r IOWA DEPARTMENT OF NATURAL RESOURCES C ONSTRU C TION DO C UMENTS FOR MINES OF SPAIN STATE PARK ROADWAY PAT C HING DUBUQUE C OUNTY, IOWA I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS PREPARED UNDER MY SUPERVISION AND THAT ENGINEERING DECISIONS WITH REGARD TO THE DESIGN WERE MADE BY ME UNDER THE WS OF THE STATE OF IOWA. Heath Delzell g�: 1 t; i f_�:�2y o��5�42 5��0· ""' DOT PROJECT#SP-689-0(9)--?C-31 PROJECT# 21-03-31-01 1-800-292-8989 w.iowaonecall.com HEATH B. DELZELL INi IYPNE MY LICENCE RENEWAL DATE IS DECEMBER 31, 20 _ PAGES COVERED BY THIS SEAL: ______ _ ' DIRECTORY PROJECT DESCRIPTION / AUTHORIZATION TO BID PROJECT MANAGER CONSTRUCTION INSPECTOR This project consisls of patching and asphalt ove�ay of 875' of roadway. COMPANY IOWA DEPARTMENT OF NATURAL RESOURCES COMPANY ADDRESS 502 êST 9TH STREET ADDRESS CITY,STATE,ZIP DES MOINES, IA, 50319 CI,STATE,ZIP CONTACT Troy Duff CONTACT TELEPHONE 515-250-3715 TELEPHONE FAX FAX EMAIL troy.duff@dnr.iowa.gov EMAIL IOWA DEPARTMENT OF NATURAL RESOURCES Melvin Pacovs 319-240-3553 melvin.pacovs@dnr.iowa.gov N · 1 Ck De11a ca Digitally signed by Nick Dellaca Date: 2021.06.22 15:14:43 -05'00' AUTHORITION - PARKS I WILDLIFE I FISHERIES I LAW ENFORCEMENT I FORESTRY DATE Digitally signed by Travis Baker Travis Baker Date:2021.06.2816:50:40 -05'00' ENGINEERING BUREAU CHIEF DATE r SHEET INDEX ' A.01 COVER SHEET A.02 LOCATION MAP B.01 PICAL CROSS SECTIONS AND DETAILS C.01 QUANTITIES AND GENERAL INFORMATION D.01 SITE PLAN D.02 SITE PLAN D.03 SITE PLAN z z 0 u 0 w U Z w 0 w w C oz w w z w > 0 u REVISION 0 w z 0 w z DRAWN BY PROJECT NUMBER· TDD 21-03-31-01 CHK'DBY MAY 2021 A.01 z u 0 0 21
Transcript

r

IOWA DEPARTMENT OF NATURAL RESOURCES

CONSTRUCTION DOCUMENTS

FOR

MINES OF SPAIN STATE PARK

ROADWAY PATCHING

DUBUQUE COUNTY, IOWA

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS PREPARED UNDER MY SUPERVISION AND THAT ENGINEERING DECISIONS WITH REGARD TO THE DESIGN WERE MADE BY ME UNDER THE LAWS OF THE STATE OF IOWA.

Heath Delzell g�:1

t;i

f_�:�2�y

o��5��4���2

5��0· ""'

DOT PROJECT #SP-689-0(9)--?C-31

PROJECT# 21-03-31-01

1-800-292-8989www.iowaonecall.com

HEATH B. DELZELL PRINibbUR IYPEUNAME

MY LICENCE RENEWAL DATE IS DECEMBER 31, 20 _ PAGES COVERED BY THIS SEAL: ______ _

'

DIRECTORY PROJECT DESCRIPTION /

AUTHORIZATION TO BID

PROJECT MANAGER CONSTRUCTION INSPECTOR This project consisls of patching and asphalt ove�ay of 875' of roadway.

