N
Cottee Parker Architects Pty Ltd
Brisbane OfficeABN 77 010 924 106
201 Montague RoadWest End QLD 4101
T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au
Scale
Issue
Date Job no.
ApprovedCheckedDrawn
4800
Drawing no.
AF/LR
DD 2001
Client
Project
Location
Drawing Title
AmendmentsIssue Revision In.
12 - 14 WALDEN LANE, BOWEN HILLS
ANNEXE APARTMENTS
DREW GROUP
FLOOR PLAN - BASEMENT 02
As Shown
General Notes
Additional Notes
Date
teamwork://CPABNEBIM01/4800 Dameline Master: 20/02/2015: 4:55 PM
REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS
1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.
2. All construction to comply with the building code of Australia and applicable Australian standards.
3. Do not scale from this drawing - use figured dimensions.
4. A signed original of this drawing is retained in CPA Offices for verification purposes.
5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.
6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.
7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made
8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.
9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.
.. KV
MAY 2014
1
1
3
3
5
5
9
9
11
11
11
R
10
R
09
R
08
R
04
R
03
R
05
R
07
R
06
R
02
R
01
R
12
R
13
R
14
R
15
R
17
R
18
R
19
R
20
R
26
SCB
25
R
24
R
23
R
22
R
21
R
16
R
LM
FHRFHR
MECH700x1000
MECH600x800
G01B2
8 800 10 760 7 565 2 150 8 665 7 485
4 550
8 955
2 525
2 650
6 200
6 200
6 200
310
1 080
1 135
200
SSL 4.675
SSL 1.775
SSL 1.775
SSL 2.050 SSL 3.150
SSL 2.720
SSL 1.120
RL 2.050RL 3.150
D01B 2
D02B 2
D04B 2
D05B 2
D03B 2
LIFT 1
REVERSE BAYS
BASEMENT 0226 CARS RAMP
MIN 1:16
SPOON DRAIN
SPOON DRAIN
SPOON DRAIN
SPOON DRAIN
SPOO
N DR
AIN
SPOO
N DR
AIN
REMOTE EARTH GRID FORTRANSFORMER IN SLAB
HANGING BIKE RAKE FOR BIKE STORAGE ABOVE EACH CAR BAY
CAR LIFT CAR LIFT
MOTOR ROOM
13101
13101
13102
13102
13103
13103
13104
13104
13105
13105
6
6
7
7
A A
F F
B B
C C
E E
1-
FLOOR PLAN - BASEMENT 02 SCALE @ A1 1:100
SCALE 1: 100 @ A1SCALE 1: 200 @ A3
metres
0 1 2 3 4 5 6 7 8 9 10
A COODRINATION ISSUE 12/05/14 AF
J
B INFORMATION AND ROOM NAMES ADDED 16/05/14 AFC GMP ISSUE 23/05/14 AFD CONSULTANT COODRINATION ISSUE 03/06/14 AFE GMP ISSUE 2 06/06/14 AF
F STAIR RELOCATED, LEVELS AND RAMPAMENDED
08/09/14 AF
G STREET ADDRESS AMENDEDBASEMENT STRUCTURE AMENDED
GRID LINE 9 AMENDED
16/12/14 AF
H STRUCTURE AMENDEDLIFT AMENDED
04/02/15 AF
J LIFT SHAFT SIZE AMENDEDSTRUCTURE & RAMP GRADE REVISED
MOTOR ROOM ADDED
20/02/15 AF
N
Cottee Parker Architects Pty Ltd
Brisbane OfficeABN 77 010 924 106
201 Montague RoadWest End QLD 4101
T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au
Scale
Issue
Date Job no.
ApprovedCheckedDrawn
4800
Drawing no.
AF/LR
DD 2002
Client
Project
Location
Drawing Title
AmendmentsIssue Revision In.
12 - 14 WALDEN LANE, BOWEN HILLS
ANNEXE APARTMENTS
DREW GROUP
FLOOR PLAN - BASEMENT 01
As Shown
General Notes
Additional Notes
Date
teamwork://CPABNEBIM01/4800 Dameline Master: 20/02/2015: 4:55 PM
REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS
1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.
2. All construction to comply with the building code of Australia and applicable Australian standards.
3. Do not scale from this drawing - use figured dimensions.
4. A signed original of this drawing is retained in CPA Offices for verification purposes.
5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.
6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.
7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made
8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.
9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.
