9104-1 Rewrite Team9104-1 Rewrite Team
Report to the RMCRMC Annual Meeting 2008
23 January 2008
Title- IAQG 9104/1 Revision Originator- Michael C. Roberts Date- 5 April 2006
Initiative Summary- Revise existing IAQG 9104 document to accommodate changes as result of the release of IAQG 9104/2 (Oversight) and IAQG9104/3 (Training and Qualification).
Initiative pre-requisites/constraints/dependencies-
This activity will proceed upon release of IAQG 9104/2 and IAQG9104/3. (Published April 2007)
Initiative deliverables-
Published IAQG 9104/1 in the respective AS/EN/JISQ formats
Applicable to-
Aviation/Space/Defence
Estimated Implementation Value High Estimated Implementation difficulty- Hard
Planned start date- July 2006
Actual Start date: April 2007
Estimated duration- 1 Year
Realistic duration: 1.5 years
Estimated resource needs-
3 Focals from Each Sector
Initiative sponsored by- IAQG - OPMT Signed- (Sector Leader/IAQG member)
Colin Clarke – AAQG Chairman
Prime strategic focus subject addressed-
Management of Certification/Registration System
Strategy Group Initiative Reference Number-
OPMT - 1
Degree of strategic alignment- Full OPMT Alignment
Comments- Aligned to Implementation of QMS Responsibility of OPMT
Signed- (Strategy Team Leader)
Rick Downs – OPMT Chairman
Initiative Phase 0 Summary
• Justification of 9104-1Project
– The rewrite of 9104 is the last step in development of the “Trilogy” series of documents.
– The Trilogy will complete the commitment the IAQG and the sectors made to the authorities for a command media package describing the entire process.
– The 9104-1 project would be initiated after the publication of 9104-2 and 9104-3. Documents 9104-2 & 9104-3 were published in mid-2007.
– The 9104-1 will further define ‘controversial’ or ‘confusing’ text in the existing document, and will add new chapters defining roles of OASIS, resolutions, feedback process, sector management, etc.
Project Description
9104-1 Re-write Team MembersRole Name Representing
Initiative Team Leader Mike Roberts OPMT / Boeing
Team Sponsor / Member Rick Downs OPMT / Cessna
Team Member Tim Lee Americas Sector / Boeing
Team Member Vince May Americas Sector / Honeywell
Team Member Mike Gallagher Americas Sector / Lockheed
Team Member Patrice Bleau Americas Sector / Bombardier
Team Member Reg Blake Americas Sector / IAAR – CBs
Team Member Lori Scheid-Gillespie Americas AB / ANAB
Team Member Gualtiero Arsento European Sector / Alenia
Team Member Herbert Mairose European Sector / Airbus
Team Member Gerard Pleigneur European Sector / Safran
Team Member Pamela Wehlitz European Sector / MTU
Team Member Ian Folland European AB / UKAS
Team Member Hans Luijt European AB / ASD
Team Member Tamaki Nishio Asian Sector / IHI
Team Member Shuji Komori Asian Sector / Subaru-FHI
9104-1 Team Member Attendance
Te
le -
We
d
De
c 1
9 2
00
7
Te
le -
Tu
es
Ja
n 1
5 2
00
8
Te
le -
Tu
es
Fe
b 2
6 2
00
8
Te
le -
Tu
es
Ma
rch
25
20
08
Mtg
- T
ue
s
Ap
r 8
20
08
Mike Roberts p p
Rick Downs p p
Tim Lee p i
Vince May p p
Mike Gallagher
Patrice Bleau p p
Reg Blake p i
Lori Scheid-Gillespie i i
Gualtiero Arsento p p
Herbert Mairose i i
Gerard Pleigneur p p
Pamela Wehlitz i
Ian Folland p p
Hans Luijt p p
Tamaki Nishio p p
?