COMPANY IOWA DEPARTMENT OF NATURAL RESOURCES COMPANY

ADDRESS 502 EAST 9TH STREET ADDRESS

CITY,STATE,ZIP DES MOINES, IA, 50319 CITY,STATE,ZIP

CONTACT Troy Duff CONTACT

TELEPHONE 515-250-3715 TELEPHONE

FAX FAX

'- EMAIL [email protected] EMAIL

IOWA DEPARTMENT OF NATURAL RESOURCES

Melvin Pacovsky

319-240-3553

[email protected] ,I '-

N ·1 Ck De 11 a ca Digitally signed by Nick Dellaca Date: 2021.06.22 15:14:43 -05'00'

AUTHORIZATION - PARKS I WILDLIFE I FISHERIES I LAW ENFORCEMENT I FORESTRY DATE

• Digitally signed by Travis Baker Travis Baker Date:2021.06.2816:50:40

-05'00'

ENGINEERING BUREAU CHIEF DATE

r SHEET INDEX

'

A.01 COVER SHEET

A.02 LOCATION MAP

B.01 TYPICAL CROSS SECTIONS AND DETAILS

C.01 QUANTITIES AND GENERAL INFORMATION

D.01 SITE PLAN

D.02 SITE PLAN

D.03 SITE PLAN

'- ,I

"" z

� i,l z 0 u

01&. V) wi-UZall: w::::, :e 0 I- V) all: w<( all: ICI.. .... w <(C all: <(::::, == � oz

I-w

w o!

::2 <:) z

Q::'. w

> <( ::;;: 0

:r:

u

REVISION

<( 0.... w I-<( I-(/)

z

<( 0.... (/)

w

z

DRAWN BY PROJECT NUMBER·

TDD 21-03-31-01

CHK'DBY

MAY 2021

A.01

z

u

0

0

21All

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK'D BY:

SHEET No:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

21-03-31-01

CO

NS

ULTA

NT:

HM

A P

ATC

HIN

G F

OR:

