14
A S I A E N E R G Y PLC 1 Phulbari Coal Project UK November 29th, 2005
Transcript
Page 1: A S I A E N E R G Y PLC Phulbari Coal Project · 2017-09-04 · A S I A E N E R G Y PLC 14 Important Notice… – These presentation materials (“the Presentation Materials”)

A S I A E N E R G Y PLC

1

Phulbari Coal Project

UK

November 29th, 2005

Page 2: A S I A E N E R G Y PLC Phulbari Coal Project · 2017-09-04 · A S I A E N E R G Y PLC 14 Important Notice… – These presentation materials (“the Presentation Materials”)

A S I A E N E R G Y PLC

2

Phulbari

Ishurdi

Darshana

Khulna

Mongla

Akram point

Jamuna Bridge

Hardinge Bridge

Dhaka

Gazipur

Chandpur

Chittagong

The Phulbari Coal Project…

India

Handymax 40-45ktPanamax 55-70kt

Presenter
Presentation Notes
The shipment of the coal to the world market is a complex process, the coal need to be; Mined; Washed; Classified; Loaded on trains; Travel a distance of 361 km by train; Unloaded from the train and placed in stockpile of 400,000 tonnes plus; Loaded into barges; Sailed down river over a distance of some 60 nautical miles (111 km); Transferred from the barges to the sea going ships and then send to the customers. To do this the barrier to the sea need to be removed by dredging.
Page 3: A S I A E N E R G Y PLC Phulbari Coal Project · 2017-09-04 · A S I A E N E R G Y PLC 14 Important Notice… – These presentation materials (“the Presentation Materials”)

A S I A E N E R G Y PLC

3

Placing…

• US$52M (gross) placing through JPMorgan Cazenove

• Allocation Preference existing Institutionalshareholders

• Firm Placing + Conditional Placing EGM

• EGM for Conditional Placing 22nd December

Page 4: A S I A E N E R G Y PLC Phulbari Coal Project · 2017-09-04 · A S I A E N E R G Y PLC 14 Important Notice… – These presentation materials (“the Presentation Materials”)

A S I A E N E R G Y PLC

4

Reasons for Placing…

• Fund certain initial Project development activities in order to achieve current mining plans

• Mining Equipment:• purchase initial gear site preparation / operator training• deposit for larger equipment join manufacturers’ delivery queue

• Resettlement & Community:• Commence Land Acquisition Process

– Initial mining area– Model village initial resettlement site

Page 5: A S I A E N E R G Y PLC Phulbari Coal Project · 2017-09-04 · A S I A E N E R G Y PLC 14 Important Notice… – These presentation materials (“the Presentation Materials”)

A S I A E N E R G Y PLC

5

Reasons for Placing…

• Water Management:– Purchase pumps / associated equipment– Commence dewatering

• preparation for mining late 2006

• Administration & Development:– Build Project development team– Detailed mine planning– Production scheduling– Contract preparation

Page 6: A S I A E N E R G Y PLC Phulbari Coal Project · 2017-09-04 · A S I A E N E R G Y PLC 14 Important Notice… – These presentation materials (“the Presentation Materials”)

A S I A E N E R G Y PLC

6

Resettlement & CommunityUS$10M

Mining Equipment & DepositsUS$23M

Administration & DevelopmentUS$9M Water Management (Dewatering)

US$8M

Net Placing Proceeds Expenditure…

TOTAL US$50M (net) approx. 1/3 of Project Expenditure 2006

Page 7: A S I A E N E R G Y PLC Phulbari Coal Project · 2017-09-04 · A S I A E N E R G Y PLC 14 Important Notice… – These presentation materials (“the Presentation Materials”)

A S I A E N E R G Y PLC

7

Funding Strategy…• Life-of-Mine model estimates:

– US$1.07B (excl. financing costs) required before Project reaches +ve cashflow in 3rd year coal production (2010)

– CAPEX US$850M – Net OPEX US$220M …to 2010

• 14%2006… 44%2007… 34%2008… 8% 2009 • Estimates will continue to be optimised in lead up to

finalising Banking Project Info Memo

Page 8: A S I A E N E R G Y PLC Phulbari Coal Project · 2017-09-04 · A S I A E N E R G Y PLC 14 Important Notice… – These presentation materials (“the Presentation Materials”)

A S I A E N E R G Y PLC

8

Funding Strategy…• Barclays Capital August 2004 financial advisors• Finance Options being evaluated (but not limited to):

