1 A Line (Snelling) Bus Rapid Transit February 24, 2014 Technical Advisory Committee Meeting #5
Transcript
Page 1: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

1

A Line (Snelling) Bus Rapid Transit

February 24, 2014 Technical Advisory Committee Meeting #5

Page 2: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

2

A Line Project Progress

• $10 million for A Line in Governor’s proposed bonding bill

• $1.9 million design contract with Kimley-Horn authorized 1/22/14 – A Line design – Pilot station – Prototypical arterial

BRT station shelter

Page 3: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

3

Agenda

• Design team introduction & overview of scope • 2014 design schedule • IRT progress • Outreach activities • Station concept design • Roundtable/project coordination updates • Next meeting

Page 4: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

4

Issue Resolution Teams

1. 7th & Olson Pilot Station 2. Snelling & University 3. Snelling & Dayton 4. Transit Signal Priority 5. Station Technology

Page 5: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

5

2014: Pilot Station at 7th & Olson

6th Avenue N Olson Memorial Highway

<<

Metro Transit Heywood Garage

Current Route 19 Planned C Line

Current Route 5 Future

Arterial BRT

5

Page 6: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

6

Northbound Snelling & University

Southbound BRT Station

IRT Recommended Concept: Farside Spruce Tree Bumpout station Aligned with southbound station

Page 7: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

7

• Existing SB stop • Ridership

• 84 SB: 25 on / 27 off • 144 EB: 1 on / 12 off

• Property Information • 201 North Snelling – Snelling Imports 651-643-

7600 Mr. David Nadini

Snelling & Dayton

DAYTON AVE

80 ft

x 1

0 ft

MN Pain & Wellness Ctr

Snelling Imports

T

201

209

Site 17307

25 / 39

Site 17371

47 / 26 80 ft x 10 ft

T

T

T

Redevelopment – The Vintage on Selby

Page 8: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

8

Business Outreach

• Targeting businesses on station corners

• 42 letters sent • 60 follow-up calls • 25 one-on-one

meetings during January 24-30 Ginkgo Coffeehouse owner Kathy Sundberg

Page 9: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

9

Business Outreach Meetings held with •Har Mar Mall Snelling & County Rd B •BP Gas Station Snelling & Larpenteur •Falcon Crossing Snelling & Larpenteur •Lloyd’s Pharmacy Snelling & Minnehaha •Gingko Coffeehouse Snelling & Minnehaha •Spruce Tree Centre Snelling & University •CVS Snelling & University •Midway Book Snelling & University •Stoltz Dry Cleaners Snelling & Grand •Sweeney Cleaners Snelling & St. Clair •Fourleaf Enterprises Snelling & St. Clair •R & S Crossing Snelling & Randolph •ProFuel Snelling & Randolph •Walgreens Snelling & Randolph •Plum’s Snelling & Randolph •Parkway Family Physicians Snelling & Highland •Gloria Dei Lutheran Church Snelling & Highland •Red Robin Cleaners Ford & Kenneth •Highland Lifecare Ford & Kenneth •Highland Bank Ford & Finn •Parkway West Apartments 46th & 46th •Jakubas Dental 46th & Minnehaha •Highland Business Assn •Midway Chamber of Commerce

Page 10: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

10

Roseville/Falcon Heights Open House

• January 23, Roseville Library • Approximately 40 attendees • 10 comment sheets received, many conversations &

exhibit comments

Page 11: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

11

Comments on Specific Locations

Location Comment Rosedale Transit Center • Would like the Park-and-Ride back at Rosedale.

Snelling & County Rd B •Target needs to make a sidewalk to the Har Mar bus stop.

Snelling & Roselawn • Almost nobody uses this stop.

Hamline & Larpenteur • An 84 route option to serve as much of Hamline as possible would be a good idea (a la future Route 83).

Hamline & Hoyt • Consider restoring the 84 Local to the Hamline/Hoyt area!

Snelling & Nebraska • Can you add a stop between Larpenteur and Como, even with the limitation of the west side boundary of the State Fair? • Job Corps span of service later at night. • Need stop in the Como-Larpenteur gap!

Snelling & Como • A dedicated bike lane is needed along Snelling between Como and Hewitt (similar to bike bridge along Lexington).

Snelling & University • The bus stop by the book store is too small for such a high usage.

Page 12: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

12

Hoyt-Midway Feasibility Review

T T T T T

Larp

ente

ur

Hoyt

Mid

way

Com

o

Arlin

gton

T Current Bus Stop

HHH Job

Corps

Minnesota State Fair Grounds

Guardrail, no sidewalk St

atio

n

Stat

ion

Fence, no sidewalk

NORTH >>

Page 13: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

13

Station Elements Design

Custom BRT Shelter

Layout varies by size and location constraints

Identity is consistent across sizes, locations

Pylon

- Iconic station identifier - Appears at EVERY station - Real-time info panel - Security cameras - Emergency telephone

Other Station Elements

Must-Haves: - Ticket Vending Machine - GoTo Validator Other elements tailored by location: - Trash - Seating - Bike Parking - Etc.

3 Base Layout

Concepts

10 Identity Concepts for Shelter & Pylon

Page 14: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

14

Concept A Base – Open Layout

Page 15: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

15

Concept B Base – L-Shaped

Page 16: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

16

Concept C Base – C-Shaped

Page 17: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

17

10 Identity Concepts

Page 18: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

18

Page 19: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

19

Page 20: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

20

Page 21: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

21

Page 22: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

22

Page 23: A Line (Snelling) Bus Rapid Transit · 2014-02-24 · 2 . A Line Project Progress • $10 million for A Line in Governor’s proposed bonding bill • $1.9 million design contract

23

Next TAC Meeting

• Currently scheduled for: Thursday, March 20 1:30–3:30 p.m. Metro Transit FTH Chambers (560 6th Ave N, Mpls)