.. KV
MAY 2014
1
1
3
3
5
5
9
9
11
11
LM
FHRFHR
08
R
04
R
03
R
05
R
07
R
06
R
02
R
01
R
09
R
10
R
12
R
13
R
14
R
15
R
20
SCB
19
R
18
R
17
R
16
R
11
R
MECH700x1000
MECH600x800
LM
LM
4 550
8 955
2 525
2 650
8 800 10 760 7 565 2 150 8 665 7 485
6 200
6 200
3102 635
1 600
3 560
200
SSL 3.875SSL 7.950
SSL 5.050 SSL 6.100
SSL 5.640
D01B 1
D02B 1
D04B 1
D06B 1
D07B 1
D03B 1
D05B 1
LIFT 1
REVERSE BAYS
BASEMENT 0120 CARS
LIFT 2PIT
RAMPMIN 1:16
TRANSFORMERSERVICING
ROOM
HANGING BIKE RAKE FOR BIKE STORAGE ABOVE EACH CAR BAY
SPOON DRAIN
SPOON DRAIN
SPOON DRAIN
SPOO
N DR
AIN
SPOO
N DR
AIN
CAR LIFT CAR LIFT
BIKE RAKES- 9 BIKES
BIKE RAKES- 10 BIKES
FIRE PUMP ROOM
13101
13101
13102
13102
13103
13103
13104
13104
13105
13105
6
6
7
7
A A
F F
B B
C C
E E
1-
FLOOR PLAN - BASEMENT 01 SCALE @ A1 1:100
SCALE 1: 100 @ A1SCALE 1: 200 @ A3
metres
0 1 2 3 4 5 6 7 8 9 10
J
C GMP ISSUE 23/05/14 AFD CONSULTANT COODRINATION ISSUE 03/06/14 AFE GMP ISSUE 2 06/06/14 AF
F STAIR RELOCATED, LEVELS AND RAMPAMENDED, SERVICE ROOM ADDED
08/09/14 AF
G STREET ADDRESS AMENDEDBASEMENT STRUCTURE AMENDED
GRID LINE 9 AMENDED
16/12/14 AF
H STRUCTURE AMENDED, LIFT AMENDEDTRANSFORMER ROOM AMENDED
STAIRS AMENDEDFIRE PUMP ROOM ADDED
04/02/15 AF
J LIFT SHAFT SIZE AMENDEDSTRUCTURE & RAMP GRADE REVISED
DRIVEWAY AMENDED
20/02/15 AF
N
Cottee Parker Architects Pty Ltd
Brisbane OfficeABN 77 010 924 106
201 Montague RoadWest End QLD 4101
T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au
Scale
Issue
Date Job no.
ApprovedCheckedDrawn
4800
Drawing no.
AF/LR
DD 2003
Client
Project
Location
Drawing Title
AmendmentsIssue Revision In.
12 - 14 WALDEN LANE, BOWEN HILLS
ANNEXE APARTMENTS
DREW GROUP
FLOOR PLAN - GROUND FLOOR
As Shown
General Notes
Additional Notes
Date
teamwork://CPABNEBIM01/4800 Dameline Master: 20/02/2015: 4:55 PM
REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS
1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.
2. All construction to comply with the building code of Australia and applicable Australian standards.
3. Do not scale from this drawing - use figured dimensions.
4. A signed original of this drawing is retained in CPA Offices for verification purposes.
5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.
6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.
7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made
8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.
9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.
