr. Sh. 3

ISO Aux. Cooling Wtr. (AWS-01)

ISO Aux. Cooling Wtr. (AWR-01)

Roof & Fl. Drains Fab. Sketches

Roof & Fl. Drains Fab. Sketches

ISO Roof & Floor Drains Sh. 1

ISO Roof & Floor Drains Sh. 2

ISO Aux. Cooling Wtr. (RWR-02)

ISO Aux. Cooling Wtr. (AWR-03)

ISO Ignitor Gas

Sketch Aux. Cooling Wtr. Supply F. S.

Sketch Aux. Cool. Wtr. Ret. F.S. 1

Sketch Aux. Cool. Wtr. Ret. F. S. 1/2

AI 22 112 Thru 133 Sketch Aux. Cool. Wtr. Ret.

AL 321 Thru 9

SRV 12-53

AL 12. 1 Thru 6

SRV 14-32

FGS 31-33

FOS 33-35

TDH ll-47

sws 24-48

III-9

F. S. 113

Sketch Ignitor Gas F. s.

Sketch Safety Relief Valves Vents F. S.

ISO Safety Relief Valves Vents 5' 16. 17

ISO Vents & Drains (Htrs, Turb. & Gen.)

ISO Fuel Gas (FGS)

ISO Fuel Oil Supply (FOS)

ISO Trap Drain Header (TDH)

ISO City Water (SWS)

Page 61: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V NO. Manufacturer

06-369 ITT Grinnell

D6-370 ITT Grinnell

D6-371 ITT Grinnell

D6-372 ITT Grinnell

06-373 ITT Grinnell

D6-374 ITT Grinnell

D6-375 ITT Grinnell

D6-376 ITT Grinnell

D6-377 ITT Grinnell

D6-378 ITT Grinnell

D6-379 ITT Grinnell

D6-380 ITT Grinnell

06-381 ITT Grinnell

D6-382 ITT Grinnell

D6-383 ITT Grinnell

D6-700 ITT Grinnell

06-701 ITT Grinnell

D6-702 ITT Grinnell

D6-703 ITT Grinnell

D6-704 ITT Grinnell

D6-705 ITT Grinnell

Drawing No.

8 CTM 22-49

ccs 53-50

MDV 61-51

SRV 12-52

For - 33-36 22

AW0-11-37

TPS/D-3340

Air-16-41

LAV 35-42

BBD - 50-43

BTV/DRV 13-44

DRE. 13-45

GEO - 11-46

AL 22 134tThru 137 AL 22-138

4-1600 Thru 1622 4-1623, 41624

A 030 ll-7-'72

A 030 ll-13-72

QSA

H-1

III-10

Description

ISO Cooling Tower Make Up (CTM)

ISO Chlorine Solution (CSS)

ISO Stack & Air Preheater Drns.

ISO Safety Relief Valves Vents

System Fuel Oil Return (For) Design table Fd-9.2 'Later)

Aux. Cool Water Tk. Drain (AWO) Des. Table Fd 7-1

Fuel Pump Suction Disch & Unload Des. Table PD -9

Air Compr. Piping, Contr. & Serv. Air

System: Lubricating Oil (LOV) Des. Table - F.D. - 11-1

System: Boiler Blowdown (BBD) Des. Table - F.D. 12-1

Blowd Tk. Vent & Drains Recir. Vent & Des. Table F.D. 12.3

Misc. Drains Receiver Outlet Des. Table F.D. 15.2

Gland Exhauster Outlet -Des. Table- F. D. 15.3

CTM 22-1 Thru 04

AWR 22 47A

Water Treatment (Hanger)

Aux. Steam Piping

Blr. FDWTR. Piping Supports

Boiler Fewtr. Piping Hanger Sketches

Aux. Steam Piping Hanger Sketches

Recir. Piping Supports Matl's & Sketches

Page 62: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

D6-706 ITT Grinnell

D6-707 ITT Grinnell

D6-708 ITT Grinnell

D6-709 ITT Grinnell

D6-710 ITT Grinnell

D6-711 ITT Grinnell

D6-712 ITT Grinnell

D6-713 ITT Grinnell

D6-714 ITT Grinnell

D6-715 ITT Grinnell

D6-716 ITT Grinnell

D6-717 ITT Grinnell

D6-718 ITT Grinnell

D6-719 ITT Grinnell

D6-720 ITT Grinnell

D6-721 ITT Grinnell

D6-722 ITT Grinnell

D6-723 ITT Grinnell

D6-724 ITT Grinnell

D6-725 ITT Grinnell

D6-726 ITT Grinnell

D6-727 ITT Grinnell

Drawing No.

A 030.7

A 030.9

A 030.8

A 030-11 p2-16

A 030-10 p2-8

Description

Condensate Piping Support Mat'ls

Condensate Piping Support Sketches

Piping Supp. Matl's & Sketches

Heater Drains Hangers

Fuel Oil Hangers

Fuel Gas Hangers

Extraction Steam HI-8, Q5A 4-314 - 4-320A

Main Steam 4-100 Thru 4-105

ACW-Hl 41900-41982A Aux. Cooling Water Hangers

4210 thru 2113

4-2700 thru 2730 4-2716A, 2726A

4-2900 thru 2907

Deaerator Drn., Overflow & Vent

Lubricating Oil

City Water

Condenser Air Extr.

Condenser Water Box Vent

4-2200 thru 2202 Desuperhtg. Water "BFW"

4-2500 thru 2509 Ignitor Gas "IGS"

4-2000 thru 2011 Aux. Cooling Wtr. Makeup "ACW"

4-1700 thru 1757 Roof & Flr. Drns. "BRD"

42500 thru 252 Sketches Aux. Steam S.V. Vent

4-1500 thru 1509 A Sk. Heater Shell Relief Valve Vent

42600 thru 2617 Sk. Control & Serv. Air

42800 thru 2813 Bk. Misc. Equipment Drains

II I-ll

Page 63: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

K4A-l Bailey Meter Co.

K4A-2 Bailey Meter Co.

K4A-3 Dezurik

K4A-4 Bailey Meter Co.

K4A-5 Bailey Meter Co.

K4A-6 Bailey Meter Co.

K4A-7 Bailey Meter Co.

K4A-8 Bailey Meter Co.

K4A-9 Bailey Meter Co.

K4A-10 Bailey Meter Co.

K4A-11 Bailey Meter Co.

K4A-12 Bailey Meter Co.

K4A-13 Bailey Meter Co.

K4A-14 Bailey Meter Co,

K4A-15 Bailey Meter Co.

K4A-16 Bailey Meter Co.

K4A-17 Jordan

Drawing No.

C3039245

C3040417C

Y-36240

D8049360

D8049361B

D8049362

D8049363

D8049364

D8049365

D8049366

D8049367

D8049368

C8049479 Shs 1-4

D8051249

D8051248

D8051250

95A011279

III-12

Description

Flame Detector Outline

Flame Detector Packing Gland

Burner Gas Valves 4BCV-l-6

Furnace Purge Auto Control Logic

Furnace Firing Permissives Annunciation, Mode Control Logic

Air Register Management, Sequence Control and Indication Logic

Gas System Monitor, MFR rip, and Status Sequence Logic

Lighter Control Logic

Burner Shutdown and Burner Status Sequence Logic

Gas Burner Permissives and Sequence Logic

Air Register Control and Interface Logic

Idle Air Register Control Logic

Burner System Input and Output

Common External Connection Diagram

Common External Connection Diagram

Burner External Connection Drawing

Air Register Drive-Wiring

Page 64: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

K4A-18 Jordan 96D011394 Air Register Drive-Outline

K4A-19 Bailey Meter Co. C6627309 Burner Front Junction Box

K4A-20 Bailey Meter Co. D6627777 Burner Front Control Station

K4A-21 Bailey Meter Co. D6627876 Burner Remote Control Station

III-13

Page 65: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No.

K6A-l thru 16

K6A-17

K6A-18

K6A-19

K6A-20

K6A-21

K6A-22

K6A-23

K6A-24

K6A-25

K6A-26

K6A-27

K6A-28

K6A-29

K6A-30

K6A-31

K6A-32

K6A-33

K6A-34

Manufacturer

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Drawing No.

C3029709

C3010315

A3016419

C3011085

E3010660

C3025054

D3035145

D3044218

A5014572

B3017576

B3014832

B3015639

C3010000

A802285

C3013646

C3033401

A3025026

B3014501

III-14

Description

Not Used

FW Flow Element 4FE-l Cond. Flow Element 4FE-3

Desuperheater Water Flow Element 4FE-2

Fuel Gas Flow Element 4FF-4

Flow Tap Connection 4FE-l, 3

FD Fan Coupling Drive 4CRD-l

FD Fan Coupling Drive 4CRD-l

FD Fan Discharge Damper Drive 4CRD-2

FD Fan Discharge Damper Drive 4CRD-2

Control Drive 4CRD-l, 2 Wiring

FW Flow Trans. 4FT-l Desup. Flow Trans. 4FT-2

Cond. Flow Trans. 4FT-3 Fuel Gas Flow Trans. 4FT-4

Fuel Oil Flow Trans. 4FT-5, 6

Boiler Air Flow Trans. 4FT-7, 9

Alarm Switch Wiring 4FT-9, 4LT-13

Mtg and Hookup Type KP13 Press. Trans.

Cond. Vacuum Trans. 4PT-8 Igniter Press. Trans. 4PT-14

Wind Box-Furnace Trans. 4PT-16

Level Trans. 4LT-l, 3

Page 66: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

K6A-35 Bailey Meter Co. B3040103 Level Trans. 4LT-2, 9, 10, 11

K6A-36 Bailey Meter Co, B3017141 Level Trans. 4LT-13

K6A-37 Not Used

K6A-38 Not Used

K6A-39 Bailey Meter Co. C3025163 Temp. Elem. 4TE-3, 5

K6A-40 Bailey Meter Co. Data Sheets 1-36 Instrument Data

K6A-41 Not Used

K6A-42 Not Used

K6A-43 Not Used

K6A-44 Fisher P-98873-01 Control Valve 4CRV-21 J-16743-1

K6A-45 Bailey Meter Co. C701679 Control Valve 4CRV-3

K6A-46 Bailey Meter Co. C701672 Control Valve 4CRV-4

K6A-47 Bailey Meter Co. C701674 Control Valve 4CRV-7

K6A-48 Bailey Meter Co. C701674 Control Valve 4CRV-8

K6A-49 Bailey Meter Co. C701673 Control Valve 4CRV-9

K6A-50 Bailey Meter Co. C701673 Control Valve 4CRV-10

K6A-51 Bailey Meter Co. C701673 Control Valve 4CRV-ll

K6A-52 Bailey Meter Co. C701675 Control Valve 4CRV-12

K6A-53 Bailey Meter Co. C701675 Control Valve 4CRV-13

K6A-54 Bailey Meter Co. C701673 Control Valve 4CRV-14

K6A-55 Bailey Meter Co. C701673 Control Valve 4CRV-15

K6A-56 Bailey Meter Co. C701675 Control Valve 4CRV-16

K6A-57 Bailey Meter Co. C701672 Control Valve 4CRV-17

K6A-58 Bailey Meter Co. C701672 Control Valve 4CRV-18

K6A-59 Bailey Meter Co. C701675 Control Valve 4CRV-19

III-15

Page 67: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No.

K6A-60

K6A-61

K6A-62

K6A-63

K6A-64

KGA-65

K6A-66

K6A-67

K6A-68

K6A-69

K6A-70

K6A-71

K6A-72

K6A-73

K6A-74

K6A-75

K6A-76

K6A-77

K6A-78

K6A-79

K6A-80

K6A-81

K6A-82

Manufacturer

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Bailey Meter Co.

Fisher

Fisher

Bailey Meter Co.

Bailey Meter Co.

Drawing No.

C701672

C701672

C701672

C701672

C701672

C701668

C701669

P-98871-01 J-16743

P-98872-01 J-17570

E5057327

E5057328

Howell H4200-38-l

Howell H4200-38-2

Control Components 109949

Control Components 113090

Control Components 115350

Control Components 111211

Control Components 115340

Control Components 108580

Bailey Meter Co. D8052692

Bailey Meter Co. D8052691

Bailey Meter Co. E8052690

Bailey Meter Co. E8052689

III-16

Description

Control Valve 4CRV-27

Control Valve 4CRV-29

Control Valve 4CRV-20

Control Valve 4CRV-30, 31

Control Valve 4SSV-2

Control Valve 4SSV-3

Control Valve 4SRV-28

Control Valve 4CRV-22

Control Valve 4CRV-23, 24

Control Schematic Combustion, Steam Temp.

Control Schematic FW, Htr Drains, Misc.

Temperature Monitor

Temperature Monitor

Control Valve 4CRV-2

Control Valve 4CRV-2

Control Valve 4CRV-2

Control Valve 4CRV-l

Control Valve 4CRV-l

Control Valve 4CRV-l

Purge and Interlock Sub­panel - Wiring

Main Control Panel - Wiring

Main Control Panel - Wiring

Main Control Panel - Wiring

Page 68: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

K6A-83 Bailey Meter Co. E8052688 Main Control Panel - Wiring

K6A-84 Bailey Meter Co. E8052687 Main Control Panel - Wiring

K6A-85 Fisher AV6897 Control Valve 4CRV-25

K6A-86 Bailey Meter Co. A3048321 Control Panel - Legend

K6A-87 Bailey Meter Co. E3047013 Control Panel - Layout

K6A-88 Rochester D-1014-411 Sh 1 Annunciator

K6A-89 Rochester D-1014-411 Sh 2 Annunciator

K6A-90 Bailey Meter Co. C80905 Wiring Temp. Trans. 4TT-1, 2

K6A-91 Bailey Meter Co. B3032686 Temp. Element 4TE-2

K6A-92 Bailey Meter Co. C3024837 Temp. Trans. 4TT-1, 2

K6A-93 Bailey Meter Co. D6623510 Temp. Element 4TE-l

K6A-94 EFCO-EBV D-8-150-4 Sh 1 Control Valve 4SSV-l

K6A-95 EFCO-EBV D-8-150-4 Sh 2 Control Valve 4SSV-l

K6A-96 Transmation 00079-000 Transducer 4TT-3, 4, 5

K6A-97 Transmation 700000-097 Conn. Diagram Thermocouple to Transducer 4TT-3, 4, 5

K6A-98 General Electric 104A8526 HFA Relay

K6A-99 General Electric 55-151081 Relay Box - Outline

K6A-100 Micro-Switch 115AT5 Toggle Switch

K6A-101 General Electric K-6375626 HGA Relay

K6A-102 General Electric K-6375626 HGA Relay

K6A-103 Yarway 021-948904 Level Trans. 4LT-12

K6A-104 Barton D3-336C001-5-4 Differential Pressure Controller 4CRV-17

K6A-105 Barton D3-336C001-3-B Data Sheet 4CRV-17

K6A-106 Barton D3-336C001-A Differential Pressure Controller 4CRV-9

III-17

Page 69: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No.

K6A-107 Yarway 021-935552

K6A-108 Barton D3-335C001-B

K6A-109 Yarway 021-927326

K6A-110 Yarway EL-919-800

K6A-lll Yarway 021-936017

K6A-112 Yarway 021-835389

K6A-113 Master Specialties 851-24750

K6A-114 Bailey Meter Co. E3048389

K6A-115 Mason-Neilan CP-1055

K6A-116 Mason-Neilan CP-1055

K6A-117 Mason-Neilan Bl0771-l

K6A-118 Mason-Neilan Bl0771-l

K6A-119 Mason-Neilan 51360-16-C

K6A-120 Mason-Neilan 51360-16-C

K6A-121 Bailey Meter Co. E8052727

K6A-122 Bailey Meter Co. E8052728

K6A-123 Bailey Meter Co. E8052729

K6A-124 Bailey Meter Co. E8052730

K6A-125 Bailey Meter Co. E8052731

K6A-126 Westinghouse 771B657

K6A-127 Bailey Meter Co. Al95161

K6A-128 Bailey Meter Co. Al95808

K6A-129 Bailey Meter Co. Al95809

III-18

Description

Level Trans. 4LT-12 Outline

Data Sheet 4CRV-9

Level Transmitter 4LT-12 Outline

Level Trans. 4LT-12 Wiring

Level Indicator 4CD-20

Level Trans. 4LT-12 and Indicator 4CP-20 Assembly

Switch Wiring

Relay Panel - Outline

Temperature Bulb for 4CRV-21

Temperature Bulb for 4CRV-22

Air Filter Regulator for 4CRV-21

Air Filter Regulator for 4CRV-22

Temperature Controller 4CRV-21

Temperature Controller 4CRV-22

Relay Panel - Wiring

Relay Panel-- Wiring

Relay Panel - Wiring

Relay Panel - Wiring

Relay Panel - Wiring

Transducer Housing

Instrument Valve

Instrument Valve

Instrument Valve

Page 70: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

K6A-130 Bailey Meter Co.

K6A-131 Bailey Meter Co.

K6A-132 Bailey Meter Co.

K6A-133 Bai!ey Meter Co.

K6A-134 Bai~ey Meter Co.

K6A-135 Bailey Meter Co.

K6A-136 Bailey Meter Co.

K6A-137 Bailey Meter Co.

K6A-138 Bailey Meter Co.

K6A-139 Bailey Meter Co.

K6A-140 Bailey Meter Co.

K6A-141 Westinghouse

K6A-142 Westinghouse

K6A-143 Westinghouse

K6A-144 West;inghouse

K6A-145 Westinghouse

K6A-146 Westinghouse

K6A-147 Bailey Meter Co.

K6A-148 Howell

K6A-149 Fisher

K6A-150 Fisher

Drawing No.

Bl951205

Bl951208

E3011514

E3011514

E3011514

C3011366

A3012993

C80905

C80905

Al95171

Bl95191

6627D88

6629D69

263C099

263Cl52

6629D65 Ill

6629D65 112

Dl945991

BH16001Al

CE7209

CE7209

III-19

Description

Purge Meter

Instrument Manifold

Flow Element 4FE-l Installation Detail

Flow Element 4FE-2 Installation Detail

Flow Element 4FE-3 Installation Details

Flow Elements 4FE-l, 2, 3 Reservoirs

Air Filter Regulator

Recorder 4CP-8 - Wiring

Recorder 4CP-3 Wiring

Tubing Fittings

Instrument Valve

Oxygen Analyzer Calibration Chamber

Oxygen Analyzer Probe

Oxygen Analyzer Junction Condulet

Oxygen Analyzer Reference Gas Set

Oxygen Analyzer System

Oxygen Analyzer System

Timing Relay

Temperature Monitor Terminal Panel

Level Transmitter 4CRV-7

Level Transmitter 4CRV-10

Page 71: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

K6A-151 Fisher CE7209 Level Transmitter 4CRV-13

K6A-152 Fisher CE7209 Level Transmitter 4CRV-14

K6A-153 Fisher CE7209 Level Transmitter 4CRV-18

K6A-154 Fisher CE7209 Level Transmitter 4CRV-16

K6A-155 Fisher CE7209 Level Transmitter 4CRV-29

K6A-156 Fisher CV4903 Level Transmitter 4LT-8

K6A-157 Fisher CP6457 Level Transmitter 4LT-4

K6A-158 Fisher CP6457 Level Transmitter 4LT-5

K6A-159 Fisher CP6457 Level Transmitter 4LT-6

K6A-160 Fisher CP6457 Level Transmitter 4LT-7

K6A-161 Bailey Meter Co. D3027822 Thermocouple 4TE-4

K6A-162 Fisher AV2260 Control Valve 4CRV-32

K6A-163 Fisher 10A7397 Control Valve 4CRV-32

K6A-164 Dieterich E84 Flow Element 4FE-5

III-20

Page 72: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

M16A-l Chicago Heater D-2802 Rev. F Deaerator

M16A-2 Chicago Heater B-1542 Deaerator Support

M16A-3 Chicago Heater 2974 B/M (De&erator)

Ml6B-l Yuba Heat 71-H-676-1-1 Rev. 4 L.P. Heater 4A

Ml6B-2 Yuba Heat 71-H-676-2-1 Rev. 3 L.P. Heater 4B

M16B-3 Yuba Heat 71-H-676-4-1 Rev. 3 H.P. Heater 4D

Ml6B-4 Yuba Heat 71-H-676-5-1 Rev. 2 H.P. lieater 4E

M16B-5 Clayton Mark 3000 Orifice Union

M16B-6 Yuba Heat CAPS Feedwater Heater Relief Valve Caps

M16B-7 Yuba Heat 1970 4SRV-10 & 4SRV-11

Ml6B-8 Yuba Heat 1975 4SRV-8 & 4SRV-9

M16B-9 Yuba Heat 1900G 4SRV-15

M16B-10 Yuba Heat 1900H 4SRV-14

M16B-ll Yuba Heat 1900J 4SRV-12 & 4SRV-13

Ml6B-12 Yuba Heat 15-47274-0 Relief Valve Data

III-21

Page 73: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

M32A-l Yarway

M32A-2 Dresser

M32A-3 Dresser

M32A-4 Pacific Pumps

M32A-5 Pacific Pumps

M32A-6 Pacific Pumps

M32A-7 Pacific Pumps

M32A-8 Pacific Pumps

M32A-9 Pacific Pumps

M32A-10 Pacific Pumps

M32A-11 Westinghouse

M32A-12 Pacific Pumps

Drawing No.

053-043154

FC-48026

C-16709

A-26103 Rev. 1

B-15300

C-15665 Rev, 1

B-9118 Rev. 1

CW-48026

SF-48026

T-48026

1396C32 Rev. 2

L0-48026

III-22

Description

Automatic Recirculation Control Valve

Boiler Feed Pump 4A & 4B

Lagging (B.F. Pump)

Metering Orifice (Balancing Orifice)

Warm-up Orifice

Temperature Detector

Assembly Skid

Cooling Water Piping

Seal Flushing Piping

Thermocouple Drilling

Motor Outline - Boiler Feed Pumps 4A & 4B

Lube Oil Piping

Page 74: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

M34A-l Combustion Engr.

M34A-2 Combustion Engr.

M34A-3 Combustion Engr.

M34A-4 Combustion Engr.

M34A-5 Combustion Engr.

M34A-6 Combustion Engr.

M34A-7 Combustion Engr.

M34A-8 Combustion Engr.

M34A-9 Combustion Engr.

M34A-10 Combustion Engr.

M34A-ll Combustion Engr.

M34A-12 Green Fuel

M34A-13 William Powell

M34A-14 Dresser

M34A-15 Dresser

M34A-16 Consolidated

M34A-17 Combustion Engr.

M34A-18

M34A-19 Combustion Engr.

M34A-20 Combustion Engr.

ID4A-21 Combustion Engr.

Drawing No.

E-394-832

E-394-829

E-394-830

E.,-394-831

E-394-063

CE 0030143

242012

E-396-397

A-392-102

D-395-385

E-395-797

28-2617

039255-3&4

3-1748WA-2-803-S-WSC-l

3-1758WD-2-803-S-WSC-l

35-33025-0

C-917-324

D-395-636

D-443-373

D-367-411

III-23

Description

Loading Diagram

General Arrangement - Side

General Arrangement - Front

General Arrangement - Plan

Boiler Support Arrangement

Equipment Summary

Air Heater

Burner Arrangement

Burner Appurtenances

Boiler Feed Conn.

Ignition Air Piping

F.D. Fan

Power Control Isolating Valve

4SRV-l & 2

4SRV-3

Safety Valve Data

Connecting Wiring Diagram (Control Cabinet - Gas)

Test Equipment and Installation Arrangement

Switch Control Box (Igniter)

Pilot Gas Control Cabinet

Page 75: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

M34A-22 Fisher

M34A-2 Westinghouse

M34C-24 Combustion Engr.

M34C-25 Combustion Engr.

M34C-26 Combustion Engr.

M34C-27 Combustion Engr.

M34C-28 Combustion Engr.

M34C-29 Combustion Engr.

M34C-30 Combustion Engr.

M34C-31 Combustion Engr.

M34C-32 Combustion Engr.

M34C-33 Combustion Engr •.

M34C-34 Combustion Engr.

M34C-35 Combustion Engr.

M34C-36 Combustion Engr.

M34C-37

M34C-38 Cosmec, Inc.

M34C-39 Combustion Engr.

M34A-40 Combustion Engr.

M34A-41 Combustion Engr.

M34A-42 Combustion Engr.

M34A-43 Combustion Engr.

M34A-44 Combustion Engr.

Drawing No.

AV3825 CU4800

3834C53

E-396-037

E-396-038

B-997-311

B-392-655

B-146-652

D-395-982

78C3721

78A3485

20A7680 AN1174

5-046-13-084-006

78C3722

78-A-3089 D.O

78-A-3088 D.O

78-A-3124 D.O.

1061F

A-392-100

D-395-629

E-396-583

AP-72038-0

E-993-321

E-993-322

III-24

Description

4SRV-4

Motor (F.D. Fan)

Air Duct Arrangement

Gas Duct Arrangement

List of Approved Coatings

Schematic (Desuperheaters & Control Piping)

Thermocouple Well

Sugg. Burner Piping Schematic

F.D. Fan Hydraulic Coupling

B/M (Hydraulic Coupling)

F.D. Fan Hydraulic Coupling Oil Cooler

Oil Piping (F.D. Fan Hydraulic Coupling)

Notes (Oil Piping)

Notes (Hydraulic Coupling)

Terminal Box Assembly

Self Lubricating Bearing Plates

Seal Air Piping Schematic

Aspirating Air Piping Arrangement

Pressure Parts Arrangement

Desuperheater Spray Water

Expansion Joint Insulation Flat & Ribbed Lagging

Method of Attaching Ribbed Lagging to Ducts, Sh. 1

Page 76: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

M34A-45 Combustion Engr.

M34A-46 Combustion Engr.

M34A-47 Combustion Engr.

M34A-48 Combustion Engr.

M34A-49 Combustion Engr.

M34A-50 Combustion Engr.

M34A-51 Combustion Engr.

M34A-52 Combustion Engr.

M34A-53 Combustion Engr.

M34A-54 Combustion Engr.

M34A-55 Combustion Engr.

M34A-56 Combustion Engr.

M34A-57 Combustion Engr.

M34A-58 · Combustion Engr.

M34A-59 Crane

M34A-60 Crane

M34A-61 Crane

M34A-62 Combustion Engr.

Drawing No.

E-998-323

D-383-125

C-366-667

C-997-154

C-991-185

E-993-318

E-368-061

D-367-536

C-367-739

E-367-384

E-369-191

E-396-366

D-396-162

Brochure 3-16-72

K-8150

H-31056

BP-1445-1

E-395-249-0

III-25

Description

Method of Attaching Ribbed Lagging to Ducts, Sh. 2

Metal Lagging Ducts & iliary Equipment

Method of Attaching Insulating Fasteners to Plate

Self-Tapping Screw Data

Amega Strips Support Bracket for Duct Ribbed Casing

Duct Insulation

Refract, & Insulation Arrangement, Sh, 1

Refract. & Insulation Arrangement, Sh. 2

Drum Head Insulation

Material List for Refractory and Insulation

Gas Side Baffle Arrangement (Refractory)

Aluminum or Steel Casing Arrangement

Arrangement of Buckstays Covers

Metal Lagging and Insulation Specifications

Feedwater Check Valve

Feedwater Stop Valve

Bypass Assembly

Superheater Arrangement

Page 77: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No.

M~4A-63

M34A-64

M34A-65

M34A-66

M34A-67

!134A-68

M24A-69

!134A-70

M34A-71

M34A-72

!134A-73

M34A-74

!134A-75

!134A-76

!134A-77

!134A-78

M34A-79

M34A-80

M34A-81

M34A-82

M34A-83

Manufacturer Drawing No.

Combustion Engr. D-368-202

Green Fuel 14-11250

Combustion Engr. A-5-3324

Combustion Engr.

