N Cottee Parker Architects Pty Ltd Brisbane Office ABN 77 010 924 106 201 Montague Road West End QLD 4101 T 617 3846 7422 F 617 3846 7433 W www.cotteeparker.com.au Scale Issue Date Job no. Approved Checked Drawn 4800 Drawing no. AF/LR DD 2001 Client Project Location Drawing Title Amendments Issue Revision In. 12 - 14 WALDEN LANE, BOWEN HILLS ANNEXE APARTMENTS DREW GROUP FLOOR PLAN - BASEMENT 02 As Shown General Notes Additional Notes Date teamwork://CPABNEBIM01/4800 Dameline Master: 20/02/2015: 4:55 PM REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS 1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding. 2. All construction to comply with the building code of Australia and applicable Australian standards. 3. Do not scale from this drawing - use figured dimensions. 4. A signed original of this drawing is retained in CPA Offices for verification purposes. 5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority. 6. Builder and or Subcontractor to supply one sample each of the proprietary items, finishes, sample materials & shop drawings for sign off prior to placement of order, fabrication or construction. Once approved one signed item is to be held by the Builder and one duplicate item to be forwarded to Client’s Representative. 7. Information detailed in drawing revisions is for information only and may not be indicative of all changes made 8. Builder and or Subcontractor to confirm setouts, levels, setbacks and critical dimension on site for all services fixtures and fittings prior to and during the works. Notify Architect of any conflicts discovered prior to proceeding. 9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days. .. KV MAY 2014 1 1 3 3 5 5 9 9 11 11 11 R 10 R 09 R 08 R 04 R 03 R 05 R 07 R 06 R 02 R 01 R 12 R 13 R 14 R 15 R 17 R 18 R 19 R 20 R 26 SCB 25 R 24 R 23 R 22 R 21 R 16 R LM FHR FHR MECH 700x1000 MECH 600x800 G01 B2 8 800 10 760 7 565 2 150 8 665 7 485 4 550 8 955 2 525 2 650 6 200 6 200 6 200 310 1 080 1 135 200 SSL 4.675 SSL 1.775 SSL 1.775 SSL 2.050 SSL 3.150 SSL 2.720 SSL 1.120 RL 2.050 RL 3.150 D01 B 2 D02 B 2 D04 B 2 D05 B 2 D03 B 2 LIFT 1 REVERSE BAYS BASEMENT 02 26 CARS RAMP MIN 1:16 SPOON DRAIN SPOON DRAIN SPOON DRAIN SPOON DRAIN SPOON DRAIN SPOON DRAIN REMOTE EARTH GRID FOR TRANSFORMER IN SLAB HANGING BIKE RAKE FOR BIKE STORAGE ABOVE EACH CAR BAY CAR LIFT CAR LIFT MOTOR ROOM 1 3101 1 3101 1 3102 1 3102 1 3103 1 3103 1 3104 1 3104 1 3105 1 3105 6 6 7 7 A A F F B B C C E E 1 - FLOOR PLAN - BASEMENT 02 SCALE @ A1 1:100 SCALE 1: 100 @ A1 SCALE 1: 200 @ A3 metres 0 1 2 3 4 5 6 7 8 9 10 A COODRINATION ISSUE 12/05/14 AF J B INFORMATION AND ROOM NAMES ADDED 16/05/14 AF C GMP ISSUE 23/05/14 AF D CONSULTANT COODRINATION ISSUE 03/06/14 AF E GMP ISSUE 2 06/06/14 AF F STAIR RELOCATED, LEVELS AND RAMP AMENDED 08/09/14 AF G STREET ADDRESS AMENDED BASEMENT STRUCTURE AMENDED GRID LINE 9 AMENDED 16/12/14 AF H STRUCTURE AMENDED LIFT AMENDED 04/02/15 AF J LIFT SHAFT SIZE AMENDED STRUCTURE & RAMP GRADE REVISED MOTOR ROOM ADDED 20/02/15 AF
Transcript
Page 1: A A B B C C - edqdad.dsdip.qld.gov.auedqdad.dsdip.qld.gov.au/media/userfiles/593/6981/FloorPlans.pdf · AF/LR DD 2001 Client Project Location Drawing Title Amendments Issue Revision

N

Cottee Parker Architects Pty Ltd

Brisbane OfficeABN 77 010 924 106

201 Montague RoadWest End QLD 4101

T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au

Scale

Issue

Date Job no.

ApprovedCheckedDrawn

4800

Drawing no.

AF/LR

DD 2001

Client

Project

Location

Drawing Title

AmendmentsIssue Revision In.

12 - 14 WALDEN LANE, BOWEN HILLS

ANNEXE APARTMENTS

DREW GROUP

FLOOR PLAN - BASEMENT 02

As Shown

General Notes

Additional Notes

Date

teamwork://CPABNEBIM01/4800 Dameline Master: 20/02/2015: 4:55 PM

REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS

1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.

2. All construction to comply with the building code of Australia and applicable Australian standards.

3. Do not scale from this drawing - use figured dimensions.

4. A signed original of this drawing is retained in CPA Offices for verification purposes.

5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.

6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.

7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made

8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.

9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.