.. KV
MAY 2014
1100Lt BIN
1100Lt BIN
1100Lt BIN
1100Lt BIN
1100Lt BIN
3
3
5
5
9
9
03
R
07
R
02
R
06
R
05
R
04
R
08
LM
LM
MSB
NBN
DB
FHR
FHR
FHR
G01G
LM
WC
VB
01
R
L01G
D01G
4 550
8 955
2 525
2 650
7 700 10 760 7 565 4 400 6 415 7 135
6 200
2 700
6 720
1 5351 200
4 800
5 215
13101
13101
13102
13102
13103
13103
13104
13104
13105
13105
SSL 6.504SSL 10.300
SSL 9.800
SSL 10.400SSL 8.720
SSL 8.600
SSL 7.800
SSL 9.000
SSL 9.200
SSL 8.170
SSL 9.950
SSL 9.350
SSL 8.700
SSL 9.350D15G
D08G
D31G
D22G
D09G
D12G
D07G
D26G
D23G
D27G
D21G
D28G
D17G
D18G
D13G
D19G
D20G
D14G
D03G
D16G
D24G
W02G
D11G
D29G
D30G
D02G
D06G
D04G
D05G
D10G
PLATFORM LIFT RAILPLATFORM
LIFT
CAR LIFT
WAL
DEN
LANE
BOW
EN B
RIDG
E RO
AD
LIFT 1 LIFT 2
REVERSE BAYS
CHAI
N BA
RRIE
R GA
TE
BIKE RAKES- 11 BIKES
RAMP1:20
PLATFORM LIFT RAIL
PLATFORMLIFT
GROUND8 CARS
TOTAL 54 CARS
AWNI
NG A
BOVE
FOYER
CAR LIFT
LETTERBOXES
HR
PWD
COMMS
GAS
SWITCH ROOM
REFUSES BINSMANAGERS
12 m²
TRANSFORMERPADMOUNT
25 m²
BOOSTER
RETAIL61 m²
STORE02
STORE01
SSL 10.150
6
62
2 8
8 10
10
A A
F F
B B
C C
E E
FIP
MECH700x1000
HR08 MECH600x1500
1-
FLOOR PLAN - GROUND FLOOR SCALE @ A1 1:100
SCALE 1: 100 @ A1SCALE 1: 200 @ A3
metres
0 1 2 3 4 5 6 7 8 9 10
N
G MANAGERS DOOR AMENDED 11/09/14 AF
H BIN STORE, STAIR 3 & BIKE RAKESREVISED
11/09/14 AF
J STREET ADDRESS AMENDEDGRID LINE 9 AMENDED
16/12/14 AF
K STAIRS AMENDED, LIFTS AMENDEDBOOSTERS AND FIP RELOCATED
STORE AMENDEDTRANSFORMER AMENDED
TOTAL CAR PARKS REVISED
04/02/15 AF
L PUBLIC BIKE PARKS REMOVEDRETAIL SLAB HEIGHT AMENDED
09/02/15 AF
M PADMOUNT ENCLOSURE REVISEDSTORE ROOM DIVIDED
12/02/15 TVR
N STAIR & LIFT SHAFT SIZE AMENDEDSTRUCTURE REVISED
20/02/15 AF
N
Cottee Parker Architects Pty Ltd
Brisbane OfficeABN 77 010 924 106
201 Montague RoadWest End QLD 4101
T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au
Scale
Issue
Date Job no.
ApprovedCheckedDrawn
4800
Drawing no.
AF/LR
DD 2004
Client
Project
Location
Drawing Title
AmendmentsIssue Revision In.
12 - 14 WALDEN LANE, BOWEN HILLS
ANNEXE APARTMENTS
DREW GROUP
FLOOR PLAN - LEVEL 01
As Shown
General Notes
Additional Notes
Date
teamwork://CPABNEBIM01/4800 Dameline Master: 4/02/2015: 9:23 PM
REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS
1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.
2. All construction to comply with the building code of Australia and applicable Australian standards.
3. Do not scale from this drawing - use figured dimensions.
4. A signed original of this drawing is retained in CPA Offices for verification purposes.
5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.
6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.
7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made
8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.
9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.