Combustion Engr. A-5-2835-D

Combustion Engr. A-5-1610-AD

Combustion Engr. 025-102795

Combustion yarway 028908121

Combustion Yarway 028-940999

Combustion Yarway 028-042552

Combustion Yarway P-1225

Combustion Yarway 014-016452

Combustion Yarway PD-423432, Sh 1

Combustion ¥arway 8-16990

Combustion Yarway Al-70EE

Combustion Yarway PD 423432, Sh 2

Combustion Yarway PD 423432, Sh 3

Combustion Zurn 144B3513

Combustion Zurn B-1350-1

Combustion Zurn E 396 084

Combustion Zurn 1441233

III-26

Description

3" Gas Eddy Plate - Front Igniter

Assembly of Accessories for F.D. Fan Pillow Block

Regulator 4CRV-26

Head Sheets - 2 Pages

Valve Type 7330W

Valve Type 7130W

Color Port Water Gage

Floor Stand & Mirrow Assembly

Direct Vision Hood

Illuminator

3/ 4" ASCO Solenoid Valve

Blow Off Valve

Acid Stop Valve

Forced Draft Fan Performance Curves

Pressure Gauge Assembly

Acid Stop Valve - Inlet Weld Detail

Acid Stop Valve - Outlet Weld Detail

Motor Prints

Type CI Fan

Water Gage Vision Duct

Sound Trunk Outline

Page 78: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

M34A-84 Combustion Zurn

M34A-85 Combustion Zurn

M34A-86 Combustion Zurn

M34A-87 Combustion Zurn

M34A-88 Combustion Zurn

M34A-89 Combustion Zurn

M34A-90 Combustion Engr.

M34A-91 Combustion Engr.

M34A-92 Combustion Engr.

M34A-93 Yarway

M34A-94 Combustion Engr.

M34A-95 Combustion Engr.

M34A-96 Combustion Engr.

Drawing No.

8 25969

8 26043

8 26199

8 26101

8 26101

Aug. 18, 1972

E-380-788

039255-5

SK A 7210 230125

WC-919-979

24965

27083

III-27

Description

Thermocouple Application

Shaft Seal

Inlet Screen

Coupling Fan to Fluid Drive

Coupling Fluid Drive to Motor

H.P. Fluid Coupling vs. Fan Speed

Flashing Arrangement

Power Control Isolating Valve Maintenance Manual

4CRV 5, 6

90° Hooded Intermediate Mirror

T/C Assemblies Wire Detail

T/C Assemblies Wire Details

Junction Box Assembly

Page 79: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No.

M36A-l Southwestern Engr. N 146 C

M36A-2 Southwestern Engr. ZE-72551

M36A-3 Ingersoll-Rand MP-2106

M36A-4 Ingersoll-Rand C24LFV86Xl4

M36A-5 Ingersoll-Rand C24LFV321Xl

M36A-6 Temp Flex D-16702

M36A-7 Ingersoll-Rand D-14-6APHC86Xl0

M36A-8 Westinghouse 1392C69

M36A-9 Hughes-Anderson 0276-1-01

M36A-10 Hughes-Anderson 0267-2-01

M36A-ll Southwestern Engr. AE72590

M36A-12 Southwestern Engr. 55D2453-02

M36A-13 Southwestern Engr. 55D2466-0l

M36A-14 Southwestern Engr. 55D4507-A

M36A-15 Southwestern Engr. 55D4507

M36A-16 Southwestern Engr. 55S2372-02

M36A-17 Southwestern Engr. 55S2436-02

M36A-18 Hughes-Anderson 0276-1-02

M36A-19 Hughes-Anderson 0276-2-02

III-28

Description

Auxiliary Water Cooler Spec Sheet

Surface Condenser

Bill of Material (Circ. Water Pumps)

Circ. Water Pumps

Cooling Water & Drain Piping (Circ. Water Pumpsf"

Expansion Joint Assembly

Condensate Pumps

Motor (Circ. Water Pumps)

Auxiliary Water' cooler 4A

Auxiliary Water Cooler 4B

Finish Requirements

42" Butterfly Valve & Expansion Joint

24" Butterfly Valve 4MOV-24, 25 & Expansion Joint

16" Butterfly Valve & Expansion Joint

16" Butterfly Valve & Expansion Joint

Shaft Crossection 4MOV-24, 25 ( 42" & 24" Butterfly Valves)

Shaft Crossection (16 11 Butterfly Valve)

Front Channel (Auxiliary Water Cooler 4A)

Front Channel (Auxiliary Water Cooler 4B)

Page 80: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. ·Manufacturer Drawing No.

M36A-20 Hughes-Anderson 0276-1-03

M36A-21 Hughes-Anderson 0276-2-03

M36A-22 Hughes-Anderson 0276-1-04

M36A-23 Hughes-Anderson 0276-2-04

M36A-24 Hughes-Anderson 0276-1-05

M36A-25 Hughes-Anderson 0276-2-05

M36A-26 Hughes-Anderson 0276-1-06

M36A-27 Hughes-Anderson 0276-2-06

M36A-28 Hughes Anderson 0276-07

M36A-29 Hughes-Anderson 0276-08

M36A-30 Hughes-Anderson 0276-09

M36A-31 Hughes-Anderson 0276-10

M36A-32 Hughes-Anderson 641-D-7927

M36A-33 Hughes-Anderson 696-D-8176

M36A-34 Hughes-Anderson 732-C-7569

M36A-35 Hughes Anderson 696-C-8176

M36A-36 Temp-Flex B-16856

M36A-37 Temp::-Flex B-16857

M36A-38 Philadelphia Gear 15-476-0900-3

M36A-39 Behm 0-72-134-3

M36A-40 Consolidated 1902

M36A-41 Dresser 1975

III-29

Description

Shell (Aux. Water Cooler 4A)

Shell (Auxiliary Water Cooler 4B)

Back Channel (Aux. Water Cooler 4A)

Back Channel (Aux. Water Cooler 4B)

Tube Sheet (Aux. Water Cooler 4A)

Tube Sheet (Aux. Water Cooler 4B)

Tube Bundle (Aux. Water Cooler 4A)

Tube Bundle (Aux. Water Cooler 4B)

Gasket (Aux. Water Coolers)

Nameplate (Aux. Water Coolers)

B/M (Aux. Water Coolers)

B/M (Aux. Water Coolers)

Condenser Exhauster

Piping Assy. (Cond. Exhausters)

Tank Assembly (Cond. Exhausters)

Bill of Material Piping Assy. (Condenser Exhauster)

Expansion Joint (Extraction)

Expansion Joint (Extraction)

Wiring Diagram (C.W. Pump Discharge Valve)

Lagging - Condenser Neck Extraction

Consolidated Safety Relief Valve 4SRV-18, 19

4SRV-20 & 21

Page 81: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No, Manufacturer Drawing No.

M36A-42 Southwestern Engr. SKWA72C37620

M36A-43 Ingersoll-Rand 718-Y-18

M36A-44 Southwestern Engr. 005-36051

M36A-45 Westinghouse 2739 D 37

M36A-46 Southwestern Engr. 14-3478

Southwestern Engr. 14-3479

M36A-48

M36A-49 Southwestern Engr. EN1119-711

M36A-50

M36A-51 143587

III-30

Description

Shaft Outline - Cond. Pumps

Coupling Sketch - Condensate Pumps

Speed Torque Curve - Condensate Pumps

Motor Outline - Condensate Pumps

Condenser Exhauster CL-705

Condenser Exhauster Cl-705

Performance Curve (Cond. Exh.)

1 set of erection dwgs.

Wiring Dia. Control Pnl. CE Units

Page 82: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

M40A-l General Electric A-1196Jl5 Notes (Turbine Oil Reservoir)

M40A-2 General Electric D-4026J91 Foundation & Piping Design Data

M40A-3 General Electric 7556E47 Turbine Outline

M40A-4 General Electric 698E359 Turbine Oil Reservoir

M40A-5 General Electric D-4029J31 Lagging Support

M40A-6 General Electric 8948569 Exhaust Flange

M40A-7 General Electric 435C759 Strut Arrg't (Exh Casing)

M40A-8 General Electric 1196J39 Outline Notes

M40A-9 General Electric C239U3 Generator Data

M40A-10 General Electric 894B478 Pressure Indicating Devices

M40A-11 General Electric D-4034J41 Turbine Gage Panel

M40A-12 General Electric 653A512 Electrical Devices Data

M40A-13 General Electric D-4034J42 Electrical Control Diagram, Sh. 1

M40A-14 General Electric D-4034J42 Electrical Control Diagram, Sh. 2

M40A-15 General Electric D-4034J42 Electrical Control .Diagram, Sh. 3

M40A-16 General Electric D-4034J42 Electrical Control Diagram, Sh. 4

M40A-17 General Electric R & P-5 Hz Cooler Performance Data

M40A-18 General Electric 941B738 Hz Coolers

M40A-19 General Electric 7511E86 Electrical Control Conn.

M40A-20 General Electric 7556E58 Piping Steam Turbine

M40A-21 General Electric 4358514 Remote Purity Indicator

M40A-22 General Electric C-3009J39 Piping Seal Oil

M40A-23 General Electric C-3044Jl4 Piping Diag. Brg. Enlarg Vent

M40A-24 General Electric D-4032J47 Cabinet OTL Hydrogen Control

III-31

Page 83: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No.

M40A-25

M40A-26

M20A-27

M40A-28

M40A-29

M40A-30

M40A-31

M40A-32

M40A-33

M40A-34

M40A-35

M40A-36

M40A-37

M40A-38

M40A-39

M40A-40

M40A-41

M40A-42

M40A-43

M40A-44

M40A-45

M40A-46

M40A-47

M40A-48

M40A-49

Manufacturer

General Electric

General Electric

General Electric

General Electric

Genral Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

General Electric

Drawing No.

698 E 381

C 3044S62

7555E59

698E387

357G269

D-4032J50

B-2035J88

1196

698E391

7556E33

B-2005J67

C-3026J82

652E946

652E946.

C-3036J80

B-2047 J11

100 A 753

654 A 658

D 4039 J58

B 1129 J94 pg 1

B 1129 J99 pg 1

B 1177 J63 pg 4

D 4034 J42 pg 5

698 E 664

III-32

Description

Piping Diagram (Hydrogen)

Piping Diag. (Exhaust Hood Spray)

Turbine Control Diagram

Spring Support Hangers

Vacuum Pump

Main Steam Line

Stop Valve Blowdown Cover

Notes (Oil Piping and Steam)

Piping Generator

Piping Oil Turbine

Turbine Customer Prints list

Thermometer Well-Steam Line

Generator Conn. Outline, Sh. 1

Generator Conn. Outline, Sh. 2

Control Start Themocouples

Pressure Transmitter

Cutout Dims Selvn Indicator

Outline Dimensions DB-40 Case

Piping Vacuum Pump

1500# & 2500# M.O. Valves

600# M.O. Valves

1500# Globe Valve

Elec. Cont. Dia. Turbine

Insulation Data

Page 84: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

M40A-500 General Electric 44C 305715 Excitation compartment

M40A-501 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. 1

M40A-502 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. lC

M40A-503 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. 2

M40A-504 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. 2A

M40A-505 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. 3A

M40A-506 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. 4

M40A-507 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. 5

M40A-508 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. 6

M40A-509 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. 7

M4CA-510 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. 8

M40A-511 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. 9

M40A-512 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. 10

M40A-513 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. 11

M40A-514 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. 12

M40A-515 General Electric 44C 305761 Wiring Diagram - Static Exciter R1:>.!;ula.tor, Sh. 13

M40A-516 General Electric 44C 305761 Wiring Diagram - Static Exciter Regulator, Sh. 14

M40A-517 General Electric 44C 305761 Wiring Diagram - Static Exciter Regualtor, Sh. 15

III-33

Page 85: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

M40A-518 General Electric

M40A-519 General Electric

M40A-520 General Electric

M40A-521 General Electric

M40A-522 General Electric

M40A-523 General Electric

M40A-524 General Electric

M40A-525 General Electric

M40A-526 General Electric

M40A-527 General Electric

M40A-528 General Electric

M40A-529 General Electric

M40A-530 General Electric

M40A-531 General Electric

M40A-532 General Electric

M40A-533 General Electric

M40A-534 General Electric

M40A-535 General Electric

M40A-536 General Electric

M40A-537 General Electric

M40A-538 General Electric

M40A-539 General Elec~ric

M40A-540 General Electric

M40A-541 General Electric

M40A-542 General Electric

Drawing No. Description

44A202646 41CS Switch & 70 CS Switch

44A202646 43 CS Switch

0165A7859 ET-16 Indicator Light

B3147K39 Transfer Voltmeter

44B21139 Voltage Adjust Pot

SP803 Special Paint Information

44B334539 Saturable Current Trans., Sh. 1

44B334539 Saturable Current Trans., Sh. 2

44A301085 Control Switch Type SB-1

9T25Y6024 Transformer Nameplate

278C700AK Power Potential Transformer

821D339 Magnetic Motor Starter DC

B2130 K809 Outline (Transformer)

NP3101XOOlOH354 Nameplate

A 8649941 Outline Potential Transformer

NP 216393 NamePlate Potential Trans.

H 968 9241-293 Ratio & Phase Angle Curve

0203Al960 Potential Trans. Conn. Diagram

0153B8678 Neutral Grounding Equipment Connection Diagram

0191B4204 Arrangement P.T. & Surge Compt.

0191B4205 Neutral Grd'g. Compart.

140A 360 Terminal Box for Bushing Current Transformers

140A 361 Terminal Box Assembly

6534 A 512 Sh. 1-9 Electrical Devices Data

III-34

Page 86: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

M40A-543 General Electric

M40A-544 General Electric

M40A-545 Genral Electric

M40A-546 Lurgi Knost

M40A-547 Lurgi Knost

M40A-548 Lurgi Knost

M40A-549 Lurgi Knost

M40A-550 Lurgi Knost

M40A-551 Lurgi Knost

M40A-552 Lurgi Knost

M40A-553 Lurgi Knost

M40A-554 Lurgi Knost

MSOA-555 Lurgi Knost

M40A-556 Lurgi Knost

Drawing No.

D-4034 J42

B-5795365

C-5473449

C-5473445

D-2634K43

D-5797936

B-8947055

C-9851021

D-202A16531

C203 A 1652

44C305830

44C305830

44C305830

44A300215, Sh. 1

III-35

Description

Electrical Control Diagram

Otl Dims Rec (SP & V & ECC)

Otl Dims Power Unit

Otl Dims. Rec (Exp. & Vib)

Conn Diag Exp & Vib

Conn Diag SP & V & Ecc

Panel L/0 Sp & V & Ecc, Exp, Vib

Otl Dims Ref Det Unit

Summary Sheets 1 - 4

Summary Sheets 1 - 4

Static Exciter - Regulator Stnd •• Sh. 1

Static Exciter - Regualtor Stnd., Sh. 2

Static Exciter - Regulator Stnd., Sh. 3

Meter Outline (GE DB 40)

Page 87: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manuf ac tur er

M42A-1 Crane

M42A-2 Crane

M42A-3 Crane

M42A-4 Crane

M42A-5 Crane

M42A-6 Crane

M42A-7 Crane

M42A-8 Crane

M42A-9 Crane

M42A-10 Crane

M42A-ll Crane

M42A-12 Crane

M42A-l3 Crane

M42A-14

M42A-15 Crane

M42A-16 Crane

M42A-17 Crane

M42A-18 Crane

M42A-:9 Pratt

M42A-20 Crane

M42A-21

M42A-22 Crane

B-108388 1 of 2 & 2 of 2

B-108403-A

B-108409

B-108404-A

B-108399-A

PE-150258

B-108405

B-107459

B-108395

PE-151276

B-108392 1 of 2 & 2 of 2

H-19665-S

H-19652

H-19651-L

B-908

B-4217

K-8381

B-8605

H-31031

K-8134

III-36

4 MOV-1

4 MOV-2

4 MOV-3

4 MOV-4 & 4 MOV-5

4 MOV-7 & 4 MOV-8

4 MOV-9

4 MOV-10, 4 MOV-11, 4 MOV-13, 4 MOV-14, 4 MOV-19, 4 MOV~20, 4 MOV-16 & 4 MOV-17

4 MOV-12

4 MOV-15

4 MOV-18

4 MOV-21, 4 MOV-22

600 PSI Steel Gate Valves

900 & 1500 PSI Steel Gate Valve

1500 PSI Steel Gate Valves

4 MOV-6

(Motor Operator) 4 MOV-6

8" /133 1/2 XUF. 300 LB Gate Vabre

4 MOV-6

6", 8", 12" 90011 & 1500 II Gate Valves

By-Pass Valve for 4 MOV-1

Page 88: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

M42A-24 Crane

M42A-25 Crane

M42A-26 Crane

M42A-27 Crane

M42A-28 Crane

M42A-29 Crane

M42A-30 Crane

M42A-31 Crane

M42A-32 Crane

M42A-33 Crane

M42A-34

M42A-35 Crane

M42A-36 Crane

M42A-37 Crane

M42A-38 Crane

M42A-39 Crane

M42A-40 CJEane

M42A-41 Crane

M42A-43 Crane

M42A-44 Crane

M42A-45 Crane

M42A-46 Crane

Drawing No.

K-8135

B-108391-

B-108390

B-108389

H-31033

K-8137

H-31034

H-31032

B-108396

K-8136

02-404-0004-4

15-476-1112-3

15-477-2839-3-5-5 15-476-0900-3

02-403-0012-3

15-477-4425-3

02-403-0012-3

15-477-4425-3

02-408-0009-3

15-476-1112-3

02-403-0002-3

15-476-1112-3

III-37

Description

By-Pass Valve for 4 MOV-21 & 4 MOV-22

4-HPV-1 & 4-HPV-2 & 4-HPV-3 & 4-HPV-15

4-HPV-7, 4HPV-8, 4HPV-9 & 4HPV-10

4HPV-ll, 4HPV-12

1 1/2" & 2" 1500 II Gate Valve

4HPV-4

2 1/2" 150011 Gate Valve

8" & 10" 6001/ Gate Valve

4HPV-13, 4HPV-14

1 1/2" x 2" 8001/ gate Valve

4 MOV-12 Limitorque Valve Control

4 MOV-12 Limitorque Wiring Diag.

4 MOV-6

4 MOV-9 Limitorque Valve Control

4 MOV-9 Limitorque Wiring Dia.

4 MOV-18 Limitorque Valve Control

4 MOV-18 Limitorque Wiring Dia.

Limitorque Valve Control 4 MOV-1

Limitorque Wiring Dia. 4 MOV-1

Limitorque VAlve Control 4 MOV-3

Limitorque Wiring Control 4 MOV-3

Page 89: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

M42A-47 Crane

M42A-48 Crane

M42A-49 Crane

M42A-50 Crane

M42A-51 Crane

M42A-52 Crane

M42A-53 Crane

M42A-,54 Crane

M42A-55 Crane

M42A-56 Crane

M42A-57 Crane

M42A-58 Crane

M42A-59 Crane

M42A-60 Crane

M42A-61 Crane

M42A-62 Crane

Drawing No.

02-403-0002-3

15-476-1112-3

02-403-0012-3

15-476-112.3

02-403-0002-3

15-476-1112-3

02-403-0012-3

15-476-1112-3

02-403-0002-3

15-476-1112-3

02-403-0002-3

15-476-1112-3

B-108521-A

H-31034-C

PB-149549

PB-149549

III-38

Description

Limitorque Valve Control 4 MOV-7, 4 MOV-8 Part #874152

Limitorque Wiring Diagram 4 MOV-7, 4 MOV-8 Parts #874152

Limitorque Valve Control 4 MOV-15

Limitorque Wiring Diagram 4 MOV-15

Limitorque Valve Control 4 MOV-10, 11, 13, 14, 16, 17, 19, 20

Limitorque Wiring Diagram 4 MOV-10, 11, 13,14, 16, 17, 19, 20

Limitorque Valve Control 4 MOV-21, 4 MOV-22

Limitorque Wiring Diagram 4 MOV-21, 4 MOV-22

Limitorque Valve Control 4 MOV-4, 4 MOV-5

Limitorque Wiring Diagram 4 MOV-4, 4 MOV-5

Limitorque Valve Control 4 MOV-2

Limitorque Wiring Diagram 4 MOV-2

3" /1787-U 1500 LB. Pressure Seal Gate Valves

Gen. Ass. & Dimension Dwg. Valves Tag. 4HPV-5; 4 HPV-6

10" /147-1/2 XUF 150 Lb. Gate Valve f 4 MOV-9

12" 1147-1/2 XUF 150 Lb. Gate Valve f/ valve 4 MOV-18

Page 90: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No.

D8-101

DB-102

D8-103

D8-201

D8-202

D8-203

D8-204

D8-205

D8-206

D8-207

D8-208

DB-209

DS-210

D8-301

DB-302

D8-303

DB-304

Manufacturer

Square D

Bailey

Square D

Kato

Kato

Kato

Kato

Kato

Kato

Kato

General

Kato

Kato

C&D

C&D

C&D

C&D

Electric

Drawing No.

M42-2

C30052-170

M-8298

103-10060

AR-8866-B

M6-8800-572

612-10002-99

HU-8856

HU-8825

2060 PDL

MGS-967

K-4747

12-204

K-3692-1

RS-420

III-39

1268

Description

Panelboard Schedule

Multi-Pointer Gage

Push-Button Station

Quotation

MG Set Outline

Brushless Generator

Motors-Generators &

Control Panel

Stator Hook-Up

Motor Hook-Up

Controls

Circuit Bkr Load Centers

AC Generators

Motor-Generator Sets

Battery Outline

Stationary Batteries

Outline-Racks

Charger Handbook

Page 91: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

D8-401 Anaconda

D8-402 Anaconda

D8-403 Anaconda

D8-404 Anaconda

D8-405 Anaconda

D8-406 Anaconda

D8-407 Samuel Moore

D8-408 Samuel Moore

D8-409 Samuel Moore

D8-410 Anaconda

D8-501 General Electric

08-601 Spero

D8-602 Infranor

08-603 Crescent

D8-604 Pittsburgh

D8-605 Spero

08-606 Pittsburgh

08-607 Pittsburgh

08-608 General Electric

D8-609 Stonco

;

Drawing No.

G-17, 18 & 19

WC-6613

6-37

WC-6517

Section 3, Page

Section 6, Page

lCMX-B-1

C-54

5700 Page 1-3 & 8-11

A-5 & 6

31-F-22

IV-3 & 4

S-59 & S-60

27

S-3

24

9273-1

Section K

III-40

Description

Power Cable - Types "A" & HBII

Power Cable - Type "D"

Control Cable - Type "F"

Control Cable

3 Cable - Type "THW"

11 Cable -Type "USE"

Instrument Wire - Type "G"

T/C Extension - Type "Ku

T/C Extension - Type "M"

Power Cable - Type "E"

Neutral Grounding Resistors

Lighting Reflectors

Lighting Fixture "FL4"

Lighting Fixture "H"

Lighting Fixture "J"

Lighting Fixture "L"

Lighting Fixture ·"S"

Lighting Fixture "T"

Lighting Fixture

Lighting Fixture "Fl, F2, F3, FF"

Page 92: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

D8-610 Crouse-Hinds 12-18-72 Light Fixture "G"

DB-611 Holophane Light Fixture "K"

DS-612 Hubbell 106 Light Fixture "L & Ll"

D8-613 Hubbell Mercury Lamp Ballasts

D8-614 Holophane R-45M-5 Lighting Fixture ''M"

D8-615 Crouse-Hinds 11-18-72 Lighting Fixture "N"

D8-616 Appleton 4.24 Lighting Fixture "NN"

D8-617 Appleton 4.32 Lighting Accessories "NN"

D8-618 Westinghouse Lighting Fixture "P"

D8-619 Holophane Lighting Fixture "R''

D8-620 Ho1ophane 06344-7 Lighting Fixture "R"

D8-621 Ho1ophane 460-120-PR Lighting Fixture "U"

D8-622 Revere 1100-1/2 Lighting Fixture "Vn

D8-701 Browne-Davies 589 Communication System

D8-702 Gai-Tronics S-1589 Line Balance Assembly

D8-703 Gai-Tronics SS-1661 Wall Handset Station

D8-704 Gai-Tronics SS-1670 Wall Handset Station

D8-705 Gai-Tronics SS-1861 Desk Top Station

D8-706 Gai-Tronics SS-1668 Desk Top Station

D8-707 Gai-Tronics SS-1669 W.P. Handset Station

D8-708 Gai-Tronics SS-1670 W.P. Handset Station

D8-709 Gai-Tronics SS-1671 Speaker Amplifier Assy

D8-710 Gai-Tronics SS-1672 Speaker Amplifier Assy

III-41

Page 93: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

D8-711 Gai-Tronics SS-1673 W.P. Speaker Amplifier

DB-712 Gai-Tronics SS-1674 W.P. Speaker Amplifier

08-713 Gai-Tronics SS-1685 Wall Station

D8-714 Gai-Tronics B-1686 Wall Station

D8-715 Gai-Tronics SS-1693 W.P. Wall Station

D8-716 Gai-Tronics B-1694 W.P. Wall Station

D8-717 Gai-Tronics SS-1237 Cone Apeaker Assy

08-718 Gai-Tronics SS-1735 Cone Apeaker Assy

D8-719 University 3402 Driver Unit

D8-720 University Mounting Dimensions

D8-721 Gai-Tronics SS-1729 Speaker Mounting Assy

D8-722 Gai-Tronics SS-6E-641-l Distribution & Test Enclosure

D8-723 Gai-Tronics SS-6E-640-l Wiring Diagram - Enclosure

D8-801 Thermon 10060 Freeze Protection Heater Cable

D8-901 Globe Tray

Dl0-201 Dis-Tran Electrical Equipment

010-501 Rome Cable Cables

III-42

Page 94: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

ElOA-1 Allis-Chalmers 72-211-296 OCB Outline

ElOA-2 Allis-Chalmers SWH-050B2 Anderson Gnd Connection

ElOA-3 Allis-Chalmers 72-211-165-414 Operating HSG Diagram

ElOA-4 Allis-Chalmers 72-211-164-412 Diagram

ElOA-5 Allis-Chalmers 72-210-450-457 BCT Diagram

ElOA-6 Allis-Chalmers 2303 BCT Curves

ElOA-7 Allis-Chalmers 2304 BCT Curves

ElOA-8 Allis-Chalmers 72-210-484-401 Notes & Symbols

ElOA-100 Allis-Chalmers 63-307-806-401 Transformer Outline

ElOA-101 Allis-Chalmers 63-307-700-153 Nameplate

ElOA-102 Allis-Chalmers 63-307-749-449 Schematic Diagram

ElOA-103 Allis-Chalmers 63-307-748-434 External Wiring Diag.

ElOA-104 Allis-Chalmers 63-307-747-448 Control Box Wiring

ElOA-105 Allis-Chalmers 01-317-526-018 Transformer Bushing

ElOA-106 Allis-Chalmers 63-307-715-014 Transformer Bushing

ElOA-107 Allis-Chalmers 63-307-714-014 Transformer Bushing

ElOA-108 Allis-Chalmers 63-209-066-431 C.T. Wiring Diag.

ElOA-109 Allis-Chalmers 63-117-687-023 HV Bushing

ElOA-110 Allis-Chalmers 63-118-516-450 Shipping Outline

III-43

Page 95: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

ElOA-200 Westinghouse

ElOA-201 Westinghouse

ElOA-202 Westinghouse

ElOA-203 Westinghouse

ElOA-204 Westinghouse

ElOA-205 Westinghouse

ElOA-206 Westinghouse

ElOA-207 Westinghouse

ElOA-208 Westinghouse

ElOA-209 Westinghouse

ElOA-210 Westinghouse

ElOA-211 Westinghouse

ElOA-212 Westinghouse

ElOA-213 Westinghouse

ElOA-214 Westinghouse

ElOA-215 Westinghouse

ElOA-216 Westinghouse

ElOA-217 Westinghouse

ElOA-218 Westinghouse

ElOA-219 Westinghouse

ElOA-220 Westinghouse

ElOA-221 Westinghouse

ElOA-222 Westinghouse

ElOA-223 Westinghouse

Drawing No.

