+ All Categories
Home > Documents > A02 Building A Ground Floor Pl - San Clemente High School · ground floor walkway cbr rl 18.50m...

A02 Building A Ground Floor Pl - San Clemente High School · ground floor walkway cbr rl 18.50m...

Date post: 05-Oct-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
1
Drawing No.: Title: Drawn: Scale: Date: Status: Plot Date: Drawing: Amendments: Rev: Date: Legend: Detail: Bar Scale: Client: Project No: Project: North Point: 06:01 Project Name: Alterations & Additions: San Clemente Catholic High School CDJ DA 1:100 06:01 7/5/07 carste STUDIO PTY LTD All information, concepts and ideas contained herein are the property of Carste Studio Pty Ltd and may not be distributed and/ or reproduced without express permission from Carste Studio Pty Ltd. It is the responsibility of the builder to check and verify all dimensions on-site prior to the commencement of work and to notify Carste Studio Pty Ltd of any errors and omissions. Do not scale drawing. Do not use drawing for consrtuction purposes unless issued by Carste Studio Pty Ltd for construction. ABN 16122394450 trading as ACN 122394450 p: (02) 4951 2578 m: 0427 432 720 f: (02) 4950 0591 e: [email protected] a: PO Box 149 Wallsend 2287 stephen booker architect Architects and Heritage Consultants 07.05.07 -DA-A02 CATHOLIC SCHOOLS OFFICE Diocese of Maitland - Newcastle Building A: Ground Floor Plan 78 Havelock Street Mayfield N 600 3,180 110 6,380 110 2,710 270 600 1,665 770 270 3,100 110 3,800 110 19,940 110 3,350 270 31,060 16,395 1,070 535 1,776 535 1,070 3,552 1,070 535 1,776 535 1,070 8,580 110 4,900 110 9,900 270 2,230 230 13,360 26,330 39,690 1,379 13,525 1,100 2,410 340 2,410 360 950 3,710 110 3,450 950 1,820 2,410 340 2,410 830 270 26,330 11,180 950 1,230 3,035 2,505 230 3,292 230 3,292 230 3,292 230 3,292 230 3,292 230 3,292 230 2,230 230 230 3,364 230 3,364 230 3,364 230 270 530 950 2,395 100 2,444 950 480 270 600 610 950 1,940 110 300 470 2,265 270 2,505 1,900 1,405 2,410 830 870 300 4,005 350 2,410 3,370 2,410 350 2,410 2,770 2,410 350 2,410 350 2,410 2,005 2,410 640 1,100 2,410 350 2,410 3,080 2,410 3,080 2,410 350 2,410 350 2,410 1,100 2,460 2,022 610 350 610 2,405 610 350 610 2,022 3,500 270 5 A04 5 A04 ART CLASSROOM SV 89.60m 2 DUPLICATING ROOM CPT IT CLASSROOM CPT 79.10m 2 LIBRARIAN OFFICE/ WORKROOM CPT 35.70m 2 DP SEMINAR 02 CPT 13.00m 2 SEMINAR 01 CPT 13.00m 2 ART STORE SV 44.35m 2 DP DP DP GRASSED COURTYARD DP DP DP DP DP DP DP DP DP DP AV STORE CPT 9.00m 2 DP DP LINE OF EXISTING DEMOUNTABLE WINDOW WINDOW BOUNDARY WINDOW LINE OF EXISTING BUILDING WINDOW WINDOW WINDOW LINE OF EXISTING BUILDING WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW DOOR DOOR DOOR DOOR WINDOW WINDOW WINDOW WINDOW WINDOW OPENING OPENING OPENING WINDOW WINDOW ENTRY SV 10.60m 2 BOOK HIRE CPT 28.55m 2 WINDOW WINDOW DOOR DOOR WINDOW WINDOW WINDOW WINDOW WINDOW DOOR WINDOW DOORS LIBRARY CPT 243.65m 2 DOOR OPENING GROUND FLOOR WALKWAY CBR RL 19.00m HAVELOCK STREET Catalogues Computers Computers Stack Area Computers Compactus SECURE STORE CPT BURSAR CPT RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITH CONCRETE TO MAKE THE SCHOOL GROUND LEVEL WHOLLY ACCESSIBLE CBR OPPING WITH UND LEVEL WC: WOMEN GENERAL REFURBISHMENT AND NEW FITOUT CT NEW STAIR 01 EXISTING STAIR 345 2,410 345 110 770 1,900 1,225 2,410 350 2,410 350 2,410 1,805 270 820 2,410 820 950 820 2,410 1,720 0 1 2 3 4 5 AL ALUMINIUM LOUVRES CBR CONCRETE - BROOM FINISH CC OFFORM CONCRETE COLUMN - CLASS 2 FINISH CPT CARPET FLOOR FINISH DP COLORBOND DOWNPIPE - SHALE GREY FB1 FACE BRICK - TO MATCH EXISTING FB2 FACE BRICK - LIGHT CONTRAST TO EXISTING MC COLOROBOND METAL ROOF CAPPING - SHALE GREY MR COLORBOND METAL ROOF SHEETING - SHALE GREY SC STEEL COLUMN - GALVANISED SV SHEET VINYL FLOOR FINISH Building A: Ground Floor Plan 1 1:100
Transcript
Page 1: A02 Building A Ground Floor Pl - San Clemente High School · ground floor walkway cbr rl 18.50m door door window dp dp dp dp dp dp ha velock street catalogues computers stack area

