A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING THE WEAKLY HARD REAL-TIME SYSTEMS HABIBAH BINTI ISMAIL A thesis submitted in fulfilment of the requirements for the award of the degree of Master of Science (Computer Science) Faculty of Computing Universiti Teknologi Malaysia JUNE 2013
Transcript
Page 1: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING THE WEAKLY

HARD REAL-TIME SYSTEMS

HABIBAH BINTI ISMAIL

A thesis submitted in fulfilment of the

requirements for the award of the degree of

Master of Science (Computer Science)

Faculty of Computing

Universiti Teknologi Malaysia

JUNE 2013

Page 2: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

iii

To my beloved husband, sons, daughter, mom, late father, siblings, parents-in-law,

brothers and sisters-in-law and families

Page 3: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

iv

ACKNOWLEDGEMENTS

First and foremost, I would like to express my sincere appreciation to my

supervisor, Associate Professor Dr Dayang Norhayati Abang Jawawi, for her

encouragement, guidance, critics, friendship, advices, motivations and constant help

during my study. Without her continued support and interest, this thesis would not

have been the same as presented here. I have learned a lot from her and I am

fortunate to have her as my mentor and supervisor.

I am also indebted to Universiti Teknologi Malaysia (UTM) for providing the

facilities, good environment and funds to support my study. All of UTM members

also deserve special thanks for their assistance in supplying the relevant efforts. Not

forgotten, the Research University Grant (RUG) and Fundamental Research Grant

Scheme (FRGS) for funding my study at UTM.

Also, I would like to thank profoundly to my fellow postgraduate’s friends

for their cooperation, supportive, views and help. My sincere appreciation also

extends to all my colleagues, especially in Embedded Real-Time and Software

Engineering Lab (EReTSEL), Software Engineering Research Group (SERG) and to

all those involved either directly or indirectly. Unfortunately, it is not possible to list

all of them in this limited space. Finally, I am grateful to all my family members for

their continuous support, love, help and attention.

Page 4: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

v

ABSTRACT

For real-time systems, hard real-time and soft real-time systems are based on

“miss restriction” and “miss tolerance”, respectively. However, a weakly hard real-

time system integrates both these requirements. The problem with these systems is

the limitation of the scheduling analysis method which only uses the traditional

scheduling approach. Besides that, the current framework has problems with the

complexity and predictability of the systems. This study proposed a scheduling

analysis framework based on the suitability of scheduling algorithms, weakly hard

real-time modelling and the combination of the deterministic and probabilistic

schedulability analyses for predicting the weakly hard real-time tasks. Initially, the

best fitting specification of a weakly hard real-time system was integrated into the

proposed framework and tested in the Modeling and Analysis of Real-Time

Embedded systems (MARTE) profile. The profile was enhanced because the current

MARTE timing constraint restricted to the hard and soft real time timing

requirement, thus some modifications were made to model the weakly hard real-time

requirements. For complex systems, rather than only using scheduling algorithms to

schedule the tasks, the algorithms were used with Unified Modeling Language

(UML) modelling. Sequence diagram complexity factor metrics were used to

measure the behavioural complexity. The proposed combination approach was

applied on case studies and then evaluated with reference to the existing approaches.

The results of the evaluations showed that the proposed framework is more

predictable compared to the other frameworks and has addressed the problem posed

in this research. In conclusion, the proposed scheduling analysis framework provides

a less complex design through the behavioural complexity measurements, as well as

increases the predictability of the systems.

Page 5: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

vi

ABSTRAK

Bagi sistem masa nyata, sistem masa nyata keras dan lembut masing-masing

adalah berdasarkan "sekatan kehilangan" dan "kehilangan bertoleransi". Walau

bagaimanapun, sistem masa nyata keras yang lemah menggabungkan kedua-dua

keperluan tersebut. Masalah dengan sistem ini adalah keterbatasan kaedah analisis

penjadualan yang hanya menggunakan pendekatan penjadualan tradisional. Selain

itu, rangka kerja semasa mempunyai masalah dengan kerumitan dan kebolehramalan

sistem. Kajian ini mencadangkan satu rangka kerja analisis penjadualan berdasarkan

kesesuaian algoritma penjadualan, pemodelan masa nyata keras yang lemah dan

gabungan analisis penjadualan berketentuan dan kebarangkalian untuk meramalkan

tugas masa nyata. Pada mulanya, spesifikasi terbaik telah disepadukan ke dalam

rangka kerja yang dicadangkan dan diuji dalam profil Pemodelan dan Analisis

Sistem Terbenam Masa Nyata (MARTE). Profil tersebut telah dipertingkatkan

kerana kekangan masa MARTE semasa terhad kepada keperluan masa nyata keras

dan lembut, dengan itu beberapa pengubahsuaian telah dibuat untuk memodelkan

keperluan masa nyata keras yang lemah. Bagi sistem yang kompleks, selain hanya

menggunakan algoritma penjadualan sahaja untuk menjadualkan tugas, algoritma

telah digunakan bersama dengan Bahasa Pemodelan Bersepadu (UML) model.

Metrik faktor kerumitan gambarajah berjujukan digunakan untuk mengukur

kerumitan tingkah laku. Pendekatan gabungan yang dicadangkan telah digunakan

pada kajian kes dan kemudian dinilai dengan merujuk kepada pendekatan yang sedia

ada. Keputusan penilaian menunjukkan bahawa rangka kerja yang dicadangkan

adalah lebih mudah diramalkan berbanding dengan yang lain dan ia telah menangani

masalah yang ditimbulkan dalam kajian ini. Kesimpulannya, cadangan rangka kerja

analisis penjadualan menyediakan reka bentuk yang kurang kompleks melalui

ukuran kerumitan tingkah laku, serta meningkatkan kebolehramalan sistem.