.. KV

MAY 2014

1

1

3

3

5

5

9

9

11

11

11

R

10

R

09

R

08

R

04

R

03

R

05

R

07

R

06

R

02

R

01

R

12

R

13

R

14

R

15

R

17

R

18

R

19

R

20

R

26

SCB

25

R

24

R

23

R

22

R

21

R

16

R

LM

FHRFHR

MECH700x1000

MECH600x800

G01B2

8 800 10 760 7 565 2 150 8 665 7 485

4 550

8 955

2 525

2 650

6 200

6 200

6 200

310

1 080

1 135

200

SSL 4.675

SSL 1.775

SSL 1.775

SSL 2.050 SSL 3.150

SSL 2.720

SSL 1.120

RL 2.050RL 3.150

D01B 2

D02B 2

D04B 2

D05B 2

D03B 2

LIFT 1

REVERSE BAYS

BASEMENT 0226 CARS RAMP

MIN 1:16

SPOON DRAIN

SPOON DRAIN

SPOON DRAIN

SPOON DRAIN

SPOO

N DR

AIN

SPOO

N DR

AIN

REMOTE EARTH GRID FORTRANSFORMER IN SLAB

HANGING BIKE RAKE FOR BIKE STORAGE ABOVE EACH CAR BAY

CAR LIFT CAR LIFT

MOTOR ROOM

13101

13101

13102

13102

13103

13103

13104

13104

13105

13105

6

6

7

7

A A

F F

B B

C C

E E

1-

FLOOR PLAN - BASEMENT 02 SCALE @ A1 1:100

SCALE 1: 100 @ A1SCALE 1: 200 @ A3

metres

0 1 2 3 4 5 6 7 8 9 10

A COODRINATION ISSUE 12/05/14 AF

J

B INFORMATION AND ROOM NAMES ADDED 16/05/14 AFC GMP ISSUE 23/05/14 AFD CONSULTANT COODRINATION ISSUE 03/06/14 AFE GMP ISSUE 2 06/06/14 AF

F STAIR RELOCATED, LEVELS AND RAMPAMENDED

08/09/14 AF

G STREET ADDRESS AMENDEDBASEMENT STRUCTURE AMENDED

GRID LINE 9 AMENDED

16/12/14 AF

H STRUCTURE AMENDEDLIFT AMENDED

04/02/15 AF

J LIFT SHAFT SIZE AMENDEDSTRUCTURE & RAMP GRADE REVISED

MOTOR ROOM ADDED

20/02/15 AF

Page 2: A A B B C C - edqdad.dsdip.qld.gov.auedqdad.dsdip.qld.gov.au/media/userfiles/593/6981/FloorPlans.pdf · AF/LR DD 2001 Client Project Location Drawing Title Amendments Issue Revision

N

Cottee Parker Architects Pty Ltd

Brisbane OfficeABN 77 010 924 106

201 Montague RoadWest End QLD 4101

T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au

Scale

Issue

Date Job no.

ApprovedCheckedDrawn

4800

Drawing no.

AF/LR

DD 2002

Client

Project

Location

Drawing Title

AmendmentsIssue Revision In.

12 - 14 WALDEN LANE, BOWEN HILLS

ANNEXE APARTMENTS

DREW GROUP

FLOOR PLAN - BASEMENT 01

As Shown

General Notes

Additional Notes

Date

teamwork://CPABNEBIM01/4800 Dameline Master: 20/02/2015: 4:55 PM

REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS

1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.

2. All construction to comply with the building code of Australia and applicable Australian standards.

3. Do not scale from this drawing - use figured dimensions.

4. A signed original of this drawing is retained in CPA Offices for verification purposes.

5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.

6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.

7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made

8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.

9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.