D r a w i n g N o . :

T i t l e :

D r a w n :

S c a l e :

D a t e :

S t a t u s :

P l o t D a t e :

D r a w i n g :

A m e n d m e n t s :R e v : D a t e :

L e g e n d :

D e t a i l :

B a r S c a l e :

C l i e n t :

P r o j e c t N o :

P r o j e c t :

N o r t h P o i n t :

06:01

P r o j e c t N a m e :

Alterations & Additions:San Clemente Catholic High School

CDJ

DA

1:100

06:01

7 / 5 / 0 7

c a r s t e S T U D I O P T Y L T D

Al l i n fo rma t ion , concep ts and i deas con ta ined he re in a rethe p rope r t y o f Ca rs te S tud io P ty L td and may no t bed i s t r i bu ted and / o r rep roduced w i thou t exp ress pe rm iss ionf rom Cars te S tud io P ty L td . I t i s t he respons ib i l i t y o f t hebu i l de r t o check and ve r i f y a l l d imens ions on -s i t e p r i o r t othe commencemen t o f wo rk and to no t i f y Ca rs te S tud ioP ty L td o f any e r ro rs and omiss ions . Do no t sca led raw ing . Do no t use d raw ing fo r cons r tuc t i on pu rposesun less i ssued by Cars te S tud io P ty L td fo r cons t ruc t i on .

A B N 1 6 1 2 2 3 9 4 4 5 0 t r a d i n g a s A C N 1 2 2 3 9 4 4 5 0

p : ( 0 2 ) 4 9 5 1 2 5 7 8 m : 0 4 2 7 4 3 2 7 2 0 f : ( 0 2 ) 4 9 5 0 0 5 9 1e : b o o k e r a r c h @ t p g . c o m . a u a : P O B o x 1 4 9 W a l l s e n d 2 2 8 7

s t e p h e n b o o k e r a r c h i t e c tA r c h i t e c t s a n d H e r i t a g e C o n s u l t a n t s

