WORSHOP SOBRE POWER LINE COMMUNICATIONS A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE APLICA APLICA Ç Ç ÃO DA TECNOLOGIA PLC ÃO DA TECNOLOGIA PLC ANEEL – 04/MAIO/2007
Transcript
Page 1: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

�WORSHOP SOBRE

�POWER LINE COMMUNICATIONS

A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DEA CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE

APLICAAPLICAÇÇÃO DA TECNOLOGIA PLCÃO DA TECNOLOGIA PLC

ANEEL – 04/MAIO/2007

Page 2: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

ÍÍNDICENDICE

� INTRODUÇÃO

� PROJETOS DE P&D´s COM A TECNOLOGIA PLC/BPL

� A CELG E A PARTICIPAÇÃO BRASILEIRA NO PROJETO OPERA 2

� PERSPECTIVAS DE APLICAÇÃO DA TECNOLOGIA PLC

Page 3: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

INTRODUÇÃO

� SEMINÁRIOS APTEL� I – 1999 – Rio de Janeiro

� V – 2004 – Goiânia

• Criação da Diretoria do Forum APTEL BRASIL PLC

• Projeto “Ilhas Digitais”

� Centro Comunitário

� Escola Municipal São Cristovão

� Cidade de Aruanã-GO (Rally dos Sertões)

� VIII – Julho/ 2007 – Porto Alegre – RS

� Grupo de Trabalho Power Line APTEL - 2002� Aspectos Técnicos, Comerciais e Regulatórios

� Projeto Piloto CELG – 2003� Equipamentos Masters e Acopladores – Internet, VoIP e Câmeras de Vídeo

� Acompanhamento da implantação do Campo de Teste para PLC do CPqD, Campinas – SP – 2003

Page 4: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

INTRODUÇÃO

� Grupo de Trabalho Conjunto APTEL/ ANATEL para o Programa 2 da CBC-7, daANATEL - 2003� GT1 – Regulamentação, Normatização e Certificação para Prestação de Serviços de

Telecomunicações via Rede Elétrica com a Tecnologia PLC

� GT2 – Produção Local da Tecnologia PLC e Benefícios para o país

� Estes trabalhos serviram de referência à ANATEL para criação no âmbito da CBC-7, do Sub-programa PLC- Utilização de PLC para Serviços de Comunicação

� Projeto de Inclusão Digital/ Barreirinhas (MA) – Fase I

� APTEL e Parceiros – Outubro/ 2004

� Testes em conjunto com ANATEL e fabricantes de PLC sobre Análise de Espectro e Medição de Interferências, realizados em 2005 e 2006, em RD´s da CELG (Goiânia)

� Artigo aprovado e apresentado no XI ISPLC (International Symposium on Power Line Communications and its Applications-IEEE) – Pisa–Itália, Março 2007 – Regulation Issues about Broadband PLC: A Brazilian Experience and Perspective.

� Autores: Moisés V. Ribeiro (UFJF); Eduardo L. Rege (ANATEL-GO); Eliézer A. Teixeira; Thienne M. Johnson (UNAMA); Elton M de Souza (CELG); Fábio S. Marques (CELG).

Page 5: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

� CICLO 2004/2005

– FITEC - Supervisão do Fornecimento de Energia Elétrica em Média Tensão através da Tecnologia PLC de Banda Larga.

• Contrato assinado e em execução

� CICLO 2005/2006

– UFG - Modelo Prático de Gerência para Plataformas de Telecomunicações Envolvendo Tecnologia PLC – EEEC/UFG.

• Procedimentos internos de contratação e confirmação final da ANEEL

� CICLO 2006/2007

– ITCO – Modelo de Negócios e Arquitetura de Sistema para Implementação de um Sistema de AMR na CELG

– ITCO – Modelo de Evolução para SMARTGRID, para rede elétrica da CELG

• Procedimentos de análise

PROJETOS DE P&D´sCOM TECNOLOGIA PLC/BPL

Page 6: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

P&D CICLO 2004 / 2005

PROJETO (CELG/FITec)

Supervisão do Fornecimento de Energia Elétrica em Média Tensão através da Tecnologia

PLC de Banda Larga.

