Bharat Heavy Electricals Limited, Bhopal भारत हेवी इलेरिकस ललिटेड, भोपावष 18, अंक 09, जनवरी 2019
Transcript
  • Bharat Heavy Electricals Limited, Bhopal

    भारत हेवी इलेक्ट्रिकल्स लललिटेड, भोपाल

    वर्ष 18, अंक 09, जनवरी 2019

  • भेल दिवस…………….

    …...

    Commissioning within a record time…

    Order received ……

    ….

    CBIP Award……….

    Largest SPV power plant …...

  • भेल भोपाल में हाइड्रो लेब परिसि में भेल दिवस अत्यंत उत्साह के साथ मनाया गया। श्री डी.के. ठाकुि, काययपालक दनिेशक,

    बीएचईएल भोपाल ने भािी संख्या में उपदथथत कमयचारियों को बीएचईएल के थटेक होल्डिों के साथ की गई वचनबद्धताओ ं

    को हि हाल में पिूा किने का अनिुोध किते हुए कहा दक बीएचईएल अपने अध्यक्ष एवं प्रबंध दनिेशक के कुशल नेततृ्व में

    एक बेहति कल के दनमायण के दलए प्रदतबद्ध हैं। इस अवसि पि सभी महाप्रबन्धक, वरिष्ठ कमांडेंट तथा टे्रड यदूनयनों के प्रदतदनदध भी उपदथथत थे।

    श्री ठाकुि ने सबसे पहले अध्यक्ष एवं प्रबंध दनिेशक, श्री सोबती का संिेश पढ़कि सनुाया । श्री ठाकुि ने इस बात पि प्रसन्नता

    व्यक्त की दक बीएचईएल, को वर्य 2018 के िौिान अच्छे आिेश प्राप्त हुए ह ै। इसके साथ साथ उन्होंने अन्य दवभागों की

    भी सिाहना की।

    इस अवसि पि भेल कापोिेट काययलय द्वािा अयोदित छायादचत्र प्रदतयोदगता के दविेताओ

    को भी सम्मादनत दकया गया दिसमे श्री सुिेश कुमाि सोनपिेु, उप अदधकािी (प्रचाि एवं िंसम्पकय दवभाग) को “हम दहतधािकों

    को खशु किते हैं” वगय मैं प्रथम पिुथकाि तथा श्री सत्य श्री, उप प्रबंधक (एचसीएम दवभाग) को “भेल मैं िीवन ” वगय मैं दत्रदतय

    परुुथकाि प्राप्त हुआ ह ै। काययक्रम के समापन के बाि श्री ठाकुि ने सभी ब्लॉकों तथा दवभागों में कमयचारियों से भेंट दकया औि

    उनका उत्साह वधयन दकया।

    काययक्रम का संचालन श्री िाघवेन्र शकु्ल, अपि महाप्रबंधक (पी एण्ड पीआि) ने दकया।

    “भले दिवस”

  • Among all State and Central Public Sector Enterprises, BHEL has

    been adjudged as the Best PSE in Strategic Performance by an

    independent jury for the Governance Now PSU Award 2019. The

    award was received by Sh. Atul Sobti, CMD, BHEL, from Sh. Manoj

    Tiwari, Hon’ble Member of Parliament, at a function in New Delhi.

    “Best PSE Award”

  • Bharat Heavy Electricals Limited (BHEL) has been awarded the CBIP Award

    2019 for 'Best Power Equipment Manufacturing Organisation'. The award was

    received by Sh. Atul Sobti, CMD, BHEL, from Sh. R.K. Singh, Hon'ble Union

    Minister of State (Independent Charge) for New & Renewable Energy and

    Power, on CBIP Day. BHEL has been conferred with the award for its

    outstanding contribution towards nation building through manufacturing a wide

    range of equipment for the core sectors of the economy.

