VINTAGE 95 ROAD VINTAGE 95 ROAD MINERAL RIDGE ROAD CONCEPTUAL DESIGN CURRENT DESIGN MINERAL RIDGE ROAD PROPOSED US-95 SB TYPICAL SECTIONS US-95 Granite North Safety Improvements PROPOSED US-95 NB PROPOSED US-95 SB PROPOSED US-95 NB 16’ 30’ 30’ 10’ 10’ 50’ 12’ 12’ 12’ 12’ 21’ 21’ 10’ 10’ 4’ 4’ Travel Lane Travel Lane Median Utility Corridor Shared Use Path Travel Lane Travel Lane Travel Lane Travel Lane Shoulder Shoulder Shoulder Shoulder Shoulder Shoulder 12’ 12’ 16’ 2’ 2’ 16’ Travel Lane Travel Lane Shoulder Shoulder 12’ 12’ 16’ Existing Ground Existing Ground Existing Ground 2’ 2’ 16’ Travel Lane Travel Lane Shoulder Shoulder Clear Zone Clear Zone Clear Zone Clear Zone Clear Zone Clear Zone Clear Zone Clear Zone Clear Zone Clear Zone Clear Zone Clear Zone Buffer Travel Lane Travel Lane Shoulder Shoulder 12’ 12’ 16’ 2’ 2’ Existing Ground 30’ 12’ 12’ 12’ 12’ 12’ 12’ 16’ 16’ 21’ 62’ 10’ 10’ 4’ 4’ 30’ 33’ 2’ 2’ 5’ 10’ Utility Corridor Shared Use Path Travel Lane Travel Lane Travel Lane Travel Lane Shoulder Shoulder Shoulder Median Shoulder 95 Your Safety Your Mobility Your Economic Opportunity Existing US-95 Existing US-95 Following the public meeting in July 2018, the design team made changes to the project to incorporate feedback, limit impacts, and reduce costs. To reduce excavation efforts, the design now calls for independent alignments and grades for US-95 NB and SB, Vintage 95, and Mineral Ridge Road. The shared use path and utility corridor are now located adjacent to Mineral Ridge Road. July 2019
Transcript
Page 1: 95 Safety Improvements US-95 Granite North TYPICAL ......2019/07/23  · US-95 Granite North TYPICAL SECTIONS Safety Improvements PROPOSED US-95 NB PROPOSED US-95 SB PROPOSED US-95

VINTAGE 95 ROAD

VINTAGE 95 ROAD

MINERAL RIDGE ROAD

CONCEPTUAL DESIGN

CURRENT DESIGN

MINERAL RIDGE ROAD

PROPOSEDUS-95 SB

TYPICAL SECTIONSUS-95 Granite North Safety Improvements

PROPOSEDUS-95 NB

PROPOSEDUS-95 SB

PROPOSEDUS-95 NB

16’30’ 30’ 10’ 10’50’12’ 12’ 12’ 12’

21’ 21’10’ 10’4’ 4’

Travel Lane

Travel Lane

Median

Utility Corridor

Shared Use Path

Travel Lane

Travel Lane

Travel Lane

Travel Lane

Shoulder

Shoulder

Shoulder

Shoulder

Shoulder

Shoulder

12’ 12’ 16’2’2’

16’

Travel Lane

Travel Lane

Shoulder

Shoulder

12’ 12’ 16’

Existing Ground

Existing Ground

Existing Ground

2’2’

16’

Travel Lane

Travel LaneShoulder

Shoulder

Clear Zone

Clear Zone

Clear Zone

Clear Zone

Clear Zone

Clear Zone

Clear Zone

Clear Zone

Clear Zone

Clear Zone

Clear Zone

Clear Zone

Bu�er

Travel Lane

Travel Lane

Shoulder

Shoulder

12’ 12’ 16’

2’2’

Existing Ground

30’ 12’ 12’ 12’ 12’

12’ 12’16’ 16’

21’

62’

10’ 10’4’ 4’

30’

33’

2’ 2’5’10’

Utility Corridor

Shared Use Path

Travel Lane

Travel Lane

Travel Lane

Travel Lane

Shoulder

Shoulder

Shoulder

Median

Shoulder

95 Your Safety Your MobilityYour Economic Opportunity

Existing US-95

Existing US-95

Following the public meeting in July 2018, the design team made changes to the project to incorporate feedback, limit impacts, and reduce costs.

To reduce excavation efforts, the design now calls for independent alignments and grades for US-95 NB and SB, Vintage 95, and Mineral Ridge Road. The shared use path and utility corridor are now located adjacent to Mineral Ridge Road.

July 2019

Page 2: 95 Safety Improvements US-95 Granite North TYPICAL ......2019/07/23  · US-95 Granite North TYPICAL SECTIONS Safety Improvements PROPOSED US-95 NB PROPOSED US-95 SB PROPOSED US-95

Dry Lake

Conceptual Design construction limits;fill into Dry Lake

Current Design construction limits

Retaining wall; no fill into Dry Lake

RETAINING WALL95 Your Safety Your MobilityYour Economic Opportunity

US-95 Granite North Safety Improvements

Existing dissipator remains in placeunder Current Design

July 2019

ITD will build a retaining wall along Mineral Ridge Road to protect the existing wetland (Dry Lake) and concrete dissipator. (A dissipator prevents erosion where stormwater pipes or ditches discharge into areas such as slopes or channel banks.)

Page 3: 95 Safety Improvements US-95 Granite North TYPICAL ......2019/07/23  · US-95 Granite North TYPICAL SECTIONS Safety Improvements PROPOSED US-95 NB PROPOSED US-95 SB PROPOSED US-95

TRAILS END ROAD INTERSECTION IMPROVEMENTS95 Your Safety Your MobilityYour Economic Opportunity

US-95 Granite North Safety Improvements

To SandpointTo Sandpoint

NN

To AtholTo Athol

LuminaireLuminaire

Trails End Rd

Mineral Ridge Rd

Vintage 95

July 2019

• Trails End Road will be realigned and improved to accommodate large truck turning movements.

• Vintage 95 will terminate at the proposed Trails End Road.• Left and right turn lanes will be added along US-95 NB and SB.• Street lighting will be added to the US-95/Trails End Road

intersection.

Page 4: 95 Safety Improvements US-95 Granite North TYPICAL ......2019/07/23  · US-95 Granite North TYPICAL SECTIONS Safety Improvements PROPOSED US-95 NB PROPOSED US-95 SB PROPOSED US-95

Existing Old House Rd

N

Existing US-95/Old House Roadintersection to be eliminated.Old House Road now intersects Mineral Ridge Road.

Conceptual Mineral Ridge Rd

Mineral Ridge Rd

US-95 N

orthbound

US-95 Southbound

Vintage 95

OLD HOUSE ROAD INTERSECTION IMPROVEMENTS95 Your Safety Your MobilityYour Economic Opportunity

US-95 Granite North Safety Improvements

July 2019


Recommended