07.05.07

-DA-A02

CATHOLICSCHOOLSOFFICEDiocese ofMaitland - Newcastle

Building A: Ground Floor Plan

78 Havelock Street Mayfield

N

1234567891011121314151617

0 1 2 3 4 5

600

3,18

011

06,

380

110

2,71

027

060

01,

665

770

270 3,100 110 3,800 110 19,940 110 3,350 270

31,060

16,3

95

1,070 535 1,776 535 1,070 3,552 1,070 535 1,776 535 1,070

8,58

011

04,

900

110

9,90

027

02,

230

230

13,3

6026

,330

39,6

90

1,379

13,525

1,10

02,

410

340

2,41

036

095

03,

710

110

3,45

095

01,

820

2,41

034

02,

410

830

270

26,3

30

11,1

8095

01,

230

3,03

5

2,50

523

03,

292

230

3,29

223

03,

292

230

3,29

223

03,

292

230

3,29

223

02,

230

230

230 3,364 230 3,364 230 3,364 230

1,80

02,

500

3,845

597 2,185 328 355 2,185 350 2,185 350 2,185 350 2,185 955 7,985

22,195

12,4

256,

340

3,55

02,

185

1,95

06,

335

1,28

02,

185

1,28

0

270

530

950

2,39

510

02,

444

950

480

270 60

061

095

01,

940

110

270 7,420 110 3,625 110 7,280 270

18,7

65

19,085

270

2,83

511

04,

470

270

5,79

527

04,

475

270

600

355 2,185 350 2,185 350 2,185 350 350 2,344 350 2,344 350 2,344 350 2,344 350

1,270

4,445

18,7

65

270

3,34

595

035

02,

185

350

2,18

51,

610

950

230

270

6,07

060

0

300 470 2,265 270 2,505 1,900 1,405 2,410 830 870 300

230

2,29

835

02,

298

350

2,29

830

0

1,900 4,420 2,005

270 2,840 270 2,400 110 2,400 110 2,400 270 2,285 950 3,022 1,900 2,698 270

973

4,005 350 2,410 3,370 2,410 350 2,410 2,770 2,410 350 2,410 350 2,410 2,005 2,410 640

