22
U. T. of Daman & Diu A Blue print for development August 2015
Transcript

U. T. of Daman & Diu

A Blue print for development

August 2015

1

L O C A T I O N

• Two Districts: Daman & Diu

• Head Quarter: Daman

• Parliament Constituency: 01

• Daman: 72 Sq. Km.

• Diu: 40 Sq. Km. An island near

Una Taluka of Junagarh

District in Gujarat State.

1

L O C A T I O N

• Two Districts: Daman & Diu

• Head Quarter: Daman

• Parliament Constituency: 01

• Daman: 72 Sq. Km.

• Diu: 40 Sq. Km. An island near

Una Taluka of Junagarh

District in Gujarat State.

1

L O C A T I O N

• Two Districts: Daman & Diu

• Head Quarter: Daman

• Parliament Constituency: 01

• Daman: 72 Sq. Km.

• Diu: 40 Sq. Km. An island near

Una Taluka of Junagarh

District in Gujarat State.

2

A D M I N I S T R A T I V E S E T U P

PARTICULARS DAMAN DIU TOTAL

Districts 1 1 2

Blocks 1 1 2

(a) District Panchayats 1 1 2

(b) District Panchayat elected wardmembers 12 8 20

(a) Village Panchayats 11 4 15

(b) Village Panchayat members 99 38 137

(c) Sarpanches 11 04 15

Villages 21 4 25

Municipal Councils 1 1 2

Urban Ward 15 13 28

D E M O G R A P H I C I N F O R M A T I O N

INDICATOR DAMAN &DIU INDIA

POPULATION As per 2011 Census

Total Population 2,43,247 1,21,05,69,573

Population Male 1,50,301 62,31,21,843

Population Female 92,946 58,74,47,730

Population Density (p/sq. km) 2172 382

Population of SC (in %) 2.52 16.6

Population of ST (in %) 6.31 8.6

Sex Ratio (No of females per 1000 males) 618 943

Sex Ratio (0-6 years age group) 904 919

3

LITERACY AND HEALTH INDICES

INDICATOR DAMAN & DIU INDIA

LITERACY As per 2011 Census (in %)

Total Literacy 91.54 80.9

Male Literacy 79.54 64.6

Female Literacy 87.10 73.0

HEALTH INDICATOR

Birth Rate (SRS – Sept.,2014) 17.90 21.40

Death Rate (SRS - Sept.,2014) 4.90 7.00

Infant Mortality Rate (SRS -Sept.,2014) 20.00 40.00

ALLOCATION 2015-16(` in Crore)

Revenue Capital Total (BE)

Plan 320.38 403.22 723.60

Non- Plan 1057.15 0.67 1057.82

Total 1377.53 403.89 1781.42

1991 2001 2011

Males 82.66 86.76 91.54Females 59.40 65.61 79.54Total 71.20 78.18 87.10

0

20

40

60

80

100

Literacy rates in %

I n f r a s t r u c t u r e

4

POWER

Demand : 280MW Availability : 300 MW• One of the lowest tariff rates in the Country

Sources (MW) :

