Revision C ECO 99-1411 December 1999© As of date shown above The Marley Cooling Tower Co. unpublished-all rights reserved under the copyright laws.
The Marley Cooling Tower Company7401 W. 129th Street, Overland Park Kansas 66213
(913) 664-7400
97-1188CPrinted in U.S.A.
Assembly Manual(for the following tower models)
NC1200NC2200NC3200NC4200NC5200NC6200NC7200NCA200NCB200
NC SERIES
K/D Assembly ManualNC Series
Manual 97-1188C
(This page intentionally left blank)
WARNINGThe location and orientation of the cooling tower can affect the safety of
those responsible for installing, servicing or repairing the cooling tower. SinceMarley does not dictate or determine where the tower is located or how it isoriented, Marley is not responsible for addressing the safety issues that areaffected by the tower�s location or orientation. The following safety issues shouldbe considered by those responsible for designing the tower installation. Failureto consider and address these issues may result in substantial personal injury ordeath to those involved in installing, servicing or repairing the cooling tower.
* Access to and from the fan deck.
* Access to and from maintenance access doors.
* Access for cleaning and other service.
* Potential access problems due to obstructions surrounding the tower.
* The possible need for handrails around the fan deck.
* The possible need for ladders (either portable or permanent) to gainaccess to the fan deck or maintenance access doors.
* The possible need for safety cages around ladders.
These are only some of the safety issues that may arise in the designprocess. Marley strongly recommends that you consult a safety engineerto be sure that all safety considerations have been addressed.
Marley offers optional equipment that may assist you in addressing some ofthese safety issues. Contact your Marley representative for information on theseoptional items.
CONFIDENTIAL- The contents of this document are confidential and constitute the exclusiveproperty of the Marley Cooling Tower company and is intended for use in the construction(contractor) and maintenance (owner) of this cooling tower. This document and it�s contents maynot be made public in any manner, distributed or loaned to others, or reproduced or copied eitherin whole or part without prior written consent of The Marley Company.
(This page intentionally left blank)
NC SERIES CONTENTS
97-1188C
Getting Started color codeABOUT THIS MANUAL...................................................................................................................... iMEASUREMENT SYSTEM .............................................................................................................. iiTOOLS AND SUPPLIES ................................................................................................................... iiPVC FILL STORAGE ........................................................................................................................ iiJOINT SEALING INSTRUCTIONS ................................................................................................... iiiA FEW WORDS ABOUT FASTENERS ............................................................................................ vWHO TO CALL ................................................................................................................................ vi
Tower AssemblyCOLLECTION BASIN ................................................................................ blue ........................... 1-1COLUMNS .............................................................................................. yellow ........................... 2-1ENDPLATES ........................................................................................... yellow ........................... 2-2TORQUE TUBE ...................................................................................... yellow ........................... 2-3BRACING ................................................................................................ yellow ........................... 2-5LOUVER COLUMNS .............................................................................. yellow ......................... 2-10TOP GIRT ............................................................................................... yellow ......................... 2-11DISTRIBUTION BASIN ................................................................................ red ........................... 3-1FAN DECK ................................................................................................white ........................... 4-1CASING .................................................................................................. yellow ........................... 5-1FILL .......................................................................................................... green ........................... 6-1ELIMINATOR PACKS .............................................................................. green ......................... 6-15TIE-RODS ............................................................................................... yellow ........................... 7-1LOWER FAN CYLINDER..........................................................................white ........................... 7-2MECHANICAL EQUIPMENT ......................................................................................................... 8-1GEAREDUCER .............................................................................................................................. 8-4MOTOR .......................................................................................................................................... 8-9DRIVE LINE ................................................................................................................................. 8-16FAN INSTALLATION & ADJUSTMENT ....................................................................................... 8-18
MiscellaneousINLET PIPING & FLUME ..........................................................................white ........................... 9-1DISTRIBUTION BASIN COVERS .............................................................white ........................... 9-6UPPER FAN CYLINDER & FAN GUARD .................................................white ........................... 9-8ACCESS DOOR ...................................................................................... yellow ........................... 9-9DECALS ....................................................................................................................................... 9-10
Optional EquipmentOUTLET PIPING .......................................................................................................................... 10-1FLOAT VALVE ............................................................................................................................. 11-1
Find Number Index .................................................................................................. 12-1
Note: Optional equipment not listed above is installed using separate installation drawings and bills ofmaterial. These documents are located within the literature package and should be reviewed prior tostarting assembly. Optional equipment may affect assembly sequence.
(This page intentionally left blank)
i97-1188C
NC SERIES GETTING STARTED
ABOUT THIS MANUALTo obtain maximum efficiency, it is strongly recommended that this entire manual be read before
starting assembly. This assembly manual illustrates a typical field assembly sequence of a basictower. Some of the more commonly used options are also included. Refer to separate installationdrawings for installation of special options and additional optional equipment. Review all manuals,drawings and bills of material prior to assembly. These documents are located in a Literature Kitpacked with the tower. Contact Marley sales office if questions arise.
All steel parts are tagged for identification, as shown below. Parts that have been shop modified,per contract, will have a separate tag affixed to the part adjacent to the tag that defines the Findnumber.
Find Number: This is a three digit alpha/numeric number that ties everything together. Usedthroughout this manual, in the text, it's the number in bold type M35, in the Figures, it's the numberwithin the circle. It is also the first column in the BILL OF MATERIAL. In the bill of material, all towercomponents are listed in numerical order by this number.
Item Number: This number is used by Marley to manufacture, modify and inventory thecomponents of your cooling tower. Give these numbers to your Marley people if an item is missingor a replacement item is required.
Drawing Number: (Reference only) This is the number of the drawing used to fabricate or modifythis item.
Description: (Reference only) All steel parts begin with SHT or ASSY followed by the size ofthe sheet used to fabricate the item or a description of the assembly. Your tower may have a fewfiberglass items which begin GRP.
Stainless Steel: This indicates when an item has been made from stainless steel. If the itemis made from the standard galvanized material this will not be printed on the tag.
Color Code: To help group parts together that are assembled in similar areas of the tower, manyof the tower components are tagged with a colored stick-on dot. Reference the table of contents ofthis manual for the coding of the various tower components.
Bills of material (BOM) are separate from drawings and this manual. At the top of each bill thereis a Drawing Number, cell number and the drawing description which indicates if the items on that billwill be installed per this assembly manual or per a special installation drawing. There will be a BOMfor each cell. The find number, item number, description and quantity of items are all cross referencedon the bill of material. If a number is missing or hard to read, check the illustrations in this assemblymanual first and then the bill of material to see if you can find it. As the tower is prepared for assembly,the quantities of each item should be checked against the bill of material. If anything is missing ordamaged tell your Marley people as soon as possible. Use the orientation drawings (Sales drawings)to define the location of parts in each cell. The BOM indicates the Find Number and the contractmodifications made for specific items to be located in the indicated cell.
Stainless Steel
Description
Item Number
Find Number
Drawing Number
M35Code used in manufacturing process
ii 97-1188C
NC SERIESGETTING STARTED
MEASUREMENT SYSTEMThis manual uses both, the English System and the Système International d'Unitès (S.I.)
systems of measurement. Fasteners are denoted and supplied in conformance with theEnglish System.
TOOLS AND SUPPLIES·HOIST. 2500 pound (1140kg) capacity. For hoisting of motor and Geareducer.
·1/2" electric drill and bit set.
·Socket wrench set. You will be using 9/16" sockets a lot so it�s a good idea to have morethan one.
·Combination wrenches. Mainly 9/16" up to 1 1/8". Adjustable wrenches are OK but notrecommended.
·Screwdrivers.
·Torque wrench. 150 ft-lb (203 N-m) capacity
·Caulking guns. Required for application of sealant.
·Pipe wrenches.
·Drift pins (alignment tools). These are extremely important to help line up all the holes. Youshould have more than one.
·Allen wrenches.
·Protractor level. For setting fan blade pitch.
·Dial Indicator kit. Marley Item No. 115311M. For drive shaft alignment. Needed for motoroutside airstream option only.
·Scaffolding, portable stairs or other means of temporary access and support.
·Electric impact wrench (or air). Optional, really makes the job go fast. You can get by withoutone but if you can get one you should.
�Wear protective clothing, gloves, nonslip footwear, hard hat and safety glasses. Coolingtowers are constructed of steel and could have burrs that can cause cuts. The surface ofsteel material may be slick. Protection from thrown or falling objects should be used at alltimes around a construction site.
�ACETONE solvent. About a gallon (4 liters) and plenty of clean cotton rags.
PVC FILL STORAGEStacked and nested fill sheets can be stored uncovered outdoors in winter, spring or fall
for up to 4 weeks. In hot summer conditions it should not be left out uncovered.
iii97-1188C
NC SERIES GETTING STARTED
JOINT SEALING INSTRUCTIONS
Surface preparation instructions:The following information covering surface preparation applies to all sealed joints whether sealer
Z11 or strip sealer Z12 or Z13 is being used. Years of experience has shown the instructions onsurface preparation and sealing details do result in watertight joints. Inadequate attention to thesedetails will result in joints that leak.
Do not apply either sealer if temperature is below 40º Fahrenheit (5º Celsius).All flanges are to be straight. Rework kinks or bends that exist. Clean surfaces being sealed with
acetone. If cloth is used, it must always be clean and dry. Exercise caution in using solvents,always read labels and instructions. Care should be taken not to wipe dirt or oil onto the cleanedsurface from adjacent uncleaned area. Mating surfaces to be sealed must be kept clean and dry priorto assembly. No water, grease or dirt should contaminate cleaned area. Note that stainless steelrequires a larger area to be cleaned because oil will recontaminate surfaces quickly. Oil will migratethrough punched holes and around sheared edges.
Application instructions for Sealer Z11 (Type A, B & C seals):Sealer Z11 comes in a 1/12th gallon (315ml) cartridge and is applied using a standard caulking
gun. Apply sealer to the unassembled parts. The typical joint sealing details shown on this page andthe following page are referenced throughout this manual. Care should be taken to fill voids and gapsat joints. After parts have been assembled, trowel excess sealant over joint, taking care to forcesealant, back into joint, and not out of joint. Do not use solvent to aid in applying sealer as solventadversely affects bonding of sealant to metal. Care should be taken to avoid leaving holes or airbubbles in sealant.
Do not subject sealed joints to waterloading for 48 hours at temperatures of 70° Fahrenheit (21°Celsius) and above. Lower temperature will require a longer cure time.
A
This symbol is used throughout the manual toindicate the locations where sealer Z11 is re-quired. The refers to a �Type �A� seal� which isa 3/8" (10mm) diameter bead of sealer Z11 laidalong the centerline of a row of holes curving overeach hole it passes. Reference detail at the right.
Type A seal(Water on one side of joint)
Z11 Sealer 3/8" (10mm)diameter bead
Fastenerhole
Water sideof joint.
Z11 Sealer 3/8" (10mm)diameter bead
Fastenerhole
Type B seal
This symbol is used throughout the manual toindicate the locations where sealer Z11 is re-quired. The refers to a �Type �B� seal� which isa 3/8" (10mm) diameter bead of sealer Z11 laidalong the centerline of a row of holes curvingcompletely around each hole it passes. Refer-ence detail at the right.
B
iv 97-1188C
NC SERIESGETTING STARTED
This symbol is used throughout the manual toindicate the locations where sealer Z11 is re-quired. The refers to a �Type �C� seal� whichis a 3/8" (10mm) diameter bead of sealer Z11 laidcompletely around each hole in a row of holes.Reference detail at the right.
C
Application instructions for Strip Sealer Z12 & Z13 (Type D & E seals):Strip sealer is supplied in 1/2" (12mm) Z13 and 1" (25mm) Z12 widths. It is intended that the 1"
(25mm) wide sealer be used unless noted otherwise.Apply continuous pieces of strip sealer to the unassembled parts. Do not splice pieces except
where turning a corner. Cut with a sharp instrument, do not stretch or tear.Gaps at joints and corners can be filled by stretching a piece of strip sealer to obtain the proper
thickness. Then work it into the joint to fill gap and create an even surface.After parts are set together, use a drift pin or other pointed object to puncture sealer at each
fastener hole, where required.
This symbol is used throughout the manual toindicate the locations where a single layer of stripsealer Z12 or Z13 is required. Reference detailat the right.
D
Z12
Z13
or
TypicalFastenerhole
Type D seal
Z12
Water side of joint.Fastenerhole
Z13
Type E seal
This symbol is used on collection basin joints toindicate the locations where two layers of stripsealer are required. Align bottom edge of stripsealer Z13 with top edge of bolt holes. Align topedge of strip sealer Z12 with bottom edge of boltholes. Reference detail at the right.
E
Sealer 3/8"(10mm)
diameterbead
Z11Fastener hole
Type C seal
v97-1188C
NC SERIES GETTING STARTED
A FEW WORDS ABOUT FASTENERS
Z05Z05
Typical bolted attachment with threaded endof bolt up or bolt installed horizontally.
This symbol is used throughout the manual toindicate the locations where Loctite Z05 is re-quired. Reference details at the right.
Loctite®:Critical structural and mechanical attachments require extra protection against the nuts
vibrating loose during tower operation. This is accomplished on galvanized fasteners by applyingLoctite Z05 thread locking compound to the exposed threads of a bolt after the nut has beeninstalled and tightened. Bolts should be installed with the threaded end up or horizontally. Onstainless steel fasteners the use of anti-seize compound makes the use of Loctite ineffective.Therefore in these critical areas with stainless steel fasteners self-locking nuts have beensubstituted for the standard nuts and the Loctite will not be used.
Stainless steel fasteners:Stainless steel fasteners are sensitive to galling. This is when you notice a sudden increase
in the force needed to turn a nut before parts are clamped. Apply anti-seize compound includedwith the tower to the threads of the bolt before installing the nut. If a nut does not easily spin ona bolt do not try to force it. Chances are it will seize. Some extra hardware is included to replaceproblem hardware.
Due to availability, 3/8" standard nuts and Loctite may have been substituted for 3/8" self-locking nuts. If this substitution has been made, do not apply the anti-seize compound to thestainless steel bolts. Insert bolt thru hole before applying Loctite. Loctite will act as a threadlubricant.
Torque Requirements:The idealized standard fastener torque values for galvanized and stainless steel fasteners are
shown in the table below. These values may vary in actual practice. Note that the values shownfor stainless steel fasteners are based on the fasteners being lubricated with anti-seize compound.
* Stainless Steel
20 (27.1)
27 (37)
74 (100)
Galvanized
20 (27.1)
45 (61)
150 (203)
BoltDiameter
FASTENER TORQUE
Fastener Torquefoot-lbs.(newton-meters)
3/8"
1/2"
3/4"
* Values based on fasteners lubricated with anti-seizecompound. (Stainless steel only)
vi
STOP!WAIT!HOLD
EVERYTHING!
Birmingham, AlabamaPalmer & Lawrence, Inc.Anchorage, AlaskaJames P. Sheldon CompanyEdmonton, Alberta International Cooling Tower Inc.Phoenix, ArizonaHolbrook & Associates, Inc.Little Rock, ArkansasWoodbury-Beach CompanyVancouver, British Columbia Esko Industries Ltd.Los Angeles, California Marley Cooling TowerSan Diego, CaliforniaDelta-T Systems, Inc.San Francisco, CaliforniaCalifornia Hydronics CorporationSanta Rosa, CaliforniaMarley Cooling TowerDenver, ColoradoJ.L. Hermon & Associates, Inc.Hamden, ConnecticutThe Bernard M. Packtor CompanyWashington, D.C.Environmental & Power Systems Inc.Jacksonville, FloridaFrench & Company, Inc.Miami, FloridaMiddleton & Associates, Inc.Orlando, FloridaAqua Air Products, Inc.Pensacola, FloridaR.M. Tugwell & Associates, Inc.Tampa, FloridaAqua Air Products, Inc.Atlanta, Georgia Marley Cooling TowerHonolulu, HawaiiMechanical Systems Corp.Chicago, Illinois Marley Cooling TowerIndianapolis, IndianaKeller-Rivest, Inc.Marshalltown, IowaR.S. Stover CompanyLouisville, KentuckyP.L. Sherman Company, Inc.New Orleans, LouisianaFischer Engineering, Ltd.Shreveport, LouisianaZimmerman, Inc.Winnipeg, Manitoba Power & Mine Supply Co., Ltd.Baltimore, MarylandH.P. Rodgers, Inc.
Boston, MassachusettsR.T. Forbes Company, Inc.Detroit, MichiganRBE, Inc.Grand Rapids, MichiganHedrick AssociatesMinneapolis, MinnesotaThe Gorgen CompanyJackson, MississippiWard Mechanical EquipmentKansas City, Missouri Marley Cooling TowerSt. Louis, MissouriMidwest Machinery CompanyBillings, MontanaClapper Company, Inc.Omaha, NebraskaR.S. Stover CompanyLas Vegas, NevadaAmpco, Inc.St. John, New BrunswickTrane Company Inc.Albuquerque, New MexicoJames, Cooke & Hobson, Inc.Albany, New YorkF.R. Foote Company, Inc.New York, New York Marley Cooling TowerRochester, New YorkThe Johnston Equipment Co., Inc.Charlotte, North CarolinaPACE, Inc.Greensboro, North CarolinaPACE, Inc.Raleigh, North CarolinaPACE, Inc.Fargo, North DakotaTherm-Air Sales CorporationHalifax, Nova Scotia Conrad Trane SalesCincinnati, Ohio Marley Cooling TowerCleveland, OhioThe Craun-Liebing CompanyColumbus, OhioTower Equipment CompanyOklahoma City, OklahomaProcess Equipment CompanyTulsa, OklahomaProcess Equipment Company, Inc.Ottawa, Ontario Mechanical Trade SalesSarnia, Ontario EFI IronrossThunder Bay, Ontario Power & Mine Supply Co., Ltd.