627F681

B6695-1A

B6695-1L

508-AOSO

508-A052

508-A058

B6695-1V

B6695-2A

B6695-2B

B6695-2S

B6695-3A

B6695-3B

B6695-3C

B6695-4A

B6695-4B

B6695-4C

B6695-4D

B6695-5S

781A748

781A764

800A502

510A998

510A999

781A753

III-44

Description

One-Line Schematic

Master Drawing List

General Arrangement

Typical Foundations

Unit Base Plan

Typical Assembly

Base Plan

Front Panel Arrangements

Front Panel Arrangement

Circuit Nameplates Engraving

Side View of Unit

Side View of Unit

Side View of Unit

Material List

Material List

Material List

Material List

Interlock Spec.

Shelter Form Aisle Section Assy.

Shelter Form Aisle End Assy.

Bus Support Install. Instruct.

Taping Procedure

Taping Illustrations

Shelter Form Aisle Assy. -Light Assy.

Page 96: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

ElOA-224 Westinghouse 627F980 Conn. Diag. Unit 1

ElOA-225 Westinghouse 627F979 Conn. Diag. Unit 2

ElOA-226 Westinghouse 627F978 Conn. Diag. Unit 3

ElOA-227 Westinghouse 627F977 Conn. Diag. Unit 4

ElOA-228 Westinghouse 627F976 Conn. Diag. Unit 5

ElOA-229 Westinghouse 627F975 Conn. Diag. Unit 6

ElOA-251 Westinghouse 552F021 One-Line and Schematic Diag.

ElOA-252 Westinghouse A9010-1A Master Drawing List

ElOA-253 Westinghouse A9010-1L General Arrangement

ElOA-254 Westinghouse A9010-2B Front Panel Arrangements

ElOA-255 Westinghouse A9010-3D Side View

ElOA-256 Westinghouse A9010-4A Material List

ElOA-257 Westinghouse A9010-4B Material List

ElOA-258 Westinghouse A9010-4C Material List

ElOA-259 Westinghouse 552F202 Conn. Diag. Unit 1 & 2

ElOA-260 Westinghouse 552F203 Conn. Diag. Unit 3 & 4

ElOA-261 Westinghouse 552F205 Conn. Diag. Unit 7

ElOA-300 Westinghouse B6695-5H Bus Run

ElOA-301 Westinghouse 3579A60 Bill of Material

ElOA-302 Westinghouse 3579A61 Throat Connection

ElOA-303 Westinghouse 508A777 Taping Procedure

ElOA-304 Westinghouse 508A778 Taping Illustrations

III-45

Page 97: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

ElOA-400 Westinghouse BR1690121 Outline - Couple Cap & Pot Device

ElOA-401 Westinghouse BR1690122 Wiring Diagram

ElOA-402 Westinghouse 39-621-1 Instructions

ElOA-501 Keystone 458-BM-1 Bill of Matl - Prescott Sub.

ElOA-502 Keystone 458-L-1 Switchboard Layout

ElOA-503 Keystone 458-S-1 Control Switchboard

ElOA-504 Keystone 458-AC-1 AC Schematic-Three-Line

ElOA-505 Keystone 458-AC-2 AC Schematic-Three-Line

ElOA-506 Keystone 458-W-1 Wiring Diagram - Swbd lF

ElOA-507 Keystone 458-W-2 Wiring Diagram - Swbd lR

ElOA-508 Keystone 458-W-3 Wiring Diagram - Swbd 2F

ElOA-509 Keystone 458-W-4 Wiring Diagram - Swbd 2R

ElOA-510 Keystone 458-W-5 Wiring Diagram - Swbd lF

ElOA-511 Keystone 458-W-6 Willow Glen Sub. Wiring Diagram Swbd lR

III-46

Page 98: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

El2A-l General Electric 0623E0271 Isolated Phase Bus Arrangement

El2A-2 General Electric 0623E0272 Isolated Phase Bus Arrangement

El2A-3 General Electric 0138Bl774 Isolated Phase Bus Typical Construction

El2A-4 General Electric 0138Bl775 Isolated Phase Bus Typical Construction

El2A-5 General Electric 0935D726, Sh 1 Field Assembly of Ground Connections & Hardware

El2A-6 General Electric 0155C9473 Generator Connection

El2A-7 General Electric 0155D9478 Main Transformer Connection

El2A-8 General Electric 0193B8327 Auxiliary Transformer Connection

El2A-9 General Electric 0193B8321 Power P.T. Connection

El2A-10 General Electric 0203A3859 Gasket & Hdwr. Assy.

El2A-ll General Electric 0203A3858 Hdwr & Gasket Assy.

El2A-12 General Electric 0202A8570 Field Weld Conn.

El2A-13 General Electric 0195A8079 Expan. Conn. to Bushing

El2A-14 General Electric 0103A5278 Insulation

El2A-15 General Electric 0203A2485 go• Field Welded Expan. Connection

El2A-16 General Electric 0203Al646 Swgr. Equipment Summary

El2A-17 General Electric 0193B8212 Enclosure Grounding System

El2A-18 General Electric 73-191-1, Sh 1 Supporting Steel

El2A-19 General Electric 73-191-1, Sh 2 Supporting Steel

III-47

Page 99: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

El4A-101 Allis-Chalmers 25-121-017-403 Dual Circuit Breaker -Wiring Diagram

El4A-102 Allis-Chalmers 25-220-006-401 Combination Starter -Wiring Diagram

El4A-103 Allis-Chalmers 25-220-006-402 Combination Starter -Wiring Diagram

El4A-104 Allis-Chalmers 25-220-006-403 Combination Starter -Wiring Diagram

El4A-105 Allis-Chalmers 25-220-006-404 Combination Starter -Wiring Diagram

El4A-106 Allis-Chalmers 25-408-ll3-503, Motor Control Center 4A -Sh 1 Arrangement

El4A-107 Allis-Chalmers 25-408-ll3-503, Motor Control Center 4A -Sh 2 Arrangement

El4A-108 Allis-Chalmers 25-408-ll4-503, Motor Control Center 4B -Sh 1 Arrangement

El4A-109 Allis-Chalmers 25-408-ll4-503, Motor Control Center 4B -Sh 2 Arrangement

El4A-ll0 Allis-Chalmers 25-121-017-404 Dual Circuit Breaker -Wiring Diagram

III-48

Page 100: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

E18A-1 Westinghouse

E18A-2 Westinghouse

El8A-3 Westinghouse

El8A-4 Westinghouse

ElSA-5 Westinghouse

E18A-6 Westinghouse

El8A-7 Westinghouse

ElSA-8 Westinghouse

ElSA-9 Westinghouse

ElBA-10 Westinghouse

ElBA-11 Westinghouse

ElBA-12 Westinghouse

E18A-13 Westinghouse

El8A-14 Westinghouse

ElBA-15 Westinghouse

El8A-16 Westinghouse

ElBA-17 Westinghouse

ElBA-18 Westinghouse

El8A-19 Westinghouse

El8A-20 Westinghouse

ElSA-21 Westinghouse

ElSA-22 Westinghouse

El8A-23 Westinghouse

El8A-24 Westinghouse

ElSA-25 Westinghouse

Drawing No.

BR-17407

6669D52

6669D53

6669D54

6669D55

6669D56

6669D57

6669D58

6669D59

6669D60

6669D61

NA-25-D-484-4

NA-25-D-491-5

6671Dl3

TBL-1

TBL-2

TBL-3

TBL-4

TBL-5

TBL-6

264C520

264C521

264C522

264C523

264C524

III-49

Description

Switchboard - Bill of Material

Assembly & Floor Plan

Control Swbd Auxiliary Equipment

AC Schematic

AC Schematic

AC Schematic

AC Schematic

AC Schematic

AC Schematic

AC Schematic

Annunciator Schematic

AC Schematic

Annunciator Schematic

Schematic

Panel No. 04 - Wiring Diagram

Panel No. 04 - Wiring Diagram

Panel No. 05 - Wiring Diagram

Panel No. 05 - Wiring Diagram

Panel No. 06 - Wiring Diagram

Panel No. 06 - Wiring Diagram

DC Schematic - Bkr E

DC Schematic - Bkr F

DC Schematic - Bkr G

DC Schematic - 12.5 kV Swgr.

DC S~hematic - Ext 12.5 kV Swgr.

Page 101: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

E18A-26 Westinghouse 264C525 DC Schematic - Ext 12.5 kV Bus Tie Bkr

E18A-27 Westinghouse 264C526 DC Schematic - 4.16 kV Swgr

El8A-28 Westinghouse 264C527 DC Schematic - 4.16 kV Swgr

E18A-29 Westinghouse 264C528 DC Schematic - 4.16 kV Swgr

El8A-30 Westinghouse 264c529 DC Schematic - 4.16 kV Swgr

El8A-31 Westinghouse 264C530 DC Schematic - 480 v sus

ElBA-32 Westinghouse 264C531 DC Schematic - 480 v sus

ElBA-33 Westinghouse 264C532 DC Schematic - Turb Gen.

ElBA-34 Westinghouse 264C533 DC Schematic - Turb Gen.

ElBA-35 Westinghouse 264C534 DC Schematic - Turb Gen.

ElBA-36 Westinghouse 264C535 DC Schematic - 4.16 kV Bkr

ElBA-37 Westinghouse 264C536 DC Schematic - Lockout Relay

ElBA-38 Westinghouse 264C537 DC Schematic - Lockout Relay

ElBA-39 Westinghouse 264C538 DC Schematic - Lockout Relay

E18A-40 Westinghouse 264C539 DC Schematic - MO Disc Sw

El8A-41 Westinghouse 264C540 DC Schematic - MO Disc Sw

ElBA-42 Westinghouse 264C747 DC Schematic - Cant Swbd

ElBA-43 Westinghouse 647F330 Wiring Diagram - Panel 04

ElBA-44 Westinghouse 647F331 Wiring Diagram - Panel 05

ElBA-45 Westinghouse 647F332 Wiring Diagram - Panel 06

ElSA-46 Westinghouse 647F333 Wiring Diagram - Panel 05

ElBA-47 Westinghouse 647F334 WirL,g Diagram - Panel 04

El8A-48 Westinghouse 647F533 Wiring Diagram - Hinged Panel 06

III-50

Page 102: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

E20A-101 General Electric 0167R0851 AKD Switchgear

E20A-102 General Electric 0207A4520 Connection Diagram - Elec Bkr

E20A-103 General Electric 0227A4501 Connection Diagram - Elec Bkr

E20A-104 General Electric 0227A4502 Connection Diagram - Manual Bkr,

E20A-105 General Electric 0124B5383, Sh 1 Title Sheet

E20A-106 General Electric 0124B5383, Sh 2 Breaker Sheet

E20A-107 General Electric 0124B5383, Sh 3 Power Ckt -Unit 101

E20A-108 General Electric 0124B5383, Sh 4 Power Ckt

E20A-109 General Electric 0124B5383, Sh 5 Power Ckt -Unit 105

E20A-110 General Electric 0124B5383, Sh 6 Close & Trip Ckt

E20A-lll General Electric 0124B5383, Sh 7 52 Aux - Spares

E20A-112 General Electric 0124B5383, Sh 8 Close & Trip Ckts - Unit 102B

E20A-113 General Electric 0124B5383, Sh 9 Close & Trip Ckts - Unit 102C

E20A-114 General Electric 0124B5383, Sh 10 Close & Brip Ckts - Unit 103B

E20A-115 General Electric 0124B5383, Sh 11 Close & Trip Ckts - Unit 104B

E20A-116 General Electric 0124B5383, Sh 12 Close & Trip Ckts - Unit 104C

E20A-117 General Electric 0124B5383, Sh 14 Close & Trip Ckts - Unit lOSB

E20A-118 General Electric 0124B5383, Sh RCl Shipping Split

E20A-119 General Electric 0124B5383, Sh RC2 Remote Commection

E20A-120 General Electric 0124B5383, Sh RC3 Remote Connection

EZOA-121 General Electric 0124B5383, Sh RC4 Remote Connection

E20A-122 General Electric 0124B5383, Sh RCS Remote Connection

EZOA-123 General Electric 022BA6331 Swgr Equipment Summary

EZOA-124 General Electric 0124B5383, Sh 13 Close & Trip Ckts - Unit 104D

III-51

Page 103: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

E20A-201 General Electric 229A3493 Transformer Nameplate

E20A-202 General Electric 147Cl628 Transformer Outline

EZOA-203 General Electric 176Bl814 Connection Diagram -Transformer

E20A-204 General Electric GEI-65074 SUS Transformer Instructions

E20A-205 General Electric GEI-54039 Gas Absorber Instructions

EZOA-206 General Electric GEK-5660 Rotary Tap Changer Instructions

III-52

Page 104: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

E22A-101 Allis-Chalmers 18-468-353-401 General Arrgt & Floor Plan

E22A-102 Allis-Chalmers 72-320-050-403 Test Device PlX

E22A-103 Allis-Chalmers 72-221-908-471 Wiring Diagram

E22A-104 Allis-Chalmers 18-722-014-702 Nameplate Engraving

E22A-105 Allis-Chalmers 18-388-921-401 Units 1 & 10 - Circ. Bkr. Conn. Schem.

E22A-106 Allis-Chalmers 18-388-921-402 Units 2 & 9 - Circ. Bkr. Conn. Schem.

E22A-107 Allis-Chalmers 18-388-921-403 Units 3 & 8 - Circ. Bkr. Conn. Schem.

E22A-108 Allis-Chalmers 18-388-921-404 Unit 7 Circ. Bkr. Conn. Schem.

E22A-109 Allis-Chalmers 18-388-921-405 Unit 6 Circ. Bkr. Conn. Schem.

E22A-ll0 Allis-Chalmers 18-388-921-406 Unit 5 Circ. Bkr. Conn. Schem.

E22A-lll Allis-Chalmers 18-388-921-407 Unit 4 Circ. Bkr. Conn. Schem.

E22A-ll2 Allis-Chalmers 18-388-921-408 Symbol List & Switch Developments

E22A-113 Allis-Chalmers 18-383-921-409 Relay Wiring Diagrams

E22A-ll4 Allis-Chalmers 18-388-921-701 Pnl Arrgt -Bill of Mat'l

E22A-ll5 Allis-Chalmers 18-468-353-402 Three Line Diagram

E22A-ll6 Allis-Chalmers 18-468-353-403 Panel Arrgt

E22A-117 Allis-Chalmers 18-468-353-404 Unit 1 Wiring Diagram

E22A•ll8 Allis-Chalmers 18-468-353-405 Unit 2 Wiring Diagram

E22A-ll9 Allis-Chalmers 18-468-353-406 Unit 3 Wiring Diagram

E22A-120 Allis-Chalmers 18-468-353-407 Unit 4 Wiring Diagram

E22A-121 Allis-Chalmers 18-468-353-408 Unit 5 Wiring Diagram

E22A-122 Allis-Chalmers 18-468-353-409 Unit 6 Wiring Diagram

E22A-123 Allis-Chalmers 18-468-353-410 Unit 7 Wiring Diagram

III-53

Page 105: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

E22A-124 Allis-Chalmers 18-468-353-411 Unit 8 Wiring Diagram

E22A-125 Allis-Chalmers 18-468-353-412 Unit 9 Wiring Diagram

E22A-126 Allis-Chalmers 18-468-353-413 Unit 10 Wiring Diagram

E22A-127 Allis-Chalmers 18-468-353-414 Master Wiring Diagram

E22A-128 Allis-Chalmers 18-468-353-415 Master Wiring Diagram

E22A-129 Allis-Chalmers 18-468-353-416 Master Wiring Diagram

E22A-130 Allis-Chalmers 18-722-885-701 Accessories

E22A-131 Allis-Chalmers 18-657-492-417 Dwg. List

E22A-201 Allis-Chalmers 18-466-619-401 Duct Installation Layout

E22A-202 Allis-Chalmers 18-657-488-626 Duct Bill of Material 18-657-488-62 7

E22A-203 Allis-Chalmers 18-720-312-525 Throat Assemblies

E22A-204 Allis-chalmers 18-657-323-415 Bus End Flange

E22A-205 Allis-Chalmers 18-380-851-403 Bus Cross Section

E22A-206 Allis-Chalmers 18-650-514-401 Swgr Flange

E22A-207 Allis-Chalmers 18-657-323-410 Bar Taping Dwg

E22A-208 Allis-Chalmers 18-715-360-406 Heater Mtg Assy

E22A-209 Allis-Chalmers 18-657-323-414 Post Support

III-54

Page 106: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

E24A-101 Tatman E72-43, Sh. 1 Electrical Layout

E24A-102 Tatman E72-43, Sh. 2 Elevations & Details

E24A-103 Tatman E72-43, Sh. 3 Anchor Bolt Plan

E24A-104 Tatman E72-43, Sh. 1-5 Material List

E24A-105 Tatman 72-32, Sh. El Details & Shipping List

E24A-106 Tatman 72-32, Sh. 3 Details & Shipping List

E24A-107 Tatman 72-32, Sh. 4 Details & Shipping List

E24A-108 Tatman 68-19, Sh. 10 Details & Shipping List

E24A-201 McGraw-Edison SCC00071A o.c.B. Outline

E24A-202 McGraw-Edison SHC00562A Connection Diagram - OA-4 Operating Mech.

E24A-203 McGraw-Edison SBB01006A Bushing Outline

E24A-204 McGraw-Edison SHA01023A Connection Diagram-Current Transformer

E24A-205 McGraw-Edison IX194129 BTCT Exciting Current Curves

E24A-206 McGraw-Edison RCF194129-2 BTCT Ratio Correction Factor Curves

E24A-301 General Electric 19C305102 Potential Device

E24A-302 General Electric 19D404918 Coupling Capacitor & Pot. Device

E24A-303 Tatman A072-1295, Sh. 1 Switch Operating Mech.

E24A-304 Tatman A072-1295, Sh. 2 Switch Operating Mech.

E24A-305 Allis-Chalmers 23-138-246-003 Single Pole Assy.

III-55

Page 107: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

E24A-306 Allis-Chalmers

E24A-307 Allis-Chalmers

E24A-308 Allis-Chalmers

E24A-309 Allis-Chalmers

E24A-310 Allis-Chalmers

E24A-311 Allis-Chalmers

E24A-312 Allis-Chalmers

E24A-313 Allis-Chalmers

E24A-314 Allis-Chalmers

E24A-315 Allis-Chalmers

E24A-316 Allis-Chalmers

E24A-401 I-T-E

E24A-402 Tatman

Drawing No.

23-100-182-403

23-200-258-519

23-100-183-125

23-210-778-517

23-210-778-518

23-016-152-901

23-211-762-000

23-402-224-002

003671

002172

8485

AE67-66, Sh. 7

III-56

Description

Outline - CM-3 Mtr Oper.

Wiring Diagram - DC Motor

Motor Operator Assembly Release

Control Arrangement - SSB 138 kV

Control Arrangement - SSB 138 kV

Equipment Summary

Station.Post

CM-3 Mtr Cont. Assy with Mech. Brake

Installation Instructions

Installation Instructions

Disconnect Switch Instructions

Pedestal Post Outline

Bracket Outline

Page 108: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

E28A-101 Westinghouse

E28A-102 Westinghouse

E28A-103 Westinghouse

E28A-104 Westinghouse

E28A-105 Westinghouse

E28A-106 Westinghouse

E28A-107 Westinghouse

E28A-108 Westinghouse

E28A-109 Westinghouse

E28A-110 Westinghouse

E28A-lll Westinghouse

E28A-112 Westinghouse

E28A-113 Westinghouse

E28A-201 Westinghouse

E28A-202 Westinghouse

E28A-203 Westinghouse

E28A-204 Westinghouse

E28A-205 Westinghouse

Drawing No.

7662D53

7662D55

216P368H01

LAM 789-02

259A476

48-069-21A

48-069-16A

48-061-63

48-061-35B

48-061-21

48-065-lF

48-063-1

7662D54

7272D25

232-C-294

816A810

215P262H01

7272D24

III-57

Description

Wiring Diagram- Trans. Control

Transformer Outline

Instruction Plate

Details

Bushing Outline

Jack Lug & Cover Lifting Loops

Method of Fastening Cover to Case

Bushing Outline

Bushing Outline

Ground Pads & Terminals

Instructions for Sudden Pressure Relay

Instructions for Inertaire

Wiring Diagram - Transformer

Transformer Outline

H.V. Bushing Outline

L.V. Bushing Outline

Instruction Plate

Wiring Diagram - Transformer

Page 109: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

E28A-301 Westinghouse 7272D27 Transformer Outline

E28A-302 Westinghouse 259A014 H.V. Bushing Outline

E28A-303 Westinghouse 816A810 L.V. Bushing Outline

E28A-304 Westinghouse 215P263H01 Instruction Plate

E28A-305 Westinghouse 7276D43 Wiring Diagram - Transformer

E28A-401 Westinghouse 7274Dl0 Transformer Outline

E28A-402 Westinghouse 48-061-33 H.V. Bushing Outline

E28A-403 Westinghouse 48-061-17 L.V. Bushing Outline

E28A-404 Westinghouse 48-061-64 H.V. Neut. Bushing Outline

E28A-405 Westinghouse 48-061-44 H.V. Terminal Outline

E28A-406 Westinghouse 48-061-25 L. V. Terminal Outline

E28A-407 Westinghouse 48-063-1 Instructions for Inertaire

E28A-408 Westinghouse 4240D40 Control Equipment Outlines

E28A-409 Westinghouse 215P304H01 Instruction Plate

E28A-410 Westinghouse 7274Dll Wiring Diagram - Transformer

E28A-411 Westinghouse 7274D12 Wiring Diagram - Transformer

E28A-412 Westinghouse 7274Dl3 Wiring Diagram - Transformer

E28A-413 Westinghouse 7274Dl4 Parallel Wiring Diagram

E28A-414 Westinghouse 48-067-6A Instructions for Parallel Operation

E28A-415 Westinghouse 48-067-9A Instructions for Parallel Operation

III-58

Page 110: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No.

E28A-451

E28A-452

E28A-453

E28A-501

E28A-502

E28A-503

E28A-504

E28A-505

E28A-506

E28A-601

E28A-602

E28A-701

E28A-702

E28A-703

E28A-704

E28A-705

E28A-706

E28A-707

E28A-708

Manufacturer

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Westinghouse

Drawing No.

262D543

262D542

262D544

7273D94

48-061-16

48-061-63

48-061-25

215P299H01

7273D95

CN72C409

CN72C410

503Fl13

1206F01

426D303

425D602

425D607

425D609

425D604

B7145

III-59

Description

URT - Tap Changer Control

URT - Schematic Diagram

URT - Wiring Diagram

Transformer Outline

H.V. Bushing Outline

H.O. Bushing Outline

Terminal Outline

Instruction Plate

Wiring Diagram - Transformer

Bus Duct & Sections

Bill of Material

One-Line

Schematic

Schematic

Existing Swgr

Existing Swgr

Existing Swgr

Existing Swgr

Swgr Drawings

Page 111: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

E28A-709 Westinghouse 426D307 Connection Diagram

E28A-710 Westinghouse 426D308 Connection Diagram

E28A-711 Westinghouse 426D313 Connection Diagram

E28A-712 Westinghouse 1209F86 Connection Diagram

III-60

Page 112: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No.

D2.32-l

D2 .32-2

D2 .32-3

D2.32-4

Manufacturer

Cent. Boiler & Sheet Iron Works

Cont. Boiler & Sheet Iron Works

Cont. Boiler & Sheet Iron Works

Cont. Boiler & Sheet Iron Works

D2.32-5 Cont. Boiler & Sheet Iron Works

D2.32-6 Cont. Boiler & Sheet Iron Works

D2.32-7 Chicago Bridge & Iron

D2.32-8 Chicago Bridge & Iron

D2.32-9 Chicago Bridge & Iron

D2.32-10 Chicago Bridge & Iron

D2.32-ll Chicago Bridge & Iron

D2.32-12 Chicago Bridge & Iron

D2.32-13 Chicago Bridge & Iron

D2.32-14 Chicago Bridge & Iron

D2.32-15 Chicago Bridge & Iron

D2.32-16 Chicago Bridge & Iron

D2.32-17 Chicago Bridge & Iron

Drawing No.

4974-L

4974-L

4974-L

4974-L

4974-L

B-916

1

7

9

10

11

12

13

14

15

16

A28-0

III-61

Description

Circulating Water Piping, Sh. 1

Circulating Water Piping, Sh. 2

Circulating Water Piping, Sh. 3

Circulating Water Piping, Sh. 4

Circulating Water Piping, Sh. 5

8" Butterfly Valve MDT-2

Fuel Oil Tank

Water Drawoff with Sump (Fuel Oil)

Shell Nozzle (Fuel Oil Return)

Shell Nozzle (Fuel Oil Tank Fill)

Fuel Oil TankVent Detail

Fuel Oil Tank Inside Ladder

Fuel Oil Tank Gauge Varec Fig. 2505B

Fuel Oil Tank Roof Handrail

Fuel Oil Tank Platform and Handrail Detail

Fuel Oil Tank Pipe Supports

Fuel Oil Tank Dished Sump

Page 113: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

D2.32-19 Chicago Bridge B2-6 Fuel Oil Tank Shell Manhole & Iron

D2.32-20 Chicago Bridge Bl5-4 Fuel Oil Tank Roof Manhole & Iron

D2.32-21 Chicago Bridge D35-0 Fuel Oil Tank Ladder Detail & Iron

D2.32-22 Chicago Bridge E8-l Fuel Oil TankDetail & Iron

D2 .32-23 LCR Corp. Letter of Pipe, Valves & Fittings March 28, 1972

D2.32-24 Chicago Bridge 1117 Outside Shell Ladder & Iron

III-62

Page 114: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No.

D2 S6-2

D2 S6-9

D2 S6-10

D2 S6-ll

D2 S6-12

D2 S6-13

D2 S6-14

D2 S20-l

D2 S22-l

D2 S32-l

D2 S38-l

D2 S38-2

D2 S38-3

D2 S38-4

D2 S38-5

D2 S38-6

Manufacturer

Mosher

Mosher

Mosher

Burke

Hunt

B. F. Goodrich

Burke

General Electric

Chicago Bridge & Iron

U.S. Steel Corp.

Mosher

Mosher

Mosher

Mosher

Mosher

Mosher

Drawing No.

RE2

RE9

Data

Page 7

Data

Data

Data

1

WEX-761

1

2

4X

SPl

3

SX

III-63

Description

Partial Fdn Plan-Substa. Fdn

Cooling Tower Fdn

Bar Lists

Concrete Curing Compound

Epoxy HP-GPA

Vinyl Water Stops

Concrete Form Release Agent

Electrical Ducts

Cleaning & Painting for Oil Tank

Cyclone Fence

Anchor Bolts

Misc. Steel - Cool. Twr.

Misc. Steel - Pipe Sleeves

Misc. Steel - Castings

Alum. Frames

Template - Turb. Fdn. Bolts

Page 115: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

D2 S38-7 York Metal for Mosher

D2 S38-8 Mosher

D2 S38-9 Mosher

D2 838-10 Mosher

D2 838-11 Mosher

D2 838-12 Mosher

D2 838-13 Borden

D4 86-1 Mosher

D4 S6-2 Mosher

D4 86-3 Mosher

D4 86-4 Mosher

D4 86-5 Mosher

D4 S6-6 Mosher

D4 Sl0-1 Hill Harris & Co.

D4 810-2 Tex-Steel

D4 Sl0-3 Panelfold

D4 Sl2-2 Schueck Steel

D4 Sl2-3 Schueck Steel

D4 812-4 Schueck Steel

Drawing No.

lF

7X

AR2

AR3

EXl

8X

Sh 9,10,11

RE1

RE2

R-1 thru R-8

RE3

RE-4X

R-10-RX-4

C-6140

55/21

1

2

3

III-64

Description

Alum. Manhole Cover

Condensate Pump Sleeves

Condensate Pump Anchor Bolts

JlB Crane Anchor Bolts

Wall Joint Angle

Turb. Fdn Anchor Pls & Angles

Alum. Grating-Cooling Twr.

