  • 7/31/2019 9 - Skyway for Maint. Conf.

    1/48

    Presented by:

    Pepe Garcia, P.E.

    Steve Womble, P.E.In collaboration with

    Atiq Alvi, P.E. and Teddy Theryo, P.E.

    with Parsons Brinckerhoff

    Presented by:

    Pepe Garcia, P.E.

    Steve Womble, P.E.

    In collaboration with

    Atiq Alvi, P.E. and Teddy Theryo, P.E.

    with Parsons Brinckerhoff

    Yesterday, Today and TomorrowYesterday, Today and Tomorrow

    STATE

    OFFLORIDA

    DEP

    ARTM

    ENTOFTRAN

    SPORT

    A

    TION

    May 2006

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

  • 7/31/2019 9 - Skyway for Maint. Conf.

    2/48

  • 7/31/2019 9 - Skyway for Maint. Conf.

    3/48

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    SEPT. 6, 1954: The $22 million, 4-mile Sunshine Skyway bridge opens with twolanes between Manatee and Pinellas counties

    MAY 19, 1971: A second two-lane Skyway span is added at a cost of $25 millionBuilt west of the original span, it carried southbound traffic

    MAY 9, 1980: A phosphate freighter strikes a Skyway pier during a severe storm.A huge section of the span built in 1971 crumbles into the Bay killing 35 people

    MAY 11, 1980: The undamaged northbound span of the bridge reopens for two-way traffic

    A signature replacement bridge was envisioned by then Governor Bob Graham

    APRIL 30, 1987: A new, $244 million Sunshine Skyway opens. It is touted as saferthan the old bridge. The shipping channel is widened about 50 percent

    The bridge is considered the flag bridge of the State

    The bridge receives significant local and national media attention

    The bridge rates Travel Channels No. 3 of Top 10 Bridges

    NOV. 21, 2005: Bridge named The Bob Graham Sunshine Skyway Bridge

    History

  • 7/31/2019 9 - Skyway for Maint. Conf.

    4/48

    1971

    1954

    Yesterday

  • 7/31/2019 9 - Skyway for Maint. Conf.

    5/48

    Sunshine Sk yw ay Br idgeSunshine Sk yw ay Br idge

    Summit VentureBridge Impact 1980

  • 7/31/2019 9 - Skyway for Maint. Conf.

    6/48

    On January 31, 1981 Gov. Bob Grahamannounced that the new Sunshine SkywayBridge Would be a state-of-the-art concrete

    cable-stayed bridge.

    Sunshine Sk yw ay Br idge

    The Vision

    Governor Grahams

    Tomorrow

  • 7/31/2019 9 - Skyway for Maint. Conf.

    7/48

    HIGH LEVELAPPROACH

    Main SPAN HIGH LEVELAPPROACH

    LOW LEVELTRESTLE

    SPANS

    LOW LEVELTRESTLE

    SPANS

    Total Bridge length: 4.14 miles

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Bridge GeometryBridge Geometry

  • 7/31/2019 9 - Skyway for Maint. Conf.

    8/48

  • 7/31/2019 9 - Skyway for Maint. Conf.

    9/48

  • 7/31/2019 9 - Skyway for Maint. Conf.

    10/48

    MAIN SPAN

    Total length: 4,000 ft

    Post-Tensioned Precast Segmental Box42 Continuous Stay Cables, 21 per Pylon

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Bridge GeometryBridge Geometry

  • 7/31/2019 9 - Skyway for Maint. Conf.

    11/48

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    PE Ducts

    High Level Approaches

    Pre-Cast Column

    PT Segments

  • 7/31/2019 9 - Skyway for Maint. Conf.

    12/48

    High Level ApproachesSuperstructure

    PT Segmental Construction

    Sunshine Sk yw ay Br idge

  • 7/31/2019 9 - Skyway for Maint. Conf.

    13/48

    June 1984

    Main SpanPre-Cast

    PT Segments

    Sunshine Sk yw ay Br idge

  • 7/31/2019 9 - Skyway for Maint. Conf.

    14/48

  • 7/31/2019 9 - Skyway for Maint. Conf.

    15/48

    Stay Cable Dampners

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idgeMain Span

  • 7/31/2019 9 - Skyway for Maint. Conf.

    16/48

    Yesterday and TodayYesterday and Today

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

  • 7/31/2019 9 - Skyway for Maint. Conf.

    17/48

    Yesterdays GoneYesterdays Gone

    SunshineSk yw ay Br idgeSunshineSk yw ay Br idge

  • 7/31/2019 9 - Skyway for Maint. Conf.

    18/48

  • 7/31/2019 9 - Skyway for Maint. Conf.

    19/48

    TodayToday

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

  • 7/31/2019 9 - Skyway for Maint. Conf.

    20/48

    Non-Routine MaintenanceNon-Routine Maintenance

    Armored Joint

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

  • 7/31/2019 9 - Skyway for Maint. Conf.

    21/48

    Teflon JointReplacement 1993

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    22/48

    Spot Paint Project 1997

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    23/48

    Modular Joint Replacement

    2001

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idgeNon-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    24/48

    Access StairsSegmental Transition

    2003

    Access StairsSegmental Transition

    2003

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    25/48

    PT InvestigationCorrosion at

    Column 133 NBSeptember 2000

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    26/48

    NDT- Non-Destructive TestingNDT- Non-Destructive Testing

    PT Tendon Vibration Testing

    PT Investigation

    AcademiaCollaboration

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    27/48

    PT Investigation

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

    Destructive Testing

  • 7/31/2019 9 - Skyway for Maint. Conf.