.. KV

MAY 2014

1

1

3

3

5

5

9

9

11

11

LM

FHRFHR

08

R

04

R

03

R

05

R

07

R

06

R

02

R

01

R

09

R

10

R

12

R

13

R

14

R

15

R

20

SCB

19

R

18

R

17

R

16

R

11

R

MECH700x1000

MECH600x800

LM

LM

4 550

8 955

2 525

2 650

8 800 10 760 7 565 2 150 8 665 7 485

6 200

6 200

3102 635

1 600

3 560

200

SSL 3.875SSL 7.950

SSL 5.050 SSL 6.100

SSL 5.640

D01B 1

D02B 1

D04B 1

D06B 1

D07B 1

D03B 1

D05B 1

LIFT 1

REVERSE BAYS

BASEMENT 0120 CARS

LIFT 2PIT

RAMPMIN 1:16

TRANSFORMERSERVICING

ROOM

HANGING BIKE RAKE FOR BIKE STORAGE ABOVE EACH CAR BAY

SPOON DRAIN

SPOON DRAIN

SPOON DRAIN

SPOO

N DR

AIN

SPOO

N DR

AIN

CAR LIFT CAR LIFT

BIKE RAKES- 9 BIKES

BIKE RAKES- 10 BIKES

FIRE PUMP ROOM

13101

13101

13102

13102

13103

13103

13104

13104

13105

13105

6

6

7

7

A A

F F

B B

C C

E E

1-

FLOOR PLAN - BASEMENT 01 SCALE @ A1 1:100

SCALE 1: 100 @ A1SCALE 1: 200 @ A3

metres

0 1 2 3 4 5 6 7 8 9 10

J

C GMP ISSUE 23/05/14 AFD CONSULTANT COODRINATION ISSUE 03/06/14 AFE GMP ISSUE 2 06/06/14 AF

F STAIR RELOCATED, LEVELS AND RAMPAMENDED, SERVICE ROOM ADDED

08/09/14 AF

G STREET ADDRESS AMENDEDBASEMENT STRUCTURE AMENDED

GRID LINE 9 AMENDED

16/12/14 AF

H STRUCTURE AMENDED, LIFT AMENDEDTRANSFORMER ROOM AMENDED

STAIRS AMENDEDFIRE PUMP ROOM ADDED

04/02/15 AF

J LIFT SHAFT SIZE AMENDEDSTRUCTURE & RAMP GRADE REVISED

DRIVEWAY AMENDED

20/02/15 AF

Page 3: A A B B C C - edqdad.dsdip.qld.gov.auedqdad.dsdip.qld.gov.au/media/userfiles/593/6981/FloorPlans.pdf · AF/LR DD 2001 Client Project Location Drawing Title Amendments Issue Revision

N

Cottee Parker Architects Pty Ltd

Brisbane OfficeABN 77 010 924 106

201 Montague RoadWest End QLD 4101

T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au

Scale

Issue

Date Job no.

ApprovedCheckedDrawn

4800

Drawing no.

AF/LR

DD 2003

Client

Project

Location

Drawing Title

AmendmentsIssue Revision In.

12 - 14 WALDEN LANE, BOWEN HILLS

ANNEXE APARTMENTS

DREW GROUP

FLOOR PLAN - GROUND FLOOR

As Shown

General Notes

Additional Notes

Date

teamwork://CPABNEBIM01/4800 Dameline Master: 20/02/2015: 4:55 PM

REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS

1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.

2. All construction to comply with the building code of Australia and applicable Australian standards.

3. Do not scale from this drawing - use figured dimensions.

4. A signed original of this drawing is retained in CPA Offices for verification purposes.

5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.

6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.

7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made

8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.

9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.

.. KV

MAY 2014

1100Lt BIN

1100Lt BIN

1100Lt BIN

1100Lt BIN

1100Lt BIN

3

3

5

5

9

9

03

R

07

R

02

R

06

R

05

R

04

R

08

LM

LM

MSB

NBN

DB

FHR

FHR

FHR

G01G

LM

WC

VB

01

R

L01G

D01G

4 550

8 955

2 525

2 650

7 700 10 760 7 565 4 400 6 415 7 135

6 200

2 700

6 720

1 5351 200

4 800

5 215

13101

13101

13102

13102

13103

13103

13104

13104

13105

13105

SSL 6.504SSL 10.300

SSL 9.800

SSL 10.400SSL 8.720

SSL 8.600

SSL 7.800

SSL 9.000

SSL 9.200

SSL 8.170

SSL 9.950

SSL 9.350

SSL 8.700

SSL 9.350D15G

D08G

D31G

D22G

D09G

D12G

D07G

D26G

D23G

D27G

D21G

D28G

D17G

D18G

D13G

D19G

D20G

D14G

D03G

D16G

D24G

W02G

D11G

D29G

D30G

D02G

D06G

D04G

D05G

D10G

PLATFORM LIFT RAILPLATFORM

LIFT

CAR LIFT

WAL

DEN

LANE

BOW

EN B

RIDG

E RO

AD

LIFT 1 LIFT 2

REVERSE BAYS

CHAI

N BA

RRIE

R GA

TE

BIKE RAKES- 11 BIKES

RAMP1:20

PLATFORM LIFT RAIL

PLATFORMLIFT

GROUND8 CARS

TOTAL 54 CARS

AWNI

NG A

BOVE

FOYER

CAR LIFT

LETTERBOXES

HR

PWD

COMMS

GAS

SWITCH ROOM

REFUSES BINSMANAGERS

12 m²

TRANSFORMERPADMOUNT

25 m²

BOOSTER

RETAIL61 m²

STORE02

STORE01

SSL 10.150

6

62

2 8

8 10

10

A A

F F

B B

C C

E E

FIP

MECH700x1000

HR08 MECH600x1500

1-

FLOOR PLAN - GROUND FLOOR SCALE @ A1 1:100

SCALE 1: 100 @ A1SCALE 1: 200 @ A3

metres

0 1 2 3 4 5 6 7 8 9 10

N

G MANAGERS DOOR AMENDED 11/09/14 AF

H BIN STORE, STAIR 3 & BIKE RAKESREVISED

11/09/14 AF

J STREET ADDRESS AMENDEDGRID LINE 9 AMENDED

16/12/14 AF

K STAIRS AMENDED, LIFTS AMENDEDBOOSTERS AND FIP RELOCATED

STORE AMENDEDTRANSFORMER AMENDED

TOTAL CAR PARKS REVISED

04/02/15 AF

L PUBLIC BIKE PARKS REMOVEDRETAIL SLAB HEIGHT AMENDED

09/02/15 AF

M PADMOUNT ENCLOSURE REVISEDSTORE ROOM DIVIDED

12/02/15 TVR

N STAIR & LIFT SHAFT SIZE AMENDEDSTRUCTURE REVISED

20/02/15 AF

Page 4: A A B B C C - edqdad.dsdip.qld.gov.auedqdad.dsdip.qld.gov.au/media/userfiles/593/6981/FloorPlans.pdf · AF/LR DD 2001 Client Project Location Drawing Title Amendments Issue Revision

N

Cottee Parker Architects Pty Ltd

Brisbane OfficeABN 77 010 924 106

201 Montague RoadWest End QLD 4101

T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au

Scale

Issue

Date Job no.