Toronto, Ontario Marley Cooling TowerPortland, OregonOregon Air Reps, Inc.Harrisburg, PennsylvaniaH & H Sales AssociatesPhiladelphia, Pennsylvania Marley Cooling TowerPittsburgh, PennsylvaniaP.F. Sherman CompanyMontreal, Quebec Enviroair Industries Inc.Quebec City, Quebec Evap-Tech Inc.Saskatoon, Saskatchewan Power & Mine Supply Co., Ltd.Columbia, South CarolinaPACE, Inc.Greenville, South CarolinaPACE, Inc.Knoxville, TennesseeFerguson Equipment CompanyMemphis, TennesseeT.J. O'Brien Engineering Co.Nashville, TennesseeJohnson & Scott, Inc.Austin, TexasDreher & Associates, Inc.Corpus Christi, TexasLewis Mechanical SalesDallas, TexasSlack Buckner SystemsEl Paso, TexasJames, Cooke & Hobson, Inc.Fort Worth, TexasSlack Buckner SystemsHouston, Texas Marley Cooling TowerSan Antonio, TexasDreher & Associates, Inc.Salt Lake City, UtahHolbrook & Associates, Inc.Richmond, VirginiaFrank Howell Company, Inc.Seattle, WashingtonOlympic Engineered Sales, Inc.Milwaukee, WisconsinChipley & Zeman, Inc.
Call us if you need help of any kind assembling this cooling tower.If you're missing a part, we'll replace it. If a part is damaged, we'll getyou a new one. Call us. We're standing by to solve any assemblyproblem you might have. Below is a complete list of Marley's salesrepresentatives in the US and Canada. If you need help determiningthe representative in your area please call 913.664.7400 or checkthe internet at www.marleyct.com.
97-1188C PAGE 1-1
NC SERIES TOWER ASSEMBLY
Note: If required, 6" (152mm) dia. holefor standpipe overflow is typicallyinstalled opposite of the planned motorlocation. See outlet piping key planand/or contract sales drawing for specialrequirements.
A01
A02V07 A01
A02
X02 Galvanized basin
orW02 X12 Stainless steel basinGalvanized basin
details to insure a watertight basin. Note: Refer to Basin Orientation drawing
and Bills of Material for location of parts modifiedfor per contract requirements. Begin assembly ofthe collection basin by attaching the forklift floorpanels A02 to the depressed section floor panelA01. Refer to Figure 1-1 for models NC1200thru NC4200 and Figure 1-2 for models NC5200thru NC7200, NCA200 and NCB200. Next, at-tach the forklift stiffeners A03. On models NC5200thru NC7200, NCA200 and NCB200 attach addi-tional stiffeners A04.
D
Strip sealer Z12
A03
A02
V07
W32
W22
X02 Galvanized basin
or X12 Stainlesssteel basin
C
Figure 1-1NC1200 thru NC4200
COLLECTION BASINThe assembly site for the basin and tower
should be flat, level and clean. It should alsoallow for access to fasteners beneath the collec-tion basin.
During assembly, locate the head of boltseither on the exterior of tower or in a uniformmanner for a better appearing finished product.Sealing washers, when specified, should beplaced against the basin floor or side as shown indetails to prevent leaks at the fasteners. A flatwasher should be placed between the sealingwasher and nut or bolt head to reduce the possi-bility of damage to the sealing washer whiletightening fastener. Please observe the sealing
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188CPAGE 1-2
NC SERIES TOWER ASSEMBLY
Figure 1-2NC5200 thru NC7200,
NCA200 & NCB200
Note: If required, 6" (152mm) dia. holefor standpipe overflow is typicallyinstalled opposite of the planned motorlocation. See outlet piping key planand/or contract sales drawing for specialrequirements.
A02V07
V07
A01
X02 Galvanized basin
or
W02
X12 Stainless steel basin
Galvanized basin
D
A03
A02
W32
W22
X02 Galvanized basin
or X12 Stainlesssteel basin
C
A02
V07
W02
Galvanizedbasin
A04A04
A03
A01
Strip sealer Z12
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188C PAGE 1-3
NC SERIES TOWER ASSEMBLY
Figure 1-3NC1200 thru NC3200
Attach the remaining floor panels A05 (andA06 on models NC4200 thru NC7200, NCA200and NCB200) along with end panel A09 perFigure 1-3 for models NC1200 thru NC3200 orFigure 1-4 for models NC4200 thru NC7200,NCA200 and NCB200.
W02
Galvanizedbasin
X02Galvanized basin
or
W02
X12Stainlesssteel basin
Galvanizedbasin
V07
V07
X02Galvanized basin
or
X12Stainless steel basin
E
Top row of holes only.
Strip sealerZ13 on top,Z12 on bottom
E
Top row of holes only.
Strip sealerZ13 on top,Z12 on bottom
A05
A05
A09
A05
A05
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
W22
W22
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188CPAGE 1-4
NC SERIES TOWER ASSEMBLY
Figure 1-4NC4200 thru NC7200,
NCA200 & NCB200
W02Galvanized
basin
V07
E
Top row of holes only.
Strip sealerZ13 on top,Z12 on bottom
A05
W02Galvanized
basin
V07X02 Galvanized basin
or
X12 Stainlesssteel basin
E
Top row of holes only.
Strip sealerZ13 on top,Z12 on bottom
A06
A06
A05
E
Top row of holes only.
Strip sealerZ13 on top,Z12 on bottom
W22
X02Galvanizedbasin
or
X12Stainlesssteel basin
A06
A05
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
V07
W22 W22
W22
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
A09
A09
97-1188C PAGE 1-5
NC SERIES TOWER ASSEMBLY
Figure 1-5NCA200 & NCB200
(Viewed from underside of basin)
Models NCA200 and NCB200 require at-tachment of end stiffeners A16 as shown inFigure 1-5.
V07
W02
A16
X02 Galvanized basin
or X12 Stainless steel basin
Cold water basin end
Galvanized basin
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188CPAGE 1-6
NC SERIES TOWER ASSEMBLY
Figure 1-6NC4200 thru NC7200
Following the assembly of the floor panels,on models NC1200 thru NC7200, the basin sidesA07, A20 and A21 are spliced together andattached. Also, the corner seals A13 are in-stalled at this time. Refer to Figure 1-6 andFigure 1-7 for models NC1200 thru NC7200.
A21
A07
A20
A07
A20
A21
SeeFigure 1-7
A13
Note: If collection basin siderequires cutout, check label onpart for correct face orientation.
97-1188C PAGE 1-7
NC SERIES TOWER ASSEMBLY
Figure 1-7NC4200 thru NC7200
V07
V31
W33V31
V07
W30
W23
W35
V19
X02Galvanizedbasin
or
X12Stainlesssteel basin
X03Galvanizedbasin
or
X13Stainlesssteel basin
X04 Galvanizedbasin
or
X15 Stainlesssteel basin
W02 Galvanizedbasin
W22
W05
Galvanizedbasin
W02Galvanized
basin
X02Galvanizedbasin
or
X12Stainlesssteel basin
W32
V07
E
Top row of holes only.
Strip sealerZ13 on top,Z12 onbottom
D
Strip sealer Z12
D
Strip sealer Z12A07
A20
A13
Apply aroundholes, alongedges, and onback side ofboth flanges.
B
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
X02 3/8" Nut
X03 1/2" Nut
X04 3/4" Nut
X12 3/8" Self-locking Nut
X13 1/2" Self-locking Nut
X15 3/4" Self-locking Nut
FindNo. Description
V07 3/8"x1" Bolt
V19 1/2"x1 1/2" Bolt
V21 3/4"x1 1/2" Bolt
W02 3/8" Lock Washer
W05 3/4" Lock Washer
W22 3/8" Flat Washer
W23 1/2" Flat Washer
W30 3/4" Flat Washer
W32 3/8" Sealing Washer
W33 1/2" Sealing Washer
W35 3/4" Sealing Washer
NC1200 thruNC4200 only
97-1188CPAGE 1-8
NC SERIES TOWER ASSEMBLY
Figure 1-8NCA200 & NCB200
On models NCA200 and NCB200, the basinsides A07, A20 and A21 are attached to the floorand end panels first. Splice plates A22 and A23are then attached where the sides meet. Cornerseals A13 are also installed at this time. Refer toFigure 1-8 and Figure 1-9.
A21
A07
A20
A07
A20
A21
SeeFigure 1-9
A13
A22
A23
A22
A23
Note: If collection basin siderequires cutout, check label onpart for correct face orientation.
97-1188C PAGE 1-9
NC SERIES TOWER ASSEMBLY
Figure 1-9NCA200 & NCB200
V07
W35
V31
V07
W30
A23
V19
X02Galvanizedbasin
or
X12Stainless
steel basin
X04Galvanized basin
orX15Stainless steel basin
W05
Galvanizedbasin
X02Galvanizedbasin or
X12Stainlesssteel basin
V07
D
Strip sealer Z12
D
Strip sealer Z12
A07
A20
A13
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
X03 Galvanized basin
or X13 Stainlesssteel basin
W02Galvanized
basin
W02
Galvanizedbasin
W22
W32
E
Top row of holes only.
Strip sealer Z13 ontop, Z12 on bottom
Apply around holes, alongedges, and on back sideof both flanges.
W03Galvanizedbasin
Apply strip sealer Z13 vertically, along edge of both basinsides at splice. Apply strip sealer Z12 horizontally, directlyabove floor attachment bolts, overlapping vertical strips.
B
FindNo. Description
V07 3/8"x1" Bolt
V19 1/2"x1 1/2" Bolt
V21 3/4"x1 1/2" Bolt
FindNo. Description
W02 3/8" Lock Washer
W03 1/2" Lock Washer
W05 3/4" Lock Washer
W22 3/8" Flat Washer
W30 3/4" Flat Washer
W32 3/8" Sealing Washer
W35 3/4" Sealing Washer
X02 3/8" Nut
X03 1/2" Nut
X04 3/4" Nut
X12 3/8" Self-locking Nut
X13 1/2" Self-locking Nut
X15 3/4" Self-locking Nut
97-1188CPAGE 1-10
NC SERIES TOWER ASSEMBLY
Figure 1-10NC1200 thru NC3200
(Viewed from underside ofbasin)
X02Galvanizedbasin
or
X12Stainlesssteel basin
W02
Galvanizedbasin
V07
V07
V07
W32
W22
A12
A10
C
All models require additional stiffeners un-der the sloping collection basin floor. ModelsNC1200 thru NC3200 use two floor stiffenersA12 and one end stiffener A10 on each side ofthe tower. See Figure 1-10. On model NC4200three floor stiffeners A12 and two end stiffenersA10 per side are used as shown in Figure 1-11.Figure 1-12 shows the stiffener installation onmodels NC5200 thru NC7200, NCA200 and
NCB200. Model NC5200 uses 5 floor stiffenersA12 per side, model NC6200 uses 6 per side,model NC7200 uses 7 per side, and modelsNCA200 and NCB200 use 9 per side. On modelNC7200, one stiffener on each side is installed inthe opposite direction as the others. All five ofthese models use two each per side of endstiffeners A10 and A11.
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188C PAGE 1-11
NC SERIES TOWER ASSEMBLY
Figure 1-11NC4200
(Viewed from underside of basin)
X02 Galvanizedbasin
or
X12 Stainlesssteel basin
W02Galvanizedbasin
V07
V07V07
W32
W22
A12
A10
C
W02
Galvanizedbasin
X02 Galvanizedbasin
or X12 Stainlesssteel basin
A10
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188CPAGE 1-12
NC SERIES TOWER ASSEMBLY
Figure 1-12NC5200 thru NC7200,
NCA200 & NCB200(Viewed from underside of basin)
X02 Galvanizedbasin
or
X12 Stainlesssteel basin
W02Galvanizedbasin
V07
V07
V07
W32
W22
A12
A11
C
W02
Galvanizedbasin
A11V07
W22
W32
W22W32
X02 Galvanizedbasin
or
X12 Stainlesssteel basin
(10 required on NC5200)(12 required on NC6200)(14 required on NC7200)(18 required on NCA200and NCB200)
A10
A10
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188C PAGE 1-13
NC SERIES TOWER ASSEMBLY
Figure 1-13NC1200 thru NC4200
The collection basin assembly is completedwith the installation of the fill support angles A14.These angles must be orientated with the bottomflange pointing in the direction shown so thatnotches in the vertical flange will accommodatefill tubes. See Figure 1-13 for models NC1200thru NC4200 or Figure 1-14 for models NC5200thru NC7200, NCA200 and NCB200. If access tothe underside of the collection basin will beavailable, the fill support angles may be installedduring fill installation if desired. Extra attention tosealer application is required.
A14
V07
W22
X02Galvanized basin
or
X12Stainless steel basin
W32
C
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
IIf access to the undersideof the collection basin will beavailable the fill support
angles may be installed during fillinstallation if desired. Extra attentionto sealer application is required.
FindNo. Description
V07 3/8"x1" Bolt
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188CPAGE 1-14
NC SERIES TOWER ASSEMBLY
Figure 1-14NC5200 thru NC7200,
NCA200 & NCB200
A14
V07
W22
X02Galvanized basin
or
X12Stainless steel basin
W32
C
IIf access to the undersideof the collection basin will beavailable the fill support
angles may be installed during fillinstallation if desired. Extra attentionto sealer application is required.
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188C PAGE 1-15
NC SERIES TOWER ASSEMBLY
Before proceding, retighten (check torque) of fasteners on each coldwater basin joint. Sequential installation of fasteners may have loosenedpreviously tightened fasteners.
Remember, if you are havingany problems assembling thiscooling tower, help is just a phonecall away.
(This page intentionally left blank)
97-1188C PAGE 2-1
NC SERIES TOWER ASSEMBLY
Figure 2-1
COLUMNSRefer to Figure 2-1 for installation of col-
umn D01 and bottom cross bracing clip D02 orD03 to collection basin.
NOTE: It is critical that all bolted connectionsin the structural support of mechanicalequipment remain tight. Thread locking
compound has been provided to apply to threads ofgalvanized bolts after final torquing. Because stainlesssteel hardware requires the use of an anti-seizecompound, thread locking compound should not be used.Instead self-locking nuts are used on stainless steelbolts.
I
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
X04 Galvanizedbasin
or
X15 Stainlesssteel basin
D01
D02
D03
W35W30
V32
FindNo. Description
V32 3/4"x2" Bolt
W30 3/4" Flat Washer
W35 3/4" Sealing Washer
X04 3/4" Nut
X15 3/4" Self-locking Nut
97-1188CPAGE 2-2
NC SERIES TOWER ASSEMBLY
ENDPLATESThe endplates D35 (and D39 on motor side
of NC1200) are connected to the columns perFigure 2-2. On the motor side of modelNC1200, an endplate stiffener (D40 on towerswith standard motor location or M38 on towerswith MOA) is also required.
Figure 2-2
NC1200Motor side with MOA
NC1200Motor side withstandard motor
D39
D40
D39
M38
D35
X04 Galvanizedtower
or
X15 Stainlesssteel tower
X04 Galvanizedtower
or
X15 Stainlesssteel tower
X03 Galvanizedtower
or
X13 Stainlesssteel tower
V31
V32
V19
FindNo. Description
V19 1/2"x1 1/2" Bolt
V31 3/4"x1 1/2" Bolt
V32 3/4"x2" Bolt
X03 1/2" Nut
X04 3/4" Nut
X13 1/2" Self-locking Nut
X15 3/4" Self-locking Nut
97-1188C PAGE 2-3
NC SERIES TOWER ASSEMBLY
TORQUE TUBEAttach torque tube assembly D36 to
endplates on models NC1200 thru NC4200 us-ing top holes in endplates. See Figure 2-3.
Figure 2-3NC1200 thru NC4200
X04 Galvanizedtower
or
X15 Stainlesssteel tower
V31
D36
FindNo. Description
V31 3/4"x1 1/2" Bolt
X04 3/4" Nut
X15 3/4" Self-locking Nut
97-1188CPAGE 2-4
NC SERIES TOWER ASSEMBLY
Figure 2-4NC5200 thru NC7200,
NCA200 & NCB200
On models NC5200 thru NC7200, NCA200and NCB200 use bottom three holes to attachtorque tube assembly D36 to endplates. Refer toFigure 2-4.
X04 Galvanizedtower
or
X15 Stainlesssteel tower
V31
D36
FindNo. Description
V31 3/4"x1 1/2" Bolt
X04 3/4" Nut
X15 3/4" Self-locking Nut
97-1188C PAGE 2-5
NC SERIES TOWER ASSEMBLY
BRACINGBegin bracing installation by attaching top
clips D37 and D38 to torque tube assembly. SeeFigure 2-5 for models NC1200 and NC2200.
