A Quality and Technology Network
Instituto de Soldadura e Qualidade
José Oliveira Santos29 January 2009
ISQPotencial involvement on ESSand the CERN experience
Technological Development, Quality and innovation since 1965
1. ISQ
2. Services
3. ESS – Vision
4. Objectives and Motivation
5. Strategy
6. ISQ Participation @ the LHC Project
7. Other Projects
8. The Future
Privately owned, non-profit technical and scientific organisation
Founded in 1965 as Welding Institute
Around 1000 co-workers in Portugal and 500 abroad
Operating in more than 20 countries
Turnover (2009)
– ISQ Group: 80 M€ (49% abroad)
– ISQ : 62 M€
Accumulated investment in R&D during the last 10 years: 55M€
Headquarter:
– Total Area: 40 000 m2
– Covered Area: 15 000 m2
Activity and services in technical areas covering a wide range Industrial Activities
1. 1. ISQ – Instituto de Soldadura e ISQ – Instituto de Soldadura e QualidadeQualidade
2. ISQ – Services2. ISQ – Services
Non Destructive Evaluation Testing Engineering and Performance
Thermodynamics, Materials, Mechanical testing, ElectromagneticCompatibility and Finite Element Modeling Production Technologies (welding and brasing) Project Revision and Follow Up Quality Assurance : QA/QC Technical Inspections Health and Safety Maintenance and Structural Integrity Risk Based Inspection : RBI Metrology Training Research and Development ...
3. ESS - Vision3. ESS - Vision
ISQ strategy as proved that scientific international cooperation projects are profitable by themselves and provide the levering for technological developments that allow to enter new business markets producing simultaneously a marketing effect capable of generating business on the traditional markets.-Some examples in ISQ recent history include: CERN, ESO, ESA, CNES/ARIANSPACE, FLPP, E- ELT, CHERNOBYL
Opportunities: Visibility of ISQ as an R&D partner for industry solutions A market per si. An outstanding and unique opportunity to be present at the development stage of new technological solutions that can place ISQ as a market leader in particular segments of industry.
4. Objectives and Motivation4. Objectives and Motivation
Development of new Non Destructive Evaluation and Production Technologies Solutions
Development of Test procedures for the qualification of new Materials and new usage conditions for known materials
Participation, as third party, in the Quality Assurance / Quality Control of Mechanical and Electrical Components and Assemble
Create “critical mass” to enter a new business area in the “nuclear” field
ISQ as an international reference, helping on the Internationalization strategy – based on services of high value and technologically unique.
Placing ISQ as an engineering and testing house for the Automotive, Aero and Nuclear Industries
Marketing of ISQ image, allowing a different approach on the international market of big Oil and Gas and Public Works
Positioning ISQ towards an industry that has never emerged in Portugal, but that can be decisive on the Internationalization strategy in Spain, Brazil, Emirates, China, etc...
5. Strategy5. Strategy
Benchmarking the services provided at CERN
Benchmarking the QA/QC services provided at CNES/ARIANSPACE
Collaboration with the Portuguese Scientific community allowing mutual interest development of competences and positioning in the market
To act as service integrator for Portuguese SMEs that can integrate consortium's led by ISQ
6. ISQ Participation @ the LHC 6. ISQ Participation @ the LHC ProjectProject
Start – September 2001End - 2007Inspectors– Integrate a CERN Project Team– Training period in the beginning– Inspections activities coordinated by the Project Team
Number of inspectors from 16 till 26
IntroductionIntroduction
6. ISQ Participation @ the LHC 6. ISQ Participation @ the LHC ProjectProject
CERN– Assures technical management of Inspectors– Programs Inspector’s activities
ISQ– Manages inspector logistics, travels, visas,...– Provides technical support to inspector
Working with CERN engineers, ISQ inspector’s functions are:– Follow manufacturing at suppliers or onsite (installation)– Incoming reception of materials at manufacturer– Attend tests according to ITP and at random– Report and follow-up of non conformities– Facilitate interface CERN- Manufacturer– Prepare or supervise the preparation of Travelers at manufacturer– Reporting to CERN Engineers
General FrameworkGeneral Framework
6. ISQ Participation @ the LHC 6. ISQ Participation @ the LHC ProjectProjectInspections – personnel and Inspections – personnel and locationslocations
6. ISQ Participation @ the LHC 6. ISQ Participation @ the LHC ProjectProjectInspections – activities and Inspections – activities and personnelpersonnel
6. ISQ Participation @ the LHC 6. ISQ Participation @ the LHC ProjectProjectInspector’s selection and allocation– Competence– Communication skills– Integration: CERN, manufacturer, country– Long term expatriation
Multi locations project– Legal issues– Logistics
Personal inspector support
Overall coordination– Resources– Project development– Contractual reports– Budget control– Inspector’s performance
Contract ManagementContract Management
6. ISQ Participation @ the LHC 6. ISQ Participation @ the LHC ProjectProject
TECHNICAL
New equipment expertise:– SC Cables– Magnets– Vacuum– Cryogenics, …
Data Management Process
International Environment
Project OutcomeProject Outcome
Management
New experience and knowledge– Large scientifi c projects– High tech projectImportant reference for similar international projects– SC Cables– Magnets– Vacuum– Cryogenics,– ITER
Financial
7. Other Projects - Engineering7. Other Projects - Engineering
1. Study of new Non Destructive Examination Methodologies on the Poloidal Field Superconductor Jacketing
2. Qualification of a Non Destructive Examination Solution based on Automatic UT (Phased Array) for the Toroidal Field Case Closure Welds – Austenitic materials with high thickness and variable geometry.