    “CBIP Award 2019”

  • Amidst stiff international competitive bidding (ICB), Bharat Heavy Electricals

    Limited (BHEL) has bagged a major order for setting up a 660 MW supercritical

    thermal power plant in West Bengal. Valued at approximately Rs. 3,500 Crore, the

    order for setting up the 1x660 MW Sagardighi Thermal Power Project Extension

    Unit-5 at Manigram village in Murshidabad district of West Bengal, has been placed

    on BHEL by West Bengal Power Development Corporation (WBPDCL).

    BHEL’s scope of work in the project includes design, engineering, manufacture,

    supply, erection, testing and commissioning of the Main Plant Turnkey Package,

    comprising supercritical boiler and turbine generator along with its auxiliaries,

    electricals, controls & instrumentation, switchyard, flue gas desulphurization (FGD)

    and selective catalytic reduction (SCR) systems, coal handling plant and ash

    handling plant. The supercritical technology based project would significantly

    contribute to the nation’s quest for clean and eco-friendly power and would cut fuel

    consumption by employing high efficiency equipment working at higher operating

    parameters. The project will further limit emissions by utilizing state-of-the-art

    emission control equipment - FGD and SCR systems to capture pollutants like SOx

    and NOx, aimed at meeting revised emission norms, notified by the Ministry of

    Environment, Forest and Climate Change.

    Significantly, BHEL has so far contributed over 80% of the total coal-based

    generating capacity of WBPDCL. The key equipment for the project will be

    manufactured at BHEL’s Trichy, Haridwar, Bhopal, Ranipet, Hyderabad, Jhansi,

    Thirumayam and Bengaluru plants, while the company's Power Sector - Eastern

    Region division will be responsible for construction and installation activities on

    site. BHEL is the leading power equipment manufacturer in the country with 58 sets

    of supercritical boilers and 51 sets of supercritical turbine generators ordered on it

    so far, by various customers in the domestic as well as overseas markets.

    BHEL is India’s largest manufacturer of power generation equipment with an

    installed base of over 1,83,000 MW of power plant equipment globally. In the

    supercritical segment, BHEL has successfully manufactured and executed 660 MW,

    700 MW and 800 MW sets, thereby demonstrating its leadership status and

    technological prowess.

    “Received Order worth Rs. 3500 crores”

  • Enhanced focus on expeditious project execution has resulted in Bharat

    Heavy Electricals Limited (BHEL) creating a new benchmark of

    successfully commissioning a 800 MW thermal unit within a record time

    of 46 months. This is a marked improvement over the time taken in

    commissioning of 800 MW sets till date in the country by various

    developers. Following the successful commissioning in record time by

    BHEL, the power plant has attained commercial operation. The 800 MW

    set has been commissioned at Kothagudem Thermal Power Station

    (KTPS) of Telangana State Power Generation Corporation (TSGENCO).

    BHEL has executed this project on Engineering, Procurement and

    Construction (EPC) basis, which includes design, engineering,

    manufacture, supply, civil works and erection & commissioning of Steam

    Turbines, Generators, Boiler and associated Auxiliaries and electricals,

    besides state-of-the-art controls & instrumentation (C&I), Electrostatic

    precipitators (ESPs) and Balance of Plant (BoP) packages. While the

    construction of the plant was undertaken by the company's Power Sector

    - Southern Region, the key equipment for the contract has been

    manufactured at BHEL’s Trichy, Haridwar, Bhopal, Ranipet, Hyderabad,

    Jhansi, Thirumayam and Bengaluru plants. Besides the 1x800 MW

    Kothagudem project, TSGENCO had awarded the 5x800 MW Yadadri

    project and the 4x270 MW Bhadradari project to BHEL, which are

    presently under execution. In addition, in the state of Telangana, BHEL is

    also executing the Steam Generator package at the 2x800 MW Telangana

    STPP for NTPC. BHEL has been a committed partner in the development

    of Telangana, with BHELsupplied sets contributing to 88% of the coal-

    based power stations installed in the state. Projects equipped with BHEL

    supplied sets such as Ramagundam and Kothagudem have been

    consistently winning meritorious awards from the Ministry of Power for

    their outstanding performance. BHEL is India’s largest manufacturer of

    power generating equipment with an installed base of over 1,83,000 MW

    of power plant equipment globally. BHEL has so far contracted 57 sets of

    supercritical boilers and 50 sets of supercritical turbine generators from

    various customers, in domestic as well as overseas markets.