ApprovedCheckedDrawn

4800

Drawing no.

AF/LR

DD 2004

Client

Project

Location

Drawing Title

AmendmentsIssue Revision In.

12 - 14 WALDEN LANE, BOWEN HILLS

ANNEXE APARTMENTS

DREW GROUP

FLOOR PLAN - LEVEL 01

As Shown

General Notes

Additional Notes

Date

teamwork://CPABNEBIM01/4800 Dameline Master: 4/02/2015: 9:23 PM

REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS

1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.

2. All construction to comply with the building code of Australia and applicable Australian standards.

3. Do not scale from this drawing - use figured dimensions.

4. A signed original of this drawing is retained in CPA Offices for verification purposes.

5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.

6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.

7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made

8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.

9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.

.. KV

MAY 2014

FWFW

FWFWFW

FW

FW

FWFW

FW

FW

FW

FWFW

FW

FW

FWFW

FW

FW

FW

FW

FW

FW

FWFW

FW

FW

FWFW

FW

FW

FW

FWFW

MECH2300x400

MECH1800x400

FHR ELEC2700x200

MECH

2000

x500

COMM900x400

AC AC

13101

13101

13102

13102

13103

13103

13104

13104

13105

13105

17 930 8 195 4 300 13 550

4 935

8 695

2 400

2 650

RL 13.600

RL 13.700

RL 13.600

D33L 1

D31L 1

D32L 1

D33L 1

D31L 1

D32L 1

D45L 1

D46L 1

D44L 1

D43L 1

D41L 1

D42L 1

D45L 1

D46L 1

D44L 1

D43L 1

D41L 1

D42L 1

D54L 1

D53L 1

D55L 1

D63L 1

D64L 1

D91L 1

D95L 1

D94L 1

D92L 1

D93L 1

D101L 1

D21L 1

D22L 1 D23

L 1

D24L 1

D25L 1

D10L 1

D11L 1

W70L 1

W60L 1

D05L 1

D06L 1

D12L 1

W71L 1

D80L 1

D90L 1

D100L 1

D62L 1

D61L 1

W100L 1

D13L 1

D50L 1

W42L 1

W50L 1

D30L 1

W20L 1

D20L 1

D51L 1

D52L 1

W01L 1

D12L 1

D02L 1

D03L 1

D04L 1

D40L 1

D01L 1

W41L 1

W31L 1

W30L 1

W80L 1

W81L 1

W90L 1

D70L 1

D60L 1

D08L 1

D07L 1D09

L 1

W22L 1

W21L 1

W40L 1

W72L 1

W91L 1

PLANTER

PLANTER

2.5° FALL

2.5° FALL

ACCESSIBLE

ACCESSIBLE

LINENLINEN

LINEN

LINEN

LINEN/DB

LINEN/DB

F

LINEN/DB

OV

DW

DWRP

MW

PF

MW

OVDWDWR

LINEN P

F

DB

MW

OV DW

DWR

DWR

PF DB

MWOV

DWDWR

P FDB

MWOV

DWDWR

P

F

DB

MW

OV DW

DWRP

F

DB

MW

OVDW

DWR

P

F DBMWOV

DWDWR

P

FMW

OV

DW

DWR

LIFT 1 LIFT 2STAIR 1 UNIT H182 m²

UNIT F175 m²

UNIT G132 m²

UNIT E152 m²

UNIT B163 m²

UNIT C185 m²

UNIT D151 m²

BALCONY35 m²

BALCONY34 m²

UNIT B163 m²

UNIT C185 m²

CORRIDOR

6

62

2

4

4 8

8 10

10

A A

F F

B B

C C

D D

1-

FLOOR PLAN - LEVEL 01 SCALE @ A1 1:100

SCALE 1: 100 @ A1SCALE 1: 200 @ A3

metres

0 1 2 3 4 5 6 7 8 9 10

M

D GMP ISSUE 23/05/14 AFUNIT TYPE D1 AMENDED 26/05/14 AFEMARKETING PLAN ISSUE 30/05/14 AFF

G CONSULTANT COODRINATION ISSUE 03/06/14 AFH GMP ISSUE 2 06/06/14 AF

J FLOOR LEVEL AMENDED, UNIT TYPE A1REVISED

08/09/14 AFK UNIT TYPE A1 KITCHEN REVISED 25/09/14 AF

L STREET ADDRESS AMENDEDLDRY SINK REVISED TO MATCH

SCHEDULE

16/12/14 AFM FIRE STAIRS AND LIFTS AMENDED 04/02/15 AF

Page 5: A A B B C C - edqdad.dsdip.qld.gov.auedqdad.dsdip.qld.gov.au/media/userfiles/593/6981/FloorPlans.pdf · AF/LR DD 2001 Client Project Location Drawing Title Amendments Issue Revision

N

Cottee Parker Architects Pty Ltd

Brisbane OfficeABN 77 010 924 106

201 Montague RoadWest End QLD 4101

T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au

Scale

Issue

Date Job no.

ApprovedCheckedDrawn

4800

Drawing no.

AF/LR

DD 2005

Client

Project

Location

Drawing Title

AmendmentsIssue Revision In.

