A Bridge to the Comarca Del Puente Engineering Corrinne Beyer, Jillian Broadbent (PM), Wesley Karras, Carissa Maes, Thomas Stroup Community Background Embera-Wounaan Comarca, Darién province, Panama Six communies totaling 2,000 people Alto Playón Closest to Puerto Limón, desired bridge locaon Subsistence farmers 262 people - 45% under fiſteen years old Chucunaque River is an important resource Drinking water Bathing Laundry Defecaon Trash disposal No water purificaon or sanitaon system Project Descripon Puerto Limón - primary access to Comarca Temporary bridge built during dry season Allows vehicular travel Only lasts 3 weeks - 3 months Rainy season travel is by motorized dugout canoe 10 minute - 4 hour ride Gas is expensive Benefits Opportunity to sell crops outside of community Accessible and affordable connued educaon Safer and shorter travel Design Components Suspension bridge 275 ſt span 15 ſt clearance above 100-year flood level 8 ſt camber Supports pedestrian and equestrian loading 50 ſt steel towers Steel cables and suspenders Concrete tower foundaons Concrete anchor blocks 4 ſt wide mber decking Gabion system for slope protecon Sloped gravel approach Cost Breakdown Anchor Blocks ······························································· $54,800 Approaches ········································································ $300 Cables ··········································································· $88,100 Gabions ······································································· $170,000 Towers··········································································· $32,700 Tower Foundaons ······················································· $21,500 Walkway········································································ $50,600 Total Esmated Project Cost ······································· $418,000 Advisors: Mr. Michael T. Drewyor, P.E., P.S. and Dr. David Watkins, PhD, P.E. Peace Corps Volunteer: Amber Naylor Panamanian Contact: Larry Belken, CH2M Hill Objecve To aid the communies of the Embera-Wounaan Comarca with the development of a footbridge in order to provide safer, more convenient, less expensive and faster travel year-round. Civil Engineering Internaonal Senior Design CE 4916 Fall 2013 Alto Playón Implementaon Requirements Professional Engineer review Potenal funding Bridges to Prosperity Engineers Without Borders Material donaons Formaon of local bridge commiee Banking system Maintenance training
Transcript
Page 1: A ridge to the omarca - Michigan Technological Universitydwatkins/idesign09/2013/Del Puente... · 2013. 12. 13. · A ridge to the omarca Del Puente Engineering orrinne eyer, Jillian

A Bridge to the Comarca Del Puente Engineering

Corrinne Beyer, Jillian Broadbent (PM), Wesley Karras, Carissa Maes, Thomas Stroup

Community Background Embera-Wounaan Comarca, Darién province, Panama Six communities totaling 2,000 people Alto Playón Closest to Puerto Limón, desired bridge location Subsistence farmers 262 people - 45% under fifteen years old Chucunaque River is an important resource Drinking water Bathing Laundry Defecation Trash disposal No water purification or sanitation system

Project Description Puerto Limón - primary access to Comarca Temporary bridge built during dry season Allows vehicular travel Only lasts 3 weeks - 3 months Rainy season travel is by motorized dugout canoe 10 minute - 4 hour ride Gas is expensive Benefits Opportunity to sell crops outside of community Accessible and affordable continued education Safer and shorter travel

Design Components Suspension bridge 275 ft span 15 ft clearance above 100-year flood level 8 ft camber Supports pedestrian and equestrian loading 50 ft steel towers Steel cables and suspenders Concrete tower foundations Concrete anchor blocks 4 ft wide timber decking Gabion system for slope protection Sloped gravel approach

Cost Breakdown Anchor Blocks ······························································· $54,800 Approaches ········································································ $300 Cables ··········································································· $88,100 Gabions ······································································· $170,000 Towers ··········································································· $32,700 Tower Foundations ······················································· $21,500 Walkway········································································ $50,600 Total Estimated Project Cost ······································· $418,000

Advisors: Mr. Michael T. Drewyor, P.E., P.S. and Dr. David Watkins, PhD, P.E. Peace Corps Volunteer: Amber Naylor

Panamanian Contact: Larry Belken, CH2M Hill

Objective To aid the communities of the Embera-Wounaan Comarca with the development of a footbridge in order to provide safer, more convenient, less expensive and faster travel year-round.

Civil Engineering International Senior Design CE 4916 Fall 2013

Alto Playón

Implementation Requirements Professional Engineer review Potential funding Bridges to Prosperity Engineers Without Borders Material donations Formation of local bridge committee Banking system Maintenance training