33
/T W jv.g_ a () FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam REcj CILy of ride West Ryde Urban Village Development Section 96 Application to Modify Local Development Consent No. LDA200710559 Section 96 No. M0D200910080 Please find attached your Section 96 Consent No. M0D2009/0080 which is to be read in conjunction with Development Consent No. LDA2007/0559 approved by Council on 11 December 2007. It is the responsibility of the applicant to carefully read all conditions of Development Consent prior to making application for a Construction Certificate. Should you have any further questions please contact the Customer Service Centre on 9952 8222 Yours faithfully / Domi(ic Johnson Group Manager Environment & Planning
Transcript
Page 1: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

/T W jv.g_

a ()

FILE COPY a

Remo West Ryde Pty Ltd10 Regatta RoadFIVE DOCK NSW 2046

21 October2009

Dear Sir/Madam

REcjCILy of ride

West Ryde Urban Village DevelopmentSection 96 Application to Modify Local Development Consent No.LDA200710559Section 96 No. M0D200910080

Please find attached your Section 96 Consent No. M0D2009/0080 which is tobe read in conjunction with Development Consent No. LDA2007/0559approved by Council on 11 December 2007.

It is the responsibility of the applicant to carefully read all conditions ofDevelopment Consent prior to making application for a ConstructionCertificate.

Should you have any further questions please contact the Customer ServiceCentre on 9952 8222

Yours faithfully

/Domi(ic JohnsonGroup Manager Environment & Planning

Page 2: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

FILE COPYCity of Ryde

Civic Centre, Devlin Street, RydeLocked Bag 2069, North Ryde NSW 1670

DX 8403, RydeFacsimile 9952 8070 .

Telephone 9952 8222

Section 96 Consent

Applicant: Remo West Ryde Pty Ltd10 Regatta RoadFIVE DOCK NSW 2046

Section 96 Consent No: M0D2009/0080

Approval Date: 20 October 2009

Modification of Development Consent No. LDA2007/0559 under Section 96 of theEnvironmental Planning and Assessment Act, 1979

Property: • Small lot on northern edge of 7 Chatham Road, WestRyde - Lot 1, DP 1072082

• 9-19 Chatham Road, West Ryde - Lots 149-1 54, DP11208

• 7A & 7B Chatham Road, West Ryde - Lots A & B, DP398801

• 5 & 5A Anthony Road, West Ryde - Lots I & 2, DP590509

• 3 Anthony Road, West Ryde - Lot B, DP 414394• 10 Anthony Road, West Ryde - Lot 2, DP 1072079• Part of Anthony Road, West Ryde• Part of Chatham Road, West Ryde

Development: Erection of a seven storey building of mixed retail,commercial and residential use with five basement levelsand the provision of a village square on the areaadjoining the building, landscaping and associated roadworks, and erection of four storey building to housecommunity services and some retail floor space abovetwo basement car parking levels

The City of Ryde as the Consent Authority pursuant to Section 96 of the EnvironmentalPlanning and Assessment Act, 1979 (as amended) hereby consents to the modification ofLocal Development Application No. LDA200710559 dated 11 December 2007 subject tothe following (highlighted in yellow):

A. CONDITION I IS TO BE AMENDED TO READ AS FOLLOWS:

1. Development is to be carried out in accordance with the following plans and supportinformation as submitted to Council, except where amended by these conditions ofconsent:

Page 3: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

Section 96 Consent No. M0D2009/008020 October 2009

Document Author Date

Architectural____________

DA.02D - Master Plan__________________________Anthony Vavayis Architects March 2009

DA 201E - Basement BI (RetailCarparking)

Anthony Vavayis Architects March 2009____________

DA 202E - Basement B2 (CouncilCarparking)

__________________________

Anthony Vavayis Architects

___________________________

March 2009____________

DA 210K Ground Floor Anthony Vavayis Architects March 2009DA 21 1G - Level 1 Anthony Vavayis Architects March 2009DA 212G - Level 2 Anthony Vavayis Architects March 2009DA 213F - Level 3 Anthony Vavayis Architects March 2009DA 214E - Level 4 Anthony Vavayis Architects March 2009DA 215E - Level 5 Anthony Vavayis Architects March 2009DA 216E - Level 6 Anthony Vavayis Architects March 2009DA 21 7E - Level 7 Anthony Vavayis Architects March 2009DA 301H - Elevations Anthony Vavayis Architects March 2009DA 302J - Elevations Anthony Vavayis Architects March 2009DA 303F - Section Anthony Vavayis Architects March 2009DA 304G - Section Anthony Vavayis Architects March 2009DA 401F - Typical units Anthony Vavayis Architects March 2009DA 402B - Typical units Anthony Vavayis Architects March 2009DA 403C - Typical units Anthony Vavayis Architects March 2009DA 501 D - Solar Access Anthony Vavayis Architects March 2009DA 502 D - Solar Access Anthony Vavayis Architects March 2009DA 1O1D - Community Centre - BiCarpark

AnthonyVavayis Architects 26.03.09

DA 102D - Community Centre - B2Carpark

___________________________AnthonyVavayis Architects___________________________

_____________

26.03.09_____________

DA 103E - Community Centre - Ground Anthony Vavayis Architects 26.03.09DA 104D - Community Centre - Level 1 Anthony Vavayis Architects 26.03.09DA 105D- Community Centre - Level 2 Anthony Vavayis Architects 26.03.09DA 106D - Community Centre - Level 3 Anthony Vavayis Architects 26 .03.09DA 107D Community Centre - RoofPlan

AnthonyVavayis Architects 26.03.09____________

DA 11 OD - Community Centre - Sections1 &2

___________________________Anthony Vavayis Architects__________________

26.03.09________

DA 111 D - Community Centre - Sections3&4

Anthony Vavayis Architects 26.03.09________

DA 112D - Community Centre -

Elevations

__________________

Anthony Vavayis Architects 26.03.09

DA 11 3D - Community Centre -

ElevationsAnthony Vavayis Architects 26.03.09

DA 11 4B - Community Centre Jack Taylor Architects Pty ltd 26.03.09Civil ServicesVCOO - Cover sheet, drawing index andlocality plan

_________________________

Buckton Lysenko ConsultingEngineers

___________

31 .07.07____________

VCO1 - General notes and Legend Buckton Lysenko ConsultingEngineers

31 .07.07_____________________________________________________

VCO2 - Soil and Water managementPlan, Notes and Details

Buckton Lysenko ConsultingEngineers

31 .07.07_____________

Page 4: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

Section 96 Consent No. M0D2009/0080

20 October 2009

Document Author DateVCO3 - Stormwater - Basement 4 Floor Buckton Lysenko Consulting 31 .07.07Plan EngineersVC04 - Stormwater - Basement 3 Floor Buckton Lysenko Consulting

_____________

31 .07.07Plan EngineersVC05 - Stormwater - Basement 2 Floor Buckton Lysenko Consulting

_____________

31 .07.07Plan EngineersVCO6 - Stormwater- Basement lB Floor Buckton Lysenko Consulting

_____________

31.07.07Plan EngineersVCO7 - Stormwater - Basement 1A Floor Buckton Lysenko Consulting

_____________

31.07.07Plan EngineersVCO8 - Stormwater - Ground Floor Plan Buckton Lysenko Consulting

_____________

31 .07.07______________________________________ EngineersVCO9 - Stormwater - Level 1 Floor Plan Buckton Lysenko Consulting

_____________

31 .07.07______________________________________ Engineersvol 0 - Stormwater - Level 2 Floor Plan Buckton Lysenko Consulting

_____________

31.07.07______________________________________ EngineersVC1 1 - Stormwater - Level 3 Floor Plan Buckton Lysenko Consulting

_____________

31.07.07______________________________________ EngineersVCI 2 - Stormwater - Level 4 Floor Plan Buckton Lysenko Consulting

_____________

31 .07.07______________________________________ EngineersVOl 3 - Stormwater - Level 5 Floor Plan Buckton Lysenko Consulting

_____________

31 .07.07____________________________________ Engineersvc 14 - Stormwater - Level 6 Floor Plan Buckton Lysenko Consulting

_____________

31.07.07______________________________________ Engineersvol 5 - Stormwater - Roof Plan Buckton Lysenko Consulting

_____________

31 .07.07______________________________________ Engineers

_____________

LandscapingLS1 - Landscape Concept Plan

__________________________

Jack Taylor Architects Pty Ltd____________

25.07.07LS2 - Podium Landscape Concept Jack Taylor Architects Pty Ltd 25.07.07LS3 - Concept Details Jack Taylor Architects Pty Ltd 25.07.07Civil Services - Community Building0000 - Community - Cover Sheet,