MIN

ES O

F S

PAIN S

TA

TE P

AR

K

DU

BU

QU

E C

OU

NTY

TDD

MAY 2021

JOHN DEERE

RD W

3

3

3

32

946

AIRPORT

REGIONAL

DUBUQUE

GARRYOWEN RD

DRIS

CO

LL R

D

CU

RO

E R

D

ST J

OES P

RAIRIE R

D

HAXBYLANE RD

HIGGINSPORT RD

WASHINGTON MILLS RD

TH

UN

DER HIL

LS R

D

SWISS V

ALLEY

RD

BUDD RD

BU

DD R

D

ASBU

RY R

D

JAM

ES RD

RIDGE RD

BA

LLTOW

N R

D

JAM

ES R

D

SHERRILL RD

MU

D L

AKE R

D

N W

AUPET

ON R

D

MC A

LLISTER RD

TARA LN

ROCHE LN

WHI

TEW

ATER

DR

PRAIRIE CREEK RD

LEHNER LN

O'BRIEN RD

LA

BA

N R

D

PITZ RD

FOUST RD

LY

ON

S R

D

FIS

HP

ON

D R

D

BIE

RM

AN R

D PILOT GROVE RD

ED

VA

L L

N

OAKLAND FARMS RD

JEC

KLIN L

N

RYA

N R

D

MERLIN RD

KE

MP R

D

KANE RD

WEBER R

D

HA

NN

AH R

D

RO

OT L

N

HER

OD LN

FLANNAGAN RD

PFEILE

R R

D

FREIBURGER LN

REIGLER RD

KLEIN L

N

LOVER

S LN

KRUSE L

N

RO

LLER C

OSTER R

D

SIM

ON R

D

KEARNEY RD

SUN

DO

WN R

D

BER

NA

RD R

D

HIGGINSPORT RDHIGGINSPORT RD

MO

LONEY RD

FEENEY RD

BEN

NETT

VILLE R

D

SKYLINE RD

PLA

CID R

D

PLA

CID R

D

CHESTERMAN RD

GRAF RD

SU

ND

OW

N R

D

E PLEASANT GROVE RD

SU

ND

OW

N R

D MONASTERY RD

MONASTERY RD

SWISS VALLEY RD

ST J

OES P

RAIRIE R

D

OLD

E D

AV

EN

PO

RT R

D

N B

AN

KST

ON R

D

ASBURY RD

GU

N C

LUB R

D

MILLVILLE RD

ASBU

RY R

D

ASBURY RD

GRAF RD

MIDDLE RD

MILLVILLE RD

OLD HIGHWAY RD

SU

ND

OW

N R

D

RUPP

HOLL

OW R

D

HA

LES M

ILL R

D

KENNEDY RD

RIDGE RD

RIDGE RD

MIL

L R

D

JA

MES R

D

SOUTH MOUND RD

FIV

E P

OIN

TS R

D

MU

D L

AKE R

D

SHERRILL RD

TH

EN R

D

FAIR

WA

Y R

D

GEHL LN

REITER RD

NORTH CASCADE RD

URBAIN RD

RAYSFORD LN

RE

A R

D

CALLAHAN RD

FIS

CH

ER R

D

HUNT RD

STO

FFEL

RD

MC C

AR

TH

Y R

D

LA

RKIN R

D

FA

GA

N R

D

LA

MBE R

D

BUNCOMBE RD

HART

MA

N R

D

MANDERSCHEID RD

LA

MBE R

D

ARENSDORF RD

MO

ZE

NA L

N

KIDDER RD

PILOT GROVE RD

KO

OP

MA

N R

D

SR

OK

A L

N

CO

TTIN

GH

AM R

D

NORTH

CASCADE R

D

CA

SE

Y L

N

DUTCH LANE RD

NOLAN LN

AIR

VIE

W D

R

LAUDEVILLE R

D

OLDE MASSEY RD

LA

KE E

LEA

NO

R R

D

DA

YTO

N R

D

MA

NDERS LN

GIRL SCO

UT RD

MARY LN

CEDAR RIDGE RD

VA

LLE

Y RID

GE R

D

LE

WIS R

D

DERBY GRANGE RD

KA

UNE LN

HUMKE RD

HUMKE RD

CO

FFEE HIL

L R

D

FLANNAGAN RD

PFEILER RD

COTTAGE HILL RD

HANTELMAN RD

HO

RSESH

OE R

D

REIG

LER R

D

HO

CH

REIN R

D

BOY SC

OUT R

D

PARADISE VALLEY

RD

SPEC

HTS F

ER

RY R

D

HANTELMAN RD

HA

MM

ERA

ND R

D

KOLTES LN

HER

BER R

D

RIV

ERSID

E D

R

KENKA

LLN

THEIL

EN R

D

GU

N

CLU

B R

D

HA

NN

AH

RD

FOUR BYFOUR LN

WHITEYS

LN

SO

UTH

MO

UN

D R

D

BUDD

CLO

VER

LN