Figure 2-5NC1200 and NC2200
X04 Galvanizedtower
or
X15 Stainlesssteel tower
V31
D37
D38
FindNo. Description
V31 3/4"x1 1/2" Bolt
X04 3/4" Nut
X15 3/4" Self-locking Nut
97-1188CPAGE 2-6
NC SERIES TOWER ASSEMBLY
X04 Galvanizedtower
or
X15 Stainlesssteel tower
V31
D37
D38
Refer to Figure 2-6 for bracing top clip D37and D38 installation on models NC3200 thruNC7200, NCA200 and NCB200.
Figure 2-6NC3200 thru NC7200,
NCA200 & NCB200
FindNo. Description
V31 3/4"x1 1/2" Bolt
X04 3/4" Nut
X15 3/4" Self-locking Nut
97-1188C PAGE 2-7
NC SERIES TOWER ASSEMBLY
Attach bracing channels D05 to top andbottom bracing clips. See Figure 2-7 for mod-els NC1200 and NC2200.
Figure 2-7NC1200 and NC2200
X04 Galvanizedtower
or X15 Stainlesssteel tower
V31
X04 Galvanizedbasin
or
X15 Stainlesssteel basin
D05
V31
D05
D05D05
FindNo. Description
V31 3/4"x1 1/2" Bolt
X04 3/4" Nut
X15 3/4" Self-locking Nut
97-1188CPAGE 2-8
NC SERIES TOWER ASSEMBLY
Refer to Figure 2-8 for models NC3200and NC4200. Attach bracing channels D05 to topand bottom bracing clips.
Figure 2-8NC3200 and NC4200
X04 Galvanizedtower
or X15 Stainlesssteel tower
V31
X04 Galvanizedbasin
or
X15 Stainlesssteel basin
D05
V31
D05
D05D05
FindNo. Description
V31 3/4"x1 1/2" Bolt
X04 3/4" Nut
X15 3/4" Self-locking Nut
97-1188C PAGE 2-9
NC SERIES TOWER ASSEMBLY
Models NC5200 thru NC7200, NCA200 andNCB200 require two bracing channels D05 andD06 that attach to top and bottom bracing clips.See Figure 2-9.
Figure 2-9NC5200 thru NC7200,
NCA200 & NCB200
X04 Galvanizedtower
or X15 Stainlesssteel tower
V31
X04 Galvanizedtower
or
X15 Stainlesssteel tower
D06
V31
D05
D06
D05
D06
FindNo. Description
V31 3/4"x1 1/2" Bolt
X04 3/4" Nut
X15 3/4" Self-locking Nut
97-1188CPAGE 2-10
NC SERIES TOWER ASSEMBLY
Figure 2-10
X03 Galvanized basin
or X13 Stainless steel basin
V19
D25
D24
LOUVER COLUMNSInstall louver columns D24 and D25 to col-
lection basin per Figure 2-10.
W03Galvanized basin
W33
W23
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V19 1/2"x1 1/2" Bolt
W03 1/2" Lock Washer
W23 1/2" Flat Washer
W33 1/2" Sealing Washer
X03 1/2" Nut
X13 1/2" Self-locking Nut
97-1188C PAGE 2-11
NC SERIES TOWER ASSEMBLY
TOP GIRTSModel NC1200 utilizes a three piece girt
E01, E26 and E27, with stiffeners E28 that mustbe sub-assembled before setting in place. SeeFigure 2-11. Attach girt assembly to centercolumns, but do not bolt to louver columns at thistime.
X02 Galvanizedtower
or X12 Stainlesssteel tower
Figure 2-11NC1200
X04 Galvanizedtower
or
X15 Stainlesssteel tower
V31
V07
X03 Galvanizedtower
E27
E28E01
E28
E28
E01
E26
E01
E26
E27
E27
FindNo. Description
V07 3/8"x1" Bolt
V31 3/4"x1 1/2" Bolt
X02 3/8" Nut
X04 3/4" Nut
X12 3/8" Self-locking Nut
X15 3/4" Self-locking Nut
97-1188CPAGE 2-12
NC SERIES TOWER ASSEMBLY
Figure 2-12NC2200 and NC3200
E32
E32 E01
V31
V31
X04 Galvanizedtower
or
X15Stainlesssteel tower
X04Galvanizedtower or
X15 Stainlesssteel tower
Models NC2200 and NC3200 use a twopiece girt E01 and E32 that splice together at thecenter of the tower per Figure 2-12. Attach girtsto center columns, but do not bolt to louvercolumns at this time.
FindNo. Description
V31 3/4"x1 1/2" Bolt
X04 3/4" Nut
X15 3/4" Self-locking Nut
97-1188C PAGE 2-13
NC SERIES TOWER ASSEMBLY
Figure 2-13NC4200 thru NC7200,
NCA200 & NCB200
E27
E27
V31
X04 Galvanizedtower
or
X15 Stainlesssteel tower
If you have a model NC4200 thru NC7200,NCA200 and NCB200 connect girt E27 to thecenter columns as shown in Figure 2-13.
FindNo. Description
V31 3/4"x1 1/2" Bolt
X04 3/4" Nut
X15 3/4" Self-locking Nut
(This page intentionally left blank)
97-1188C PAGE 3-1
NC SERIES TOWER ASSEMBLY
DISTRIBUTION BASINBefore beginning basin assembly, be sure to
study Figures 3-1 thru 3-3. The same attention tosealing details is required here as on the collec-tion basin to ensure watertightness. The impor-tance of sealing properly the first time cannot beoverstated.
Figure 3-1NC1200 thru NC6200
& NCA200
V07
W22
W32
X02
X12
Galvanizedbasin
orStainless
steel basin W22
W22
V07
W32
W22
C08
C08
X02
X12
Galvanizedbasin
orStainless
steel basin
V07
W32
W22C03
C02
C01
C14
C15
2" (50mm)
24"
(610mm)
12"
(305mm)
3" (75mm)
E
Top row of holes only.
Strip sealerZ13 on top,Z12 on bottom
Top row of holes only.
Strip sealerZ13 on top,
Z12 on bottom
Apply sealer aroundholes, along edges,and on back side ofboth flanges of C08.(Typical)
ISee the �DECALS� section of thismanual for Surface Preparation &General Application Instructions.
Begin basin assembly by attaching sidesC02 and C03 to floor panel C01. Attach cornerseals C08 and apply decals C14 and C15. SeeFigure 3-1 for models NC1200 thru NC6200 andNCA200.
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
E
97-1188CPAGE 3-2
NC SERIES TOWER ASSEMBLY
Models NC7200 and NCB200 assemble simi-larly, but have an additional deflector C04 on theeliminator side of the basin. See Figure 3-2.
Figure 3-2NC7200 & NCB200
V07
W22
W32
X02
X12
Galvanizedbasin
orStainless
steel basin
C04
W22
V07
W32
W22
C08
C08
X02
X12
Galvanizedbasin
orStainless
steel basin
V07
W32
W22
C03
C02
C01
C14
C15
2" (50mm)
24"
(610mm)
12"
(305mm)
3" (75mm)
Top row of holes only.
Strip sealerZ13 on top,Z12 on bottom
Top row of holes only.
Strip sealerZ13 on top,
Z12 on bottom
Apply sealer aroundholes, along edges,and on back side ofboth flanges.
ISee the �DECALS� section of thismanual for Surface Preparation &General Application Instructions.
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
E
E
97-1188C PAGE 3-3
NC SERIES TOWER ASSEMBLY
On models NC4200 thru NC7200, NCA200and NCB200 the sides of the basin are put on atthis time. If you have a galvanized tower withstainless steel distribution basins, stainless steelliners are required. Attach basin side E01 or E26,liner E11 or E12 (if required), and deflector C05as shown in Figure 3-3.
X12
X02Galvanizedbasin
or
Stainlesssteelbasin
V07
V07
W22
W32
W22
W32
Top row of holes only.
Strip sealerZ13 on top,
Z12 on bottom
D
Strip sealer Z12
C05
E11This side
E12Opposite side
or
Required on galvanizedtowers with stainless steel
distribution basins only.
E26This side
E01Oppositeside
or
Bottom row of holes only.
Strip sealerZ12 on top,
Z13 on bottomFigure 3-3
NC4200 thru NC7200,NCA200 & NCB200
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I Find
No. Description
V07 3/8"x1" Bolt
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
E
E
97-1188CPAGE 3-4
NC SERIES TOWER ASSEMBLY
Figure 3-4NC1200 thru NC3200
W32
X02
X12
Galvanizedbasin
orStainless
steel basin
V07
W22W32
W02
C06
V07
W22
Galvanizedbasin
Basin floor stiffeners are installed next. In-stall center stiffener C06 on model NC1200 thruNC3200 per Figure 3-4.
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188C PAGE 3-5
NC SERIES TOWER ASSEMBLY
Figure 3-5NC4200
W22
V07
X02
X12
Galvanized basin
orStainless steel basin
W02
Galvanizedbasin
W32
V07
C06
V07
W22
W32
Model NC4200 requires center stiffener C06installed per Figure 3-5.
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188CPAGE 3-6
NC SERIES TOWER ASSEMBLY
Figure 3-6NC5200, NC6200 & NCA200
W33
X02
X12
Galvanized basin
orStainless steel basin
X03
X13
Galvanized basin
orStainless steel basin
W23V19
X03
X13
Galvanized basin
or Stainless steel basin
W33
W23
V19
Galvanizedbasin
W02
V07
C06
Install center stiffener C06 on modelsNC5200 and NC6200 as shown in Figure 3-6.Model NCA200 has two stiffeners that installsimilarly, but are equally spaced on the floorinstead of being at the center.
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
V19 1/2"x1 1/2" Bolt
W02 3/8" Lock Washer
W23 1/2" Flat Washer
W33 1/2" Sealing Washer
X02 3/8" Nut
X03 1/2" Nut
X12 3/8" Self-locking Nut
X13 1/2" Self-locking Nut
97-1188C PAGE 3-7
NC SERIES TOWER ASSEMBLY
Figure 3-7NC7200 & NCB200
W33
X02
X12
Galvanized basin
orStainless steel basin
X03
X13
Galvanized basin
orStainless steel basin
W23
V19
X03
X13
Galvanized basin
orStainless steel basin
W33
W23
V19
Galvanizedbasin
W02
V07
C06
Model NC7200 requires back to back centerstiffeners C06 installed per Figure 3-7. ModelNCB200 has two sets of stiffeners that installsimilarly, but are equally spaced on the floorinstead of being at the center.
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
V19 1/2"x1 1/2" Bolt
W02 3/8" Lock Washer
W23 1/2" Flat Washer
W33 1/2" Sealing Washer
X02 3/8" Nut
X03 1/2" Nut
X12 3/8" Self-locking Nut
X13 1/2" Self-locking Nut
97-1188CPAGE 3-8
NC SERIES TOWER ASSEMBLY
Figure 3-8NC5200 thru NC7200,
NCA200 & NCB200
X02
X12
Galvanizedbasin
or
Stainlesssteelbasin
V07
W22
W02
Galvanizedbasin
C07
On models NC5200 thru NC7200 additionalfloor stifferners C07 are installed between thecenter stiffener and the basin side per Figure3-8. Models NCA200 and NCB200 have addi-tional stiffeners that install similarly, but are cen-tered between existing stiffeners.
FindNo. Description
V07 3/8"x1" Bolt
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188C PAGE 3-9
NC SERIES TOWER ASSEMBLY
Install tie rod clips C16 to distribution basinper Figure 3-9 on models NC1200 thru NC3200.
Figure 3-9NC1200 thru NC3200 V07
C16
W32
W22
X02
X12
Galvanized basin or
Stainless steel basin
C
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188CPAGE 3-10
NC SERIES TOWER ASSEMBLY
Figure 3-10NC4200 thru NC7200,
NCA200 & NCB200
V07
C16
W32
W22
X02
X12
Galvanized basin or
Stainless steel basin
C
Install tie rod clips C16 to distribution basinper Figure 3-10 on models NC4200 thru NC7200,NCA200 and NCB200. Note that clip does notattach to basin side at this time.
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188C PAGE 3-11
NC SERIES TOWER ASSEMBLY
V07
V19
X03
X13
Galvanized basin or
Stainless steel basin
W33
W23
W02
Galvanizedbasin
X02
X12
Galvanized basin
or Stainless steel basin
E31
Figure 3-11NC4200 thru NC7200,
NCA200 & NCB200
If a handrail package is to be installed onmodels NC4200 thru NC7200, NCA200 andNCB200 a post clip E31 should be installed at thistime as shown in Figure 3-11. If a handrail is notrequired, the top hole provided for the clip attach-ment must be plugged with the fasteners pro-vided.
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
V19 1/2"x1 1/2" Bolt
W02 3/8" Lock Washer
W23 1/2" Flat Washer
W33 1/2" Sealing Washer
X02 3/8" Nut
X03 1/2" Nut
X12 3/8" Self-locking Nut
X13 1/2" Self-locking Nut
97-1188CPAGE 3-12
NC SERIES TOWER ASSEMBLY
Figure 3-12NC1200 thru NC3200
V07
V19
W32
Top row of holes only.
Strip sealerZ13 on top,Z12 on bottom
E02
E11
E12
Required ongalvanized towers
with stainlesssteel distribution
basins only.
W22
The distribution basin is set into place be-tween the girts at this time on models NC1200thru NC3200. Refer to Figure 3-12. If you havea galvanized tower with stainless steel distribu-tion basins, stainless steel liners are required.Attach bolts thru girt, liner E11 or E12 (if re-quired), basin, and deflector C05.
Bottom row of holes only.
Strip sealerZ12 on top,
Z13 on bottom
C05
W32
X12
X02Galvanized
basin
or
Stainlesssteel basin
X13
X03 Galvanizedbasin
or
Stainlesssteel basin
W22
D
Strip sealer Z12
W03
Galvanizedbasin
D
Strip sealer Z12
If required
E02
E11
If required
DistributionBasin Assembly
To avoid damaging sealingwashers use the impact wrenchon the side opposite the sealingwasher wherever possible.I
FindNo. Description
V07 3/8"x1" Bolt
V19 1/2"x1 1/2" Bolt
W03 1/2" Lock Washer
W23 1/2" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X03 1/2" Nut
X12 3/8" Self-locking Nut
X13 1/2" Self-locking Nut
E
E
97-1188C PAGE 3-13
NC SERIES TOWER ASSEMBLY
Figure 3-13NC4200 thru NC7200
On models NC4200 thru NC7200, set basinin place and attach to center girts and louvercolumns as shown in Figure 3-13.
X13
X03 Galvanized tower
or Stainless steel tower
X15
X04 Galvanized tower
or Stainless steel tower
W03 Galvanized tower
W05Galvanized
tower
V31
V19
DistributionBasin Assembly
FindNo. Description
V19 1/2"x1 1/2" Bolt
V31 3/4"x1 1/2" Bolt
W03 1/2" Lock Washer
W05 3/4" Lock Washer
X03 1/2" Nut
X04 3/4" Nut
X13 1/2" Self-locking Nut
X15 3/4" Self-locking Nut
97-1188CPAGE 3-14
NC SERIES TOWER ASSEMBLY
Figure 3-14NCA200 & NCB200
On models NCA200 and NCB200, set basinin place and attach to center girts with spliceplates E30 and E31 and bolt to louver columns asshown in Figure 3-14.
X13
X03 Galvanized tower
or Stainless steel tower
X15
X04 Galvanized tower
or Stainless steel tower
W03 Galvanized tower
W05
Galvanizedtower
V31
V19
DistributionBasin Assembly
E31
E30
E30
E31
FindNo. Description
V19 1/2"x1 1/2" Bolt
V31 3/4"x1 1/2" Bolt
W03 1/2" Lock Washer
W05 3/4" Lock Washer
X03 1/2" Nut
X04 3/4" Nut
X13 1/2" Self-locking Nut
X15 3/4" Self-locking Nut
97-1188C PAGE 4-1
NC SERIES TOWER ASSEMBLY
FAN DECKAfter the distribution basins are in place the
fan deck may be installed. Begin by attaching fandeck channels E13 to top girts per Figure 4-1.
Figure 4-1
X02Galvanizedtower
or
X12Stainlesssteel tower
W02 Galvanizedtower
V07
E13
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188CPAGE 4-2
NC SERIES TOWER ASSEMBLY
Install hoisting clips E03 to top girts as shownin Figure 4-2.
Figure 4-2
X04Galvanizedtower
or
X15Stainlesssteel tower
W05
V32
E03
E03
W30
Galvanizedtower
FindNo. Description
V32 3/4"x2" Bolt
W05 3/4" Lock Washer
W30 3/4" Flat Washer
X04 3/4" Nut
X15 3/4" Self-locking Nut
97-1188C PAGE 4-3
NC SERIES TOWER ASSEMBLY
Figure 4-3NC1200
Fan deck sheets are attached next. ModelNC1200 uses 2 each of fan deck sheets E09 andE15 as shown in Figure 4-3. Basin coversupport E14 is sandwiched between fan deckand distribution basin. If your tower was notordered with optional lubeline, cover lubelineaccess hole with cover plate E10. If your towerwas not ordered with optional ladder and hand-rail, plug holes for handrail post clips and walk-way in top girt flange.