    “Commissioning within a record time”

  • Bharat Heavy Electricals Limited (BHEL) has won an order for setting up

    129 MW Solar Photovoltaic (SPV) power plants in Telangana from

    Singareni Collieries Company Limited. Significantly, valued at Rs.565

    Crore, this is the largest SPV power plant order won by BHEL till date.

    The plants are to be set up at four locations in Telangana - Ramagundam

    (50 MW), Yellandu (39 MW), Manuguru (30 MW) and Pegadapally (10

    MW), on Engineering, Procurement and Construction (EPC) basis. With

    this order, BHEL’s solar portfolio has risen to more than 710 MW. BHEL

    has more than three decades of expertise in solar photovoltaic products and

    services backed by a dedicated R&D setup.

    BHEL is one of the very few companies in India, having established

    capability in major segments of the PV value chain viz., solar cells, PV

    modules and power conditioning units and systems. BHEL has

    significantly contributed to the ‘Make in India’ initiative of GoI and

    various initiatives for developing and promoting renewable energy based

    products and services on a sustained basis. The company has also enhanced

    its state-of-the-art manufacturing lines of solar cells and solar modules. In

    addition to this, BHEL is assembling space-grade solar panels using high

    efficiency cells at its Electronic Systems Division, Bengaluru. In addition

    to solar photovoltaic products, BHEL offers complete EPC solutions from

    concept to commissioning for both off-grid and grid-interactive SPV

    power plants in various parts of the country including Lakshadweep and

    Andaman & Nicobar Islands.

    “Largest SPV power plant order”

  • Bharat Heavy Electricals Limited (BHEL) will set up a network of Solar-

    based Electric Vehicle Chargers (SEVC) on the Delhi-Chandigarh

    Highway. The project is covered under the FAME scheme [Faster

    Adoption and Manufacturing of (Hybrid &) Electric Vehicles in India] of

    the Department of Heavy Industry (DHI), Government of India.

    The establishment of EV chargers at regular intervals over the entire 250

    kms stretch between Delhi and Chandigarh would allay range-anxiety

    among the Electric Vehicle users and bolster their confidence for inter-city

    travel.

    BHEL’s scope of work in the project includes design, engineering,

    manufacturing, supply and installation of the EV charging stations along

    with a Central Monitoring System. Each SEVC charging station will be

    equipped with a rooftop solar power plant to supply green energy to fast

    and slow chargers planned to be installed at the location.

    As part of its diversification initiative, BHEL has been expanding its

    footprints in the e-mobility business. Notably, the company has already

    installed DC chargers at Udyog Bhawan in New Delhi. BHEL is also

    executing another commercial order for installation of DC chargers across

    various locations in the country.

    BHEL is extending its offering in the e-mobility segment and has equipped

    itself to foray into manufacturing of EV chargers, electric buses and related

    critical components. As part of the ‘Make in India’ initiative of the

    Government of India, in-house development of EV motors, propulsion

    systems and fast chargers has also been undertaken by the company.

    “Set-up Solar-based EV Chargers”

  • दवभागीय दहिंी सदम दत यों के अध् यक्ष/सदचवों की बैठक दिनांक 30.12.2018 को महाप्रबंधक (मानव संसाधन) श्री एम इसािोि

    की अध् यक्षता में प्रशासदनक भवन, तीसिी मंदिल के सम् मेलन कक्ष में सम् पन् न हुई. इस बैठक में दवशेर् अदत दथ के रूप में

    महाप्रबंधक (एससीआि इिंी. एवं एमएम) श्रीमती नीलम भोगल, अपि महाप्रबंधक (मा.सं.) श्री दवनय कुमाि, वरिष् ठ िािभार्ा

    अदधकािी श्रीमती पनूम साहू एवं सभी दवभागीय सदम दत यों के अध् यक्ष एवं सदचवगण सदहत 61 लोग उपदथथत थे.