1,10

02,

410

350

2,41

03,

080

2,41

03,

080

2,41

035

02,

410

350

2,41

01,

100

2,46

02,

022

610

350

610

2,40

561

035

061

02,

022

3,50

027

0

5A04

5A04

7A05

7A05

ART CLASSROOMSV

89.60m2

RECEPTIONCPT

DUPLICATING ROOMCPT

NEW RAMP1:14

Shelving above desk

Shelving above desk

WC

IT CLASSROOMCPT

79.10m2

PRACTICEROOM

CPT6.80m2

LIBRARIAN OFFICE/WORKROOM

CPT35.70m2

DP

SEMINAR 02CPT

13.00m2

SEMINAR 01CPT

13.00m2

ART STORESV

44.35m2

DP

DP DP

PRACTICEROOM

CPT6.80m2

DP

DP

DP

GRASSEDCOURTYARD

DP DP

DP

PRACTICEROOM

CPT6.80m2

MUSIC ROOMCPT

56.30m2

GARDEN STORECBR

21.00m2

SPORTS STORECBR

42.20m2

MUSIC ROOMCPT

56.30m2

DP

DP

DP

DP

DP

DPDP

AV STORECPT

9.00m2

DPDP

LIN

E O

F E

XIS

TIN

G D

EM

OU

NTA

BLE

WINDOW WINDOW

BO

UN

DA

RY

WINDOW

LINE OF EXISTING BUILDING

WINDOW WINDOW WINDOW

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

WIN

DO

WW

IND

OW

WIN

DO

WW

IND

OW

WIN

DO

W

WINDOWDOOR

DO

OR

DO

OR

DO

OR

WIN

DO

WW

IND

OW

WIN

DO

WW

IND

OW

WIN

DO

W

OPENINGOPENINGOPENING

WIN

DO

WW

IND

OW

ENTRYSV

10.60m2BOOK HIRE

CPT28.55m2

WIN

DO

WW

IND

OW

DO

OR

DO

OR

WINDOW WINDOW WINDOW WINDOW WINDOWDOORWINDOWDOORS

LIBRARYCPT

243.65m2

DO

OR

OP

EN

ING

GROUND FLOOR WALKWAYCBR

RL 19.00m

MUSICCOMPUTER/

STOREROOM

CPT17.40m2

BO

UN

DA

RY

BOUNDARY

WINDOW

DOORDOOR

OPENINGWINDOW WINDOWWINDOW

WIN

DO

WW

IND

OW

WIN

DO

W

WINDOW WINDOW WINDOW

GROUND FLOOR WALKWAYCBR

RL 18.50m

DO

OR

DO

OR

WIN

DO

W

DP DP

DP

DP

DP

DP

HAV

ELO

CK

STR

EE

T

Cat

alog

ues

ComputersComputers

Stack Area Computers

Com

pact

us

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

SE

CU

RE

STO

RE

CP

T

INTERVIEWCPT

AL ALUMINIUM LOUVRESCBR CONCRETE - BROOM FINISHCC OFFORM CONCRETE COLUMN - CLASS 2 FINISHCPT CARPET FLOOR FINISHDP COLORBOND DOWNPIPE - SHALE GREYFB1 FACE BRICK - TO MATCH EXISTINGFB2 FACE BRICK - LIGHT CONTRAST TO EXISTINGMC COLOROBOND METAL ROOF CAPPING -

SHALE GREYMR COLORBOND METAL ROOF SHEETING - SHALE GREYSC STEEL COLUMN - GALVANISEDSV SHEET VINYL FLOOR FINISH

Roof above

BURSARCPT

SICK BAYSV

SICK BAYSV

WAITINGCPT

CLERICALCPT

E: CURRENT BOOK HIRE ROOM -REFURBISH AND FIT OUT FOR PANTY

AND LAUNDRYSV

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RA

ISE

LE

VE

L O

F E

XIS

TIN

G W

ALK

WAY

BY

TOP

PIN

G W

ITH

CO

NC

RE

TE T

O M

AK

E T

HE

SC

HO

OL

GR

OU

ND

LE

VE

LW

HO

LLY

AC

CE

SS

IBLE

CB

R

RA

ISE

LE

VE

L O

F E

XIS

TIN

G W

ALK

WAY

BY

TOP

PIN

G W

ITH

CO

NC

RE

TE T

O M

AK

E T

HE

SC

HO

OL

GR

OU

ND

LE

VE

LW

HO

LLY

AC

CE

SS

IBLE

CB

R

INTERVIEWCPT

A5: CURRENT MUSIC CLASSROOM -GENERAL REFURBISHMENT ANDFIT OUT FOR PERFORMING ARTS

CPT

A6: CURRENT PHYSICAL EDUCATION CLASSROOMGENERAL REFURBISHMENT ANDFIT OUT FOR PERFORMING ARTS

CPT

B3: CURRENT FOOD TECHNOLOGY CLASSROOM -REFURBISH AND INSTALL NEW FIT-OUT

REFURBISHMENTS TO INCLUDE THE INSTALLATION OFCEILING AND SUBFLOOR VENTILATION

SV

B3: CURRENT PANTRY AND LAUNDRY -REFURBISH AND INSTALL NEW FIT-OUT FOR PANTRY

REFURBISHMENTS TO INCLUDE THE INSTALLATION OFCEILING AND SUBFLOOR VENTILATION

SV

A7 & A8: CURRENT FRENCH AND MATHEMATICS CLASSROOMS -REFURBISH AND FIT OUT FOR FOOD TECHNOLOGY

SV

WC: WOMENGENERAL

REFURBISHMENT AND NEW FITOUT

CT

NEW STAIR 01 EXISTING STAIR

INTERVIEW

345 2,410 345110

770 1,900 1,225 2,410 350 2,410 350 2,410 1,805 270 820 2,410 820 950 820 2,410 1,720