    28/48

  • 7/31/2019 9 - Skyway for Maint. Conf.

    29/48

    High Level ApproachSuperstructure Inspection

    High Level ApproachSuperstructure Inspection

    PT Investigation

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    30/48

  • 7/31/2019 9 - Skyway for Maint. Conf.

    31/48

    Stay CablesVibration Testing

    PT Investigation

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    32/48

    Tendon Corrosion

    Tendon Failures

    Split/Crack PEDuct

    Grout Voids

    Contaminated

    Grout

    Salt Water inHollow Columns

    Segmental JointLeaks

    Concrete cracks Suspect PE Duct

    Quality

    PT Investigation Summary

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    33/48

    PT Repair and Maintenance Strategy

    Structural Redundancy

    Restoration of Corrosion Protection PT Duct Wrapping

    PT Void Grouting

    New Levels of Corrosion Protection Surface Coatings

    Pour-backs Caps

    Main Span Median Watertight Joints New PT Corrosion Protection Strategies

    Localized or Universal Repairs as Applicable

    Monitoring Program

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    34/48

    Geotechnical: Review of existing pile driving records Review of boring log Evaluate the existing foundation capacity (Florida Pier)

    Structural: Global time dependent analysis model

    Finite element analysis Vessel Collision Risk analysis Evaluate structural capacity of existing column and new repair options FDOT PT Corrosion Protection Improvement Strategies

    Materials: Mass concrete with fly ash or slag PT bars (45 mm diameter) Approved pre-packaged grout material Improve PT details Polymer coating (polyurethane)

    PT Corrosion Engineering Evaluation

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    35/48

    2001: Revised grouting specifications

    2001: FDOT allowed only Non-Bleed approvedprepackaged grout materials

    Since 2002: FDOT New Direction for Florida Post-Tensioned Bridges

    FDOT Five Strategies Strategy 1: Enhanced PT Systems

    Strategy 2: Fully Grouted Tendons Strategy 3: Multi-Layered Anchor Protection

    Strategy 4: Watertight Bridges

    Strategy 5: Multiple Tendon Paths

    FDOT PT Corrosion ProtectionImprovement Strategies

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    36/48

    Vertical Tendon Grouting

    Mock-Up Test Set-Up2003

    Vertical Tendon Grouting

    Mock-Up Test Set-Up2003

    PT Repairs

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    37/48

    PT Repairs

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine MaintenanceUniversal Repairs 2003

  • 7/31/2019 9 - Skyway for Maint. Conf.

    38/48

    Inserting Bars into Box GirderInserting Bars into Box Girder

    PT Repairs

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    39/48

    Pier Cap Coating and Crack InjectionPier Cap Coating and Crack Injection

    PT Repairs

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    40/48

    Protective Sealing RepairProtective Sealing RepairPT Repairs

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    41/48

    Shrink Wrap Sleeve

    PE Duct

    Shrink Wrap Sleeve

    PE Duct

    Heat Shrink WrapRepairs

    PT Repairs

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Non-Routine Maintenance

  • 7/31/2019 9 - Skyway for Maint. Conf.

    42/48

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Maintenance Steering Committee Maintenance Continuity for Expected Long Life

    Asset Maintenance Contract Inspection and Monitoring Services Routine Maintenance MMS 800 Series Activities Non-Routine (Periodic)

    Non-Routine Maintenance Asset Maintenance Project Specific Emergency Fast Response

    Engineering, Planning and Construction

    Management Support

    Todays Maintenance Plan

    Maintenance Steering CommitteeSeptember 1999

  • 7/31/2019 9 - Skyway for Maint. Conf.

    43/48

    S hi Sk B id

  • 7/31/2019 9 - Skyway for Maint. Conf.

    44/48

    Asset Maintenance Routine MaintenanceAsset Maintenance Routine Maintenance

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

  • 7/31/2019 9 - Skyway for Maint. Conf.

    45/48

  • 7/31/2019 9 - Skyway for Maint. Conf.

    46/48

    S hi Sk B idS hi Sk B id

  • 7/31/2019 9 - Skyway for Maint. Conf.

    47/48

    Sunshine Sk yw ay Br idgeSunsh ine Sk yw ay Br idge

    Media Attention

    Travel Channels Top 10 Bridges

    1. Golden Gate Bridge, San Francisco, California

    2. Akashi Kaiyko Bridge, Kobe, Japan

    3. Sunshine Skyway Bridge, St.Petersburg, FL

    4. Tower Bridge, London, England

    5. Firth of Forth Bridge, Queensferry, Scotland

    6. Brooklyn Bridge, Brooklyn, NY

    7. Chesapeake Bay Bridge-Tunnel, Virginia Beach, VA

    8. Sydney Harbour Bridge, Sydney, Australia

    9. Leonard P. Zakim Bridge, Boston, MA10. London Bridge, Lake havasu, AZ

    Gene Figg1937 - 2002

    13

    Pepe Garcia

  • 7/31/2019 9 - Skyway for Maint. Conf.

    48/48

    Bob Graham Sunshine Sk yw ay Br idgeBob Graham Sunshine Sk yw ay Br idge