NTPC (Thermal) : 151.39

NTPC (GAS) : 62.39

Nuclear (TAPP & KAPP) : 22.96

RGPPL : 38.00

NSPCL :70.00

Power Tariff• LT- Domestic ` 1.20 – ` 2.55/KWh

• LT- Commercial ` 2.65 – ` 3.65/KWh

• LT- Agriculture ` 0.70 – ` 1.00/KWh

• LTP- Motive Power ` 3.52– ` 4.20/ KWh

• HT- Industrial ` 4.55 – ` 4.70/ KWh

Sub Stations ( Existing)• 01 of 220 KV ( 220/66 KV) ,Daman

• 07 of 66 KV ( 66/11 KV) ,Daman

• 01 of 66 KV (66/11 KV), Diu

Key Plans• 01 of 66 KV / 11KV Bhimpore

• 01 of 220 KV / 400 KV Ringanwada/Dabhel

• 01 of 160 MVA Transformer 220/66 KV Magarwada

• 01 of 6 MWp on Grid Solar Plant at Diu

• 01 of 1 MWp on Grid Solar Plant at Magarwada,Daman

• 01 of 1 MWp on Grid Solar Plant at Diu

I n f r a s t r u c t u r e

5

ROADS AND BRIDGES

ROAD LENGTH: Daman Diu

PWD 87.40 Kms 33.50 Kms

Municipality 49.00 Kms --

District Panchayat 105.00 Kms 29.93 Kms

Total Length 241.40 Kms 63.43 Kms

BRIDGES• Construction of 01 Bridge on Kolak river at Pataliya, Daman is completed and 01

Bridge on Kalai river is under progress. This will improve connectivity with GujaratState.

KEY CONNECTIVITY PLANSes (Cable Stayed Bridge, Padestrian Bridge, Bridge ongam – Magarwada, Kachigam – Zari) across Damangangaconnectivity (`301.02 Cr.).

es (Parallel Bridge at Ghoghla & Tad Bridge) at Diu.

H-8) : The proposal for construction of Railway Over BridgeVapi – Udwada ( Crossing No. 81/C), Mohangam Phatak

mbeli Railway Station (Crossing No. 77) and Motiwadaada.

ing Corporation of India Ltd.(SCI) for operationalisation ofi – Daman – Diu.

ing Corporation of India Ltd. for dredging of the mouth of theGoghla Creek at Diu. This can enable berthing facilities foraran services.

construction of major district roads MDR/ODR in Daman &

I n f r a s t r u c t u r e

5

ROADS AND BRIDGES

ROAD LENGTH: Daman Diu

PWD 87.40 Kms 33.50 Kms

Municipality 49.00 Kms --

District Panchayat 105.00 Kms 29.93 Kms

Total Length 241.40 Kms 63.43 Kms

BRIDGES• Construction of 01 Bridge on Kolak river at Pataliya, Daman is completed and 01

Bridge on Kalai river is under progress. This will improve connectivity with GujaratState.

KEY CONNECTIVITY PLANS• Construction of 05 Brid idge, Bridge on

Coastal Highway, Ka oss Damangangariver at Daman for bett

• Construction of 02 Brid ge) at Diu.(` 42.02 Cr.).

• Highway connectivity ( ailway Over Bridgeat Balitha Gate Betwe Mohangam Phatakbetween Vapi and Ka 77) and MotiwadaRailway Crossing at U

• MOU signed with Shi perationalisation ofCatamaran from Mum

• MOU signed with Dred of the mouth of theDamanganga river an erthing facilities forfishing vessals and cat

• Improvement, widenin R/ODR in Daman &Diu.

I n f r a s t r u c t u r e

5

ROADS AND BRIDGES

ROAD LENGTH: Daman Diu

PWD 87.40 Kms 33.50 Kms

Municipality 49.00 Kms --

District Panchayat 105.00 Kms 29.93 Kms

Total Length 241.40 Kms 63.43 Kms

BRIDGES• Construction of 01 Bridge on Kolak river at Pataliya, Daman is completed and 01

Bridge on Kalai river is under progress. This will improve connectivity with GujaratState.

KEY CONNECTIVITY PLANS• Construction of 05 Bridges (Cable Stayed Bridge, Padestrian

Coastal Highway, Kachigam – Magarwada, Kachigam – Zari)river at Daman for better connectivity (`301.02 Cr.).

• Construction of 02 Bridges (Parallel Bridge at Ghoghla & Tad B(` 42.02 Cr.).

• Highway connectivity ( NH-8) : The proposal for construction ofat Balitha Gate Between Vapi – Udwada ( Crossing No. 81/Cbetween Vapi and Karambeli Railway Station (Crossing NRailway Crossing at Udwada.

• MOU signed with Shipping Corporation of India Ltd.(SCI) forCatamaran from Mumbai – Daman – Diu.

• MOU signed with Dredging Corporation of India Ltd. for dredgiDamanganga river and Goghla Creek at Diu. This can enablefishing vessals and catamaran services.

