+ All Categories
Home > Documents > A40/A417 Roundabout Overview...A40/A417 Roundabout Overview Gloucestershire County Council together...

A40/A417 Roundabout Overview...A40/A417 Roundabout Overview Gloucestershire County Council together...

Date post: 29-Mar-2021
Category:
Upload: others
View: 15 times
Download: 0 times
Share this document with a friend
1
45 42 45 Maisemore A417 Highnam Roundabout A40(T) Gloucester City, A417 Over Causeway New Sheet Piled retaining wall to accommodate carriageway widening. Existing bank profile to remain as present New Sheet Piled retaining wall to accommodate carriageway widening. Existing bank profile to remain as present Carriageway widened and approach lanes extended to increase capacity at roundabout Carriageway widening Carriageway widening to facilitate additional lane on roundabout Carriageway widening Carriageway widened and additional approach lane constructed to increase capacity at roundabout All Existing pedestrian and cycle routes (Sustrans routes 42 &45) to remain as existing Longford Roundabout A40(T) N A40/A417 Roundabout Overview Gloucestershire County Council together with GFirst LEP, are proposing to undertake highway improvement works to the A40 Over Roundabout. The scheme is planned to start early 2018 and will comprise of the following elements: • A417 Southbound: widening of the southbound approach to the roundabout entry to extend three approach lanes at the junction Give Way line • A40 Westbound: widening of the westbound approach to the roundabout entry to extend three lanes at the junction Give Way line • A40 Roundabout Circulatory: the addition of a third circulatory lane Gloucestershire County Council LA076627 Working in partnership with Over Roundabout Site A40(T) A40(T) A417
Transcript
Page 1: A40/A417 Roundabout Overview...A40/A417 Roundabout Overview Gloucestershire County Council together with GFirst LEP, are proposing to undertake highway improvement works to the A40

45

42

45

Mais

em

ore

A417

Highnam Roundabout

A40(T)

Glo

uceste

r City,

A417 O

ver C

au

sew

ay

New Sheet Piled retaining wall toaccommodate carriageway widening.Existing bank profile to remain as present

New Sheet Piled retaining wall toaccommodate carriageway widening.Existing bank profile to remain as present

Carriageway widened andapproach lanes extended toincrease capacity at roundabout

Carriageway widening

Carriageway widening to facilitateadditional lane on roundabout

Carriageway widening

Carriageway widened and additionalapproach lane constructed toincrease capacity at roundabout

All Existing pedestrian and cycleroutes (Sustrans routes 42 &45)to remain as existing

Longford Roundabout

A40(T)

N

A40/A417 Roundabout OverviewGloucestershire County Council together with GFirst LEP, are proposing to undertake highway improvement works to the A40 Over Roundabout. The scheme is planned to start early 2018 and will comprise of the following elements:

• A417 Southbound: widening of the southbound approach to the roundabout entry to extend three approach lanes at the junction Give Way line

• A40 Westbound: widening of the westbound approach to the roundabout entry to extend three lanes at the junction Give Way line

• A40 Roundabout Circulatory: the addition of a third circulatory lane

Gloucestershire County Council

LA076627Working inpartnership with

Over Roundabout Site

A40(T)

A40(T)

A417

Recommended