Basement Equip. Bases

Ground Floor Slab

Bar Lists for 1 & 2

Tank Floor

Operating Floor

Bar Lists for 3 & 4X

Doors & Hardware

Doors & Frames

Kitchen Folding Door

Paneling

Paneling

Paneling

Page 116: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

D4 Sl2-5 Schueck Steel 4 Paneling

D4 Sl2-6 Schueck Steel 5 Paneling

D4 S12-7 Schueck Steel 6 Paneling

D4 Sl2-8 Schueck Steel 7 Paneling

D4 S12-9 Schueck Steel 8 Paneling

D4 Sl2-10 Schueck Steel 9 Paneling

D4 Sl2-ll Schueck Steel 10 Paneling

D4 Sl2-12 Jackson Stone Co. 1 Precast Concrete Panels Elevation 1

D4 Sl2-13 Jackson Stone Co. 2 Elevation 2,4,5,6,7

D4 S12-14 Jackson Stone Co. 3 Sections & Details

D4 S12-15 Jackson Stone Co. 4 Sections & Details

D4 Sl2-16 Jackson Stone Co. 5 Elevation 3

D4 S12-17 Jackson Stone Co. 6 No. Elev. - Anchor Layout

D4 Sl2-18 Jackson Stone Co. 7 E. & W. Elev.-Anchor Layout

D4 518-1 Thornton Ind. A50588 1-1/2 Ton Geared (10 Ft. Lift) Supply Co.

D4 Sl8-2 Thornton Ind. A50588 2 Ton Geared (45 Ft. Lift) Supply Co.

D4 S18-3 Thornton Ind. E3251 4 Ton Trolley Hoist Supply Co.

D4 S18-4 Thornton Ind. E2802 5 Ton Trolley Hoist Supply Co.

D4 S18-5 Thornton Ind. E3385 1-1/2 Ton J1B Crane Supply Co.

D4 Sl8-6 Thornton Ind. 20 Ton Geared Trolley Supply Co.

III-65

Page 117: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V Manufacturer Drawing No. Description

D4 SlS-10 Otis Elev. Form 613A Power Supply Confirmation

D4 SlS-11 Otis Elev. Data Sheet Color Selection

D4 SlS-12 Otis Elev. 344984-PN Plan & Section View

D4 SlS-13 Otis Elev. 344984-DD Door Details

D4 Sl8-15 Otis Elev. 6395E Car Position Indicator

D4 Sl8-16 Otis Elev. 7069W Sh 1 Push-Button Hall Fixture

D4 Sl8-17 Otis Elev. 7069W Sh 2 Push-Button Hall Fixture

D4 Sl8-18 Otis Elev. PD-36339-500 Car Operating Panel

D4 Sl8-l9 Otis Elev. PD-36339-501 Floor I.D. Plate

D4 S20-l Western Engr. Ventilating Fans & Mfg Co.

D4 S20-2 Wonderly Letters 6833 Letters for Bldg Sign & Tablet

D4 S20-3 Ruskin PB & OB-31-763 Control Damper

D4 S20-4 Waterloo Sheet 1 of 1 Diffus -A-Jet Register Div.

D4 S20-5 Anemostat Form 636-l Submittal Sheet Diffus -A-Sheet

D4 S20-6 Trane Sales Order Submittal Data I/K7-0735

D4 S20-7 Trane Sales Order Submittal Data IICK7-D73l

D4 S20-8 Trane Sales Order Submittal Data KK7-0729 Approval Stamp

D4 S20-9 Trane Sales Order Submittal Data I/SK7-D732

D4 S20-10 ILG DB5-101B Unit Heaters

III-66

Page 118: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No.

D4 S20-11 ILG DB3-900

D4 S20-12 Frigidaire Data Sheets

D4 S24-l Acorn Wire 1

D4 826-1 L.C.R. Corp.

D4 826-2 Elkay

D4 830-1 DESCO Brochure

D4 S30-2 Mcinnis 9 Sketches

D4 S36-l Rothschild Boiler D-3178-1 & Tank

D4 S36-2 Rothschild Boiler D-3178-1 & Tank

D4 S38-l Fabsteel E6

D4 S38-4 Fabsteel E9

D4 S38-12 Fabsteel 11

D4 S38-13 Fabsteel 13

D4 S38-14 Fabstee1 18

III-67

Description

Relief Vents

Stove, Refrig. Hood

Std. 130A Wire Mesh Part.

Plumbing Fixtures

Color Selection-Drinking Fountains

Nealon Roof Decking Coat

Flashing Requirements

Stack & Breeching

Stack & Breeching Details

El. 85 '-0"

El. 103'-0" & El. 111'-0"

Handrail

Handrail

Handrail

Page 119: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

D4 S38-15 Fabsteel 20 Handrail

D4 S38-16 Fabsteel 22 Handrail

D4 S38-20 Fabsteel 33 Handrail

D4 838-21 Fabsteel 34 Handrail

D4 838-22 Fabsteel 39 Handrail

D4 S38-40 Blaw-Knox DE7851-l Tread Takeoff

D4 838-41 Blaw-Knox 59D951 Grating-Stair Landings

D4 S38-42 B1aw-Knox 59D952 Grating-El. 85'-0"

D4 838-43 . B1aw-Knox 59D953 Grating-El. 85'-0"

D4 S38-44 Blaw-Knox 59D954 Grating-El. 96'-0"

D4 S38-45 B1aw-Knox 59D955 Grating•El. 96'-1-1/2"

D4 S38-46 B1aw-Knox 590956 Grating-El. 112'-1-1/2"

D4 S38-47 B1aw-Knox 59D957 Grating-El. 103'-0"

D4 S38-48 B1aw-Knox 59D958 Grating-E1. 127'-0"

D4 S38-49 Blaw-Knox 59D959 Grating-E1. 127'-0"

D4 S38-50 B1aw-Knox 59D960 Chk 'd Pl. & Grating Details

D4 S40-1 Fabstee1 Ell El. 85'-0" (Erection)

D4 S40-2 Fabsteel E12 El. 96'-0" (Erection)

D4 S40-3 Fabsteel El3 El. 103'-0" & El. 111 I -0"

D4 S40-4 Fabsteel E14 El. 127'-o"

D4 S40-5 Fabsteel El5 El. 140'-0"

D4 S40-6 Fabsteel E16 Steel Framing EL & Details

D4 S40-7 Fabsteel El7 Girt Elev. & Details (Erect.)

D4 S40-8 Fabsteel E18 Stairs & Platforms

III-68

Page 120: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No.

04 S40-9 Fabsteel El9X

04 S40-10 Fabsteel El

04 840-11 Fabstee1 E2

04 S40-12 Fabsteel E3

04 S40-13 Fabsteel E4

04 840-14 Fabstee1 E5

04 840-15 Fabsteel E6

04 840-16 Fabsteel E7

04 840-17 Fabsteel E8

04 840-18 Fabsteel E9

D4 840-19 Fabsteel ElO

D4 S40-20 Fabsteel 1

D4 S40-21 Fabsteel lAX

D4 840-22 Fabsteel 7

D4 840-23 Fabsteel 15

D4 840-24 Fabsteel 21

D4 840-25 Fabsteel 23

D4 S40-26 Fabsteel 28

D4 S40-27 Fabsteel 65

III-69

Description

Misc. Elevations

Architectural North, West and South Elevations

Architectural East Elevation, Elevator & Roof Plan

Architectural Details

Architectural Details Door & Finish Schedule

Basement-El. 74'-0" Finish Floor Plan & Details

Ground Floor-El. 85 1 -0" Concrete & Grating Plan

Concrete Details Equip. Base Details & Schedules

Operating Floor-El. 96'-0" Concrete & Grating Plan

Upper Burner Platform­El. 103 1 -0", Tank Floor­El. 111 '-0", Concrete & Grating Plan

Upper Drum Platform­El. 127' -0" Plans & Details

Base Plates

Base Plates

Columns

Columns

Columns

Columns

Columns

Columns

Page 121: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

D4 840-28 Fabsteel 67 Columns

D4 840-29 Fabsteel 85 Columns

D4 840-30 Fabsteel 87 Columns

D4 840-31 Fabsteel 41 Columns (F Row)

D4 840-32 Fabsteel 50 Columns (F Row)

D4 840-33 Fabsteel 52 Columns (F Row)

D4 840-34 Fabsteel 54 Columns (F Row)

D4 S40-35 Fabsteel 59 Columns (B Row)

D4 840-36 Fabsteel 62 Columns (B Row)

D4 840-37 Fabsteel 63 Columns (B Row)

D4 840-38 Fabsteel 64 Columns (B Row)

D4 840-39 Fabsteel 69 Columns

D4 S40-40 Fabsteel 2 Beams-El. 85'-0"

D4 840-41 Fabsteel 3 Beams-El. 85'-0"

D4 S40-42 Fabsteel 8 Beams-El. 85'-0"

D4 S40-43 Fabsteel 9 Beams-El. 85'-0"

D4 S40-44 Fabsteel 10 Beams-El. 85'-0"

D4 S40-45 Fabsteel 12 Beams-El. 85'-0"

D4 S40-46 Fabsteel 16 Beams-El. 85'-0"

D4 S40-47 Fabsteel 17 Beams-El. 85'-0"

D4 S40-48 Fabsteel 19 Beams-El. 85'-0"

D4 S40-49 Fabsteel 24 Beams-El. 85'-0"

D4 S40-50 Fabsteel 26 Beams-El. 85'-0"

D4 840-51 Fabsteel 27 Beams-El. 85'-0"

D4 S40-52 Fabsteel 30 Beams-El. 85'-0"

III-70

Page 122: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

D4 840-53 Fabstee1 31 Beams-El. 85'-0"

D4 840-54 Fabstee1 32 Beams-El. 85'-0"

D4 S40-55 Fabsteel 35 Beams-E1. 96'-0"

D4 840-56 Fabstee1 37 Beams-El. 96'-0"

D4 840-57 Fabsteel 38 Beams-El. 96'-0" '

D4 840-58 Fabsteel 42 Beams-El. 96'-0"

D4 840-59 Fabsteel 43 Beams-El. 96'-0"

D4 840-60 Fabstee1 44 Beams-El. 96'-0"

D4 840-61 Fabsteel 48 Beams-El. 96'-0"

D4 S40-62 Fabsteel 51 Beams-E1. 96'-0"

D4 840-63 Fabsteel 55 Beams-El. 96'-0"

D4 S40-64 Fabsteel 56 Beams-El. 96'-0"

D4 840-65 Fabsteel 57 Beams-El. 96'-0"

D4 840-66 Fabstee1 58 Beams-El. 96'-0"

D4 S40-67 Fabsteel 61 Beams-El. 96'-0"

D4 S40-68 Fabstee1 68 Beams-El. 96'-0"

D4 S40 69 Fabstee1 71 Beams El. 96'-0"

D4 S40-70 Fabstee1 76 Beams-El. 96'-0"

D4 S40-72 Fabstee1 66 Beams-El. 103'-0" & 111'-0"

D4 S40-73 Fabstee1 70 Beams-El. 103'-0" & 111'-0"

D4 S40-74 Fabstee1 73 Beams-El. 103'-0" & 111'-0"

D4 840-75 Fabstee1 78 Beams-El. 103'-0" & 111'-0"

D4 S40-76 Fabstee1 80 Beams El. 103'-0" & 111'-0"

D4 S40-77 Fabstee1 82 Beams El. 103'-0" & 111'-0"

D4 S40-78 Fabstee1 84 Beams-El. 103'-0" & 111'-0"

III-71

Page 123: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

D4 840-79 Fabstee1 86 Beams-El. 103'-0" & 111'-0"

D4 840-80 Fabstee1 92 Beams-El. 103'-0" & 111'-0"

D4 840-81 Fabstee1 105 Beams-El. 103'-0" & 111'-0"

D4 540-82 Fabsteel 107 Beams-El. 103'-0" & 111 t -0"

D4 840-83 Fabsteel 110 Beams-El. 103'-0" & 111'-0"

D4 540-84 Fabsteel 89 Beams-El. 127'-0"

D4 540-85 Fabsteel 90 Beams-El. 127'-0"

D4 540-86 Fabsteel 91 Beams-El. 127'-0"

D4 840-87 Fabsteel 93 Beams-El. 127'-0"

D4 540-88 Fabsteel 101 Beams-E1.-127'-0"

D4 840-89 Fabsteel 102 Beams-El. 127'-0"

D4 840-90 Fabsteel 108 Beams-El. 127'-0"

D4 840-91 Fabsteel 101 AX Beams-El. 127'-0"

D4 840-92 Fabsteel 77 Columns

D4 540-93 Fabsteel 83 Columns

D4 540-100 Fabsteel 94 Braces

D4 840-101 Fabstee1 103 Braces

D4 540-102 Fabstee1 104 Braces

D4 540-103 Fabstee1 106 Braces

D4 840-104 Fabstee1 109 Braces

D4 840-105 Fabstee1 111 Braces

D4 540-106 Fabstee1 119 Braces

D4 540-107 Fabstee1 123 Beams-El. 127'-0"

D4 540-108 Fabstee1 127 Beams-El. 127'-0"

D4 840-109 Fabstee1 129 Beams-El. 127'-0"

III-72

Page 124: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

D4 540-110 Fabsteel 132 Beams-El. 127'-0"

D4 540-111 Fabsteel 137 Beams-El. 127'-0"

D4 S40-112 Fabstee1 113 Beams-El. 140'-0"

D4 S40-113 Fabsteel 116 Beams-El. 140'-0"

D4 S40-114 Fabsteel 120 Beams-El. 140'-0"

D4 S40-115 Fabsteel 124 Beams-El. 140'-0"

D4 S40-116 Fabsteel 126 Beams-El. 140'-0"

D4 S40-117 Fabsteel 130 Beams-El. 140'-0"

D4 S40-118 Fabstee1 133 Beams-El. 140'-0"

D4 S40-119 Fabstee1 135 Beams-El. 140'-0"

D4 S40-120 Fabstee1 138 Beams-El. 140'-0"

D4 S40-121 Fabstee1 139 Beams-El. 140'-0"

D4 S40-122 Fabstee1 142 Beams-El. 128'-7"

D4 S40-123 Fabstee1 143 Beams-El. 128'-7"

D4 S40-124 Fabstee1 144 Beams-E1. 128'-7"

D4 S40-125 Fabsteel 148 Beams-El. 128'-7"

D4 S40-126 Fabstee1 150 Crane Beam

D4 S40-127 Fabsteel 151 Crane Beam

D4 S40-128 Fabsteel 155 Crane Rail & Splice Plates

D4 840-129 Fabsteel 114 Steel Frame-El. 134'-6"

D4 S40-130 Fabsteel 112 Girts & Details

D4 S40-131 Fabsteel 115 Girts & Details

D4 S40-132 Fabsteel 118 Girts & Details

D4 S40-133 Fabsteel 121 Girts & Details

D4 S40-l34 Fabsteel 122 Girts & Details

III-73

Page 125: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

D4 840-135 Fabsteel 125 Girts & Details

D4 840-136 Fabsteel 128 Girts & Details

D4 840-137 Fabsteel 131 Girts & Details

D4 840-138 '.Fabsteel 134 Girts & Details

D4 840-139 Fabsteel 136 Girts & Details

D4 840-140 Fabsteel '140 Girts & Details

D4 840-141 Fabsteel 145 Girt's & Details

D4 840-142 Fabstee1 146 Girts & Details

D4 840-143 Fabstee1 147 Girts & Details

D4 840-144 Fabsteel 152 Girts & Details

D4 840-145 Fabsteel 154 Girts & Details

D4 840-146 Fabstee1 157 Girts & Details

D4 840-147 Fabsteel 149 Girts & Details

D4 840-148 Fabsteel 153 Girts & Details

D4 840-149 Fabsteel 156 Girts & Details

D4 840-150 Fabsteel 160 Girts & Details

D4 840-151 Fabsteel 164 Girts & Details

D4 840-152 Fabsteel 165 Girts & Details

D4 840-153 Fabstee1 5 Bracing

D4 840-154 Fabstee1 6 Bracing

D4 840-155 Fabstee1 14 Bracing

D4 540-156 Fabsteel 36 Stair Details

D4 540-157 Fabstee1 40 Stair Platform

D4 540-158 Fabstee1 45 Stair Details

D4 540-159 Fabstee1 46 Stair Details

III-74

Page 126: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Manufacturer

D4 S40-160 Fabstee1 47 Stair Details

D4 S40-161 Fabstee1 75 Stair Details

D4 S40-162 Fabstee1 81 Stair Details

D4 S40-163 Fabsteel 88 Stair Details

D4 S40-164 Fabsteel 95 Handrail-Stairs

D4 S40-165 Fabstee1 96 Handrail

D4 S40-166 Fabsteel 97 Handrail-Stairs

D4 S40-167 Fabsteel 98 Handrail-Stairs

D4 S40-168 Fabstee1 99 Handrail-Stairs

D4 S40-169 Fabsteel 100 Handrail-Stairs

D4 S40-170 Fabsteel 117 Handrail-Stairs

D4 S40-171 Fabsteel 141 Floor Plate-Drum Floor

D4 S40-172 Fabstee1 158 Cooling Tower Screens

D4 840-173 Fabsteel 159 Beams-E1. 96'-0"

D4 840-174 Fabsteel 162 Beams-El. 96'-0"

D4 840-175 Fabsteel 163 Beams-El. 96'-0"

• D4 840-176 Fabsteel 167 Beams-El. 96'-0"

D4 840-177 Fabsteel 168 Beams-El. 112'-0"

D4 840-178 Fabsteel 169 Bracing-E1. 96' & 112'

D4 840-179 Fabstee1 170 Beams-El. 112'-0"

D4 S40-180 Fabsteel 172 Beams-E1. 96'-0" & 112'-0"

D4 S40-181 Fabsteel 173 Bracing

D4 840-182 Fabsteel 174 Beams-El. 127'-0"

D4 840-183 Fabsteel 176 Beams-El. 112 I -0"

D4 840-184 Fabsteel 177 Beams-El. 111'-0"

III-75

Page 127: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No.

D4 S40-185 Fabsteel 178

D4 S40-186 Fabsteel 179

D4 S40-187 Fabsteel 180

D4 S40-168 Fabsteel 181

D4 S40-189 Fabsteel 182

D4 S40-190 Fabsteel 183

D4 S40-191 Fabsteel 184

D4 S40-192 Fabsteel 6AX

D4 S40-193 Fabsteel 161

D4 S40-194 Fabsteel 166

D4 S40-195 Fabsteel 171

D4 S40-196 Fabsteel 175

D4 S40-197 Fabsteel 189

D4 S40-198 Fabsteel 191

D4 S40-199 Fabsteel 192

D4 S40-200 Fabsteel 193

D4 S40-201 Fabsteel 4

D4 S40-202 Fabsteel 25

D4 S40-203 Fabsteel 29

D4 S40-204 Fabsteel 49

D4 S40-205 Fabsteel 53

D4 S40-206 Fabsteel 60

D4 S40-207 Fabsteel 72

III-76

Description

Beams-El. 127' -0"

Beams El. 127 '-0"

Beams-EL 127'-0"

Beams-El. 12 7 '-0"

Columns-Fan Area

Columns-Fan Area

Columns-Fan Area

Bracing

Handrail Details

Stair Stringers

Stair Stringers

Stair Stringers

Handrail Details

Handrail Details

Handrail Details

Handrail Details

Floor Plate

Handrail

Handrail

Handrail-T.S. 1-1/2 x 1-1/2 X .14

Handrail-T.S. 1-1/2 x 1-1/2 X .14

Handrail-T.S. 1-1/2 x 1-1/2 X .14

Handrai1-T.S. 1-1/2 x 1-1/2 X .14

Page 128: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer Drawing No. Description

D4 840-208 Fabsteel 74 Handrail T .S. 1-1/2 X 1-1/2 X .14

D4 840-209 Fabsteel 79 Handrail T. S. 1-1/2 X 1-1/2 X .14

D4 840-210 Fabsteel 185 Handrail T.S. 1-1/2 X 1-1/2 X .14

D4 840-211 Fabsteel 186 Handrail T. S. 1-1/2 X 1-1/2 X .14

D4 840-212 Fabsteel 187 Handrail T.S. 1-1/2 X 1-1/2 X .14

D4 840-213 Fabsteel 188 Handrail T.8. 1-1/2 X 1-1/2 X .14

D4 840-214 Fabsteel 190 Handrail T.8. 1-1/2 X 1-1/2 X .14

D4 840-215 Fabsteel 194 Handrail T.8. 1-1/2 X 1-1/2 X .14

D4 840-216 Fabsteel 195 Frames 1-3/4 X 1-3/4 X 1/4 Angle

D4 840-217 Fabsteel 196 Anchor Bolts

D4 840-218 Fabsteel 196 AX Anchor Bolts

D4 840-219 Fabsteel 197 Sleeves

D4 840-220 Fabsteel 198 Angles 3 X 3 X 1/4

D4 840-221 Fabsteel 198AX Angle

D4 840-222 Fabsteel 199 Plate

D4 840-223 Fabsteel 199AX Plate

D4 840-224 Fabsteel 200X One Tread Plate

D4 840-225 Fabsteel 200AX Erection Bolts

D4 840-226 Fabsteel 241-1 Bolt Placement List (17-25) (25-25)

III-77

Page 129: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B&V No. Manufacturer

D4 S40-227 Fabsteel

D4 S40-228 Fabsteel

D4 S40-229 Fabsteel

Drawing No.

D-3178 Sh 1 of 2

D-3178 Sh 2 of 2

197 AX

III-78

Description

Stack & Breeching

Stack & Breeching Details

Sleeve B/M

Page 130: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

IV. DRAWINGS

The following drawings are reproductions of several sheets of the plans selected to indicate the scope of the project.

For complete construction drawings refer to the full sets of prints from which these drawings were selected.

IV-1

Page 131: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air
Page 132: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air
Page 133: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

I I B. ..3

. 'I i Lt

' , I

Page 134: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

' --...-Sf ~-:o.,~J~· I - -r-

I

l

- rtr

I ,

Page 135: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air
Page 136: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

i @

Page 137: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

-

i

~

'~I i

®

.I ~

~

~ '

I '

I I

I

I

~

:

A 'l:.!ifj/

Page 138: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

t : I !

i '

Page 139: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

/ ,.

1

11 I ::

I I

Page 140: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air
Page 141: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air
Page 142: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

i I

Page 143: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

, } r" "ll i. !: ~i

,, !I !I .,

' " 1'-~

Page 144: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air
Page 145: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

I ~~

H ~~=il=lt I ;I !'

"' ~-·f=~=::! ii ' @ !---+---+---~

j---f - "--~·~1-1---J.I. ~!

rr h--~---~ f--11

A "&/

' . ' . -<>'f

Page 146: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

ALEXANDRIA, LOUISIANA D.G. HUNTER ELECTRIC GENERATING STATION

UNIT 4 85,000KW

FLOW DIAGRAMS fD-1 MAIN AND AUXILIARY SHAM FD-2 EXTRACTION STEAM

FD-3 BOILER FEEDWATER

FD-4 CONDENSATE

fD-9 FUEL Oil

fD-10 COMPRESSED AIR FD-11 lUBRICATING OIL

F0-5 NEATER VENTS AND DRAINS AND CONDENSER AIR FD-6 CIRCULATING WATER

FD-12 BlOWDOlYN AND BOILER MISCELlANEOUS PIPING FD-13 BOILER DRAFT PIPING

FD-14 MISCEllANEOUS TURBINE PIPING FD-15 MISCELlANEOUS EQUIPMENT DRAINS FD-7 AUXILIARY COOLING WATER

fD-8 FUEL GAS

BlACK & VEATCH CONSUlTING ENGINEERS KANSAS CITY, MISSOURI

PROJECT NO. 5765 1972

fD-16 WATER TREATMENT, SAMPLING kND CITY WATER

FD-17 PLANT DRAINS AND GAS PIPING

Page 147: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

FLOW DIAGRAM LEGEND VALVE PREFIXES ABBREVIATIONS VALVES ACCESSORIES INSTRUMENTS

!fACV - AIR CHECK VALVES APT - 4BSOLUTE ~HSSURE TUNSM!TTER --w- GATE -<S>- SIGHT FLOW INOICATOR e TEMPEUTUR£ HEMEMT TEST WELl lfBBV - COMTIIWOIIS BLOWOOWII VALVE BS - BELLOWS SEAL STRAINER, Y TYPE --- GLOBE --k;l-118CV - !liJRMU: COIITIWl VALVES CC - COIIOUCT!VITY CElL

0 LOCAL !lltllCATOR ~CRV - COIITROL VALVES COR • COIITROL Dlt!V£ --- PltiG -j)>- STIIAIIIER, CONE OR PUlE TYPE

IIESV - EXTRACTIOfl CHECK VALVES CP - COIITROL PANEl --- BAll -@-- STRAIIIER, BASKET TYPE C:::) LOCAl ELECTROIIfC DEVICE IIIIPV - HIGII PRESSURE VALVES DC - ORAIN COLLECTOR

IIHOV - MOTOR OI'Eii:ATEO VALVES OPT- OIFHRENTIAL PRESSURE TRANSMITHJI -N- CIIEC« -rn- STRAINER, llllPLEX SASKET TYPE 8 ELECTROIIIC TRAIISMITTEft OR CONTROLLER !fSV - SOL£11010 Of'EIIATEO VALVES EJ - UPAIIS!OM JOIMT

-M- HOI' CHECK FIRST LIIIE - SERVICE !fSRV - SAFETY RELIEf VALVES EH - EXHAUST HEAO ---4*--- EXI'AIISION JOINT SECOND tiME - f\fi!G;JON OR

~SY - SAfETY SHUTOFf VALVES "F" - F1Jftii1SHED WITH ASSOCIATES fQUII'MEMT '( ANGLE STOI' fHECK RECEIVER DESIGNATION -lffil- TRAP !!CCV- CONOEIISATE I'UMP DISCIIA!!GE CHECK VALVES H - fLOW CO!HROL

E3 I'!IEIIHAHC TRAIISMITTER DR FD - FtOOR DRAIN --f'.l.- AIR OPERATED ChECK

=rn GAUGE GLASS CONTROLLER F£ • flOW ELEMENT -i4- ·AIR OPERAITO CHECK WITH fiRST LIIIE - SERVICE

" - fLOW ·:NOICATOR CLOSING HAND\111EEl --l•f- ORIFICE SEC(IjifO LINE • TIL\NSMITTU OR

RECEIVER OESIUIIUION FS • fLO~ iWITCH r ANGLE SREAWOlill DnlflCE fXH • fL£) I JL[ HOSE -=-

FT - FLOW -RAIISMITTER __,.,-- THREE WAY ~ FLOW NOZZLE GG • UA\WE GLASS FUW "USE (PIPE SECTIOII) INSTRIJMENT fU!ICTJOIIS

+ -c::>-R • RECOROE"R ''lOP - GAUGE PANEL

liLA·,· HIGH .EVEL ALAIIM fOUl! WAY y OPER OI!WI ~liiiNEl c ~ COIITR{ll HLI - H_IGH ~EVEL INTE~LOCX ' • INDICA!OI! HPA- NIGH •aESSURE ALARM -;.._,_ 8UTTERflY ""- SAMPLE COil "' • TEMPERATURE HPI -HIGH >RES SURE INHRLOCX -T- AIR TRAIISFOR -0- D I SPU.cEMEKT '~ETER

MONITOft NTA - HIGH fEl<IPERATU~E ~LARM COMP - COMPEllSAfiON liT! • HIGH ;EM!'ERATURE lftTERlOCK -w- OIAI'HRAGM -YVt- FLEX IKE HOSE c - LEVEl 4 -Ill- IS(ILAT!IIG OIAPHR~.GM ~'

G!APHRAGM OPERATED OIAPHRAGM I. SECONDARY VALVES fOR INSnUMENT3 HOT LC • LEVEL CONTROliEW

-Ill- SEPU,IT ION C iAM8ER SHOWN 011 r'!IE FLOW DIAGRAMS. SEE lFA • lOW fcOW ALARM --, DOUSLE DIAPHRAGM AN\lLE "CONTROL AIIO IIISTRUME!ITAT!OK TYPICAL lFI - LOW HOW IIITERLOCK --8- VERT, flOH VALVE PIPIIIG" SHEElS IIICLUOEO WITH THE Cl • LEVEl INDICATOR i PIPING I'LAIIS. SAfETY OR REll Ef

-B-LlA • LCII L~YH ALARM VEIIT, THHMlSTATIC UlVE 2. PIPI~G. V~lVES Al!D EQUIPMEIH SHUWN liGHf FURM!SI!ED SliT HOT IIECESSARILY LLI • LC1W t.;VEL IHTERlOCK

-<!>- IN-LINE SAfETY =- FIRE HOSE RAC~ INSTALU:D UNDER SEPARATE CONTRACT. LPA ~ LOW PlESSURE ALMio!