• Improvement, widening & construction of major district roads M

• Construction of 05 Bridgges (Cable Stayed Bridge, Padestrian BBrridge, Bridge on Coastal Highway, Kachchi igam – Magarwada, Kachigam – Zari) aacrcross Damanganga river at Daman for betteerr connectivity (`301.02 Cr.).

• Construction of 02 Bridgges (Parallel Bridge at Ghoghla & Tad Brriiddge) at Diu.(` 42.02 Cr.).

• Highway connectivity ( NNH-8) : The proposal for construction of RRailway Over Bridge at Balitha Gate Betweeenn Vapi – Udwada ( Crossing No. 81/C)),, Mohangam Phatak between Vapi and Karraambeli Railway Station (Crossing Noo.. 77) and Motiwada Railway Crossing at Uddwwada.

• MOU signed with Shipppping Corporation of India Ltd.(SCI) for ooperationalisation of Catamaran from Mumbbaai – Daman – Diu.

• MOU signed with Dredgging Corporation of India Ltd. for dredginngg of the mouth of the Damanganga river andd Goghla Creek at Diu. This can enable bberthing facilities for fishing vessels and cataam maran services.

• Improvement, wideningg & & construction of major district roads MDDR/ODR in Daman & Diu. Diu.

I n f r a s t r u c t u r e

6

WATER SUPPLY

Demand: 25- 27 MLD Availability: 21 MLD

Key PlansWater treatment Plants(WTP) :• Construction of 17 MLD New water treatment Plant at Dunetha is under progress.

(` 16.93 Cr.)

• Upgradation of Dabhel Water treatment Plant from 16 MLD to 36 MLD.(` 25.13 Cr.)

• Upgradation of Magarwada Water treatment Plant from 05 MLD to 11 MLD.

(` 9.63 Cr.)

• Underground Sump of 40 lakhs liters capacity at WTP, Dabhel. (` 2.86 Cr.)

Pipeline Projects:• The work for laying pipeline from Madhuban Dam to Dunetha, Dabhel and

Magarwada Water treatment Plants (55 Kms) is under progress (` 49.31 Cr.).

• Sardar Sarovar Canal based pipeline project at Diu (` 35.00 Cr.).

I n f r a s t r u c t u r e

7

SANITATION PROJECTS

A. Solid Waste Management SystemDaman

• Project cost: ` 17.50 Cr.• Initial Plant capacity : 90MT/ Day• Total waste collection & disposal: 50MT/ Day• Total design period : 30 years• Tentative date of completion: August, 2016

Diu

• Project cost: ` 13.37 Cr.• Initial Plant capacity : 50MT/ Day• Total waste collection & disposal: 25MT/Day• Total design period : 30 years• Tentative date of completion: March, 2017

B. Under Ground Sewerage SystemDaman

• Project cost: ` 27.66 Cr.• STP capacity: 4.20 MLD• Total design period : 30 years• Tentative date of completion: December, 2016

Diu

• Project cost: ` 29.80 Cr.• STP capacity: 6.00 MLD• Total design period : 30 years• Tentative date of completion: March, 2017

8

T O U R I S MKey Plans

• National branding campaign for Diu

tourism launched.

• Festival of Diu Planned for 2015-16.

• Construction of World Class

Oceanarium at Diu.

• Eco Tourism and Bird Sanctuary

Projects at Daman & Diu.

• Efforts are being made to invite

high value Investors to establish

luxury resorts in Diu on Public

Private Partnership (PPP) basis.

• MOU signed with INTACH for

Conservation and Protection of historical

monuments.

• Catamaran (Ferry boat) facility from

Mumbai- Daman- Diu.

• Development of River front on Kalai

River form Bamanpuja to Jampore

Beach, Moti Daman.

• Construction of Auditorium at Diu.

• Coverage of Diu as a part of Junagadh, Gir Forest & Somnath tourism Circuit.