_________________________Buckton Lysenko Consulting

____________

25.07.07Drawing Index, and Locality Plan EngineersCOOl - Community - General Notes and Buckton Lysenko Consulting

_____________

25.07.07Legend Engineers0002 - Community - Soil and Water Buckton Lysenko Consulting

____________

31.7.07Management Plan, Notes and Details Engineers0003 - Community - Soil and Water Buckton Lysenko Consulting

____________

31.7.07Management Plan, Notes and Details Engineers0004 - Community - Stormwater - Buckton Lysenko Consulting

____________

31.7.07Basement 2 Engineers0005 - Community - Stormwater - Level Buckton Lysenko Consulting

____________

31 .7.072 and Level 3 Engineers0006 - Community - Stormwater - Roof Buckton Lysenko Consulting

____________

31 .7.07Plan EngineersRoad Design

____________

RDO1 - Cover Sheet, Drawing Index and________________________

Buckton Lysenko Consulting___________

25.7.07Locality Plan EngineersRDO2 - General Notes, and Legend Buckton Lysenko Consulting

____________

25.7.07______________________________________ Engineers

_____________

Page 5: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

Section 96 Consent No. M0D2009/008020 October 2009

Document Author DateRDO3 - Sediment and Erosion Control Buckton Lysenko Consulting 25.7.07Plan EngineersRDO4 - Proposed Intersections, Buckton Lysenko Consulting

_____________

UpdatedStormwater Drainage EngineersRD05 - MC01 - Anthony Road Buckton Lysenko Consulting

_____________

25.7.07Longitudinal Section EngineersRDO6 - MCO2 - Reserve Street and Buckton Lysenko Consulting

_____________

25.7.07Longitudinal Section EngineersRDO7 - MCO3 - New Betts Street and Buckton Lysenko Consulting

_____________

25.7.07Longitudinal Section EngineersRDO8 - MCO1 - Anthony Road Cross Buckton Lysenko Consulting

_____________

25.7.07Sections, Sheet 1 of 2 EngineersRDO9 - MCO1 - Anthony Road Cross Buckton Lysenko Consulting

_____________

25.7.07Sections, Sheet 2 of 2 EngineersRDO1O - MCO2 - Reserve Street Cross Buckton Lysenko Consulting

_____________

25.7.07Sections EngineersRDO1 1 - MCO3 - Reserve Street Cross Buckton Lysenko Consulting

____________

25.7.07Sections EngineersRDO12 - Kerb Returns Buckton Lysenko Consulting

_____________

25.7.07______________________________________ EngineersRDO1 3 - Stormwater Longsections Buckton Lysenko Consulting

_____________

25.7.07______________________________________ Engineers

_____________

B. CONDITION 3 IS TO BE AMENDED TO READ AS FOLLOWS:

3. Utility installations must not be located above ground unless otherwise required bythe relevant authority. The installation of utilities will occur to the satisfaction of therelevant authority (eg. Energy Australia) prior to the occupation of the development.All works are to be at the applicant's/developers expense.

C. CONDITION 5 IS TO BE AMENDED TO READ AS FOLLOWS:

5. A schedule of all materials, colours and finishes must be submitted to Councilssatisfaction prior to the issue of a Construction Certificate. The details of the publicdomain, whereby the paving materials and colour any street furniture, seating, binsand bollards, lighting details and any public art within the public domain shall beinstalled to the satisfaction of Council. The details of such elements within the publicdomain shall be submitted with the application for a Construction Certificate, and theapplicant shall liaise with Council prior to the installation of these elements.

a) The applicant shall, at no cost to Council, construct full width granite footpathpaving, new 'SA' kerb and gutter and driveway laybacks across the full frontageof the property. The village square shall be constructed granite paving. Thelevels of the footpath paving and kerbing shall conform with levels issued byCouncil's Public Works Division.

Page 6: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

Section 96 Consent No. M0D2009/008020 October 2009

b) Granite footpath crossings shall be constructed at all locations where vehiclescross the footpath, to protect it from damage resulting from the vehicle traffic,except the footpath crossing servicing the loading docks in New Betts Street,which may be constructed in concrete. The location, design and constructionshall conform to the requirements of Council. Finished levels shall conform withthe alignment levels issued by Council's Public Works Division. Kerbs shall notbe returned to the alignment line. Bridge and pipe crossings will not bepermitted.

c) All hard landscaping, paving, soft landscaping including species selection, streetfurniture and the like for the public domain, including the Village Square shall becarried out in accordance with the approved landscape plans and full detailsincluding samples, schedules and plans shall be submitted to and approved bythe Council prior to the construction of the development. Where soft landscapingis proposed including species selection, the applicant must ensure that thespecies health is guaranteed for a minimum of 2 years to ensure the characterand appearance of the streetscape is maintained and established. Any specifiesthat die within two years of planting must be replaced by the applicant with aspecies of a similar size and maturity.

d) A Public Arts Strategy shall be developed and implemented to the satisfaction ofthe Council. The strategy shall be developed in conjunction with the City ofRyde and will include a management and action plan. Identify the exactlocations of proposed public art installations. The applicant shall be responsiblefor the costs of preparing the strategy and action plans and the implementationof these plans prior to the issue of a final Occupation Certificate.

D. CONDITION 10 IS TO BE AMENDED TO READ AS FOLLOWS:

10. The boundary fence of Darvall Park shall be re-designed to so that the overland flowof stormwater is not affected, the fence should also be returned around the AnthonyRoad corner to also address the street. This section of fence is to incorporate a pairof steel gates to match the fence, tO provide vehicular access. Plans and details ofthe wall and overland flow path shall be submitted to the satisfaction of Council priorto the issue of a Construction Certificate.

E. CONDITION 133 IS TO BE AMENDED TO READ AS FOLLOWS:

133. The Waste Management Plan prepared by Remo Properties dated April 2009 mustbe complied with. Furthermore full details of future waste management plans are tobe prepared to Council's satisfaction and submitted to Council for approval prior toissue of Occupation Certificate.

F. CONDITION 141 IS TO BE AMENDED TO READ AS FOLLOWS:

141. The trading hours of the retail/commercial elements of Precinct 1 are restricted to7:00am to 12 Midnight Monday to Saturday and 7:00am to 10pm on Sunday.

G. CONDITION 145 IS TO BE AMENDED TO READ AS FOLLOWS:

145. The hours of operation of the loading docks are 7:00am to 8:00pm, 7 days a week.Furthermore deliveries by semi trailers must occur within the abovementioned hours.

Page 7: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

Section 96 Consent No. M0D2009/008020 October 2009

H. CONDITION 147 Is TO BE AMENDED TO READ AS FOLLOWS:

147. The following restrictions and works apply to the loading dock:

4. Noise generated by the loading dock must comply with the EPA Industrial NoisePolicy requirements, or create an offensive noise as defined in the Protection ofthe Environment Operations Act 1997.

5. Truck engines must be turned of during loading and unloading.6. Vehicles must enter and exit the loading dock in a forward direction.

7. Signage requesting that staff and visitors minimise noise within the area at alltimes must be installed in the loading dock and maintained thereafter.

8. All loading and unloading in relation to the use of the premises shall take placewholly within the property.

9. Loading areas are to be used for the loading and unloading of goods andmaterials, waste collection and general servicing access only and for no otherpurpose.

10. B-Double trucks are not permitted to access the loading dock.

11. The gates on the loading dock are to be configured to allow access to the wastestorage areas shown on Plan No 210K, Ground Floor, dated March 2009.

I. CONDITION 150 IS TO BE AMENDED TO READ AS FOLLOWS:

150. The new intersections and modifications to the streets surrounding the developmentmust be constructed as follows:

a. The Chatham Road I New Betts Street intersection must be a roundabout withtwo northbound lanes.

b. The Chatham Road/Dickson Avenue must be a Roundabout with twonorthbound lanes.

c. The two (2) lane roundabout at the intersection of Chatham Road/New marketStreet/Dickson Avenue shall be designed as a two-lane roundabout for both thenorthbound and southbound movements along Chatham Road. The design ofroundabouts shall comply with the intent of the requirements of AustroadsGuidelines - Part 6: Round abouts.

d. The Chatham Road/ New Market Street/Dickson Avenue mUst have on thenorthwest approach two (2) lanes allowing Right Turn, Left Turn.

e. The Chatham Road / New Market Street/Dickson Avenue southeast of NewMarket Street must have two (2) departure lanes.

The New Betts Street / residential car park access intersection must allow carsto access the site covering all movements. However this is conditional that areview be undertaken in six (6) months time (post development completion) thatreaffirms that no vehicle movements currently occurring as both ingress/egressconflict with adjacent through traffic. The applicant (Remo Properties) is toengage an appropriately qualified traffic engineering professional to undertakesuch assessment.