    बैठक में थ वागत संबोधन के पवूय बीएचईएल, भोपाल की ई-गहृ पदत्रका “भेल भािती” का दवमोचन महाप्रबंधक (मानव संसाधन)

    श्री एम इसािोि एवं महाप्रबंधक (एससीआि इिंी. एवं एमएम) श्रीमती नीलम भोगल ने दकया. इस अवसि पि महाप्रबंधक (मानव

    संसाधन) श्री एम इसािोि ने अपने संबोधन में कहा दक दहिंी कायय को आगे बढ़ाने में हम सभी लोगों को वर्य भि दहिंी में कायय

    किना होगा इसके दलए सभी का सहयोग अपेदक्षत ह.ै भोपाल इकाई में दहिंी कायय का अच् छा वाताविण ह.ै उन् होंने आहवान दकया

    दक िो दवभाग दहिंी कायय में कमिोि हैं उन् हें सभी दवभाग दमलकि सहयोग किें दिससे वे वर्य के िौिान बेहति कायय कि सके.

    इसके पश् चात महाप्रबंधक (एससीआि इिंी. एवं एमएम) श्रीमती नीलम भोगल ने अपने संबोधन में कहा दक आि हमें गवय ह ैदक

    दहिंी एवं भेल के प्रदत सभी को प् याि ह.ै इकाई में दहिंी कायय को बढ़ाने में सभी की भागीिािी होनी चादहए. आि तकनीकी क्षेत्र

    में भी काफी कायय दहिंी में हो िहा ह ैइसके साथ ही ई-मेल में दहिंी के प्रयोग से कायय को काफी बढ़ाया िा सकता ह ैइसके दलए

    ज् यािा से ज् यािा दहिंी का प्रयोग ई-मले में किें. उन् होंने आहवान दकया दक सभी दवभागाध् यक्ष अपने हथ ताक्षि एवं दटप् पदणयां दहिंी

    में ही दलखें. इसके दलए पे्रम भाव व दिल से कायय किें इससे हमें सकािात् मक ऊिाय दमलेगी.

    इसके पश् चात मानव संसाधन की वरिष् ठ काययपालक (दवदध) श्रीमती नम्रता िायसवाल एवं पे्रसशॉप दवभाग के श्री एम एम खिे,

    उप अदभयंता ने अपने अपने दवभागों में वर्य के िौिान दकेये गए दहिंी कायों का प्रथ ततुीकिण दकया गया. काययक्रम का संचालन

    श्रीमती पनूम साहू, वरिष् ठ िािभार्ा अदधकािी ने दकया. इस अवसि पि दवभाग के समथ त अदधकािी/कमयचािी उपदथथत थे.

    “विभागीय व िंदी सव व यों के अध् यक्ष/सवििों की बठैक”

  • बी एच ई एल कॉपोिेट कायायलय द्वािा कम्पनी थति पि दवदभन्न 8 वगय/दवर्यो पि छायादचत्र

    प्रदतयोदगता आयोदित की गई थीIदिसमे भेल भोपाल के श्री सिेुश सोनपिेु,उप अदधकािी(प्रचाि एवं

    िन सम्पकय )को “ हम दहतधािको को खशु किते है” वगय मे प्रथम पिुथकाि तथा श्री सत्यश्री को “

    भेल मे िीवन” वगय मे त्रतीय पिुथकाि प्राप्त हुआIश्री डी के ठाकुि,काययपालक दनिेशक ने “भेल

    दिवस” के अवसि पि िोनों दविेताओ को दनिेशक मानव संसाधन द्वािा हथताक्षरित प्रमाण पत्र प्रिान

    दकये एवं हादियक बधाई िीI

    भेल परिवाि की ओि स ेश्री सिेुश सोनपिेु एवं श्री सत्यश्री को अनेक शभुकामनाए I

    “बधाई”