– Equity– Project debt– Debentures– Convertible debentures– Export credit agencies– Multi & bi-lateral agencies– Off-take agreements– JV partners

• Financing structure part of finance process commencing early 2006

Page 9: A S I A E N E R G Y PLC Phulbari Coal Project · 2017-09-04 · A S I A E N E R G Y PLC 14 Important Notice… – These presentation materials (“the Presentation Materials”)

A S I A E N E R G Y PLC

9

Progress Phulbari Coal Project …

• Resource of 572 million tonnes• Approx. 93% Measured + Indicated• Drilling / Geophysics:

• basin extends southwards (remains open)• Diverse Product Mix:

• Thermal & Semi Soft Coking Coal

• Comprehensive Study Completed:• First coal 2008• 15Mtpa saleable coal by 2013• >30 year Project life• Lowest Quartile Cost Producer

(<US$25/tonne)

Page 10: A S I A E N E R G Y PLC Phulbari Coal Project · 2017-09-04 · A S I A E N E R G Y PLC 14 Important Notice… – These presentation materials (“the Presentation Materials”)

A S I A E N E R G Y PLC

10

Thermal Coal Cash Cost Curve2005 Thermal Coal FOB Cash Cost Curve

adjusted to 6350kcal/kg gar

-

5

10

15

20

25

30

35

40

45

50

0 40 80 120 160 200 240 280 320 360 400 440 480 520Million Tonnes

USD

per

Ton

ne

Australia Indonesia China South africa Colombia Venezuela Russia East Russia West Poland Vietnam USA Canada

Page 11: A S I A E N E R G Y PLC Phulbari Coal Project · 2017-09-04 · A S I A E N E R G Y PLC 14 Important Notice… – These presentation materials (“the Presentation Materials”)

A S I A E N E R G Y PLC

11

Metallurgical (Non HCC) Cash Cost Curve2005 Metallurgical Coal FOB Cash Cost Curve

-

10

20

30

40

50

60

70

0 10 20 30 40 50 60 70

Million Tonnes

USD

per

Ton

ne

Australia Canada China South africa Venezuela Russia East USA Indonesia

Page 12: A S I A E N E R G Y PLC Phulbari Coal Project · 2017-09-04 · A S I A E N E R G Y PLC 14 Important Notice… – These presentation materials (“the Presentation Materials”)

A S I A E N E R G Y PLC

12

Progress Phulbari Coal Project …

• Coal Export:• Rail / River Barge / Port Infrastructure

requirements established• Environment Clearance

• from GoB September 2005• Feasibility/Scheme of Development

• to GoB October 2005

NEXT STEPS• Commence initial development activity• Final Project Approval GoB• Complete Banking Project Info Memo• Project Funding…assistance from BarCap

Page 13: A S I A E N E R G Y PLC Phulbari Coal Project · 2017-09-04 · A S I A E N E R G Y PLC 14 Important Notice… – These presentation materials (“the Presentation Materials”)

A S I A E N E R G Y PLC

13Phulbari Movie

Page 14: A S I A E N E R G Y PLC Phulbari Coal Project · 2017-09-04 · A S I A E N E R G Y PLC 14 Important Notice… – These presentation materials (“the Presentation Materials”)

A S I A E N E R G Y PLC

14

Important Notice…– These presentation materials (“the Presentation Materials”) in respect of Asia Energy Plc

(“the Company”) are being issued on a strictly private and confidential basis to, and only to, Investment Professionals as defined in Section 19 of the Financial Services and Markets Act (Financial Promotion) Order 2001, and are only available to and are only being made to such persons who have professional experience in matters relating to investments and those persons who do not have such experience should not act upon or rely on these Presentation Materials.

– The Presentation Materials do not constitute or form part of any offer for sale or subscription or any solicitation for any offer to buy or subscribe for any securities in the Company nor shall they or any part of them form the basis of or be relied upon in connection with any contract or commitment whatsoever. Although the statements of fact in this presentation have been obtained from and are based upon sources that the Directors believe to be reliable, the Directors do not guarantee their accuracy or completeness. All opinions and estimates included in this presentation constitute the Directors’ judgement as of the date of this presentation and are subject to change without notice.

– The Presentation Materials are being supplied to you for your own information and may not be reproduced, further distributed to any other person or published, in whole or in part, for any purpose whatsoever.


Recommended