January 13, 2016 95 Express Lanes Update Presentation to the FAMPO Citizens Transportation Advisory Group
Transcript
Page 1: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

January 13, 2016

95 Express Lanes Update

Presentation to the

FAMPO Citizens Transportation Advisory Group

Page 2: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

Original 95/395 Express Lane Plan

• Called “ Virginia HOT Lanes”

• New/Upgraded 56 Mile Facility

• Massaponax to Pentagon/Eads St

– I-95 – 47 Miles

– I-395 – 9 Miles

• About Half Actually Built To Date

– I-95 – 26 Miles

– I-395 – 2 Miles

9

Page 3: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

Governor’s 95 Express Lane Announcement

• Public Announcement on 11/24/2015

• Two New Express Lane Projects– Add 9 miles to I-95/395 Express Lanes

• 7 Mile Extension along I-395 in Northern Virginia

• 2 Mile Extension along I-95 in Stafford

– New Total Length Will be 37 miles• I-95: 28 Miles

• I-395: 9 Miles

10

Page 4: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

I-395 Express Lanes Extension

11

Page 5: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

I-95 Express Lane Extension in Stafford

12

• Two Mile Extension

• One Reversible lane built for potential conversion to two lanes

• Project Start in 2016

• Project Completion in 2018

• Project Website: https://www.expresslanes.com/uploads/1000/938-95_Operational_Improvements_Fact_Sheet.pdf

Page 6: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

Review of Toll and Revenue Study for I-95/I-395 HOT Lanes Project

13

Page 7: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

Study Background

• Completed by VDOT consultant Halcrow in 2009

• Covered about 56 miles of I-95/395 from the Pentagon area in Arlington to the Massaponax area in Spotsylvania

• Used data from the 2000 to 2006 timeframe to forecast to 2071

• Used Washington MPO Modeling Tool for analysis

• Initially used to support 95/395 Express Lane projects. In August, 2015, however, this study was used as justification by the state for not moving ahead with the Southern Section of the 95 Express Lanes project

14

Page 8: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

State interpretation of Study Findings

Study does not support 95 Express lane improvements south of Rte 610: Garrisonville Rd

1. From 8/21/15 FLS Article“Studies indicate that toll revenue won’t support the cost to extend the express lanes” …

“it would cost $30 million to $40 million a mile to add the lanes, and that doesn’t include a bridge that would have to be built between the current spans across the Rappahannock River.”

2. From October 19th FAMPO Meeting:• Northern Section would generate approximately six times the revenue of Southern Section

• Construction cost of Southern Section would be approximately $1 Billion

• Operation cost of Southern Section would be approximately $1 Billion over a 60 year period. This calculation is based on Transurban’s current operation costs.

15

Page 9: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

Study Toll Sections

• Six Sections

• Northern Section = 4 section; A to D

• Southern Section = 2 sections; E to F

• Breakpoint between Northern and

Southern Section at Garrisonville Rd

16

Page 10: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

Summary of Study Results 1

• Table 7.1 - pg. 54 – Toll Revenue can be maximized in 2030 with a minimum speed of 55 mph compared to 45 or 65 mph

• Finding supports current minimum Express Lane Speed Threshold of 55 mph

17

Page 11: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

Summary of Study Results 2: Toll Rates Decline South of Garrisonville

18

Garrisonville

Page 12: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

Study Results 2 continued:Toll Rates Decline South of Garrisonville

19

Garrisonville

Page 13: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

Study Results 2 continued:Transactions Decline South of Garrisonville

20Garrisonville

Page 14: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

But Observed Study Traffic Data from 2001 to 2006 Does Not Show an I-95 Traffic Dropoff at Garrisonville

21Garrisonville

Page 15: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

And 2000 to 2014 Daily Traffic Trends For I-95 Corridor: I-495 (Springfield Interchange) to Hanover County

Does Not Show a Traffic Drop-off at Garrisonville

22Garrisonville Massaponax Garrisonville Massaponax

Low Growth

2000 to 2014

High Growth

2000 to 2014High Growth

2000 to 2014

Low Growth

2000 to 2014

NOVA Hanover NOVA Hanover

Page 16: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

Why Does Study Analysis Show a Significant Drop-off in Toll Revenue South of Garrisonville?

• Due to Limitations of using Washington Model to Model FAMPO region1. Northern part of FAMPO only included to better

model Washington MPO area and include entire

Washington Urbanized area which includes

Northern Stafford and ends near Garrisonville

2. Only covers about 50% of FAMPO Model area

3. Does not include most of Spotsylvania

4. Insensitive to Growth South of Massaponax

5. Model known to underestimate traffic between

NOVA and Fredericksburg

23

Page 17: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

Study Report Documents Model Problem where Trips Under-forecast between FAMPO region and NOVA

24

1. Adjustment based on 2000 CTPP data was

inadequate for 2005 base model adjustment

2. Adjustment based on 2000 CTPP data did not

properly account for future growth in travel between

FAMPO Counties and NOVA from 2005 to 2071

Page 18: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

Summary

1. Study incorrectly under-forecasts Toll & Revenue from 95/395 Express Lane improvements south of Garrisonville due to limitations in the study modeling tool

2. Study based on old data from 2000 to 2006 timeframe

3. Study cannot be used to justify no need for 95 Express Lane improvements south of Garrisonville

4. A New Toll & Revenue Study is needed for 95 Express Lanes Southern Section

25

Page 19: 95 Express Lanes Update - FAMPO€¦ · 95 Express Lanes Update Presentation to the ... ahead with the Southern Section of the 95 Express Lanes project 14. State interpretation of

New 95 Express Lane Before/After Study Effort

• Concerns at December FAMPO Policy Committee regarding whether or not 55 mph speed threshold was being maintained for 95 Express lanes in FAMPO area

• New Joint FAMPO Staff/Consultant effort to evaluate Weekday and Weekend Peak Congestion and Travel Times between Fall, 2014 and Fall, 2015

• Consultant Cost: $5,000

• Results expected at February MPO meetings

26