12 - 14 WALDEN LANE, BOWEN HILLS

ANNEXE APARTMENTS

DREW GROUP

FLOOR PLAN - LEVEL 02 - 03

As Shown

General Notes

Additional Notes

Date

teamwork://CPABNEBIM01/4800 Dameline Master: 4/02/2015: 9:23 PM

REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS

1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.

2. All construction to comply with the building code of Australia and applicable Australian standards.

3. Do not scale from this drawing - use figured dimensions.

4. A signed original of this drawing is retained in CPA Offices for verification purposes.

5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.

6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.

7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made

8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.

9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.

.. KV

MAY 2014

FWFW

FWFWFW

FW

FW

FWFW

FW

FW

FW

FWFW

FW

FW

FWFW

FW

FW

FW

FW

FW

FW

FWFW

FW

FW

FWFW

FW

FW

FW

FWFW

MECH2300x400

FHR ELEC2700x200

MECH

2000

x500

MECH1800x400

COMM900x400

13101

13101

13102

13102

13103

13103

13104

13104

13105

13105

17 930 8 195 4 300 13 550

4 935

8 695

2 400

2 650

RL 16.400

D33L 2

D31L 2

D32L 2

D33L 2

D31L 2

D32L 2

D45L 2

D46L 2

D44L 2

D43L 2

D41L 2

D42L 2

D45L 2

D46L 2

D44L 2

D43L 2

D41L 2

D42L 2

D54L 2

D53L 2

D55L 2

D63L 2

D64L 2

D91L 2

D95L 2

D94L 2

D92L 2

D93L 2

D101L 2

D21L 2

D22L 2 D23

L 2

D24L 2

D25L 2

W70L 2

W60L 2

D05L 2

D06L 2

D01L 2

W71L 2

D62L 2

D61L 2

W100L 2

W02L 2

W42L 2

W50L 2

W41L 2

W20L 2

D51L 2

D52L 2

W01L 2

D02L 2

D03L 2

D04L 2

D80L 2

D90L 2

D100L 2D10

L 2D11L 2

D70L 2

D60L 2

D08L 2

D07L 2

D09L 2 D50

L 2D30L 2

D20L 2

D40L 2

D01L 2

W31L 2

W30L 2

W22L 2

W80L 2

W90L 2

W81L 2

W21L 2

W40L 2

W72L 2

W91L 2 ACCESSIBLE

ACCESSIBLE

LINENLINEN

LINEN

LINEN

LINEN/DB

LINEN/DB

LINEN

F

LINEN/DB

OV

DW

DWRP

MW

PF

MW

OVDWDWR

P

F

DB

MW

OV DW

DWR

DWR

PF DB

MWOV

DWDWR

P FDB

MWOV

DWDWR

LIFT 1 LIFT 2STAIR 1

P

F

DB

MW

OV DW

DWRP

F

DB

MW

OVDW

DWR

P

F DBMWOV

DWDWR

P

FMW

OV

DW

DWRUNIT H1

82 m²

BALCONY10 m²

BALCONY9 m²

UNIT G132 m²

UNIT E152 m²

UNIT B163 m²

UNIT C185 m²

UNIT D151 m²

UNIT B163 m²

UNIT C185 m²

CORRIDOR

UNIT F175 m²

6

62

2

4

4 8

8 10

10

A A

F F

B B

C C

D D

1-

FLOOR PLAN - LEVEL 02 -03 SCALE @ A1 1:100

SCALE 1: 100 @ A1SCALE 1: 200 @ A3

metres

0 1 2 3 4 5 6 7 8 9 10

M

C PROPOSED GLAZING INDICATED 16/05/14 AFD GMP ISSUE 23/05/14 AF

UNIT TYPE D1 AMENDED 26/05/14 AFEF MARKETING PLAN ISSUE 30/05/14 AFG CONSULTANT COODRINATION ISSUE 03/06/14 AFH GMP ISSUE 2 06/06/14 AFJ FLOOR LEVEL AMENDED 08/09/14 AFK UNIT TYPE H1 REVISED 25/09/14 AF

L STREET ADDRESS AMENDEDLDRY SINK REVISED TO MATCH

SCHEDULE

16/12/14 AFM FIRE STAIRS AND LIFTS AMENDED 04/02/15 AF

Page 6: A A B B C C - edqdad.dsdip.qld.gov.auedqdad.dsdip.qld.gov.au/media/userfiles/593/6981/FloorPlans.pdf · AF/LR DD 2001 Client Project Location Drawing Title Amendments Issue Revision

N

Cottee Parker Architects Pty Ltd

Brisbane OfficeABN 77 010 924 106

201 Montague RoadWest End QLD 4101

T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au

Scale

Issue

Date Job no.

ApprovedCheckedDrawn

4800

Drawing no.

AF/LR

DD 2006

Client

Project

Location

Drawing Title

AmendmentsIssue Revision In.

12 - 14 WALDEN LANE, BOWEN HILLS

ANNEXE APARTMENTS

DREW GROUP

FLOOR PLAN - LEVEL 04

As Shown

General Notes

Additional Notes

Date

teamwork://CPABNEBIM01/4800 Dameline Master: 4/02/2015: 9:23 PM

REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS

1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.

2. All construction to comply with the building code of Australia and applicable Australian standards.

3. Do not scale from this drawing - use figured dimensions.

4. A signed original of this drawing is retained in CPA Offices for verification purposes.

5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.