Page 6: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

vii

TABLE OF CONTENTS

CHAPTER TITLE

PAGE

DECLARATION DEDICATION ACKNOWLEDGEMENTS

ii iii iv

ABSTRACT v

ABSTRAK

vi

TABLE OF CONTENTS

vii

LIST OF TABLES xiii

LIST OF FIGURES xvi

LIST OF ABBREVIATIONS

xviii

LIST OF SYMBOLS xxi

1 INTRODUCTION 1.1 Overview

1.2 Background of the Problem

1.3 Formation of Research Questions

1.4 Objectives of the Study

1.5 Scope of the Research

1.6 Significance of the Study

1.7 Organization of the Thesis

1 1 4 8 11 11 12 12

Page 7: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

viii

2 LITERATURE REVIEW 2.1 Introduction 2.2 Schedulability Analysis 2.3 Various Schedulability Analysis Algorithms 2.3.1 Rate Monotonic Algorithm (RMA) 2.4 Comparison of the Scheduling Algorithms 2.4.1 Discussion on Schedulability Analysis 2.5 Specification of Weakly Hard Real-Time Systems 2.5.1 Skip factor, s 2.5.2 (m,k)-frim deadlines 2.5.3 Weakly Hard Constraints 2.6 Analysis of Weakly Hard Real-Time Systems 2.6.1 µ-patterns 2.7 Unified Modeling Language (UML)

2.7.1 UML for Schedulability, Performance and

Time 2.7.2 UML for Modeling and Analysis of Real-Time

Embedded systems 2.7.3 Evaluation on UML for Real-Time Profiles 2.7.4 Design Tool 2.7.5 Behavioral Complexity of Sequence Diagrams 2.7.6 Sequence Diagram Complexity Factors 2.8 Related Work Based on Scheduling Analysis in AMR Software 2.9 Related Work on Deterministic Schedulability

Analysis 2.10 Related Work on Probabilistic Schedulability Analysis

14 14 14 16 17 18 19 20 21 21 21 23 23 24 24 28 30 32 35 35 36 38 40

Page 8: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

ix

2.11 Related Work Based on Scheduling Analysis for Hard and Soft Real-Time Systems

2.12 Related Work Based on Scheduling Analysis for

Weakly Hard Real-Time System 2.13 Summary

43 44 49

3 RESEARCH METHODOLOGY 3.1 Introduction 3.2 Research Process 3.3 Research Methodology Phase 3.3.1 Phase 1: Literature Review 3.3.2 Phase 2: Comparative Analysis of Weakly Hard

Real-Time Specifications 3.3.3 Phase 3: Definition of Temporal Constraints

Model for Weakly Hard Real-Time Tasks 3.3.4 Phase 4: Selecting Scheduling Algorithms 3.3.5 Phase 5: Modification of UML Profiles to Model Weakly Hard Real-Time Requirements 3.3.6 Phase 6: A Proposed Scheduling Analysis

Framework 3.3.7 Phase 7: Elaboration of Result Analysis and

Conclusion 3.5 Case Studies 3.5.1 Autonomous Mobile Robot System Case Study 3.5.2 Robotic Highway Safety Markers System Case

Study 3.6 Summary

50 50 50 53 53 54 54 56 57 58 59 60 61 63 64

4 COMPARATIVE ANALYSIS OF THE WEAKLY HARD REAL-TIME SPECIFICATIONS 4.1 Introduction

65 65

Page 9: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

x

4.2 Mobile Robot System Case Study for Weakly Hard

Real- Time Requirements 4.2.1 Hyperperiod Analysis 4.2.2 Weakly Hard Constraints 4.2.3 Discussion 4.3 General Comparison and Evaluation of Weakly Hard

Real-Time Specifications 4.4 Comparison Strategy and the Criteria for Weakly Hard

Real-Time Tasks 4.5 Comparison Results 4.5.1 Skip factor, s

4.5.2 (m,k)-firm deadlines

4.5.3 Weakly Hard Constraints 4.6 Summary and Discussion of the Comparison

4.7 Summary

66 67 68 69 69 75 76 76 80 83 86 89

5 PROPOSED SCHEDULING ANALYSIS FRAMEWORK FOR WEAKLY HARD REAL-TIME REQUIREMENTS 5.1 Introduction 5.2 The Proposed Scheduling Analysis Framework 5.2.1 Discussion on the Proposed Scheduling Analysis

Framework 5.3 Modification of UML Profiles for Weakly Hard Real-

Time Requirements 5.3.1 Strategy of Modification Process 5.4 UML-SPT Modifications for Weakly Hard Concept 5.5 MARTE Modifications for Weakly Hard Concept 5.6 Experimenting UML-SPT and MARTE on a Case

90 90 91 94 95 96 102 104

Page 10: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

xi

Study 5.6.1 Autonomous Mobile Robot System Case Study

5.7 Summary

107 108 114

6 EVALUATION OF THE PROPOSED SCHEDULING ANALYSIS FRAMEWORK 6.1 Introduction 6.2 Timing Analysis 6.2.1 Schedulability Analysis 6.2.2 Task Parameters 6.3 Deterministic Schedulability Analysis 6.4 Probabilistic Schedulability Analysis

6.5 Combination of Deterministic and Probabilistic Schedulability Analysis 6.5.1 Discussion on the Combination Approach 6.6 Behavioral Complexity Comparison 6.6.1 Sequence Diagram Complexity Factors

6.6.2 Behavioral Complexity of UML-SPT Sequence

Diagram 6.6.3 Behavioral Complexity of MARTE Sequence Diagram 6.7 Scheduling Analysis View

6.7.1 Domain Model for Schedulability Analysis

Modeling (SAM)

6.7.2 Discussion on the Results of Modification 6.8 Comparison of the Proposed Framework 6.8.1 Description of Comparison Criteria 6.9 Evaluation of the Proposed Framework

115 115 116 117 120 122 124 125 127 128 128 130 132 135 137 141 142 143 145

Page 11: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

xii

6.8.2 Definition of Evaluation Criteria 6.10 Summary

146 150

7 CONCLUSION AND RECOMMENDATIONS FOR FUTURE WORKS 7.1 Summary 7.2 Research Conclusion and Contribution 7.3 Recommendations for Future Works

151 151 154 156

REFERENCES 158

APPENDIX A 164

Page 12: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

xiii

LIST OF TABLES

TABLE NO.