ASBURY

RD

COOHEY

LN

LN

CARYN

CLYDE

LN

LY

NC

H

LN

ELANOR

LN

HORSESHOE RD

FIN

LEYS

LAN

DIN

G RD

400 ST

MILI

TARY

RD

BAKEY LN

DERBY GRANGE RD

BOYSCOUT

RD

RD

TURNIS

LN

300 ST

300 ST

JO

HN D

EERE R

D S

DU

TC

H L

AN

E R

D

FIV

EP

OIN

TS R

D

NO

RTH C

ASC

AD

E R

D

OLD

E D

AV

ENP

ORT R

D

CR

EE

K R

D

PLU

M

PARK

RD

BAN

KSTO

N

RDPARK HOLLO

W

RD

MID

WA

Y

LN

HIN

GTE

N

LN

FETTKETH

ER

RD

HO

CH

REIN

MOUND RDSOUTH

RD

HA

BERKO

RN

WA

UPETO

N R

D

S

RD

VA

LLE

Y

CR

EE

K

RIDGE RD

CIRCLE

RID

GE R

D

CIR

CLE

HOLLOW RDSLEPPY

HILL RD

CLA

Y

MIL

L R

D

EN

GLIS

H

RD

CALO

NDER

LNBREH

M

RD

THEILEN

RD

HOLLO

W

DRY

CLU

B R

D

GU

N

RD

SPRIN

GS

CO

X

LN

RODDY

RDCASCADE

NORTH

RD

WHITETO

P

LN

VALLEYHIDDEN

CASC

ADE

RD

NO

RTH

RD

MASS

EY STA

TIO

N

HILL RD

HILKEN

HILL RD

HILKEN

RDST CATHERINE

MILL R

DMITC

HELL

HEIGHTS R

DSCHUELLER

RDVILLE

BEN

NETT-

RD

HIGGINSPORT

CASC

ADE

RD

NO

RTH

CASC

ADE RD

NORT

H

RD

BE

NN

ETTVIL

LE

RID

GE R

D

CIR

CLE

FURNACE RD

BURTONS

RD

LO

NE PIN

E

QUARRY LNSTONE

RIDGE LNHILL

RD

SP

RIN

GS

CO

X

HOLSTEIN

RD

PARK HOLLOW RD

DU

RA

NG

O R

D

JFK R

D

CED

AR RID

GE RD

LORE MO

UN

D

RD

HALESMILL RD

POTTER

HILLDR

CH

ER

RY H

OLLO

W L

N

OLD HIGHWAY RD

KN

EPP

ER L

N

PILOT GROVE RD

PRAIRIE CREEK RD

BER

NA

RD R

D

FISCHER RD

MC

AN

DR

EW

SRD

CALLAHAN RD

OLD HI

GHWAY RD

BA

LLTO

WN R

D

BA

LLTO

WN R

D

MC C

ABE L

N

MC

CULLOUGH

LN

BURDS RD

HE

ND

RIC

KS L

N

AIR

VIE

W D

R

WA

KASU LN

SEYMORE LN

WELTER L

N

TWELV

E MILE RD

GRAF

RD

FILLMORE

RD

SPRI

NGDALE

RD

STEIL L

N

LA

TTN

ER

VIL

LE L

N

HABERKORN RD

HO

CH

REIN R

D

BREE

ZYRID

GE

CLE

AR VIE

W

HEIG

HTS

SC

HLO

TH

LN

BASSW

OO

D LN

BO

BC

AT R

D

KEY W

EST

DR

KE

Y W

EST D

R

HABERKORN RD

LN

SIG

WA

RTH

RD

WAUPETON

N

LN

RO

WLES

DR

VALLE

YRIV

ER

LNSCHUST

ER

LN

LU

DESC

HER

LN

MC CLAIN

RD

CO

TTIN

GH

AM

LN

CONRAD

RD

HIGHWAY

OLD

LNZAUCHE

DA

VE

NP

OR

T R

D

OLD

E

LN

MARCIE

LN

DECKER

LN

LAVERNE

LN

BR

AN

CH

GAUGE RDNARROW

RD

SWIT

CH

RD

N BUENA VISTA

CLAYTON CO.

JONES CO. JACKSON CO.

GRANT CO.

JO DAVIESS CO.

EPWORTHPEOSTA

GRAF

BALLTOWN

DURANGO

SAGEVILLE

ASBURY

CENTRALIA

BERNARD

ZWINGLE

BANKSTON

SHERRILL

RICKARDSVILLE

DUBUQUE

South Fork

Catfish Cr

.

West

Bass

wood

Cr.

RIVER

MISSISSIPPI

Bloody

Run

Cre

ek

Little

Maquoketa

Cr.

Fork

Catfish Creek

Clote

Catfish

Cree

k

LAKE

ELEANOR

Creek

Creek

Lytle

Buncombe

Creek

Otter

Branch

White W

ater

Cr.

White

Water

Creek

Middle

COLLEGE

COMMUNITY

IOWA

NORTHEAST

INC.