T07
W22
V07E10
T07
W22
X02 Galvanizedtower
or
X12Stainlesssteel tower
X02 Galvanizedtower
or
X12 Stainlesssteel tower
W02 Galvanizedbasin
V07
E09
V07
V19
V07
E15
E14
X02 Galvanized basin
or X12 Stainlesssteel basin
X03 Galvanized tower
or X13 Stainlesssteel tower
W02Galvanized
tower
W02
Galvanizedtower
W02
Galvanizedtower
Plugwalkway
holes
Plug postclip holes
Apply strip sealer Z13 tomating surfaces under fansheet. Paper backing doesnot need to be removed.
FindNo. Description
T07 3/8"x1" Tap Screw
V07 3/8"x1" Bolt
V19 1/2"x1 1/2" Bolt
W02 3/8" Lock Washer
W03 1/2" Lock Washer
W22 3/8" Flat Washer
X02 3/8" Nut
X03 1/2" Nut
X12 3/8" Self-locking Nut
X13 1/2" Self-locking Nut
97-1188CPAGE 4-4
NC SERIES TOWER ASSEMBLY
Figure 4-4NC2200 and NC3200
Models NC2200 and NC3200 use 2 each offan deck sheets E09 and E15 as shown in Figure4-4. Basin cover support E14 is sandwichedbetween fan deck and distribution basin. If yourtower was not ordered with optional lubeline,cover lubeline access hole with cover plate E10.If your tower was not ordered with optional ladderand handrail, plug holes for handrail post clipsand walkway in top girt flange.
T07
W22
V07E10
T07
W22
X02 Galvanizedtower
or
X12 Stainlesssteel tower
W02
Galvanizedbasin
V07
E09
V07V19
V01
E15E14
X02 Galvanized basin
or X12 Stainlesssteel basin
X03Galvanized tower
orX13Stainless steel
tower
W02
Galvanized tower
W02
Galvanizedtower
Plugwalkway
holes
Plug postclip holes
Apply strip sealerZ13 to matingsurfaces under fansheet. Paperbacking does notneed to be removed.
X11
W03Galvanizedtower
X02 Galvanizedtower
or
X12 Stainlesssteel tower
FindNo. Description
T07 3/8"x1" Tap Screw
V01 1/4"x3/4" Bolt
V07 3/8"x1" Bolt
V19 1/2"x1 1/2" Bolt
W02 3/8" Lock Washer
W03 1/2" Lock Washer
W22 3/8" Flat Washer
X02 3/8" Nut
X03 1/2" Nut
X11 1/4" Self-locking Nut
X12 3/8" Self-locking Nut
X13 1/2" Self-locking Nut
97-1188C PAGE 4-5
NC SERIES TOWER ASSEMBLY
Figure 4-5NC4200
Model NC4200 uses 2 each of fan decksheets E09, E15 and E16 as shown in Figure4-5. Basin cover support E14 is sandwichedbetween fan deck and distribution basin. If yourtower was not ordered with optional lubeline,cover lubeline access hole with cover plate E10.If your tower was not ordered with optional ladderand handrail, plug holes for handrail post clipsand walkway in top girt flange.
T07
W22V07
E10
T07
W22
X11
X02
or
X12
W02
V07
E09
V19V01
E15
E14
X02
or X12
X03Galvanized tower or
X13Stainless steel tower
W02
Galvanizedtower
W03
Galvanizedtower
Plugwalkway
holes
Plug postclip holes
Galvanizedbasin
Galvanized basin
Stainlesssteel basin
E16
Galvanizedtower
Stainlesssteel tower
Apply strip sealerZ13 to matingsurfaces under fansheet. Paperbacking does notneed to be removed.
FindNo. Description
T07 3/8"x1" Tap Screw
V01 1/4"x3/4" Bolt
V07 3/8"x1" Bolt
V19 1/2"x1 1/2" Bolt
W02 3/8" Lock Washer
W03 1/2" Lock Washer
W22 3/8" Flat Washer
X02 3/8" Nut
X03 1/2" Nut
X11 1/4" Self-locking Nut
X12 3/8" Self-locking Nut
X13 1/2" Self-locking Nut
97-1188CPAGE 4-6
NC SERIES TOWER ASSEMBLY
Figure 4-6NC5200 thru NC7200,
NCA200 & NCB200
Models NC5200 thru NC7200, NCA200 andNCB200 use 2 each of fan deck sheets E09, E15and E16 as shown in Figure 4-6. Basin coversupport E14 is sandwiched between fan deckand distribution basin. If your tower was notordered with optional lubeline, cover lubelineaccess hole with cover plate E10. If your towerwas not ordered with optional ladder and hand-rail, plug holes for handrail post clips and walk-way in top girt flange.
T07
W22
V07
E10
T07 W22
W02
V07
E09
V19
E15
E14
X02
or X12X03Galvanized tower or
X13Stainless steel tower
W02
Galvanizedtower
W03
Galvanizedtower
Plugwalkway
holes
Plug postclip holes Apply strip sealer
Z13 to matingsurfaces under fansheet. Paperbacking does notneed to be removed.
Galvanizedbasin
Galvanized basin
Stainless steelbasin
E16
V07
X02Galvanized tower or
X12Stainless steel tower
X02Galvanized tower or
X12Stainless steel tower
W02
Galvanizedtower
E15
FindNo. Description
T07 3/8"x1" Tap Screw
V07 3/8"x1" Bolt
V19 1/2"x1 1/2" Bolt
W02 3/8" Lock Washer
W03 1/2" Lock Washer
W22 3/8" Flat Washer
X02 3/8" Nut
X03 1/2" Nut
X12 3/8" Self-locking Nut
X13 1/2" Self-locking Nut
97-1188C PAGE 4-7
NC SERIES TOWER ASSEMBLY
Figure 4-7NC1200
V07
X02
or X12
Galvanized tower
Apply a bead of sealerZ11 to top of angle
W02Galvanized tower
E17
Stainless steel tower
After fan deck sheets are in place, installstiffeners under fan deck. Model NC1200 re-quires one diagonal stiffener E17 in each cornerof fan deck as shown in Figure 4-7.
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188CPAGE 4-8
NC SERIES TOWER ASSEMBLY
Figure 4-8NC2200 thru NC4200
V07
X02
or X12
Galvanized tower
Stainless steel tower
W02Galvanizedtower
E17
E18
Apply a bead of sealerZ11 to top of angle
Models NC2200 thru NC4200 require twodiagonal stiffeners E17 and E18 in each corner offan deck as shown in Figure 4-8.
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188C PAGE 4-9
NC SERIES TOWER ASSEMBLY
Figure 4-9NC5200 thru NC7200,
NCA200 & NCB200
V07
X02
or X12
Galvanized tower
Stainless steel tower
W02Galvanizedtower
E19
Apply a bead of sealerZ11 to top of angle
W02
Galvanizedtower
E17
E18
Models NC5200 thru NC7200, NCA200 andNCB200 require two diagonal stiffeners E17 andE18 in each corner of fan deck and an additionalstiffener E19 installed parallel to each top girt asshown in Figure 4-9.
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
(This page intentionally left blank.)
97-1188C PAGE 5-1
NC SERIES TOWER ASSEMBLY
CASINGBegin casing installation of casing in the
plenum area. On motor side of model NC1200,refer to Figure 5-1 and attach casing sheetsD07 and D08 to the top girt and the collectionbasin. See page 5-8 for typical attachmentdetails. On this model only, the center casingsheet is dependent upon motor selection and isinstalled in the mechanical equipment section ofthis manual.
D08
D07
Apply strip sealer Z13 to columnsbefore installing casing. Afterinstalling casing, run a bead ofsealer Z11 at all casing seams.
Figure 5-1NC1200 Motor Side
97-1188CPAGE 5-2
NC SERIES TOWER ASSEMBLY
D08
D07
Apply strip sealer Z13 to columnsbefore installing casing. Afterinstalling casing, run a bead ofsealer Z11 at all casing seams.
Figure 5-2NC1200 Side Opposite Motor
D10
On side opposite motor, on model NC1200,install casing sheets D07, D08 and D10 as shownin Figure 5-2. See page 5-8 for typical attach-ment details.
97-1188C PAGE 5-3
NC SERIES TOWER ASSEMBLY
D08
D07
Apply strip sealer Z13 to columnsbefore installing casing. Afterinstalling casing, run a bead ofsealer Z11 at all casing seams.
Figure 5-3NC2200 and NC3200
D33D10
D33
D12
D11
On models NC2200 and NC3200, installcasing sheets D07, D08, D10, D11 and D12. Usechannel stiffeners D33 as indicated in Figure5-3. See page 5-8 for typical attachmentdetails.
97-1188CPAGE 5-4
NC SERIES TOWER ASSEMBLY
D08
D07
Apply strip sealer Z13 to columnsbefore installing casing. Afterinstalling casing, run a bead ofsealer Z11 at all casing seams.
Figure 5-4NC4200
D10
On model NC4200, install casing sheetsD07, D08 and D10 as shown in Figure 5-4. Seepage 5-8 for typical attachment details.
97-1188C PAGE 5-5
NC SERIES TOWER ASSEMBLY
D08
D07
Apply strip sealer Z13 to columnsbefore installing casing. Afterinstalling casing, run a bead ofsealer Z11 at all casing seams.
Figure 5-5NC5200
D33D10
D33
D12
D11
On model NC5200, install casing sheetsD07, D08, D10, D11 and D12. Use channelstiffeners D33 as indicated in Figure 5-5. Seepage 5-8 for typical attachment details.
97-1188CPAGE 5-6
NC SERIES TOWER ASSEMBLY
D08
D07
Apply strip sealer Z13 to columnsbefore installing casing. Afterinstalling casing, run a bead ofsealer Z11 at all casing seams.
Figure 5-6NC6200 & NCA200
D33
D10
D33
D12
D11
D43
D43
On models NC6200 and NCA200 installcasing sheets D07, D08, D10, D11, D12 andD43. Use channel stiffeners D33 as indicated inFigure 5-6. See page 5-8 for typical attach-ment details.
97-1188C PAGE 5-7
NC SERIES TOWER ASSEMBLY
D08
D07
Apply strip sealer Z13 to columnsbefore installing casing. Afterinstalling casing, run a bead ofsealer Z11 at all casing seams.
Figure 5-7NC7200 & NCB200
D33D10
D33
D12
D11
On models NC7200 and NCB200 installcasing sheets D07, D08, D10, D11 and D12. Usechannel stiffeners D33 as indicated in Figure 5-7. See page 5-8 for typical attachment details.
97-1188CPAGE 5-8
NC SERIES TOWER ASSEMBLY
X03
Galvanized tower
or
X12
Stainless steel tower
W03
Galvanized tower
V07 V07
X12
Galvanizedtower
or
X02
Stainlesssteel tower
W02Galvanizedtower
Casing to TopDeck Attachment
Casing to CasingAttachment
Casing to CollectionBasin Attachment
Typical Other CasingAttachment
V07T07
V07
W32
W02
X02Galvanized basin or
X12Stainless steel basin
Galvanizedbasin
W02
X02Galvanized tower or
X12Stainless steel tower
Galvanizedbasin
In fillarea
D33
Whenrequired
Bolt headon outsideof tower
or V19
orW02
X13or
X02or
FindNo. Description
X02 3/8" Nut
X03 1/2" Nut
X12 3/8" Self-locking Nut
X13 1/2" Self-locking Nut
FindNo. Description
T07 3/8"x1" Tap Screw
V07 3/8"x1" Bolt
V19 1/2"x1 1/2" Bolt
W02 3/8" Lock Washer
W03 1/2" Lock Washer
W32 3/8" Sealing Washer
97-1188C PAGE 6-1
NC SERIES TOWER ASSEMBLY
FillBefore beginning, determine which side of
tower the fill will be installed from. Sufficientspace is required on one side of the tower to allowfill tubes to be installed in the collection basin (thiswill be a space approximately equal to the widthof the tower). Once this is determined, the firststep is to install the casing on the opposite side.
If you have a model NC1200 thru NC4200refer to Figure 6-1. Locate casing sheet B03,and attach tube support B07.
Figure 6-1NC1200 thru NC4200
T07
W32
B03
B07
B07
B03
Strip sealer Z12
D
FindNo. Description
T07 3/8"x1" Tap Screw
W32 3/8" Sealing Washer
97-1188CPAGE 6-2
NC SERIES TOWER ASSEMBLY
Figure 6-2NC5200, NC6200 & NCA200
If you have a model NC5200, NC6200 orNCA200 refer to Figure 6-2. Locate casingsheet B03, and attach tube support B07.
T07
W32
B03
B07
B07
B03
Strip sealer Z12
D
FindNo. Description
T07 3/8"x1" Tap Screw
W32 3/8" Sealing Washer
97-1188C PAGE 6-3
NC SERIES TOWER ASSEMBLY
Figure 6-3NC7200 & NCB200
If your model is an NC7200 or NCB200,locate casing sheets B01 thru B04 and assemblewith channel stiffeners D33 as shown in to Figure6-3.
D33
B03
B04
B01
B02
D33
V07
X02
W02
X12
Galvanizedtower
Stainless steel tower
or
Strip sealer Z13
G
Galvanizedtower
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188CPAGE 6-4
NC SERIES TOWER ASSEMBLY
Figure 6-4NC7200 & NCB200
Continue on with models NC7200 andNCB200 by attaching tube support B07. SeeFigure 6-4.
B07
B07
Strip sealer Z12
D
T07
Casing assembly
FindNo. Description
T07 3/8"x1" Tap Screw
W32 3/8" Sealing Washer
W32
97-1188C PAGE 6-5
NC SERIES TOWER ASSEMBLY
Figure 6-5
Apply strip sealer Z13 on top flange ofassembled casing. Attach casing to collectionbasin, top girt, louver column and existing casingas shown in Figure 6-5. Casing to casingattachments require the use of channel stiffenersD33.
X02
X12
Galvanized tower
Stainless steel tower
or
Galvanizedtower
D33
Casingassembly
FindNo. Description
T07 3/8"x1" Tap Screw
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
V07
Galvanizedtower
W02
V07
T07W32
X02
X12
or
Galvanized tower
Stainless steel tower
V07
W02
D33
* Apply strip sealer by placingedge of sealer against theedge of the holes. Fold thesealer around the corner ontothe vertical face of the casingsheet.
Interior face ofcasing assembly
Strip sealer Z12 *
97-1188CPAGE 6-6
NC SERIES TOWER ASSEMBLY
Slip fill support tubes B10 thru holes in tubesupport and slide retaining bolt V06 from the top,thru the slot in tube support and on thru the holesin the support tube. This prevents the tube fromslipping out of support. See Figure 6-6.
V06
B10
Figure 6-6Viewed from Underside
of Distribution Basin
FindNo. Description
V06 1/4"x4" Bolt
97-1188C PAGE 6-7
NC SERIES TOWER ASSEMBLY
Figure 6-7Viewed from Underside
of Distribution Basin
Temporary tube supports B27 are suppliedwith the tower to assist with the fill installation(wire or rope must be supplied by the erector).Refer to Figure 6-7 and install tempory fill tubesupport approximately 12" (305mm) from centerof tower as shown.
Thera are two types of fill sheets, B11 andB12, which are installed alternately to form aproperly spaced fill pack. It is important that thefill packs be installed correctly or the coolingtower will not perform at full capacity. You can tellthe difference between an A fill sheet B11 and aB fill sheet B12 by the rotation of the indexingspacer formed within the fill sheet.
With temporary tube support in place, beginby installing one A fill sheet and water deflectorB08 with the short flange bent towards the first fillsheet. Continue fill sheet installation (first a Bsheet, and then an A sheet) until the number ofsheets recommended to be to the left of the fillpartition have been installed, (see Figure 6-9 formodels NC1200 thru NC4200, Figure 6-10 formodels NC5200, NC6200 and NCA200 or Figure6-11 for models NC7200 and NCB200) plus twoadditional sheets. The edges of the sheetsshould form a honeycomb pattern on the louverand eliminator faces as they are installed. If anyof the sheets "nest" together, you have installedtwo identical sheets together.
B27
B11
Temporarytube support
Indexingspacer
Eliminators(NC1200 thru
NC6200 &NCA200)
Louvers
Temporary HangerFasten rope or wire thru nozzle holes indistribution basin and thru 3/4" (19mm)diameter holes in Marley supplied supports.
B12
B08
97-1188CPAGE 6-8
NC SERIES TOWER ASSEMBLY
Figure 6-8
With the recommended number of fill sheetson the support tubes, install another temporarytube support B27 on the outside of the fill asshown in Figure 6-8. Remove the first tempo-rary support and slide the fill sheets over againstthe casing. If lower fill tube retainers are notalready in place, they should be installed as fill isbeing moved into place. For location of lower filltube retainers, see Figure 6-12.
Tower models NC1200 thru NC3200 do notrequire U-bolt supports, so fill partition is installednext. Tower models NC4200 thru NC7200,NCA200 and NCB200 require U-bolt supports onthe upper fill tubes. First, compress the fillsimulating a tight installation. Next, determinebetween which fill sheets U-bolts should beinstalled by locating slots in distribution basinfloor and projecting straight down. Install U-boltsN98 per Figure 6-13A.
Fill sheets should forma honeycomb pattern.
B27
After installing the recommendednumber of fill sheets, install asecond temporary support towardthe ends of the tubes. Removefirst support and slide fill into finalposition. A lubricant on thesurface of the tube may facilitatesliding the fill.
If tube retainers make fillinstallation difficult and accessto the underside of collectionbasin is available, retainersmay be installed as the fill ismoved into place. See Figure6-12A.