1234567891011121314151617

0 1 2 3 4 5

600

3,18

011

06,

380

110

2,71

027

060

01,

665

770

270 3,100 110 3,800 110 19,940 110 3,350 270

31,060

16,3

95

1,070 535 1,776 535 1,070 3,552 1,070 535 1,776 535 1,070

8,58

011

04,

900

110

9,90

027

02,

230

230

13,3

6026

,330

39,6

90

1,379

13,525

1,10

02,

410

340

2,41

036

095

03,

710

110

3,45

095

01,

820

2,41

034

02,

410

830

270

26,3

30

11,1

8095

01,

230

3,03

5

2,50

523

03,

292

230

3,29

223

03,

292

230

3,29

223

03,

292

230

3,29

223

02,

230

230

230 3,364 230 3,364 230 3,364 230

1,80

02,

500

3,845

597 2,185 328 355 2,185 350 2,185 350 2,185 350 2,185 955 7,985

22,195

12,4

256,

340

3,55

02,

185

1,95

06,

335

1,28

02,

185

1,28

0

270

530

950

2,39

510

02,

444

950

480

270 60

061

095

01,

940

110

270 7,420 110 3,625 110 7,280 270

18,7

65

19,085

270

2,83

511

04,

470

270

5,79

527

04,

475

270

600

355 2,185 350 2,185 350 2,185 350 350 2,344 350 2,344 350 2,344 350 2,344 350

1,270

4,445

18,7

65

270

3,34

595

035

02,

185

350

2,18

51,

610

950

230

270

6,07

060

0

300 470 2,265 270 2,505 1,900 1,405 2,410 830 870 300

230

2,29

835

02,

298

350

2,29

830

0

1,900 4,420 2,005

270 2,840 270 2,400 110 2,400 110 2,400 270 2,285 950 3,022 1,900 2,698 270

973

4,005 350 2,410 3,370 2,410 350 2,410 2,770 2,410 350 2,410 350 2,410 2,005 2,410 640