.. KV
MAY 2014
FWFW
FWFWFW
FW
FW
FWFW
FW
FW
FW
FWFW
FW
FW
FWFW
FW
FW
FW
FW
FW
FW
FWFW
FW
FW
FWFW
FW
FW
FW
FWFW
MECH2300x400
MECH1800x400
FHR ELEC2700x200
MECH
2000
x500
COMM900x400
AC AC
13101
13101
13102
13102
13103
13103
13104
13104
13105
13105
17 930 8 195 4 300 13 550
4 935
8 695
2 400
2 650
RL 13.600
RL 13.700
RL 13.600
D33L 1
D31L 1
D32L 1
D33L 1
D31L 1
D32L 1
D45L 1
D46L 1
D44L 1
D43L 1
D41L 1
D42L 1
D45L 1
D46L 1
D44L 1
D43L 1
D41L 1
D42L 1
D54L 1
D53L 1
D55L 1
D63L 1
D64L 1
D91L 1
D95L 1
D94L 1
D92L 1
D93L 1
D101L 1
D21L 1
D22L 1 D23
L 1
D24L 1
D25L 1
D10L 1
D11L 1
W70L 1
W60L 1
D05L 1
D06L 1
D12L 1
W71L 1
D80L 1
D90L 1
D100L 1
D62L 1
D61L 1
W100L 1
D13L 1
D50L 1
W42L 1
W50L 1
D30L 1
W20L 1
D20L 1
D51L 1
D52L 1
W01L 1
D12L 1
D02L 1
D03L 1
D04L 1
D40L 1
D01L 1
W41L 1
W31L 1
W30L 1
W80L 1
W81L 1
W90L 1
D70L 1
D60L 1
D08L 1
D07L 1D09
L 1
W22L 1
W21L 1
W40L 1
W72L 1
W91L 1
PLANTER
PLANTER
2.5° FALL
2.5° FALL
ACCESSIBLE
ACCESSIBLE
LINENLINEN
LINEN
LINEN
LINEN/DB
LINEN/DB
F
LINEN/DB
OV
DW
DWRP
MW
PF
MW
OVDWDWR
LINEN P
F
DB
MW
OV DW
DWR
DWR
PF DB
MWOV
DWDWR
P FDB
MWOV
DWDWR
P
F
DB
MW
OV DW
DWRP
F
DB
MW
OVDW
DWR
P
F DBMWOV
DWDWR
P
FMW
OV
DW
DWR
LIFT 1 LIFT 2STAIR 1 UNIT H182 m²
UNIT F175 m²
UNIT G132 m²
UNIT E152 m²
UNIT B163 m²
UNIT C185 m²
UNIT D151 m²
BALCONY35 m²
BALCONY34 m²
UNIT B163 m²
UNIT C185 m²
CORRIDOR
6
62
2
4
4 8
8 10
10
A A
F F
B B
C C
D D
1-
FLOOR PLAN - LEVEL 01 SCALE @ A1 1:100
SCALE 1: 100 @ A1SCALE 1: 200 @ A3
metres
0 1 2 3 4 5 6 7 8 9 10
M
D GMP ISSUE 23/05/14 AFUNIT TYPE D1 AMENDED 26/05/14 AFEMARKETING PLAN ISSUE 30/05/14 AFF
G CONSULTANT COODRINATION ISSUE 03/06/14 AFH GMP ISSUE 2 06/06/14 AF
J FLOOR LEVEL AMENDED, UNIT TYPE A1REVISED
08/09/14 AFK UNIT TYPE A1 KITCHEN REVISED 25/09/14 AF
L STREET ADDRESS AMENDEDLDRY SINK REVISED TO MATCH
SCHEDULE
16/12/14 AFM FIRE STAIRS AND LIFTS AMENDED 04/02/15 AF
N
Cottee Parker Architects Pty Ltd
Brisbane OfficeABN 77 010 924 106
201 Montague RoadWest End QLD 4101
T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au
Scale
Issue
Date Job no.
ApprovedCheckedDrawn
4800
Drawing no.
AF/LR
DD 2005
Client
Project
Location
Drawing Title
AmendmentsIssue Revision In.
12 - 14 WALDEN LANE, BOWEN HILLS
ANNEXE APARTMENTS
DREW GROUP
FLOOR PLAN - LEVEL 02 - 03
As Shown
General Notes
Additional Notes
Date
teamwork://CPABNEBIM01/4800 Dameline Master: 4/02/2015: 9:23 PM
REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS
1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.
2. All construction to comply with the building code of Australia and applicable Australian standards.
3. Do not scale from this drawing - use figured dimensions.
4. A signed original of this drawing is retained in CPA Offices for verification purposes.
5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.
6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.
7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made
8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.
9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.