97-1188C PAGE 6-9
NC SERIES TOWER ASSEMBLY
Figure 6-9NC1200 thru NC4200
B12&
Alternatingfill sheets
B11
B±1
A±1
B10
X02 X12 Stainless steel tower
Galvanizedtower
or
Apply sealer Z12on flat surfaceacross deflectorson both eliminatorand louver faces.
Apply a bead of sealer Z11around and between holesbefore installing deflectors.Apply an additional bead ofsealer along top edge ofdeflector after it is in place.
Galvanized tower
If the fill pack is not tight, use additional fill sheets from padprovided.
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
Recommended Fill Sheet Quantities
Model A B + Last Sheet Total
NC1200 49 49 98
NC2200 65 57 122
NC3200 65 57 122
NC4200 73 65 138
W02
B15
V07
B13
B08
or
Last fill sheet
B11 B12
97-1188CPAGE 6-10
NC SERIES TOWER ASSEMBLY
Figure 6-10NC5200, NC6200 & NCA200
B12&
Alternatingfill sheets
B11
B±1
A±1
W02
X12 Stainless steel tower
Galvanizedtower
or
Apply sealer Z12on flat surfaceacross deflectorson both eliminatorand louver faces.
Apply a bead of sealer Z11around and between holesbefore installing deflectors.Apply an additional bead ofsealer along top edge ofdeflector after it is in place.
Galvanized tower
If the fill pack is not tight, use additional fill sheets from padprovided.
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
Recommended Fill Sheet Quantities
Model A B + Last Sheet Total
NC5200 89 81 170
NC6200 97 89 186
NCA200 120 98 218
X02
V07
B15
B10
B08
B14
B13
or
Last fill sheet
B11 B12
97-1188C PAGE 6-11
NC SERIES TOWER ASSEMBLY
Figure 6-11NC7200 & NCB200
If the fill pack is not tight, use additional fill sheets frompad provided.
B12&
Alternatingfill sheets
B11
B±1
A±1
B10
Stainless steeltower
Galvanizedtower
or
Apply sealer Z12on flat surfaceacross deflectorson botheliminator andlouver faces.
Apply a bead of sealerZ11 around and betweenholes before installingdeflectors. Apply anadditional bead of sealeralong top edge of deflectorafter it is in place.
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
Recommended Fill Sheet Quantities
Model A B + Last Sheet Total
NC7200 97 89 186
NCB200 104 114 218
Galvanizedtower
W02X02
X12
V07
B15
B08
B12or
Last fill sheet
B11
B13B14
97-1188CPAGE 6-12
NC SERIES TOWER ASSEMBLY
The fill partition will be installed next perFigure 6-9, 6-10 or 6-11. Sub-assemble the fillpartition before installing in tower. Models NC5200thru NC7200, NCA200 and NCB200 must haveeliminator side B13 attached to louver side B14.All models have water deflectors B15 at the topthat bolt together with partition sandwiched be-tween. Install in tower in the same mannor as thefill sheets. Deflectors on fill partition are to extendover the first fill sheet next to the partition. Sealends of deflectors, under hot water basin deflec-tors, using strip sealer Z12.
If the fill pack is not tight, use additional fill sheetsfrom pad provided.
B
A
A
Figure 6-12Two times A plus B equals the
Total number of fill sheets.
Fill supports
Recommended Fill Sheet Quantities
Model A B Total
NC1200 11 76 98
NC2200 11 100 122
NC3200 11 100 122
NC4200 11 116 138
NC5200 32 106 170
NC6200 32 122 186
NC7200 32 122 186
NCA200 48 122 218
NCB200 48 122 218
97-1188C PAGE 6-13
NC SERIES TOWER ASSEMBLY
Figure 6-13B
Remove the temporary support at the rightend of the fill tubes. Note: be sure the U-bolts arein place (on NC4200 thru NC7200, NCA200 andNCB200) before removing the temporary sup-port. Continue installing fill sheets as describedearlier until all but the last sheet are in place.Note: if the final fill sheets are difficult to install usea sheet of plywood with ropes near the top andbottom of the fill to compress and hold the fill whilethe last sheets are installed. Make sure fill packis tight. If additional fill sheets can be added, doso. Install water deflector B08 with the top bentflange toward the casing (see Figure 6-13B).Install the final fill sheet.
Fill sheets
Water deflector
Casing
First and last fillsheets thould bebetween the casingand the waterdeflectorB08. Topdeflector flangeshould be angledtoward casing.
Figure 6-13ANC4200 thru NC7200,
NCA200 & NCB200
A
X11
Fill tube
N35
W21
N98
Vertical distance from top of filltube to distribution basin floor.
Install one per tube (NC4200 thruNC7200) or two per tube (NCA200 &NCB200)
FindNo. Description
W21 1/4" Flat Washer
X11 1/4" Self-locking Nut
Model A
NC4200 8 15/16" (227mm)
NC5200 8 1/16" (205mm)
NC6200 8 1/16" (205mm)
NC7200 8 1/16" (205mm)
NCA200 8 1/16" (205mm)
NCB200 8 1/16" (205mm)
B08
97-1188CPAGE 6-14
NC SERIES TOWER ASSEMBLY
Figure 6-14
V06
Models NC1200thru NC4200 have
only one tube.
V07
B07
W02 X02
B18
W32
B01T07
W32
B10
X12 Stainlesssteel tower
or
Galvanizedtower
Galvanizedtower
Strip sealer Z12
D
T07
B
or
B17 When the lower tube is not thesame material as the upper tube.
T07W32
Slip tube support B07 over fill tubes and slidebolt V06 thru slot in support and thru holes in endof tube as shown in Figure 6-14. Install lower fillretainer tubes B10 or B17 thru the cutouts in thecollection basin and into the holes in the fill. Note:lower tubes install easier from the left side of thefill, when viewed from the louvers. This may notbe possible due to tower location. Also, a light oilor soap on the tubes can help. After the lowertubes are in place install coverplates B18 asshown. Note: on multiple tower installation,coverplates must be installed on side betweentowers, before next cell is set in place. Apply stripsealer Z12 to tube support B07 and casing sheetB01 (or casing assembly on models NC7200 andNCB200) as shown. Maneuver casing into placeand attach to collection basin, girt, and tubesupport.
Install remaining casing by refering back toCasing Section and Figures 5-1 thru 5-7.
FindNo. Description
T07 3/8"x1" Tap Screw
V06 1/4"x4" Bolt
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
Interior face ofcasing assembly
* Apply strip sealer by placingedge of sealer against theedge of the holes. Fold thesealer around the corner ontothe vertical face of the casingsheet.
Strip sealer Z12 *
97-1188C PAGE 6-15
NC SERIES TOWER ASSEMBLY
Figure 6-15NC7200
Eliminator PacksEliminator packs are required on models
NC7200 and NCB200. See Figure 6-15 formodel NC7200. Attach eliminator support anglesA16 to bottom fill supports and eliminator supportD18 to eliminator support angles. Attach topeliminator retainer D23 to distribution basin end.
Eliminator packs are installed by pushing upunder the top retainer and setting over lip onbottom eliminator tray. Install eliminator packsD19 beginning against the casing on the rightside and continuing towards the fill partition. The
pack next to the fill partition must be cut to fit snugagainst the right side of the fill partition, with theremainder of the pack placed on left side ofpartition. Continue adding full width packs untilthey no longer fit. Measure remaining space, cutthe last pack 1" (2.54 mm) wider and install for atight fit.
V07
V07
W02 Galvanized tower
X02
X12Stainlesssteel tower or
Galvanized tower
X02
X12Stainlesssteel tower
or
Galvanizedtower
D23
Distribution basin end
W02
Galvanizedtower
V07
A16
D18
Fill support
Fill side
Dischargeside
Fill side
Discharge side
Section A-A
Cut off last pack this side soeliminator pack will set flush.
D19
Fillpartition
Typical
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188CPAGE 6-16
NC SERIES TOWER ASSEMBLY
Figure 6-16NCB200
See Figure 6-16 for model NCB200. Attacheliminator support angles A16 to bottom fill sup-ports and eliminator support D18 to eliminatorsupport angles. Attach top eliminator retainerD23 to distribution basin end.
Eliminator packs are installed by pushing upunder the top retainer and setting over lip onbottom eliminator tray. Install eliminator packsbeginning with 4.8" (122 mm) wide pack D20against the casing on the right side and continu-ing towards the fill partition with 9.6" (244) widepacks D19. The pack next to the fill partition must
be cut to fit snug against the right side of the fillpartition, with the remainder discarded. Begin onleft side of fill partition with D19 and continue untilthey no longer fit. Measure remaining space, cutthe last pack 1" (2.54 mm) wider and install for atight fit.
V07
V07
W02 Galvanized tower
X02
X12Stainlesssteel tower or
Galvanized tower
X02
X12Stainlesssteel tower
or
Galvanizedtower
D23
Distribution basin end
W02
Galvanizedtower
V07
A16
D18
Fill support
Fill side
Dischargeside
Fill side
Discharge side
Section A-A
Cut off last pack this side soeliminator pack will set flush.
D20
Fillpartition
First packonly
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
D19
Typical
97-1188C PAGE 7-1
NC SERIES TOWER ASSEMBLY
TIE RODSFigure 7-1 shows the tie-rod installation
on the louver face. Connect tie-rods D27 tocollection basin end at the bottom and tie-rod clipat the top. Secure tie-rods where they crossusing U-bolt D41. Note that galvanized U-boltscome with a plate and nuts for installation, but onstainless steel towers the plate D42 and nuts areseperate items.
D27
Figure 7-1
V32
X04
D27
X15or Stainless steel basin
Galvanized basin
W30
V32
W35X04
X15 orStainless steel basin
Galvanized basin
D41
D41
orStainlesssteel tower
Galvanized tower
D42 X01
D27
C
FindNo. Description
V32 3/4"x2" Bolt
W30 3/4" Flat Washer
W35 3/4" Sealing Washer
X01 1/4" Nut
X04 3/4" Nut
X15 3/4" Self-locking Nut
97-1188CPAGE 7-2
NC SERIES TOWER ASSEMBLY
Figure 7-2NC1200 thru NC4200
& NCA200
LOWER FAN CYLINDERRefer to Figure 7-2 for lower fan cylinder
orientation on models NC1200 thru NC4200 andNCA200 or to Figure 7-3 for models NC5200 thruNC7200 and NCB200.
Install 1/4" bolts (with threaded end up)around cutout in fan deck using sealing washersW31 as retainers to hold bolts in place. Lower
E20
E21
E21
E20
fiberglass fan cylinder segments E20 (and E21on models NC1200 thru NC4200 and NCA200)over bolts as shown in Figure 7-4A. Note: beforetightening fasteners, making splice joints, or in-stalling doweling fasteners, refer to the Fan Ad-justment section.
97-1188C PAGE 7-3
NC SERIES TOWER ASSEMBLY
Figure 7-3NC5200 thru NC7200
& NCB200
E20
E20
Make adjustments, then splice cylinder seg-ments together using existing holes in cylinder asa template, drill (3) 7/16" (11mm) holes and installfasteners as shown in Figure 7-4B.
Drill doweling holes in each cylinder seg-
ment at approximately 22 1/2° off tower centerlineand install doweling fasteners as indicated inFigure 7-5A. After tightening fasteners, boltcylinder to fan deck stiffeners.
97-1188CPAGE 7-4
NC SERIES TOWER ASSEMBLY
Figure 7-4ACylinder to Deck Attachment
Figure 7-4BCylinder Splice
Stainless steel fasteners used on all towers.
E21
W31
W21
V04
W21
E20
or
Use cylinder as atemplate to drill holes.
W22
V07
X12
W22E21E20 or
FindNo. Description
V04 1/4"x1 1/2" Bolt (all thd.)
V07 3/8"x1" Bolt
W21 1/4" Flat Washer
W22 3/8" Flat Washer
W31 1/4" Sealing Washer
X11 1/4" Self-locking Nut
X12 3/8" Self-locking Nut
X11
97-1188C PAGE 7-5
NC SERIES TOWER ASSEMBLY
Figure 7-5ADoweling Installation
Figure 7-5BCylinder to Stiffener Attachment
T10
X11
Drill (2) 1/4" (6mm) diameter holesthru fan deck in each cylindersegment, countersink, and installfasteners (bolt head up).
W11
V02
X11
W11
Stainless steel fasteners used on alltowers.
FindNo. Description
T10 1/4"x1" Flat Head Bolt
V02 1/4"x1" Bolt (all thd.)
W11 1/4" Oversize Washer
X11 1/4" Self-locking Nut
(This page intentionally left blank.)
97-1188C PAGE 8-1
NC SERIES TOWER ASSEMBLY
MECHANICAL EQUIPMENTThe previously installed torque tube assem-
bly that spans the width of the tower has a platefor each, the motor and Geareducer to sit on. Themotor utilizes channel supports that produce thecorrect elevation and the Geareducer may ormay not have similar supports, depending ontower model.
On towers with motor outside airstream(MOA) option, the motor is placed on a specialsupport outside the tower and a driveshaft isused as the drive line between motor andGeareducer.
Review tower model, motor frame, and mo-tor location on tower being assembled and referto the table on this page for corresponding figurenumbers to use in this manual.
INote that standard motor location is onthe side opposite of the 6" (152mm)diameter hole in the collection basin floor.
Tower Model Motor FrameRequired Figure Numbers
Standard MotorLocation
MOA Option
NC1200 &NC1210
184T, 213T, 215T,254T & 256T
8-2, 8-4, 8-11 & 8-16 8-3, 8-4, 8-9, 8-11 & 8-17
NC1220213T & 215T 8-2, 8-5, 8-12 & 8-16 8-3, 8-5, 8-9, 8-12 & 8-17
254T, 256T & 284TS 8-2, 8-5, 8-13 & 8-16 8-3, 8-5, 8-9, 8-13 & 8-17
NC2200 thruNC4200
215T 8-6, 8-12 & 8-16 8-6, 8-9, 8-12 & 8-17254T, 256T, 284T,
284TS, 286T & 286TS8-6, 8-14 & 8-16 8-6, 8-9, 8-14 & 8-17
324TS 8-6, 8-15 & 8-16 8-6, 8-9, 8-15 & 8-17
NC4200 324T & 326T 8-6, 8-15 & 8-16 8-6, 8-9, 8-15 & 8-17
NC5200 thruNC5220
215T 8-7, 8-12 & 8-16 8-7, 8-10, 8-12 & 8-17
254T & 256T 8-7, 8-11 & 8-16 8-7, 8-10, 8-11 & 8-17284T,286T,324T,326T
& 364T8-7, 8-14 & 8-16 8-7, 8-10, 8-14 & 8-17
NC5230 thruNC7200, NCA200
& NCB200
215T, 254T & 256T 8-8, 8-11 & 8-16 8-8, 8-10, 8-11 & 8-17284T, 286T,324T, 326T,
364T & 365T8-8, 8-14 & 8-16 8-8, 8-10, 8-14 & 8-17
NC7200, NCA200& NCB200 404T & 405T 8-8, 8-15 & 8-16 8-8, 8-10, 8-15 & 8-17
97-1188CPAGE 8-2
NC SERIES TOWER ASSEMBLY
On model NC1200, the casing installed inthe motor area is dependent upon the motorlocation. When the motor is in the standardlocation it will project thru the casing and there-fore requires a motor cover. See Figure 8-2.
Figure 8-2NC1200 only
The motor cover may come in three pieces asshown, or on smaller motors, a one piece designis used. Both designs install similarly. Installmotor cover D50 (and D51 if required) as shown.
X02 Galvanized tower
or X12 Stainlesssteel tower
W02 Galvanized tower
V07
X12
Galvanizedtower
or
X02
Stainlesssteel tower
W02 Galvanizedtower
W02
Galvanizedtower V07
V07
D51
D51
D50
X02 Galvanized tower
or X12 Stainlesssteel tower
W02 Galvanized tower
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188C PAGE 8-3
NC SERIES TOWER ASSEMBLY
On model NC1200 with the MOA option,install center casing sheet D50 as shown inFigure 8-3.
Figure 8-3NC1200 only
X12
Galvanizedtower
or
X02
Stainlesssteel tower
W02
Galvanizedtower
X02 Galvanized tower
or X12 Stainlesssteel tower
W02 Galvanized tower
V07
V07
D50
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188CPAGE 8-4
NC SERIES TOWER ASSEMBLY
Figure 8-4NC1200 and NC1210
GEAREDUCER INSTALLATIONThe Geareducer type and installation is de-
pendent upon what model cooling tower is beingassembled. Models NC1200 & NC1210 use aSeries 10 Geareducer installed on a support.Attach Geareducer support stiffeners M33 to
Geareducer support M32, adding spacers M41as required. Attach support to plate on torquetube assembly and Geareducer M20 to support,as shown. See Figure 8-4.
M33
X03 Galvanized tower
or X13 Stainlesssteel tower
W03
Galvanizedtower
V19
W23
W23
V22
W23V19
M41
Use asrequired toeliminategaps.
X03
W03
X03Galvanizedtower
or
X13Stainlesssteel tower
W23
M32 Position flange with slotstoward back of Geareducer.
Series 10Geareducer
M20
M33
W03Galvanizedtower
W23
IDo not apply anti-seize compoundto stainless steel Geareducer holddown bolts. Loctite will be appliedto these attachments later.