TITLE PAGE

2.1

Significant terms in schedulability analysis 15

2.2 Comparison of the scheduling algorithms 18

2.3 Weakly hard constraints 22

2.4 UML-SPT, SAProfile common stereotypes 27

2.5 UML-SPT, PAProfile common stereotypes 27

2.6 UML-MARTE, SAM Profile common stereotypes 30

2.7 Evaluation of UML for real-time profiles based on specified criteria

31

2.8 Comparison of Papyrus and Rhapsody tools 34

2.9 Related work based on scheduling analysis in AMR 37

2.10 Related work on deterministic schedulability analysis

39

2.11 Related work on probabilistic schedulability analysis 42

2.12 Related work based on scheduling analysis for hard and soft real-time systems

43

2.13 Related work based on scheduling analysis framework for weakly hard real-time systems

48

3.1 Phases and steps in the research methodology 59

3.2 Example task set; the worst case response times of the task set; the Cruise task misses its deadlines in the worst case

62

Page 13: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

xiv

3.3 Worst case response times of the task set; Way-point3 and Way-point4 tasks miss their deadlines in the worst case

64

4.1 Differences between ai and Ai, Hyperperiod H = 2000 68

4.2 Evaluation of weakly hard specifications based on specified criteria

72

4.3 Evaluation based on the process model for skip factor, s 77

4.4 Evaluation based on temporal specifications for skip factor, s

78

4.5 Evaluation based on predictability for skip factor, s 79

4.6 Evaluation based on temporal specifications for (m,k)-firm deadlines

81

4.7 Evaluation based on predictability for (m,k)-firm deadlines 82

4.8 Evaluation based on temporal specifications for the weakly hard constraints

84

4.9 Evaluation based on predictability for the weakly hard constraints

85

4.10 Summary of the comparison 87

5.1 SAprofile stereotypes and tags for UML-SPT profile 98

5.2 SAM profile stereotypes and tags for UML-MARTE profile

99

5.3 Schedulability analysis of the UML-SPT 100

5.4 Schedulability analysis of the UML-MARTE 101

5.5 Task parameters of the task set 109

6.1 Tasks with temporal parameter for each task (7 tasks)

122

6.2 Tasks with temporal parameter for each task (9 tasks) 122

6.3 Results of deterministic schedulability analysis for AMR task set

123

6.4 Results of deterministic schedulability analysis for RHSM task set

123

6.5 Results of probabilistic schedulability analysis for AMR

Page 14: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

xv

task set

124

6.6 Results of probabilistic schedulability analysis for RHSM task set

125

6.7 6.8 6.9

Results of combination for AMR task set Results of combination for RHSM task set Result of behavioral complexity of designed sequence diagrams

126 127 134

6.10 Mapping from design model to schedulability analysis 136

6.11

Comparison of scheduling analysis frameworks 144

6.12 Summary of comparison 145

6.13 Comparison criteria for evaluation 147

6.14 Comparison of related framework 147

6.15 Summary of the evaluation 149

6.16 Availability count criterion for each framework 150

Page 15: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

xvi

LIST OF FIGURES

FIGURE NO.

TITLE PAGE

2.1 UML-SPT structure 26

2.2 UML-MARTE structure 29

3.1 Research process flow 51

4.1 Process flow of the comparison 75

4.2 5.1 5.2

Skipping a task Proposed scheduling analysis framework Process flow of the strategy of modifications

80 93 97

5.3 UML-SPT SAprofile metamodel 103

5.4 UML-SPT PAprofile metamodel 104

5.5 5.6

SAM_Workload metamodel using Rhapsody tool SAM_Workload metamodel

105 106

5.7 SAM_Workload metamodel using Papyrus tool 107

5.8 UML-SPT sequence diagram of AMR case study in schedulability analysis modeling using Rhapsody tool

110

5.9 UML-SPT sequence diagram of AMR case study in performance analysis modeling using Rhapsody tool

111

5.10 MARTE sequence diagram of AMR case study in analysis modeling using Rhapsody tool

112

5.11 MARTE sequence diagram of AMR case study in analysis modeling using Papyrus tool

113

Page 16: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

xvii

6.1(a) UML-SPT sequence diagram of AMR case study in schedulability analysis modeling

130

6.1(b) UML-SPT sequence diagram of AMR case study in performance analysis modeling

131

6.2 MARTE sequence diagram of AMR case study in analysis modeling

133

6.3 Resources platform 138

6.4 Workload situation 139

6.5 Scenario behavior 140

6.6 Workload behavior 141

Page 17: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

xviii

LIST OF ABBREVIATIONS

AMR

- Autonomous Mobile Robot

BMS - Bi-Modal Scheduler

BWP - Blue When Possible

CAN - Controller Area Network

CBS - Constant Bandwidth Server

C(SQ) - Sequence Diagram Complexity

DBP - Distance-Based Priority

DMA

- Deadline Monotonic Algorithm

DWCS - Dynamic Windows-Constrained Scheduling

EDF - Earliest Deadline First

EPL - Eclipse Public License

FP - Fixed-Priority

GA - Genetic Algorithm

GCM -

Generic Component Model

GQAM

- Generic Quantitative Analysis Modeling

GRM - General Resource Modeling

HLAM - High-Level Application Modeling

HRM - Hardware Resource Modeling

LCM - Least Common Multiple

Page 18: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

xix

LST-CAN -

Latest Send Time-CAN

MARTE - Modeling and Analysis of Real-Time Embedded systems

NIMSAD - Normative Information Model-based Systems Analysis and Design

OMG

- Object Management Group

PAM - Performance Analysis Modeling

PDF - Probability Density Function

PFs - Probability Functions

PTDA - Probabilistic Time Demand Analysis

RHSM - Robotic Highway Safety Markers

RLP - Red as Late as Possible

RMA - Rate Monotonic Algorithm

RM-RTO - Rate Monotonic RTO

RTO - Red Tasks Only

SAM - Schedulability Analysis Modeling

SDCF - Sequence Diagram Complexity Factors

SMUF - Sequence Method Utilization Factor

SMW - Sequence Message Weight

SOW - Sequence Object Weight

SPT - Schedulability, Performance and Time

SRM - Software Resource Modeling

SRMS - Statistical Rate Monotonic Scheduling

STDA - Stochastic Timed Demand Analysis

SysML - Systems Modeling Language

TDA - Time Dilation Algorithm

Page 19: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

xx

TDA - Time Demand Analysis

UML - Unified Modeling Language

WCET - Worst Case Execution Time

WCRT - Worst Case Response Times

WHRTCBS - Weakly Hard Real-Time Constant Bandwidth Server

Page 20: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

xxi

LIST OF SYMBOLS

Di - Deadline

Ti - Period

Ci - Worst case execution time

t - Time instant

U - Utilization factor

N - The number of tasks

ґi - Task

µi - Worst case execution pattern

Ri - Worst case response times

k - Upper bound

H - The period of time is called the hyperperiod

hi The number of invocations of a task in the hyperperiod at level i

Ai Task invoked in the hyperperiod

ai Task invoked in the hyperperiod at level i

λ - Weakly hard constraints

hp - The set of higher priority tasks

Gi - Equal to the worst case execution time

(┼) - Explicitly mentioned

Page 21: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

xxii

(┬) - Implicitly mentioned

(—) - Not mentioned at all

Page 22: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

CHAPTER 1

INTRODUCTION

1.1 Overview

Real-time systems are computer systems in which the correctness of the

system depends not only on the logical results, but also on the time factors at which

