A DYNAMIC AND MODERN COMPANY ACTING FOR
ROMANIAN ROADS
Gura Humorului, June 14th 2011Eugen C. FLORESCU, Ph.D.
Technical Manager – Iasi Bypass
VEGA 93 Galati is recognised on the civil engineering market as a very stable and strong company by means of the civil, administrative and industrial buildings that were made at a special qualitative level with a modern architecture.
At the very beginning of its activity, Vega 93 was acting on building works and hydro technical field.
Viva Club in Galati – your
perfect destination for
business or leisure…do not
miss it if you travel to Galati !
As the Romanian market changed and evolved, we had to adapt our vision and strategy to new reality, and to develop (mainly since 2006) the branch of roads and bridges construction.
The turnover of the company evolved as follows:
…and we expect to reach 100 M euros in 2011, mainly due to our bridge and roads activity.
Indicator 2006 2007 2008 2009 2010
Turnover lei 191.673.579 230.754.489 266.110.768 373.709.795 356.099.029
Turnover euro 56.679.652 63.917.370 66.794.759 88.385.080 83.037.736
Bridges – with precast beams
Bridges – with post-stressed beams
High productivity concrete and asphalt plants
Modern equipment and trucks adapted for earthworks
On site crushing equipment for foundation layer
Fabrication and laying gravel stabilized with road binders
Reinforced soil with geogrid
Vega 93 – vector for sustainable development- Use of granulated slag for foundation layers
Vega 93 – vector for sustainable development- Cold recycling of old road structures
Cold recycling of a rigid pavement in Iasi using foamed bitumen
The most valuble resource – our people• We are 2200 people proudly working in Vega 93• Management: - general manager
- economical manager - 1- marketing manager - 1- technical manager - 3
• Production: - Chief Engineers – 2- project managers – 6
• working points supervisors (engineers, sub engineer, foremen) – 35
• expert on roads and bridges – 1• expert on public acquisitions – 4
Iasi Bypass – site in progress…• Iasi – one of the largest cities in Romania, 400.000 people• Technical figures:
– length 14 km– Earthworks 450,000 cum– Granular layers 120,000 cum– Asphalt 50,000 tons– Ditches and gutters 22,000 m– Drainage 5,400 m– Bridges/overpass 8 pcs (1600 m)– Environmental devices 12 pcsA section of 6 km is in use, 8 km to be finished by the end of
this year.
...remaining bombs from the World War 2...
Constant support from local and central
authorities
June 2009
October 2009 August 2010
Your trustworthy Romanian partner
Gura Humorului – in the very heart of Romanian spirituality
(Voronet Monestery)
…the famous Dracula Castle…not very far!
Thanks for your kind attention !