�RESULTADOS PRINCIPAIS

• Modelo detalhado da aplicação de PLC, nos moldes da arquitetura Intelligrid;

• Levantamento de dados sobre perdas técnicas e fraudes na rede da CELG.

� RESULTADO ADICIONAL

• Referência para o Projeto Piloto de Conectividade - Barreirinhas-MA (Fase II).

�OBJETIVO

� Desenvolver um sistema de supervisão, permitindo acompanhamento "on line" das redes de distribuição:

�Arquitetura de sistema – Equipamentos PLC e Câmeras IP

� Supervisão de Chaves seccionadoras;

�Balanceamento energético;

� Gerenciamento com qualidade e precisão do fornecimento de energia;

� Controle das perdas técnicas e comerciais;

�Redução do tempo de interrupção de energia.

Page 7: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

Arquitetura do Sistema

CPEMA

M

Poste 8

MVG

Div. Manutenção

de Equipamentos

CPEMA

M

Poste 7

MVG

Laboratório

de Medição

CPEMA

M

Poste 6

MVGClube Recreativo

Câmera IP

CPEMA

M

Poste 5

MVGCELG Armazém

Poste 2

MVGCPE

MA

M

CELG MED

Poste 3

MVGCPE

MA

M

CELG CMD

Poste 4

Câmera IP

Poste 1

Câmera IP

BT LAN

IP

Sistema de

Supervisão

COS/COD

MVG

Subestação

13,8 K

V

220 V

220 V

220 V

220 V

220 V 220 V

13,8 KV

13,8 KV

13,8 KV

HE

MA MA

A

CPEMA

M

CPECPEMAMA

MM

Poste 8

MVG

Div. Manutenção

de Equipamentos

CPEMA

M

CPECPEMAMA

MM

Poste 7

MVG

Laboratório

de Medição

CPEMA

M

CPECPEMAMA

MM

Poste 6

MVGClube Recreativo

Câmera IP

CPECPEMAMA

MM

Poste 5

MVGCELG Armazém

Poste 2

MVGCPE

MA

M

CELG MED

CPECPEMAMA

MM

CELG MED

Poste 3

MVGCPE

MA

M

CELG CMD

CPECPEMAMA

MM

CELG CMD

Poste 4

Câmera IP

Poste 1

Câmera IP

BT LAN

IP

Sistema de

Supervisão

COS/COD

MVG

Subestação

13,8 K

V

220 V

220 V

220 V

220 V

220 V 220 V

13,8 KV

13,8 KV

13,8 KV

HE

MA MA

A

Page 8: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

Balanceamento Energético

Poste 1

HE

Sistema de

Supervisão

LAN

CPEMA

M

CPEMA

M

Medidor Circuito 1 Medidor Circuito 2

220V

MT/BT

13,8KV

COS/CODMMA

Medidor Global

IP

Poste 1

HE

Sistema de

Supervisão

LAN

Sistema de

Supervisão

LANLAN

CPEMA

M

CPECPEMAMA

MM

CPEMA

M

CPECPEMAMA

MM

Medidor Circuito 1 Medidor Circuito 2

220V

MT/BT

13,8KV

COS/CODMMA

Medidor Global

MMMAMA

Medidor Global

IPIP

Page 9: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)
Page 10: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

P&D CICLO 2005 / 2006

PROJETO (CELG/UFG)

Modelo Prático de Gerência para Plataformas de Telecomunicações Envolvendo Tecnologia PLC

� OBJETIVO

Desenvolver um modelo de gerência para plataformas de telecomunicações

envolvendo a tecnologia PLC (Power Line Communication), visando:

• Gerir a infra-estrutura dos sistemas de telecomunicações da concessionária;

• Reduzir custos por meio de ações de gerência de rede;

• Agregar valor com a disponibilidade de serviços de dados;

• Auxiliar o processo de padronização da tecnologia PLC para uso e aplicação

da rede elétrica;

• Oferecer rede de acesso simplificada contribuindo para universalização de

serviços públicos.