1,10

02,

410

350

2,41

03,

080

2,41

03,

080

2,41

035

02,

410

350

2,41

01,

100

2,46

02,

022

610

350

610

2,40

561

035

061

02,

022

3,50

027

0

5A04

5A04

7A05

7A05

ART CLASSROOMSV

89.60m2

RECEPTIONCPT

DUPLICATING ROOMCPT

NEW RAMP1:14

Shelving above desk

Shelving above desk

WC

IT CLASSROOMCPT

79.10m2

PRACTICEROOM

CPT6.80m2

LIBRARIAN OFFICE/WORKROOM

CPT35.70m2

DP

SEMINAR 02CPT

13.00m2

SEMINAR 01CPT

13.00m2

ART STORESV

44.35m2

DP

DP DP

PRACTICEROOM

CPT6.80m2

DP

DP

DP

GRASSEDCOURTYARD

DP DP

DP

PRACTICEROOM

CPT6.80m2

MUSIC ROOMCPT

56.30m2

GARDEN STORECBR

21.00m2

SPORTS STORECBR

42.20m2

MUSIC ROOMCPT

56.30m2

DP

DP

DP

DP

DP

DPDP

AV STORECPT

9.00m2

DPDP

LIN

E O

F E

XIS

TIN

G D

EM

OU

NTA

BLE

WINDOW WINDOW

BO

UN

DA

RY

WINDOW

LINE OF EXISTING BUILDING

WINDOW WINDOW WINDOW

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

WIN

DO

WW

IND

OW

WIN

DO

WW

IND

OW

WIN

DO

W

WINDOWDOOR

DO

OR

DO

OR

DO

OR

WIN

DO

WW

IND

OW

WIN

DO

WW

IND

OW

WIN

DO

W

OPENINGOPENINGOPENING

WIN

DO

WW

IND

OW

ENTRYSV

10.60m2BOOK HIRE

CPT28.55m2

WIN

DO

WW

IND

OW

DO

OR

DO

OR

WINDOW WINDOW WINDOW WINDOW WINDOWDOORWINDOWDOORS

LIBRARYCPT

243.65m2

DO

OR

OP

EN

ING

GROUND FLOOR WALKWAYCBR

RL 19.00m

MUSICCOMPUTER/

STOREROOM

CPT17.40m2

BO

UN

DA

RY

BOUNDARY

WINDOW

DOORDOOR

OPENINGWINDOW WINDOWWINDOW

WIN

DO

WW

IND

OW

WIN

DO

W

WINDOW WINDOW WINDOW

GROUND FLOOR WALKWAYCBR

RL 18.50m

DO

OR

DO

OR

WIN

DO

W

DP DP

DP

DP

DP

DP

HAV

ELO

CK

STR

EE

T

Cat

alog

ues

ComputersComputers

Stack Area Computers

Com

pact

us

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

SE

CU

RE

STO

RE

CP

T

INTERVIEWCPT

AL ALUMINIUM LOUVRESCBR CONCRETE - BROOM FINISHCC OFFORM CONCRETE COLUMN - CLASS 2 FINISHCPT CARPET FLOOR FINISHDP COLORBOND DOWNPIPE - SHALE GREYFB1 FACE BRICK - TO MATCH EXISTINGFB2 FACE BRICK - LIGHT CONTRAST TO EXISTINGMC COLOROBOND METAL ROOF CAPPING -

SHALE GREYMR COLORBOND METAL ROOF SHEETING - SHALE GREYSC STEEL COLUMN - GALVANISEDSV SHEET VINYL FLOOR FINISH

Roof above

BURSARCPT

SICK BAYSV

SICK BAYSV

WAITINGCPT

CLERICALCPT

E: CURRENT BOOK HIRE ROOM -REFURBISH AND FIT OUT FOR PANTY

AND LAUNDRYSV

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RA

ISE

LE

VE

L O

F E

XIS

TIN

G W

ALK

WAY

BY

TOP

PIN

G W

ITH

CO

NC

RE

TE T

O M

AK

E T

HE

SC

HO

OL

GR

OU

ND

LE

VE

LW

HO

LLY

AC

CE

SS

IBLE

CB

R

RA

ISE

LE

VE

L O

F E

XIS

TIN

G W

ALK

WAY

BY

TOP

PIN

G W

ITH

CO

NC

RE

TE T

O M

AK

E T

HE

SC

HO

OL

GR

OU

ND

LE

VE

LW

HO

LLY

AC

CE

SS

IBLE

CB

R

INTERVIEWCPT

A5: CURRENT MUSIC CLASSROOM -GENERAL REFURBISHMENT ANDFIT OUT FOR PERFORMING ARTS

CPT

A6: CURRENT PHYSICAL EDUCATION CLASSROOMGENERAL REFURBISHMENT ANDFIT OUT FOR PERFORMING ARTS

CPT

B3: CURRENT FOOD TECHNOLOGY CLASSROOM -REFURBISH AND INSTALL NEW FIT-OUT

REFURBISHMENTS TO INCLUDE THE INSTALLATION OFCEILING AND SUBFLOOR VENTILATION

SV

B3: CURRENT PANTRY AND LAUNDRY -REFURBISH AND INSTALL NEW FIT-OUT FOR PANTRY

REFURBISHMENTS TO INCLUDE THE INSTALLATION OFCEILING AND SUBFLOOR VENTILATION

SV

A7 & A8: CURRENT FRENCH AND MATHEMATICS CLASSROOMS -REFURBISH AND FIT OUT FOR FOOD TECHNOLOGY

SV

WC: WOMENGENERAL

REFURBISHMENT AND NEW FITOUT

CT

NEW STAIR 01 EXISTING STAIR

INTERVIEW

345 2,410 345110

770 1,900 1,225 2,410 350 2,410 350 2,410 1,805 270 820 2,410 820 950 820 2,410 1,720

