October 16, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 33 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG is hydrotesting approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 33 for the period of October 6, 2019 through October 12, 2019.
Transcript
  • October 16, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 33 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG is hydrotesting approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 33 for the period of October 6, 2019 through October 12, 2019.

  • Federal Energy Regulatory Commission -2- October 16, 2019 Filing Information EPNG is e-Filing this letter and report with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000.

    Respectfully submitted,

    EL PASO NATURAL GAS COMPANY, L.L.C.

    By__________/s/_______________ Francisco Tarin Director, Regulatory

    Enclosures

  •   

     

    EPNG WeDocket NProject N

    County/S

    ReportinEnvironm 1. Summ 

    Line NDurin

     MainpipinStatio2000 StatioNo. 2

     Line NHogglocatthe liand Mthen replaMetesegmsuccethen 

     2. Relev

    DurinsevenDelaw

     All eq All opNo an

     3. Envir

    No en

    eekly EnviroNo. CP19‐28‐Name: 

    State: 

    ng Period: mental Inspe

    mary of Con

    No. 31111 Long this repor

    nline  Valve  ag at Line Noon was  painMLV  1.    In

    on bypass lin2000 pig laun

    No. 1105 Hyg Meter Statied at the Mine.   After dMLV 4 were installed,  aced.    Wateer  Station  inment of pipeessfully testetested on Sa

    vant Environng  this  repon‐hundred  tware Basin E

    quipment wa

    pen ditch wnimals were

    ronmental Pnvironmenta

    onmental Ins‐000 

    NorWinCouOct

    ector:  Dav

    nstruction Ac

    oop Line:   rting period,

    and  Pig  Lauo. 1105 MLVnted.    The  rn  addition,  tne were comncher/receiv

    ydrostatic Teion and MLV

    MLV 5 tempodewatering,  jremoved anand  the  tesr  was  then n  preparatiobetween  th

    ed.  The nexaturday, Oct

    nmental Actorting  periodtwo  (702)  pExpansion Pr

    as checked f

    as walked o noted in the

    Problems/Issal problems/

    spector Rep

    rthern Delawnkler,  Ector,unties, Texastober 6, 2019vid McCullou

    ctivity for In

     piping at W

    uncher/ReceV 12 and MLemainder  othe  forms  fompleted andver barrel at 

    esting:  DuriV 5 was pushorary workspjumpers at nd test headt  headers  wpumped  ba

    on  for  hydrohe Line No. xt segment btober 12, 20

    ivities: d,  two  (2)  people  have roject.   

    for noxious w

    on a daily bae ditch durin

    sues and Co/issues were

    port No. 33

    ware Basin E,  Crane  ands 9 to Octobeugh 

    nspection Pe

    Wink Compre

    eiver  ModifiLV 5, Line Nof  the  graveor  concrete d a concreteWink Comp

    ng this repohed out of thpace locatiothe Line Noers at each owere  weldeack  into  Linostatic  testi3103  takeo

    between the19.   

    people  receivreceived  e

    weeds and fo

    asis to ensurng this repor

    rrective Acte identified d

    Expansion Prd  Upton  D

    r 12, 2019 

    eriod: 

    essor Station

    ications:    Do. 2000 MLVl was  delivesupports  fo

    e pad was popressor Statio

    orting periodhe pipe and n in order to. 3103 takeof these sited  back  intoe  No.  1105ng.    On  Frioff  site and e MP 41.0 te

    ved  environnvironment

    ound to be c

    re that no arting period.

    ions Taken:during this re

    roject Date: 10/16/

    n was painte

    uring  this  rV 1 and at Wered  and  spor  the  Keystoured at theon.   

    d, water in tinto the aboto remove aoff site, MPes were cut oo  the  line  a5  between Mday,  OctobeMP 41.0  tesest break site

    nmental  traial  training  o

    clean.   

    nimals had .   

    eporting per

    /2019 

    d.   

    reporting  peWink Comprread  at  Linetone  Compre end of the

    he pipe betwove ground tir pockets wP 41.0 test boff.  Fill pigs and  the  jumMLV  5  and er  11,  2019st break sitee and MLV 4

    ining.    A  toton  the  Nort

    been entrap

    riod. 