Page 11: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

P&D CICLO 2006 / 2007

PROJETO I (CELG/ITCO)

Modelo de Evolução para “Smart Grid”, para a Rede Elétrica da CELG

� OBJETIVOS

Elaboração de Modelo de Abordagem e de Evolução para Redes Inteligentes, através de uma

proposta de uma Arquitetura de “Smart Grid” para a Rede Elétrica da CELG.

PROJETO II (CELG/ITCO)

Modelos de Negócios e Arquitetura de Sistema para Implementação de um Sistema de AMR na

CELG

� OBJETIVOS

Proposta de modelo de negócio, arquitetura, serviços, tecnologias, padrões e protocolos de

comunicação de uma Rede AMR para a CELG, considerando parâmetros de custos/benefícios,

tecnologias selecionadas, serviços propostos e sistemas de gerência, dentre outros.

Page 12: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

PROJETO OPERA

� OPERA - Open PLC European Research Alliance

� Projeto Integrado baseado em P&D com a TecnologiaPowerLine Communications (PLC)

� Recursos da Comunidade Européia - Sixth Framework Programme (FP6)

� Internet Society Technologies (IST) – Prioridade“Broadband for All”

Page 13: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

PROJETO OPERA

� A primeira fase (2004-2005) foi finalizada e revisada em abril de 2006

� A segunda fase (2007-2008) iniciou-se em janeiro de 2007

� A IBERDROLA está na gerência e coordenação do Projeto

� Projeto OPERA tem uma duraçãoestimada de 48 meses, dividido emduas fases de 24 meses cada.

Former Complete OPERA Proposal

OPERA Phase 1

OPERA Phase 2

Jan 2004

Jan 2006 Jan 2007

Dec 2008

Jan 2004

Dec2008

Page 14: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

OPERA

Rede de AcessoAlternativa paraxDSL & Cable

-Melhoria desempenho

-Menor custo

Cobertura de regiõesmenos desenvolvidas, periféricas e áreas

rurais

-Integração do PLC com outras Tecnologias

- Capilaridade da redeelétrica.

Inclusão Digital

- Acesso a serviços e informação – Inclusão

Social

Desenvolver procedimentos de aplicação da tecnologia

Power Line Communications (PLC) que possa vir a ser

uma alternativa de acesso Banda Larga, onde todos os

usuários finais podem ser alcançados.

Page 15: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

OPERA II Participantes

Telecom Operators - 2Telecom Operators - 2

• ONI (Portugal)

• PPC (Germany)

• ONI (Portugal)

• PPC (Germany)

Utilities - 6Utilities - 6

•EDEV-CPL (EDF Group) (France)

•IBERDROLA (Spain)

•LinzAG Strom (Austria)

•UNION FENOSA (Spain)

•CELG (Brazil)

•ELEKTRO LJUBLJANA (Slovenia)

•EDEV-CPL (EDF Group) (France)

•IBERDROLA (Spain)

•LinzAG Strom (Austria)

•UNION FENOSA (Spain)

•CELG (Brazil)

•ELEKTRO LJUBLJANA (Slovenia)

Technology Providers - 2Technology Providers - 2

•CTI (Switzerland)

•DS2 (Spain)

•CTI (Switzerland)

•DS2 (Spain)

Universities - 7Universities - 7

• Swiss Federal Institute of Technology (Switzerland)

• University of Comillas(Spain)

•University of Dresden (Germany)

• University of Duisburg-Essen (Germany)

• University of Karlsruhe (Germany)

• University PolitécnicaMadrid (Spain)

•University Ramon Llull(Spain)

• Swiss Federal Institute of Technology (Switzerland)

• University of Comillas(Spain)

•University of Dresden (Germany)

• University of Duisburg-Essen (Germany)

• University of Karlsruhe (Germany)

• University PolitécnicaMadrid (Spain)

•University Ramon Llull(Spain)

Developers and Manufactures - 6

Developers and Manufactures - 6

• Amperion (UK)

•Dimat (Spain)

•Schneider Electric Powerline (Sweden)

•Eichhoff (Germany)

•Robotiker (Spain)

•Telvent (Spain)

• Amperion (UK)

•Dimat (Spain)

•Schneider Electric Powerline (Sweden)

•Eichhoff (Germany)

•Robotiker (Spain)

•Telvent (Spain)

Engineering and Consultancy Companies - 2

Engineering and Consultancy Companies - 2

• Eutelis Italia (Italy)

•Iberdrola Ingenieríay Construcción(Spain)

• Eutelis Italia (Italy)

•Iberdrola Ingenieríay Construcción(Spain)Other Organizations - 1Other Organizations - 1

•Chamber of Commerce and Industry of Madrid (Spain)

•Chamber of Commerce and Industry of Madrid (Spain)

� Consórcio de 26 parceiros integrados, buscando alcançarum padrão comum.