1234567891011121314151617

0 1 2 3 4 5

600

3,18

011

06,

380

110

2,71

027

060

01,

665

770

270 3,100 110 3,800 110 19,940 110 3,350 270

31,060

16,3

95

1,070 535 1,776 535 1,070 3,552 1,070 535 1,776 535 1,070

8,58

011

04,

900

110

9,90

027

02,

230

230

13,3

6026

,330

39,6

90

1,379

13,525

1,10

02,

410

340

2,41

036

095

03,

710

110

3,45

095

01,

820

2,41

034

02,

410

830

270

26,3

30

11,1

8095

01,

230

3,03

5

2,50

523

03,

292

230

3,29

223

03,

292

230

3,29

223

03,

292

230

3,29

223

02,

230

230

230 3,364 230 3,364 230 3,364 230

1,80

02,

500

3,845

597 2,185 328 355 2,185 350 2,185 350 2,185 350 2,185 955 7,985

22,195

12,4

256,

340

3,55

02,

185

1,95

06,

335

1,28

02,

185

1,28

0

270

530

950

2,39

510

02,

444

950

480

270 60

061

095

01,

940

110

270 7,420 110 3,625 110 7,280 270

18,7

65

19,085

270

2,83

511

04,

470

270

5,79

527

04,

475

270

600

355 2,185 350 2,185 350 2,185 350 350 2,344 350 2,344 350 2,344 350 2,344 350

1,270

4,445

18,7

65

270

3,34

595

035

02,

185

350

2,18

51,

610

950

230

270

6,07

060

0

300 470 2,265 270 2,505 1,900 1,405 2,410 830 870 300

230

2,29

835

02,

298

350

2,29

830

0

1,900 4,420 2,005

270 2,840 270 2,400 110 2,400 110 2,400 270 2,285 950 3,022 1,900 2,698 270

973

4,005 350 2,410 3,370 2,410 350 2,410 2,770 2,410 350 2,410 350 2,410 2,005 2,410 640