6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.

7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made

8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.

9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.

.. KV

MAY 2014

MECH2300x400

FHR ELEC2700x200

MECH

2000

x500

MECH1800x400

COMM900x400

13101

13101

13102

13102

13103

13103

13104

13104

13105

13105

17 930 8 195 4 300 13 550

4 935

8 695

2 400

2 650

RL 21.800

W70L 4

W60L 4

D05L 4

D06L 4

D01L 4

W71L 4

D62L 4

D61L 4

W100L 4

W02L 4

W42L 4

W50L 4

W41L 4

W20L 4

D51L 4

D52L 4

W01L 4

D02L 4

D03L 4

D04L 4

D80L 4

D90L 4

D100L 4D10

L 4D11L 4

D70L 4

D60L 4

D08L 4

D07L 4

D09L 4 D50

L 4D30L 4

D20L 4

D40L 4

D01L 4

W31L 4

W30L 4

W22L 4

W80L 4

W90L 4

W81L 4

W21L 4

W40L 4

W72L 4

W91L 4

REFER TO LEVEL 02FOR LAYOUT

REFER TO LEVEL 02FOR LAYOUT

REFER TO LEVEL 02FOR LAYOUT REFER TO LEVEL 02

FOR LAYOUT

REFER TO LEVEL 02FOR LAYOUT

REFER TO LEVEL 02FOR LAYOUT

REFER TO LEVEL 02FOR LAYOUT

REFER TO LEVEL 02FOR LAYOUT

REFER TO LEVEL 02FOR LAYOUT

LIFT 1 LIFT 2STAIR 1 UNIT H182 m²

BALCONY10 m²

BALCONY9 m²

UNIT G132 m²

UNIT E152 m²

UNIT B163 m²

UNIT C185 m²

UNIT D151 m²

UNIT B163 m²

UNIT C185 m²

CORRIDOR

UNIT F175 m²

6

62

2

4

4 8

8 10

10

A A

F F

B B

C C

D D

1-

FLOOR PLAN - LEVEL 04 SCALE @ A1 1:100

SCALE 1: 100 @ A1SCALE 1: 200 @ A3

metres

0 1 2 3 4 5 6 7 8 9 10

A COODRINATION ISSUE 12/05/14 AF

K

B UNIT LAYOUTS AMENDED 15/05/14 AFC PROPOSED GLAZING INDICATED 16/05/14 AFD GMP ISSUE 23/05/14 AF

UNIT TYPE D1 AMENDED 26/05/14 AFEF CONSULTANT COODRINATION ISSUE 03/06/14 AFG GMP ISSUE 2 06/06/14 AFH FLOOR LEVEL AMENDED 08/09/14 AFJ STREET ADDRESS AMENDED 16/12/14 AFK FIRE STAIRS AND LIFTS AMENDED 04/02/15 AF

Page 7: A A B B C C - edqdad.dsdip.qld.gov.auedqdad.dsdip.qld.gov.au/media/userfiles/593/6981/FloorPlans.pdf · AF/LR DD 2001 Client Project Location Drawing Title Amendments Issue Revision

N

Cottee Parker Architects Pty Ltd

Brisbane OfficeABN 77 010 924 106

201 Montague RoadWest End QLD 4101

T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au

Scale

Issue

Date Job no.

ApprovedCheckedDrawn

4800

Drawing no.

AF/LR

DD 2007

Client

Project

Location

Drawing Title

AmendmentsIssue Revision In.

12 - 14 WALDEN LANE, BOWEN HILLS

ANNEXE APARTMENTS

DREW GROUP

FLOOR PLAN - LEVEL 05

As Shown

General Notes

Additional Notes

Date

teamwork://CPABNEBIM01/4800 Dameline Master: 4/02/2015: 9:23 PM

REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS

1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.

2. All construction to comply with the building code of Australia and applicable Australian standards.

3. Do not scale from this drawing - use figured dimensions.

4. A signed original of this drawing is retained in CPA Offices for verification purposes.

5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.

6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.

7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made

8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.

9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.

