Disclaimer Forward Looking StatementThe material used in this presentation is intended to be a summary of selected geological data, current and proposed activities, as well as resource estimates based on information available to Heron Resources at the time. It does not include all available information and should not be used in isolation as a basis to invest in Heron Resources. Any potential investor should refer to Heron Resources’ ASX releases and statutory reports before considering investing in the company.This presentation includes information relating to a completed independent scoping study, completed independent resource estimate and a feasibility study which is in progress and includes “forward looking statements” which include, without limitation, estimates of potential nickel in concentrate production based on mineral resources that are currently being evaluated. While the Company has a reasonable basis on which to express these estimates, any forward looking statement is subject to risk. Risks include, without limitation: nickel metal prices, foreign exchange rate movements, failure to meet joint venture milestones, project funding capacity, concentrate off-take contracts and estimates of future capital and operating costs.The Company does not undertake to release publicly any revisions to forward looking statements included in this presentation to reflect events or results after the date of this presentation, except as may be required under applicable securities laws.
Company Profile – CorporateListed ASX August 1996
• Focus on acquisition and exploration to develop long life nickel mines
Capital Structure• 168m shares at A$0.80, mkt cap A$134m• A$5.9 million cash at bank, debt free
Significant Shareholders• Directors and associates 25.5%• Inco Limited 9.9%• BHP Billiton 9.6%
KNP Terms and ProjectSubject to meeting technical milestones, Inco sole funds Feasibility Study
• Pre-Feasibility, minimum US$18m
• Full Feasibility, minimum US$50m
Inco earn 60% oncompletion of Feasibility and securing project funding
• Inco procures all project debt funding
• Heron equity fund cap 4.5% of total equity
• Inco lends Heron its remaining equity funds
Inco Farm-in -Timing Milestones Step 1, confirm 120mt at 1.5% Ni
• Diamond drilling, screening studies• Completion July 2006
Step 2, flow sheet selection • Batch metallurgy and mini-pilot, Sep 2007
Step 3, resource and engineering• Resource drill out, plant design, Jan 2009
Feasibility Study• Bankable, completion deadline July 2011
Completed
Commenced
Step 1 Work ProgramPQ triple tube diamond drilling
• 53 holes twinning RC and DD holes, included sonic Drilling
• Confirmation of previous head assays• Beneficiation test work, 1.5% Ni LFG
Geological re-logging of all prospects• Focus on metallurgical material types
Volume estimation
Material Types In CorePlaty CUS
MagnesiticCLN
CLF
Beneficiation: how it works
Scrubbed slurryinto pilot plant
trommel screen deck
Screened rejectsSilica fragments 60%Reject grade 0.3% Ni
Screened slurryLimonite 40%
Leach feed grade 1.5% Ni
Screen Upgrade
Inco’s Conclusions to Step 1“KNP is a large nickel resource in a political stable region with good existing infrastructure which has the potential to achieve the Assumption tonnes and grade.” Leach Feed of 120mt at 1.5% Ni
“KNP is one of the better undeveloped nickel laterite opportunities in the world.”
“No fatal flaws detected during Step 1, but the core drilling, interpretations and database interpretation raised geological issues previously not recognised that need addressing during Step 2.”
Step 2 ProgramCovers first 6 months only estimated at US $2m
• Bench Scale Metallurgical Tests, 100 samples for
HPAL and AL, settling and rheology tests.
• Crushing, attritioning and scrubbing crushing
optimisation evaluate beneficiation options.
• Bulk metallurgical tests, three, 500kg semi
continuous pilot high pressure leach runs.
