  • Note : D : Design & Engineering P : Procurement M : Manpower C : Construction E : Electrical I : Instrument & Control T : Tele. & Network System PL : Plumbing

    I N N O - A C E ( T H A I L A N D ) C O . , L T D

    www.inno-ace.com

    Inno-ace Job Experiences

    Name of Client Project Description Location Scope of Work Period

    Construction Campany Isuzu Showroom and Service Center Project

    (Electrical Construction Detail Design)

    Ayutthaya D,E Mar’06 – May’06

    Subenja Co.,Ltd. Q-House Lumpini Blg. Project

    (Electrical Wiring for AHU and FCU System)

    Bangkok, Lumpini C,E Mar’06 – May’06

    Toyota Motor Thailand Co.,Ltd. TMT Line Project

    (Electronic Timer Control Process Line)

    Thailand

    Toyota Showroom

    D,P,C,E Mar06 – Apr’06

    P&P Electric System Ltd.,Part.

    (Maki Denki (Thailand) Co.,Ltd.)

    Sato Kogyo Bangkok (New Office) Project

    (Electrical and Network Systems)

    Y.W.C.A. Building

    Bangkok, Sathorn rd.

    C,E,T Mar’06 – Apr’06

    ATN Co.,Ltd.

    ATN New Factory Project

    (Electrical and Network Systems)

    Samutprakan,Bangplee D,C,PL Mar’06 – Mar’06

    Engineering Corner co.,Ltd. Kang Yong Electric Co.,Ltd. (KYE)

    (Remove and Installation ABB Surge Device)

    Samutprakarn, Bangplee C,E Mar’06 – Mar’06

    P&P Electric System Ltd.,Part.

    (Maki Denki (Thailand) Co.,Ltd.)

    Thai NOK Renovation Sky Hall Project

    (Electrical for Lighting System of Ground Floor)

    Amata Nakorn IE.,Chonburi C,E Apr’06 – Apr’06

    P&P Electric System Ltd.,Part.

    (Maki Denki (Thailand) Co.,Ltd. (SATO Project))

    Takebe (Thailand) Co.,Ltd. (New Factory)

    (Electrical for Main Feeder)

    Amata Nakorn IE.,Chonburi C,E Apr’06 – Apr’06

    UMI Engineering Co.,Ltd.

    Procfer & Gramble Manufacturing (Thailand)Co.,Ltd. (P&G)

    (Sound System for E-Line Machine)

    Wellgrow IE.,Chachoengsao P,C,E May’06 – May’06

    UMI Engineering Co.,Ltd.

    Procfer & Gramble Manufacturing (Thailand)Co.,Ltd. (P&G)

    (Electrical Counter Unit Machine Line)

    Wellgrow IE.,Chachoengsao P,C,E May’06 – May’06

    P&P Electric System Ltd.,Part.

    (Maki Denki (Thailand) Co.,Ltd. (SATO Project))

    Asia Honda (Thailand) Co.,Ltd. (New Warehouse)

    (Electrical Main Feeder for New Warehouse)

    Wellgrow IE.,Chachoengsao C,E Jun’06 – Jun’06

    UMI Engineering Co.,Ltd.

    Procfer & Gramble Manufacturing (Thailand)Co.,Ltd. (P&G)

    (Electrical Maintenance for Conveyor Line)

    Wellgrow IE.,Chachoengsao P,C,E Jun’06 – Jun’06

    Inteqc Feed Co.,Ltd.

    Aquatic and Swine Feed Line project

    (Electrical Termination Control Motor Process)

    Smutsakhorn M,C,E Jun’06 – Jun’06

  • Note : D : Design & Engineering P : Procurement M : Manpower C : Construction E : Electrical I : Instrument & Control T : Tele. & Network System PL : Plumbing

    I N N O - A C E ( T H A I L A N D ) C O . , L T D

    www.inno-ace.com

    Inno-ace Job Experiences

    Name of Client Project Description Location Scope of Work Period

    P&P Electric System Ltd.,Part.

    (Maki Denki (Thailand) Co.,Ltd. (SATO Project))

    Asia Honda (Thailand) Co.,Ltd.