-<4- -f/9 F I RE ~YDRAHT lPI • LOW HfSSURE INTERLOCK OiRECT flOAT OPERAT£0

LS • UVEL SWITCH -<l>- SLIDE GATE 7 ROOF 'laAIII Oft fLOOR DRAIIIS

" " LEVEL TRANSMITTER

%-lTA - LC\i TEMPERATURE ALARM MOTOR OI'EIL\TEO --3 CLOSU.~E, SCR~"WED

LX - LOCAL TRANSMITTER ---1) CLOSU~E, WEU>ED CAl' PC - PRESSURE COIITROlLER % SOLENOID OPERATED --llf- INStiUTEG flAIIOE pH - pH CEll

= VEMT SEAL

" • PRESSURE INDICATOR % PS - PRESSURE SWITCH HYORAMOTOR OPERATED + SAFETY VALVE ORIP VENT PT • PRESSURE TRA~SM!TTER ---!+- I'!STON OPERATED

-0 HOSE CONNECTION RO - ROCf DRAIN

A SC - SAHnE COIL PISTON OPUATEO WITH POSITIONER -® QUICK OISCO~NECTIOII

SJ ~SWIVEL JO!MT SS • STAIHLESS STEEl ~ DIAPHRAGM Of'UAUO SPRI~G OPENING ¢. UHAIIST HEAD

PIPING ST " STRAINER TC " TEMPHATURE CO~TROLLER --*-- -@ TEST PLUG

T£ • fEMPfRATURE ELEMENT DIAPHRAGM OPERATED SPRING ClOS!~G -0- RATE OF flOW l~O!CATOR - PI Pill(, 2-1/2." AIIO LARGER Tl • TEMPERHIIRE INDICATOR _£_ r9 HEAD CH~BH TR - TRAP DIAPHRAGM OPERATED W!Tii PllSIT!OII£R --- PIPING 2" AIID SMAlLU TS - TEMPERATURE SWITCH a --{')- FILH~ ----- Ta.tPORARV PIPING TT TEMPERATURE TRANSMITTER SElf CO!ITAIIIEO CONTROl VALVE --- PIPING FURII!SH£1l WlTll £QUIPM~Nl" TW - TEMP!RATURE EL£Mt:NT TEST WELL ~ PRESSURE "REGULATOR

" • HliEf VALVE VENT SEAL

1 SlRA=G'fTEN N\l VANH ------ EXISTING IIIPIHG -=-VPT- VACUliM PRESSURE TRANSMITTER

""' -·-·- fUTURE PIPING XI' - TRANSMITTER PANEL RUPTURE DISC

RR .:. RE!..o\Y RAC~ AUTOMATIC RECIRCULATI0/1 VALVE --:it- qLAMP c<II!Pll SG OP • ORifiCE PLAT€ OR IJH!ON

-o- LIKE SIZE CH~MGE

CITY OF AlEXANDRIA, lOUISIANA D. G:. NUIIITfll HE CUlt GfMUAlllli STATHI!t- Uf<lf.

Page 148: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

~

--.---r,~-·i!

j_...,"""~ • ~

i ·- i! ' ' ' '

' ~

Page 149: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air
Page 150: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

~ ... ·:. "~ .. ~ .. ·~ ~ ..... 1 ~ ..... "" ~--~.,., ·- . '" .

.

. UP-5-j'-fi- -M'

L" "114PY•{o

I j .J...-~II.UU>-r ~I .. ~,.~(11-~T]Of\

~ M~

( ~~ 4Tt·!< . .. ~

"' DEAERATOR 4C

~c~·~ ., ...

-··

~~ ,.

v"" ~~a ..

: 10") VJ .. •. f-a naT

-+-4PS~S'I ....... ..........

.. , ~,.~ TOOM\N~

,J

~ ... :·""~ ~~ ..c.

4Pi"'l

!-<·

,.

l ~ . .. "

- _f.":_

~~PV-14

,-) 4_5!\.V-; lGOI'Jo.lN~ ,.

~PS-G

··--'~-$";:tt.-..~

Ut" SU ,.,.,.

JJ4"

·n£-~J ··I c.·

r<Y

~~Lf. ... ~TUT

L.J _, '""''-?J ,_,. ~mr ~""~ ~;f.t_

Ta Dllo\!1'<

_.. ... , -~·

'' D~~~~~i"t!l.

HP HEATER 4E

~tllV•.$ 4U.v-.

~ GENERATOR

.i.

'--

F...":"\

..

. .

~ ' . HP HEATER 40

1-\"

Li'A ~~:.::--...J~4W\

~ u--v Lp;:----.l/4"./ ~,.,r··~ ...

(~· ~ 1. ,...~":""

• .,1.1'1 ·n

~· . Co<\ ,, ~ DAA\"'

~-· I !I ~a

te!k~

''"t' !/" ~~

ru c-

BOILER FEED PUMP 4A ~1-l TO (IR.o.IN

41ri0V·4 "' ... ov..,

~ ,.

~ I" --4

Bj ~~~~;J ,,,.~

4FH/~

BOILER FEED PUMP 48

-~

(,~

LPI~ U'l (4PS-~

•. ~ io

~·· $ ... _!_

,.

4PT-r;i

~ v·---...

"f[·l --:::ir.\

~'{Int.

-~" ~

CITY Of ~ ""'' ~......, tJiif~ tGISIIllllll UlliiiEfRI D. G, r····---

_r·

~:.":".:1::\~.:::.,::.=.~~BlACK & VEATCH

~· !EiJ """""" u . J'J: '1... .... .,.LlP!&z._ ~ 5765 BOlLER

~

, . • ...,..t fi=jl ~--s

CIO >I'+ ·-· ., 1---"

4t11V·1

~""'"'s -I"~:L_ \.,;J . ........ ,

un• ~~v FD<,

tt.t.UWJ>,lt.l"'

Page 151: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

DEMINERALIZED WATER STORAGE TANKS

Vt!<T TO "'TJ'IO$PH£1U: :!!_ 48 4C

VENT "T<>

··J ~ '4'· ''Y~ '~r ~t~ ~,... 3

"'JQSJ"N ~ I ~f-Uf~ (" m

""·"'II

CONDENSER 4

FD-4 CONDENSATE

Page 152: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

-

• ~ z ~ z 8

I I'

Page 153: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

T I ~

r+-- --f-

I I I I lr --+-

(!) ~ I I I J,l I I

(!)

Li.l ' ' r7 r7

·~ " !J

r J"'l

~ G-

h 6- -<i>

~ ~ ~ i ;-

li

--·---

I I I I I I I I I I I I I

---T ----·------J I L--

Page 154: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

------- ... t,· , _. _.- - •• ··"' ..,. ,. . /• <,.. .<.;- 11o'! ,·....: -~- -- ~"·1vz· / r 4A

,------,--If ~·· VJ ( ~,:,4-CON NSER EXH~~;~~:.'sl \'"

(r,·~.-6 &=~~·.--6L --~--~.-~·~·· -,._,) ·· 1"-'e - - ~ ~ .. r•" L · 001. t<IIUR OIL COOI.tll v 5"~ IJ.;r---'-;...---,.---J;..---.-------.-<>-1

Ulr J "' p.'::'p rr-1\ II "' :u.MP n:'_N~C·{. ,. )J" v·· ~· ~·· ~~~- !--'"'" ~~--··:~~-u !JM ~ _ .1.e. t·•,. ~ ._ v:!.>~>'t" ~,-e·llt" ·lli ~/l·IIZ" w

(( ~ v -·-~ ~··"" ...... · '"'" <'" ~

1 1_ HYDROGEN . _ •

If( 4A ,.(_ 1- <48 4C ~~~·_. r- 40 ur-r /'""'-...: - - ~ .. -

,.----, . • •. -"" ~ ~]' !-~·-·"·. 1--·-~-,.. .I ~ I r• - - .. .1_'?- f-; ~. "'j f>·· ~:~ •. ~~ i<j ·~ ~I

~ t·!lt' "'9 e:-..: ... s.m: I'!:: ~ •t~W·U. _r::t~ (I" JA"J. /"G" :w.•...!. M·~ ' {

J (ii} - r <" <W·U i-' ·~T '". ~ -rw ""l~ .. Q ..Y •• ~ I N l,,. ~~ I m • 2 j ; m {t· ' / . t-lt(J I '~/ '-s· v t-4

'" 'fit' ~v•' 1• t'•• • _ 111 &Et.:~l' /'\0' C £""

r.ul.-, :.::.~ ,.~ !'", v AUXILIAR' 1 /""""~,··<~ 4A ~~:~· ,~'"/"'',. ,.. '~' /~,· [ ·" nt (~ tll!i'J!l v•· 1 COOLING WATER v '"~- r . Y.~ / ~~ ~ 1

... ~m- , 1 TANK 4 • .., .• .,_." r~· ·~-'!'-' c.. ·~·p...-· ,,_,. ~ •. :~ r,. ~;· ~·'~;"')~.~r-'.~ .; ~ "7' :r I~ ·-:,~-:-A~.~-c:;;,;:~-:;;_--~~ ''J

'-Jr-ooo--:1:-~"~~:·_,')t_...~ rAL ,. ~ -<~'5·" ~..-- nu lOOAAI~t ,.J " 0~ ~" ,._ ~-~ 46 ' ~· ~ ~~·· CONDENSER ""'~ '??.i'r,,_

l/4'_.- HUD~jll; ~{ 10" " . " 1-'""., sn," " sEE ~IHl CHEMICAl - 4 5" ._ ltL" __ fEEQ_ .!(,." 3" - ~,.r: 8

'I'!IDII,I\I~~R 4 • 4.T•I! Jf7' ,._,.

o ""~-], AUX COOLING WATER AUX WATER COOLER 46

PUMPS 4 L--l::.::_::.=_=-:::.:::.::=-:::.:::.:.=.:J::<:;d.,_ L--------------~·~·=~~··;..._.._ __________ ., ,'!'r-W-'

,_ V<'

,·, ~· ,. '\\.,.,.,--... ----' "' .-- v' 1 · ..

~--,1 {' ~~ r''n·-.._;F.,;:'' J;"t [~: ~ n ·n 11 ... , OJ

~ ,~ ~ HYDRAULIC cou:>LING ATFI COMPRESSOR 4 AFTERCOOLER 4 ~Of l.OU1.

=~· ~-JJ " W 0 ) HEATER DRAIN PUMP 4 1\ Robert M. Ellis -:T ~ ~~~~

r4" , • ./ \.~ UfGIHU~ ,,. ~

"it::1:t1J ~~-\{l!tl~ ill; ~ ="':"'==-===::-;:.~ BLACK I VEATCH CITY Of AlEXANDRIA lOUISIANA ::..v _ 8-"Ht IUUE ·rnR t(lNSTRU!;Tiot-1 -31'lt o..- I ~' - ~~-~-~ COISUlTIIIII ElliiEEIIS II. G. I!UIIIrtll EU!:TIIlC llfUIIATI~II STIITIIII. UIIIJf 4 NO.

(;-$·72. ll>SU&OfOII.BID,5PttO-I). 0 D ~--- DJ ...,...,. FD-7 DATI -AAIJ<ttt:oi!I>MI- "0, lOY Co< APP :4 - ..,~ ~ 5765 AUXILIARY COOLING WATER

Page 155: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

VEIIT TO ATMOilffl~~£

A1"S;IO~~l~\:L Vf~'J;t.,~11"£ • ~1" u. !41'·'"

•M·~I

FD-8

Page 156: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

,.

~~

<i ("';'' ·1 ..

"<:·

STEAM GENERATOR 4

,.,.----..... ,.,.---, I' ' / '

I ' / \ / fUEL 0\L \ ( fUEL OIL I ~·---...._ I STORAGE I \ ~ }1--t.q..~--l~~i~:N [.~

. ., \ -TANK 4 I \ ~ 1 1 r-:~~:r~, 1 , /J--..p::::j---1-- 1---, I -... _,1 -....... ...- .::o-..--"'1 • I

~s· -~~ ~~--1-~ ______ J: _______ j~-----·l--, l. L------:}-----1------:.:r--~1 I I 1\ '1 4

I • J I L.::_ __ p ffi ~) j./~ E-in'}- ---L 1

11 4ST-H ::!: .... , 1 I l r----7--...... --_,.'r--.7\--r.t..J I I : co· j ~· " ! ,_$_1 3" ! I v·· i-'""' * '1" ~ 1

: ~"i¥1' 1 tU..'JI. !f.! W ";:<" \~) t.._s,) ~.. ~ I ·,· ~-,,. ;:; ;:; •i• l' I I ~· ,'!., l!' ~ lTJ I I ... -, lr-' *"-· ' .... -..., I I L--c/ \:.-1, . L{{ 'tJ-- ..J I

"\ I ( \ I J" I :!:_.,_n . .a• L:c=<:S.

!J..till._,;i t illil.L§_ ~ ~ UNLOt>.DING I fUEL at f>YMP"V-3" ~ ~ ~ f>UMf> I

, PUMP PUMP \ -- I r----=-· ~· li. I r-- : .. ,; =-~. 1

BY~TQ ;-::::=7--'--- - ----~ \ ON IT l 1'n UNIT$ l1,l I I

., ., -~

,.

' '-' AIII$1/P9LY L-------~ ~

I I I I l ~· I r 1 ,.

I· c·· I ysw::r I t0 ·~Y·tu .... ~ ;~11---J \

,.·1·"

··•'j \

Hll"

I I I I I

I I

cs· I ~ ; n~ntJ to4U------------.J

FD-9

Page 157: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

h_ ,,. +-:!:-=-=•=•~•=--•· <c•<>·o· ~ HOKI,_S '

4UV·l ~V-t 4£$¥·51") ~ ~ ~

'-<il<lc--!~ ,. I" ,--r 4SV-'II '15¥-S<>

rr· '"t' ·c

,.

n1'-o• ~

,.J --r·· j•J

r ~

~ >O"WA.'TEII MA!<G14tT£!1.

~ S: Q Til MP<fiA>1Nll ~II\

hi ,. i 01010 ,-w---1--9 J -0 -<I,·,,.,. p s- . ;

M>"-1 <'.::. 0 0 0 3, ... • •

v L[

"4T BURNERS

"'"14 l b,.,,, ,,_ .. r x Tl) DRAIN

r·· .... - <.;.,;- - • "!;! ,,.

I T ["""._. y ' ~-,_1.--=-...J

,.

......--1 Tll ~· IT!IOI. O~l<ttS

CONTROL AIR FILTERS 4 v.._· r • ,_,.()+--.)+--<><~-• --!I

A .c

CONTROL AIR DRYER 4

L f:.-or•"

k-···· _{_'

Til URI\IN

~ -·~~L .~ 4

.~:~~V-31

~ ~ ~ AIR RECEIVER 3 AIR RECEIVER 3 AIR RECEIVER 1,2

~ -;:-;;;,.::r----t><.J-{i.v.r• ··<Jl:•· SERVICE AIR RECEIVER I 2

,..-£><.1-- ---t><:.--- -----y-<::-~·)

y-~·----, ~ .... lU~I>NEC M!.A !IllS£ B!B' Bnli .. ER MI-A $SUllO

''"~· ..lf---'(

VUlT T\1 ~TMU!'I<Eftf

aLOWOFF SILENCER 4

TO Uf\AI>I

I;··

T~•l

~~

i:>~UE.D

! •!" ~-ua• :•r ... ----- __ t__ __.!..._ r-----'1 f----4 (-----1 I I I I I I I 1 I ! I I

,.. I 1 I 1 I I I 1 3 • j I I I I 1 I 1 \ I : I I ~ I ~ I r I 1 I I L-----' l-----1 L ____ ..J

,.

~~~~==-~"; BlACK & VEATCH CITY OF ALEXANDRIA.LOUISfANA ;:ay :::.:~,o:n• ,.. .::;.•; 'I"#~'P~'J:!l" C:OISUtTIIG EIIGilUIII II. II. Hlllllfll UfCUit UHIIIIATIII& l!TATIOII UNIT4 •

·--~s::?'.L::. \iii] """''= F0-10 ,~-~;;;.,. "" ... .. Ll.P.!fl,._ C!l.! 5765 COMPRESSED AIR

Page 158: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

BEARING·. DRAIN

ENLARGEM§NT 4

VEIH' TQ o\TMIISI'IIEM

,.

1-·112"

Z·.!IZ."

LUBE OIL

I' I I H DRAIN 1-'AN

.,.,,z_'

·2"

y OIL DRAIN FUNNEL

t·IIZ"

"""" E1'.'JRACT0fd 1/2"

•.

VENT

2'!.

V~IOT lC> o\Th<O$PIIUtE

l;'M!N

Nt u

..

'

Ql.b...YAEQB.•

SEpARATOR

,.

FD~tl

Page 159: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

@E!b

~r ~

__ ../

w: .. T Til Al ... OBPKtftE

SILENCER

'= 4·M<>V·I &MI .. ---· ~"'"

~~OIIAIN U:e;l'!>•f

fROM llf."-EMATo

a.t~II.6W f

•1

,.

'"

' ' ' ' TO __ L ___ T __ J

IIUIWOOWM PIT ~~·./

'E£ FO·\

·-SA.M"-l 1/<liU ~·[ FD·!{I

L--··~

SLOWDOWN TANK 4

'"'jJ 411~V-I

····; ,.

Vti\IT ~ .-TioletP\ItP.t vti<IT ll> ~ThlllSl'II~~E FJ\OM ~~~tR

:;;;J SILENCER FtEDWMER 8tf r~-3

~=" nn

,.uz• ~N:.I\TAI!Lt L- ,;. .

,..-•· !·lAi r-r-- ~ i·V~

~ Ttol~ 4 £..:.!.,.(1\

"---' J ylQc ~n:- 4 ttl\

L-

L. ,_.) Hit.~

~I TUT

u~- ~ 'f.< r

1- ........__, PU.TUI a" Oln\.tT I<E,li!El!IIW>I

/ r:..'<ATEN

S>< 1>1\.iT "tAIJI;" liMit<

TOSilftr_"'f~ot.£ .,. ·~

,..__ ""'·- ' '-'-·' ·~

~·-;,Jr"t:'Ter;..~~~ ... "="' 9-•" DI\A•

... ><t .. MA.

" WJ.TtiO.

,)f tl>l.UMN

~:1.1~~~

-~~":"'~ ii<.OOIDH" '

\ [:; t•IJI." -".tiD'""'" tOll!(

4111 liU.TE!'. CI.Uo!<\1<6 DJY!U

.STE.o.::~ OA..<!ft

STEAM GENERATOR 4

lit' .,. . ,. ., .

'7 ,.

"'j / / r·· /" I I I I ,.

~

FD-12

Page 160: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

0 G G

~PS•.oW;

~

~·-'"

~-STEAM GENERATOR 4

• ·n •• ,_.. --

"' "'

~ (!)(!)

HEAJER

~ CONTROL PANEL 4

"' • 4"'-·U

"' fO FAN HYDRAULIC COUPLING

O<L CONTROL DR!V£ 4

DAMPER CONTROL

-

~1':;44

l/4' ~ ., ....

4P:iH17

"'

BLACK & VEATCH CITY OF ALEXANDRIA, lOUISIANA ... --- s-1-n !S.SOtD fOl\ (QNSTRUtT\ilN SPE.t 0'{. ' CUISUlTING lNCIIUil II. 8. NUITU UlCTIIC llliUIIAliNI ST-'flllll UlfiT 4 ~-

--- Q-5·1t lSSUE.D FbP.. l!o\0, Sf'EC 0·10 0 ~ -·~ FD-13

~- ~ ..... OICINI....., •oO()ll:g Ol'lBo>n ~ .. e~ """ 5765 BOILER DRAFT PIPING

Page 161: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

STEAM SEAL REGULATOR 4 ~ ., "

"~ M.O.lN m~

Uf.fO·I

W4'

TI'IMISC<>A.OIH5 RECtiii(.A SEt FO·I$

.._fl'D\ .liEit.T """"1'1 "TO C<>MI'>i:HSEI\ &1:1: F0·15

8UOII£ $EAT !>MIN 1"0a&..OWilD\'RfT.o.NII

8U F01Z

~$T·ll

,.,.

1·!14"

,..

~-u

e. m

OAAIHTO <:ONDI; .. .Iotl'. .$l.E FI)·IS

TO MIS<: PIVIINS 1\EC!IV~Il S~£ FO•IS

COJ<TilQL Woi.V~ STtt.O IHI'IU lEit.KOff TO I<P ~Eit.TtR ~£.

SE.E ~g • .z_

f•llt"

Utt.O ~~M\OI'F T~ MIS(: llMIII RECtiVt;;l'. U£ FO·I$

DAAI"' TO CONDE!<Uil .$tE FD·IS

L-..

u;Jf.;s~~";.._-~. _____ _

·-

"~

HP TURBINE

,.

TO <aU.\10 fli<MJ$TEI\ IIEE fD-tS

LP TURBINE

,~--- •'"""') ,f',.~~--4: 'j '7' , '1 I ~-~ SPAA'I'! ''· ----~ I -~~~ FMM

~ OCIIY.ta I l CDNotiiSATE

SEE F0·4

' •

~- 3/4-"

( •q y 4$1-29 I Film' CO~OCIIS~Tf: 1 1_71 ~~ 0 l 6UfD·4 ~

CITY OF

FD-!4 MISCELLANEOUS TURBINE PIPING

Page 162: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

' .!_,___I "''"' :!I>'"

;~=~---"--'

:.

j aJ ;!r-t

!~i~ % g~ ~::1.::#

~~ £; l: ' s! ~ ' s ~g

··' , t ~~ "· i~

~

6 ~

"' z < "' 0

'-

~ "' 5 w z <

• :1 w

"' w m z

<> "' :;

~ z 0 u

Page 163: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

B .. ~~ -----:g ~~ ~~

·~· ~J

i e

------.... {; ·~:

• l •

"'

~ • ! e

/ '

' I I I I

.,. '!" ~ I

• ~~ :.~=t!

~~ ~!:! ... ~ ... •

z~ i~~

§§~ ·g-~~ g~

• ~ . . .

I •

' ~

"

i ~ ~~--~~----~ ~

i i -~ ~

~ i i' -~

• '

\

i ~~~·-·~,~~------~~·L---~--~~~ : 1r , !e~~~ gi \~f~·~1 l_ ------- _________________________ j

Page 164: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

~f:.•n Tll .oTIIIO$P~tM.

,.

HYDROGEN

~ CABINET

,.

"' PURGE CONTROL MANIFOLD

..!:£. £M!. ~

TO Diu.!N

N-•

ROOF AND Fl,OOR DRAJNS

~ ••o•-o• '{ '{ .. '{ .. Y

E\... Ill$~~·

~~- 'F··--1 1 c ¥ y

2."CIINN fRoM Dl'IIH>(ING FOUNTAIN -··

..

..

,.

"'""" . lY I I Y I ·· ..

,.

FD-!7

Page 165: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

SYSTEM PAGE

MAIN STEAM A-1 THRU A-7

EXTRACTION STEAM B-1 THRU B-3

BOILER FEED WATER C-1 THRU C-7

CONDENSATE D-1 HRU D-5

CIRCULATING WATER E-1 THRU E-8

AUXILIARY COOLING WATER F-1 THRU F-2

BOILER PROTECTION SYSTEM G-1 THRU G-7

TURBINE AUXILIARY H-1 THRU H-9

BOILER AUXILIARY J-1 THRU J-4

BOILER FUEL/AIR K-1 THRU K-2

DATl IIEYISIOII 011 ISSUE 110. BY

BLACK I VEATCH CITY OF ALEXAN DR I A, LOUIS lANA LOGIC DIAGRAM

CIIIIISIILTIIIIIII EIIIIIIIIEEIIS II. G. IIIIIIITER ElECTRIC GEIIIERATIIIIII STATIIIIII - IIIIIIT 4

INDEX TO LOGIC DIAGRAMS ~ PROJECT

5765

Page 166: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

cs ''OFI!W~ 4CP'-77

c5 "HA ciPetJ" 4CP-77

:~·· Se;AL IN E!Lr\ OP~IAIG

!00% CL<SED

VAI.Jif et..osHf& STOP ......., 0-

. ' ;a t:-J

t40"R.¥ OV~D

' ~ ~

• ~ ;; ii cs 11cuu" 2 4<-P-77

:-l~ i SI10itT

~ ""'-"" CS •HA.CL.o~' CLoSitl$

4CP-77

?' a SI<AI. '" d'

HIGH CJ..OS!NG ll)RQVe. Q li!S SToP

\/AllfE ~ VAI.IIE J()O 'll. ef'£N CL.Q>o .. • l<S

~§ ... ~

5 ""' VALVE OI"'ENIH&

• 1110 .. "-~m < VALliS IOOt'o Ct..()$£0 "e"' ~7 ~a; s i!'S

m M .... VALVE 100% OPEN §]---€) ll ""' "'"' "'"'

4Cf'-77 .. -' .... Ill-<

3: !lo l> ; ...

§i m)lo r :;;,_ <ti> ~m ro_, !!!><

~~ "> :z l"' ""' o., ::;,., <:t ,._ ·~ :!:a--~ :-.. ...-.. .,

!;c:: 100 ~;; !!z :;:>

~ 0 ~

)>;:; I "' -;;

"' " cs: "

FCLO$~- OPEN~, SN:IMG-~ 70 N"RI<1AL FROM •ct.cs£~ fJNO ''OP6N 11

El..-i!C SC~!&I"f- vI

Page 167: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

s \;;:

~ • ii I

j

• ~

R

l

,,,~~ !:<:00: ;;; "' ....

~ ~G'I< "'a !5:: m_,

H -" ~

!1 ;;"' r" c:l:

"' ~ ~~ %-t <0 ,q

mn

=== "n ;.-..... ill-< ~0 :: ... ;.;s. m,­"m ;:)( "> "Z ii!c MOO ~­::!)> .. , "..-!lo !!;c::: iW ~> !!z ;:!>

:; "' :t>n

I o [':);;

" ~

P8 "OP6H" 4C·p.:.roSA

SEAt- tH

HIGH DPE.NINW TORQUt::. i!S

vALvE /CO"' CLoseo ES

14':> 1/At..VE. c.t.o.:s1HG frtOjJ .-j

~101t>~ .t:Nl!'R.IJJAD

5£AL. IH

HIGH Ci-OSJN& 1t)RQ«<£ .., VAL.Vf!. tOO% OP£.1( ;!$

VA.t,Ve OPEHING--

VALVE 100% C.J...05£P

es 4<:1'-IOSA

VALVE 100% OPE,H ~ "s <> ...fep--1038

.,. .. VALVE OP""""'

"""' \101..'1£

""''"" ..

""'"' vALVE CUl> ...

SlbP _,E CI..OSIH&

P8: ~(';.LOSE""; ~OMENTA~ c;o,.JTA<.T7 8AC¥LIGUfeP

P8: 80PeN'' 1 ft1dMfir/lfT1J!)olY CONTACT, 8/ICKL1614T£P

SSAL JH

~----------------~·2

021 AA

~ . :._~

\ -··~

£J.,.U. SCHtfM ~ V )_

Page 168: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

., . .,_ . ~ ~ w

~

< rl\ ;:; ii li

i

l

~ ...... ...... l:ll» ..... 5""' • "' .... '>4~;<

0) "' • ,.,

"'~·> ~-~

~ '""' 5"' eli' "';;1

"' j; ro <m ~~

·~ ~"' 3~

~~

MC"> == !"n .. -...... ill-< !lc :::-.. Ill> M,.... !lm &)( "> ~~ M::IO f:_ =1> ... .. ,.... !lo ~=

~I="' ~~;;; z!!z

·~ "'m "

:>

b " )> n

I 0

w ;; " !' "'

VALVE 100% OPeN

"" VALVf!. CLOSING

LOAD >eO%.

SH PESUPUY"R SPiAV $1JX.I( VALVE: 4-MOV-4 too% ct..DSED FI(OM LO A-4

Sl+ DESUPI-R"K S~Y .Bl-OCK VALVS. 4MOV-5' /00% CL..0.5e:D ~0"1 LD A-5

SH DESOPHn SPAAY ~ VALVE. t> 4CR.V-5- 100% CL.O~EI> FROM LO A-S SH OESVI'Itrle: sPRAY -Ct'J~T'ROL. wa.ve

c,t.Jl5ED

DR

~ VALVE- OF'f'HING IMCi11 1 r VAL-VE > .9 Z" 9'o CLOSED 25

HIC.Oii CL.OSIN& TO~QtJf:

i<S

VAU/1" 100% Ct..O~~ 25 ---- -- =---!V

4CP-78

VA'--VE. 100% OPE..N E!}--0 ft G

+cP-78

TO l-D A-4 VAL..V£. 100 o/11 OPEN

zs TO LO A-S'

Sl>d<T "'I.VE 0"'-

sroP ~vc Of'f!HJJJG

I G> SEAL. IN

1--------!.2

O:l3 RA

VAL.VS: 100% CL.O$EP

""

START W!Lljtt

Cl..OSJH&

STOP VALVE CUlSUI"

<:J~"/ ~RA

CS~ "cLaS€ -oPE/>J 11J :SPRING R'ETtJAA/ 'TO NO,;'MJIL Fll0/4 11 oo:"~N1

1 ~IHNTAINED IN "Ct..O.'!.E"

Et..EC SCI-f!r•J- V-DCI

Page 169: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

VALY~ IOOfo OPEN

""' ST>IRT / SEAL IN

VAI.VE ~\IE. CLOSING OPEH!N&

' LOAD "' 20,. 0.,

•" . ~ ~ ..

Sl<JP

'

~ ~"'""" OPENIIKi

• •• ~ ;; ii 2

~ •

Wlt.Y£

R

' MAJN STEAM STbP y,At.V£. SWlT

• 4 JOO "' Ct-OSI£.D Vii~LYE

,.,li~ ;<!S OASIN•

Ei"" =· VALVE. > 9~ 'Yo CL0!5ED

~~lOll< J!S 0'1 "'."" srnp 1,}1 ~!!:1 HIG-14 CL.OSIHE. Tn~UE.

m ... i!S ...u.ve

ii:::z: CLOSIH&

!"n e VALVE 0P£Hf,.G (fl c D--. .... "' =-< VALVE 100 'Jb CL.o5EO §l--0 ~"' !lo zs "" k~ ; ... 4'!f'-79

"iii ;!!;o. \1\l..VE JOO% OPEN B--® ~"' 5~ •• 4CP-79

~~ !!>< ... ,. 1\:Z ., :=o •• ~ r!:!! VALliE 100 .. /p CLOSISD [:> TO L.D A-3

~· :!]> ;;cs 1W :· ~;;! !lr- VALl/~ 11!10 Y., Of';;H [:>TO LD A-6 '" ,.o

"" ~~ a= ~ ""' ~>

!!z ;:,.

:; > "' n

..,. "' ;; "' ~ cs: "C LOS£-oPt::.N: SPR lNG RETIJRN 7 0 A/Oi?MAL P"RCM "c~eJV•1 MAI/'ImiNt!P tN ~.:srof'~

" £L/5C SCH"M - v 3

Page 170: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

~~~

~ • ii g

~

!l

~

14111~ ;=-c

~ =· ~ ~;< "'~ilS:::

~ .... ~ ... == •n

(,0 ·-c .....