FindNo. Description
V19 1/2"x1 1/2" Bolt
V22 1/2"x2 1/2" Bolt
W03 1/2" Lock Washer
W23 1/2" Flat Washer
X03 1/2" Nut
X13 1/2" Self-locking Nut
97-1188C PAGE 8-5
NC SERIES TOWER ASSEMBLY
Figure 8-5NC1220
Refer to Figure 8-5 for installation of aSeries 20 Geareducer M20 on model NC1220.
M20
Series 20Geareducer
W04
X05
W29
W29
V30
IDo not apply anti-seize compoundto stainless steel Geareducer holddown bolts. Loctite will be appliedto these attachments later.
FindNo. Description
V30 5/8"x2 1/2" Bolt
W04 5/8" Lock Washer
W29 5/8" Flat Washer
X05 5/8" Nut
97-1188CPAGE 8-6
NC SERIES TOWER ASSEMBLY
Figure 8-6NC2200 thru NC4200
Models NC2200 thru NC4200 use a Series20 Geareducer M20 installed per Figure 8-6.
M20
Series 20Geareducer
W04
X05
W29
W29
V30
IDo not apply anti-seize compoundto stainless steel Geareducer holddown bolts. Loctite will be appliedto these attachments later.
FindNo. Description
V30 5/8"x2 1/2" Bolt
W04 5/8" Lock Washer
W29 5/8" Flat Washer
X05 5/8" Nut
97-1188C PAGE 8-7
NC SERIES TOWER ASSEMBLY
Figure 8-7NC5200 thru NC5220
On model NC5200 thru NC5220 attachGeareducer supports M32 and M33 to plate ontorque tube assembly and then the Series 20Geareducer M20 to supports. See Figure 8-7.
M20 Series 20Geareducer
W04
X05
W29
W29
V30
W23
W03
X03
Stainlesssteel tower
Galvanizedtower
or
X13
Galvanizedtower
W29
V29
M33
M32Position flange withslots toward back ofGeareducer.
Position flange withslots toward backof Geareducer.
IDo not apply anti-seize compoundto stainless steel Geareducer holddown bolts. Loctite will be appliedto these attachments later.
V19
X05
Stainlesssteel tower
Galvanizedtower
or
X14
W04
Galvanizedtower
W29
(Over slots only)
FindNo. Description
V19 1/2"x1 1/2" Bolt
V29 5/8"x2" Bolt
V30 5/8"x2 1/2" Bolt
W03 1/2" Lock Washer
W04 5/8" Lock Washer
W23 1/2" Flat Washer
W29 5/8" Flat Washer
X03 1/2" Nut
X05 5/8" Nut
X13 1/2" Self-locking Nut
X14 5/8" Self-locking Nut
97-1188CPAGE 8-8
NC SERIES TOWER ASSEMBLY
Figure 8-8NC5230 thru NC7200,
NCA200 & NCB200
Models NC5230 thru NC7200, NCA200 andNCB200 use a Series 22 Geareducer M20 thatattaches directly to the plate on the torque tubeassembly. Models NC7200, NCA200 andNCB200 require stiffener plates M24 under theback Geareducer feet. Refer to Figure 8-8.
Series 22Geareducer
W04
X05
W29
W29
M24NC7200,NCA200 &NCB200 only
M20
IDo not apply anti-seize compoundto stainless steel Geareducer holddown bolts. Loctite will be appliedto these attachments later.
FindNo. Description
V30 5/8"x2 1/2" Bolt
V49 5/8"x3" Bolt
W04 5/8" Lock Washer
W29 5/8" Flat Washer
X05 5/8" Nut
V30 NC5230 &NC6200 only
V49NC7200,NCA200 &NCB200 only
or
97-1188C PAGE 8-9
NC SERIES TOWER ASSEMBLY
Figure 8-9NC1200 thru NC4200
with MOA option
MOTOR INSTALLATIONIf your tower has the MOA option, you must
install a motor support on the outside of thecasing. For models NC1200 thru NC4200 referto Figure 8-9. The motor support is bolted tothe tower using the same holes that attach thetorque tube assembly. Leave the bottom twobolts on each side in place and remove the toptwo bolts. Attach motor support M29 on outsideof tower with support angles M36 and channelsM37 on inside of tower as shown.
X04 Galvanized tower
or X15 Stainlesssteel tower
V19
X03 Galvanized tower
or X13 Stainlesssteel tower
V32
M29
M37
M36
Do not remove these twobolts! Square holes in motorsupport are to clear bolt heads.
FindNo. Description
V19 1/2"x1 1/2" Bolt
V32 3/4"x2" Bolt
X03 1/2" Nut
X04 3/4" Nut
X13 1/2" Self-locking Nut
X15 3/4" Self-locking Nut
97-1188CPAGE 8-10
NC SERIES TOWER ASSEMBLY
Figure 8-10NC5200 thru NC7200,
NCA200 & NCB200with MOA option
For models NC5200 thru NC7200, NCA200and NCB200 refer to Figure 8-10. The motorsupport is bolted to the tower using the sameholes that attach the torque tube assembly. Leavethe middle two bolts on each side in place andremove the top and bottom bolts. Attach motorsupport M29 on outside of tower with supportchannel assembly M36 and channels M37 oninside of tower as shown.
X04 Galvanized tower
or X15 Stainlesssteel tower
V19
X02 Galvanized tower
or X12 Stainlesssteel tower
V32
M29
M37
M36
Do not remove these twobolts! Square holes in motorsupport are to clear bolt heads.
V07
X03 Galvanized tower
or X13 Stainlesssteel tower
FindNo. Description
V07 3/8"x1" Bolt
V19 1/2"x1 1/2" Bolt
V32 3/4"x2" Bolt
X02 3/8" Nut
X03 1/2" Nut
X04 3/4" Nut
X12 3/8" Self-locking Nut
X13 1/2" Self-locking Nut
X15 3/4" Self-locking Nut
97-1188C PAGE 8-11
NC SERIES TOWER ASSEMBLY
Figure 8-11
The motor will set on supports that vary inheight dependent upon tower model and motorframe. If your tower model and motor frame arelisted below, refer to Figure 8-11. Install motorto support as shown.
X02 184T, 213T & 215T
or X03 254T & 256T
W02 184T, 213T & 215T
or W03 254T & 256T
W23
184T, 213T & 215T
or
W22
254T & 256T
V09 213T & 215T
or V22 254T & 256T
V07 184T
or
Motor
M25
A
Position flangewith slots towardback of motor.
IDo not apply anti-seize compoundto stainless steel motor hold downbolts. Loctite will be applied tothese attachments later.
FindNo. Description
V07 3/8"x1" Bolt
V09 3/8"x1 1/2" Bolt
V22 1/2"x2 1/2" Bolt
W02 3/8" Lock Washer
W03 1/2" Lock Washer
W22 3/8" Flat Washer
W23 1/2" Flat Washer
X02 3/8" Nut
X03 1/2" Nut
Tower Model Motor Frame A
NC1200 thru NC1210
184T 2 1/8" (54mm)
213T & 215T 2 1/8" (54mm)
254T & 256T 2" (51mm)
97-1188CPAGE 8-12
NC SERIES TOWER ASSEMBLY
Figure 8-12
If your tower model and motor frame arelisted below, refer to Figure 8-12. Install motorto supports M25 and stiffeners M34 and M35 withspacers M42 as shown.
A
X02
W02
Motor
M25Position flange
with slots towardback of motor.
IDo not apply anti-seize compoundto stainless steel motor hold downbolts. Loctite will be applied tothese attachments later.
Tower Model Motor Frame A
NC1220 213T & 215T 2 3/16" (56mm)
NC2200 thru NC4200 215T 1 7/8" (48mm)
NC5200 thru NC5220 215T 2 1/8" (54mm)
FindNo. Description
V09 3/8"x1 1/2" Bolt
V19 1/2"x1 1/2" Bolt
W02 3/8" Lock Washer
W03 1/2" Lock Washer
W22 3/8" Flat Washer
W23 1/2" Flat Washer
X02 3/8" Nut
X03 1/2" Nut
X13 1/2" Self-Locking Nut
V09
W22
W23 or
Stainlesssteel tower
X03
X13
Galvanizedtower
W03 Galvanized Tower
V19
W23
M42
M34
M35
97-1188C PAGE 8-13
NC SERIES TOWER ASSEMBLY
Figure 8-13
If your tower model and motor frame arelisted below, refer to Figure 8-13. Install motorto supports M25 and M26 as shown.
X03
W03
A
M25
Position flangewith slots towardback of motor.
V22
W23
Motor
B
M26
Position flangewith slots towardback of motor.
IDo not apply anti-seize compoundto stainless steel motor hold downbolts. Loctite will be applied tothese attachments later.
Tower Model Motor Frame A B
NC1220
254T
3 1/2" (89mm)
2 5/16" (59mm)
256T 4" (102mm)
284TS 3 9/16" (90mm)
FindNo. Description
V22 1/2"x2 1/2" Bolt
W03 1/2" Lock Washer
W23 1/2" Flat Washer
X03 1/2" Nut
97-1188CPAGE 8-14
NC SERIES TOWER ASSEMBLY
Figure 8-14
If your tower model and motor frame arelisted below, refer to Figure 8-14. Install motorto supports M25 and stiffeners M34 and M35 withspacers M42 as shown. X03
Position flangewith slots towardback of motor.
Motor
M34
IDo not apply anti-seize compoundto stainless steel motor hold downbolts. Loctite will be applied tothese attachments later.
Tower Model Motor Frame A
NC5200 thru NC5220 254T & 256T 2 11/16" (68mm)
NC5230 thru NC7200215T 2 7/16" (62mm)
254T & 256T 2 9/16" (65mm)
FindNo. Description
V19 1/2"x1 1/2" Bolt
V22 1/2"x2 1/2" Bolt
W03 1/2" Lock Washer
W23 1/2" Flat Washer
X03 1/2" Nut
X13 1/2" Self-locking Nut
W23V22
W03
W03Galvanized Tower
or
Stainlesssteel tower
X03
X13
Galvanizedtower
M25
M35
W23
V19
A
M42
97-1188C PAGE 8-15
NC SERIES TOWER ASSEMBLY
Figure 8-15
If your tower model and motor frame arelisted below, refer to Figure 8-15. Install motorto supports M26 and/or M25 as shown.
Motor
M26
A
Position flange with slotstoward back of motor.
V30
324T326T364T365T
V22
254T256T284T284TS286T286TS
or
X03
324T326T364T365T
or
X05
254T256T284T284TS286T286TS
W04
324T326T364T365T
W03
254T256T284T284TS286T286TS
or
W23
324T326T364T365T
or
W29254T256T284T284TS286T286TS
M25Position flange with slots
toward back of motor.
B
IDo not apply anti-seize compoundto stainless steel motor hold downbolts. Loctite will be applied tothese attachments later.
FindNo. Description
V22 1/2"x2 1/2" Bolt
V30 5/8"x2 1/2" Bolt
W03 1/2" Lock Washer
W04 5/8" Lock Washer
W23 1/2" Flat Washer
W29 5/8" Flat Washer
X03 1/2" Nut
X05 5/8" Nut
orM25
TowerModel
MotorFrame
A B
NC2200thru
NC4200
254T
2 1/4" (57mm)
1 15/16" (49mm)
256T 3 11/16" (94mm)
284T 2 1/8" (54mm)
286TS 3 11/16" (94mm)
NC5200thru
NC5220
284T3 1/4" (83mm)
1 3/4" (44mm)
286T 3 1/4" (83mm)
324T2 7/8" (73mm)
2 3/8" (60mm)
326T 3 7/8" (98mm)
364T 3 1/8" (79mm) 3 3/8" (86mm)
NC5230thru
NC7200,NCA200
&NCB200
284T2 7/8" (73mm)
1 3/8" (35mm)
286T 2 7/8" (73mm)
324T1 5/8" (41mm)
1 5/8" (41mm)
326T 3 3/8" (86mm)364T &365T
2 7/8" (73mm) 2 7/8" (73mm)
97-1188CPAGE 8-16
NC SERIES TOWER ASSEMBLY
Figure 8-16
If your tower model and motor frame arelisted below, refer to Figure 8-16. Install motorto supports M26 and/or M25 as shown.
Motor
M25
M25
Position flange with slotstoward back of motor.
Position flangewith slots towardback of motor.
V33324T326T324TS
V30
404T405T
or
W29
324T326T324TSW30
404T405T
or
X05
324T326T324TSX04
404T405T
or
W05324T326T324TS
W04
404T405T
or
A
B
IDo not apply anti-seize compoundto stainless steel motor hold downbolts. Loctite will be applied tothese attachments later.
FindNo. Description
V30 5/8"x2 1/2" Bolt
V33 3/4"x2 1/2" Bolt
W04 5/8" Lock Washer
W05 3/4" Lock Washer
W29 5/8" Flat Washer
W30 3/4" Flat Washer
X04 3/4" Nut
X05 5/8" Nut
or M26
Tower Model Motor Frame A B
NC2200 thru NC4200 324TS 1 3/8" (35mm) 1 1/8" (29mm)
NC4200324T
2 7/8" (73mm)2 5/8" (67mm)
326T 4 1/8" (105mm)NC7200, NCA200 &
NCB200404T & 405T 1 1/2" (38mm) 1 1/2" (38mm)
97-1188C PAGE 8-17
NC SERIES TOWER ASSEMBLY
Figure 8-17
DRIVELINE INSTALLATIONFor standard installation of motor inside the
tower refer to Figure 8-17. Line up motor andGeareducer shafts approximately 1/2" to 1" (13 to25mm) apart and connect motor supports totorque tube assembly. Install drive coupling M27using shims Y56 as required to align drive cou-pling. Refer to Close Coupling Service Manualfor installation instructions. After installing drivecoupling, coat motor and Geareducer shafts withpaint.
or
V19
Stainlesssteel tower
M27X03
X13
W03
Galvanizedtower
Galvanizedtower
Y56
Asrequired
Motor(Assembledto supports)
See Service Manualfor installation andalignment instructions
Y56
W23
Asrequired
Geareducer(Assembled totorque tube)
See Mechanical EquipmentHold Down Fasteners sectionfor alignment pin installation.
FindNo. Description
V19 1/2"x1 1/2" Bolt
W03 1/2" Lock Washer
W23 1/2" Flat Washer
X03 1/2" Nut
X13 1/2" Self-locking Nut
97-1188CPAGE 8-18
NC SERIES TOWER ASSEMBLY
Figure 8-18MOA only
For optional MOA (Motor Outside Airstream)installation refer to Figure 8-18. Coat motorshaft, Geareducer shaft and bores of driveshaftyokes with lubricant Z21. Slide driveshaft guardM30 around driveshaft M28 and install driveshafton motor and Geareducer shafts. Using theDriveshaft Service Manual, determine motor lo-cation, based on shaft engagement indicated.
Use shims Y56, as required, to align driveshaft.After installing driveshaft, coat motor andGeareducer shafts with paint. Install guard clipsM31 on inside of casing. Slide guard thru hole incasing against motor, and use clips as templatesto drill (2) 3/16" (5mm) diameter holes in guard,and attach to clips. On models NC1200 andNC2200, apply low head room decal M40 to bothsides of support at dimensions shown. AttachM.E. installation decal M39 to right side of sup-port above caution decal on models NC1200 andNC2200 or in lower position on all other models.
or
V19
Stainlesssteel tower
M28X03
X13
W03
Galvanizedtower
Galvanizedtower
Y56
Asrequired
Motor(Assembledto supports)
See Service Manualfor installation andalignment instructions
Y56
W23
Asrequired
Geareducer(Assembled totorque tube)
See Mechanical EquipmentHold Down Fasteners sectionfor alignment pin installation.
M31
T06
FindNo. Description
T06 1/4"x3/4" Tap Screw
V19 1/2"x1 1/2" Bolt
W03 1/2" Lock Washer
W23 1/2" Flat Washer
X03 1/2" Nut
X13 1/2" Self-locking Nut
M39Install on this sideof support only.
M40Install on both sides ofsupport. Required onNC1200 & NC2200 only.
M30 M31
97-1188C PAGE 8-19
NC SERIES TOWER ASSEMBLY
Fan blade
Fan blade
Blade Tip Clearance CheckAdjust by repositioning Geareducer within
cylinder or by adjusting fan cylinder
Fan Tilt CheckAdjust by shimming Geareducer while
maintaining alignment with motor.
Pitching boss
A
A
Fan cylinder
Fan blade
Fan cylinder
Tip Track CheckIf not within tolerancerecheck blade, blade
attachment and fan pitch.
Any single blade must be samedistance from fan deck to fanblade around perimeter of cylinderwithin a range of one inch (25mm).
All blades when rotated past the same location on cylinder mustbe same distance from fan deck within ±3/8" (±10mm) NC1200thru NC5200 or ±1/2" (±13mm) NC6200, NC7200, NCA200 &NCB200.
Fanrotation
Fan
Inside ofcylinder
A ±1/8" (±3mm)
Fan bladepitch angle
±1/2°
FAN INSTALLATION & ADJUSTMENTBefore lower fan cylinder is secured in place,
install fan M51, set fan blade pitch to contractrequirements and adjust fan blade tip clearance,tip track, and fan tilt as indicated in Figure 8-19.Fan blades should be pitched at a location wherethe fan hub is level and parallel with fan deck.