Page 8: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

Section 96 Consent No. M0D2009/008020 October 2009

g. The public access ramp (out) onto Chatham road shall be left only.

h. The public access ramp (into) from New Market Street shall be left in only.

i. The two (2) marked pedestrian crossings with associated infrastructure (kerbramps et al) along New Betts Street shall meet RTA and Council requirementsas appropriate.

The marked pedestrian crossing with associated infrastructure (kerb ramps etal) along New Market Street shall meet RTA and Council requirements asappropriate.

k. All marked pedestrian crossings are to be satisfactorily illuminated inaccordance with ASI 158.4: SAA public lighting code, part 4: SupplementaryLighting at Pedestrian Crossings" (specifies the level of lighting at pedestriancrossings).

That adequate pedestrian management (wayfinding) measures are in place tocontrol/manage pedestrian movements through the centre to ensure safepassage.

m. The marked pedestrian crossing across the retail ramp ingress to be removed.

n. The taxi stand along Anthony Road (northern boundary of the development site)shall comply with AS 2890.5 and the relevant AustRoads Traffic EngineeringSeries Guidelines: Part 11 - Parking.

o. Clear cycle warning signs, cycle routes signage for cyclist links and pavementmarkings must be provided to warn vehicles of the cycle route in accordancewith the RTA's NSW Bicycle Guidelines, Austroads Part 14 and AS1742.9.

p. In designing the junctions of New Betts Street with Chatham Road and AnthonyRoad, the layout should take into account the location of nearby residentialdriveways.

q. The marked pedestrian crossing with associated infrastructure (kerb ramps etal) along Chatham Road (between New Market Street and New Betts Street)shall meet RTA and Council requirements as appropriate.

J. CONDITION 151 Is TO BE DELETED

K. CONDITION 156 IS TO BE AMENDED TO READ AS FOLLOWS:

156. Prescribed Conditions

a) Design and Construction Standards - All engineering design and construction shallbe carried out in accordance with the requirements of Ryde City Council, in particularwith reference to DCP 2006 and RCC "Environmental Standards - DevelopmentCriteria Section 4 Public Civil Works" (Draft).

Page 9: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

Section 96 Consent No. M0D2009/008020 October2009

b) Stormwater Management - All Stormwater Management systems on the site andwithin the immediate surroundings must be designed and constructed in accordancewith the Buckton Lysenko DA Drawings and the letter titled "Proposed Developmentof the West Ryde Precinct", 21 November2007.

c) Floor Levels above the flood levels - All habitable and non habitable floor levels ofthe proposed development are to be sited a minimum of 300mm above the criticallOOyr ARI flood level. The minimum ground floor level for the community centrecomponent of the development is to be RLI 9.25AHD.

d) To ensure the safety of people within the basement car park, the minimum thresholdentry level for the New Betts Street car park entry and the Chatham Road entry shallbe set at RL2O.84m AHD and RL19.18m AHD respectively, as marked on plannumbered DA 210G. Details and Plans are required to be submitted prior to the issueof a Construction Certificate.

e) Additional Basement Entry Crest Requirement for Community Centre - In addition tocompliance with Condition 1 56(d), the basement entry point to prevent inundation ofthe basement areas with floodwaters for all events up to and including the PMF. TheDCW is to be fully operational in the event of a power blackout and must be regularlymaintained and tested to ensure its readiness in the event of a flood.

f) Floor Warning System - There is to be no connection between the existingWoolworths basement car park and the proposed basement carparking facilities thatwould allow the passage of floodwaters.

g) Raising Anthony Road sag - The proposed raising of the Anthony Road sag pointmust be restricted to a maximum of 250 mm.

h) Chatham Road drainage - The existing piped drainage system in Chatham Roadalong the development frontage is to be upgraded to a minimum of 2Oyr ARIcapacity.

i) Reserve Road Drainage - The existing piped drainage system in Reserve Road is tobe upgraded to a minimum of lOOyrARl capacity.

j) Sustainability The development must incorporate the water related sustainabilitymeasures as described in the Bunkton Lysenko letter titled "Proposed Developmentof the West Ryde Precinct", 21 November 2007. In addition, the development mustachieve a minimum "4 Green Star Certified Rating" in accordance with the "GreenStar Shopping Centre Design Pilot", Green Building Council of Australia for theproposed commercial component of the development.

k) Public Roadworks - All public road works must be approved by Council based on theprovisions of Section 138 of the Roads Act 1993.

I) Stormwater pipes - all stormwater pipes within the public road reserve shall bereinforced concrete.

m) Emergency overland flow path - An unobstructed emergency overland flow path is tobe maintained between the Anthony Road sag and Market Street with a maximumfinished surface of RL 19mAHD and a capacity to convey lOOyr ARI flows with adepth of less than 250mm in the event that the Anthony Road sag inlets are fullyblocked.

Page 10: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

Section 96 Consent No. M0D2009/008020 October 2009

Matters to be inôorporated into the development and maintained over the fife of thedevelopment

n) Sustainability Audit - A sustainability audit shall be carried out by the proposedshopping centre and community centre management teams on an ongoing 5 yearfrequency to assess the performance of sustainability measures and the availabilityof new technologies that will enable more sustainable practices to be implemented inthe future. The results of each sustainability audit shall be submitted to Council forinformation.

o) Rainwater tanks - Rainwater tanks are to be installed as part of the development andthe collectedwater re-used in accordance with the Buckton Lysenko report titled "ProposedDevelopment of theWest Ryde Precinct", 21 November 2007 and the following.

o A first flush device shall be fitted to the system to divert the first 5mm of runofffrom the total roof are so as to drain away from the storage tank (e.g. 0.5 litreper square metre).

o Adequate provisions shall be made to prevent mosquitoes breeding in thereservoirs. This should include suitable screening to prevent eggs being laidwithin the tank.

• All tanks shall be structurally sound.

o Overflow from the tank shall be piped to an approved stormwater system.e Dual submersible pumps are to be installed and maintained so as to prevent

cross connection with the potable water supply.o A "topping up" decide (from potable water supply) shall be provided to ensure

continuous supply once the tank is emptied;

• A "backflow prevention device" shall be installed.

o All rainwater services shall be clearly labelled "Non Potable Water" withappropriate hazard identification and

o Pipe work used for rainwater services shall be coloured purple in accordancewith AS 1319.

L. CONDITION 157 IS TO BE AMENDED TO READ AS FOLLOWS157. Matters to be satisfied prior to the issue of a construction certificate.

a) Detailed Design Drawings - Detailed design drawings of all road/drainage works tobe undertaken inthe public road reserve are required to be submitted and approved by Council prior tothe issuing ofthe Construction Certificate.

b) Integrated Water Management Report - An Integrated Water Management Report(IWMR) is to besubmitted to Council for approval prior to issue of the Construction Certificateincorporating thefollowing:

Incorporation of proposed stormwater quantity, quality, flooding, conveyance,WSUD and sustainability/reuse components of the development into a singlereport;

Page 11: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

Section 96 Consent No. M0D2009/008020 October 2009

A description, including detailed drawings, of all stormwater managementcomponents of the proposal updated to include all requirements of theconditions of development consent;

• Updating of all drainage models as a result of the detailed design process;

• Complete a detailed daily water balance modelling over an historic period of 5years (ie containing wet, average and dry rainfall years) so as to confirm theachievement of the 40% reduction in potable water demand. Both "traditional"and "water saving: scenarios are to be modelled; and

• A quantative assessment of the water quality benefit provided by the proposedstormwater treatment measures.

c) Flood emergency response plan - Detailed Flood Emergency Response Plans(FERP) are to be developed for both the proposed mixed use development andcommunity centre. Both plans shall consider floods up to and including the ProbableMaximum Flood (PMF). Implementation and maintenance of the FERPs are tobecome the responsibility of the body corporate/shopping centre management andthe community centre management. All residents, owners and tenants of the shippingcentre and community centre must be made aware of the relevant FERP. Details ofeach FERP are to be submitted to Council to Council for approval prior to issue of theConstruction Certificate.

d) Sustainability - Water efficient fixtures and water recycling systems must beimplemented as part of the development to achieve a total reduction in potable waterdemand of no less than 40% compared with the traditional water use of similarcommercial/retail applications (ie compared with pre year 2000 applications). Detailsare to be noted on the plans submitted with the Construction Certificate. In addition, adetailed assessment by a suitably qualified engineer/scientist demonstratingcompliance with the above 40% target including water balance calculations, is to besubmitted prior to issue of a Construction Certificate.