3. New methodologies for the control of the brasing between terminations of the superconductors junction (Coper-Coper)
4. Welding technology and Non destructive Examination training for F4E
Study of new Non Destructive Examination Methodologies on the Poloidal Field Superconductor Jacketing
ITER Magnet System
18 Toroidal Field (TF) coils
Central Solenoid (CS)
6 Poloidal Field (PF) coils
18 Correction Coils (CC)
H1
H2
WORK PERFORMED
Conventional Radiography with high sensitivity films
Computed Radiography
Computed Tomography
7.1 7.1 Other Projects - EngineeringOther Projects - Engineering
Flaws Notch 1 Notch 2 Notch 3 Notch 4 Notch 5 Hole 1 Hole 2
Conventional Radiography Detecte
dDetect
edDetect
edDetecte
dTough
ShallowDetect
edDetect
ed
Computed Radiography Detecte
dDetect
edDetect
edDetecte
dShallow Detect
edDetect
ed
Computed Tomography Detecte
dDetect
edDetect
edDetecte
dDetecte
dDetect
edDetect
ed
7.1 7.1 Other Projects - EngineeringOther Projects - Engineering
20
Transmitter
Receiver
Squint angle
0<Z<25
Vertical scanning
Qualification of a Non Destructive Examination Solution based on Automatic UT (Phased Array) for the Toroidal Field Case Closure Welds – Austenitic materials with high thickness and variable geometry.
7.2 7.2 Other Projects - EngineeringOther Projects - Engineering
Qualification of a Non Destructive Examination Solution based on Automatic UT (Phased Array) for the Toroidal Field Case Closure Welds – Austenitic materials with high thickness and variable geometry.
7.2 7.2 Other Projects - EngineeringOther Projects - Engineering
New methodologies for the control of the brasing between terminations of the superconductors junction (Coper-Coper)
7.3 7.3 Other Projects - EngineeringOther Projects - Engineering
New methodologies for the control of the brasing between terminations of the superconductors junction (Coper-Coper)
7.3 7.3 Other Projects - EngineeringOther Projects - Engineering
7. 7. Other Projects – Quality Other Projects – Quality Assurance and InspectionsAssurance and Inspections
QA/QC EFDA
As a result of a collaboration with IPFN, ISQ as placed in EFDA a co-worker at the position of QA/QC.
This co-worker has latter changed from EFDA to F4E where he maintains the same responsibilities, being the the representative of Quality Assurance at Fusion for Energy
7. 7. Other Projects – Quality Other Projects – Quality Assurance and InspectionsAssurance and Inspections
ESO (European Organisation for Astronomical Research in the Southern Hemisphere)Quality Audit of Cryostat Production (for VLT) : 2007Scope•Review of ESO relevant documentation•Definition of Audit scope (objectives, responsibilities, processes and documentation to be audited)•Definition of Audit requirements according to the project reference documentation•Audit at suppliers premises•MoM issuing•Final Audit report issuing (audited processes, personnel contacted, documentation reviewed, non-conformities, improvement opportunities)
7. 7. Other Projects – Quality Other Projects – Quality Assurance and InspectionsAssurance and Inspections
ESO (European Organisation for Astronomical Research in the Southern Hemisphere)Quality and Product Assurance to the E-ELT Project – 2010 -...
E-ELT - European Extremely Large Telescope, is a revolutionary new ground-based telescope concept that will be 42 metres in diameter and will be the world's biggest eye on the sky.Scope• Review of ESO PA and QA manuals and procedures in the context of the various ESO contracts with particular attention to issues that may become cost drivers.• Provide a list of suggested modifications to ESO standards• Review of requirements of the technical specifications in the light of the quality and product assurance matters• Review of documentation generated by suppliers• Reporting to E-ELT project office.