Section A-AFan Blade Pitch Detail
Figure 8-19
M51
Each blade must be rotated and pitched at thesame reference point as the first blade pitched.Tower must be plumb and cylinder centeredaround fan to provide proper tip clearance. Uselongest blade and check all around cylinder for tipclearance. Be certain each blade is in its� furthestout position.
Tower Model A
NC1200 thru NC5200 3/8" (10mm)NC6200 thru NC7200,NCA200 & NCB200
1/2" (13mm)
97-1188CPAGE 8-20
NC SERIES TOWER ASSEMBLY
Y55
On models with Series 20 or 22 Geareducer,after rechecking alignment, drill thru supportand drive pin to project an equal distanceabove Geareducer foot and below support.
After all driveline and fan adjustments havebeen made refer to Figure 8-20. Tighten eachmotor and Geareducer nut 5 to 10 ft-lbs (7 to 13N-m) less than specified torque while holding bolthead. Retighten nuts to specified torque. Boltheads may be tightened while holding nut if nut isnot accessible with torque wrench. Now apply
Figure 8-20(This detail applies to both, standard motorand motor outside airstream installations.
Detail shows motor inside tower.)
thread locking compound Z05 to all bolt threads.On towers with a Series 20 or 22 Geareducer,
two drive pins Y55 are used to retain alignment.Using pilot holes in Geareducer feet, drill a 23/64"(9mm) diameter hole thru support and drive pinthru to project an equal distance aboveGeareducer foot and below support.
Fastener Torque at Motor and GeareducerHold-Down Fasteners Only
BoltDiameter
Fastener Torquefoot-lbs. (Newton-meters)
Galvanized(Unlubricated)
Stainless Steel(Unlubricated
3/8" 30-32 (41-43) 34-36 (46-48)
1/2" 64-66 (87-90) 85-90 (115-122)
5/8" 135-140 (183-190) 125-130 (169-176)
3/4" 220-230 (298-312) 195-205 (264-278)
97-1188C PAGE 8-21
NC SERIES TOWER ASSEMBLY
X11
Figure 8-21
After making fan adjustments, secure fancylinder in position by drilling (2) 1/4" (6 mm)diameter holes approximately 22 1/2 degrees offtower centerline in each cylinder quadrant, coun-tersink, and install fasteners (bolt head up) ineach hole as shown.
T10
Drill 1/4" (6 mm) diameterhole thru fan deck in fan
cylinder, countersink, andinstall fasteners.
FindNo. Description
T10 1/4"x1" Flat Head Bolt
X11 1/4" Self-locking Nut
(This page intentionally left blank.)
97-1188C PAGE 9-1
NC SERIES MISCELLANEOUS
INLET PIPING & FLUMEIf tower is not using the optional HC valves,
inlet piping is attached directly to the distributionbasin. See Figure 9-1A. Note that inlet pipingand fasteners are supplied by others.
If HC valves N40 are to be installed, they areattached as shown in Figure 9-1B. A full facegasker N45 is used between valve and distribu-tion basin and a ring gasket N39 is used betweenvalve and inlet piping.
Figure 9-1B
Figure 9-1A
N45
Inlet piping and fastenerssupplied by others
Distribution basin floor
Piping, supports, design of piping andsupports, and restraint of lateral pipingloads is the responsibility of others.I
X04
X04
N45
N40
Inlet pipingsupplied by others
Half bolts are threadedinto tapped holes in valvebody, the other half boltsrequire nuts.
Distribution basin floor
Full face gasketwith bolt circle
6" and 8"dia. valves
FindNo. Description
V32 3/4"x2" Bolt
V35 3/4"x3" Bolt (all thrd.)
V42 7/8"x5" Bolt (all thrd.)
V46 7/8"x2" Bolt
W20 7/8" Flat Washer
W30 3/4" Flat Washer
W35 3/4" Sealing Washer
W36 7/8" Sealing Washer
X04 3/4" Nut
X06 7/8" Nut
N39
V35
V42
or
10" dia. valve
V42
or
V32 6" and 8"dia. valves
10" dia. valveW20
or
W30 6" and 8"dia. valves
10" dia. valve
W36
or
W35 6" and 8"dia. valves
10" dia. valve
97-1188CPAGE 9-2
NC SERIES MISCELLANEOUS
Assemble the distribution basin flumes onmodels NC1200 thru NC7200 by attaching flumesupports C09 to center flume C10. On modelNC7200, supports must be added to end flumesections C11 and C12 also. See Figure 9-2.
C11
C12
C10
C09
C09 W02
X02
C09
V07
X12or Stainless steel basin
Galvanizedbasin
Galvanizedbasin
NC7200 only
NC7200 only
Figure 9-2NC1200 thru NC7200
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188C PAGE 9-3
NC SERIES MISCELLANEOUS
Refer to Figure 9-3 for distribution basinflume assembly on models NCA200 and NCB200.Attach flume supports C09 to center flume C10and to end flume sections C11and C12 as shown.
C09 W02
X02
C09
X12or Stainless steel basin
Galvanizedbasin
Galvanizedbasin
Figure 9-3NCA200 & NCB200
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
C12
C10V07
C11
C09
97-1188CPAGE 9-4
NC SERIES MISCELLANEOUS
Figure 9-4
Install plastic nozzles by firmly pressing into1 3/4" (44mm) diameter holes in basin floor.Attach outside flumes to distribution basin asshown in Figure 9-4. Slide center flume intoplace under distribution basin inlet, and attach asindicated.
V07
W32
W22
X02
Nozzle
Flumes(assembledon previouspage)
FindNo. Description
V07 3/8"x1" Bolt
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
97-1188C PAGE 9-5
NC SERIES MISCELLANEOUS
Figure 9-5
V26
W23X03
Install support bolt for inlet flume per en-larged detail in Figure 9-5.
FindNo. Description
V26 1/2"x6" Bolt (all thd.)
W23 1/2" Flat Washer
X03 1/2" Nut
97-1188CPAGE 9-6
NC SERIES MISCELLANEOUS
Attach water deflectors C13 to distributionbasin floor on models NC7200 and NCB200 asshown.
Figure 9-6
Two center deflectors requiredon models NCB200 only.
C13
C13T07
T07
FindNo. Description
T07 3/8"x1" Tap Screw
97-1188C PAGE 9-7
NC SERIES MISCELLANEOUS
DISTRIBUTION BASIN COVERSBegin distribution basin cover installation
by attaching bolt, lock washers and standard nutin lower horizontal flange of distribution basininlet end as shown in Figure 9-7. Install distri-bution basin cover E22 (and E23 on some mod-els) by slipping one end of cover between fandeck and cover support, sliding other end overpreviously installed bolt, and securing with seal-ing washer and wing nut. Refer to Figure 9-7 forcover configuration on your specific model.
Figure 9-7
X42
Stainless steel fasteners used on all towers.
V12
W02
X02
E22 E23or
FindNo. Description
V12 3/8"x2 1/2" Bolt (all thd.)
W02 3/8" Lock Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X42 3/8" Wing Nut
W32
97-1188CPAGE 9-8
NC SERIES MISCELLANEOUS
Figure 9-8Partial Plan Views
NC1200
NC2200 & NC3200
NC4200
NC5200, NCA200 & NCB200
NC6200 & NC7200
E22 E23
E23
E22
E22
E22
E22E22
E23
97-1188C PAGE 9-9
NC SERIES MISCELLANEOUS
UPPER FAN CYLINDER & GUARDFan cylinder segments D31 are installed
on top of the lower cylinder that extends downfrom fan deck. Segments are to straddle towercenterline (except models NC1200 & NCA200thru NCC200) and be orientated as shown inFigure 9-9.
A single piece fan guard is provided onmodels NC1200 thru NC3200. Models NC4200thru NC7200, NCA200 and NCB200 use a twopiece fan guard and require guard splice hard-ware. On models with a two piece fan guard,guard D32 is installed first and a splice clip N97is used to retain guard D34.
Figure 9-9
N97
X11
V09
W12
W12
W02
X02
W21 W01X01
V04D31 T07
D31
D32
V09
W12
W12
X02
W02
X11
Fan deck
Threaded end ofexisting 1/4" bolt
W23 Five 1/2" washers used asspacers.
D34
Apply a 3/8" (10mm) dia. bead ofsealer around the perimeter toeliminate any rattles.
Lower fan cylinder
FindNo. Description
T07 3/8"x1" Tap Screw
V04 1/4"x1 1/2" Bolt (all thd.)
V09 3/8"x1 1/2" Bolt
W01 1/4" Lock Washer
W02 3/8" Lock Washer
W11 1/4" Oversize Washer
W12 3/8" Oversize Washer
W23 1/2" Flat Washer
X01 1/4" Nut
X02 3/8" Nut
X11 1/4" Self-locking Nut
W21
97-1188CPAGE 9-10
NC SERIES MISCELLANEOUS
Figure 9-10
ACCESS DOORAs shown in Figure 9-10, attach male
portion of hinges D14 to the casing sheet, and thefemale portion to the access door D13. Set thedoor in place and attach rubber door bumpersD28. Access door should open and close smoothlybefore fasteners attaching hinges to casing aretightened. Next, install handle D15 and latchD16. Slots have been provided where the latchattaches to the access door, check the operationof the latch and adjust as necessary.
D13
D28
D13
D14
T04
T04
D28
T06
X09
W43D14
T03D16
D15
D28
Models NC3200 thruNC7200, NCA200 & NCB200
use three hinges per door.
FindNo. Description
T03 #10x1/2" Mach. Screw
T04 1/4"x1/2" Cap Screw
T06 1/4"x3/4" Tap Screw
W43 #10 Flat Washer
X09 #10 Nut
97-1188C PAGE 9-11
NC SERIES MISCELLANEOUS
Figure 9-11
N34 One on eachend of tower
Surface PreparationSurface must be clean and dry. Oil and dirt may be removed with solvent (such as acetone)
or commercial detergent. Finally wash the area with warm water and dry with a lint-free cloth.Ultimate adhesion will occur 24-48 hours after application. Application should not be undertakenif temperature is below 35° F (2° C) or humidity is greater than 95%.
General application instructionsPeel off backing paper, taking care to avoid dirt contamination of the exposed adhesive. On
larger decals with slit back removal of half of the backing paper before and the other half duringinstallation is beneficial for ease of alignment and installation.
Carefully apply the decal to the desired location with light pressure to avoid any distortionof vinyl. This is the time to remove the other half of backing paper on larger decals. Oncepositioned, smooth out with the aid of a squeegee or toweling.
If air bubbles occur, puncture with a pin or needle and smooth down with the squeegee. Thefinished decal should be completely flat.
Note: Decals are an important part of the tower assembly. Decals and nameplates provideinstructions, identifications, cautions and warnings deemed necessary for proper maintenance.
DECALS
Install one decal N34 on each end of thecollection basin per Figure 9-11.
97-1188CPAGE 9-12
NC SERIES MISCELLANEOUS
See Figure 9-12 for installation of remain-ing decals on models NC1200 and NC4200. Firstinstall serial number plate N30, patent numberdecal N31, inspection decal N35, and warningdecal N43 to the motor side of tower. Install
Figure 9-12NC1200 and NC4200
warning and caution decals N32, N33, N34 & N36to both sides of the tower. Add CTI decal N37 andFactory Mutual decal N38 to motor side of tower,if required. Below decals on casing sheet, installthe extra motor nameplate supplied with motor.
N38 (If required)
N31
N36
N30
N32
N33
N34
N35
N37
Y50
(If required)
Install extra motor nameplate atthis location. Using top two holesin nameplate as a template, drilltwo .130" (3mm) diameter holesand attach with rivets Y50.
N43
FindNo. Description
Y50 1/8" Pop Rivet
97-1188C PAGE 9-13
NC SERIES MISCELLANEOUS
Figure 9-13NC2200, NC3200,
NC5200 thru NC7200,NCA200 & NCB200
Remaining decals on models NC2200,NC3200, NC5200 thru NC7200, NCA200 andNCB200 are installed per Figure 9-13. Firstinstall serial number plate N30, patent numberdecal N31, inspection decal N35, and warningdecal N43 to the motor side of the tower. Install
warning and caution decals N32, N33, N34 & N36to both sides of the tower. Add CTI decal N37 andFactory Mutual decal N38 to motor side of tower,if required. Below decals on casing sheet, installthe extra motor nameplate supplied with motor.
N38
(If required)
N31
N36
N30
N32
N33
N34
N35
N37 Y50(If required)
Install extra motor nameplate atthis location. Using top two holesin nameplate as a template, drilltwo .130" (3mm) diameter holesand attach with rivets Y50.
N43
FindNo. Description
Y50 1/8" Pop Rivet
97-1188CPAGE 9-14
NC SERIES MISCELLANEOUS
Cut stripe decal D30 to lengths requiredbased on tower model. Install stripe decal andlogo decal D29 at dimensions shown in Figure9-14.
Figure 9-14
D30D29
D30
Model NC6200only
18"(457mm)
23"(584mm)
B
A
C
Tower Model A B C
NC1200 24 1/2" (622mm) 20 3/8" (518mm) ---
NC2200 24 1/2" (622mm) 19 1/4" (489mm) ---
NC3200 38" (965mm) 19 1/4" (489mm) ---
NC4200 38" (965mm) 38 3/8" (975mm) ---
NC5200 38" (965mm) 38 3/4" (984mm) ---
NC6200 38" (965mm) --- 38 3/4" (984mm)
NC7200 42" (1067mm) 18 3/4" (476mm) ---
NCA200 38" (965mm) 20" (508mm) ---
NCB200 42" (1067mm) 18 3/4" (476mm) ---
97-1188C PAGE 10-1
NC SERIES OPTIONAL EQUIPMENT
W22
Overflow & drain connections(not present when tower hasstandpipe drain & overflow)
Figure 10-1Side Outlet Suction
OUTLET PIPINGThe following details explain the installation
of the four possible types of outlet piping connec-tions that your tower may have. A tower may notrequire an outlet if it is flumed to another tower.The flume and flume weir gate installations arealso covered in this section. The various types ofoutlets are the side outlet suction, the sump,bottom outlet with screen and bottom outlet with-out screen. The side suction is installed in thecollection basin side. The other outlets, whenused, are located in the depressed section floor.The collection basin may be connected to an-other tower with a flume. Refer to the contract
work order, outlet piping key plan drawing,and/or the contract sales drawing to deter-mine what equipment you have and the cor-rect installation location for it.
The side outlet suction Q01 is installed perFigure 10-1 by attaching it to the inside of thecollection basin using gasket Q00. Two suctionscreens Q02 are set in place between the de-pressed section sides and the suction hood withthe flanges facing down toward the hood. A thirdscreen Q03 is hooked over the top of the flangeon the end of the hood.
Install with flangestoward hood
Collectionbasin side
Hook top overhood flange
Collection basindepressed section
Install with flangestoward hood
(2 required) Installin hood to create orbreak air tight seal.
V07
W32
Q00
T07
Q02Q03
X02
Q02
Stainless steel fasteners must beused on stainless steel basins toavoid loss of connection.
Q01
FindNo. Description
T07 3/8"x1" Tap Screw
V07 3/8"x1" Bolt
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
97-1188CPAGE 10-2
NC SERIES OPTIONAL EQUIPMENT
Sump installation is per Figure 10-2. Sumpmay be rotated 90° or 180° provided outlet pipingwill clear supporting steel. Lay strips of gasketY10 around sump opening in depressed sectionfloor. Set sump Q04 in place and use as atemplate to drill 7/16" (11mm) diameter holesthru gasket. Attach sump to floor and seal aroundperimeter. On fiberglass sumps, install plastictank adapter Q06 and pipe cap Q07 in the bottomof the sump as a drain (on steel sumps, pipe plugQ07 is installed in the coupling in the front of thesump).
Figure 10-2Sump
Stainless steel fasteners must beused on stainless steel basins toavoid loss of connection.
Fiberglasssump only
Q06
Q07
Drain plug(Steel sump only)
Q06
Install two layers thick with corners overlapped.Do not leave gaps where strips butt. Sump maybe used as a template to drill 7/16" (11mm)diameter holes in gasket strips.
V09
W12
W22
W32
Y10X02
Fiberglasssump only
C
Underoversizedwasher
Apply abeadwherestrips butt.
After sump is installed,apply a bead of sealeraround perimeter ofsump, force into seam,and spread out evenly.
Collection basindepressed section
Q04
FindNo. Description
V09 3/8"x1 1/2" Bolt
W12 3/8" Oversize Washer
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
97-1188C PAGE 10-3
NC SERIES OPTIONAL EQUIPMENT
See Figure 10-3 for the typical attachmentof customer piping using gasket Q14. A sumpplate Q96 is used on the inside of fiberglasssumps only. After piping has been install setsump screen (if required) in place over the sumpopening. On sumps with higher flows, a screenassembly with anti-vortex plate is used instead ofthe sump screen shown. See "Anti-vortex Plate"installation detail. The tower is not designed tosupport additional piping loads. DO NOTSUPPORT PIPING FROM THE TOWER.
Outlet piping and fastenersSupplied by others.
Fiberglass sumps only. Installusing outlet piping fasteners.
Sump ScreenOn sumps with high flows, ascreen assembly with anti-vortexplate is used. (See "Anti-vortexPlate" installation detail.)
Q14
B
Piping, supports, design of piping andsupports, and restraint of lateral pipingloads is the responsibility of others.I
Figure 10-3Sump Screen
Q96
Clean surfaces and apply a 3/8"(10mm) dia. bead of sealer aroundand between all holes on sumpplate and outside of sump.