Jallandhar Shrine

8

T O U R I S MKey Plans

• National branding campaign for Diu

tourism launched.

• Festival of Diu Planned for 2015-16.

• Construction of World Class

Oceanarium at Diu.

• Eco Tourism and Bird Sanctuary

Projects at Daman & Diu.

• Efforts are being made to invite

high value Investors to establish

luxury resorts in Diu on Public

Private Partnership (PPP) basis.

• MOU signed with INTACH for

Conservation and Protection of historical

monuments.

• Catamaran (Ferry boat) facility from

Mumbai- Daman- Diu.

• Development of River front on Kalai

River form Bamanpuja to Jampore

Beach, Moti Daman.

• Construction of Auditorium at Diu.

• Coverage of Diu as a part of Junagadh, Gir Forest & Somnath tourism Circuit.

Jallandhar Shrine

8

T O U R I S MKey Plans

• National branding campaign for Diu

tourism launched.

• Festival of Diu Planned for 2015-16.

• Construction of World Class

Oceanarium at Diu.

• Eco Tourism and Bird Sanctuary

Projects at Daman & Diu.

• Efforts are being made to invite

high value Investors to establish

luxury resorts in Diu on Public

Private Partnership (PPP) basis.

• MOU signed with INTACH for

Conservation and Protection of historical

monuments.

• Catamaran (Ferry boat) facility from

Mumbai- Daman- Diu.

• Development of River front on Kalai

River form Bamanpuja to Jampore

Beach, Moti Daman.

• Construction of Auditorium at Diu.

• Coverage of Diu as a part of Junagadh, Gir Forest & Somnath tourism Circuit.

Jallandhar Shrine

9

SAARTHI BUS SEWA

• Earlier, no local public transport system was available in the UT.

• “Saarthi Bus Sewa” started on 10th August, 2014 with 06 buses in Daman & 02buses in Diu.

• Has provided safe, time-bound and reliable service at reasonable rates to theresidents.

• Service starts at 6:30 AM & ends at 10:30 PM on all days.

HEALTHA. Existing Infrastructure:

District Hospital 02C. H. C. 02 Ayurvedic Units 06Sub Centre 26 P. H.C. 03

Blood Bank 02 Evening Clinic 02

No. of Beds 278 Trauma Centre 01

Integrated Counseling and Testing Centre (HIV) 04

Manochikitsa Kendra 01No. of 108 Ambulance 05Ayush Hospital & Panchkarma 01

• Emergency Medical Services (108 Dial)Less than 15 Minutes in Rural and 10 Minutes in Urban.

• Non- Emergency Medical Help Line (104 Dial)24 x 7 Consultancy Service

10

B. Key Plans

• Construction of 02 PHCs at Bhimpore and Dabhel.• Modular OT in all Govt. Hospitals and fire safety equipments in all Govt. Health

Institutions.• Mobile Dental Unit for Schools, Tribal Areas and Industrial Areas.• Construction of Modern 60 bedded Hospital at Diu.• Implementation of HMIS & Sanjeevani Swasthya Bima Yojana.

EDUCATIONA . GENERAL EDUCATION(INFRASTRUCTURE)

Level of Education

Nos. of Institutions

Govt. PrivateTotal

Aided Un-Aided

Pre- Primary 13 01 22 36

Primary 53 01 22 76

Middle 38 03 17 58

Secondary 23 04 15 42

Higher Secondary 10 03 09 22

Degree College 02 -- -- 02

PTC -- -- 02 02

B.Ed. -- 01 -- 01

Dental College -- -- 01 01

Total 139 13 88 240

10

B. Key Plans

• Construction of 02 PHCs at Bhimpore and Dabhel.• Modular OT in all Govt. Hospitals and fire safety equipments in all Govt. Health

Institutions.• Mobile Dental Unit for Schools, Tribal Areas and Industrial Areas.• Construction of Modern 60 bedded Hospital at Diu.• Implementation of HMIS & Sanjeevani Swasthya Bima Yojana.