  • भोपाल

    An awareness programme on “Organ Donation “was organized by

    Shree Shivam Foundation in Jawaharlal Nehru School and Kasturba

    College of Nursing. The programme was led by Dr. Mrs. Pratibha

    Thakur, President- Ladies Club, BHEL. Mrs. Neelam Bhogal

    General Manager (SCR-Engg&MM) &(President-BSM), Mrs. Navita Nigam (Vice –President, Ladies Club, BHEL, Mr. Ashutosh

    Chatterjee (Secretary, BSM), Dr. Kalpana Thorat (Joint Secretary-

    BSM) were present in the programme.

    Mr. Harish Mantri, Director (Shree Shivam Foundation) gave a

    comprehensive talk on organ donation. He started the talk by

    energizing the audience with clapping exercise. The topics covered

    in the session were need for organ donation, importance of organ

    donation in saving another life, types of organ donation. Interactive

    session saw active participation from students, asking doubts on

    different issues related to organ donation. Mrs. Neelam Bhogal also

    shared her experience recipient of kidney in their family,

    encouraging everyone for organ donation.

    “Programme on “Organ Donation”

  • बी.एच.ई.एल. लेडीज़ क् लब की अध् यक्ष डॉ. श्रीमती प्रदतभा ठाकुि द्वािा बी.एच.ई.एल. लेडीज़ एिूकेशनल

    वेलफेयि दवंग में काययित कमयचारियों औि भले में िाने वाले कम् प् यूटि आपिेटसय को नववर्य का उपहाि प्रिान कि

    शभुकामनाएँ िी। इस अवसि पि संथ था की उपाध् यक्ष श्रीमती नदवता दनगम औि कोर्ाध् यक्ष श्रीमती सुतपा भौदमक

    एवं लेडीज़ क् लब द्वािा संचादलत सभी सेंटि की उपाध् यक्ष एवं काययकारिणी सिथ य उपदथथत थी।

    भेल हदेल्पंग हणै्डस के टेकनीकल सेन्टि में गत दिवस नववर्य हते ुउपहाि दवतिण का काययक्रम आयोदित दकया गया।

    इस अवसि पि भेल लेडीि वेलफेयि सोसायटी की अध्यक्षा डॉ श्रीमदत प्रदतभा ठाकुि के कि कमलों द्वािा नवबर्य हते ु

    हदेल्पंग हणै्डस के कमयचारियों को उपहाि दवतिण दकया गया। अध्यक्षा द्वािा नववर्य हते ुअपनी शभुाकामनाएं व्यक्त

    की। इस अवसि पि लेडीि क्लब काययकािणी के उपाध्यक्षा श्रीमती पषु्पलता दमश्रा, उपाध्यक्षा श्रीमदत दिक्षा दनगम,

    उपाध्यक्षा श्रीमदत दनदकता माथिु, टेकनीकल सेंटि की सदचव श्रीमदत सदुमता सिना एवं कोर्ाध्यक्षा श्रीमदत अनिुा

    मिूमिाि आदि दवशेर् रुप से उपदथथत थे।

    “लेडीज़ क् लब की झलदकया”

  • “Appreciation”

  • “BHEL Day’19 celebration at CO”

    http://intranet.bhel.in/home/Videos/CMDBHELdayspeech.mp4

    javascript:openlink('http://intranet.bhel.in/home/Videos/CMDBHELdayspeech.mp4')

