9355.070 Cuba Road Bridge Preconstruction Meeting Summary- 10-23-15 MEMORANDUM To: Robert Kosin, VBH Director of Administration Brian Cecola, VBH Chairman Roads & Bridges From: Dan Strahan, P.E., CFM Gewalt Hamilton Associates (GHA) Date: October 23, 2015 Re: Cuba Road Bridge Replacement Project Preconstruction meeting summary A preconstruction meeting for the Cuba Road Bridge replacement was held at IDOT on Thursday, October 20, 2015. Copenhaver Construction intends to begin the project as soon as possible. As discussed previously, the project requires a full closure of the road at the bridge with an accompanying detour route. Message boards describing the detour will be placed on Monday. The contractor plans to initiate the detour route on Monday, November 2, 2015 and begin work that week, pending IDOT approval. Our office will send out notice of the closure and detour to Barrington Transportation Company, the Cuba Township Highway Department, waste haulers, police and fire departments, and the post office. We will also provide a letter to residents along Buckley Road, Cuba Road, and Merri Oaks Road to make sure those closest to the project are aware of the closure. We would recommend notice also be posted to the Village website. During the bridge closure, traffic will still be able to turn from Buckley Road to Cuba Road east of Buckley and vice versa; however, traffic will not be able to turn from Merri-Oaks Road north onto West Cuba Road as this area is included in the closure due to construction storage and staging requirements. The road closure is expected to last throughout construction activities; the contract specifies that the road will be reopened to traffic by May 13, 2015.
Transcript
Page 1: 9355.070 Cuba Road Bridge Preconstruction Meeting Summary ... · PDF file9355.070 Cuba Road Bridge Preconstruction Meeting Summary- 10-23 ... P: \ 8 1 0 1-9 4 9 9 \ 9 3 5 5 B a r r

9355.070 Cuba Road Bridge Preconstruction Meeting Summary- 10-23-15

MEMORANDUM To: Robert Kosin, VBH Director of Administration

Brian Cecola, VBH Chairman Roads & Bridges From: Dan Strahan, P.E., CFM

Gewalt Hamilton Associates (GHA) Date: October 23, 2015 Re: Cuba Road Bridge Replacement Project Preconstruction meeting summary A preconstruction meeting for the Cuba Road Bridge replacement was held at IDOT on Thursday, October 20, 2015. Copenhaver Construction intends to begin the project as soon as possible. As discussed previously, the project requires a full closure of the road at the bridge with an accompanying detour route. Message boards describing the detour will be placed on Monday. The contractor plans to initiate the detour route on Monday, November 2, 2015 and begin work that week, pending IDOT approval. Our office will send out notice of the closure and detour to Barrington Transportation Company, the Cuba Township Highway Department, waste haulers, police and fire departments, and the post office. We will also provide a letter to residents along Buckley Road, Cuba Road, and Merri Oaks Road to make sure those closest to the project are aware of the closure. We would recommend notice also be posted to the Village website. During the bridge closure, traffic will still be able to turn from Buckley Road to Cuba Road east of Buckley and vice versa; however, traffic will not be able to turn from Merri-Oaks Road north onto West Cuba Road as this area is included in the closure due to construction storage and staging requirements. The road closure is expected to last throughout construction activities; the contract specifies that the road will be reopened to traffic by May 13, 2015.

Page 2: 9355.070 Cuba Road Bridge Preconstruction Meeting Summary ... · PDF file9355.070 Cuba Road Bridge Preconstruction Meeting Summary- 10-23 ... P: \ 8 1 0 1-9 4 9 9 \ 9 3 5 5 B a r r

J~ 0

11 0:::

0 -0:::

SPRING CREEK RD

FILE NAME = 4853.000-Detour.dwg USER NAME = DAN STRAHAN DESIGNED

DRAWN

PLOT SCALE = ," = .OB33' Q-lECJ(8)

PLOT DATE = 03/20/2015 DATE

OAK KNOLL RD

- DJS REVISED

PJS REVISED

- DJS REVISED

4 REVISED

4

5

WORK ZONE

STATE OF ILLINOIS DEPARTMENT OF TRANSPORTATION

N SCHEDULE OF QUANTITIES

SIGN NO.

