 T rinity Episcopa l Church Easton, P ennsylvania  January 25, 2009
Transcript

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 1/34

 Trinity Episcopal Church

Easton, Pennsylvania

 January 25, 2009

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 2/34

A Vision of Good NewsOutline the major capital needs of Trinity,

Easton

Describe a vision of how we can addressthose needs

Share a vision for mission around the globe.

Understand how we can touch lives of people

in Easton and in Kajo-KejiKnow that we can improve our parish

ministry, worship and outreach as we gobeyond fixing broken walls into building for

the next 100 years.

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 3/34

Current SituationSouth wall leaning out asmuch as 5” at peak overhigh altar area.

Wall separating from

main church.Organ well past 20 year

maintenance schedule.Organ 1961 console both

out of date and breaking

down.Poor lighting and soundsystems in church.

Lack of handicappedaccess.

No accessible classroom& meeting space.

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 4/34

Other needsKitchen too small and in need of renovationNo handicapped restrooms in church & Conine

Hall

Inadequate entrance to Conine Hall from parkinglot.1985 Lehigh organ is overdue for 20 year

maintenanceRe-leathering

Replace, fix, upgrade switches.Console dating to 1961 in need of complete rebuildFinish instrument: MIDI digital sampling to provide “long pipes”

Make “library” connector barrier free

Church lighting and sound system upgrades,

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 5/34

Project details

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 6/34

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 7/34

South wall stabilizationRemove roof & wall

at pantry

Install roof supportat southwest cornerof high altar

Rebuild south wall at

altarSupport south wall

using building asbuttress.

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 8/34

Buttressing south wall

alone• Three 45’ verticalsupports.

• Three 20’ long

footers.• Three diagonalbraces.

•Horizontal anddiagonal braces tiesvertical supportstogether.

•Goal: prevent southwall from leaning out

anymore without

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 9/34

Buttress detail

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 10/34

“A buttress disguised as a

building.”•  Take away walland roof atpantry.

•Rebuild southwall at high altar.•Addition toprovide supportfor south wall

(goal: no stresson main building)

•Kitchen additionto provide similarsupport to

Conine Hall.

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 11/34

A new, bigger kitchen

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 12/34

New restrooms and entrance

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 13/34

Conference room/nursery

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 14/34

Conine Hall & church

connector

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 15/34

Conine Hall & church

connector

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 16/34

OrganSeal all air leaks in windchest bottom board

Replace swell engine with all electric servo-

motorRe-leather Pedal Bourdon 14 note chest

Clean Great Trompette pipesProvide protective shield from ceiling arch paint & plaster

Replace choir side light cableAdd “Prepared for” Digital voices

Rebuild and modernize 1961 Organ Console

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 17/34

Other parts of the projectParking lot resurfacing

Fill in well/cistern behind South Wall.

Change drainage to take water away fromChurch

Handicapped accessible restroom and janitorsarea near chapel.

Improved Lighting in ChurchImproved sound system including extending

sound system into Conine Hall & ConferenceRoom & assistance for hearing impaired.

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 18/34

A primary school in Kajo-Keji

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 19/34

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 20/34

A Primary School in Kajo-

Keji

We will also build a

school for primaryschool students inour partner dioceseof Kajo-Keji,

Southern Sudan.

ContentPlaceholder4

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 21/34

A Primary School in Kajo-

Keji$65,000 will build

a school house inKajo-Keji.

ContentPlaceholder6

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 22/34

Project cost estimates

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 23/34

Estimated costsPhase One – Part OneSouth wall stabilization $147,886.00

new roof column at southwest corner of high altar

areatemporary weather-/water-proofingtemporary bracing into parking lotremoving and storing stained glass window

Parking Lot: $36,650Kitchen/Conf Room/Entrance/Rest rooms:

$263,138.00bracing for remaining south wall

reframing and cladding area around the high altar area reinstallin the stain lass window

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 24/34

Estimated costsPhase One – Part TwoOrgan - $63,800

Phase Two

"West Entrance" (Library and Stage):$117,125.00

Phase ThreeChapel-side Handicapped restroom with janitors sink:

$33,473Lighting and sound: $10-12,000

Total estimate: $598,272The capital campaign will also support the

building of a new school in Kajo-Keji in Trinity’sname: $50–65,000

Capital Campaign is a three year project Project can be phased if needed.

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 25/34

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 26/34

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 27/34

Summary and benefits

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 28/34

Project benefitsBigger and more modern kitchenHandicapped accessible entranceHandicapped accessible bathrooms

Handicapped accessible classroom that also canserve as safe, secure nursery.Increased seating in Conine HallImproved and increased storageBarrier-free access between church and Conine

HallImproved and modernized organBrighter and more even lighting in ChurchEasier to maintain

Sound system to include hearing impaired system

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 29/34

Project benefitsWe will serve more people through our outreach

ministries.

We will have a functional, attractive and easy to

maintain kitchen.We will improve movement between Church and

Hall.

We will have a better stage for Coffeehouse,

Church School, and other functions.

Our worship will be improved with a better organwith more capacity and range.

We will deepen our mission both at home and

with our adopted school in Kajo-Keji.

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 30/34

What can you do? Take part in Capital CampaignServe on Capital Campaign Committee Communications

Logistics and Support Kick-off Events Children and Youth Mission Prayer

Host and/or Come to Cottage GroupsBuilding and Grounds groupsWork groups for preparation and completion

Pray!

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 31/34

It all began 190 years

ago…Samuel Sitgreaves and other Eastoniansformed an Episcopal congregation.

From the beginning our congregation has

touched both Easton and people around theglobe.

We continue the tradition of worship,education, service and mission begun in 1819.

Our space is our greatest single materialasset; with it we serve people of all ages andfrom all over the area.

With these projects, we will do more than fix a

wall, we will prepare ourselves for ministry

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 32/34

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 33/34

8/14/2019 A Vision for Ministryoject Introduction

http://slidepdf.com/reader/full/a-vision-for-ministryoject-introduction 34/34

Pray for Trinity Church!

May God go with you in all you do!