1
PIPELINE OF GOLD PRODUCTION IN NOVA SCOTIA
…applying Australian expertise to an overlooked Canadian gold province…
ASX:ATV
www.atlanticgold.com.au
November 2011
2
•Track record of gold discovery and production in Western Australia
•Focused on the same, but now in Nova Scotia
•Applying a new approach to a forgotten goldfield
•Assembled a Resource inventory of 1.2 million ounces – including Reserves of 454,000 ounces
•Project pipeline: Touquoy – next step: development
Cochrane Hill – next step: feasibility study
Exploration lands – next step: discovery
OVERVIEW
3
Fully paid shares 530.1M Partly paid shares (20 cents paid to 9 cents) 30.3M Options unlisted (15.5 cents, 12 months) 2.0M Market Cap:$20-25 million
CAPITAL STRUCTURE
4
Market Capitalisation per Resource Ounce
EV:resources (A$/oz)
5
DEVELOPMENT PROPERTIES
THE TOUQUOY & COCHRANE HILL GOLD
PROJECTS
6
7
Cochrane Hill
8
TOUQUOY
Total 11.7 1.5 557,000
TOUQUOY WEST
Total 1.5 2.0 99,000
COCHRANE HILL
Total 10.1 1.7 549,000
TOTAL ALL 23.3 1.6 1,205,000
MINERAL RESOURCES
contained million tonnes grade g/t ounces gold
9
TOUQUOY
10
TOUQUOY
Proved 2.49 1.48 118,000
Probable 7.10 1.47 336,000
TOTAL 9.59 1.48 454,000
ORE RESERVES
contained million tonnes grade g/t ounces gold
11 Touquoy geology and drillhole locations
12 Touquoy deposit section 21625mE
13
14
Low strip ratio – 2.5:1
Soft ore – BWI ~ 10
Excellent metallurgy – 93.5% (70% gravity)
Coarse grind - 150µm
Low reagent consumption – 0.4kg/t CN
Excellent CN detox
No acid rock drainage – carbonate, low sulphide
Grid power – coal-fired – 5km to connect
Excellent infrastructure
Keen local and homecoming workforce
No on-site accommodation required
Supportive government
TOUQUOY’S ADVANTAGES
15
Ore reserves 9.59Mt @ 1.48g/t
Production 422,000 oz
Mine life 5.0 years
Ave annual production 84,000 oz pa
Throughput 2.0mtpa
Initial capex C$123M
Operating costs US$505/oz
Gold price US$1100/oz
Project NPV (8%, ungeared, pre-tax) C$79M
Project IRR 32%
TOUQUOY SUMMARY FINANCIALS
16
ENVIRONMENTAL ASSESSMENT APPROVAL FEASIBILITY STUDY COMPLETED
MINERAL LEASE GRANTED
ACQUIRE REMAINING SURFACE TITLES
in progress
FINAL PERMITTING
Industrial Approval – documentation done
PROJECT FINANCING
Touquoy Gold Project STEPS TO PRODUCTION
17
COCHRANE HILL
18
COCHRANE HILL
Indicated 4.5 1.8 251,000
Inferred 5.6 1.6 298,000
Total 10.1 1.7 549,000
* Lower cut-off grade 0.5g/t
MINERAL RESOURCES
contained million tonnes grade g/t* ounces gold
19
20
REGIONAL EXPLORATION IN NOVA SCOTIA
21
22
Touquoy Gold Project NQ DIAMOND CORE – HOLE MR-05-084
121–122 m : 2.16 g/t
122–123 m : 9.23 g/t
123–124 m : 8.98 g/t
Argillite host rock with no quartz veins
23
24
25
26
27
28
•Acquire remaining surface titles at Touquoy
•Grant of Touquoy Industrial Approval
•Secure project financing for Touquoy
•Complete drill-out of Cochrane Hill and commence Feasibility Study
LOOKING AHEAD
29
PIPELINE OF GOLD PRODUCTION IN NOVA SCOTIA
…applying Australian expertise to an overlooked Canadian gold province…
ASX:ATV
www.atlanticgold.com.au
November 2011