the results are produced. Formally, a classification of real-time tasks or systems is

based on the importance of missing a deadline.

Traditional real-time systems are classified into two categories, namely, hard

real-time systems and soft real-time systems (Shin et al., 1994). In applications of

real-time for hard real-time systems, no missed deadline is tolerated; in other words,

the deadline must be met successfully, otherwise there is a damaging effect on the

system. For soft real-time systems, the missed deadline is tolerated as long as it is

minimised and occurs occasionally; however, the term “occasional” is not precise.

Nevertheless, it is still acceptable even though the task is delayed because missing a

deadline usually happens in a non-predictable way.

Page 23: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

2

The new generation for a real-time system is the weakly hard real-time

system which provides a mechanism that can tolerate some deadlines using

specifications in a clear, predictable and bounded way where the deadlines can be

missed; thus, the following advantages have been identified when defining weakly

hard tasks in a real-time system (Bernat et al., 2001):

• Alleviating the pessimism in the parameters of the system and worst-

case scenarios as occurs with all hard real-time tasks.

• Providing a mechanism for fair degradation of the quality of the

service tasks.

• Obtaining a fair mechanism for deciding which task needs to be

skipped during transient overload.

A hard real-time system is very restrictive because all the tasks must meet the

deadlines or, in other words, no deadlines are allowed to be missed. Meanwhile, a

soft real-time system is too relaxed because no guarantee can be given to the

deadline, whether it is met or missed. As hard real-time and soft real-time systems

are based on “miss restriction” and “miss tolerance”, respectively, the weakly hard

real-time system can integrate both of these requirements in which the distribution of

its met and missed deadlines during a window of time is precisely bounded. For

weakly hard real-time tasks, the missed or lost deadline happens occasionally and it

can be considered, however it is still necessary and crucial to finish the tasks within a

given deadline, otherwise failure occurs for the tasks. In a weakly hard real-time

system, the number of deadlines that may be missed can be specified; in other words,

it may specify exactly how many deadlines may be missed in the worst case. This

makes a weakly hard real-time system stronger than a soft real-time system.

Multimedia systems are a typical example of systems with weakly hard real-

time requirements because in such a system is it unnecessary to meet the entire tasks

and the deadlines as long as the misses (or deadlines) are spaced distantly/evenly.

Hard tasks usually co-exist with soft tasks; thus, it means that most hard real-time

tasks are not that hard actually. The occasional miss or loss of some deadline can be

Page 24: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

3

tolerated but missing deadlines have to be stated precisely; that is, the way it happens

is predictable and accurately known. For example, in autonomous mobile robot

(AMR) systems, the tasks are divided into two group (or types) according to hard and

soft real-time tasks (Jawawi et al., 2006). Thus, missing the deadlines of certain tasks

is acceptable for AMR software. As a consequence, AMR can be defined as weakly

hard real-time tasks.

A framework for the schedulability analysis of real-time tasks can determine

whether a specific task set derived from a software model can satisfy certain timing

constraints and can be successfully scheduled. That framework enables scheduling

analysis to predict the behaviour of critical tasks by meeting the deadline and at the

same time predicting the bounded way in which missing of some deadlines is

acceptable by comparison to less critical tasks (Bernat, 1998). A more realistic

framework is required for the scheduling analysis of weakly hard real-time tasks

because the constraints of missing deadlines do not exist in hard real-time task

analysis frameworks and are not stated precisely in soft real-time tasks analysis

frameworks (Bernat et al., 2001).

In order to determine whether a real-time system can run within the timing

constraints put upon it, a number of different algorithms have been designed to

analyse a system and determine whether it is schedulable or not. The timing

constrained requirements are the direct input for the scheduling analysis algorithms.

Scheduling analysis is a mathematically sound way of predicting the timing

behaviour of a set of real-time systems (Klein, 1993). There are many scheduling

policies that can be used in real-time system development. The most well-known and

widely-used scheduling algorithms for real-time tasks are the rate monotonic (RM)

algorithm and deadline monotonic (DM) algorithm for fixed priority scheduling and

the “earliest deadline first” (EDF) algorithm for dynamic priority scheduling (Liu and

Layland, 1973).

Modelling timing constraints and scheduling behaviour through the

adaptation of modelling language is recognised as an alternative way to predict the

timing behaviour and performance of set concurrent tasks in order to react to the

Page 25: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

4

changing environment (Jensen, 2009). This is due to the increasing complexity of

contemporary ubiquitous real-time systems which require an adequate modelling

language. The well-known and most widely-used modelling language for software

modelling systems is the Unified Modelling Language (UML). The new extension

for the UML profile, called Modelling and Analysis of Real-Time Embedded

(MARTE) system, has been standardised by the Object Management Group (OMG)

to be the future standard for UML modelling of real-time and embedded systems

although a number of other modelling standards exist already (MARTE OMG,

2007). This new profile is intended to replace the existing UML Profile for

Schedulability, Performance and Time (SPT) because MARTE provides some new

key features such as support for non-functional property modelling and adds rich

time and resource models to the UML.

1.2 Background of the Problem

The accuracy of real-time software depends not only on the logical results,

but also on the time at which the outputs are generated. This is due to the fact that

these software systems interact with the physical world or environment via sensors

and actuators and this environment changes with time. Thus, real-time software is

difficult to develop because, besides the functionality, the timing of each software

task is an important factor that needs to be considered.