.. KV
MAY 2014
FWFW
FWFWFW
FW
FW
FWFW
FW
FW
FW
FWFW
FW
FW
FWFW
FW
FW
FW
FW
FW
FW
FWFW
FW
FW
FWFW
FW
FW
FW
FWFW
MECH2300x400
FHR ELEC2700x200
MECH
2000
x500
MECH1800x400
COMM900x400
13101
13101
13102
13102
13103
13103
13104
13104
13105
13105
17 930 8 195 4 300 13 550
4 935
8 695
2 400
2 650
RL 16.400
D33L 2
D31L 2
D32L 2
D33L 2
D31L 2
D32L 2
D45L 2
D46L 2
D44L 2
D43L 2
D41L 2
D42L 2
D45L 2
D46L 2
D44L 2
D43L 2
D41L 2
D42L 2
D54L 2
D53L 2
D55L 2
D63L 2
D64L 2
D91L 2
D95L 2
D94L 2
D92L 2
D93L 2
D101L 2
D21L 2
D22L 2 D23
L 2
D24L 2
D25L 2
W70L 2
W60L 2
D05L 2
D06L 2
D01L 2
W71L 2
D62L 2
D61L 2
W100L 2
W02L 2
W42L 2
W50L 2
W41L 2
W20L 2
D51L 2
D52L 2
W01L 2
D02L 2
D03L 2
D04L 2
D80L 2
D90L 2
D100L 2D10
L 2D11L 2
D70L 2
D60L 2
D08L 2
D07L 2
D09L 2 D50
L 2D30L 2
D20L 2
D40L 2
D01L 2
W31L 2
W30L 2
W22L 2
W80L 2
W90L 2
W81L 2
W21L 2
W40L 2
W72L 2
W91L 2 ACCESSIBLE
ACCESSIBLE
LINENLINEN
LINEN
LINEN
LINEN/DB
LINEN/DB
LINEN
F
LINEN/DB
OV
DW
DWRP
MW
PF
MW
OVDWDWR
P
F
DB
MW
OV DW
DWR
DWR
PF DB
MWOV
DWDWR
P FDB
MWOV
DWDWR
LIFT 1 LIFT 2STAIR 1
P
F
DB
MW
OV DW
DWRP
F
DB
MW
OVDW
DWR
P
F DBMWOV
DWDWR
P
FMW
OV
DW
DWRUNIT H1
82 m²
BALCONY10 m²
BALCONY9 m²
UNIT G132 m²
UNIT E152 m²
UNIT B163 m²
UNIT C185 m²
UNIT D151 m²
UNIT B163 m²
UNIT C185 m²
CORRIDOR
UNIT F175 m²
6
62
2
4
4 8
8 10
10
A A
F F
B B
C C
D D
1-
FLOOR PLAN - LEVEL 02 -03 SCALE @ A1 1:100
SCALE 1: 100 @ A1SCALE 1: 200 @ A3
metres
0 1 2 3 4 5 6 7 8 9 10
M
C PROPOSED GLAZING INDICATED 16/05/14 AFD GMP ISSUE 23/05/14 AF
UNIT TYPE D1 AMENDED 26/05/14 AFEF MARKETING PLAN ISSUE 30/05/14 AFG CONSULTANT COODRINATION ISSUE 03/06/14 AFH GMP ISSUE 2 06/06/14 AFJ FLOOR LEVEL AMENDED 08/09/14 AFK UNIT TYPE H1 REVISED 25/09/14 AF
L STREET ADDRESS AMENDEDLDRY SINK REVISED TO MATCH
SCHEDULE
16/12/14 AFM FIRE STAIRS AND LIFTS AMENDED 04/02/15 AF
N
Cottee Parker Architects Pty Ltd
Brisbane OfficeABN 77 010 924 106
201 Montague RoadWest End QLD 4101
T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au
Scale
Issue
Date Job no.
ApprovedCheckedDrawn
4800
Drawing no.
AF/LR
DD 2006
Client
Project
Location
Drawing Title
AmendmentsIssue Revision In.
12 - 14 WALDEN LANE, BOWEN HILLS
ANNEXE APARTMENTS
DREW GROUP
FLOOR PLAN - LEVEL 04
As Shown
General Notes
Additional Notes
Date
teamwork://CPABNEBIM01/4800 Dameline Master: 4/02/2015: 9:23 PM
REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS
1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.
2. All construction to comply with the building code of Australia and applicable Australian standards.
3. Do not scale from this drawing - use figured dimensions.
4. A signed original of this drawing is retained in CPA Offices for verification purposes.
5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.
6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.
7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made
8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.
9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.