7. 7. Other Projects – Quality Other Projects – Quality Assurance and InspectionsAssurance and Inspections
ESAGSE & Ground Units Certification in the context of ESA ProgramsScopeConformity assessment of the ground units that can be used in different countries (amongst others, France for the Guyana Space Centre, the USA for the Kennedy Space Center and the Vandenberg Air Force Base, and Russia for the Plessetsk and Baykonur Cosmodromes), including:Listing the systems prone to risk covered in the study and analysing the regulations of the countries in which these systems may be implemented, Cross-analyses of regulationsDefinition of certification processesSpecifications drawn up for the various types of ground equipment and units used by the ESA. ActivitiesConsultingConformity Assessment
ESAConsultancy (Technical Assistance) to ESTECRESIDUAL STRESS MEASUREMENTS IN WELDED Ti ALLOY PLATES SUPPORT TO THE METROLOGY LABORATORY ON THE ACCREDITATION IN ROUNDNESS MEASUREMENTS - Support to ESTEC Metrology Laboratory on its accreditation with ISO 17025 in roundness measurements.FATIGUE TEST OF THREADED A2-70 SIZE M5 FASTENERS - To present a test program to establish the fatigue strength of “cheese head” M5 size, fasteners made of A2-70 austenitic stainless steel, according to DIN912.ScopeLaboratory measurements and measurement tools development;Consultancy on metrological technology, procurement, equipments maintenance, installation support and procedures;Procedures developmentTraining in specific measurement techniques;Feasibility Assessment;
7 7 Other Projects - TestingOther Projects - Testing
Alcatel-Alenia Space: Re-entry simulation test on metallic TPS
To perform several cycles simulating the re-flight of a reasonable re-entry system.The tests will be performed in test articles with a maximum temperature on the test article of 900ºC, with pressure variable from 5hPa up to ambient pressure.Data will be gathered from 19 thermocouples, 6 displacement sensors and 1 pressure sensor.
7 7 Other Projects - TestingOther Projects - Testing
SNECMA PROPOLSION SOLIDE – Windward and Nose C/SiC Assembly Tests
IXV program is an ESA program, which aim is to study the atmospheric re-entry with a vehicle namedIntermediate eXperimental Vehicle. Snecma Propulsion Solide is responsible for the Windwardassembly and the Nose assemblyScopeMechanic and thermal characterisation of the attachment system:Mechanical test on the MACOR washersMechanical characterization of the standoffCharacterization of the screw with a constant temperatureThermal characterization
Insulation TestsElementary insulation characterizationInsulation interface thermal characterization
Engineering testthermomechanical characterizationsInsulation stack-up thermal characterization
7 7 Other Projects - TestingOther Projects - Testing
Thales Alenia Space: FLPP- Future Launchers Preparatory Program Period 2 Step 1 Cryogenic Upper Stages Technology - CUST 1.1 – In Progress
Scope• Test Campaign Definition and Planing• Test Procedures and Facility Set-up / Test Execution• Raw Materials and Technology Process Samples• Mechanical tests• Thermal tests• Modal Survey on Full Scale Panel• Sinusoidal and Random Tests on Full Scale Panel
7 7 Other Projects - TestingOther Projects - Testing
AIRBUSEMOC Coupons Tests – in ProgressAs part of the Multi Disciplinary Optimised Wing Project WP3.2.1.4, this test campaign is being carried out to understand the effect of absorbed moisture on composite materials (EMOC). These tests will provide preliminary information on the effect of absorbed moisture temperature on strength.Specimens will undergo environmental conditioning prior to testing and be subject to strict environment control. The tests themselves will also be carried out across a range of temperatures.
Scope• In plane shear tests• 90º tension tests• 0º compression tests• 90º compression tests• Open hole compression (OHC)• Filled hole compression (FHC)
7 7 Other Projects - TestingOther Projects - Testing
Welding Inspection during the fabrication of piping for the French Nuclear reactor RES – Project launched by the French partner APAVE
Welding Inspection during the fabrication of piping for the French Nuclear reactor Flamanville 3 – AREVA EPR - Project launched by the French partner APAVE
Non Destructive Examination, performed by ISQ Spain, for Tecnatom, during the periodic shut-downs of Spanish Nuclear Facilities in Valencia
7 7 Other Projects - NuclearOther Projects - Nuclear
8. The Future8. The Future
ISQ will maintain its strategy establishing it self as a partner for research and development during the engineering phase.
Following the first step, ISQ will approach the industry main contractors in the perspective of the technology transfer
Collaboration with the owner of the installation shall try to encompass services as technical inspections (on mechanical construction and electrical facilities) and 3rd party Quality Assurance
Act as a National SME integrator in multi-disciplinary projects that involve competences not available in-house.
Instituto de Soldadura e Qualidade
2010
ISQ
A Quality and Technology Network