MAPCO

NATURAL GAS

NORTHERN

COMPANY

ENERGY

MIDAMERICAN

BP

GAS CO.

NATURAL

NORTHERN

INC.

MAPCO

ENERGY

BLACK HILLS

R.R. CO.

CANADIAN NATIONAL

EAS

TE

RN R.R.

CO

RP.

DA

KO

TA,

MIN

NES

OT

A &

R-2E

R-1W

T-91

N

R-1E

T-89

N

R-3E

T-87

N

R-2E

T-90

N

WAUPETON

KEYWEST

MASSEY

POINTS

FIVE

SPAIN

MINES OF

C O N C O R D

J E F F E R S O N PERU

D U B U Q U E

CENTER

I O W A

T A Y L O R

V E R N O N

M O S A L E M

W A S H I N G T O N

W H IT E W A T E R

M O U N D

T A B L E

C R E E K

P R A IR IE

1234

9

21 2223

24

2526

27

28

33 34 35 36

1

2345

6

7 89

20 21 2223 24

2526

272829

30

3132 33 34 35 36

123456

7

9

20 21 2223 24

252627282930

31 32 33 34

3536

56

78 9 10

20

2122 23

24

30

29 28 2726

31 3233 34

35

1234

5

6

7 8

9

20 2122

23

24

25262728

2930

3132 33

34 3536

12

34

56

78

13

20 21 22 23 24

252627

282930

31 3233

3435 36

1

23

9

22 23

24

25262728

33 34

35

36

6 5 4

3

2

7 8 9

31

3233

1234

5

6

7 8 9

2021

22

2526

2728

2930

31 3233

34

3536

123

22 23 24

252627

34 35 36

6

7

30

31

54

3

89

2021

2223

2928

27 26

32 33 34 35

1234

56

7 8

9

20 21 22 23 24

25262728

29

30

31 3233

34 3536

3132 33

34

35 36

30

29

123

22

2324

252627

34 3536

181415

10

11

12

19

17

1615

14

13

121110

18 17 16

19

15

1718

19

16

12

131416 15

10

10 1112

15161718

10 11 1210 11

12

19

1011

12

1314

15

10 11 12

1314

15

10 11 12

1314151617

18

19

10

15161718

19

10

1314

1011

12

15161718

19

19

17

16

141513

1617181314

8

1413

1516

34

ENERGYBLACK HI

LLS

C9Y

D53

C61

C61

C9Y

C9Y

Y21

Y21

C65

D17

Y17

C65

C9Y

C9Y

C9Y

Y21

Y17

Y21

Y17

Y17

Y17

Y21

D41

D29

D29

D41

D41

D57

D61

D53

Y21

Y17

Y31

D53

Y31

D53

D35

D35

Y38

68

POP.

182

POP.

177

POP.

22

POP.122

POP.

4170

POP.

57637

POP.

1860

POP.

79

POP.

134

POP.

1377

POP.

112

POP.

91

POP.

R-1WR-1E

ET

AT

S

O

F

W

I

S

C

O

N

S

I

N

S

T

A

T

E

O

F

I

L

L

I

N

O

I

S

NE

W M

ELLER

AY R

D

E PLEASANT GROVE RD

PIPELINE CO.