Due to the need for timing analysis, scheduling theories have been developed

to provide and offer mathematically fundamental tools to predict the timing

behaviour of set concurrent tasks. However, these theories have not fulfilled most of

the application requirements since the scheduling algorithms have been successfully

executed only on feasible systems (systems in which all the deadlines have to be

met) and on infeasible systems (systems which could tolerate missed deadlines), as

the performance for such algorithms may be executed poorly and may be

unacceptable (Anderson and Baruah, 2004). Zhu (2009) presented weakly hard real-

time combination constraints and proposed a new Constant Bandwidth Server (CBS)

Page 26: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

5

algorithm, which uses weakly hard real-time systems to reduce the variance in all

tasks (called WHRTCBS). However, the WHRTCBS cannot apply to the periodic

tasks because the tasks of the WHRTCBS are aperiodic tasks and their deadlines are

random.

For complex systems, besides using the scheduling algorithms only to

schedule tasks and determine whether a task is schedulable or not, the algorithms can

be used together with UML because UML is a commonly accepted modelling

language for complex systems (Jensen, 2009). The MARTE profile, a standard was

defined to improve the specification of timing requirements and to prepare models

for timing analysis (Woodside, 2007). The problem with the current MARTE profile

is that its timing constraint has been restricted with hard and soft real-time systems.

For soft real-time systems, the timing requirement, called the “miss ratio” is already

defined in the MARTE profile. However, the window of time over the maximum

ratio is not well specified in the MARTE profile. Therefore, to specify the maximum

allowable deadlines that may be missed more precisely, weakly hard real-time

requirements need to be added to the MARTE profile.

The modelling profile must cope with the complexity of the system, including

the structure and behaviour aspects. As a result, it is essential to evaluate which

model copes with the complex structure and behaviour as well as its non-functional

requirements. The model’s features must allow designers to map the problem domain

semantic directly onto the model. This is beneficial for users in order to develop

maintainable and less complex real-time systems (Pereira, 2000). The behaviour of

the system is known as a set of external and internal sequences of events, actions and

transitions (Harel and Gery, 1997). It also can be said that the behaviour of a system

is the response to the external events and the execution of actions that are taken at

any time (Rational Software Corporation, 2003). Hence, it is important to measure

the behavioural complexity of design in weakly hard real-time systems in order to

reduce the system’s complexity.

Page 27: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

6

The most important feature of real-time systems is their predictability

(Goossens et al., 2001). The objective in real-time systems is to meet the timing

requirements of the tasks and the property required to do so is predictability. In real-

time systems it is required to guarantee that the temporal constraints will be met

during execution. Also, predictability requires that information about the system is

known. The schedule theory of the weakly hard real-time systems aims to solve the

situation that most real-time applications can tolerate certain deadlines to be missed

but the challenge is to ensure the missing of deadlines occurs under a precise

distribution over a finite time window (Zhu, 2009). Meeting all the deadlines is

impossible; thus, Bernat (1998) provided a conceptual framework for specifying real-

time systems that can tolerate occasional losses of deadlines in which the distribution

of the met and lost deadlines is precisely bounded.

Some researchers have considered the control system as a case study; for

example, Bernat and Cayssials (2001) used a robot control system case study to

apply a scheduling framework called the bi-modal scheduler. However, the DMA

they used for the schedulability analysis is not optimal for weakly hard systems.

Another similar work was done by Broster et al. (2002) in which they used weakly

hard constraints on a controller area network. However, the fault model used in the

schedulability analysis has limitations. Since a large number of studies on weakly

hard real-time systems have used mobile robot systems in their schedulability

analysis, it makes sense that the mobile robot control system case study is the best

case study for this type of study. This is supported further by the cases analysis

performed by Bernat et al. (2001) in which the robot control system was a system

mixture of hard and soft tasks, thus it can be described as a weakly hard task system.

It is generally required to specify the upper bounds on the number and pattern of

deadlines missed during a period of time.

Some promising efforts about the specification of weakly hard real-time

systems have been reported. For example, Hamdaoui and Ramanathan (1995)

presented the notion of (m, k)-firm deadlines to specify tasks (or messages) which are

desired meets at least m deadlines in any window of k consecutive invocations in the

context of scheduling messages. They declare that, for all the tasks, there is no

Page 28: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

7

differential between the parameters m and k. They presented a scheduling algorithm

called the distance-based priority (DBP) assignment, where tasks which are closer to

missing their (m, k)-firm constraint have higher priority. This approach is a best-

effort scheduling algorithm where no guarantee can be obtained and it offers a

straightforward priority assignment policy. It only works to minimise the number of

tasks that could be missed but no guarantee is given on the number of deadlines a

task can miss. However, those ideas only use the m and k deadline model while the

richer information on the whole pattern (zeroes and ones) contained is neglected.

Koren and Shasha (1995) introduced the skip-over scheduling algorithm in

which the algorithm skips some task invocations according to the notion of the skip

factor, s. If a task has a skip factor of s it will have one invocation skipped out of s

consecutive invocations. That means the distance between two consecutive skips

must be at least s periods (it can be specified as a (s – 1, s)-constraint). When s =

infinity (∞), no skips are permitted. However, the disadvantage of this skip constraint

is that a selected number of task invocations are discarded (or skipped) even though

the tasks could meet their deadline or there may be available computation resources

to finish on time.

Koren and Shasha (1995) also introduced the (m, k)-constraint which is

equivalent to the nm

constraint introduced by Bernat et al. (2001). This approach is

the closest technique to the one used in our study. They introduced the notion of the

nm

constraint that is useful for weakly hard real-time systems which are expanded

from the concept of mk

constraints. Most importantly, they clearly specified the

number of deadlines a task could miss and the pattern of how these deadlines can be

missed with the introduction of four temporal constraints, also known as weakly hard

constraints, and the two patterns (zeros and ones) that represent a missed deadline

with a 0 and a met deadline with a 1, also called the µ-patterns.

Page 29: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

8

As a result, a motivation arises from the review of these three works to

undertake an evaluation by comparing these three weakly hard real-time

specifications in order to find which specification is better in predicting the

behaviour of a task if a deadline is missed. This comparison can be based on several

criteria by experimenting with the case study.