Protection of the West Ryde Stormwater Tunnel (WRST)e) Deleted

f) Prior to the issue of the construction certificate a design report for the developmentas it relates to the West Ryde Stormwater Tunnel (the tunnel), containing all relevantgeotechnical calculations, test data and drawings to the satisfaction of Council,shall be prepared by an engineer with suitable qualifications in the geotechnical andstructural design and evaluation of tunnels and submitted to and approved by theManager - Catchments and assets. The report shall confirm the proposeddevelopment will not adversely impact the structural integrity and performance of thetunnel.

g) The report referred to in condition 157 (f) must include the following information:

• A determination of the zone of influence as it relates to the tunnel;• A construction plan showing the details of any construction within the zone of

influence for the tunnel;• A detailed tunnel monitoring plan to provide ongoing measurement of the

geotechnical and structural conditions and variations within the tunnel; and• A contingency pan to address any adverse impacts upon the tunnel structure

during the construction process.

Page 12: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

Section 96 Consent No. M0D2009/008020 October 2009

The approval tunnel monitoring plan is required to be implemented prior to thecommencement of any basement construction works and retained in place until allconstruction works are complete. Monitoring data shall be provided to Council atagreed intervals and upon request. A certificate to this effect shall be provided to thePCA prior to the issue of a construction certificate. (AMENDED)

h) In carrying out the development, all aspects of the report approved by Council inaccordance with Conditions 157 (f) (including any details provided in accordance with1 57(g)) must be complied with.

i) Where the construction of the development will involve works within the Zone, theCouncil shall, prior to the commencement of such work, be provided with security inaccordance with Section 80A of the Environmental Planning and Assessment Act1979 for the sum of $2 million for the period of the construction of the basement carpark to cover the cost of making good any damage cause to the WRST as aconsequence of the works.

j) Existing 1500mm dia. Line Downstream of the Anthony Road sag - The proposedmethod of excavation and any associated protection/support measures within thevicinity of the existing 1500mm dia. line located downstream of the Anthony Roadsag is to be submitted to Council for approval prior to the issue of the ConstructionCertificate.

M. CONDITION 159 IS TO BE AMENDED TO READ AS FOLLOWS:159. Prior to the final occupation of the development full details which include a

breakdown of the allocation of parking for each land use shall be submitted to, andapproved by Council.

N. CONDITION 162 IS TO BE AMENDED TO READ AS FOLLOWS:162. Any paid parking schemes adopted for the development site must be appropriately

managed to minimise on-street parking in the local area to the satisfaction of theCouncil and RTA. A carparking management plan is to be submitted to Council.This plan should address parking fee structures, in particular a period of freeparking and the hours of operation. The hours of operation should take into accountnot only the operating hours of the subject development but also the hours ofoperation of other nearby businesses in West Ryde. (This plan might, but notnecessarily, provide a higher level of access to the Councils 145 parking spaces).Areview of the Car Parking Management Plan must be undertaken by anappropriately qualified traffic engineer at six (6) months post completion and yearlythere after up to three (3) years post completion.

0. CONDITION 184 IS TO BE DELETED

P. CONDITION 186 IS TO BE AMENDED TO READ AS FOLLOWS:186. Prior to the issue of any Construction Certificate the VPA approved in connection

with the subject Development Application and the Variation to VPA approved on 20October 2009 must be registered on the relevant folios of the Torrens Title Registerheld by the NSW Office of Land and Property Information pertaining to the land thesubject of the development.

Page 13: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

Section 96 Consent No. M0D2009/008020 October 2009

Q. CONDITION 187 IS TO BE AMENDED TO READ AS FOLLOWS:

187. Infrastructure, site works and site preparation works may commence on the mixeduse component of the proposed development, with the prior agreement of Council,prior to the completion of the community facilities building.

R. CONDITION 189 IS TO BE DELETED

S. CONDITION 191 IS TO BE DELETED

You are advised that failure to observe any condition of approval set out in the consent isan offence and Council may institute legal proceedings.

You are advised of your right of appeal to the Land and Environment Court under Section96(6) of the Environmental Planning & Assessment Act.

Dominic JohnsonGroup Manager Environment & Planning

The fees quoted at the time of issue of this Consent may be subject to variation. Council's annual fees andcharges are published in the Management Plan. To confirm fees please contact Customer Service on9952-8222.

Page 14: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

CITY OF RYDELDANo

2 0 OCT 2009App roved Plans 4;?SignedSubject to the condition the Consent

BASIX REQUIREMENTS:

WATER:Diuhwahers - 4,9*, Kitchen taps - 5* Bathroom taps - 5*Toilets - 4* Showerheads - 3*

THERMAL COMFORT:- R2.5 insulation to all ceilings with roof directly above.- R2.5 insolation to all external walls (fibro & brick veneer).- R2.0 insolation to plasterboard on stud 'party walls'.- Aluminium-framed single-glazed clear glaoe(NFRC: LJw=7.73, SHGC0.78) to all glazing,except Unit 7.50.- Aluminium-framed single-glazed Low-E glass(NFRC: Uw=5.76, SHGCO,48) to Unit 7.50.- 'Medium' coloured external walls; 'Medium' coloured roofs.- Units with 'low -E' galzing: 1.9, 2.9, 5.50, 7.50

ENERGY OPTIONS - DWELLINGS:Cooling: - No active cooling.Heating: - No active heafing.Water Heating: - Central system, electric heat pump, gas boosted. R0.6 insulation to internal piping.Lighting: - Compact fluorescent or LED to: Nil.Cooking: - Gas cook-tops, electric ovens.Ventilation: - Bathroom + Laundry: exhaust fans, ducted, interlocked to light.Kitchen: exhaust ducted, manual 'on/offRefrigerator rating I space: - Not rated / well ventilated space.Dishwasher rating: - 3.0Clothes drying lines: - N/A.Clothes Dryers: - 3.0

ENERGY OPTIONS - PROJECT COMMON AREAS:'Common Areas' identified: - Car parks; Lobbies. Garbage Rooms, Plant rooms, Lifts.Lighting: - Compact fluorescents to all 'Common Areas'. Daylight +motions sensors to car parks &lobbies/hallways. Manual switches to other common areas.Lift systems: - Gearleas traction with Wi/F motor.Ventilation: - 'Exhaust oniy' to car-park areas, with CO rnonitcr & VSD fan. 'Exhaust only' to garbage rooms.No mechanical ventilation specified to lobbies & hallways & plant rooms.

Project: WESTRYDE VILLAGE MIXED USE DEVELOPMENTLocation:CHATHAM RD 5ndANTHONY RD Client:

N ORTH RYDE EiMO City of t5yde

NSW 1670 Prm°4e*

Issue: A - Section 96 pre DA issue, 12 March 2009B - Section 96 Pre DA issue, 29 April 2009C- SECTION 96 ISSUE, 15 MAY 2009D- SECTION 96 ISSUE, 22 MAY 2009

ANTHONYVAVAYIS ±ASSOOFATESRRcHITEcTO OEOIGNERO PLANNERS

24 LNE STREET K!'SG STREET'YYF SYDNEY 5525 2000

I SOrTS V225S20C rSS TSR 25E 400 04* UZ 4*4

MASTER PLAN

NOT TO SCALE MARCH 2009

DAO2 D

Page 15: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

/S / /' // I '/// Y

/\ /\/

/\• \//\4/ /

A /

\ / / /\/

/ / A / /•/ / A / /'\

\\\/\ Z / \/ / /-z///// /./ // / /////

/ 4 / // / / 4 // / /

// )/ N' N N/ //\/ // / N/ ///\/ N

/1 //\/ / / T4 /

// / \/ // / / / / /N/></ /ZT

/ i>/N I I -4 I\/ /

/\// / - /\'N

, //// /// //y/Z /Z. \N /

/f // /\

/ / < /, / / / //\/

/

Project: WESTRYDE VILLAGE - MIXED USE DEVELOPMENTLoCatiOn:CNATHAM RDandANTHONY RD Client:

N ORTI-t RYDE EIMO C ity of flydeSCALE(1:250@A1) !2 6 Horn

NSW 1670PropeAos

// \/ /N/ /N/

N //

-/

/N )// N //Y/ /N/>

//N \N// / /•

>>\\N<I

/ - --

// N

/ // / ;// /

// //// N,

LDA No

21) OCT 7q

Approved Pa

Signed ___________

Subject to the conditi sof

/ AN ///\ ,///,/N,/N/

/ .// / 2'

f ///'/ //\/

/•/\, ////\//\/N///

// / /// / ;>/

.N/ \\ /\\/\ N/4//\ -4 N< /

A •//// ////

S //'V'/N /

/ N_

k -4 /4/\/\ \/A/// /N\N N/

/N\

Issue: A - Section 96 pre DA issue, 12 March 2009B-Section 96 Pre DA issue, 29 April 2009C - Coordination issue 11 May 2009D - SECTION 96 ISSUE, 15 MAY 20096- SECTION 96 ISSUE 22 MAY 2009