SIGN LEGEND SIGNALIZED INTERSECTION

OJ r W20-1 48 IN. x 48 IN. CONSTRUCTION WARNING SIGN, WITH AMBER FLASHING LIGHT. NUMBER DENOTES TYPE

M4-9 SERIES DETOUR SIGN WITH ROAD NAME AND DIRECTION PLATES. NUMBER DENOTES TYPE

D OTHER DETOUR SIGNS NUMBER DENOTES TYPE

TYPE III BARRICADES WITH AMBER FLASHING LIGHTS

..... PROPOSED CONSTRUCTION SIGN

c:::J DETOUR ROUTE

( .................... j WORK ZONE

MAINTENANCE OF TRAFFIC - DETOUR PLAN CUBA ROAD BRIDGE RECONSTRUCTION

SCALE: N. T. S. SHEET NO. 1 OF 1 SHEETS STA NA TOSTA NA

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

W20-2 (0) 48

W20-3 (0) 48

W20-3 (0) 48

IIOAD WLL .CL_D FRO __ DD

nRI_

ARTERIAL ROAD INFORMATION SIGN FOR ROADS TO BE

FULLY CLOSED AND DETOURED

1 c~g::., 1 R11-2 4830

I 1I0AD CL081D I :~~-:'~I: R11-3 6030

I~I M4-10R (0) 4818

I~I M4-10L (0) 4818

IlIETrR 1 M4-9 (0) 3024

1 -r0u~ 1 M4-9R (0) 3024

1 DETOU~ 1 M4-9R (0) 3024

1 ~ouil 1 M4-9L (0) 3024

I~I M4-9L (0) 3024

1 u:r':UR 1 M4-8a (0) 2418

1 Cub. Rd 1 SPECIAL (0) 9 VARIABLE

1 ..... 1 O.k. Rd 1 SPECIAL (0) 9 VARIABLE _____ Rd

SPECIAL (0) 6030 CLOImTOnRIT_ U. PIlon Tno lid

I Cii. t:!: .... , Md I : CLOIm ~O 111~ ~RAFFIC: SPECIAL (0) 6030

...,. M3-2 (0) 2412

WUT M3-4 (0) 2412

DETOUR CUSTOM 8ECOND

RIGHT

NOTE: THE CONTRACTOR SHALL NOTIFY LAKE COUNTY PASSAGE TWO WEEKS BEFORE THE DETOUR IS IMPLEMENTED.

TYPICAL DETOUR SIGN ASSEMBLY

SIGN NO. -SIGN NO. -

SIGN NO. -

1260

SECTION

DIRECTION ROAD NAME

DEOUR

COUNTY

12-00020-00-BR LAKE 41 8

CONTRACT#: 61B04

Page 3: 9355.070 Cuba Road Bridge Preconstruction Meeting Summary ... · PDF file9355.070 Cuba Road Bridge Preconstruction Meeting Summary- 10-23 ... P: \ 8 1 0 1-9 4 9 9 \ 9 3 5 5 B a r r

Access to beMaintained

Area of Closure

Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN,Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom,MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

Road Closure OverviewCuba Road BridgeBarrington Hills, IL

Draw

n By:

gnew

tonFil

e: P:\

8101

-9499

\9355

Barr

ington

Hills

\9355

.123 C

uba R

oad B

ridge

Pha

se O

ne R

eport

\GIS

\Map

ping\C

ubaR

dBrid

ge_R

oadC

losure

Overv

iew.m

xd

Date: 10/23/2015 Project: 9355.123

Sourc

es: E

SRI W

orld I

mage

ry

o 1,000Feet

1 inch =

Map Center: -88.18542 42.17616

LegendArea of Closure

Page 4: 9355.070 Cuba Road Bridge Preconstruction Meeting Summary ... · PDF file9355.070 Cuba Road Bridge Preconstruction Meeting Summary- 10-23 ... P: \ 8 1 0 1-9 4 9 9 \ 9 3 5 5 B a r r

íì

Access to beMaintained

Area of Closure Cuba

Road

Buck

ley R

oad

Merri-Oaks Road

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS,USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GISUser Community

Road Closure MapCuba Road BridgeBarrington Hills, IL

Draw

n By:

gnew

tonFil

e: P:\

8101

-9499

\9355

Barr

ington

Hills

\9355

.123 C

uba R

oad B

ridge

Pha

se O

ne R

eport

\GIS

\Map

ping\C

ubaR

dBrid

ge_R

oadC

losure

.mxd

Date: 10/23/2015 Project: 9355.123

Sourc

es: E

SRI W

orld I

mage

ry

o 100Feet

1 inch =

Map Center: -88.18542 42.17616

LegendArea of Closure

Page 5: 9355.070 Cuba Road Bridge Preconstruction Meeting Summary ... · PDF file9355.070 Cuba Road Bridge Preconstruction Meeting Summary- 10-23 ... P: \ 8 1 0 1-9 4 9 9 \ 9 3 5 5 B a r r

íì

Access to beMaintained

Area of Closure Cuba

Road

Buck

ley R

oad

Merri-Oaks Road

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS,USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GISUser Community

Road Closure MapCuba Road BridgeBarrington Hills, IL

Draw

n By:

gnew

tonFil

e: P:\

8101

-9499

\9355

Barr

ington

Hills

\9355

.123 C

uba R

oad B

ridge

Pha

se O

ne R

eport

\GIS

\Map

ping\C

ubaR

dBrid

ge_R

oadC

losure

.mxd

Date: 10/23/2015 Project: 9355.123

Sourc

es: E

SRI W

orld I

mage

ry

o 100Feet

1 inch =

Map Center: -88.18542 42.17616

LegendArea of Closure


Recommended