� 11 paísesrepresentados no Projeto.

� Provendo e compartilhando o conhecimento no desenvolvimento de uma área de pesquisa Européiaintegrada em PLC.

Page 16: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

OPERA IIEstrutura do Projeto

WP 7 Dissemination Leader: Iberdrola

WP 8 Intellectual Property Rights Leader: Iberdrola

Project Coordinator / Chairman of Steering Committee Iberdrola

STEERING COMMITTEE (SC) – COMITÊ DIRETIVOChairman of SC: IberdrolaExecutive member 1: CTIExecutive member 2: ONI (EDP Group)Executive member 3: DS2Executive member 4: Linz Strom GmbHExecutive member 5: EDEV-CPL (EDF group)Executive member 6: PPCExecutive member 7: IberdrolaExecutive member 8: Schneider Electric Powerline Communications

WP 5StandardizationProject Leader

EDEV-CPL (EDF)

WP 3PLC system

Improvements and customer equipment

based on PLCDS2

WP 2Trial and PLC Integration

ONI (EDP Group)

WP 4Services over PLC networkLinz Strom

WP 1Coupling / conditioning devices, EMC and

channel characteristicCTI

WP 6PLC Business Deployment and maintenance tools

PPC

WP9 Management Leader: Iberdrola

TECHNICAL COMMITTEE (TC) – COMITÊ TÉCNICOChairman of TC and Tech. Coordinator: Schneider Electric Powerline CommunicationsWP 1 leader (Coupling/conditioning devices, EMC and channel characteristics) CTIWP 2 leader (Trial and PLC Integration) ONI (EDP Group)WP 3 leader (PLC System improvements and customer equipment based on PLC) DS2WP 4 leader (Services over PLC Network) Linz Strom GmbHWP 5 leader (Standardization) EDEV-CPL (EDF group)WP 6 leader (PLC Business Deployment and maintenance tools) PPCWP 7 leader (Dissemination) Iberdrola

Page 17: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

OPERA IIParticipação do Brasil

Project Coordinator / Chairman of Steering Committee Iberdrola

STEERING COMMITTEE (SC)

WP 7 Dissemination Leader: Iberdrola

WP 8 Intellectual Property Rights Leader: Iberdrola

WP 5StandardizationProject Leader

EDEV-CPL (EDF)

WP 3PLC system

Improvements and customer equipment

based on PLCDS2

WP 2

Trial and PLC Integration

ONI (EDP Group)

WP 4

Services over PLC network

Linz Strom

WP 1Coupling / conditioning devices, EMC and

channel characteristicCTI

WP 6

PLC Business Deployment and maintenance tools

PPC

WP9 Management Leader: Iberdrola

TECHNICAL COMMITTEE (TC)

Page 18: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

OPERA IIKick OFF Meeting

� ENCONTRO PRESENCIAL – 09 e 10 de Janeiro – Madri – Espanha

� Encontro dos Representantes dos Parceiros do Consórcio;

� Apresentação dos Líderes dos Grupos de Trabalhos – WP´s;

� Discussão das atividades de cada Grupo de Trabalho;

� Aprovação da agenda dos trabalhos;

� Definição do cronograma de atividades

Page 19: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

OPERA IIWP2: ONI (Herlander Branco)

� INTEGRAÇÃO E TESTE DE CAMPO COM PLC

– Principais Conclusões:

• Atividade 2.1: ESPECIFICAÇÃO DOS TESTES DE CAMPO:

• Descrição de Teste de Campo – ONI (LISBOA) - SEPC

• Descrição de Teste de Campo – IBERDROLA (MADRID) - CTI

• Descrição de Teste de Campo – LINZ STROM (Linz) – SEPC

� Campo de Teste na CELG – Goiânia

� Participação e acompanhamento de relatórios.