.. KV
MAY 2014
MECH2300x400
FHR ELEC2700x200
MECH
2000
x500
MECH1800x400
COMM900x400
13101
13101
13102
13102
13103
13103
13104
13104
13105
13105
17 930 8 195 4 300 13 550
4 935
8 695
2 400
2 650
RL 21.800
W70L 4
W60L 4
D05L 4
D06L 4
D01L 4
W71L 4
D62L 4
D61L 4
W100L 4
W02L 4
W42L 4
W50L 4
W41L 4
W20L 4
D51L 4
D52L 4
W01L 4
D02L 4
D03L 4
D04L 4
D80L 4
D90L 4
D100L 4D10
L 4D11L 4
D70L 4
D60L 4
D08L 4
D07L 4
D09L 4 D50
L 4D30L 4
D20L 4
D40L 4
D01L 4
W31L 4
W30L 4
W22L 4
W80L 4
W90L 4
W81L 4
W21L 4
W40L 4
W72L 4
W91L 4
REFER TO LEVEL 02FOR LAYOUT
REFER TO LEVEL 02FOR LAYOUT
REFER TO LEVEL 02FOR LAYOUT REFER TO LEVEL 02
FOR LAYOUT
REFER TO LEVEL 02FOR LAYOUT
REFER TO LEVEL 02FOR LAYOUT
REFER TO LEVEL 02FOR LAYOUT
REFER TO LEVEL 02FOR LAYOUT
REFER TO LEVEL 02FOR LAYOUT
LIFT 1 LIFT 2STAIR 1 UNIT H182 m²
BALCONY10 m²
BALCONY9 m²
UNIT G132 m²
UNIT E152 m²
UNIT B163 m²
UNIT C185 m²
UNIT D151 m²
UNIT B163 m²
UNIT C185 m²
CORRIDOR
UNIT F175 m²
6
62
2
4
4 8
8 10
10
A A
F F
B B
C C
D D
1-
FLOOR PLAN - LEVEL 04 SCALE @ A1 1:100
SCALE 1: 100 @ A1SCALE 1: 200 @ A3
metres
0 1 2 3 4 5 6 7 8 9 10
A COODRINATION ISSUE 12/05/14 AF
K
B UNIT LAYOUTS AMENDED 15/05/14 AFC PROPOSED GLAZING INDICATED 16/05/14 AFD GMP ISSUE 23/05/14 AF
UNIT TYPE D1 AMENDED 26/05/14 AFEF CONSULTANT COODRINATION ISSUE 03/06/14 AFG GMP ISSUE 2 06/06/14 AFH FLOOR LEVEL AMENDED 08/09/14 AFJ STREET ADDRESS AMENDED 16/12/14 AFK FIRE STAIRS AND LIFTS AMENDED 04/02/15 AF
N
Cottee Parker Architects Pty Ltd
Brisbane OfficeABN 77 010 924 106
201 Montague RoadWest End QLD 4101
T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au
Scale
Issue
Date Job no.
ApprovedCheckedDrawn
4800
Drawing no.
AF/LR
DD 2007
Client
Project
Location
Drawing Title
AmendmentsIssue Revision In.
12 - 14 WALDEN LANE, BOWEN HILLS
ANNEXE APARTMENTS
DREW GROUP
FLOOR PLAN - LEVEL 05
As Shown
General Notes
Additional Notes
Date
teamwork://CPABNEBIM01/4800 Dameline Master: 4/02/2015: 9:23 PM
REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS
1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.
2. All construction to comply with the building code of Australia and applicable Australian standards.
3. Do not scale from this drawing - use figured dimensions.
4. A signed original of this drawing is retained in CPA Offices for verification purposes.
5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.
6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.
7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made
8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.
9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.
.. KV
MAY 2014
FWFW
FW
FW
FW
FW
FW
FWFW
FWFW
FWFWFW
FW
FW
FWFW
FW
FW
FW
FWFW
FW
FW
FWFW
FWFW
FW
FW
FW
FWFW
FW
MECH2300x400
FHR ELEC2700x200
MECH
2000
x500
MECH1800x400
COMM900x400
13101
13101
13102
13102