ANTHONY VAVAYIS + ASSOCIATESARCHITECTS DESIGNERS PLANNERS

24 LIIIE STREET KING STREET WHARF SVDSES 55,42/AGT022200/RlO EOSH294IREO

E40'[email protected] 04560 20/ 260 JEIE STREET K/OS STOKER S OAF STY/ES OSW 2/OS

LEVEL-i RETAIL CAR PARKING (Bi)

1:250@A1, 1:500@A3 MARCH 2009

DA2OIE

Page 16: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

/\ \\ \\ \\

;K •/// \\\\ /4\\ '< /

/\/\\/ / : /4\ \

F / /\/\/\\\

H \\// \/ /\\

/ I

Kt \\/Z / o/4/ /\ \/

LDA No

20 OCT 2009

F -

/\//4//

/ / ///

-f - -

'H <\\ /

I

i\ N /

N '

/ //

1:H /

\'\\ \''\/ /

N \\ N \\,/ /

NN / N/ /

N '/// (/

// 'N7N U U U //

//z

/,N /

/ /

F / '/

\T \/\/' 2 / / / / )•\/ 4/ / / /\// /

/ / / k // // / / / J / / // 4

// //N J (N/ NJ /

/\ / /

N/ / H //// NI N

4'H/4'N \//4/ ////

'/ I / */<H/ / / 2< 2 / (4/ //•/ N/\/ /\/• 4/ ' N / /// ' / (4

./ / )/ //// H/ \/ / //\ N \/,(4 N\/ / /4 \\// (4/ /\\/\/ <• /I/\

///< I 4' / //\/' /\< / / 4 // / / 4 N // / // / // /

/ / // /// J 1 ' /N/ / 1/ \,F / 4 /\ j //// I / / /" 4 / /N>N // / /'//\ //

/\ /1/: \/ /\ 'H \/N// / \/>\<\ /4/

//// / //// / / I '2 / // // y I I / / / / / / / / / //

/ / '4 / / 4N

4 / N\ N// 4' • //\ \/\/, \/\/ / /

1 t /4'A 4 2'///,"/ />

Project: WESTRYDE VILLAGE - MIXED USE DEVELOPMENTI

I I

F 1

Approved Psig2edSub Ct m Tho condition the

C. I.SCAI. L Ii A I Fl AM IC U 2110 A N ION I I-C U F UIIRFIC OLALO )l:uoU Wi Al) un'- F 11.1 m Issue: A - Section 96 pre DA issue, 20 APRIL 2009 ANTHONY VAVAYIS + ASSOCIATESN 0 Ri H R Y D E EM1O () City of Ryde B - Section 96 Pre DA issue, 29 Aplil 2009 AR CHIT E C/SD

N SW i 670 Properles C - CoordinatIon Issue, 11 May 2009550 STREET 5155SF SVCSEV US,S 2225

1020290 ISIS 1029250 1510

D - SECTION 96 ISSUE, 15 MAY 2009 PESSEEAAAA OSFCAS22'ESTREET IISSST01115155ISC 5100EV 5150915E - SECTION 96 ISSUE, 22 MAY 2009 5lTCOsl IVAUAT S & ASSOCIATES FTC Cr 050 S 797 555

LEVEL-2, RETAIL CAR PARKING (B2j

1:250 @ Al, 1:500 @ A3 MARCH 2009

DA2O2E

Page 17: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

I - ,".oo eo \, I ' _.yoo NORTHBOUNIDARY /K : c1 ! rWALLJ

A T1IJ/L RL+19450 -4 + + -+ -+ 4 4

ii D \ - I i -- - -/D

-p-- ---/-/L StREEt /:i- RL+17 /

\I I j I cf I

I L -::- - =----- - ¶ 4

\ + •i'

-- ---=--*\aI

li_- \ p

LOADDOCK_±_______

'1 " j //• T

74.6OSQMNLf /v.

_.L4!/

3696M 7 J356247 SQM NLA PIrcHPOINT /RL +20.00

/

NEWBOUNDARY ___FOR CHILDCARE1LiT1 /CENTRE

-

/

EXTENT OF WALKWAYSSHOWN SHADED 135413 m2

4 t

iJ _ H

_____ ____________________________________

E)cTENTOFCOUNCPLWLLAGE

NOTE:

.2W

CITY OF RYDELDA No Mi)'b

20 OCT 2009r:edPIans

Subject to the condition f the Consent

\\\\ \Project: WESTRYDE VILLAGE - MIXED USE DEVELOPMENTGROUNDFLOOR

Location: CHAT HAM RD and ANTHONY RD Client: SCALE (1:250 @A1) 2 6 I 10 m Issue: C - Coordination issue, 11 May2009 ANTHONY VAVAYS +ASSCOIATES 1:250 © Al, 1:500 A3 MARCH 2009N ORTH RYD E (J City of Ryde

FONLYPp4Do:oP:TPPS:oSDSSSEEr?op;sojvAjooo

0 A 2 1 0 KG - RAMP LEVEL ADJUSTED, 14 AUG 2009 n r:riaru VflLDD IS LASS 0515555 PT? LTD 0511 059 757 055

H - ADD TENANCIES 2 & 3 18 SEPT 2009- RECONFIGURE ADD TENANCIES 2 & 3, 18 SEPT 2009

K - RECONFIGURE ADD TENANCIES 1 & 3.21 SEPT 2009

Page 18: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

©

VISITOR AR PARK47 CAR SPACES

liii

&

__ 1i1 'f________

© © © © © © © ©62.20 n2 70,6 o2 78.9 n2 79.9 n2 78.9 n2 79.902 70.6 02 87.25 ro2

Project: WESTRYDE VILLAGE MIXED USE DEVELOPMEIT ________Location: CHAT HAM RD and ANTHONY RD Client:

__

SCALE (1______

:250 @ Al)________

2 6

_________

hO m

_ ______Issue:

__ ________ ________ ___

A - Section 96 pre DA issue, 12 March 2009_____

N 0 R T H R Y D E EMO City of Ryde B - Section 96 Pre DA issue. 29 April 2009N S W 1 6 7 0 PoperSeo C - Coordination ssue, 11 May 2009

D - SECTION 96 ISSUE, 15 MAY 2009E - SECTION 96 ISSUE, 22 MAY 2009F - SECTION 96 ISSUE, 27 JUL 2009G - SECTION 96 ISSUE, 14 OCT 2009

LDA No

20 OCT 2009

APProVed Planssigned

etothec00d1ti08th

C COMMERCIAL SUITES

rpIk - 'id/ ii'l

GBA Commercial - 134597 m2

LEVEL I FLOOR PLANANTHONY VAVAYIS + ASSOCIATES 1:250 @ Al, 1:500 @ A3 MARCH 2009ARCHITECTS DESIGNERS PLANNERS

24LAIESIREET KINDSTREETWRHRF SYDNEY NSA2YSH D A 2 1 GPSSI]IHS**$R 20 IDEA LEIESTREET 080 STAREr WHARF SYDNEY ISA 205

Page 19: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

.................................................................................................

2.11"--' 63.69 m2

()23 ()2.14 - (25 (2.16 (?2.17 (2.18 m2.l9)e9.34 nO

2.2163.69 992

LDANoMtP,09t T,20 OCT 2009

FiTh

Subject to the conditions o he Consent

210

L

I

T

L± LLH --- ---

OOMMERGIAL GFA - 019.81 n2--- - --

. ...________________ __________- -

II I I_________________

____

LcJ COMMERCIAL SUITES__

18 I BEDROOM UNITS

__- -

2.9 2 8 2.7 26 2.5 2 4 2.3 2.2 IBA 1 BEROOM 1 BATH. UNITS (ACCESSIBLE)© © © © © © © ©

GBA_residential - 1293.02 m2

GBA Commercial - 1297.91 m2

GFA Residential - 980.20 m2

GFA Commercial

Pro)ect: WESTRYDE VILLAGE - MIXED USE DEVELOPME1T _________________ ________ ________ ________ ________ ________ LEVEL2FLOORPLANLocation: CHAT HAM RD and ANTHONY RD ClienI:

N 0 R T H R Y D E EIMOSCALE (1:250 @A1)

City of Ryde2 6 I 10 m

_____Issue: A - Section 96 pre DA issue, 12 March 2009

8 - Section 96 Pie DA issue 29 A ril 2009

___

ANTHONY VAVAYIS +ASSOCLATES 1:250 @ Al, 1:500 @ A3 MARCH 2009

N SW 1 670 ProperOes. p

C - Coordination Issue, 11 May 200924 210,10 STREET IRSG STREETOSTOSRF SOONER RSO' 2220

