Government of India
Ministry of Environment, Forest & Climate Change,Jor Bagh Road, Aliganj, New Delhi-110003
i;kZoj.k] ou ,oa tyok;q ifjorZu ea=ky;]tksj ckx ekxZ] vyhxat] ubZ fnYyh&110003www.moef.gov.in www.indiraparyavaranbhawan.com
A NEW BENCH MARK IN SUSTAINABLEBUILT HABITAT
Main Construction Agencies\Engaged by CPWDM/s Swadeshi Civil Infra structureM/s Swadeshi Civil Infra structureM/s Simpex ProjectsM/s Shivalay Enterprises
Main Composite ContractSolar PowerAutomated ParkingHorticulture
Consultants Engaged by CPWDM/s DPAPM/s Spectral ServicesM/s Kothari Associates
Green BuildingMEP ServicesInterior Design
GRIHA 5 STAR Rating GRIHA Certificate forExemplary Demonstration of
Renewable Technology
MoEF&CC (Ministry of Environment, Forest & Climate Change)
CPWD (Central Public Works Department)
CPWD (Central Public Works Department)
Architectural Planning and Structural Design
Project Management & Execution
AnnualConsumption
ConvetionalDesign
Energy Efficient \Design in the Project
Saving
Electricity
Water
22 lakh Kwh
20,000 KL
14 lakh Kwh
9,000 KL
40%
55%
Conservation Scenario
Parking Capacity
Single car retrieval time
Total cars retrieval time
:
:
:
330 Cars
3 Minutes (Max)
40 Minutes (6 Cars Lifts)
FULLY AUTOMATED ROBOTIC CAR PARKING7.
l RE EC UU SD EE lR Rl E
E C
S Y
U C
F L
E E
RRobotic Dolly and shuttle
(Total 10 Nos)
Car Parking Lot
Project Team
(Done for the first time in India with such low system retrieval time)
INDIRA PARYAVARAN BHAWANJorbagh Road, Aliganj, New Delhi-110003
Website: www.moef.gov.in Air F
low
thro
ugh
the B
uild
ing
NORTH
JAL AAKASH PRITHVI
VAYU AGNI
JORBAGH ROAD
1. PROJECT DETAILS
CostStructurePlinth AreaGeneral Services
: Rs. 209 CrG+7 Storeyed plus 3 Basements32,000 SqmCentral Air Conditioning (Heating Ventilation & Air-conditioner) 440TRLifts, Fire Fighting and Fire Alarm SystemsDG Sets, UPS, Integrated Building Management System and Closed Circuit Television systemsRoof top Solar PV system 930 Kwph Fully Automated Robotic Car ParkingModular Furniture and Work StationsSewage Treatment Plant 30 Kilo Litres Discharge capacity
25.01.2011
31.10.2013
28.02.2014
:
:
:
:
:
Special Provisions
Start of Construction
Completion
Inaugurations
:::
:::
4. Other Energy Efficiency Measures
Chillers and Air-Handling Unit with Variable Frequency Driver
Heat Recovery System (DedicatedOutdoor Air Units)
Thermostat controls for HVAC
Liquid Crystal Display lights and Occupancy & Lux Level Sensors, etc.
6. WATER CONSERVATION
Recycling of waste water through Sewage Treatment Plant
Low discharge water fixtures
Sensor Urinals & Dual flow Cisterns
Low demand plants in landscaping
Geothermal Heat Exchange System
Rain Water Harvesting
Use of curing compounds
IPB is a Centrally Air Conditioned
Office Building designed and
constructed by CPWD (Central
Public Works Department), for the
Ministry of Environment, Forest &
Climate Change (MoEFCC) to
accommodate 3 Ministers and their offices
along with about 600 officials and is located at Jor Bagh
Road, New Delhi-110003
LEED INDIA PLATINUM&
GRIHA 5 STAR
GREEN BUILDING RATINGSNET ZERO ENERGY
MULTISTOREYED BUILDINGWITH
100% ONSITE POWER GENERATION(First of its kind)
1. Energy Efficient Chilled Beam System of Air Conditioning
Air conditioning by convection currents rather than air supply through ducts
Chilled water circulated right up to the diffuser & to the chilled beam
Chilled beam has provision for draining out any condensed water
More than 50% saving in energy consumption on air conditioning
5. ENERGY EFFICIENT SYSTEM
Rapidly renewable Bamboo Jute Composite for door frames
& shutters.
UPVC window with hermetically sealed double glass
(SHGC: 0.32, U value: 1.5 & VLT 59%)
Calcium Silicate ceiling Tiles
Grass Paver blocks in pavements and roads for ground water
percolation
Low VOC Paints for better indoor air quality
High reflectance terrace tiles and PUF Insulating for low
heat ingress
Rockwool insulation of outer walls and concrete surfaces
East West Building orientation, separation of different blocks with connecting corridors and central attriumOut of total 79 trees, only 19 trees cut and 11 transplanted Building Envelope designed to ensure daylight in 75% occupied area. Access friendly to differently-abled persons (Dingjang)Zero Surface ParkingPlantation and grassing in more than 50% area outside the buildingCirculation roads and pathways made with grass paver blocks to enable ground water rechargeTerrace Garden at seventh floor
2. ARCHITECTURAL PLANNING AND LANDSCAPING
4. NET ZERO ENERGY
Capacity of Power Generation
Annual Energy requirement
Annual Energy generation
Net Energy Consumption
Total area of Solar panels
Photo Voltaic panels
No of Panels
Nature of Power Generation
:
:
:
:
:
:
:
:
930 Kilowatt Peak
14 lakh Unit (Kilowatt Hour)
14 lakh Unit (Kilowatt Hour)
ZERO
4600 sq. mt.
Mono Crystalline
20% efficiency
2844
Grid Interactive
3. SUSTAINABLE BUILDING MATERIAL
Walls with Fly ash bricks and light weight & heat insulating AAC blocksEntire concreting, mortars and plasters with PPC (Fly-ash Cement)Locally available Stone floorings, claddings, Terrazzo flooring and flooring with broken Marble and Kota stone
Internal road with
paver blocks
permitting
water percolation
Terrace Garden
Minister Floor in Aakash BlockAesthetically designed and naturally lit work stations Rapidly renewable wooden Composite
2. Geo Thermal Heat Exchange System
Utilises advantage of difference between ambient temperature and the temperature below ground level
Vertical Closed loop system with 32mm dia. High Density Poly Ethylene U-loops 180 Nos and 80 m deep each
Reduction of 160Ton of Refrigeration load on cooling tower and also reduction in consumption of water.
Regenerative Passengers Lifts
Energy efficient by converting braking energy into Electrical Energy
7 Nos Machine Room Gearless Lifts of OTIS made
3.