MAGELLAN

D17

‒‒5

‒‒0

‒‒0

‒‒1

‒‒5

‒‒4

‒‒3

‒‒0

‒‒2

‒‒0

‒‒67

‒‒64

‒‒66

‒‒65

‒‒62

‒‒60

‒‒61

‒‒59

‒‒58

‒‒57

‒‒53

‒‒52

‒‒56

‒‒55

‒‒54

‒‒51

‒‒50

‒‒49

‒‒191

‒‒48

‒‒190

‒‒47

‒‒189

320‒‒‒‒

317

‒‒318

‒‒319

‒‒316

‒‒315

‒‒45

‒‒314

‒‒44

‒‒43

‒‒186

‒‒185

‒‒184

‒‒94‒‒93 ‒‒183

‒‒182

‒‒181

‒‒313

‒‒312

‒‒311

‒‒310

‒‒308

‒‒309

‒‒307

‒‒306

‒‒305

‒‒302

‒‒303

‒‒304

‒‒92

‒‒91

‒‒90

‒‒42

‒‒41

‒‒40

‒‒39

‒‒38

‒‒37

‒‒36

‒‒89

‒‒88

‒‒180

‒‒179

‒‒87

‒‒86

‒‒85

‒‒84

‒‒83

‒‒178

‒‒177

‒‒176

‒‒175

‒‒82‒‒81‒‒80

‒‒79

‒‒63

‒‒65

‒‒60

‒‒55

‒‒50

‒‒305

‒‒80

‒‒310

‒‒315

‒‒190

320‒‒

‒‒45

‒‒185

‒‒85

‒‒90

‒‒180

‒‒175

‒‒40

A.02

PR

OJEC

T L

OC

ATIO

N M

AP

PROJECT LOCATION

52

52

61

20

2052

61

61

52

20

151

151

151

151

20

151

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK'D BY:

SHEET No:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

21-03-31-01

CO

NS

ULTA

NT:

HM

A P

ATC

HIN

G F

OR:

MIN

ES O

F S

PAIN S

TA

TE P

AR

K

DU

BU

QU

E C

OU

NTY

TDD

MAY 2021

B.01

TYPIC

AL C

RO

SS S

EC

TIO

NS A

ND D

ETAIL

S

20' 0.076

20' 0.014

LENGTH WIDTH AREA SY MILESROAD & STATIONING

MINES OF SPAIN RD

1" INTERLAYER 1.5" INTERMEDIATE 1.5" SURFACE

OVERLAY TABLE

COMMENTS

(10X30)

PATCHES

TYPICAL GRANULAR SHOULDER SECTION

Normal Foreslope - 3:1

Top of Subgrade

2.0'

4.0%

Replace with millingsRemove existing material

(Millings)

Shoulder

Granular

1.5-inches Intermediate Course1.5-inches Surface Course

1-inch Interlayer

MILLED HEADER DIMENSIONS AND DETAILS

TRANSISTION SLOPE = 1 INCH : 10 FEETEXISTING PAVEMENT

25 FEET

DISTANCE VARIES

1.5-INCH SCARIFYING

2.5"

(USE INTERMEDIATE MIX)MILLED TRANSISTION AREA

80+81 - 84+81

MINES OF SPAIN RD

108+55 - 112+55

FARMSTEAD RD

203+68 - 204+43

400'

75'

400' 20' 889

167

0.076

(10X100)

PATCHES

(10X100)

PATCHES53.17 TONS

53.17 TONS

10.0 TONS

79.75 TONS

79.75 TONS

14.95 TONS 14.95 TONS

79.75 TONS

79.75 TONS889

PROJECT NUMBER:

DATE:

NO.DATE

BYREVISION

DRAWN BY:

CHK'D BY:

SHEET No:

NA

TU

RA

L R

ES

OU

RC

ES

IOW

A D

EP

ART

ME

NT O

F

502 E. 9TH S

T., D

ES M

OIN

ES, IA 5

0319-0

034

EN

GIN

EERIN

G S

ER

VIC

ES - W

ALLA

CE B

UILIN

G

21-03-31-01

CO

NS

ULTA

NT:

HM

A P

ATC

HIN

G F

OR:

MIN

ES O

F S

PAIN S

TA

TE P

AR

K

DU

BU

QU

E C

OU

NTY

TDD

MAY 2021

QU

AN

TITIE

S A

ND G

EN

ER

AL I

NFO

RM

ATIO

N

ITEM

NO.

ESTIMATE REFERENCE INFORMATION

DESCRIPTION

ESTIMATED PROJECT QUANTITIES

ITEM NO. ITEM UNIT TOTAL

GENERAL NOTES

C.01

No work will be allowed from 12 noon Friday until the following Monday. No work on holidays.