.. KV

MAY 2014

FWFW

FW

FW

FW

FW

FW

FWFW

FWFW

FWFWFW

FW

FW

FWFW

FW

FW

FW

FWFW

FW

FW

FWFW

FWFW

FW

FW

FW

FWFW

FW

MECH2300x400

FHR ELEC2700x200

MECH

2000

x500

MECH1800x400

COMM900x400

13101

13101

13102

13102

13103

13103

13104

13104

13105

13105

17 930 8 195 4 300 13 550

4 935

8 695

2 400

2 650

RL 24.500

D54L 5

D53L 5

D55L 5

D63L 5

D64L 5

D101L 5

D34L 5

D32L 5

D33L 5

D34L 5

D32L 5

D33L 5

D46L 5

D47L 5

D45L 5

D44L 5

D42L 5

D43L 5

D46L 5

D47L 5

D45L 5

D44L 5

D42L 5

D43L 5

D92L 5

D96L 5

D95L 5

D93L 5

D94L 5

D22L 5

D23L 5

D24L 5

D25L 5

D26L 5

D10L 5

D11L 5

W70L 5

W60L 5

D05L 5

D06L 5

D12L 5

D80L 5

D90L 5

D100L 5

D62L 5

D61L 5

W02L 5

D50L 5

W41L 5

W50L 5

D30L 5

W20L 5

D20L 5

D51L 5

D52L 5

W01L 5

D02L 5

D03L 5

D04L 5

D41L 5

D21L 5

W21L 5

W30L 5

D31L 5

W90L 5

W80L 5

D71L 5

D81L 5

D91L 5

D40L 5

D01L 5

W71L 5

D70L 5

W100L 5

D60L 5

W40L 5

D08L 5

D07L 5D09

L 5

LINEN/DB

LINENLINEN

LINEN

LINEN

LINEN/DB

LINEN

F

LINEN/DB

OV

DW

DWRP

MW

P

F

DB

MW

OV DW

DWR

DWR

PF DB

MWOV

DWDWR

P FDB

MWOV

DWDWR

P

F

DB

MW

OV DW

DWRP

F

DB

MW

OVDW

DWR

P

F

DB

MW

OVDW

DWR

P

F DBMWOV

DWDWR

P

FMW

OV

DW

DWR

LIFT 1 LIFT 2STAIR 1 UNIT H272 m²

BALCONY10 m²

BALCONY9 m²

BALCONY8 m²

BALCONY8 m²

BALCONY9 m²

BALCONY9 m²

BALCONY8 m²

BALCONY8 m²

CORRIDOR

UNIT F266 m²

UNIT G132 m²

UNIT E152 m²

UNIT D151 m²

UNIT B254 m²

UNIT C277 m²

UNIT C277 m²

UNIT B254 m²

6

62

2

4

4 8

8 10

10

A A

F F

B B

C C

D D

1-

FLOOR PLAN - LEVEL 05 SCALE @ A1 1:100

SCALE 1: 100 @ A1SCALE 1: 200 @ A3

metres

0 1 2 3 4 5 6 7 8 9 10

N

D GMP ISSUE 23/05/14 AFUNIT TYPE D1 AMENDED 26/05/14 AFEMARKETING PLAN ISSUE 30/05/14 AFF

G CONSULTANT COODRINATION ISSUE 03/06/14 AFH GMP ISSUE 2 06/06/14 AFJ UNIT TYPE C2 & F2 AMENDED 25/06/14 AFK FLOOR LEVEL AMENDED 08/09/14 AFL UNIT TYPE H2 REVISED 25/09/14 AF

M STREET ADDRESS AMENDEDLDRY SINK REVISED TO MATCH

SCHEDULE

16/12/14 AFN FIRE STAIRS AND LIFTS AMENDED 04/02/15 AF

Page 8: A A B B C C - edqdad.dsdip.qld.gov.auedqdad.dsdip.qld.gov.au/media/userfiles/593/6981/FloorPlans.pdf · AF/LR DD 2001 Client Project Location Drawing Title Amendments Issue Revision

N

Cottee Parker Architects Pty Ltd

Brisbane OfficeABN 77 010 924 106

201 Montague RoadWest End QLD 4101

T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au

Scale

Issue

Date Job no.

ApprovedCheckedDrawn

4800

Drawing no.

AF/LR

DD 2008

Client

Project

Location

Drawing Title

AmendmentsIssue Revision In.

12 - 14 WALDEN LANE, BOWEN HILLS

ANNEXE APARTMENTS

DREW GROUP

FLOOR PLAN - LEVEL 06 - 09

As Shown

General Notes

Additional Notes

Date

teamwork://CPABNEBIM01/4800 Dameline Master: 4/02/2015: 9:23 PM

REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS

1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.

2. All construction to comply with the building code of Australia and applicable Australian standards.

3. Do not scale from this drawing - use figured dimensions.

4. A signed original of this drawing is retained in CPA Offices for verification purposes.

5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.

6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.

7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made

8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.

9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.