EDUCATIONA . GENERAL EDUCATION(INFRASTRUCTURE)

Level of Education

Nos. of Institutions

Govt. PrivateTotal

Aided Un-Aided

Pre- Primary 13 01 22 36

Primary 53 01 22 76

Middle 38 03 17 58

Secondary 23 04 15 42

Higher Secondary 10 03 09 22

Degree College 02 -- -- 02

PTC -- -- 02 02

B.Ed. -- 01 -- 01

Dental College -- -- 01 01

Total 139 13 88 240

10

B. Key Plans

• Construction of 02 PHCs at Bhimpore and Dabhel.• Modular OT in all Govt. Hospitals and fire safety equipments in all Govt. Health

Institutions.• Mobile Dental Unit for Schools, Tribal Areas and Industrial Areas.• Construction of Modern 60 bedded Hospital at Diu.• Implementation of HMIS & Sanjeevani Swasthya Bima Yojana.

EDUCATIONA . GENERAL EDUCATION(INFRASTRUCTURE)

Level of Education

Nos. of Institutions

Govt. PrivateTotal

Aided Un-Aided

Pre- Primary 13 01 22 36

Primary 53 01 22 76

Middle 38 03 17 58

Secondary 23 04 15 42

Higher Secondary 10 03 09 22

Degree College 02 -- -- 02

PTC -- -- 02 02

B.Ed. -- 01 -- 01

Dental College -- -- 01 01

Total 139 13 88 240

11

B . Higher /Technical Education/ Skill Development

TTI 02

ITI 02

Polytechnic 02C . Key Plans• Establishment of New Engineering College under PPP Mode at Daman.

• Introduction of new trades in existing ITI and Polytechnic to fill up the gaps of

skilled man power in Local Industries.

• Greater focus on skill Up-gradation of teachers through in service training.

• Establishment of Degree College & Govt. Polytechnic at Education

Hub, Diu.

• Training to 5000 people Annually in 05 years.

• Modernization of ITI/ Polytechnic.

• Construction/ Up-gradation of Stadium at Diu.

• Construction of Girls Hostel.

Bhimpore High School Building, Daman

I n d u s t r i a l D e v e l o p m e n t

12

INDUSTRIAL DEVELOPMENT• Industrial Estates 39 Nos.

• Industrial Units 3292 Nos.

• Capital Investment `12146 Cr• Employment in Industries 83143 Nos.

Key Sectors• Plastics, Pharmaceutical, Chemical & Chemical Products, Textiles, Electrical

Conductors, Basic Metals, Paper and Paper Products, Tourism etc. New Industrial Policy announced on 22nd Jan.,2015

Focus Areas• Skilled Development• Ease of doing Business• Investor friendly environment

• Development of Tourism Infrastructure.

• Investor facilitation portal launched.

• Incentive to labour intensive & green industries.

Key incentives to the IndustriesSCHEMES FOR MSME

1) ASSISTANCE OF CAPITAL INVESTMENT SUBSIDYCapital investment subsidy @10% of investment made in plant and machinerieswith an upper ceiling of ` 25.00 lakh.

2) ASSISTANCE FOR INTEREST SUBSIDYInterest subsidy @5% with an upper ceiling of ` 30.00 lakh per annum for a periodof 5 years.

I n d u s t r i a l D e v e l o p m e n t

13

3) ASSISTANCE FOR QUALITY CERTIFICATIONThe scheme is aimed to extend support to MSME to get quality certification to

introduce quality products in competitive market. MSME as defined in the manufacturingsector will be eligible for assistance.

4) ASSISTANCE FOR PATENT REGISTRATIONAny Enterprise taking action for patent registration will be eligible for assistance

under the scheme.

5) ASSISTANCE FOR SAVING IN CONSUMPTION OF ENERGY AND WATERAny Enterprise taking action for saving in consumption of Energy and Water will

be eligible for assistance.