~ = <

l \'1 l!l C> Ill ..... ~ I',. ~ :; r­~m

~ !!!>< r ll n > ~ gl = z

1) .. Cl

'.11! i~ .fol: =» H :;... '<~ = Q IN • c: ~ ::!_

0} = CfJ

~ ;. > ,.,( !z

:>

b ~

)> ;;

' c lrt ~

3!: "'

VALVE. JOO "" OPeN i!S

VALVE Ct...OSING-

SH PESUf'f.ITt. MAtH Bt...OCJ( VALV.S +Mt:!V-S 100 9fJ Of>S,H_ F'ltOM LD A~S su OS.SciPffTR Sf'Wt'/ ~ VAL.V/!; 4Cit'i -6 10016 c.w:l$SP FRllf!l 1-P A~

~

MFfl. aB" TRIP lfRIJM LO L..~l

Tvtt81N1f- CDNntoL VAUIE ,co% ~SEP

'i<S

=

\?U.VE. > 115"'% CLoSED es

HI~ CL-OSIHG> Ttl~IJe zs

VALVE. Of'e:N11tt:;.

VAUtE- 100% CLOS.lO.£> . J:::t .... tfi.' zs ~::::.;

4CP·80

VAL.¥6 100 'i'o CPeN ~ zs 6

4CP·80

VI+LvE: 100% c,t...05ED [:> ro u:> A-3 .. s

VAI-Vfl.. IOO'fo OP&N [:> ro LD A-7 2S

S1AAT VAI..Vf!. Ofl'f:NIIl&

ST!>P VIU.YE OPaltlfti'

smRT ,..o-YAL\0£

J CLOSING-

STbP VALVE. CL.OS>""

\------1•

cs: "CLCSE>OPE:N", SPR!NG ~eru~N m rHl~ PR.OM "OP6N''; fi)Aiti'TP/I>Jf:D tN "CLLJ.Se"

I<J-E:C. s ........ v 3

~L..IN

~

()']<)lAA-i

Page 171: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

~ .../

~

~ .o \{\ L' )--- ~ ~1.1.1 Ul 1(\ ~ ll.l ""> 5 ('l)t:":E"> ~-~ ~~~~ UJ~

tl)

V\CQI'l> '<l-:t::>.. ...

hl ~stl)~ -w ~v'l

1-o'j \1)<0 ill ~i'll<:::> ~~ Will I-C. 1

mit'~~ ~~

~

n il <() '"" 1 '

<1: <1:

(g) :1 0 .J

t ~ g

V)

~ IL

1l. \'f)

"'- 0 \j

g)ll 11.1

...._,..--\1!~ > - .... > ~ "'"'" ~. Cl

<1)> <t ~ Ill 0 '

V)

1){2:: <1: ..j 3 l-It

5 ~ u ~\ I!> ~ '# ~~ l:: 0') 0

0 .../ ...J ~ -1 fl: - 11i SiT~

0 lj)

~· <!) UJ

~t 3' Vl U<;f - § ~

'·73 lssv£ I Jll>f1

DATE II£VISIOII 011 ISSUE 110. IT

BLACK I VEATCH CITY OF ALEXANDRIA, LOUISIANA LOGIC DIAGRAM COISULnllll EIIIIEEIIS 0. G. IIUIITEII ELECTRIC GEIIEIIATIIIilll STATIOII - UIIIT 4

A-6 ~

PROJECT

57€5 SVPeR14S:ATER O£$()P S:IZ.I-IEATE R

COHTROL VAl-VE 4cR.V-5'

Page 172: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

;z

f~ 1)

(()

gz~ "' 0 :;;. ~~~U.\ V'lll.l L

'<~-> ·~~-:\" Ul-.1

w :t

~l:~§ IIJ~ <J 'To ~lA)

1/)

~~<:1~ 1.11 VI \)

m~ lU

~~~~ .J

I ill

~o..:3~ ~g

~· 11) 41 I I

t ~ <t q;

Q Q

-.1 ..)

' g I ~ ~

I ' I ' ' I ~ I

~ illl IT)

" ~~I \J.)

oo I j "->- ~~ ~ ~~I e 10

let l~n Q

')/. I ' -.1 !il i

1->q; ~ 2 ~0

,._f~ o.b d ::> J If)

z

~~I: ;fl.

<t(\j .J 0

:t_J& ~ 0

'!);/;lL II( tO >-:• l)j

Zl!(l ' ,. _J Ill

8.+ - § Ill

(75 I< SU£ I RllM DATt R£¥1$1011 011 I SSU£ 110. 8Y

BLACK I VEATCH CITY OF AlEXANDRIA, lOUISIANA LOGIC DIAGRAM

COIIULniiGI IEI8111EEIII D. II. HIIIIITEII ELECTRIC SEIIEIIATINII STATION • UNIT 4 A-7

~ PROJECT

SU PEO:~f+E.An;;.R 576,. DE SU PERHE!A TE.R et:JNTfi!.OL.. VALVE 4CRV-S

Page 173: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

.. I 'J.~ ·W.i/#15 O>il_l .. 7507.?, Nf Q,J!ftrJII!Yfl 1/'tir/Q. ~lfj_ 'fllltll'ft ~ tlit"J ?,!J 9flil11~) :.N~d0 ·]SO 7 ~ •. · 5 J r

~

l!i ~

;;; ----! "~:~; !;£::1! z~a~r f-Srh 8111-51) /.OI·nlr 8!'''"'" -,kV5fJ ~ CCJ 1 7•/IS3h t(·AS' A ~J.u, 8!~51, SIW·SI) 'tahnh )1•14/fr ~h(//1 § S·M1h ~E'"ft5h S·.J..7~-t 0!·51h tiW-sn 8gt•dJ/. t~MWh Ohdll '(·!iS~h bC·/!Sir J".17h n·.P b&J-511 0/hPi. 1;,:/#Wh flh"d7 ..., .. /"flS;J/1 !C·!Sh L -m. J.r:-57/t 111·Sr? t.lhl"' ,.!0/(h ~hJ7

:zli. <=

-¥·!5Jh ~-ISh .V:i7hl )11-57/t ~;; i .¥1i.?h OAf3r.1~ ¥(,i/J.H -~~

"'" " o>O ~ " _,., -~ " <o: ~ .:

- < ci~ "'" ¥·/\53!., ;li\'U',A )IHH") t'Ud0

r:::l o::; " 52 :Zlli ~ ~

O_i. .... ·ASh 3li'Oo!/JH3

=~ V:f>07.) 'uVV• "Jl <v • 1.) Xe;_ h

:::;~ ~ ~ h, "' Of'.WWO..J ~N'"'.) > 11(1 <:;;:

u.."' " '--¥-/IS:Jh :;nY;\ li>•11)11S07) ¥:.1...71-t 0~ ~ ~ >-~ ' ::: C!J. .f'·!J5h "'$/ZI"JC/3!1"3--:10 ""'!-/ '"''7 .f"·lr ;>i.L II

~.:: f-. -" <>o

:o::;m

<J -;;;,_ c..>::l

'GfH/7 j 1:fl·G7 OJ. lj/(1501) »l7J ;/flJJ.hH5 ¥ lr Y.L/1 !;;: !! 0 \n l..U w ~ ::>• 0 ~ wf

¥-J;Jh ,., ..,~ '"' 9 lPN • /YNU F& Ill. fl""'Yf ""'" .,-- h 5il~l ~ "'

Si! O»•>:J "!' '"(I mu

~ ~

<W·~y11 ~"'"'"(.) #I/! 'ill. "Jl ~ do.J.S

"' "" r.:::: !);;; f'~() "[; W{ "'II "' c: co~ ,.,,,,

- g

:Y ·~ omor:;

9~t/Sf>7] /Vt ·w~s s ~AW,oi "JN './ 'I' ~ .JJit;JS

4'-57k ~

~ ""'" "'~"!¥-•"'-"" " ~0

~~ G"-" ,., .. ~ sz • '"'"'.J ~"" ~ '71' ~) · '>""II -. ~ #-Oh

I i' ,>'>07::{, .s.J

<f---8 Si!" ~~ /OliO t" WJ 7111r;t '-"

~ ~ d<1l5 ~ 'JN IJ ''!' f

:r 5>£

:Y ~~

., :; it 1'111 ""II <<:

'If - '"U I -= I ..IJI'I.JS If/ "11>'~5 I

'i-§ """0 ''l\

I I

I I

«B .,Y-.• ot. ' • .i•Y.J.S •.'( > .J

....... ~o~:>h I I ,rruu. >J \

Page 174: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

..l''d."•) t.••J.t••w•w 1 .. 3S07J. : gd

.L>t/ND) 4dWJ NiiW•/J 1 .ft:1d0,, :gO

,[0 fliP/ r>•t L·Hh $·57[, /·57h Oll'll)oc"w' )[,·llO

OhO (lt•t ji'LP! {,·5Th Of·57h &Hrh ltt/517 b "f.fh ?!hJH h£0 1 '"'t v•w 11-m <1-57 1"<-m tu·r<J ,, . ...,, q;"dll HOI!l//1 I ~If{ [1-S7h [,/·5Th «·Sih <fiN/ fN·I'I{[, gh·dl

?.'E:O lll{lf Ylll ft-51[, 1t·SI[, !C->11• Lltlf7 L .,. •• Yh-d7

flY .;t<J> ¥JJ/, t•r"' !(fr>r• f'o/57b ~~ f•IY"'o/IW!.jJ/1

~"'""') ···jfl/. lJl/{

(11•tlj_ ~~~I(J~n'J) SZ

(?J-Sl/r

l_c '"H •t•o '"U v¥h8lH

I ~~~~~~~vm~r.m~~-~~~~s,,•~ r ~'ff" '1"1!" ••uw·~:Yhl/.1/f

(b}S1h

1r1 7i'.95 I

__l'I:JdO. 'ifd

'- i g

I •

I -~ I I~ ,.

18

!f I I

! i I . ',

I

1++-i r- . ' -t· I' , I I ·

Page 175: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

FRo11 LD· B "--

(I> VALVE 0etAtt4/Cjo

BLACK I VEATCH CUIULTIIIII ElllllfiiEEIII

~

5ToP t/ALVE CLOSIAIG

tLEc [),AG - V (.

CITY Of AlEXA II G iiii~TER "HfCTIIIC GfPifiM1'1 NG STATIO~- Ulfl14

1/E,fTER OowN~rRI£AI1 DR1111v liAUES 'lt161J·'l 'lf'IW·II 'IMW-11 'llfoV-1

LOGIC DIAGRAM

B3

Page 176: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

cs nsriH<r" 4-CP-70

cs ''FO" 4CP-70

DEAERAToR 'iLEVE.L L<D'IN' "'t.S•'/ \

LUBE 011.- I"R£SS 4PS-2

cs •sroP' 4CP-70

CS "PO" 4CP-7o

4-C.P-70

CS "NA STAilT" 4CF'-70

LC!VV LUBE OIL PI4:SS 4PS-:L

4-P.:S-1

. RA ot>'f

STOP SFP4A

CS "PO"

~----------------~R 4<:?-70

r-----------------~R LOCAl-

To LO C-5

TO LD C•7

,-------{a. 4cP-70

L

TO LO C-3

TOLD C-5

.----{W

4CI'-10

4CP-12D

cs: 'STOP,- STAilT", WITH ~erj SPRING-~ 77) N<Jil/IIAL. F/?OM 115TDI"'• AND START-, f'UI.L (!)UT n> &..CCK IN ''ST'l11'•

t..Pt:J: "SToP-s~·, lfi()Mf:IJTARY Ew::c SCH£1'1 - D 5

-7:3 1 ssue IIEVI SIOtl Otl IIIIU£

C-1 BLACK I VEATCH CITY OF ALEXANDRIA, LOUISIANA

·e. II. IIIIIIITUI EUCTIIIC IEIIIIEIIATIIIIII STATIOIII • UIIIIT 4 COIIULTIII& EHIIIEIEIII

~

Page 177: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

4CP-71

cs 11Po 0

4CP-71

LUBE OIL PRESS 4PS-7

cs •srop" 4CP-71

CS 11PO' 4CP-71

LP6 ".STOP"

CS 'START"

4CP-71

CS "NA START1

4CP-71

Lf)'(; Ltll3E OIL PRESS '/PS-7

MOTOR OV/:RLOAP

8FP SUCT/01\1 PRE:SS LOW 4PS-S

.START BFP4B

STOP 13FP413

cs "Po" 4CP-71

~--------------~R 4CP-71

~----------------~R LOCAl..

TCl LD C-6

jC LD C-7

.--------{(3

4CP-71

t---------1e LOCAL.

TO LDC-4

TO LO C-6

,----{W

C:> 'NA STAI1T11

oto I<'A

CS : 'STOP- START" 1 W IT"rt TAFtGET, :5f'RING RETURN To AAJRM/11.. PI<OM 'sror• AAD 115TART''1 PULLouT To L.t:ICI! IN •:srciP"

LPS: '':sn>P- START~ MOMII=-NTM< y J:;I.E.C SCf.IEM - D 5

BLACK I VEATCH CITY OF ALEXANDRIA. lOUISIANA LOGIC DIAGRAM CONSULnllll EIIIIIIIEERS

~ I'IIOJECT

II. G. IIIINTEII ELECTRIC GENEIIATING STATION • UNIT 4

8011.-E:IZ FEE.iJ P!JMP 48 C-2

Page 178: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

LS S "RtJNn

CS '5TART' 4CP-70

(§-CS '1 NA START" 4CP 70

-:::::1

1-Ufi3(£ 011- PRE£5S LOW p

~ 4P.S-4

START 6FP 4A !-----® LSS "AUT01 I AIJX OIL PIIMP R

4CP-70

\

8--- ~ 8FP 4A STOPPI=D ~ FROM LD C-1

~ STOP SFP+II f----@ AUX OIL PIJI1P 4-CP-70

r.::::::l.

MOTOR OVERLOAD o

'

cs; .se:E L.D-1 LSS: 11AVTO - RLW~ MAINTAIIE.O

51-E.C SCf4£M-P/

~-73 /H. liE I ..f~ DATE fi£VI SIOII 011 I S8Ul 110. 8Y

BLACK I VEATCH CITY OF AlEXANDRIA •. lOUISIANA LOGIC DIAGRAM

COIIIUL111111 EIIIIIIIUIIJ II. II. IIIINTEII ELECTRIC IIEIIIEIIATINII STATION - UNIT 4 C-3

~ I'IIOJIECI'

5765 /5011-E:R F£E:D PUMP +A AVX/1-IARY OIL P1MP

Page 179: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

LSS "RUN 11

CS 11 S"fART 11

4CP-71 e--CS 11 NA STARr 11

4CP-7t

Lllat:. OIL PRESS LOW s-~ 4-PS-9

SIART &FP 48 I ®

LS.S ':t\UTO" AUl< 01 L Pf}HP

4CP-71

-;;:::!

8-.:::::r

~ BFP 48 SlOPPeD I FROM L.IJ C-2. ~

ON STOP BFP+S I 0 51'HN IWY. OIL PIJMP

4CP-71

c::l MOTOR. 01/ERI..OAD ~

cs: 5!E'-E LD-C:t LSS: "AUTO- RUN", MAINTMNEO

E:LEC SQ<EM. PI

!. - ?'$ l!.sv£ I Pfi;i IIATt II£YISIOII 011 111811[ 1110. Ill'

BLACK I VEATCH CITY OF AlEXANDRIA. lOUISIANA LOGIC DIAGRAM

COIIIIillnllll IEIIIIIIIIEERll II. 8. IIIINTEII ELECTIIIC GEIIIEIIATIIIIG STATIOII - 111111 4

~ i'IIQJECT C-4 5765

Blllt..F-1'<. FIZED PUMi'J 4-8

AUXILIARY OIL PUMP

Page 180: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

8FP 4A RUNNING-

l FROM t...C> C-1 STAilT 8 FP 4-A /:IlSCH

VAl-Ve 100% OPEN r::::J I I

VA/...V£ 4-1'1011-ZI 0Pf3NIN€r

tS r..::.:J :::::1

[3(;, VALVE- CL-OSING r:::J ~

'A HI<' lfM "7, (" li>C&" t:::J ~ ~>np I?FP <A "s<H -e

2.5 • §H> 4-MOV-el OP!f;NING-

c;lENING 79Uv« Htr;.H 8...... r MoroR Ovu'"" o 8

BFP 4A STOPPED START BFP 4A 1>1~ Vllt.VE FROM L.D C-1 4-MOV-et CLOSING-

CLOSING TllF:i':lU£ H/6-fl r:=1 b z z:s "E:J .... PR'

0

VALVE: 100% OPEN 0 STOP t/ Ff' 4-A l>13CH VALVE.

&$ Nv ~

4MOV- 21 CL-OSING-

I VALVE OPENING ~

VALVE 100% OPEN §] ® zs 4CP-70

VAl-VO: 100% CLOSW 8 ® ""s 4CP-70

El.-E-C ~EM - V 7

1.-n /HIJ£ I i'lJII DAft llt:V I SIOII 011 111311£ 110. 8Y

BlACK I VEATCH CITY OF ALEXANDRIA, LOUISIANA LOGIC DIAGRAM

COIIISUL'I'III IEIIIIIIIEEIIS 0. G. IIUIIITEII ELECTRIC IIEIIEIIATIIIIII STATIOIII - UIIIIT 4 C-5

~ I'IIOJEcr

5765 BOIL8R FEED PUMP 41'

PISCH VALVE. 4/101/-e.l

Page 181: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

FROM LD -2.

VALVE 100 % Of'EN i!S

0PE4/141(; Z?eovtlltGN i!S

FROM LD ·2

VALVIE 100% OPI!N

VALVE OF'EIVrN&

,.-_...,...STARI BFP 48 DISCil VALVf; 4-MO'o/-2..2. OPENII>Ui

~-.~,,.,.,__ STOP 8FP "113 PJ:SCH 164L.VE 4MOV- 2.e OPEN I PI&

r----START BFP 48 DISCH VALVE 4MOV-2.2. Cl-OSING-

~ ® VALVe tOO% c.w:>SED %!':5

4CP-71

~~-----® 4Cf>-71

BLACK I VEATCH CITY OF AlEXANDRIA. lOUISIANA LOGIC DIAGRAM COIIISUl111111 EIIIIIIIIIEEIIS I'., PROJECT 5765'

Ill. 8. 111118TEII EUCTIIIC: liEIIIERATIIII STATIOIII • IIIIIIT 4

f301LcR FE.;:o PUMP 4-8

DISCH VAL.V£ 4-MOV- 2.2.

C-6

Page 182: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

BLACK I VEATCH COIIIIUlTIIIIII EIIISIIIIEEI'II leJ PIIOJECT

~ lfi7(S

'/Cf'·/17

£LEer ScH£<11· I 8

c I TY 0 F A l EX A N D R I A I L 0 u I s I A IV A D. G. IIUNTift ElECTRIC _0£NmATIHQ SfATIOIII- UrlrT +

8owa~ FeED Pu11P Low OtscHARGE ALAii'"'!

LOGIC DIAGRAI>l

C-7

Page 183: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

CS "STAii?T'1

4CP-81

C.3 It pan

4CP-81

C:5 "sro P 11

4Cf'-81

CS "po• 4CP-SI

LP8 "Sn>P"

CS "NA START 0

4CP-81 w

4CJ'-61

CS 11 P011

4CP-81

STOP CONilf!llii'ITE 4C.P-IZI

PUMP4A G

4CP-91

CS: "STOP-STAP:T", wm1 TARG£r"1 !lPI(}NG RETU/i?N TO NORMAL. FROM 11~0P11 AND ':srARf: PIJL.L.OOT 1"0 L.OCK IN 1'Srof'

U'B: 11SIOf'- STIH?T" J 1'10/'1l'NT/IIN E:J-C:C 5CHEJ'1 - £. '/

BLACK I VEATCH CITY OF ALEXANDRIA, LOUISIANA LOGIC DIAGRAM COIUULTIIIII EHimiiS

~ I'IIOJECT

51Bf5

·11. II. IIIIIIITEII ELECTIIIC IIEIIIEIIATIIIII !ITATIOfl - IIIIIIT 4

CONDENSATE PUMP 'fA D-1

Page 184: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

CS "START 11

4CP-8t!!

C'5 'tpo'' 4CP-82

C5 ''STOP 4CP-82

CS 'PO' 4CP-82

LPS 'STOP"

-® 'ICf'-'J:t

CS 'NA START" 4CP-82

cs •po• 4CP-82

S7t>P

CONDE'HSATE PIJMP4B

CONDENSATE DISCH PRESS ~ 4-::;:PS:;::_.;so;;::::.::..:.:...::::....::::.:..::=:.....!..==---------.-;;'""'o-1~ ~

4CP-DO 8·5

w 4Cf'-82

4CP·I21

6

«P-82.

CS: "STOP-STAAT~ WITH TARGeT) SPI"I~G RE':TVRN -ro NOFlMAI.- PROM "51oP' AND 11 5TA1tr4 , PUW.<WT TO LOCK IN 115TOP~

LPI'!: 'srop- START 1 , f'I/OMCNrAR'/ ELEC !ICHE.M -£ f

II£VISIOI 011 ISIIU£

BLACK I VEATCH CITY OF AlEXANDRIA. LOUISIANA LOGIC DIAGRAM

D-:i....

Page 185: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

r---- 5,-;. ., s-.. , IJ.r•• f.,,.p

<;flier GNDEII<&Ii' EtHAu<TEt 'l·f:Y

$11¥llGJU

JJ&L.-4.> rr,~ h$6/¥0 Ol'~"" r111A1

E~ltGIZE. <St-{4-1

70 OP£11 v ... c ........ f'1111.1' !iue.r11111 VALVE

I I 11\llm !~.... I!, ~~ JJi~ .. ~~~~~~

('W'JE~tltAIIff!RriiA~wATBHfinrdiiHf @---@ ~ rs J &:t I(,,..,:J.t

'fCP-:f'( ¥PS-IS 'lf'f--t:J. '1?5·1/ W$-'i/

cltJS ¥Mil <tPS·Jif ¥1'543 '175·1

CITY Of ALEJ\ANDRIA, LOUISIANA D.ti.IHIH11R £UCTRIC G&NlllAn~G' ST41101¥·1.1Nii4

4-:t

~TS-1

~T5-J.

LOG1C OIA6~AN

D-3

Page 186: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

CS "STARr" 4CP-dS

STAf.T NCATU' I 0 LP fffiZ. 4A Le.-"VEJ.. LIJW -B-

VI?AIII PUMP 4

4L5-33 4<:1'-85

/!jjf) G CS "SI<lPu r.:::1 4CP-83 4CP-85 ~ ....

5T1lP HEATt'£..

c:::J nor DAAIII PliMf 4-

MO'fl:lR OV~P ~

5-( w

4CP-8:3 CS "Nil STAitr' 4<:9-83 VA

4CP-IZ.I C<: (r~·A'N4S'r.,p" ~ '/CP-t/J D

cs: 'STOP- ST'At7i 5f'l'l.IHG- RETIII!N TO ND~IIL- Fll!.dM ''YrvP" AND 'srn£1""

eu:c .:s<-HEM - f I 7

7.-73 i'>v£ I fV1'1 OAT£ llt:YISIOII 011 IIIII£ ... SY

BlACK I VEATCH CITY OF AUXAIUlRIA, LOUISIANA LOGIC DIAGRAM

COUULTIIIII IEIIIHIEEU II. 8. IIUIITEII ELECTIIIC SEIIEIIATIIIS STATIIIIII - UIIIIT 4 D-5 ~

I'IIOJI!CT

576S HE:ATe:R OR41N PIJMP 4-

Page 187: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

CS ":START' P-86

C..S 11 P0'1

4CP-8B

LPS '1 START" 4CP-BS

cs ''srof''' 4CF'-86

CS''po'1

+CP-I!HI

LPB "sToP"

r------·-~ 4<-P-96

r------------------4R LOCAL

TO LO E-3

cs "PO• 4CP-86

CIRC WATER pUMP +A SHUTOFF VALVE 41"10'1-26 70 'Jb Cl..QSI::D

TOLD E-3

M07l:lR OVERLOAD

\--------1. G-

4CP-SS

\.-------{6

LOCAL

CS~ "STOP- START~ SPRIHG RE.TIJ~ TO NORMAL FRO/'! "STOP" AND 'STAAT", PULI-01/T TO LOCJ< 1H "STOP'

LPB: ''STOP- ST,ART11 l>'loMe:NrARY ELEC SCH!:M - Db

BLACK I VEATCH CITY OF ALEXANDRIA, LOUISIANA LOGIC DIAGRAM COftiiL111118 EIIIIIIIIEEIIS

~ 5165

D. II. IIUIIITEII ELECTIIIC IIEIIIEIIATIIIIII STATIOIII • UIIIIT 4

CIRCULATING WATeR. PUMP 4A E-1

Page 188: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

CS '15TART" 4-CP-87

CS''PO' 4<:.f-87

cs ''srt>r' 4-CP-87

CS ''PO.t

4<-P-87

LP.8 11Sn:>P"

STAI<T CiRC IAII!::I f-o-WATf;'i. PUMP

48

Clli?C WAT~ PUMP 46 SHUTOFF VALVE 4MOV-2.4 70'11. CI.OSED zs

,-----------(R lleP-87

r---------------------~R

cs 11 Po11

4CP-87

CS. "NA STMT11

4CP-87

STOPCIRC WA TEFI. PtiMP 4B

'ICP-121 A-I

LOCAL

TOLD E.-4

.----IW

40'-87

TO 1-1> E-4-

\--------1 Q.

4CP-87

'-------{a LOCAL

cs: •sror- :STARr", SPRIIJ& RenJRN TO NCRMAL. TO L.OC.K IN 11Sn>P"

FROM 115Tl>P' IWIJ 1'5TART* PUW-OUT J

LP6: ''STOP- 5TART 4 MOM/!ii.IIJ711tRY J a.e;c S~EM- 0~

BlACK I VEATCH CITY Of AlEXANDRIA. LOUISIANA LOGIC DIAGRAM COIIIUL1111111 IEIIIIIIIIIHRS

~ I'RO.IECT

5765

D. II. ltUIIITH ELECTRIC IIIEIIEIIATIIIIII STATIIJIII • UIIIIT 4 E-Z CIRCULATING- WATE!R PUMP 4-13

Page 189: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

r:lll i ~ t-1-rl .I I ~5:::-c: =li!P

~ ~~~ U! !!• .......

:::C""l'

u () ~?il <:: 0 -t c:: ~~ "'I -; "11 -

~

~"' ~§ Ill "i

rr, ;.7;) 3: ()~ '<-:l

I "'tJ

fi;t

== !ll'n ·-- -4 ill-< llll ;;~c .. .., ... :;;):lo !:;: ,...1 I I I . I am ->< : ,..1 I I I 1

!~~ • ,..I~ 1~1 I 1 ... ....... ;:c :::!C::: ell -11110 ,_ill ... ,..~ •z ..

I

:,..ii 1..-L.-.JI

..... "' 0 G>

Ill -(") I

"" w -,... ~~~~--,... . :z:

CW PUMP 4A RUNNING-FJa::lM WJ E-1

41'1011-25 100 'Yo OPC:N ii!S

2.) 4MDV-e5 NOT CL.OSIN& ~

fffJ"'' 1.0-11!1 cvt PUMP 4A RDNNIII& Fl<oMLD ~-1

4MoV-2.S 100% OPEN Ji33

HIGH C.l-0:5/NG TO/aQO£ l!!.S

4/"'DV-2.5 N<>T DPiENIN&

CW PUMP #'< swroFP YA!..Vf_ 4f'IOV-2.5 i!S

START CW PUMP 4A SlfUTDFI~ ,-----o- VALli£ 4MOV-i25 OPj;A/1/JG-

.STOP CW PUMP 4-A SlttJ'Tt)FI" YAL!J/f!. 4-MoV- i".o DPi;::NIN& ~

J----srART CW PoMP 4-~ SHUTOFF VAt...VE 4MoV-t?:s- CU'JSIHG

tao% CLOS~

STOP cw PUMP 4A S/WTOPF" VAt...Vt. 4MDV-E!S CLDSING

TOLD E-1

4CF-86

H9

CVJ PVMP 4A SI+VIDFF VI\1-VE:- 4MOV·e5 IOD% OP!iH ll!.S ---EI------0

4Cf'-86 t=:LCC SCH t'.lf! - V 'iS

Page 190: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

"a::ll

r.lftl~~~ 1 I I I ~i:lll': •~~~~~t

~~~~ 01a 1 ~ . = ::z::

!Dn "' -......