1.3 Formation of Research Questions

Most existing frameworks for the analysis and scheduling of real-time tasks

are focused on hard and soft real-time tasks. A more suitable framework is required

for the scheduling analysis of weakly hard real-time tasks by using the weakly hard

constraints. The framework must enable the prediction of the behaviour of a task in

the case where deadlines are missed, including the number of deadlines missed and

how many times the tasks missed the deadlines.

As discussed in relation to the problem background, there are three well-

known specifications of weakly hard real-time systems. As each specification has its

own approach, it is essential to evaluate which specification is better able to predict

the behaviour and performance of a task. To do so, an initial evaluation must

compare the weakly hard real-time specifications that are commonly used in the

academic field.

As real-time systems become more complex, alternative methods are required

to reduce the complexity and to predict the timing behaviour of weakly hard real-

time tasks besides using the typical (or traditional) scheduling approach. Therefore,

in this research, a UML-MARTE profile will be used as the modelling language to

model weakly hard real-time systems. Nevertheless, the problem with the current

UML-MARTE profile is that it cannot support the timing requirements of weakly

hard real-time systems because its profile is restricted to hard and soft real-time

requirements (MARTE OMG, 2007). Thus, the existing UML-MARTE standard

Page 30: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

9

needs to be modified in order to implement weakly hard real-time tasks in the UML-

MARTE profile.

The issue arising herein is how to increase the predictability of weakly hard

real-time tasks in terms of the deadlines missed. This is because, even though some

deadlines can be missed, the tasks still need to be guaranteed to be predictable by

meeting the timing requirements, such as, specifying in clear such a met and missed

deadlines of the tasks. The problem with predictability in the current framework is

that its scheduling work is limited to the use of deterministic schedulability analysis

only; thus, to move away from this limitation, and domination; the deterministic

schedulability analysis can be used with probabilistic schedulability analysis in order

to provide more predictable weakly hard real-time tasks.

A research question needs to be answered in order to solve the research

problem. Derived from the research problem, the following research question is

addressed in this study:

How can a scheduling analysis framework with less complexity and more

predictability for weakly hard real-time task performance and behaviour

be developed?

To answer the main research question, the following sub-questions need to be

addressed:

1) How can the temporal constraints for weakly hard real-time

systems be defined?

a) What are temporal constraints and why do we need

temporal constraints?

b) What are the current specifications of weakly hard real-

time systems?

Page 31: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

10

c) What criteria should be considered in evaluating the

specification?

2) How can systems for weakly hard real-time tasks be scheduled?

a) Which scheduling algorithm is suitable to use with weakly

hard constraints?

3) How does the MARTE profile support weakly hard real-time

requirements?

a) Why is it necessary to model weakly hard real-time

requirements using the MARTE profile?

b) What are the problems with the current MARTE profile?

c) How can the MARTE support for weakly hard real-time

requirements be proved?

4) How can a probabilistic schedulability analysis be added to a

deterministic schedulability analysis?

a) Why is it necessary to propose the combination of

deterministic and probabilistic schedulability analyses?

b) Does the proposed framework perform better than the

existing framework?

c) What criteria should be considered in evaluating the

scheduling analysis framework?

Page 32: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

11

1.4 Objectives of the Study

The objectives of the study are as follows:

1) To enhance the UML-MARTE profile as the modelling language in

order to model weakly hard real-time requirements.

2) To propose a scheduling analysis framework based on the weakly hard

real-time modelling and the deterministic and probabilistic

schedulability analyses.

3) To evaluate the complexity of the profiles in the framework and to

evaluate the proposed scheduling analysis framework by comparison

with the existing framework.

1.5 Scope of the Research

The scope of this research is defined by the following parameters:

• It provides a framework for specifying real-time tasks that could allow

several deadlines to be missed occasionally.

• It uses a schedulability analysis to predict task performance.

• It focuses on mobile robot system requirements.

• It uses UML profiles for visualisation of the design model.

• It focuses on the basic real-time modelling and schedulability analysis

such as how to model the information required.

• It particularly deals with MARTE modelling capabilities to enable

predictive quantitative analysis, namely, schedulability for weakly

hard real-time tasks.

Page 33: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

12

1.6 Significance of the Study

This research aims to contribute towards improved real-time scheduling by

providing a scheduling analysis framework for predicting the weakly hard real-time

task behaviour and performance. In order to cope with the increasing complexity in

real-time systems, a modelling language is used, and as a way to address the problem

in the current profile, modifications of the UML-MARTE profile are done in order to

support the timing requirements and predictions of weakly hard real-time systems.

Moreover, in order to increase the predictability of weakly hard tasks in terms of the

number of deadlines missed, we propose the combination of deterministic and

probabilistic schedulability analyses.

1.7 Organisation of the Thesis

The thesis is structured in seven chapters. This chapter provided an overview

of weakly hard real-time systems. The background of the problem and the

motivations for the research were explained. The research objectives and scope were

also identified. Chapter 2 describes the basic theory of weakly hard real-time

systems. The literature on real-time systems is reviewed in order to understand the

work related to the objectives of the present research. Chapter 3 sets out the research

methodology and describes the research flow.

Chapter 4 explains the general comparisons and case study comparisons

carried out to investigate the best-fit weakly hard real-time specification. Chapter 5

presents the proposed scheduling analysis framework in detail, and discusses how it

can solve the two main issues of reducing system complexity and increasing the

predictability of the systems. Also, it explains the strategy of the modifications

processes of UML-SPT and UML-MARTE profiles. Chapter 6 provides a basic

schedulability analysis of the proposed framework. This includes analysis of the

combination approach and behavioural complexity measurements, and then the

Page 34: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

13

proposed scheduling analysis framework is evaluated by reference to the closest

extant research. In Chapter 7 we conclude our work and make suggestions for

promising directions in future research.

Page 35: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

158

REFERENCES

Agrawal, S., Shankar, R. and Ranvijay (2011). A Three Phase Scheduling for System

Energy Minimization of Weakly Hard Real-Time Systems. Global Journal of

Computer Science and Technology. vol. 11(10). version 1.0. May.

Anderson, J. H. and Baruah, S. K. (2004). Energy-Efficient Synthesis of Periodic

Task Systems upon Identical Multiprocessor Platforms. Proceedings 24th

International Conference on Distributed Computing Systems (ICDCS'04). 428-

435.