Iowa DOT specification sections are listed before each bid item.

fence, rock ditch checks, silt basins or silt dikes.to install and maintain erosion control features on the project. This may involve seeding, silt The contractor is expected to have materials, equipment, and labor available on a daily basis

finish grade. The contractor shall shape graded area to maintain surface drainage. All elevations are to

caused by such work.additional compensation will be allowed to the contractor for any interference or delay determine their existence and exact location and to avoid damage thereto. No claims for existence of which is presently not known or shown. It is the contractor’s responsibility to their locations must be considered approximate only. It is possible there may be others, the structures and utilities have been plotted from available surveys and records and therefore access to these facilities for necessary modification of services. Underground facilities, of those utilities prior to the beginning of any construction. The contractor shall be afforded construction area, it shall be the responsibility of the contractor to notify the DNR Engineer Where utilities and fixtures are shown as Existing on the plans or encountered within the

will be subject to the approval of the DNR Engineer.equipment or use these areas for storage of materials. Storage, parking and service areas construction limits. The contractor will not be permitted to park or service vehicles and The contractor shall not disturb desirable grass areas and desirable trees outside the

stated in the plans or approved by the DNR Engineer.hauled to these sites. No material shall be placed within the right-of-way, unless specifically into the work involved on this project. No payment for overhaul will be allowed for material material (excavated material or broken concrete) which is not desirable to be incorporated It shall be the contractor’s responsibility to provide waste areas or disposal sites for excess

proceeding with the work.shall notify the DNR Engineer of any discrepancies, omissions, and/or conflicts prior to The contractor shall verify, at the site, all dimensions and conditions shown on the plans and

to the plans, specification, special provisions and contract.visit the project site shall not relieve the contractor from performing the work in accordance themselves with the actual job conditions prior to bidding and the start of work. Failure to The contractor shall visit the site and inspect the project area and thoroughly familiarize

ordinances.All work shall conform to and be performed in accordance with all applicable codes and

Verify actual locations and elevations with DNR Engineer.

C. Contractor shall give 2-week notice before any road closures for Park staff to provide public notice.

B. If road closures are necessary, they shall be per Iowa DOT Standard Road Plan TC-252.

A. This item includes ALL pilot cars and/or flaggers needed to complete the work under traffic.11

A. For interlayer base course.10

A. For intermediate and surface courses.9

B. No special friction requirement.

A. 1.5-inch lift.8

B. Use in transition wedge areas.

A. 1.5-inch lift.7

A. 1-inch lift.6

D. Includes both shoulders.

C. A shouldering machine must be used to place millings where possible.

B. Remove spoil from project site.

A. Remove excess shoulder/vegetation material 3-inches deep, 2 feet wide.5

D. Remove excess millings from project site, or as directed by DNR Field Engineer.

C. Screen millings down to 1.5-inch size and use as shoulder material.

B. Milled headers to be an additional 2.5-inches. Taper headers 1-inch per 10 feet.

A. Nominal 1.5-inch scarification.4

1

1

5.5

17.4

165.7

165.7

110.5

8.8

1944

3

256

0.2

2533 - Mobilization

2528 - Traffic Control

2303 - Asphalt Binder, PG 64-34E+

2303 - Asphalt Binder, PG 58-28H, High Traffic

2303 - Hot Mix Asphalt High Traffic, Surface Course, 1/2in. Mix

2303 - Hot Mix Asphalt High Traffic, Intermediate Course, 1/2in. Mix

2303 - Hot Mix Asphalt Mixture, Interlayer Base Course, 3/8in. Mix

2214 - Blading and Shaping of Shoulders

2214 - Pavement Scarification

2212 - Patches by Count (Repair)

2212 - Patches, Full Depth Repair

2212 - Cleaning and Preparation of Base

12

11

10

9

8

7

6

5

4

3

2

1

L.S.

L.S.

Tons

Tons

Tons

Tons

Tons

Sta.

S.Y.

EA.

S.Y.

Miles


Recommended