.. KV

MAY 2014

MECH2300x400

FHR ELEC2700x200

MECH

2000

x500

MECH1800x400

COMM900x400

13101

13101

13102

13102

13103

13103

13104

13104

13105

13105

17 930 8 195 4 300 13 550

4 935

8 695

2 400

2 650

2 000

RL 27.200D10L 6

D11L 6

W70L 6

W60L 6

D05L 6

D06L 6

D12L 6

D80L 6

D90L 6

D100L 6

D62L 6

D61L 6

W02L 6

D50L 6

W41L 6

W50L 6

D30L 6

W20L 6

D20L 6

D51L 6

D52L 6

W01L 6

D02L 6

D03L 6

D04L 6

D41L 6

D21L 6

W21L 6

W30L 6

D31L 6

W90L 6

W80L 6

D71L 6

D81L 6

D91L 6

D40L 6

D01L 6

W71L 6

D70L 6

W100L 6

D60L 6

W40L 6

D08L 6

D07L 6D09

L 6

REFER TO LEVEL 05FOR LAYOUT REFER TO LEVEL 05

FOR LAYOUT

REFER TO LEVEL 05FOR LAYOUT

REFER TO LEVEL 05FOR LAYOUT

REFER TO LEVEL 05FOR LAYOUT

REFER TO LEVEL 05FOR LAYOUT

REFER TO LEVEL 05FOR LAYOUT

REFER TO LEVEL 05FOR LAYOUT

REFER TO LEVEL 05FOR LAYOUT

LIFT 1 LIFT 2STAIR 1 UNIT H272 m²

BALCONY10 m²

BALCONY9 m²

BALCONY8 m²

BALCONY8 m²

BALCONY9 m²

BALCONY9 m²

BALCONY8 m²

BALCONY8 m²

CORRIDOR

UNIT F266 m²

UNIT G132 m²

UNIT E152 m²

UNIT D151 m²

UNIT B254 m²

UNIT C277 m²

UNIT C277 m²

UNIT B254 m²

6

62

2

4

4 8

8 10

10

A A

F F

B B

C C

D D

1-

FLOOR PLAN - LEVEL 06 - 09 SCALE @ A1 1:100

SCALE 1: 100 @ A1SCALE 1: 200 @ A3

metres

0 1 2 3 4 5 6 7 8 9 10

A COODRINATION ISSUE 12/05/14 AF

K

B UNIT LAYOUTS AMENDED 15/05/14 AFC PROPOSED GLAZING INDICATED 16/05/14 AFD GMP ISSUE 23/05/14 AF

UNIT TYPE D1 AMENDED 26/05/14 AFEF CONSULTANT COODRINATION ISSUE 03/06/14 AFG GMP ISSUE 2 06/06/14 AFH FLOOR LEVEL AMENDED 08/09/14 AFJ STREET ADDRESS AMENDED 16/12/14 AFK FIRE STAIRS AND LIFTS AMENDED 04/02/15 AF

Page 9: A A B B C C - edqdad.dsdip.qld.gov.auedqdad.dsdip.qld.gov.au/media/userfiles/593/6981/FloorPlans.pdf · AF/LR DD 2001 Client Project Location Drawing Title Amendments Issue Revision

N

Cottee Parker Architects Pty Ltd

Brisbane OfficeABN 77 010 924 106

201 Montague RoadWest End QLD 4101

T 617 3846 7422F 617 3846 7433W www.cotteeparker.com.au

Scale

Issue

Date Job no.

ApprovedCheckedDrawn

4800

Drawing no.

AF/LR

DD 2009

Client

Project

Location

Drawing Title

AmendmentsIssue Revision In.

12 - 14 WALDEN LANE, BOWEN HILLS

ANNEXE APARTMENTS

DREW GROUP

FLOOR PLAN - LEVEL 10 - ROOF

As Shown

General Notes

Additional Notes

Date

teamwork://CPABNEBIM01/4800 Dameline Master: 4/02/2015: 9:23 PM

REFER TO 0900 SERIES FOR GENERAL NOTATION, ABBREVIATIONS, SYMBOLS AND NUMBERING SYSTEMS

1. Confirm details of setouts, levels, setbacks and critical dimensions on site prior to and during the works. Notify architect of any discrepancies discovered before proceeding.

2. All construction to comply with the building code of Australia and applicable Australian standards.

3. Do not scale from this drawing - use figured dimensions.

4. A signed original of this drawing is retained in CPA Offices for verification purposes.

5. These drawings are the copyright of Cottee Parker Architects Pty Ltd and may not be used, retained or copied without written authority.

6. Builder and or Subcontractor to supply one sample eachof the proprietary items, finishes, sample materials & shopdrawings for sign off prior to placement of order,fabrication or construction. Once approved one signeditem is to be held by the Builder and one duplicate item tobe forwarded to Client’s Representative.

7. Information detailed in drawing revisions is for informationonly and may not be indicative of all changes made

8. Builder and or Subcontractor to confirm setouts, levels,setbacks and critical dimension on site for all servicesfixtures and fittings prior to and during the works. NotifyArchitect of any conflicts discovered prior to proceeding.

9. The Client is to review design & documentation detailed within this document. CPA will assume the design & documentation satisfies the Client's Principal's Project. Requirements if CPA receives no written advice to the contrary within 20 working days.

.. KV

MAY 2014

SSL 40.600 SSL 39.500

FAL

L

FAL

L

B

C

64 8

MECH2300x400

MECH

2000

x500

MECH1800x400

13101

13101

13102

13102

13103

13103

13104

13104

13105

13105

SSL 38.000

D01L10

3° FALL

3° FALL

AC PLANT

HWU PLANT24 m²

AC PLANT

FIRE HYDRANT TANK

WATER TANK

6

62

2

4

4 8

8 10

10

A A

F F

B B

C C

D D

17 930 8 195 4 300 13 550

4 935

8 695

2 400

2 650

2-

UPPER ROOF PLAN SCALE @ A1 1:100

SCALE 1: 100 @ A1SCALE 1: 200 @ A3

metres

0 1 2 3 4 5 6 7 8 9 10

1-

ROOF PLAN - LEVEL 10 - ROOF SCALE @ A1 1:100

SCALE 1: 100 @ A1SCALE 1: 200 @ A3

metres

0 1 2 3 4 5 6 7 8 9 10

J

C GMP ISSUE 23/05/14 AF

UNIT TYPE D1 AMENDED, SOLAR PANELSINDICATED

26/05/14 AFDE CONSULTANT COODRINATION ISSUE 03/06/14 AFF GMP ISSUE 2 06/06/14 AF

G LEVELS AMENDED, SERVICE DECKSREVISED

08/09/14 AFH STREET ADDRESS AMENDED 16/12/14 AF

J FIRE STAIRS AND LIFTS AMENDEDROOF STRUCTURE REVISED

WATER TANKS ADDED

04/02/15 AF