0029090 TRIO 100 9290 1160E R S- ,D SECTION 96 ISSUE 15 MAY 2009 e rrerey ,rorr

PbI 045,ee 20/216 LInE STREET 0040 STREETR,T501 STORER 1150,' 2005E SECTION 96 ISSUE, 22 MAY 2009 I

F - SECTION 96 ISSUE, 27 JUL 2009G . SECTION 96 ISSUE, 14 OCT 2009

((2 2v'-'74.40 992

Page 20: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

(if)T

E E

6 6

Th315 -m316' I

3.17 3.18 319 3.20 321 322 323 3.24 3.25 326 3.27 -3.28_ 73.8n2 57.42r,2 © © © © © © © @ © '__} 8O27n2 "_) 73.8n2J _______________ 52.Q42 62.C42 62.C42 62O42 62 O&2 62O42 62.O42 62.O42 62 O42 _______________

I

0c±c ::c ci:c icr

- - __ _0 I_- 6 ---- ___6

31446 2 L I L 329@

333___ ____

© I [312 J L i 331©

62.O4n2L - 62.O4fl2

0E0---

6242 - ____ -

33©62.04o2 - 62 O4EK2

3.8=F O42 62O42

R

-

__ ----.___ ___ OI -

62O42

H H CM1 651752 6517rs2 65l7ns2____________

34:

7472ii __

®8292 ®82i92 ®R2.192 ®82.19m2 262 2 BEDROOM + 2 BATH. UNITS

1BA Ii BEDROOM + 1 BATH. UNITS (ACCESSIBLE)

GBA landscape - 1 702.64m2

FA 3425,96m2

LDA No 14jJP20 OCT 2009

Approved PlansSigned

ect to the cond itS the Consent

Project: WESTRYDE VILLAGE - MIXED USE DEVELOPMENF LEVEL3FLOORPLANLocation: C HAT HAM RD and ANTHONY RD Client:

N ORTH RYDEN S W 1 6 7 o

,SCALE (1250 © Al) 2 6 110 mCity of Ryde

PropeSes

.Issue A - Section 96 pre DA issue, 12 March 2009

. B-Section96PreDAissue,29Apri12009C - Coordination issue, 11 May 2009

ANTHONY VAVAYIS + ASSOCIATESARcHITEcro DESIGNERS PLANNERS

24 LII.IE STREET KING STREET SATIRE SYDI4EV SOW 240002222201814 FT2RTTTIETO

1:250 Al, 1:500 @ A3

2 1MARCH 2009

FD - SECTION 96 ISSUE, 15 MAY 2009 E 2dA5o2yR.R00

P002225201 20/224 IRIE STREET KING STREKISHORE SYDNEY OSlO 2000E - SECTION 96 ISSUE, 22 MAY 2009

_

F - SECTION 96 ISSUE, 27JUL 2009

Page 21: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

.

4.873.8552

]

65.1755 2

67.47rY2 •

®72.58n52 ti:t4.10 (p4.11

73.8,52

4.12 78.21rs2

65.17m2

LDA No

20 OCT 2009Approved PlansJSigned

to the cündit!0fl9 the Coflt

___ 2F

®829rs2 ®82.19L5, ®82.19552 ®

1 BEDROOM STUDY UNITS

2B2 2 BEROOM 2 BATH. UNITS

2BA' 2 BEROOM 1 BATH. UNITS (ACCESSIBLE)

1BA 1 BEROOM 1 BATH. UNITS (ACCESSIBLE)

reden'aI-41O8.94m

Project: WESTRYDE VILLAGE MIXED USE DEVELOPMENT________ ________ ...._. ______ ________ ________ ________ LEVEL4FLOORPLAN

Location: C NAT H AM RD andA N THO NY RD Client: SCALE (1:250 @A1) 2 6 ( hO rn Issue: A- Section 96 pre DA issue, 12 March 2009 ANTHONY VAVAYIS ±AS500IATES 1:250 Al, 1:500 @A3 MARCH 2009N 0 RI H R Y D B City of Ryde B - Section 96 Pre DA issue, 29 April 2009 24 IEEE STREET KING STREETOHARF SYDNEY NSG 20710

S FrOpOries C - Coordination issue, 11 May 2009 0025250 5410 FED 02501000

D - SECTION 96 ISSUE, 15 MAY 2009 NG,ASEN,A 2012,5 SSSOSTSEEO ESTOSTYEETGN SO 50004B - SECTION 96 ISSUE, 22 MAY 2009 ANTHONY VAVAY IS A ASSO DINT ES 015 LOT SOS NAN 710

Page 22: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

4'

..

j5,15'' 73.&e2

@64.4802

@101.3602

®5.12

5182.73n2

10

©9i732

®5.992.73re2

R 5.8

®92.732

@65i702 j

@67.47o2

@5.16 5.19 5.2072.5802 56.20o7 85.50o7 '__./ eM 70, \_J

•U0

c1 -

30 5.29

a

Project: WESTRYDE VILLAGE - MIXED USE DEVEL0PMET_______

Location:CHATHAM RDandANTHONY RD Client: (________ _______ _______

SCALE (1:250 @ Al) 2 6 ho m_______ ________ _______

Issue: A - Section 96 pre DA issue, 12 March 20098 J Oily of HydeN OR T H R Y D E EIMIO B - Section 96 Pre DA issue, 29 April 2009

N SW 1 670 Pr0eee C - Coordination issue, 11 May 2009D - SECTION 96 ISSUE, 15 MAY 2009E - SECTION 96 ISSUE, 22 MAY 2009

6

5.22'-' 73.8re2

(J 5.23' 64.4802

5.24'--' 56.20re2

(5.2556.2002

@5,2655.72re2

LDA No AAJJ' 2ZX) 9 (2 0 OCT 2009

App r:ve

Subject to the conditions 01 eConrun:

I 5,27' -]65.17o2L___

I 1B+ 1 8EDROOM + STUDY UNITS

126202 BEROOM 2 BATH. UNITS

2 BERCOM 1 BATH. UNITS IACCESSIBLEI

1BA 1 BEROOM 1 BATH. UNITS IACCESSIBLEI

OBAres dential - 4108.94m2

______ LEVEL 5 FLOOR PLANANTHONY VAVAYIS ASSOOATES 1:250 @ Al 1:500 @ A3 MARCH 2009

E6,

2LL1ST6EET 61140 STREET 0 A 2 1 5 EPoV 20)265 .ISESTREET KI16SSREETWHSRF 8501155 1408200

Page 23: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

T

()6.873.8ro2

6773.46ro2Jl

®

6.972.58ro2

6I90.35rE2

622

®

LDA No ftjUO ZOO9(%o

20 OCT 2009Approved PlansSigned

______________________

Suojccttothc conditions ofe Consent

© 2

1T:

u r4 ?

__________ - -

2 ®8J2 2

BEDROOM Y STUDY UNITS

2 BEROOM 2 BATH. UNITS

2 BEROOM 1 BATH. UNITS (ACCESSIBLE)

I BEROOM 1 BATH. UNITS (ACCESSIBLE)

GBAresidenti41O8.94m2

Project: WESTRYDE VILLAGE • MIXED USE DEVELOPMENT LEVEL6FLOORPLANLocation: CHAT HAM RD and A N THU NY RD CIient:

N 0 R T H R Y 0 E EIMO () CitySCALE (l:250 Al) r 2 6

of RydeHo rn Issue: A-Section 96 pre DA ISSUe, 12 March2009

B - Section 96 Pm DA issue 29 A ril 2009ANTHONY VAVAYIS ASSOC ATES

I 01:250 @ Al, l:500@A3 MARCH 2009

N S W 1 6 70 PRE0ETSeS, p

C CoordInation issue, 11 May 20092ER,IESTEEETKINGSTREEIYRHARF SYDNEY NED, DOSE

TOE 9290 1910 rODSOSO RSEO D A 2 1 6 ED SECTION 96 ISSUE, 15 MAY 2009 p&&oSO,ess 20126* joE STREET nI90srREr,RnoF ST 'E R2RE&E - SECTION 96 ISSUE, 22 MAY 2009 SlITHERY 02090IHRS SSOEISTES OTT OTT DCII 55 7'? 57?