13103
13103
13104
13104
13105
13105
17 930 8 195 4 300 13 550
4 935
8 695
2 400
2 650
RL 24.500
D54L 5
D53L 5
D55L 5
D63L 5
D64L 5
D101L 5
D34L 5
D32L 5
D33L 5
D34L 5
D32L 5
D33L 5
D46L 5
D47L 5
D45L 5
D44L 5
D42L 5
D43L 5
D46L 5
D47L 5
D45L 5
D44L 5
D42L 5
D43L 5
D92L 5
D96L 5
D95L 5
D93L 5
D94L 5
D22L 5
D23L 5
D24L 5
D25L 5
D26L 5
D10L 5
D11L 5
W70L 5
W60L 5
D05L 5
D06L 5
D12L 5
D80L 5
D90L 5
D100L 5
D62L 5
D61L 5
W02L 5
D50L 5
W41L 5
W50L 5
D30L 5
W20L 5
D20L 5
D51L 5
D52L 5
W01L 5
D02L 5
D03L 5
D04L 5
D41L 5
D21L 5
W21L 5
W30L 5
D31L 5
W90L 5
W80L 5
D71L 5
D81L 5
D91L 5
D40L 5
D01L 5
W71L 5
D70L 5
W100L 5
D60L 5
W40L 5
D08L 5
D07L 5D09
L 5
LINEN/DB
LINENLINEN
LINEN
LINEN
LINEN/DB
LINEN
F
LINEN/DB
OV
DW
DWRP
MW
P
F
DB
MW
OV DW
DWR
DWR
PF DB
MWOV
DWDWR
P FDB
MWOV
DWDWR
P
F
DB
MW
OV DW
DWRP
F
DB
MW
OVDW
DWR
P
F
DB
MW
OVDW
DWR
P
F DBMWOV
DWDWR
P
FMW
OV
DW
DWR
LIFT 1 LIFT 2STAIR 1 UNIT H272 m²
BALCONY10 m²
BALCONY9 m²
BALCONY8 m²
BALCONY8 m²
BALCONY9 m²
BALCONY9 m²
BALCONY8 m²
BALCONY8 m²
CORRIDOR
UNIT F266 m²
UNIT G132 m²
UNIT E152 m²
UNIT D151 m²
UNIT B254 m²
UNIT C277 m²
UNIT C277 m²
UNIT B254 m²
6
62
2
4
4 8
8 10
10
A A
F F
B B
C C
D D
1-
FLOOR PLAN - LEVEL 05 SCALE @ A1 1:100
SCALE 1: 100 @ A1SCALE 1: 200 @ A3
metres
0 1 2 3 4 5 6 7 8 9 10
N
D GMP ISSUE 23/05/14 AFUNIT TYPE D1 AMENDED 26/05/14 AFEMARKETING PLAN ISSUE 30/05/14 AFF
G CONSULTANT COODRINATION ISSUE 03/06/14 AFH GMP ISSUE 2 06/06/14 AFJ UNIT TYPE C2 & F2 AMENDED 25/06/14 AFK FLOOR LEVEL AMENDED 08/09/14 AFL UNIT TYPE H2 REVISED 25/09/14 AF
M STREET ADDRESS AMENDEDLDRY SINK REVISED TO MATCH
SCHEDULE
16/12/14 AFN FIRE STAIRS AND LIFTS AMENDED 04/02/15 AF
N
Cottee Parker Architects Pty Ltd
Brisbane OfficeABN 77 010 924 106
201 Montague RoadWest End QLD 4101
T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au
Scale
Issue
Date Job no.
ApprovedCheckedDrawn
4800
Drawing no.
AF/LR
DD 2008
Client
Project
Location
Drawing Title
AmendmentsIssue Revision In.
12 - 14 WALDEN LANE, BOWEN HILLS
ANNEXE APARTMENTS
DREW GROUP
FLOOR PLAN - LEVEL 06 - 09
As Shown
General Notes
Additional Notes
Date
teamwork://CPABNEBIM01/4800 Dameline Master: 4/02/2015: 9:23 PM
REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS
1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.
2. All construction to comply with the building code of Australia and applicable Australian standards.
3. Do not scale from this drawing - use figured dimensions.
4. A signed original of this drawing is retained in CPA Offices for verification purposes.
5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.
6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.
7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made
8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.
9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.