Arlitt, M. and Williamson, C. (1996). Web Server Workload Characterization: The

Search for Invariants. In Proceedings of the ACM SIGMETRICS ’96

Conference. Philadelphia, PA. May.

Atlas, A. K. and Bestavros, A. (1998). Statistical Rate Monotonic Scheduling. In

Proceedings of the 19th IEEE Real-Time Systems Symposium. December.

Madrid, Spain.

Audsley, N.C., Burns, A., Richardson, M.F., and Wellings A.J. (1991). Incorporating

Unbounded Algorithms into Predictable Real-Time Systems. Computer

Systems Science and Engineering. vol. 8(3). 80–89.

Audsley, N.C., Burns, A., Richardson, M.F., and Wellings A.J. (1991). Hard Real-

Time Scheduling: The Deadline-Monotonic Approach. In Proceedings 8th

IEEE Workshop on Real-Time Operating Systems and Software. May.

Audsley, N. C. and Burns, A. (1990). Deadline-Monotonic Scheduling. Technical

Report YCS146. Department of Computer Science, University of York, UK.

Bernat, G., Burns, A. and Llamosi, A. (2001). Weakly Hard Real-Time Systems.

IEEE Transactions on Computers. 50(4), April, 308-321.

Bernat, G. and Cayssials, R. (2001). Guaranteed On-line Weakly Hard Real-Time

Systems. 22nd IEEE Real-Time Systems Symposium (RTSS’01). December.

London, England: 25-35.

Page 36: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

159 Bernat, G. (1998). Specification and Analysis of Weakly Hard Real-Time Systems.

PhD Thesis. January. Department de les Ciències Matemàtiques i Informàtica.

Universitat de les Illes Balears. Spain.

Boegholm, T., Kragh-Hansen, H., Olsen, P., Thomsen, B. and Larsen, K.G. (2008).

Model-Based Schedulability Analysis of Safety-Critical Hard Real-Time Java

Programs. Proceedings of the 6th International Workshop on Java

Technologies for Real-Time and Embedded Systems (JTRES’08). September.

Santa Clara, California, USA: 106-114.

Booch, G., Rumbaugh, J. and Jacobson, I. (2005). Unified Modeling Language User

Guide, The (Addison-Wesley Object Technology Series). Addison-Wesley

Professional.

Broster, I. et al. (2003). FIRST Architecture Framework: Key Scheduling

Technologies for the Future. Deliverable D-AF.1-v1. January.

Broster, I., Bernat, G., and Burns, A. (2002). Weakly Hard Real-Time Constraints on

Controller Area Network. 14th Euromicro Conference on Real-Time Systems

(ECRTS’02). June. Vienna, Austria: 134.

Burns, A., Bernat, G. and Broster, I. (2003). A Probabilistic Framework for

Schedulability Analysis. Lecture Notes in Computer Science. vol. 2855. 1-15.

Burns, A. and Bernat, G. (2001). Jorvik: A Framework for Effective Scheduling.

Real-Time Systems Research Group. Department of Computer Science,

University of York, UK.

Cruz, R. L. (1991). A Calculus for Network Delay, Part 1: Network Elements in

Isolation. IEEE Trans on Information Theory. vol. 37(1). January. 114-131.

Diaz, J. L. and Lopez, M. L. (2001). Probabilistic Analysis of the Response Time in a

Real-Time Systems. Technical Report. University of Oviedo.

Douglass, B. P. (2004). Real Time UML: Advances in the UML for Real-Time

Systems. CA, USA: Addison Wesley Longman Publishing Co. Inc. Redwood

City.

Fischer, K., Hordys, G. and Vogel-Heuser, B. (2004). Evaluation of an UML

Software Engineering Tool by Means of a Distributed Real Time Application

in Process Automation. Lecture Notes in Informatics, Modellierung. 135-148.

Gardner, M. K. (1999). Probabilistic Analysis and Scheduling of Critical Soft Real-

Time Systems. PhD Thesis. University of Illinois, Urbana-Champaign.

Page 37: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

160 George, R. and Kanayama, Y. (1996). A Rate Monotonic Scheduler for the Real-

Time Control of Autonomous Robots. Proceedings of IEEE International

Conference on Robotics and Automation. 2804-2809.

Goossens, J. and Macq, C. (2001). Limitation of the Hyper-Period in Real-Time

Periodic Task Set Generation. In Proceedings of the RTS Embedded System

(RTS’01).

Hamdaoui, M. and Ramanathan, P. (1995). A Dynamic Priority Assignment

Technique for Streams with (m,k)-firm Deadlines. IEEE Transactions on

Computers. vol. 44(12). December. 1443-1451.

Harel, D. and Gery, E. (1997). Executable Object Modeling with Statecharts.

Computer 30(7). 31-42.

Harter, P. K. (1984). Response Times in Level Structured Systems. Department of

Computer Science, University of Colorado, USA. CU-US-269-94.

Hasan, A. A. M. and Deris, S. (2006). Real-Time Scheduling for Autonomous

Mobile Robots using Genetic Algorithm and Constraint Based Reasoning.

Master’s Thesis. Universiti Teknologi Malaysia.

I-Logix (2004). Rhapsody Tutorial in C++. Release 5.2. Technical Report of I-Logix.

Immonen, A. and Niemelä, E. (2008). Survey of Reliability and Availability

Prediction methods from the viewpoint of software architecture. Software and

Systems Modeling. vol. 7(1). 49-65.

Jawawi, D.N.A., Deris, S. and Mamat, R. (2006). Enhancement of PECOS

Embedded Real-Time Component Model for Autonomous Mobile Robot

Application. IEEE International Conference on Computer Systems and

Applications. 882-889.

Jensen, K. E. A. (2009). Schedulability Analysis of Embedded Applications Modelled

using MARTE. Master's Thesis. Technical University of Denmark, Kongens

Lyngby, Denmark.

Joseph, M. and Pandya, P. (1986). Finding response times in a real-time system. BCS

Computer Journal. vol. 29(5). October. 390–395.

Kanjilal, A., Sengupta, S. and Bhattacharya, S. (2009). Analysis of Complexity of

Requirements: A Metrics Based Approach. In Proceedings of the 2nd India

Software Engineering Conference (ISEC’09). 131-132.