Attended
Sent Regrets
Existing Topics (For Revision Into 9104-1)
• Multi-site requirements interpretation– Multi-site definition (& expectations)– Sampling– Surveillance requirements– Multi-site frequency
• Define OASIS authority, responsibility, accountability– Improvement process
• Use and acceptability of Resolutions, process for – OPMT level and sector level
• Exact wording for existing resolutions (approx 20+)
New Topics (For Inclusion Into 9104-1)
• OPMT Charter – Rules of operation (OPMT 101, etc.)• Client/Supplier Responsibilities• IAQG Member Responsibilities• Use of process flows to improve the structure• Suspensions and withdrawals of CBs, ABs, etc.• Incorporate ISO17011, ISO17021, ISO17024, ISO19011,
& IAF Documents• Process for funding and expenditures of ICOP activities• Cross sector activities (auditing, recognition, training,
oversight etc.)• Feedback Process
Programme Schedule
No Activity
Year 2007 | 2008
A M J J A S O
N D
J F
M A
M J
J
A
S O
1. Call to Sectors for Suggestions and Inputs
2. Remove IAQG 9104/2 References
3. Remove IAQG 9104/3 References
4. Revise Format and Structure – Remaining Text
5. Add Suggestions and Inputs
6. Complete First Draft
7. Obtain Sector Comments – Update Draft
8. Ballot Document
9. Final Comments and Publish
10.
LateKey- CompletedRescheduled
9104-1 Table of Contents / Book Bosses
9104-1 Standard Mike R
Foreword Mike R
1. Scope Rick D, Tim L, Vince M, Gualtiero A
2. References Tim L, Ian F, Hans L
3. Definitions tbd – wait until last Patrice B
4. General tbd – wait until last Patrice B
5. Requirements for Accreditation Bodies Ian F, Lori S-G, Gualtiero A*, Mike G
6. Requirements for Certification Bodies Tim L, Reg B, Ian F, Hans L
7. Auditors (reference to 9104-3) Gualtiero A w/ sector lead review
8. Requirements for Assessment and Reporting Rick D, Tim L, Tamaki N, Herbert M, Ian F, Reg B
- 9101 reference Hans L
- Multisite Rick D, Vince M, Ian F, Reg B
9. Oversight (reference to 9104-2) Tamaki N, Tim L
10. OASIS Database Hans L, Jay M, Mike R
11. OPMT Rick D, First name listed is Book Boss for that section.
9104-1 Table of Contents / Book Bosses
12. Feedback Process Hans L
13. Sector Management Structure Tim L, Tamaki N, Herbert M
14. Cross Frontier Ian F, Reg B, Tim L, Tamaki N, Herbert M
15. Records Tim L
16. Fees and Financials Mike R
17. Responsibilities – (Note: 11. OPMT, tbd
13. SMS, and 14. Cross Frontier
may be grouped into this chapter. Will
include OASIS responsibilities)
12. Notes tbd
Appendix A – Information for OASIS Database Hans L, Reg B
Appendix B – Change Procedure for OASIS Hans L
Appendix C – Process Flows Reg B
First name listed is Book Boss for that section.
9104-1 Re-write Team Status
F Foreward Rough Draft Submitted1 Scope2 References wait until last3 Definitions wait until last4 General wait until last5 AB Requirements Rough Draft Submitted6 CB Requirements7 Auditors Draft Submitted - Changes requested8 Assessment & Reporting9 Oversight
10 OASIS Rough Draft Submitted11 OPMT12 Feedback Process Rough Draft Submitted13 Sector Mgt Structure14 Cross Frontier Rough Draft Submitted15 Records16 Fees and Financials17 Responsibilities
A1 Information for OASIS Rough Draft SubmittedA2 Change Procedure for OASIS Rough Draft SubmittedA3 Process Flows
Next Steps (30 – 90 Days)
Next Steps• Complete Outline / Table of Contents (Completed 12/19/07)
– Assign Book Boss / Section Leads (Completed 12/19/07)
• Last call of new/revised topics (Completed 1/15/2008)
• Resolve wording of resolutions (OPMT action)
• Resolve wording of multisite (OPMT action and SMS actions)
• Establish conference calls between sectors & team members to discuss any unresolved issues. (At discretion of chapter Book Boss)
Scheduled Milestones• All Drafts – complete and due March 26, 2008 (Sent to Mike R for
coordination into review document for Naples 9104-1 face-to-face meeting)
• Face to Face Meeting – at IAQG meeting in Naples (Team to review draft – discuss issues – assign actions – plan next activities)
Next Meetings
• Next Meeting– Tuesday, Feb 26 – Telecon
• Future Meetings– Tuesday, Mar 25 – Telecon
– Tuesday, Apr 8 – Face-face• Naples, Italy • 8:00am-12noon• Same room as OPMT