� PRÓXIMOS ENCONTROS PROPOSTOS

– Junho/ 2007 - Encontro WP2 Lisboa.

– Setembro/2007- Atenas (Amperion) ou Zurique (CTI Opcional)

Page 20: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

OPERA IIWP4: LINZ (Berthold Haberler)

� SERVIÇOS SOBRE A REDE PLC

– Trabalhos em andamento:

• Conference Call – Discussão sobre a definição e priorização de serviços – Integração com Grupo de Trabalho 2 - WP2

– CONTRIBUIÇÃO DA CELG:

» Comutação Remota

» Localização de Falhas

– ATIVIDADES PROGRAMADAS

• Junho 2007: Workshop em Linz

• Dezembro 2007: Workshop em Barcelona

Page 21: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

OPERA IIWP6: PPC (Michael Koch)

� DESENVOLVIMENTO DE NEGÓCIOS - PLC/BPL

– Principais Conclusões:

• Detalhamento sobre o Plano de Trabalho de cada atividade

• Primeiro Draft sobre pesquisa de mercado na América do Sul – CELG/ FITEC, enviada em Março de 2007.

• Continuidade dos Trabalhos – Atividades conjuntas com informaçõescomplementares e atualização.

Page 22: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

OPERA IIWP7: IBERDROLA (Javier Simón)

� DISSEMINAÇÃO

– Principais conclusões:

• Acordo detalhado sobre o plano de trabalho de cada atividade.

– Manutenção do logo - Projeto OPERA

– Líder solicitará periodicamente informações e notícias para publicações no BoletimOPERA 2 (NEWSLETTER)

� ENCONTROS

– April 2007 – Mannheim (Alemanha)

• Promovido pela PPC

– Novembro 2007 – Madrid meeting

• - Promovido pela Iberdrola

� NEWSLETTER Nº 1

� ABRIL 2007

� Internet page: www.ist-opera.org

NEWSLETTER #1

Page 23: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

Focar na atividade Principal...

VISÃO ESTRATÉGICA

Outros Negócios

Outros Negócios

NEGÓCIO PRINCIPAL

... e aproveitar as oportunidades de mercado, com Novas .....Tecnologias:

-Potencializar o uso da Infra-estrutura e da Marca CELG

- Modernização da Empresa - Fidelização dos seus Clientes

PERSPECTIVAS DE APLICAÇÃO DA TECNOLOGIA PLC

Page 24: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

PERSPECTIVAS DE APLICAÇÃO DA TECNOLOGIA PLC

� Aproveitamento racional da Infra-estrura existente

� Capilaridade da rede elétrica – Meta de 100 % dos domicílios

� Alternativas de novos serviços interligados com outras tecnologias –Vantagem de atingir a “Última Milha”

� Planejamento integrado, reduzindo custos e impactos ambientais –Atividades Multisetoriais

Page 25: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

PERSPECTIVAS DE APLICAÇÃO DA TECNOLOGIA PLC

� Avaliação e aplicação de sistemas com o uso da Tecnologia PLC para VoIP, Internet e Sistemas de Controle, Supervisão e Vigilância Eletrônica

� Análise do uso de PLC para melhoria nos processos operacionais da CELG

� Sistemas de Telefonia, Transmissão de Dados e Telecontrole

� Sistemas de Gerenciamento, Automação e Telesupervisão de RD´s e SE´s

� Sistemas de Telemedição – AMR

� Corte e religação remota

� Solução de Medição para Controle de Fraudes

� Telemetria Integrada: Energia + “Água”

• Gerência do Fornecimento de Energia Elétrica

ATENDIMENTO ÀS NECESSIDADES CORPORATIVAS

Page 26: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

PERSPECTIVAS DE APLICAÇÃO DA TECNOLOGIA PLC

� Projetos PLC específicos Internos:

� Show Room da Tecnologia PLC

� Diretorias/ Presidência

� CEDOC – Envolvendo Câmeras de Segurança

� Agência de Atendimento e Subestações

� Outros Projetos

� Estádio Serra Dourada

� Shopping Flamboyant

� Rede METROGYN – RNP- Rede Nacional de Ensino e Pesquisa

� UFG - FACOMB

� Parcerias APTEL

� Projeto Barreirinhas II (MA)

� Projeto Pirenópolis

� Projeto Cidade de Goiás

� Inclusão Digital/ Projeto Luz para Todos (MME)

Page 27: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

� AGÊNCIAS REGULADORAS

� ANEEL – ANATEL

• Acompanhamento da Regulamentação de PLC, junto às Agências Reguladoras.