1,10

02,

410

350

2,41

03,

080

2,41

03,

080

2,41

035

02,

410

350

2,41

01,

100

2,46

02,

022

610

350

610

2,40

561

035

061

02,

022

3,50

027

0

5A04

5A04

7A05

7A05

ART CLASSROOMSV

89.60m2

RECEPTIONCPT

DUPLICATING ROOMCPT

NEW RAMP1:14

Shelving above desk

Shelving above desk

WC

IT CLASSROOMCPT

79.10m2

PRACTICEROOM

CPT6.80m2

LIBRARIAN OFFICE/WORKROOM

CPT35.70m2

DP

SEMINAR 02CPT

13.00m2

SEMINAR 01CPT

13.00m2

ART STORESV

44.35m2

DP

DP DP

PRACTICEROOM

CPT6.80m2

DP

DP

DP

GRASSEDCOURTYARD

DP DP

DP

PRACTICEROOM

CPT6.80m2

MUSIC ROOMCPT

56.30m2

GARDEN STORECBR

21.00m2

SPORTS STORECBR

42.20m2

MUSIC ROOMCPT

56.30m2

DP

DP

DP

DP

DP

DPDP

AV STORECPT

9.00m2

DPDP

LIN

E O

F E

XIS

TIN

G D

EM

OU

NTA

BLE

WINDOW WINDOW

BO

UN

DA

RY

WINDOW

LINE OF EXISTING BUILDING

WINDOW WINDOW WINDOW

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

WIN

DO

WW

IND

OW

WIN

DO

WW

IND

OW

WIN

DO

W

WINDOWDOOR

DO

OR

DO

OR

DO

OR

WIN

DO

WW

IND

OW

WIN

DO

WW

IND

OW

WIN

DO

W

OPENINGOPENINGOPENING

WIN

DO

WW

IND

OW

ENTRYSV

10.60m2BOOK HIRE

CPT28.55m2

WIN

DO

WW

IND

OW

DO

OR

DO

OR

WINDOW WINDOW WINDOW WINDOW WINDOWDOORWINDOWDOORS

LIBRARYCPT

243.65m2

DO

OR

OP

EN

ING

GROUND FLOOR WALKWAYCBR

RL 19.00m

MUSICCOMPUTER/

STOREROOM

CPT17.40m2

BO

UN

DA

RY

BOUNDARY

WINDOW

DOORDOOR

OPENINGWINDOW WINDOWWINDOW

WIN

DO

WW

IND

OW

WIN

DO

W

WINDOW WINDOW WINDOW

GROUND FLOOR WALKWAYCBR

RL 18.50m

DO

OR

DO

OR

WIN

DO

W

DP DP

DP

DP

DP

DP

HAV

ELO

CK

STR

EE

T

Cat

alog

ues

ComputersComputers

Stack Area Computers

Com

pact

us

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

LIN

E O

F E

XIS

TIN

G B

UIL

DIN

G

SE

CU

RE

STO

RE

CP

T

INTERVIEWCPT

AL ALUMINIUM LOUVRESCBR CONCRETE - BROOM FINISHCC OFFORM CONCRETE COLUMN - CLASS 2 FINISHCPT CARPET FLOOR FINISHDP COLORBOND DOWNPIPE - SHALE GREYFB1 FACE BRICK - TO MATCH EXISTINGFB2 FACE BRICK - LIGHT CONTRAST TO EXISTINGMC COLOROBOND METAL ROOF CAPPING -

SHALE GREYMR COLORBOND METAL ROOF SHEETING - SHALE GREYSC STEEL COLUMN - GALVANISEDSV SHEET VINYL FLOOR FINISH

Roof above

BURSARCPT

SICK BAYSV

SICK BAYSV

WAITINGCPT

CLERICALCPT

E: CURRENT BOOK HIRE ROOM -REFURBISH AND FIT OUT FOR PANTY

AND LAUNDRYSV

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RAISE LEVEL OF EXISTING WALKWAY BY TOPPING WITHCONCRETE TO MAKE THE SCHOOL GROUND LEVEL

WHOLLY ACCESSIBLECBR

RA

ISE

LE

VE

L O

F E

XIS

TIN

G W

ALK

WAY

BY

TOP

PIN

G W

ITH

CO

NC

RE

TE T

O M

AK

E T

HE

SC

HO

OL

GR

OU

ND

LE

VE

LW

HO

LLY

AC

CE

SS

IBLE

CB

R

RA

ISE

LE

VE

L O

F E

XIS

TIN

G W

ALK

WAY

BY

TOP

PIN

G W

ITH

CO

NC

RE

TE T

O M

AK

E T

HE

SC

HO

OL

GR

OU

ND

LE

VE

LW

HO

LLY

AC

CE

SS

IBLE

CB

R

INTERVIEWCPT

A5: CURRENT MUSIC CLASSROOM -GENERAL REFURBISHMENT ANDFIT OUT FOR PERFORMING ARTS

CPT

A6: CURRENT PHYSICAL EDUCATION CLASSROOMGENERAL REFURBISHMENT ANDFIT OUT FOR PERFORMING ARTS

CPT

B3: CURRENT FOOD TECHNOLOGY CLASSROOM -REFURBISH AND INSTALL NEW FIT-OUT

REFURBISHMENTS TO INCLUDE THE INSTALLATION OFCEILING AND SUBFLOOR VENTILATION

SV

B3: CURRENT PANTRY AND LAUNDRY -REFURBISH AND INSTALL NEW FIT-OUT FOR PANTRY

REFURBISHMENTS TO INCLUDE THE INSTALLATION OFCEILING AND SUBFLOOR VENTILATION

SV

A7 & A8: CURRENT FRENCH AND MATHEMATICS CLASSROOMS -REFURBISH AND FIT OUT FOR FOOD TECHNOLOGY

SV

WC: WOMENGENERAL

REFURBISHMENT AND NEW FITOUT

CT

NEW STAIR 01 EXISTING STAIR

INTERVIEW

345 2,410 345110

770 1,900 1,225 2,410 350 2,410 350 2,410 1,805 270 820 2,410 820 950 820 2,410 1,720

Building A: Ground Floor Plan1 1:100

Recommended