97-1188CPAGE 10-4
NC SERIES OPTIONAL EQUIPMENT
The typical attachment of customer pipingfor bottom outlet or equalizer connection usinggasket Q14 is shown in Figure 10-4. Thetower is not designed to support additionalpiping loads. DO NOT SUPPORT PIPINGFROM THE TOWER.
Piping, supports, design of piping andsupports, and restraint of lateral pipingloads is the responsibility of others.I
Outlet piping and fastenersSupplied by others.
Q14
Collection basindepressed section
Figure 10-4Bottom Outlet
B
Clean surfaces andapply a 3/8" (10mm)dia. bead of sealeraround and between allholes under basinwhere gasket attaches.
97-1188C PAGE 10-5
NC SERIES OPTIONAL EQUIPMENT
Figure 10-5Screen and Mudsills
Stainless steel fasteners must beused on stainless steel basins toavoid loss of connection.
X02
Q24
W32
W22
V07
Bottom Outlet ScreenPlace between mudsills. Forbottom outlets with high flow rates,a screen assembly with anti-vortexplate is used. (See "Anti-vortexPlate" installation detail.)
When a screen is needed with the bottomoutlet, it is installed as shown in Figure 10-5.Attach mudsills Q24 to basin floor and set screenbetween them. On bottom outlets with higherflow rates, a screen assembly with anti-vortexplate is used. See "Anti-vortex Plate" installationdetail.
C
FindNo. Description
V07 3/8"x1" Bolt
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
97-1188CPAGE 10-6
NC SERIES OPTIONAL EQUIPMENT
Figure 10-6Anti-vortex Plate
X02
Stainless steel basinor X12
Galvanized basin
On towers with higher outlet flows, an anti-vortex plate is required. Assemble anti-vortexplate Q20, screens Q22 and Q23, and retainersQ21 as shown in Figure 10-6. Adjust screensor cut wire if required to allow bolts to pass thru.Position anti-vortex assembly in depressed areaof collection basin centered over outlet.
W02 Galvanized basin
W22
V07
Q22
Q22Q23
Q23
Q20
Q21
A
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
W22 3/8" Flat Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
Tower Model ANC1200 thru NC6200
& NCA200 6" (152mm)
NC7200 & NCB200 7" (178mm)
97-1188C PAGE 10-7
NC SERIES OPTIONAL EQUIPMENT
Figure 10-7ADrain & Overflow Coverplate
Figure 10-7BBlank Plate
Q11
X02Q00
V07
W32
W22
Q10
X02Q00
V07
W32
W22
Coverplates are used to close off the open-ings in the collection basin sides. Various con-figurations of coverplates are possible, but theyall attach similarly. Refer to Figure 10-7A fordrain and overflow coverplate Q11 with gasketQ00, or Figure 10-7B for blank coverplate Q10with gasket Q00. These are the two mostcommon coverplates used.
Stainless steel fasteners must beused on stainless steel basins toavoid loss of connection.
FindNo. Description
V07 3/8"x1" Bolt
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
97-1188CPAGE 10-8
NC SERIES OPTIONAL EQUIPMENT
Figure 10-8AStandpipe Overflow
Figure 10-8BCoverplate Drain Plug
Q18
All towers must have an overflow and drain,either as the standard standpipe in the collectionbasin floor or at the optional coverplate location.The standpipe overflow and drain is installed perFigure 10-8A. Bolt coupling assembly Q47 tothe bottom of the collection basin floor at the 6"(152mm) diameter hole and bolt pattern. Installstandpipe Q48. The standpipe is PVC unless anoptional heater element is close by, then a steelstandpipe will be installed with teflon tape (sup-plied by others) to provide a watertight seal.
If optional coverplate drain and overflow isbeing used, and coverplate drain is not beingplumbed, install pipe plug Q18 per Figure 10-8B.
Q48
V07
W22
W32
Q47
X02
B
Stainless steel fasteners must beused on stainless steel basins toavoid loss of connection.
ITake care not to cross thread thePVC standpipe when threadinginto the steel coupling assembly.
FindNo. Description
V07 3/8"x1" Bolt
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
97-1188C PAGE 10-9
NC SERIES OPTIONAL EQUIPMENT
Figure 10-9Flume Frame
If collection basins of multiple cell towers areto be connected together, a flume is required.Attach flume frame Q13 to outside of collectionbasin, where flume is to be located, using gasketQ00 per Figure 10-9.
V07
V12
Q13
Q00
X02
W32W22
W22
W32
X12 Stainless steel basin
or
Galvanized basin
If weir plate is required, install in secondholes from top and bottom on sides andfourth holes from ends on top and bottom.
Install in all remaining holesafter installing longer bolts.
Stainless steel fasteners must be usedon stainless steel basins to avoid loss ofconnection.
FindNo. Description
V07 3/8"x1" Bolt
V12 3/8"x2 1/2" Bolt (all thd.)
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188CPAGE 10-10
NC SERIES OPTIONAL EQUIPMENT
Figure 10-10Flume
Collection basin side
If collection basins of multiple towers are tobe connected together, a flume is installed perFigure 10-10. Note that towers must be alignedbefore attempting to install flume in place.
Sealing of the flume connections is criti-cal to prevent leaks. Apply a 1/2" (13mm) beadof sealer Z11 as indicated, around and between
all holes on both flume collars. Install non-joggled flume corners Q11 first. Apply anotherbead of sealer around and between holes wherejoggle will overlap on flume. Complete flumeinstallation by installing joggled flume cornersQ15.
Q11
Q11
Q15
Q15
V07
W32
W22W22
W32
Apply a 1/2" (13mm) diameterbead of sealer around andbetween holes on flume collars.
Apply a 1/2" (13mm) diameter beadof sealer around and between holeswhere joggle will overlap.
IMPORTANT! Flumes are not a walking surface.Flumes that are 18" (457mm) long and longer havea caution decal which should be orientated on top.
Stainless steel fasteners must beused on stainless steel basins toavoid loss of connection.
FindNo. Description
V07 3/8"x1" Bolt
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
97-1188C PAGE 10-11
NC SERIES OPTIONAL EQUIPMENT
Figure 10-11Weir Plate
Stainless steel fasteners must beused on stainless steel basins toavoid loss of connection.
If weir gate option is being used, refer toFigure 10-11 for installation details. Set gasketQ19 in place over protruding attachment bolts.Slide weir gate Q16 in place and tighten evenly.
Q16
W02
X02
Q19
FindNo. Description
W02 3/8" Lock Washer
X02 3/8" Nut
(This page intentionally left blank.)
97-1188C PAGE 11-1
NC SERIES OPTIONAL EQUIPMENT
Figure 11-1Standard Float Valve
V07
Q38
Reuseexistingfasteners
W02
Galvanizedbasin
X02Galvanized
basin
X12Stainlesssteel basin
or
Install decal on outsideof casing to the left ofthe float valve hole.
Q35
Q25
Q26
Q27
Q28
Q31
FindNo. Description
V07 3/8"x1" Bolt
W02 3/8" Lock Washer
X02 3/8" Nut
X12 3/8" Self-locking Nut
FLOAT VALVEThe float valve is used to control water
make-up and is normally provided on all towers.Multi-cell towers may not require a float valve ineach cell unless weir plates are used to isolateindividual cells. Float valve components to beused will depend on outlet piping and otheroptions in basin. Refer to Outlet Piping Draw-ing for float valve location and orientation.
Figure 11-1 shows the standard float valveinstallation. Start by attaching water inlet assem-bly Q25 to the casing. Using pipe joint compoundZ04, install a 45° elbow Q26 to the end of the inletassembly and then install a close nipple Q27.Next install the float valve Q28 (make sure valveopening is pointing down). Install float and valvestem assembly Q31. Coat exposed pipe threadswith rust inhibiting paint. See your NC OwnersManual for adjustment of float valve. Install decalQ35 on outside of tower casing, to the left of thefloat valve inlet (see decal section of this manualfor surface preparation and general applicationinstructions). If makeup piping is not to beattached immediately, install plastic thread pro-tector Q38 on inlet assembly.
97-1188CPAGE 11-2
NC SERIES OPTIONAL EQUIPMENT
Figure 11-2 shows the across basin floatvalve installation for models NC1200 and NC2200.Start by attaching support angle Q39 to collectionbasin and float valve support Q34 to angle. Installwater inlet assembly Q25 to the casing as shown.Using pipe joint compound Z04 on all pipe con-nections, connect 90° elbow Q26, pipe Q27, asecond 90° elbow Q26, pipe Q33, a third 90°elbow Q26, pipe Q32, and float valve Q28 (makesure valve opening is pointing down). Install floatand valve stem assembly Q31. Coat exposedpipe threads with rust inhibiting paint. See yourNC Owners Manual for adjustment of float valve.Use pipe clamp Q36 to secure piping to floatvalve support. Install decal Q35 on outside oftower casing, to the left of the float valve inlet (seedecal section of this manual for surface prepara-tion and general application instructions). Ifmakeup piping is not to be attached immediately,install plastic thread protector Q38 on inlet as-sembly.
Figure 11-2Accross Basin Float Valve
NC1200 and NC2200
V07 Q38
Reuseexisting
fasteners
W02
Galvanizedbasin
X02Galvanized
basin
X12Stainlesssteel basin
or
Install decal on outsideof casing to the left ofthe float valve hole.
Q35
Q26
Q27Q33
Q36
X02 Galvanizedbasin
X12 Stainlesssteel basin
or
X12 Stainlesssteel basin
or
X02 Galvanizedbasin
V07
W32
W22
V07
Q34
Q39
W02
Galvanizedbasin
V02
X01
W01
W21
Q28
Q33
Q26
Q32
Q25
Q25
Q31
C
FindNo. Description
V02 1/4"x1" Bolt
V07 3/8"x1" Bolt
W01 1/4" Lock Washer
W02 3/8" Lock Washer
W21 1/4" Flat Washer
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X01 1/4" Nut
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188C PAGE 11-3
NC SERIES OPTIONAL EQUIPMENT
Figure 11-3Accross Basin Float Valve
NC3200 thru NC7200,NCA200 & NCB200
Figure 11-3 shows the across basin floatvalve installation for models NC3200 thru NC7200,NCA200 and NCB200. Start by attaching supportangle Q39 to collection basin and float valve sup-port Q34 to angle. Install water inlet assembly Q25to the casing as shown. Using pipe joint compoundZ04 on all pipe connections, connect full couplingQ32, pipe Q33, 90° street elbow Q26, and floatvalve Q28 (make sure valve opening is pointingdown). Install float and valve stem assembly Q31.Coat exposed pipe threads with rust inhibiting paint.See your NC Owners Manual for adjustment of floatvalve. Use pipe clamp Q36 to secure piping to floatvalve support. Install decal Q35 on outside of towercasing, to the left of the float valve inlet (see decalsection of this manual for surface preparation andgeneral application instructions). If makeup pipingis not to be attached immediately, install plasticthread protector Q38 on inlet assembly.
V07
Q38
Reuseexisting
fasteners
W02
Galvanizedbasin
X02Galvanized
basin
X12Stainlesssteel basin
or
Install decal on outsideof casing to the left ofthe float valve hole.
Q35
Q32
Q33
Q25
Q31
X02Galvanized
basin
X12Stainlesssteel basin
or
X12 Stainlesssteel basin
or
X02 Galvanizedbasin
V07
W32
W22
V07Q34
Q39
W02
Galvanizedbasin
Q36 V02
X01
W21
Q28
Q33
Q26 Q25
W01
C
FindNo. Description
V02 1/4"x1" Bolt
V07 3/8"x1" Bolt
W01 1/4" Lock Washer
W02 3/8" Lock Washer
W21 1/4" Flat Washer
W22 3/8" Flat Washer
W32 3/8" Sealing Washer
X01 1/4" Nut
X02 3/8" Nut
X12 3/8" Self-locking Nut
97-1188CPAGE 11-4
NC SERIES OPTIONAL EQUIPMENT
On diagonally opposite side of the towerfrom where the float valve inlet is installed, or onboth sides of tower if it has no float valve, a holeplug Q37 is installed in the casing per Figure11-4.
Q37
Apply a small bead ofsealer around hole plug
before installing into hole.
Figure 11-4
97-1188C PAGE 12-1
NC SERIES FIND NUMBER INDEX
Find Number Index
A
A01 1-1A02 1-1A03 1-1A04 1-1A05 1-3A06 1-3A07 1-6, 1-8A09 1-3, 1-4A10 1-10A11 1-10A12 1-10A13 1-6, 1-8A14 1-13A16 1-5, 6-15, 6-16A20 1-6, 1-8A21 1-6, 1-8A22 1-8A23 1-8
B
B01 6-3B02 6-3B03 6-1, 6-2, 6-3B04 6-3B07 6-1, 6-2, 6-4, 6-14B08 6-7, 6-9, 6-10, 6-11, 6-13B10 6-6, 6-9, 6-14B11 6-7, 6-9, 6-10, 6-11B12 6-7, 6-9, 6-10, 6-11B13 6-9, 6-10, 6-11, 6-12B14 6-10, 6-11, 6-12B15 6-9, 6-10, 6-11, 6-12B17 6-14B27 6-7, 6-8
C
C01 3-1C02 3-1C03 3-1C04 3-2C05 3-3, 3-12C06 3-4, 3-5, 3-6, 3-7C07 3-8C08 3-1C09 9-2, 9-3C10 9-2, 9-3C11 9-2, 9-3C12 9-2, 9-3C13 9-6
C14 3-1C15 3-1C16 3-9, 3-10
D
D01 2-1D02 2-1D03 2-1D05 2-7, 2-8, 2-9D06 2-9D07 5-1, 5-2, 5-3, 5-4, 5-5, 5-6, 5-7D08 5-1, 5-2, 5-3, 5-4, 5-5, 5-6, 5-7D10 5-2, 5-3, 5-4, 5-5, 5-6, 5-7D11 5-3, 5-5, 5-6, 5-7D12 5-3, 5-5, 5-6, 5-7D13 9-10D14 9-10D15 9-10D16 9-10D18 6-15, 6-16D19 6-15, 6-16D20 6-16D23 6-15, 6-16D24 2-10D25 2-10D27 7-1D28 9-10D29 9-14D30 9-14D31 9-9D32 9-9D33 5-3, 5-5, 5-6, 5-7, 6-3, 6-5D34 9-9D35 2-2D36 2-3, 2-4D37 2-5, 2-6D38 2-5, 2-6D39 2-2D40 2-2D41 7-1D42 7-1D43 5-6D50 8-2, 8-3D51 8-2
E
E01 2-11, 2-12, 2-13, 3-3E03 4-2E09 4-3, 4-4, 4-5, 4-6E10 4-3, 4-4, 4-5, 4-6E11 3-3, 3-12E12 3-3, 3-12E13 4-1E14 4-3, 4-4, 4-5, 4-6E15 4-3, 4-4, 4-5, 4-6E16 4-5, 4-6
97-1188CPAGE 12-2
NC SERIES FIND NUMBER INDEX
E17 4-7, 4-8, 4-9E18 4-8, 4-9E19 4-9E20 7-2E21 7-2E22 9-7E23 9-7E26 2-11, 3-3E27 2-11, 2-13E28 2-11E30 3-14E31 3-11, 3-14E32 2-12
M
M20 8-4, 8-5, 8-6, 8-7, 8-8M24 8-8M25 8-11, 8-12, 8-13, 8-14, 8-15, 8-16M26 8-12, 8-13, 8-14, 8-15, 8-16M27 8-17M28 8-18M29 8-9, 8-10M30 8-18M31 8-18M32 8-4, 8-7M33 8-4, 8-7M34 8-12, 8-14M35 8-12, 8-14M36 8-9, 8-10M37 8-9, 8-10M38 2-2M39 8-18M40 8-18M41 8-4M42 8-12, 8-14M51 8-19
N
N30 9-12, 9-13N31 9-12, 9-13N32 9-12, 9-13N33 9-12, 9-13N34 9-11, 9-12, 9-13N35 6-13, 9-12, 9-13N36 9-12, 9-13N37 9-12, 9-13N38 9-12, 9-13N39 9-1N40 9-1N43 9-12, 9-13N45 9-1N97 9-9N98 6-8, 6-13
Q
Q00 10-1, 10-7, 10-9
Q01 10-1Q02 10-1Q03 10-1Q04 10-2Q06 10-2Q07 10-2Q10 10-7Q11 10-7, 10-10Q13 10-9Q14 10-3, 10-4Q15 10-10Q16 10-11Q18 10-8Q19 10-11Q20 10-6Q21 10-6Q22 10-6Q23 10-6Q24 10-5Q25 11-1, 11-2, 11-3Q26 11-1, 11-2, 11-3Q27 11-1, 11-2Q28 11-1, 11-2, 11-3Q31 11-1, 11-2, 11-3Q32 11-2, 11-3Q33 11-2, 11-3Q34 11-2, 11-3Q35 11-1, 11-2, 11-3Q36 11-2, 11-3Q37 11-4Q38 11-1, 11-2, 11-3Q39 11-2, 11-3Q47 10-8Q48 10-8Q96 10-3
V
V06 6-6, 6-14
Y
Y10 10-2Y55 8-20Y56 8-17, 8-18
Z
Z04 11-1, 11-2, 11-3Z05 8-20Z21 8-18