Ll Q =-< c

~g !!lo :., iJ i I!:! )a> "1\J:> ... ,... TJ :j ~m z i;~ ~ q>

~~ ""Z :CI "'= IT\ ~-~ )I) ::!)II> J 1l 1111.

G C: "" r-<. l ... 0 ' .. l'l "I) !': c::: • ~ • '"r - < ~JJt.; •z-

:::0)11>2 "" a

I ........ 0 G)

P1 ... , 0

"'"' -• G>

"" l

CW PUMP 4B RuNNING-FROM LD E-2.

4MOII- 2..4 100~ OPE!N ~

cw PIIMP 4B RLIHNIIIIG FROM U> E.-Z

4MOV-e4 tOO% OPE!N ~::s

I+IGH CLOSING n:>R:Q(}f i'5

START CW PUI"(P 4f3 Slfi)TOFF r-----<,.;VAL\11:. 4MOII-24 OPE:NING

SiOP CW AJMP 48 SlfVTOFF VAl-VE: 4-MOI/· 24 CPE.NING ~

1----START CW PUMP 4/3 Slf!)TOfF VALli£ 4-MOV- 2.4- CLOSING-

STOP CW PUMP 48 SHVIOFF \A'II..VE 4/<IOV-2..4 CLOSING' ~

""~-2+ ·~ "'''""" I ~ ~~ "'"' _, ,,,-,_. _,. ,__ :. <OO. =5€0 ~ : R TO

w e:-e

4CP-B7 ~~ PVMP 48 '!>!fUToF-F VA/_VE. 4f'IO\'·C!4 100% OPeN ~ 0

Lj<.P-97 aec .sc.t+e:M - V 'il

Page 191: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

gc::a

~-~ s:;~~~; I SIP 0)! "'< " .

~ !l•S ::lc-:t == -!"n .. -...... ::l-< () !lc 0 ;....,., ()

r-~)> i ........ (j) ~...,

a !!>< "l>

~ mz m ;c :>1) ;::10 ~

,._ ::!)> z •• .......

t ~c !:ic:::: --=Mr ');:: "' .. •z-:::;l>a ... i

I! ......... 0 G">

fll -<"> I

"' ll'\ ... ~ll!h-.. ~

CS "STM?T" 4CP-B8

cs ''Po'' 4-CP-88

LP8 11 _,"TAll. T ''

f)(CESSI\IE VIBRATION

CS "SToP" 4CP-88

,..-------® STA~T COOLING I I 4CP-811 TOWE.R FAN 4A I

STOP COOL!~

TOWER FAN 4A

CS '15TII~T 11

4CP-88

C$ Hp~ll

4-CP-88

(S {r,ef.IIA S111t' [N;,j 'ICP-'48 /(a

--@ 4-CP-88

~----iw

4CP-88

cs; LP8;

"~5TOP-START11; MAINTAINE-D IN 1':5/0P' AND 115TAf<r''; PULJ.1)UT IN ANY PO:StT/ON 11 STOP-:STAI::r'\ MoMI!!NTARY CONTACT

EI-U 5CHE:M- F I/

Page 192: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

nc:a ~~s; =C"2 5:::-:

: .. ~~ "'~ "' Ill ~a;...,.

:;:n == -!"n ... -....... z-< c:

(} !So ~ ; ......

~)> ~ ... ,... (j\ !lm

d !!!!>< "l>

~ '"'Z IT• ;c 1\) l:::a lOo -Jl :::!)> ':!:> ••

~ ... r-... c -~>-j:=

~ :::! c:: -0 Col) • •

c: )> !! z ""l>

~~ I ........

0 G> -Ill ..,

I 0 OJ .........

- lh-..

c

cs ~~Po~~

4CP-88.

LPB "s~RT''

LPB •sroP"

EXC6SSIV£ VIBRATION

cs ''sror" 4CP-8S

,------® START COOLING I I 4CP-89 TOWER FAN 46 r

sn:>P COOLING­.TOWER FAN 46

CS "STAR:I11

4CP-BS

cs "Po" 4CP-8S

,---------------~G

4CP-8S

4"-P-121

cs: U"B~

'STOP- STA12r'; /1AII'IT/l1NEO IN "srot'' ANI> ''sr!*T", PULJ...OVT 115ToP- STA!<r'; MOM!!if'/TilP-Y Ct:J!VTI/CT

tN ANY po51Tir>IJ

aE-c. s=EM - F I I

Page 193: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

~is; !~ lAP

21 h:< (J'! ... -~ "' !t iii ...... :::c-, == -

!"n !D~

f) "'-< c:: 0 !ic 0 r :-n z

~)> (i> "'r-

d "m ;;:>< ~ ;:;l>

~~ ~ ;>I)

~ e ~I§~ :!)> "" :>: ...

j\.

m r- w () = Q V\

~c::: ic;;ill ');~ c:: .. •z

i ::;)> ... li

I ........ g

l'l -(") I

"' -..._J ... ~~ .... lll: "' "'"' ..

CS_'Y;1ART" '/G P -"' 0

cs ''Po' ~ ... I A/"r>_Qn

LP8 11.5TAJ'lr" ,..s-

l .. .f'B ''S"R>P' !NoT! .-

"''""' "'""" l"'J : 6 cs 'sToP' INOTJf---..... ..;P 4cP-so NOT

!!La, ate O!!ERI.oA a !NoT! 111'1 I

START COOLiNG TOWER FAN 4<:.

ST()f' COOLINEi

TOWER PAN 4C

t--1 ® 4CP-90

I ~ 4CP-.90

S-{ ~ cs '' START 11 , 4C.P-SO

4<:-P-90

cs '1f'011 c:J

4CP-9o ~

C) 'Srodfi'A )roe.,~ 'ICP-"'o No 4

'----+~ 4CP-121

cs: LPS:

"srop- ST1'\itr'1 MAINTAINJE:O IN P5TOP 11 AND ".sTARr" 1 PIJU..OfJT IN ANY POSITION 11.5n:>P- SIAF<'T", f"'IY'IIe:N1711<'/

J;:l..EC .SCHt::M- F II

Page 194: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

~i§; !~ =· ~;; ... <

'-< 2 Ill~ ()) ... u-, !I Ill ......

::In == -!"n .., -. -4 =...c ...

8 !lo 0 :-n r l!!> z ... ,.... Cjl "m >=x -1 "> 0 .., z ~ :0 10 ... ::DI :,. = - ;;! \:;\, :n ::::! > .,. ... .:z. .., ,....

t = ol I~ !ic:::

= '"I! ~):at; •z-:::t>lii 41> 2

I .... "' 0 ... -fT1 ....

I 0 ()) ... ...

"" ~

CS 'SrA!eT" '/CP-V/

CS 11 PO" 4Cf'-!ll

L-f'8 "START"

LP'B '' STop•

E)(CESSIII£ V18RATI"N

CS 115TDP" 4CF-SI

START Cl>OLIN& -ro~~ FP.N4D

,----------® ~ 4<:-P-91

STOP C.OOC..I NG TOWER I"AN 40

C.S "StART11

4C.P-91

CS 11 Po" +c.P-91

---@ 4C.P-91

I ~ 4CP-.91

4CP-121

CS: '.SioP-:STAIZT•, MAIN~IN£0 IN "SToP\1 ANP "srA~Tq 1

PVI-LOI)T tN ANY (>OStrtoN 1.-f' B: •SToP- START" 1 MOMe'Ni AI!.Y

£Lee :scHEM- Fl/

Page 195: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

... _ f]ffi~~~ 1 1 I I ~a=--= =· ~~;<

0') .... ~ "' !l iii ""'4 I::IM

I: :::a::

l:> <:;

" r-.1> lQ -<

!='n ... -...... =-c: .. !lo ;.,

!;; ~~ I I I I C? ~ m 8 !!!! Xtl-r-T II

ii~t"±t-H i ~1§1~1 1 I ~

~ ~ 3 ., .... )>

::!)»> .... ....... ~0 !:ic: ifii:. ·- .. c:>; •z­::::;>a ..,. B

.,., -

..... I g (")

0

im-.... ll: 'II .. -...

CS 'I<UN 11

4-cP-101

cs "AUTO" 4CP-101

DISCI-I P~S 1-o\W 4PS-/6

SEAL 1/11

C':l "OFF" IHOTI-------..., 4CP-IOI

Luw

SlOP AUX Ci..G WTI< PUMP 411

4CP-12J

I ~ 4-CP-IIIi

Sl1\RTAUK @ CLGo WTR. 4-CP-/01

I'IJMP 4A

SEAL IN

fA Aft< LEI/61.. H •ON 113 @)--@]

r='nu Lqw ~ AvKC.,oLINvw'A[ER DrgHA!j''if I/~ 'iCP-/'-1

II-i

'-/CP-111 I!J-'1

CS: 'OFF -AUTO, RVN", MAINTAUoJii'D IN 110FF" 1

"AVT0°, ANV "RdtJ 1

ffU;c :=>-111!'1'1- r/0

Page 196: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

r:.:Jill5;: c:> "RuN" _____ ____ ~w ~·~ 4C>Ll" ' = - K . "

8

AID cs ''Auro'' OR A

~ j ; c: 4-cP-Jo< '"" ""' "" '" 0\ "' !!! ~ 1::J CLG WTR 0. .... ··~ "'Me4B G

I" w ~ -• "' :C 015CH P~5S 1.. 0 NOT .... -..,.-!"'-n'-1 4PS-17 ~ lt;;;;J_

... - p ~ · -4 SEAL II'# ~ " i!i -< '"' ~ a C) r----------------~~ :i) ;:;: ""1'1 , FF" PIJr ...,. 311\RT AUX. ~ 4CP-102 Q ....... < ;;: > 40P-J02 """' 4B . ;1\l "" CS ° CL& WTR --t> ~ ; ~"--H!,Jtl. •!!/.!.lzL2..mzB..z.li..J/'l'..2.J/.ifJ•Rs:,1.tl.tl4!11lcAL ___ liiOT SEAl IN i. n l>• -' 1\' : z

•ct-rrn ~ ; :;:g g ":' ~ li> - ;;I -..)

~ ii ~ 1-t~-;-.,.-, ....... ~ ~0 ~ 3; ... c:: "" 'J -- '"' .,. : Cf.l Ill ~ lJ:j ·-c

c:l>., •z­=il>2 ... i

I ,... ... 0 .,

1'1 c; I o •

f\) - "OFF' "AV1D'; IWP ''llJJN !; . "OFF-AUTO-RUN' MAINTAINt;P IN ' -FlO ,.. 8 ;- CS • l £.LEC SC#,.:M ,.. . 31: .....,lsrt-ti . =~

Page 197: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

I I TT

'i='i'~ ..... ~~ =~·~;

i~~~:i mm ~ !~]~1~ • """'! i nm: ~ j~-f]~~~ ~ i!u_;.·:~~ ~ :·g.;2~~~

~i!~ii~ g.~·-;; 2 ... ,.

~~iil~i 1 l

• ~ :;; 2

~ 0

-~

' ~ 1 ~ E ~-

fi ~~ ..

! g~ .:!.i: • • -

b o ... .!.t:,; ~i]l!~]~~

~i"~i£~Ji ~:;-.:;::~~~g ~g:·;ogl!g-e

li i"il!~] ..c: " "' " B -~ ...

itmm '§ ~i;~i~i!

-~=Jl~~.:i: ~ ::::::':;~ i.s"E

~2~~~-o~i

~ =~ tii~·Ji i i~f:!!!

~j~£[];£!

;:

-~ j ' ] ' .. • ~ ~ ;.

~ ] • ~ g 1l ,! ! ~ g.

' • • ~ 0

" ~ ! ~ ! "

I l

I

I

Page 198: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

P8 ''&OlLER EMERGENCY TRIP''

4CP-!Z5

FJiOH BAftiV SYSiEi!

AtR fLOII < 2.5%

4fT-7 {SWITCH IN TRANSHITT£11)

fO fAH 4 RUNNING BREAKER COHTI\CT

fD FAN Dlff PR£SS LOW

4PS-42

FURIIACE PRESS HIGH 4PS-44

BOILER 0>\IJM L£V£L HIGH

4LS-Z8

4(;P-126

4CP...126

BOILER DRUM LEVEL LOW To J \ ' I 4Cr::rf6 I 4LS-29 ON

1

PB: "BOILER EMERGENCY TRIP", IIOME~TARY CONTACT

P8: "MFR 'A' RESET", IIOII£NTARY CONTACT

""""'o~• AN~ REOOR~ or'"-"~

TO lt.l G-7

.........

~~.)In' I c~ IAI'P

TO lO G-G

SEAL IN

Tll LD G-3

TO tO G-4

fUfL GAS SSV-! OHII Fl«iM···co--G-4

TO LO G-S "'""'? MFR "A"

TO BAilEY S'(Sl£1'1 FIJEL OIL SSV-3 OPEN

Fl\011 LD G-6 TO LO G-7

TO lO ll-7 v

MFII "A" ENERGIZED

SEAL IN

PB "MFII A RESET'' ~01

4CP...126

SAllEY PUIIG£ CREDIT

Fl\01'1 BAILEY SYST£1'1

AANUAL PURGE CREDIT

'"

Ff ""~' y SYSTU!

TRIP TO MILE l'lfR •'II" FROM tO G-7

Mfll "S" ENERGIZEII FI\OM l!l G-3 TO lO G-7

TO tO A-4

TO lD A-S

IIFR "A" £Nfl'.GIZE0

Mf"R "B" TRIPPED fROM tO G-3

I'IFR "B" ENfMtzE!l 4C-!2.1

Fll011 t!l G-3

MFR "A" TRIPPE!!

MfR 01SAGR£EHENT ALA~M

HEC SCHEM Pl, PS

:.."":"' • .'O:~':,'~o:;.:;;;,==,~,BLACK & VEATCH CITY Of AlEXANDij:IA, lOUISIANA :!,_V :...:. ,':"'u:"~ ,:.::-::....,_ "'""""' COIUIOlTIIQ ~III;GIUEIIS II. I. IIUUEfll UEJ:UU: IIEIIEiiAtllll SfATlOII. Ullll4 N"'-

• --- ~ ··= , ,~~ 5765 I BOlU~ SAF!:TY INl!'l\l.!lCK SVSTfM

I AASTER FUtl 1\£1.1\Y A

" ,_,

Page 199: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

" " ~ ' b X :1 ~ ~ " " 5 5 5 5 5 • 5 5

• • • • • • • • •

. " ::

J > • ! < • 5 5 • 5 5 5

• • • • • •

::Z

:h

.,. :adi ... §; g ~-Q> ~: 5 > <! 5 s ii! ~: o • ... >" ... xo 0" ~- ~ ~ ~· """ • ~· :l 0 • • >. t:..:

' ~-"

~ =· u• :;; ..... ~ ~ • ~;;; , ... .. :

:::.=:"5

iJ ~~ ~: =· '"!

I J 1;: ''!' ~~ fi I ~~ !,,, !"-~< d:jh II Iii! ... , I , ~!t~ . !

~ • " . " " ~ • " :: ~ ~ ; b > • • • " ~b I b • ' ~ ' ' 5 " 5 ? • . >

~ 5 ~ 5

• 0 ~ ~ i~ ~ ~ ~~ ~ • • ti " ~ • •

! i .

5

Zt 9~

g wS

i i ~~ g E ~ i

.. ~ ~ ~ ~i ~ ~~

~ .. • ' ~ • • ;~

" ~ ~ ~ ' 0 0

8 ~ ~-g~ ::! ~ ~ . '1.

? • • " ~ ~· •• ~:,

~;[ ~ $ " .,. ::! ~ ~;;.: ff • • • " :n, • .. ..

""

Page 200: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

5 b

!ig

... zi ... .

. ~

• • :1 0

~ ~ ~ ' ~ ~ f e ~ ~ ~ ~

;;:~ ~7 :;~ : ~ o• ~· ~g ~~ =· li~ o; g ~ "" ... x;;

;~ ws ~-... ~· ift 0. ~· =· uo

~~ * ~

~::::: • ~::: =· u• • ~·· !o ..,. _:.· w• ... ,. < .. : ~s

i uo il <" ~: =· ~ jii

I ,, ·•I 'f * • !II, ; !ui ""h ~<Sir

II;! h ' ~ ...

a:t " ·:.'!· t• e~z ee~ ~;!;; ;i:~~ ; .. :: ~15; --· :: ~ ... -.. ~~e ~!:~ ~i~ ~::to -··

• i ! ' i ' • ! ' I

h •• I ;

i

• •

Page 201: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

... : ., .

.,. ~ ~; =• " QW

~ ... ~:

:!~ ~~ =. •• Qa

·~ ,. . .... •· ><• Wt . ' ~- ~:;; ...

• • • • • ~ ~ ~ ~ ~

~~ • >. t:,..; u.

e ... " "" •• !:~ <>~~ 1~7 t=ffi: ••• *Zi ~;~ :~=~ ~;~ . "

~t3!:!~ ~~~ ~~~~ ...,i:;l=! ~~~:! ••• ~t~~ ~;z ~z'i 'fU'fO

ffi*W ~e~~ ~0~ ~e:l:e 7 ;!

g * ! .,

~~ • •

t =· i ~= ,; ~; ~ ~ • ~il il .. : ::.::S ~ ~· il ..,. ~= =·

" .-,

I ~~~ • ~ !I • 1!,, !j ' ' hi!

;

,, l lj· " i•·j ! ~ -"

i I

;

i ' I ' i

~ ~~ '

•g

"" li! •• ••

' ~13 ~~

Ei ~ g ~ " ~~ ~ ~ ~ ~ ~§'

~ ~~

i ~ • , . • ~ ~ • ~ •• § ~ lj 7 ~:C • • .. " • " •

••

Page 202: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

• b ;(

' ' ~ ~

• iJ '· iz !H,

~~ ::!~ .. "· .. sffi g* il:S l;l~ •• ~~ ~~ !:::

~ 0

~

• ~ " • ~ ~

• :1 > i ;; :1 ~ , f

~ ' ~i • ~ ~ ' ~ ' !I ~ ~ " i~ ·- ~ :; • e •

* • ;; • •

~ ' ~ ~ > • ~ • • •

~ ~ ~ ~ ~ z ~':.: ~i:J

~ •• 13:!. ::!~ ~~ •• ~H!

~

~ § • ~; i ~i w

' • " "· ~~~ H

* * " " • ~ ~ " "

~

h b ·~ '

~: •• " ~~

" ~ ~.i

~ ;,.·

? ' :>:ffi :L?

~ g •• ~~ • ~ • • • ~

<! z• ::5':' ~· :;~

"" ·= ... ... Q. zo "'" ><< ~-:«2 ~5 >. !::oi ~-

T1 II I

" ~ .. g~ ;;!~ .. !; ~;;:l

~~

~ •

I !

I

Page 203: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

WI\ "A" ENERG!UD Fiitii<i i:-ii-G-2

KEY'S\I!TCH ''EN1<8lE" 4CI'-126

MilEY OPEN COMMAND FROM BA!iXY--SrsT£l'f

KEY SI/ITCH "!HSA6lf" 4(1'-!21>

TOG "OPEN" 4Cf'-126

4511-23 OPE~ SEAL IN

TOG "CLOSJ:"

4CP-l26

Mf'R "S" £NERGllEO FRtlM--LO G..:J

KEY S'ilTCH "ENABLE"

4CP-!26 --~~ .. !lAlLEY OPEN COMMAND FROM i!AIUY SYSTEM

~EY Sl/lTCI! "DISABLE"

4CP-126

TOG "OP~N" ~

4SV-Z2 OPEN

SEiiLitl TOG "ClOSE"

4CP-!2S

FUEL GAS Hfi\OER PUIWE

TOG: "Cl!IS£-OPEN" SPRING ~ETURN TO CENTER FROM "OP£N''

MONITOR MOOE

fROM iiA!lEY SYSTEM

~ty SlllTCM "OISASU"

4CP-126

SYSTEM "A" PURGE PERM!SS!VES SATISFIED

FROH LO G-2

SYSTEM "a" PURGE PERHlSS!VES SATISFIED

FROM LO G-3

t> MFR "B" TRlPHO FROH lO G-3

AIR HEATER RUNNING

FROH lO J-1

""

E!IERGIZ£ 4SV-23

OE-<NERGIZE 4SV-23

ENfRGIZE 45\1-24

SEAL IN

"" '"

s~v~nRG!lf f--"-----------1

4SV-24 ClOSEO

SEE lll G-2

SfE lD G-3

Mllll!\l BOilER PURGE CREDIT

KEY SWITCH "tNASLE" 0

START PURGING FtiH GAS I!DR

STOP I'URIH!tG FUEL GAS HDR

§--(0)

4CP--121>

MfR "A" ENERGIZED F"IWM-CtiG=2

KEY SlllTCH "ENABlE" 4CP-i26

KEY SWITCH "!!lSA8LE" 4CP-126

TOG "OPEN"

4CI'-12ti

4511-21 OPEN

SEAl IN

TOG "CLOSE"

4CI'-\26

11FR "tl" EMUGUE!I FROM LO G-3

KH $_\llTCH "ENABLE"

4CP-126

!lAllEY OPEN COI'oiiANO FROM MilEY SYSTEM

KH 51(!TCH ''OlSABtE"

4CP--IZ6

TOG "OPEN''

4CP-l26

4SII-22 OPEN SE£ TIHS SH££T

TOG "CLOSE" 4{;1'-126

!'llOT GAS HEA0£R PURGE

ENERGrtE 45\1-21

DE-ENERGIZE 45~-21

ENERGIZE 4$11-22

OE-ENERGIU 4SV-22

4SV-2l OI'EN

Sf£ TillS SI!HT

45\1-22 OPEN SH TH!S SHEH

4SV-21 ClOS£0 Sf£ tHfSS!itiT

4SV-22 Cl0Sli SH THIS SHUT

TOG: ''CLOS£-OPEN'', SHJNG 1\HU~N TO CENTER FROM "0~£11'' IIAINTAINEO lit "CLOSE"

PURGE IN PROGRESS

PURGE COMPUTE

4Ci'-!26

SEAl IN

SEAL

"