"-i 73.8ro2

Page 24: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

6

(j7.1573.92

Lr

I1r(m114

64.49r,2

(73 L

' 1- 1O1.36n2

®7.12

g2.73r2

(')7.17 (i 7.22S.....) 73.8n2

1L4

('\724'- 56.20ns2

LDA No

20 OCT 2009

Approved P!ansSigned

9273rs2 IIiL±LJ ®56 20ns2 I Ih IIJ 1 ®E

-

. r .. 5620m2

®7q92 73n2

®7.3592.73rn2

___

®2J

'

___

uL65i7k F65i72______ ______

to 2

®a2g2 ®82 9L2 ® ®1 822 82i92

m1BEDROOMUNITS

1 BEDROOM STUDY UNITS

2B2 2 BEROOM 2 BATH. UNITS

2 BEROOM 1 BATH. UNITS (ACCESSIBLE)

HBA] 1 BEROOM 1 BATH. UNITS (ACCESSIBLE)

Project: WESTRYDE VILLAGE - MIXED USE DEVELOPMENT________ ________ ____________________________ ________ LEVEL7FLOORPLAN

Location: CHAT HAM RD and ANTHONY RD Cilent:N 0 R T H R Y D E

,,tç)

SCALE (1:250 @AI)City of Ryde

2 1 6 1 10 m_______________

Issue: A - Section 96 pre DA issue, 12 March 20096-Section 96 Pm DA issue 29 A ril 2009

___

ANTHONY VAVAYIS ± ASSOCATES 1:250 @ Al, 1:500 @A3 MARCH 2009

S 059049045, p

C- Coordination issue, 11 May 2009 W 24 LISlE STRCET KISS STREET 0054SF KIDNEY NAS 2490I2i2iO 1910 0502 92001990 E

D - SECTION 96 ISSUE, 15 MAY 2009 osSo,s,s 205 240)KESTFEET KASTYOET014FE 000900 900105E - SECTION 96 ISSUE, 22 MAY 2009 AIJ15000 VOCAl IS ASSOCIATES PETtED 409 459 7'? 07.?

Page 25: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

LDANo2'WO'(

2 0 OCT 2009Approved PlansSignedSubject to the conditions Jthe Consent

NEW BElTS STREET ELEVATION

ANTHONYRO

Project: WESTRYDE VILLAGE - MIXED USE DEVELOPMENT

LOCatiOn:CHATHAMRDaDdANTHONYRD ClientN ORTH RYDE EMIO City of Ryde

NSW 1670 Propeolies

SCALE (1:250 @ Al) 12 6 10 m Issue: A - Section 96 pre DA issue, 12 March 2009B - Section 96 Pie DA issue, 29Apr11 2009C - Coordination issue, 11 May 2009D - SECTION 96 ISSUE, 15 MAY 2009E - SECTION 96 ISSUE, 22 MAY 2009F - SECTION 96 ISSUE (revised colour scheme), 29 MAY 2009G - SECTION 96 ISSUE (revised colour scheme), 02 JUN 2009H - SECTION 96 ISSUE , 27 JUL 2009

ANTHONY VAVAYIS + ASSOCIATESARCHITECTS DESIGNERS PLANNERS

24 LIEIE STREET KING STREET 400001 STONES 552920900029290 SIlO 102 0252 1562

E ad,e4egeaoa6core

NORTH EAST AND NORTH WEST ELEVATIONS

1:250 A1, 1:500@A3 MARCH 2009

DA 301H

© ©

Page 26: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

P P P P P-______________

I(i ! l•i j P I '

________________________

---- --------

-

CHATHAM ROADII1

/' / V / / '

/\////\/ / \

VILLAGE ELEVATIONiZTTiI-71

z / / \/ :7""

// / <'///// //// /

H. /

CHATHAM ROAD ELEVATION

0 Project: WESTRYDE VILLAGE - MIXED USE DEVELOPMENT

Location: CHATHAM RD andANTHONY RD Client: SCALE(1:250@A1(o N ORTH RYDE EIMO (D OiLy of Ryde

N SW 1670 Properbe

'iIL' 1ij_.I LHIj:'j' 1. •IJ,IIHI Hl( •

I IJ I, • -I I -I --

II I III __________

I IrrcITlIIIljjtIIHI H. I

_______

iii:

-/=- - 4-J/ , ' ' '"U /ç//\////',

.//

10 m Issue: D - Coordination issue, 11 May 2009E - SECTION 96 ISSUE, 15 MAY2000F - SECTION 96 ISSUE, 22 MAY 2009G - SECTION 96 ISSUE (revised colour acheme(, 29 MAY 2009H - SECTION 96 ISSUE (revised colour scheme(, 02 JUN 2009

- SECTION 96 ISSUE , 27 JUL 2009

LDANo4J) oo(t

20 OCT 2009App r:ved Plans,

SIJbIGCt to the conditions the Consent

SOUTH EAST AND SOUTH WEST ELEVATIONS1IIur ANTHONYVAVAYIS + ASSOCIATES 1:250@A1, 1:500@A3 MARCH 2009

ARCH ITECTS DESIGNERS PLANNERS

I24 LIRE STREET KING STREET WHARF SYDNEY 0502200

00252001810 P02 9250 050 DA 3 0 2 '

PESA00G$ 20/264 _6EE STREET KISOSTREET THREE STYLES 035 2000

Page 27: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

CrIY OF RYDELDA No kjt1) b9P

28 OCT 2009Approved PIans

-Subjectto the conditions of e Consent

Project WESTRYDE VILLAGE - MIXED USE DEVELOPMENTLocation: C H AT HAM RD and ANT HON V RD Client:

N 0 R T H R Y D E (J City of Hyde

N SW 1670 ProperEes

SCALE (1:250 @ Alj 2 6 1Dm Issue: A - Section 96 pre DA issue, 12 March 2009B - Section 96 pre DA issue. 20 APRIL 2009C - Section 96 Pre DA issue, 29 April 2009D - Coordination issue, 1 May 2009E - SECTION 96 ISSUE, 15 MAY 2009F - SECTION 96 ISSUE. 22 MAY 2009

ANTHONYVAVAYIS -ASSCCIATESARCHITECTS DESIGNERS PLANNERS

24 LIME STREET KIllS STREET SHARE STONES NSTS 4)5TO2N2AEIOIT F42R2REIATTI S4TLSRV 44VTVIT SETCISrES Rro 444 440 ROT 040

SECTION A-A1:250 @ Al, 1:500 @ A3 MARCH 2009

DA 303'

Page 28: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

LDANO_/lA,rO' co42D20 OCT 2009

Approved Plans /J (Signed

eCttothe1ti0 of tVe

Project: WESTRYDE VILLAGE MIXED USE DEVELOPMENT

LOCatIOn:CHATHAMRDaSdANTHONYRD Client:N ORTH RYDE EIM1O (jJ City of Ryde

NSW 1670 Prpsrtie

SCALE (1:250 @ Al) 12 6 110 m Issue: A - Section 96 pre DA issue, 12 March 2009B - Section 96 pre DA issue, 20 APRIL 2009C - Section 96 Pre DA issue, 29 April 2009O - Coordination iasue, 11 May 2009E - SECTION 96 ISSUE, 15 MAY 2009F - SECTION 96 ISSUE, 22 MAY 2009G - SECTION 96 ISSUE, 27 JUL 2009

ANTHONY VAVAYIS + ASSOCIATESARcoIrEcrs 000IoNESo PLANCERO

21 LIISESTREET KING STREET WHARF SYDNEY 55.5 20WTTTSDEG ISIS 5029252 IEEE

EadCaa,tcP9da[ TOWn _EIE SWEET WEGSTREETSHARF SYDNEY 9515250

SECTION B-B

1:250 © Al, 1:500 @ A3 MARCH 2009

DA 3O4

Page 29: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

.

LDA No

2 0 OCT 2009

______________________________ _______________________________ _______________________________ ______________________________

APProved FIanS,

- ISubecttoOCOfldFJOflOf the Consent

-.---..- - --__- BALCONY

_BALCONY - I I

24 2 BALCONY 156m2 m __ ED1

UVGZDINING LDR

LIDIN ED1/R __

_______

ELIVGDINING

T35x24x22

_ __ ____

UNIT TYPE - F(1 BEDROOM + 1 BATHROOM)

AREA - 59.46 m2

______________________________________

UNIT TYPE - G(1 BEDROOM + 1 BATHROOM)

AREA - 53.06 m2

_______________________________________

UNIT TYPE - H(2 BEDROOM + 2 BATHROOM)

AREA -69.34 m2

______________________________________

UNIT TYPE - I(2 BEDROOM +2 BATHROOM)

AREA - 74.48 m2

UNIT TYPE -J(1 BEDROOM + 1 BATHROOM)

ACCESSIBLEAREA - 63.69 m2

SIMILAR UNIT TYPE Ji _______________________________________

' I 4 ' 1 YE ED

H I ° ' fl UG/I 33 _ __ _

hI uLMNG1DINING

_

BL O Y

it

3 D B 2

n : P

8x

, O ___ ___________

I

UNIT TYPE - J2(1 BEDROOM + 1 STUDY + 1 BATHROOM)

ACCESSIBLEAREA - 78.21 m2

UNIT TYPE - K(1 BEDROOM + 1 STUDY +1

BATHROOM)AREA - 57.42 m2

UNIT TYPE - L(2 BEDROOM +2 BATHROOM)