     

    eriod, essor e  No. essor e Line 

    ween tanks within break, were 

    mpers Hogg 9,  the e was 4 was 

    tal  of thern 

    pped.  

  •   

     

     4. Envir

    No en 5. Issue

    No la 6. Work

    Ta

    Ittere

    TfoC

      

     

    ronmental Cnvironmenta

    es and Concendowner iss

    k Planned fohe tie‐in of Lnd the ditcht is anticipatested.    Testeporting perhe chain linkorms  for  theompressor S

    Compliance Ial complianc

    erns Identifisues or conc

    or the FollowLine No. 311 backfilled.  ed that the t  results  of riod.   k fence at the concrete pStation bypa

     

    Issues/Resoce issues we

    ed by Landocerns were id

    wing Reporti111 and Line

    third sectiothe  second

    he Line No. 2pad at  Line ass line will b

    lutions: re identified

    owners: dentified du

    ing Period:e No. 3162 a

    on (between d  segment 

    2000 MLV 1No. 1105 Mbe poured w

    d during this

    ring this rep

    t Wink Com

     MLV 4 and will  also  be

    1 site will be MLV 12, and with concrete

    s reporting p

    porting perio

    mpressor Stat

     Hogg Metee  reported 

    completed.the  forms  f

    e.   

    period.   

    od. 

    tion will be m

    er Station) wduring  the 

    .  In additionfor  the Keys

     

    made 

    will be next 

    n, the stone 

  •   

     

    Report NPhotos Location31111 atCompresDirectionNorthweDescriptipig launcpiping.   

    Location31111 atCompresDirectionSouthweDescriptiditch prioNo. 3111No. 3162tie‐in.  

     

    No. 33 

    : Line No. t Wink ssor Station n of Photo: est ion: Paintedcher/receive

    : Line No. t Wink ssor Station n of Photo: est ion:  Open or to the Lin11 and Line 2 crossover 

     r 

     

     

     

  •   

     

    Photos Location31111 at418+00 DirectionSouthweDescriptialong theline ROW

    Location31111 at251+00 DirectionNortheasDescriptialong theline ROW

     

    : Line No. t Station No.

    n of Photo: est ion: View e new loop W. 

    : Line No. t Station No.

    n of Photo: st ion: View e new loop W.   

     

     

     

     

     

     

     

  •   

     

    Photos Location31111 at68+00 DirectionSouthweDescriptialong theline ROW

    Location31111 at42+00 DirectionNorth Descriptialong theline ROW

     

    : Line No. t Station No.

    n of Photo: est ion:  View e new loop W. 

    : Line No. t Station No.

    n of Photo: 

    ion: View e new loop W. 

     

     

     

     

  •   

     

    Photos Location1105 at MDirectionNorth DescriptiInstallinginto one headers. 

    Location1105 at MDirectionNorth Descriptia test heLine No. 

     

     

    : Line No. MLV 4 n of Photo: 

    ion:  g the fill pig of the test 

    : Line No. MLV 4 n of Photo: 

    ion: Weldingader into 1105.   

     

     

  •   

     

    Photos Location1105 at ttake‐off sDirectionNorthweDescriptiHydrostathe first s

    Location2000 at MDirectionSouthweDescriptiSpreadinthe MLV 

     

     

    : Line No. the Line 310site n of Photo: est ion:  atic testing segment. 

    : Line No. MLV 1 n of Photo: est ion: g gravel at 1 site. 

     

     

  •   

     

    Photos Location2000 at MDirectionNorth Descriptiinstalled for the chfence.   

    LocationCompresDirectionEast Descripticoncreteend of th2000 pig launcher

     

    : Line No. MLV 1 n of Photo: 

    ion:  Newly fence postshain link 

    : Wink ssor Station n of Photo: 

    ion: New  pad at the he Line No. 

    r/receiver. 

     

     

  • Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 16th day of October 2019.

    /s/ Francisco Tarin