Kheong, L. S. and Jayaratna, N. (2009). Framework for Structuring Learning in

Problem-Based Learning. Retrieved Feb 11, 2011, from

Page 38: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

161

http://pbl.tp.edu.sg/Understanding%20PBL/Articles/lyejayarartna.pdf.

Kim, K., Bello, L. L., Min, S. L. and Mirabella, O. (2002). On Relaxing Task

Isolation in Overrun Handling to Provide Probabilistic Guarantees to Soft Real-

Time Tasks with Varying Execution Times. In Proceedings of the 14th

Euromicro Conference on Real-Time Systems. June.

King, P. J. B. (1990). Computer Communication Systems Performance Modelling.

Prentice Hall.

Klein, M.H., Lehoczky, J.P. and Rajkumar, R. (1994). Rate-Monotonic Analysis for

Real-Time Industrial Computing. Computer. 25-32.

Klein, M. H. (1993). A Practitioner’s Handbook for Real-Time Analysis: Guide to

Rate Monotonic Analysis for Real-Time System. Boston: Kluwer Academic

Publisher.

Koren, G. and Shasha, D. (1995). Skip-over: Algorithms and Complexity for

Overloaded Systems that Allow Skips. Proceedings of the 16th IEEE Real-Time

Systems Symposium. December. Pisa, Italy: 110-117.

Lehoczky, J. P. (1996). Real-Time Queuing Theory. In Proceedings 17th IEEE Real-

Time Systems Symposium. December.

Lehoczky, J.P. (1990). Fixed Priority Scheduling of Periodic Task Sets with

Arbitrary Deadlines. Proceedings of 11th Real-Time Systems Symposium.

December. 201-209.

Leung, J.Y.-T. and Whitehead, J. (1982). On the Complexity of Fixed Priority

Scheduling of Periodic, Real-Time Tasks. Performance Evaluation. vol. 4(2).

December. 237–250.

Liu, C.L. and Layland, J.W. (1973). Scheduling Algorithms for Multiprogramming

in a Hard Real-Time Environment. Journal of the ACM. vol. 20 (1). 46-61.

Lu, W.-C., Hsieh, J.-W., Shih, W.-K. and Kuo, T.-W. (2006). A Faster Exact

Schedulability Analysis for Fixed-Priority Scheduling. Journal of Systems and

Software. vol.79. 1744-1753.

Mok, A. and Chen, D. (1997). A Multiframe Model for Real-Time Tasks. IEEE

Trans. Software Engineering. vol. 23(10). October. 635-645.

Milutinovic, V. (1995). A Research Methodology in the Field of Computer

Engineering for VLSI. vol. 2. 811-816.

Page 39: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

162 Niu, L. and Xu, J. (2012). Improving Schedulability and Energy Performance for

Weakly Hard Real-Time Systems. IEEE 31st International Performance

Computing and Communications Conference (IPCCC’12). 41-50.

OMG (2007). UML Specification version 2.1.2 OMG document formal/2007-11-04.

Technical report of Object Management Group.

OMG (2005). UML Profile for Schedulability, Performance, and Time Specification.

. Technical report of Object Management Group.

OMG MARTE Specification. (2007). A UML Profile for MARTE: Beta 1. OMG

Adopted Specification ptc/07-08-04. August.

OMG (1997). The Unified Modeling Language for Object-Oriented Development,

Documentation Set Version 1.0.

Pereira, C. E. (2000). Are Object-Oriented Concepts Useful to Real-Time Systems

Development?. Real-Time Syst. 18(1). 89-94.

Qadi, A.A., Huang, J., Goddard, S. and Farritor, S. (2005). A Performance and

Schedulability Analysis of an Autonomous Mobile Robot. 17th Euromicro

Conference on Real-Time Systems (ECRTS'05). 239-248.

Rational Software Corporation (2003). C++ Reference. Rational Rose Real-Time.

Version: 2003.06.00, Part no: 800-026109-000. Technical report of Rational

Software Corporation. ftp://ftp.software.ibm.com/software/

rational/docs/v2003/unix_solutions/pdf/RoseRT/rosert_cpp_ref_guide.pdf.

Shi, J., Goddard, S., Lal, A., Dumpert, J. and Farritor, S. (2005). Global Control of

Robotic Highway Safety Markers: A Real-Time Solution. Real-Time Systems.

vol. 29(2-3). 183-204.

Shin, K.G. and Ramanathan, P. (1994). Real-Time Computing: A New Discipline of

Computer Science and Engineering. Proceedings of the IEEE. vol. 82(1).

Silly-Chetto, M. and Marchand, A. (2007). Dynamic Scheduling of Skippable

Periodic Tasks: Issues and Proposals. 14th annual IEEE International

Conference and Workshops on the Engineering of Computer-Based

(ECBS’07). March. Tucson, Arizona, USA: 171-177.

Singh, Y., Popli, M. and Shukla, S. S. P. (2012). Energy Reduction in Weakly Hard

Real-Time Systems. 1st International Conference on Recent Advances in

Information Technology (RAIT’12). 15-17 March. 909-915.

Page 40: A SCHEDULING ANALYSIS FRAMEWORK FOR PREDICTING …eprints.utm.my/id/eprint/35890/5/HabibahIsmailMFSKSM2013.pdf · Masalah dengan sistem ini adalah keterbatasan kaedah analisis penjadualan

163 Takagi, H. (1990). Queuing Analysis of Polling system: An Update in Stochastic

Analysis of Computer and Communication System. Elsevier Science North

Holland, Amsterdam: 267-318.

Tia, T. S., Deng, Z., Shankar, M., Storch, M., Sun, J., Wu, L. C. and Liu, J. S.

(1995). Probabilistic Performance Guarantee for Real-Time Tasks with

Varying Computation Times. In Proceedings of Real-Time Technology and

Applications Symposium. 164-173.

Woodside, M. (2007). From Annotated Software Designs (UML SPT/MARTE) to

Model Formalisms. Proceedings of the 7th International Conference on

Formal Methods for Performance Evaluation (SFM’07). Springer-Verlag.

Berlin, Heidelberg: 429-467.

Zhu, X. (2009). Research on Weakly Hard Real-Time Constraints and Their Boolean

Combination to Support Adaptive QoS. World Academy of Science,

Engineering and Technology.