AREA -80.27 m2

UNIT TYPE - Ml(1 BEDROOM + 1 STUDY + 1 BATHROOM)

AREA - 65.17 m2SIMILAR UNIT TYPE M2

UNIT TYPE - M3(1 BEDROOM + 1 STUDY + 1 BATHROOM)

AREA - 67.47 m2

LroJecI: YV3IITU VILLMU MIALU U UVLUrMrfl

Location: CHATHAM RD andANTHONY RD Client:

N ORTH RYDE EMO D) City of RydeSCALE(1:100@A1)

N SW 1670 PropAries

Issue: A-Section 96 pre DA issue, 12 March 2009B . Section 96 Application issue, 26 March 2009C SECTION 96 ISSUE, 15 MAY 2009D - SECTION 96 ISSUE, 22 MAY 2009E . SECTION 96 ISSUE, 27 JUL 2009F - SECTION 96 ISSUE, 14 OCT 2009

ANTHONY VAVAYIS + ASSOCIATESARCHITECT5 DESIGNERS PLANNERS

24 LIME STREET KING STREET RHREF STONER MSW2ROT 9225 lAIR P0202251840

ad ElF CravaT iv 101lFtrlfldthvv 201 TEA _IME STREET KING STREET WHARF STONER lirE OTTO

TYPICAL UNITS1:100 Al, 1:200 @ A3 MARCH 2009

DA 401

Page 30: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

I BALCONY LD 1O.04m2

-

- - 1x2 76 BALCONY . .

- I1O04m2

-- T 2.4x2.86 I LiVING/DINING 0

12 c"---'' 4.4x4.1 U r'P\J: _- =.__________ -'-----. --------

. __

I . ALCONY ALCONY L ____j X25 LIViNG/!NG T8

J DlD1L I

\ ° ED1

r (

8 36 S ° x J Vf DIN

f

BALCYT __ __

ATH 225 x 2-

_______________ _________ : = 225x27 _____ ___________________

=ni T1H 1.7x2. UNITTYPE-N BED1 ,III

(2 BEDROOM + 2 BATHROOM) =°34O.

] AREA - 82.19m2 - L / / 1

_______________________

___

0 1 / BEp1 ___

I 3.4x3.6 COURTYARD ___________

- UNIT TYPE -0 UNIT TYPE - P UNIT TYPE - P1 UNIT TYPE - R ____________

(1 BEDROOM + 1 STUDY + 1 BATHROOM) (2 BEDROOM + 2 BATHROOM) (2 BEDROOM + 2 BATHROOM (2 BEDROOM + 2 BATHROOM) oJ AREA - 62.04 m2 ACCESSIBLE

AREAACCESSIBLE AREA - 92.73m2

-88.72 m2 AREA -90.35 m2 SIMILAR UNIT TYPE Ri, R2

____

00

C)=OEI

+46550ij _____________ H LEVEL ROOF +25O

UNIT

UNIT TYPE - S _______TYPE-P

(1 BEDROOM + 1 BATHROOM)___________

I I .- - - ________ LEVEL +7 +aa-

AREA - 56.20 m2 BALCONY_______ ______________ _______ __________________

BALO I 19.25 m2

- LEVEL +6

O 1

______

: !

_________

[

-

I

_______

6 aNG/GY. __ LEVEL+5 oo

_

LOB EVEL+4O __ _ _____

_

___

J

TYPE-F

_ LEVEL+2 -55o

UNIT TYPE - SI UNIT TYPE - T UNIT TYPE - U(1 BEDROOM + 1 BATHROOM) (2 BEDROOM + 2 BATHROOM) (2 BEDROOM + 2 BATHROOM) CROSS SECTION

AREA - 58.02 m2 AREA - 80.90 m2 AREA - 72.58 m2

Locahon: andANTHONY RD Client EiMO City of HydeSCALE(1:100@A1)

NSW 1670PlOperIleS

En) Issue: A - SECTION 96 ISSUE, 15 MAY 2009B - SECTION 96 ISSUE, 22 MAY 2009

ANTHONY VAVAYIS ^ ASSOCIATESARCHITECTS DESIGNERS PLANNERS

iiLIRE STREET TINS STREETENHDNF SYDNEY NSW DRYT0292I8lT RSSS2SSIRYO

EyE ORTPOT!flREeTT 20] 205 TIE STREET KINSSTTEETNTF SYDNEY NRW 2030

TYPICAL UNITS1:100 @ Al, 1:200 @ A3 MARCH 2009

DA 4O2

Page 31: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

CITY OF RYDELDA No

20 OCT 2009

.urlIL

__ x6.35___

__ ______

J L D2 LIVNGii Pj_ _

3 7 x 4 1 SToRE//__ __ __

UNIT TYPE - JI UNIT TYPE -01

I

UNIT TYPE - RI(1 BEDROOM + 1 BATHROOM ) (1 BEDROOM + 1 STUDY + 1 BATHROOM) (2 BEDROOM + 2 BATHROOM)

ACCESSIBLE AREA - 70.68m2 AREA - 101 .36m2AREA - 73.46m2

//________I] -CU

UNIT TYPE - M2 UNIT TYPE -02 UNIT TYPE - R2(1 BEDROOM + 1 STUDY + 1 BATHROOM) (1 BEDROOM + 1 STUDY + 1 BATHROOM) (2 BEDROOM + 2 BATHROOM)

AREA- 65.17m2 AREA- 68.16m2 AREA-114.69m2

-'Inject. vv I F I U VILLMU - IYIIAU uOc I

Location: CHATHAM RD andANTHONY RD Client:N ORTH RYDE EIMIO (J') City of Ryde

SCALE (1-100@A1)

NSW 1670Propertes

m Issue: A - SECTION 96 ISSUE, 26 MAY 2009B - SECTION 96 ISSUE. 27 JUL 2009C - SECTION 96 ISSUE, 14 OCT 2009

IIr ANTHONY VAVAY!S + ASSOCIATESARCHITECTS SESIGNERS PLANNERS

ItS LIME STREET EISA STREET '559AM SYDNEY 15052060

TOO 9290 1810 F 02 E252 1800ECOCT@TaSOYI&C051

PolY A0Eo'_ 201069 NIE STREET EINSSTTEET ,SEORF SYDNEY 95252009

TYPICAL UNITS1:100 @ Al, 1:200 @A3 MARCH 2009

DA 403C

Page 32: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

(I') LEVEL 2_/ 1;4OOA1

LEVEL Il:4Al

Project: WESTRYDE VILLAGE MIXED USE DEVELOPMENT

LOCstiOn:CHATHAM RD endANTHONY RD CUentN ORTH RYDE EMO Osty of Ryde

NSW 1670 PrerEes

LEVEL 3

1:400©Al

(T4 LEVEL4l:4SOA1

Issue: A - Section 96 pre DA issue, 12 March 2009B - Section 96 Application issue, 26 March 2009C - SECTION 96 ISSUE, 15 MAY2009D - SECTION 96 ISSUE, 22 MAY 2009

SOLAR ACCESS DIAGRAM, LEVEL 1 -4ANTHONYVAVAYIS --ASSOCATES NOTTOSCALE MARCH 2009ARCHITEcTS DESI SNERS PLANNERS

24 LMESTREET K NA SIREETAHARF SYDNEY NAY DNA DD 4 5 C) I20264 _IYE 04444

Page 33: a FILE COPY - City of Ryde · FILE COPY a Remo West Ryde Pty Ltd 10 Regatta Road FIVE DOCK NSW 2046 21 October2009 Dear Sir/Madam ... DA 214E-Level 4 Anthony Vavayis Architects March

a

a

C

a

8

j r

(i LEVEL51\j_J I:400@Al

Project: WESTRYDE VILLAGE MIXED USE DEVELOPMENT

Location: CHATHAM RD andANTHONY RD Client:N ORTIl RYDE MO City of HydeNSW 1670

Propers

(i LEVEL 7- 1:400@Al

Issue: A - Section 96 pre DA issue, 12 March 2009B - Section 96 Application issue, 26 March 2009C - SECTION 96 ISSUE, 15 MAY 2009D - SECTION 96 ISSUE, 22 MAY 2009

ANTHONYVAVAYIS +ASSOOIATESARCHITECnS DESIGNERS PLANNERS

Ra

LEE STREET EINGSTREETYSHARF SYDNEY NEWNESST5292S0 ISIS P5292W lEND

EW@laRaWP'EYWIESYE, SEA ALAS STREET RING STREET IATILRF STEER rWR2

SOLAR ACCESS D!AGR M, LEVEL 5-7

NOT TO SCALEMARCH 2009

DA 5O2


Recommended