START

~~~HN~s

IANit-'STOP PURGI~G

PILOT GJ\~

'""

4CP-126 4CP-!26

KEY SI/JTCH "OlSA6LE" ~ KH SWITCH "I'NAaLE-DISJ\BLE' , MlNTA!NEO, KH lltTUAT£P

4CP-121> 4CP- 26 ELEC SCHEM PJ, P4, P7, Pll

" ---------1 ~~~-~-.

""-.,_

...... -........

., _ _,,......,.,., ..... ,......,._,. ............. '"""" ................... ,, ::..:. ,"!'',.:..~ .,"::",:"'""- .... ....

BLACK & VEATCH CITY OF ALEXANDRIA, LOUISIANA :.1.' COUUUIIS l!IGIUUS D. G. IIU!lTtll HfCTIIIC GEilUTlffli SUTIOII. Uli!T 4 1<0.

fEiJ ··"~-· I BOiLER SAFHY INTERLOCK SYSTEM

~ 57GS PURGE SYSTEMS AND KEY SWITCH

H

Page 204: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

cs "SIART 11

4CP-9e

CS 11 AVTO"

§-- ISTAI?.T AUX Oil... PIMP 4-

4CP-92.

~ 1.-t.ISE OIL PREss t..OW

PS-52. C5 "PO" -8-'(CP.'1d.. AHOl G

CS "5ToP" :.::.::J 4CP-!!!e.

4-CP-92

CS 11PO~ ®-- STOP AtJX A-GP-~e OIL PUI'IP 4-

w

B--1 4CP-92

cs •AIITO" RA .VA

4CP-121

AUX 011. PUMP D/504 PRESS NO~IIL.. ® 41'S-53

cs: 11 STOP• ~TO- STA~'. SfF/.ING RE'TURN 71::> '14ufl"' FRoM "sroP' ANC> '.:! 11tli1T~ FIJL-1-0Vr OUT TO L-OCK IN '::JTt>f'

f"'._EC SCHiiiM - E 3

~ ·?] /~~[IF' / !fOI'I DAT£ 11£VISIOII 011 I IIIII£ 110. IIY

BLACK I VEATCH CITY OF AlEXANDRIA, LOUISIANA LOGIC DIAGRAM

COIIIUL1111111 IEIIIIIIIEEIII . D. II. IIUIIIITEII ELECTIIIC IIEIIERATIIIII STATIOII • UfiiiT 4 H-I

~ I'IIOJECT ~

5765" AUXILIARY OIL PUMP 4-

Page 205: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

n c:D

[lffi i ~ 1-1 -+-rr 1 ~;::~~~e =liP

~ ~~~ ut !:1• ......

l:n == •n

~ ;.. ::::; ()> ; -< IT! • Q ~ =., - .. :0: .......

~ ;;; ~ 1-I-+IT I ~ ~ m 00

!!! >< 1-1 -r-rr 1

ii~~ :::! >ffijj 0

f •• ~ .. ...-~ =Q "ll !: c

ic;;ill ·-< c:>;;; •z­::;>!il ... i

,...I o"'

:r: G> -(") I

1'\) "" -,... ... ... ~

CS 11STA11:.T 11

4CP-96

CS 'AUTO AF7c:IZ :STARr" 4CP sl!i ------.....;

CS "AUTO AffEii! SroP ''

4<-P-96

8Kl3 t SEAL OIL PRESS J..OW 4PS- 5"4-

c:s "Aura" 4-cP-es

C. SEAL IN

8ta5 4 SEAL OIL. PRe:5.S lOll/ 4-PS-5"4-

SI'AL IN

CS ".:sTARI" 4CP-96

CS 0AIJTO AFT!Efit. .:SIAA1 11

4-CP-96

STAI!.I 1¥:1~ BRG 11 S£41;-J V OIL. PV11P 4 SEAL. IN

C$ •po• 4CP-96

·I ~

STOP AC

i9RG 4 SEPL OIL PUMP 4-

4Cf'-9S

r-------{3 4CP-S6

4cP-121

AC f51(G /I .seAL- OIL- PUMP DISCH PRE:SS NOR/tiAL. ® +I'S-5"5

4<:1'-96

I'IOfOR. OYEKLCWI > IISo/o ~·iJ @]--@ cs: "5TOP-AU1n- START~ SPIIJ/VG RETUAAI Ttl ':t\11;1)" FIZOM "'SToP" ANTI nSTA-~• J

f'UI-!..01!1 TO Lf>C:K IN "STop•

4C P-12/ B-7

ELEC- SCHEM- f:)_

Page 206: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

n Cl3

~~~ ;:;~~~~:

=liP \lj ;a ... < "l 2 Ill~ 0} "' !! "' !:1• ....... :l:c-:a

i:::c -!"'n !"=i

R '"'-< c:

i :!!lo ;..., :;!!)>

~ ... ,..... <i> !:lm ~ !!X

"l> 0 •z ~ ;0 ~ ~ ;;l~lj I"

() •• ... ,..... ;: ~0

~

~;;;I" :1 1l . '" -< i' ~>; •z-

=l)>i ... 2

I ........ g

:::t -(") I

"" Ul ... ~~~~--.... X

CS "START" 4-CP- 99 - -----

CS 11 A<lTO AFTE;? STAi<T" 4CP-99

cs "Aura Arr<'R ~/DP" 4CP- 99

H'IDROITE)I 5E"AL OIL. PRIE'SS <.ovv 4f5-56 --------....;

DC 13RG 1/ S~AL. OIL l"'f!ESS Low

4PS-57

e> SEAL IN ,.j

C::. '' :STOP11

4CP-9.9

c.s ''Po" 4CP-99-

X- BRG If SEAL OIL PUMI' PI5CH Pl<eSS NDIZMAL- 0 4PS-5d

4CP-99

M011Jiit OVt!<:WAD :;:> liS"% ~ 016 RA VA

"!CP-I'-1 f)-7

CS '1AUT<l 11

4CP-99

SfART oe BRGt :sEAL OILPUMP4

cs 11P0 11

4CP-99

STOP DC 6RG II SEAL OIL PUMI'4

St:AL IN

cs; "STOP-AU Til- Sn\RT11 > SPRING RETrJKN TO ''!tiUrD" FRIJM '151of'' AND 11.:IT!+IlT", PVI-1--0UT TO 1--0<-1( rN '1 ,>TOr'

I ~ 4cP-ss

+CP-/et

ELeC SCI-tEM-/1/

Page 207: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

cs ''SlOP'' 4CP- 9Z..

CS ''po'' 4CP-"'e.

B CS ''STOP 11

4CP-100 4CP-96

;@)-4 CS 11 P0 11

4-Cf'- 96 13

4CP-IOO

cs ICSToP11

4-CP-99

cs 11 P0'1

4CP-9S

cs: SE:fO L..D f!·l, i..D ll-a, AUD 1..0 H-3

EJ-E.C. SQ+IWI· J:. 3

It· 73 ~~~JJJI' I RDM

DATt IIEVISIOII 011 ISIIU£ 110. IY

BLACK I VEATCH CITY OF AlEXANDRIA, lOUISIANA LOGIC DIAGRAM

COI!ISULnl!ll EI!IIII!IEEIIS II. G. IIUIIITEII ELECTRIC IEIIIIEIIATIIIIG STATIOI!I • UIIIIT 4 H-4 ~

PROJECT

5765 TURBINE 4 OIL.. pUMP /1101 IN AUTtl

Page 208: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

n CICI

r::mJ~~~ 1 I I I ~5~ =r:~~~~

\'! hl~ o;,..·~ "~!l• ......

:::&"':» == !=n ., -..... X-<! c: !So ll:-n i~

z~ q>i !; ~~ 1 1 I I

"rn 0'~'

~t JQ

.f".f"

e)!. -1 ~ ~'a :t

i! ><1 1 1 I I "• :z •o ... .. :::Ia ~ -.1 ,._.., ~. •• .,,.... =o ~c:: ic;;rl! ·-< c::&lo;;; az­=t:z,.i ... 2

I ......... 0 G>

I -(") I 0

lJ) -"'"' :~1 "'"' . lll:: :'II

~

I I

CS ''STARI" 4CP-S.3

STAIIT IUKHIHG _ _ ·--'R\ ,------< ... GEAR 4 v

K§ .I CS 11NA START 11

4CP-33

BEARIN<7 OIL PRESS LoW jf/u7}---oo-4AND lf ?5 ->'f

MoTtJIU2veRLQA o

~STOP TIJRI\IIIIIG c::..:.r~ss:,<~R4

NOT! ,..j

TURNII'IG- GEAR 4- Cl-UTCH ENGAGE-D ® li!S

4CP-9<1-TURNING GI:AR 4- Cl..OTC.H PISEI\I&AGED ® ii!:S

4cp-94

C~ "NA SIART" .fCP-95

4CP-93

r-------------~6

ANV

4cP-S3

.-----0 4CP-S3

RAHVA 4CP-121

cs; 11SIOP- SIART' SfJ{IItiG RE.TtJR.N TO Nofi!MAL FROM "srop" AND 11 SIART"

I

E'L.E.C. 5C.fi6-M - F I

Page 209: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

n lCD

[jif]~~l 1 I I I ~5~ :AI&

'\ ;!!,..< '-le•rn (J)"'·~ Ill !l•...,.

:liM

~ "§7<1 "ll~ C> :c: I<) \I\

~ ()

""" r:: ... ~ ~ ; Iii Q IJI '1. \)1.

""~ 0 7,1

== !"n ... -. -4 '"'-< .. !!So ;-,

I; ~~ 1 I I I "m !! ><1 1 I I I "l> :=ztml •c ; :zl! I >-,......, ::!)> •• •,.... ~c !:ic:: :c;; . -

~c:)>~

!i! i

I r-1"' 0 G) ::r: n

I

"" 0) ... ~l!l' .... lll: ....

=l~

LPB "5TOP"

2) SEAL IN •I

/...P8 11 STAI<:r'

s> 5EAL IN •

LPB "STOP 0

2>

SeAL IN

I 0 sTART VA Po..: H 4CP-97

EXTRACTOR 4 \

STOP VAPOR SXTAAc:ro R 4-

L---------~-----------~5~/N

,------------------------{G 4CP-97

I ~ 4CP-97

NORMAL AFTE"~ ST1l/?T

SeAL /41

LPB; 11 STOP-START1', MOME/'ITMZY C[)N;t:lCT

ELEC .SCI-IfOM

Page 210: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

nec~

CJil~~~ 1 I I I ~5:11'1:: =· ~~~~ 01 !l• "'""'«

I:IC"'.\1

~ <

i\IJ ~ m 3)> Ill ~ ~ 2 -;G>

11\~ )(l> :r.­~<:

~ :>;1

~

=== !"n .. -....... '"'-< c:: !!lo ;.,

i;;~lllll "m i! ><1 1 I I I "::Jioo .. zoom ;c., "':::u .. =-;;1 :::!)> •• ...... "'c ~ ... c: ic;;:= ·-< c:l>; •z­::;l>s ... a

::r: I

-....]

I ........ g (")

~I I I I I ... ~~ U I I

1-PB "STOP"

<?.-.SEAL IN

LP8 "START"

3.-.SS:AL. IN

t..PB ''sror•

SEAL- IAI

smRT 6EARIN& DRAIN EHLAR&CMS:Hf EXHAVSTIOR 4

STOP 13EARIN<7 DRAIN

/:NLARGE.ME NT £XllA05TER: 4

---® 4CP-98

L-----------------;3 SEAL. IN

' G: 4CP-98

,-----1 \1'1 --4CP-98

~AL AFTER START SEAL IN

4CP-tet

LP8 ~ 11 STOP- START", f"{)MENTP.RY CONTACT

E:L.EC SCHEM -F3

Page 211: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

ia:t ~~~ S::lllli:

=laJIB \lj ~ "'< "' • !1: ~ a; "'-4

=c:-:a == -!='n ... -. -1 '"'-< c: !lo

i ;.., :;!!)>

<:;1 ... ,..... ~m !11 !!!!>< )< "l> $ "'z

~ !lilo _, :::::u rn lJ> -Ill :::!)> •• .... ,..... ~

= 0 := c::: ic;; ~ >r •z-::;>-a .. i

.... I g :t: -.,.. I "" -en ,...

~~~ ,... . 311:

LPB "STOP"

2.~ SEAL IN

LPB ".5TA1rr''

SEAL IN

LPB 'STOP 11

SEAL IN

START &LAND Eki-4A/JSTER. 4-

STOP Gt..AND EXHI\VSTE:.lt 4

r------------------4R 4CP-95"

L---------------------4B;>S~L IN

,-------------------~6 4Cf-9!>

I ~ 4-cP-95

NORMAL ~FrEft ~

GLANC EXHAUSTER 4 OISCI-I -r"EMP HI6H ~ 4TS-4 0/7

4CP-12.1 C-lj'

LP8: "sroP-START", MOMt:NTMl.Y COf•trACT

.fCF-IZl

S-e;C SCHE:M -r 7

Page 212: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

t-P8 'START'

GR' '""' W>Bf 0~ ~L St=:AL- IN 0 f'URIFIEf 4

S.fi4LI!l

-:-:::1

LPB "STOf'" ~

WA!cli' (,.EAL Los<; @-E1- ~ ;""·' "'"' ... "lf.F4I(O/Ic/i 5 W 1 t"C II PURIFieR 4- ·

/Vt"rnR f'lul'li1L ;,Ar>

.

LPB! "STOP- START' MC MI!!NTJIH~Y COVTACr . )

a..£.c ::JCH~M-f8 .

f.·7J I <;<;uE I lrDI1 DATI II£V I S I 011 011 I Sill£ 110. BY

BLACK I VEATCH CITY OF ALEXANDRIA. LOUISIANA LOGIC DIAGRAM

COIIIUL11111fll IEIIIGIIIIEEIII D. &. IIUIITEII UECTIIIC &EIIEIIATIII& STATIOII • IIIIIT 4 H-9

~ PROJECT

5765 LUBE OIL. PURIFieR 4-

Page 213: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

na::. ~Is;:

~~ =liP

\'1 ~ "'< -.( Ill~ Q) "'!! "' ~ Ill ........

l::n == -!'In ... -. -4 ""-< ..

)? ~0 ;-n ;>:))>

:!!:I> :r ~ ... ,.... 111 :t: ~m !; Ill !!X 11' l> "l> )lj ~ :=z 4\.'JQ •c )> + ;::1:1 ,. -jj l> ~l> •• ~ ~ ... ,.... =o -a !lc:: ~

ifn ~;: !!z -I)>

~~ I .......

g '-! -n I

0 -,.. ~~~ ,.. . E

c 5 II 5TARI 11

4CP-74-

CS "NA START" 4Cf'-74-

CS '15TOP''

4Cf'-74

MOTOR OVE'RL.OAO

r-----_.lo 8ufiNFff CtJNrRo~ S rs nr"''

STVP AIR HEi'IT E"R 'f

'-----iRA I ~

A.H '-/ TRIP

LPS "T!!ST"

t=NEKG-1 ZE 4:5V-27 Ttl START Afl 'f Ali< MOTOR

,~·f;NERt!HZE 4SV-27 TO :STOP AH lj AIR MOTOR

A,RIIu'Tfl? 'fA 1 I? ltD To f Jfv!VJJIA! c; Ol'l ~ '-1/'S-'18 '-/Cf-1).0

D-7

4CP-74

cs: '!51'llP~ smfl!.'r"1 WITH TfiRGIE:Tj SPRING R£TURN TO NOI<MAL FROM '1STOP8 /'t)JO 11STNer' LPB: "TEST", MOMeNTARY

E:L.E.C- ScltE.M -FS

Page 214: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

(1-4..

:!: Ul l:

...__ ...__ ~ ,. ...__ .,. '( ;z l)

~ UJ

u _J ,.

~~ csp lu ..J 't . ..,

~ e I

Q. lE:

~a: ':I:..J <C_ 1-0 O<:LU r!!§ (/) ..J

r d

~ ' "" Q.. ~

\... ~

~ J ; 0

ILl "' ID ' til t'. Q.. :> ...! .J

,_

BLACK I VEATCH COIISULTIIIIII EIIIIIIIIIEERS

I' &I PROJECT 575!5

lY t '::!--.,. ::> .... a. ~>!

':1:-' ~0 t~ Q..U) ~~ ~~ lrlu

()

"'r--. a:.~ v ~

~ >-~ at.~

~~ % \Uc~

~liz q~

: -~ill -~-- I </Ia.

~~ " :

~~ -\..1

CITY OF AlEXAN DR lA, LOU I SlANA LOGIC DIAGRAM D. G. IIIIIITEII ELECTRIC GEIIEIIATIIIII STATION • llllliT 4

/'IR HE:J• r£R 4 LU8f;- OIL Puc· a

AND COOLING- FAN

J-Z

Page 215: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

LC

hAl 'iPS-'1-fN cv 'lA tFS-'17 'IB 'ff5-'t'J

BLACK I VEATCH CDI8SUl111111 EllllllllfEIIS raJ I'IIOJECT

~ 5){5'

~ fCP-1'1(

P-7

CITY 0 DRIA, lOU/SlANA LOGIC DIAGRAM D. G · lfUI'IT£1\ !lECfRIC 6UURI\TIIII6 n'AiiOI<I- Uti If 4

FUNE DEr&crol({',;;oJ.IAt(S rA415 'r'A ~ '7 lJ

J-3

Page 216: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

··~

~uc-;;-.,J,.,,., [1/!Jt>IIE {£//.?I'P.

'/15 -(oJ

s; ,,.., L '"'"'" I "A "'-

'IL<;- (c.tJ

.

!i...... H£"1'1 !CA L 1/LS-FUiD

FC/MP (<t)

P;;t)~P/.IAT£ o/LS-37

1/YT>J? A 7/JI£. 'fL>-1'1

I lrDM OATt REYISIOII 011 18111£ 110. IY

BLACK I VEATCH COISUL'I'IIIG EIGIIEEIIS raJ I'IIOJECT

~ rus

CITY OF AUXANORitt lOUISIANA LOGIC DIAGRAM D. G. tiUilTE(' £ l.f tflf!C llENERAl'ING STATIO.,- UNIT""

BotJ.E/f (MMtCALf!UD /f.;MfS J- i

Page 217: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

C3 "STARI' 4-cP-75'

cs upoil 4CP.-75

LP6 •isrARr"

cs "sToP" 4-CP-75

CS "P0 11

4CP-75

LPB "SToP"

MOTOR ~RL.OI!D

START FD FHJ MOTO~ 4

STOP FP FAil MOTOR 4.

~CP-12.1 A- I

c:s "NA .s~r'' 4 -7'5

R 4CP-7,-

R

LOCAL.

10 BoiLEtrr;AF'Tf $'ymi"1 AllL

G

4-cP-15

G-

LOCAL.

w «P-75'

cs: ".Sl"'I'·STA6CT~ SPRING- RETI)RN TO IJORHAI.. ''srt>P" AND "sT'll\~tT', PULL-OUT TO LDcK

BLACK I VEATCH CITY OF ALEXANDRIA, LOUISIANA LOGIC DIAGRAM COIIIIIILTIIIItl EHIIIIEEIII

~ I'RO.IECT

S76S

D. S. IIIIIIITEII UECTIIIC SIEIIIEIIATIIIII STATIOIII • IIIIIIT 4

I=D I"AN MOTOR 4-

Page 218: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

C'3 ''START ' 4CP-76

CS " NA START'' 4CP-76

cs "Po 11

4CP-76·

LPB "STA<?T'

LPB "srop'

cs •ro' 4Cf'-76

e PUMP STOPPED

cs •po" 4CP·76

cs "NA STA,q' H

4CP-76

cs;

LPJ3;

':SToP- START"> Pili-LOUT "SToP· STAfl' >

3["01' FUEL OIL PUI"'P 4

SE'AL IN

BlACK I VEATCH CITY OF ALEXANDRIA, LOUISIANA LOGIC DIAGRAM

FUEL OIL P/JMP 4 K-2 II. II. IIUIITER ELECTIIIC IIEIIIEUTIIIII STATIIIIII • UIIIT 4 COIIISUL'Illllll EIIIJIIIJEEIIS

~ PIIOJECT

Page 219: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

''~"

... z w u

"' ... ... >-u z ... w u. .. ....

" ~ 0.

90

80

70

60

so

40

30

z 10

0

.... w w u.

0 < w :t: .J < ... 0 ...

"' w

"'

5000

4000

3000

2000

~ BRAKE HORSEPOWER

~ t ________ _._.-----------:::::::@:S:.G:·:=·~90~5;:~;:::== .. _._. .. o-:5 1000 r w

~ >IPSH

"" ...

0

200 400 600 800 FLOW- GALLONS PER MINUTE

1000 1200

CITY OF ALEXANDRIA, LOUISIANA

D.G. HUNTER ELECTRIC GENERATING STATION

UNIT 4

BOILER FEED PUMP CHARACTERISTIC CURVES

85 MW

4" S- BFIC 10 STG 3570 RPM PUMP NO. 48026 AND 48027

Page 220: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

BRAKE HORSEPOWER'-.

90

600 L 80 EFFICIENCY

70

sol 1- 60 .... z w w .. u ....

"' w 50 .. 0

-~ I ..

w >-:X: u .... z 40 1- / .. w .... u 0 ... ,_

IL w 30 I I

20 I /

101 /

200 400 600 800

FLOW- GALLONS PER MINUTE

200

I "' .. ;. 0 ... w "' I too~ :X: w "" ...: "' .,

0

'c..l 20

"" I 15 .... w w IL

.·~ 110

I >:

1000

"' .. z

I s

1200 1400

CITY OF ALEXANDRIA, LOUISIANA D.G. HUNTER ELECTRIC GENERATING STATION UNIT 4

CONDENSATE PUMPS PERFORMANCE CURVES

85 MW

14 APHC -6 1770 RPM PUMP NO. 017294 AND 017295

Page 221: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

90

80

70 I 140

... 60 z "' I u

"' so UJ ... 0. UJ

I w u.

>- I ~ 40 0 801- / w <(

~ UJ :X:

~ u.. ...J

6+ :t 30 <( ...

0 ....

20 I 401 /

1: I 21

4 8

/ __.-HEAD

BRAKE HORSEPOWU@ S.G •. l.O

12 16 20

FLOW- GALLONS PER MINUTE X 1000

--....._._ _j 800

--l'""

"' w

"' 0 0. .... "' "' 0 400 :X: w

"' <(

"' 200 "'

0 24 28 32

CiTY OF ALEXANDRIA, LOUISIANA

D.G. HUNTER ELECTRIC GENERATING STATION

UNIT 4 85 MW

CIRCULATING WATER PUMP CHARACTERISTIC CURVES

24 LFV 700 RPM PUMP NO. 1171 - 78 AND 1171 - 79

Page 222: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

"' w .... <(

"' "' w :c u

24 z -· I w

"' 20 ::>

"' "' w "' C) 0..

C)

16 u >< ;::

"' <( w .... "' "' 0

12 0.. w "' "' 0 :c

8

4

0

so

40

30

10

0

0 100 200

STATIC PRESSURE

SHAFT H·ORSEPOI'IER

300 400 500

VOLUME -1000 CFM

CITY OF ALEXANDRIA, LOUISIANA

D.G. HUNTER ELECTRIC GENERATING STATION

UNIT 4

FORCED DRAFT FAN PERFORMANCE CURVES

TYPE ZM3 - 8075 1160 RPM 115 F

85 MW

Page 223: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

4.0

95 F

90 F

w .... :::> ..J 85 F 0

"' ., <(

>-"' ::> u "' w

"' 80 F ..

0

"' w

" u %

75 F

"' "' ::>

"' "' w

"' .. 2.0 70 F

"' w "' % w 1.8 Q z 0 u

w

"' ::> .... <(

"' w 1.6

0.

"' w .... "' w

1.4 .... <(

"' " z 1.2 ;:: ...

..J ::> u

"' 1,0 u .... w .J

.8 !!:

0 .05 .10 .15 .20 .25 .30 .35 .40 .45 .50 .55 .60

STEAM FLOW TO CONOENSER- LB/HR X 106

CITY OF ALEXANDRIA, LOUISIANA

D.G. HUNTER ELECTRIC GENERATING STATION

UNIT 4 85 MW

CONDENSER PERFORMANCE CURVES 55000 SQ. FT. 30FT. TUBE LENGTH

7.28 FPS AT 56000 GPM 100% CLEANLINESS FACTOR

Page 224: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

w ... :::> ..J 0 "' "' <(

>-"' :::> u

"' w ::e u. 0 2.6 "' w X u 3

2.4

"' "' :::> "' 2.2 "' w

"' .. "' w 2.0 "' z w Q z 0 1.8 u

1.6

1.4

0 .OS .1 0 .15 .20 .25 .30 .35 .40 .45 .so .ss .60

STEAM FLOW TO CONDENSER-LB/HR X 106

CITY OF ALEXANDRIA, LOUISIANA

D.G. HUNTER ELECTRIC GENERATING STATION

UNIT 4 85 MW

CONDENSER PERFORMANCE CURVES

95 F

90 F

85 F

80 F

75 F

70 F

w 0:: :::> ... < "' w a. ::e w ... "' w ... <(

"" " z ... < ..J :::> u

"' u 1-w ..J z

55000 SQ. FT. 30FT. TUBE LENGTH 7.28 FPS AT 56000 GPM

85% CLEANLINESS FACTOR

Page 225: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

w ... "' .J 0 "' "' .. ,.. "' 2.8 "' u

"' w

"' u. 2.6 0

"' w

"' u 2.4 z

w

"' "' 2.2 "' "' w

"' .. "' 2.0 w "' z w Q z 1.8 0 u

0 .OS .10 ,1S .20 .2S .30 .3S .40 .4S

100 F

95 F

90 F

85 F

80 F

75 F

70 F

.so

w "' :::> ... .. "' w .. "' w ... "' w ... .. " C> z ... .. ..J

"' u

"' u ... w ..J 3:

STEAM FLOW TO CONDENSER- LB/HR X 106

CITY OF ALEXANDRIA, LOUISIANA

D.G. HUNTER ELECTRIC GENERATING STATION

UNIT 4 85 MW

CONDENSER PERFORMANCE CURVES 55000 SQ. FT. 30 FT. TUBE LENGTH

7.28 FPS AT 56000 GPM 80% CLEANLINESS FACTOR

Page 226: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

UJ .... :::> .J 0 "' "' <(

>-"' :::> u

"' w :>! u. 0

"' w

"' u

"" w "' :::> "' "' w

"' .. "' w "' z w 0 z 0 u

0 .05 .10 .15

100 F

95 F

90 F

85 F

80 F

75 F

70 F

.20 .25 .30 .35

STEAM FLOW TO CONDENSER-LB/HR X 106

CITY OF ALEXANDRIA, LOUISIANA

D.G. HUNTER ELECTRIC GENERATING STATION

UNIT 4 85 MW

CONDENSER PERFORMANCE CURVES

"' "' ::> .... <(

"' w 0.. :>! w ....

"' w .... <(

"' C> z .... <( .J :::> u

"' u ... w .J

""

55000 SQ. FT. 30 FT. TUBE LENGTH 7.28 FPS AT 56000 GPM

70% CLEANLINESS FACTOR

Page 227: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

100 F

95 F

w

"' ::l 1-< "' w

w 1-

0.

::> "' J

90 F w 1-

0

"' "' "' w

< 1-<

>- "' "' ::l " u z

"' 1-w

"' 85 F <

J

LL :::> 0 u

"' "' w u :t: u 1-

w z ..J

80 F z

UJ

"' :::>

"' "' UJ

"' 0.

"' w 75 F

"' z w 0 z 0 u 70 F

0 .05 .10 '15 .20 .25 .30

STEAM FLOW TO CONDENSER- LB/HR X 106

CiTY OF ALEXANDRIA, LOUISIANA

D.G. HUNTER ELECTRIC GENERATING STATION

UNIT 4 85 MW

CONDENSER PERFORMANCE CURVES 55000 SQ. FT. 30 FT. TUBE LENGTH

7.28 FPS AT 56000 GPM 60% CLEANLINESS FACTOR

Page 228: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

... .... ::> -' 0 "' "' < >-"' ::> u

"' w ::e u. 0

"' w J: u ~

w

"' ::> "' "' w

"' a.

"' w "' z w Q z 0 u

0 .05 .10 .15 .20 .25 ,30 .35 .40 .45 .50 .55

STEAM FLOW TO CONDENSER- LB/HR X 106

CITY OF ALEXANDRIA, LOUISIANA

D.G. HUNTER ELECTRIC GENERATING STATION

UNIT 4 85 MW

CONDENSER PERFORMANCE CURVES

80 F

75 F

70 F

w

"' ::l .... < "' w a. ::e w ....

"' w .... .. "' .., z .... < -' ::> u

"' u .... w ...J ~

55000 SQ. FT. 30 FT. TUBE LENGTH 7.28 FPS AT 56000 GPM

50% CLEANLINESS FACTOR

Page 229: 85,000 KW UNIT 4 ENGINEERING SUMMARY...Steam Generator II-3 3. Condenser and Auxiliaries II-6 4. Pumps II-9 5. Heat Exchangers II-11 6. Tanks and Air Receivers II-14 7. Control Air

w ... :::> ..J 0 "' ., < ,.. "' :::> u

"' w :e u. 0

"' w :X: u z

w

"' :::> "'

4.8

4.6

4.4

3.2

~ 3.0

"' 0..

"' ~ 2.8 z w 0 z 0 u 2.6

2.4

2.2

2.0

1.8

1.6

.05 .10 .15 .20 .25 .30 .35 .40 .45 .50 .55 .60

STEAM FLOW TO CONDENSER- LB/HR X 106

CITY OF ALEXANDRIA, LOUISIANA

D.G. H\)NTER ELECTRIC GENERATING STATION

UNIT 4 85 MW

CONDENSER PERFORMANCE CURVES

85 F

w

"' :::> ... < "' w Q.

:e w ... "' w ... < "' " z ... < ..J :::> u

"' u ... w ...1 z

55000 SQ. FT. 30FT. TUBE LENGTH 7.28 FPS AT 56000 GPM

50% CLEANLINESS FACTOR


Recommended