6) INCENTIVE FOR LOCAL EMPLOYMENTThis scheme is to generate employment for local people :

One time recruitment incentive of ` 3.00 lakh per 20 local people who have thedomicile/ resident certificate of UT and ordinary resident of UT since last 10 years.Maximum amount of ` 15.00 lakh to each eligible unit shall be disbursed.

The scheme is exclusively for new direct recruitment of LOCAL PERSONSabove 18 years of age of UT of Daman & Diu for continuous 12 months.

7) ASSISTANCE FOR SKILL DEVELOPMENTUnder the scheme any autonomous institutions with a background of skilled

manpower development will be provided assistance of 25% with ceiling of maximum` 1.00 crore of the project cost covering fixed capital investment in building, equipmentsand machineries (including installation cost), electrification, furniture and othermiscellaneous investment excluding the land cost required for setting up trainingfacilities.

I n d u s t r i a l D e v e l o p m e n t

14

SCHEME FOR TEXTILE SECTOR

1) INTEREST SUBSIDY

THE SCHEME & ELIGIBLE ACTIVITIES:

The disbursement will be by way of credit linked interest subsidy in Ring/Rotor/Airjet or any advanced Yarn Spinning, Texturising Yarn, Apparel/ Garments andMachine Carpeting, Fabric/ Garment Finishing & Process House.

2) INTEREST SUBSIDY IN TECHNICAL TEXTILES

THE SCHEME & ELIGIBLE ACTIVITIES:

Technical Textiles area defined as textile materials and products used primarily fortheir technical performance and functional properties rather than their aesthetic ordecorative characteristics. Depending on the product characteristics, functionalrequirement and end-user applications, the highly diversified range of technical textileshave been grouped into 13 sectors.

3) ASSISTANCE FOR TECHNOLOGY ACQUISITION AND UPGRADATION FORTEXTILE SECTOR

THE SCHEME & ELIGIBLE ACTIVITIES:

The enterprise acquiring the technology for the first time in India for specializedapplication will be considered eligible under the scheme.

The acquisition of technology can be in any form, including purchase of drawingand design and technology development through engaging experts/ R&D institution and/or technical consultancy firm.

15

INFORMATION TECHNOLOGY “ DIGITAL INDIA ”

A. Recent Initiative :

• 125 Services of 22 Departments under SamaySudhini Seva.

• Transport, VAT, Land Records, e-Stamping,Document Registration, Fisheries, Energy Billingetc., computerized.

• Out of 215 Government Establishment/ Offices 212Government Establishment/ Offices connected underUT Wide Area Network.

• 8 Saral Seva Kendras for providing citizen centricservices in Rural Areas.

B. Projects under Implementation:

• UT Data Centre.

• Wi-Fi on various Tourist spots.

• Computerization of Excise, Municipality, PDS – Public Distribution System,

NLRMP- National Land Records Modernization Programme, Health

institutions, OIDC etc.

• Aadhar Integration with 14 department operations.

• Road Assets Management System: Mapping of all Roads.

• Computerization of crime & Immigration data.

• Biometric Attendance System, Digital Life Certificate, e-Procurement etc.

• Wi-Fi launched at Pariyari Group Gram Panchayat, Daman and planned at 9

new locations.

P r i m e M i n i s t e r ’ s I n i t i a t i v e s

16

PRIME MINISTER’S INITIATIVES

JAN DHAN YOJANA

• 16979 Bank Accounts have been opened under JANDHAN YOJANA

BETI BACHAO BETI PADHAO

• Launched “BETI BACHAO BETI PADHAO”Abhiyan on 22nd Jan., 2015.

• Organized awareness Rallies/ Rath.

SWACHH BHARAT ABHIYAN

• Launched “SWACHH BHARAT ABHIYAN” one week prior to 2nd Oct., 2014.

• All the elected Members of Local Bodies participated in the Campaign.

• Being taken up on regular basis in rural as well as urban areas.

• 1st May, 2015 "SHRAMADAAN" and "SWACHHATA ABHIYAN" observed in allthe villages during 7:00 am to 10:00am.

