A N DY Status Commissioning with colliding beams (p  +p  at s=500 GeV). L.C.Bland, for AnDY 15 February 2011 Time Meeting, BNL. Jet Trigger Commissioned on Saturday 12 February. ADC from Berkeley group (“QT”) has FPGA used to form 17-bit sum of 12-bit ADC from each of 32 channels - PowerPoint PPT Presentation
Popular Tags:
7
A N DY Status Commissioning with colliding beams (p +p at s=500 GeV) L.C.Bland, for AnDY 15 February 2011 Time Meeting, BNL
Transcript
Page 1: A N DY Status Commissioning with colliding beams (p  +p   at  s=500 GeV)

ANDY StatusCommissioning with colliding beams (p+p at s=500 GeV)

L.C.Bland, for AnDY15 February 2011Time Meeting, BNL

Page 2: A N DY Status Commissioning with colliding beams (p  +p   at  s=500 GeV)

04/22/23 2

Jet Trigger Commissionedon Saturday 12 February

• ADC from Berkeley group (“QT”) has FPGA used to form 17-bit sum of 12-bit ADC from each of 32 channels

• 32-bit data from four QT per HCal module transferred to second FPGA board from Berkeley (DSM), where 19-bit sum of four terms is made

• Threshold on 19-bit sum is then used as trigger

• HCal energy scale still to be determined

RHIC clock tick before trigger

RHIC clock tick after trigger

Page 3: A N DY Status Commissioning with colliding beams (p  +p   at  s=500 GeV)

04/22/23 3

Jet Trigger Events

• Select from jet-trigger events for HCal “high-tower” to be centered in module

• Display for each detector of each module the ADC count as color scale (black=greatest count yellow=lowest count)

• Events look “jetty”, as expected

Page 4: A N DY Status Commissioning with colliding beams (p  +p   at  s=500 GeV)

04/22/23 4

Issues and Plansfor next access possibility and beyond

• Resolve a few remaining single-channel issues

• Reduce HCal gain

We are in “production” now with a jet trigger >29M jet events recorded since Sunday.

No significant on luminosity at IP6,8 yetFollowing access, in coming week…

• ECal final calibration

• Commission additional triggers

Page 5: A N DY Status Commissioning with colliding beams (p  +p   at  s=500 GeV)

04/22/23 5

Backup

Page 6: A N DY Status Commissioning with colliding beams (p  +p   at  s=500 GeV)

04/22/23 6

Schematic of detector for Run-11Equipment in place:• HCal is two existing 9x12 modules from

E864 (NIM406,227)

• ECal are two small lead-glass modules from BigCal at JLab

• BBC (from PHOBOS) and ZDC

• Preshower is newly constructed scintillator arrays

Goals:• Establish impact of 3IR operation on

PHENIX/STAR luminosity

• Calibrate HCal

• relative gain via cosmic-ray

• absolute energy scale via ,KS…

• Measure hadronic backgrounds to benchmark simulations

• Measure jet analyzing power (Lint~10 / pb, P=50%)

Page 7: A N DY Status Commissioning with colliding beams (p  +p   at  s=500 GeV)

04/22/23 7

IP2 in January, 2011Run-11 Staging of ANDY

See http://hena.lbl.gov/IP2/Business/status/<date> for pictures of progress

Left/right symmetric HCal

Left/right symmetric ECal

Left/right symmetric preshower

Trigger/DAQ electronics

Blue-facing BBC

Beryllium vacuum pipe