  • BEST WISHES

    NAME STAFFNO DESIGNATION DIV D O B ENTERED BHEL JOINED AS DURATION

    1) SHRI M HALDER 2513943 GM(FEEDERS) CIM 30/12/1958 01/11/1979 ENGINEER TRAINEE 39y 2m

    23d

    2) DR S C GOYAL 1276700 ADDL.GM (MEDICAL) MED 22/01/1959 26/07/1994 SR.MEDICAL OFFICER 24y 5m 29d

    3) SHRI A K PARANJPE 1237381 DGM TRE 06/01/1959 08/04/1980 SR.DRAUGHTSMAN 38y 9m

    16d

    4) SHRI V J JHA 1237268 SR MANAGER IMS 08/01/1959 11/03/1980 SR.DRAUGHTSMAN 38y 10m 13d

    5) SHRI A H MALLICK 1238329 SR. OFFICER TAD 20/01/1959 19/04/1979 ARTISAN 39y 9m 5d

    6) SHRI R K MISHRA 1234854 ENGINEER FTM 01/01/1959 25/07/1979 ARTISAN 39y 5m

    30d

    7) SHRI C P VERMA 1243543 ENGINEER TRM 15/01/1959 01/12/1979 D/R EMPLOYEE 39y 1m

    23d

    8) SHRI N K GOSWAMI 1259881 ADDL.ENGINEER GR.II PYX 01/01/1959 05/02/1984 ARTISAN D/R 34y 11m 19d

    9) SHRI AKHILESWAR GUPTA 1264958 DY.ENGINEER TRM 01/01/1959 28/08/1985 ARTISAN D/R 33y 4m

    27d

    10) SHRI B K SONE 1261266 DY.ENGINEER STM 21/01/1959 16/09/1984 ARTISAN 34y 4m 8d

    11) SHRI YASHPAL SACHDEVA 1266772 DY.ENGINEER TAM 06/01/1959 25/11/1987 ARTISAN C/W 31y 1m

    30d

    12) SHRI K L SHROTI 1233351 DY.OFFICER HRD 01/01/1959 05/05/1979 CATERING ATTENDANT 39y 8m

    19d

    13) SHRI V S RATHORE 1242016 GENERAL TECHNICIAN SWM 01/01/1959 27/05/1979 ARTISAN 39y 7m 28d

    14) SHRI H D MATHAN 1247239 GENERAL TECHNICIAN TEX 06/01/1959 05/12/1980 ARTISAN 38y 1m 19d

    15) SHRI GOPAL CHANDRA MISTRY

    1254952 GENERAL TECHNICIAN SWM 01/01/1959 24/12/1982 ARTISAN 36y 1m 0d

    16) SHRI P K RATHOD 1256734 GENERAL TECHNICIAN TAM 01/01/1959 07/07/1983 D/R EMPLOYEE 35y 6m 17d

    17) SHRI S L RAIKWAR 1239724 SR.ASSISTANT GR I FIN 02/01/1959 04/07/1978 UNSKILLED WORKER 40y 6m

    20d

    18) SHRI RAMSINGH MALVIYA 1240277 DRIVER (SPL.GR.) EMT 05/01/1959 02/08/1979 D/R EMPLOYEE 39y 5m 22d

    19) SHRI DAROGA SINGH 1252895 MASTER TECHNICIAN WTM 10/01/1959 19/11/1983 ARTISAN D/R 35y 2m 5d

    20) SHRI GHANSHYAM 1246364 SR.TECHN.(SLINGER) WTM 15/01/1959 25/06/1982 C/W EMPLOYEE 36y 6m 30d

    21) SHRI J P GUPTA 3043576 SR.TECHNICIAN TRM 05/01/1959 12/06/1976 C/W EMPLOYEE 42y 7m 12d

    22) SHRI ROOP SINGH 1246461 TECHNICIAN WCX 02/01/1959 19/09/1981 D/R EMPLOYEE 37y 4m 5d

    23) SHRI PHOOL CHAND 1259202 ARTISAN I(SLINGER) TXM 15/01/1959 25/07/1985 C/W EMPLOYEE 33y 5m

    30d

    24) SHRI SHANKERLAL 1239716 SSW (HG) UHV 15/01/1959 04/11/1977 D/R EMPLOYEE 41y 2m 20d

    जनवरी

    प्रचार एव ंजनसम्पकष दवभाग बीएचईएल भोपाल द्वारा सकंलन (केवल दनजी दवतरण हेतु ) सम्पािक : आर शुक्ला अपर महाप्रबंधक (पी एण्ड पीआर)