The Right Location
Infrastructure
KALGOORLIE
ESPERANCEKWINANA
RailGasRoadPorts
Esperance
Kalgoorlie
Leonora Laverton
Murrin MurrinRefinery
Kalpini
Bulong
Goongarrie
KNP
Sulphides and Second Heap Leach
Jump-up Dam
Heron Nickel Strategy
Time
-29.2 °
-29.5 °
-29.8 °
-29.5 °
-29.2 °
Legend:
Heron tenements
Ultramafic lithologies
0 10 20
Kilometres
Kookynie
-29.8 °
Kalgoorlie120km
MurrinMurrinnickellateriteprojectarea
Jump-up Dam Heap Leach Project 100% Heron owned and managed: outside of KNPFocus on lower capital intensityTested technologyIncremental growthResource drilling and test work continuingNickel production
Aubils
Boyce Creek
Jump-up Dam
Murphy Well
Mt Remarkable
50km
50km
Nickel Lateriteresource targets
E31/524
P31/1697
P31/1669
E31/664P31/1698
6712000 mN
6714000 mN
6710000 mN
0
24m @ 1.07% Nifrom 10m
22m @ 1.53% Nifrom surface
16m @ 0.89% Nifrom 20m
22m @ 0.79% Nifrom 10m
16m @ 0.90% Ni from 4m20m @ 1.15% Ni from 4m
28m @ 1.24% Nifrom 4m
44m @ 0.91% Ni from surface
50m @ 1.07% Ni from surface
38m @ 0.76% Ni from 2m
Drilled RC Drillhole
Max Ni % over 2 metres>1.51 to 1.50.75 to 10.5 to 0.750.25 to 0.5<0.25
54m @ 1.35% Ni from 18m
24m @ 0.85% Ni from 13m
Intercepts are basedon a 0.5% Ni cut-off
Current drill program-results pending
WesternZone
Eastern Zone
EasternNontronite Zone
Mineralisation Outline
Jump-up Dam Intercepts
640
Metres
LegendHeron Tenements
Ultramafic Outline
Jump-up Dam Infill DrillingLegend
Heron Tenements
Mineralisation Outline
Current drill program-results pending
Drilled RC Drillhole withmax Ni
Ultramafic Outline
0 640Metres
Drilling Ni % intercepts>1.51.25 to 1.51 to 1.250.75 to 10.5 to 0.75
Size by width of intercept
Top 15 intercepts based onNi% x width are labelled
4-12m
>40m24-40m12-24m
6712000 mN
6714000 mN
E31/524
P31/1697
P31/1669
E31/664
P31/1698
40m @ 0.91% Nifrom 14m 44m @
1.03% Nifrom surface
38m @ 1.05% Nifrom 22m39m @ 1.09% Ni
from 26m
46m @ 0.93% Ni from 12m
28m @ 1.24% Nifrom 4m
50m @ 1.07% Nifrom surface
Intercepts are basedon a 0.5% Ni cut-off
WesternZone
Eastern Zone
EasternNontronite Zone
54m @ 1.35% Nifrom 18m 44m @ 0.91% Ni
from surface
34m @ 1.14% Nifrom surface
26m @ 1.42% Nifrom surface
38m @ 0.98% Ni from 24m
44m @ 0.83% Nifrom surface
26m @ 1.31% Nifrom 28m
28m @1.29% Nifrom 26m
Jump-up Dam Drill Sections
Legend
Cover
Upper Clay
Upper Clay mineralisation
No vertical exaggeration
22m @1.53% Ni 22 metres
at 1.44%Nickel grade
Zone of mineralisation
Lower Clay mineralisation
Lower Clay
Ultramafic bedrock
Section 1920N
Western Zone Section 3200N
400RL
360RL
320RL
Eastern Zone
360RL
320RL
400RL
24m @1.07% Ni
28m @1.24% Ni
22m @1.53% Ni
50m @1.07% Ni
38m @0.76% Ni
44m @0.91% Ni
Garnierite delivering exceptional Ni%High grade zones identified with garnieriteGarnierite mineral can host up to 30% nickelCommonly grades better than 2% Ni in drillingVery amenable to leachingHas siliceous matrix for heap strength
Jump-up Dam Heap Leach Project
Jump Up Dam testwork results
Nickel Extraction v Time
0
10
20
30
40
50
60
70
80
0 20 40 60 80 100 120 140 160Time, days
HL06 Comp. HL07 Comp. HL03 Comp. HL04 Comp. HL05 Comp.
Calcrete
Stage 1Neutralisationwith Calcrete
PrecipitationStage
BarrelAgglomerator
Dilute acid solutionrecirculating
Acid addition
Heap stackingconveyor
Filtering and drying
Intermediate ProductBulk Bags
Shipping from Esperance
ConveyorCrusher
Mining
Crushed ore stockpile
Fine ore after crushing
Recycling of process water
Reticulated solution
Agglomerate nodules in heaps
Zero discharge site
Agglomeration with acid
Calcrete mining
ROM Stockpile
Acid supply
Goldfields
Jump-up Dam Heap Leach Flow Sheet
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2007 2008 2009OverviewJump-up Dam Project
Scoping study flow sheet
Key Issues• Resource drilling and estimates• Acid Supply and off take agreements• Site evaluation• Mining lease grant• Test scale heaps• Precipitation plant design
Scoping Study
Prefeasibility Study
Bankable Feasibility Study
Decision to MineConstruction
Commence ProductionRamp up to 5,000 tpa NickelRamp up to 10,000 tpa Nickel
Nickel production slide here
WA Nickel Production 2004-2005
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000Ni Tonnes
Heron Corporate Target
Jump Up Target 2
Jump Up Target 1
0
20
40
60
80
100
120
140
160
01-Dec-03
01-Mar-04
01-Jun-04
01-Sep-04
01-Dec-04
01-Mar-05
01-Jun-05
01-Sep-05
01-Dec-05
01-Mar-06
01-Jun-06
01-Sep-06
DateM
arke
t Cap
M A
UD
Summing Up: Milestone Driven GrowthHeron is continuing to deliver on the KNP Heron is delivering on medium term Nickel project from our own portfolio: Jump-up DamHeron is delivering on the divestment on non core non nickel assetsHeron delivers on land acquisition and sulphide Value add acquisitions Scoping study
and resources
Inco JV, Placement
BHPB on Register
Execution of formal agreement
Companies and Projects
Ian BuchhornManaging Director
Phone: +61 8 9091 9253 (Kalgoorlie)+61 8 9215 4444 (Perth)
ASX: HRR