+9178 MOTOR WALKWAY LAYOUT PLAN
STAIRCASEAREA #2
EXTENSION #1
TEEAREA#1
TEEAREA#2
TEEAREA#3
TEEAREA#4
CORNERAREA#2
EXTENSION #2 EXTENSION #3 EXTENSION #4 EXTENSION #5
CORNERAREA#1
TEEAREA#5
TEEAREA#6
TEEAREA#7
TEEAREA#8
CORNERAREA#3
CORNERAREA#4
EXTENSION #6 EXTENSION #7 EXTENSION #8 EXTENSION #9 EXTENSION #10STAIRCASEAREA #1
TYPICAL HOT DIPGALVANISED STAIRCASEAND PLATFORM
TYPICAL HOT DIPGALVANISED STAIRCASEAND PLATFORM
12001200
EXISTINGWIDTH120012001200 1200
12001200EXISTINGWIDTH1200
12001200 1200
EXISTINGWIDTH800 800 800 800
800 800 800 800
1900
2550
950950
850
850
850
STEPS WIDTH REVIEWFROM 400 TO 600
1900600
60050
60050
1900
2550
950 950
1900600
850
850
850
600
550
550
50
60050
60050STEPS WIDTH REVIEW
FROM 400 TO 600
1900
2550
1900600
850
850
850
60050
60050STEPS WIDTH REVIEW
FROM 400 TO 600
850
850
850
600
60050
60050
1900
2550
950 950
1900600
600
550
550 50
60050
60050STEPS WIDTH REVIEW
FROM 400 TO 600
2550
600
550
55050
STEPS WIDTH REVIEWFROM 400 TO 600
AA1
B B1
LIGHTING CABLES COMPLETEWITH CABLE TRAY SYSTEM
PROPOSED CABLE TRAY TO BE SIDEMOUNTED ON TO EXISTING 'C CHANNEL'/'I BEAM'
LIGHTING CABLES COMPLETE WITHCABLE TRAY SYSTEM
*
* * * * *
* * * * **
* * * * **
* * * **
*
LIGHTING CABLES COMPLETEWITH CABLE TRAY SYSTEM
EXISTINGCAT LADDER
EXISTINGCAT LADDER
EXISTINGCAT LADDER
EXISTINGCAT LADDER
PROPOSED EXPLOSION PROOFLIGHTING TO BE SIDE MOUNTING ONTO EXISTING 'C CHANNEL' (LIGHTINGFITTING OR POST SUPPLY BY BPC)
EXISTINGSTAIRCASE
EXISTINGSTAIRCASE
PROPOSED CABLE TRAY TO BE SIDEMOUNTED ON TO EXISTING'C CHANNEL'/'I BEAM'
PERMANENT MAINTENANCE WORKING PLATFORMHOT DIP GALVANISEDMATERIAL PLATFORMSIZE @ 2550MM X 1900MM X 1100MM HT WITH950MM HIGH RAILING ONE ROUNDTOTAL PLATFORM @ 24 UNITS
1. STAIRCASE AREA @ 2 NOS.2. CORNER AREA @ 4 NOS.3. TEE AREA @ 8 NOS.4. EXTENSION AREA @ 10 NOS.
LIGHTING CABLES COMPLETE WITHCABLE TRAY SYSTEM
MAINTENANCE PLATFORM COMPLETE WITH LIGHT FITTING
* TOTAL NOS. OF EXPLOSION PROOFLIGHTING FITTING AT EL. +9178 @ 24NOS.
EXISTING CAT LADDER
GENERAL NOTES:1. DETAILED DESIGN FOR THE PERMANENT
MAINTENANCE PLATFORM SHALL COVER A COMPLETESCOPE OF STEEL SUPPORT MOUNT ON TO THEEXISTING STRUCTURE OR TO INTRODUCE R.C.FOOTING SITTING ON THE HARDCORE WITHREFERENCES TO OUR BPC CONCEPTUAL DRAWINGATTACHED HEREWITH.
2. NO PILING WORKS INVOLVE.3. DETAILED DESIGN FOR LIGHT FITTING SUPPORT AT
C5 CONDENSER WITH REFERENCES TO OUR BPCCONCEPTUAL DRAWING.
4. RECOMMENDATION OF CONSTRUCTION METHOLOGYFOR C5 CONDENSER, C5 FEEDING PUMP ANDTURBOEXPANDER.
5. REVIEWING AND ASSESING OF AVAILABLE DRAWINGSAND INFORMATION AS PROVIDED BY BPC.
6. CAD DRAWINGS.7. PREPARATION OF BILL OF QUANTITIES (BQ).8. MATERIALS TESTINGAND MATERIAL DATA SHEET
(INCLUSIVE IN REPORTS).9. PREPARATION OF INSPECTION TEST PLAN (ITPS) AND
SITE QUANTITY CHECKLIST (SQI) INDICATINGWITNESSING HOLD POINTS DURING CONSTRUCTION.
10. PREPARATION OF PERFORMANCE AND COMMISSIONINGTEST PROCEDURE WHICH DESCRIBE HOW THECOMPLETED MAINTENANCE PLATFORM ARE DULLYWORKABLE AND SUCCESSFULLY SOUNDCOMPLTED/COMMISSIONED.
11. PREPARE WORK PROGRESS FOR THE 3 DIFFERENTLOCATIONS.
12. OUR GRATE LOAD CLASS DEFINITIONS IS MEDIUMDUTY GRATE DESIGN LOAD OF AT LEAST 28100LBSPER FOOT (125kN)
13. ALL MATERIALS TO BE HOT DIP GALVANISED STEEL(EN ISO 1461).
14. CONSULTANT HAS TO ALLOW/DESIGN MOUNTINGSUPPORTS FOR LIGHT FITTING SUPPLY BY BPC) ANDDESIGN OF CABLE TRAY SYSTEMS.