.. KV
MAY 2014
MECH2300x400
FHR ELEC2700x200
MECH
2000
x500
MECH1800x400
COMM900x400
13101
13101
13102
13102
13103
13103
13104
13104
13105
13105
17 930 8 195 4 300 13 550
4 935
8 695
2 400
2 650
2 000
RL 27.200D10L 6
D11L 6
W70L 6
W60L 6
D05L 6
D06L 6
D12L 6
D80L 6
D90L 6
D100L 6
D62L 6
D61L 6
W02L 6
D50L 6
W41L 6
W50L 6
D30L 6
W20L 6
D20L 6
D51L 6
D52L 6
W01L 6
D02L 6
D03L 6
D04L 6
D41L 6
D21L 6
W21L 6
W30L 6
D31L 6
W90L 6
W80L 6
D71L 6
D81L 6
D91L 6
D40L 6
D01L 6
W71L 6
D70L 6
W100L 6
D60L 6
W40L 6
D08L 6
D07L 6D09
L 6
REFER TO LEVEL 05FOR LAYOUT REFER TO LEVEL 05
FOR LAYOUT
REFER TO LEVEL 05FOR LAYOUT
REFER TO LEVEL 05FOR LAYOUT
REFER TO LEVEL 05FOR LAYOUT
REFER TO LEVEL 05FOR LAYOUT
REFER TO LEVEL 05FOR LAYOUT
REFER TO LEVEL 05FOR LAYOUT
REFER TO LEVEL 05FOR LAYOUT
LIFT 1 LIFT 2STAIR 1 UNIT H272 m²
BALCONY10 m²
BALCONY9 m²
BALCONY8 m²
BALCONY8 m²
BALCONY9 m²
BALCONY9 m²
BALCONY8 m²
BALCONY8 m²
CORRIDOR
UNIT F266 m²
UNIT G132 m²
UNIT E152 m²
UNIT D151 m²
UNIT B254 m²
UNIT C277 m²
UNIT C277 m²
UNIT B254 m²
6
62
2
4
4 8
8 10
10
A A
F F
B B
C C
D D
1-
FLOOR PLAN - LEVEL 06 - 09 SCALE @ A1 1:100
SCALE 1: 100 @ A1SCALE 1: 200 @ A3
metres
0 1 2 3 4 5 6 7 8 9 10
A COODRINATION ISSUE 12/05/14 AF
K
B UNIT LAYOUTS AMENDED 15/05/14 AFC PROPOSED GLAZING INDICATED 16/05/14 AFD GMP ISSUE 23/05/14 AF
UNIT TYPE D1 AMENDED 26/05/14 AFEF CONSULTANT COODRINATION ISSUE 03/06/14 AFG GMP ISSUE 2 06/06/14 AFH FLOOR LEVEL AMENDED 08/09/14 AFJ STREET ADDRESS AMENDED 16/12/14 AFK FIRE STAIRS AND LIFTS AMENDED 04/02/15 AF
N
Cottee Parker Architects Pty Ltd
Brisbane OfficeABN 77 010 924 106
201 Montague RoadWest End QLD 4101
T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au
Scale
Issue
Date Job no.
ApprovedCheckedDrawn
4800
Drawing no.
AF/LR
DD 2009
Client
Project
Location
Drawing Title
AmendmentsIssue Revision In.
12 - 14 WALDEN LANE, BOWEN HILLS
ANNEXE APARTMENTS
DREW GROUP
FLOOR PLAN - LEVEL 10 - ROOF
As Shown
General Notes
Additional Notes
Date
teamwork://CPABNEBIM01/4800 Dameline Master: 4/02/2015: 9:23 PM
REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS
1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.
2. All construction to comply with the building code of Australia and applicable Australian standards.
3. Do not scale from this drawing - use figured dimensions.
4. A signed original of this drawing is retained in CPA Offices for verification purposes.
5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.
6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.
7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made
8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.
9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.
.. KV
MAY 2014
SSL 40.600 SSL 39.500
FAL
L
FAL
L
B
C
64 8
MECH2300x400
MECH
2000
x500
MECH1800x400
13101
13101
13102
13102
13103
13103
13104
13104
13105
13105
SSL 38.000
D01L10
3° FALL
3° FALL
AC PLANT
HWU PLANT24 m²
AC PLANT
FIRE HYDRANT TANK
WATER TANK
6
62
2
4
4 8
8 10
10
A A
F F
B B
C C
D D
17 930 8 195 4 300 13 550
4 935
8 695
2 400
2 650
2-
UPPER ROOF PLAN SCALE @ A1 1:100
SCALE 1: 100 @ A1SCALE 1: 200 @ A3
metres
0 1 2 3 4 5 6 7 8 9 10
1-
ROOF PLAN - LEVEL 10 - ROOF SCALE @ A1 1:100
SCALE 1: 100 @ A1SCALE 1: 200 @ A3
metres
0 1 2 3 4 5 6 7 8 9 10
J
C GMP ISSUE 23/05/14 AF
UNIT TYPE D1 AMENDED, SOLAR PANELSINDICATED
26/05/14 AFDE CONSULTANT COODRINATION ISSUE 03/06/14 AFF GMP ISSUE 2 06/06/14 AF
G LEVELS AMENDED, SERVICE DECKSREVISED
08/09/14 AFH STREET ADDRESS AMENDED 16/12/14 AF
J FIRE STAIRS AND LIFTS AMENDEDROOF STRUCTURE REVISED
WATER TANKS ADDED
04/02/15 AF