• Acompanhamento e participação em conjunta com APTEL e fabricantes de PLC dos testes programados pela ANATEL sobrea Análise de Espectro e Medição de Interferências, nasinstalações do CPqD – 2007.

• Autorização da ANATEL – Serviços Especiais para Fins Científicos e Experimentais.

PERSPECTIVAS DE APLICAÇÃO DA TECNOLOGIA PLC

Page 28: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

TOPOLOGIA BÁSICA DO BACKBONE ÓPTICO

teGoiânia

Inhumas

Trindade

Anápolis

Aparecida de Goiânia

Senador Canedo

PERSPECTIVAS DE APLICAÇÃO DA TECNOLOGIA PLC

Page 29: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

NOC

FER

POP1

POP2

AER

XAVREA

IND

GILENOCall Center/COS

ELETRACMD/COD

Flamboyant

STM-16/64STM-16STM-1GbEthernet Agências CELG

APS

JUD

DAATRI

Backbone

Anel-1Anel-2

Centro

Jundiaí

CMD/CODAnápolis

Grande Goiânia

Centro

Leste

GNL

Sul

Sudoeste

AP-GNA

ARA-Shop

BUR-Shop

ANH

CAM

Agências Vapt-Vupt

CAM ATL

C.ARTE

Estações Goiânia

Estações Fora De Goiânia

INH

COD/CMDAg. TRI

COD/CMDAg. INH

COD/CMDSEN

SEN

MPE

GOA

Anel-3

Internet

GTWY

BACKBONE ÓPTICO

PERSPECTIVAS DE APLICAÇÃO DA TECNOLOGIA PLC

Page 30: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

PLATAFORMA DE ACESSO - MIX DE TECNOLOGIAS

Master PLC

Fibra Óptica(Cabo Espinado)

Base Station WiMAX

Backbone Óptico - MPLS(Topologia MetroEthernet)

Acesso PLCAcesso via FibraDSLAM/FTTH

Acesso WiMAX

Fibra Ópticaou PLC na

Média Tensão

Internet

SIP Server Roteador/ BRAS

Núcleo IP

Switch HíbridoEthernet/SDH

PERSPECTIVAS DE APLICAÇÃO DA TECNOLOGIA PLC

Page 31: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

MODELO DE DESENVOLVIMENTO

Gestão do Projeto

Desverticalização CELG

Inclusão Digital

Rede de Acesso

ParceriasUsuários

Projetos Específicos Aplicação

Projeto OPERA e P&D ´s

Serviços Especiais à Entidades Públicas e Privadas

Serviços CELG

Dist. e G&T

Plano de Ação Integrado

Infra-estrutura de Telecom

Page 32: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

A tecnologia PLC vai até onde nenhuma outra chega!!! Quem Duvida ?

Page 33: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

Porto AlegrePorto Alegre5 e 6 de julho de 20075 e 6 de julho de 2007

Hotel Hotel SheratonSheraton

Promovido porPromovido porCEEE CEEE –– PROCEMPA PROCEMPA –– DAMOVO DAMOVO -- FORUM APTEL BRASIL PLCFORUM APTEL BRASIL PLC

PatrocPatrocíínionioBPL GLOBALBPL GLOBAL

Page 34: A CELG NO PROJETO OPERA 2 E SUAS PERSPECITVAS DE … - Vieira.pdf · PLC system Improvements and customer equipment based on PLC DS2 WP 2 Trial and PLC Integration ONI (EDP Group)

Obrigado !

Engº. José Gonçalves VieiraFone: (62) 3243-2129 / 3243-2470

Cel: (62) 9971-0361

Fax: (62) 3243-2436

E-mail: [email protected]

[email protected]