P r i m e M i n i s t e r ’ s I n i t i a t i v e s

16

PRIME MINISTER’S INITIATIVES

JAN DHAN YOJANA

• 16979 Bank Accounts have been opened under JANDHAN YOJANA

BETI BACHAO BETI PADHAO

• Launched “BETI BACHAO BETI PADHAO”Abhiyan on 22nd Jan., 2015.

• Organized awareness Rallies/ Rath.

SWACHH BHARAT ABHIYAN

• Launched “SWACHH BHARAT ABHIYAN” one week prior to 2nd Oct., 2014.

• All the elected Members of Local Bodies participated in the Campaign.

• Being taken up on regular basis in rural as well as urban areas.

• 1st May, 2015 "SHRAMADAAN" and "SWACHHATA ABHIYAN" observed in allthe villages during 7:00 am to 10:00am.

P r i m e M i n i s t e r ’ s I n i t i a t i v e s

16

PRIME MINISTER’S INITIATIVES

JAN DHAN YOJANA

• 16979 Bank Accounts have been opened under JANDHAN YOJANA

BETI BACHAO BETI PADHAO

• Launched “BETI BACHAO BETI PADHAO”Abhiyan on 22nd Jan., 2015.

• Organized awareness Rallies/ Rath.

SWACHH BHARAT ABHIYAN

• Launched “SWACHH BHARAT ABHIYAN” one week prior to 2nd Oct., 2014.

• All the elected Members of Local Bodies participated in the Campaign.

• Being taken up on regular basis in rural as well as urban areas.

• 1st May, 2015 "SHRAMADAAN" and "SWACHHATA ABHIYAN" observed in allthe villages during 7:00 am to 10:00am.

P r i m e M i n i s t e r ’ s I n i t i a t i v e s

17

SOCIAL SECURITY PENSION SCHEME

• The Prime Minister's Social Security Pension Scheme namely Pradhan Mantri

Suraksha Bima Yojana, Pradhan Mantri Jeevan Jyoti Yojana & Atal Pension

Yojana were launched on 9th May 2015 under which more than 5138

beneficiaries covered.

• HOUSING FOR ALL

• SURYODAYA AWAS YOJANA

Eligibility:

Any resident of Daman & Diu who is the owner of a piece of land within theUnion Territory of Daman & Diu and has an annual family income of less than `1,00, 000/ - (` One lakh).

Design and construction standards:

Every house would essentially have a sanitary toilet/ latrine, with soak pitand provision for water.

Upgradation of kutcha or dilapidated houses:

This scheme would also provide financial assistance for upgradation ofkutcha / dilapidated houses.

Stages of construction and release of installments:-

i. The 1st installment would be given along with the sanction order. It would be25% of the unit cost.

P r i m e M i n i s t e r ’ s I n i t i a t i v e s

18

ii. The 2nd installment would be released on reaching the lintel level. It would be60% of the unit cost.

iii. The 3rdinstallment would be 15% of the unit cost and be given only after thehouse including the sanitary latrine is constructed

Payment to beneficiaries:

Payment to beneficiaries shall be made directly into their Bank accounts only.The account details and Aadhaar number shall be obtained in the application itself.

SAANSAD ADARSH GRAM YOJANA(SAGY)

• Pariyari Group Gram Panchayat identified by Hon’ble Member of Parliament.

• Gram Sabha meeting held on 13th Dec., 2014 for identifying various worksrequired.

• Empowered Committee constituted under the Chairmanship of Hon’bleAdministrator on 1st Jan., 2015.

• District level officers being trained for carrying out activities under SaansadAdarsh Gram Yojana.

• Dy. Coll.(HQ) appointed as a Nodal/Charge officer.

• Base line survey already completed.

• Saral Seva Kendra for providing Citizen Centric services to the Villages.

• Free Wi-Fi network launched.

19

Bridge on Kolak river connecting Daman and Udwada of Gujarat State

20

Cycle Track in Diu

20

Cycle Track in Diu

20

Cycle Track in Diu

v Govt. Prtg. Press, Daman - 11/2015 - 150 bks