    (Electrical Street Light System New Warehouse)

    Wellgrow IE.,Chachoengsao C,E Jun’06 – Jun’06

    Inteqc Feed Co.,Ltd.

    Aquatic and Swine Feed Line project

    (Electrical Wiring for Control Motor Process)

    Smutsakhorn P,C,E,I Jul’06 – Jul’06

    Sansiri MLK Co.,Ltd. TOT Public Company Limited.

    (Relocate for Telephone Cable)

    Bangkok D,C,T Jul’06 ~ Jul’07

    Sansiri MLK Co.,Ltd. TOT Public Company Limited.

    (Relocate for Telephone Cable)

    Bangkok D,C,T Jul’06 ~ Jul’10

    General Business Engineering Co.,Ltd.

    (H.Y.Q. Engineering Co.,Ltd.)

    Sankyo (Thailand) Co.,Ltd.

    (Instrument Wiring and Control Syastem)

    Hitec IE. , Ayutthaya P,C,E,I Jul’06 ~ Aug’06

    General Business Engineering Co.,Ltd.

    (H.Y.Q. Engineering Co.,Ltd.)

    Daikie Nikei Thailand Co.,Ltd.

    (Installation Street Light System)

    Amata Nakorn IE.,Chonburi C,E Aug’06 ~ Aug’06

    General Business Engineering Co.,Ltd.

    Aoyama (Thailand) Co.,Ltd.

    (Power Supply and Air, CO2 Supply for Machine Line)

    Samrong, Samutparkarn D,P,C,E,PL Aug’06 ~ Aug’06

    General Business Engineering Co.,Ltd.

    (H.Y.Q. Engineering Co.,Ltd.)

    Panasonic Industrial (Thailand) Co.,Ltd.

    Office (Electrical and Communication System)

    Ratchada, Bangkok D,P,C,E,T Aug’06 ~ Oct’06

    Tonan Engineering Co.,Ltd.

    TOA-Chuboku Paints Co.,Ltd.

    (Pilot Plant Project (E&I Installation and Control PLC System))

    Bangna-Tard Km.5, Bangkok D,P,C,E,I Aug’06 ~ Oct’06

    P&P Electric System Ltd.,Part.

    (Maki Denki (Thailand) Co.,Ltd.

    Mabuchi Co.,Ltd.

    (Electrical Lighting IHigh-Bay) for Factory)

    Amata Nakorn IE.,Chonburi C,E Oct’06 ~ Oct’06

    P&P Electric System Ltd.,Part.

    (Maki Denki (Thailand) Co.,Ltd.

    Maki Denki (Thailand) Co.,Ltd.

    (Electrical System for Maki office Sukhumvit soi36 Road.)

    Bangkok C,E Oct’06 – Oct’06

  • Note : D : Design & Engineering P : Procurement M : Manpower C : Construction E : Electrical I : Instrument & Control T : Tele. & Network System PL : Plumbing

    I N N O - A C E ( T H A I L A N D ) C O . , L T D

    www.inno-ace.com

    Inno-ace Job Experiences

    Name of Client Project Description Location Scope of Work Period

    Inteqc Feed Co.,Ltd.

    Feed mill with Capacity of 20TPH Extrusion and 40THP

    Pelleting Feed project

    (E & I Control Process Line)

    Smutsakhorn D,P,C,E,I Oct’06 – Apr’07

    Inteqc Feed Co.,Ltd.

    Feed mill with Capacity of 20TPH Extrusion and 40THP

    Pelleting Feed project

    (Electrical Lighting and Emergency Light for Process Plant)

    Smutsakhorn D,P,C,E Oct’06 – Apr’07

    Inteqc Feed Co.,Ltd.

    Feed mill with Capacity of 20TPH Extrusion and 40THP

    Pelleting Feed project

    (Electrical Main Feeder and Ground for Tower-2 Plant)

    Smutsakhorn D,P,C,E Jan’07 – Feb’07

    P&P Electric System Ltd.,Part.

    (Maki Denki (Thailand) Co.,Ltd. (SATO Project))

    Asia Honda (Thailand) Co.,Ltd. (New Warehouse)

    (Electrical Main Feeder for New Warehouse) Wellgrow IE., Chachoengsao C,E Oct’06 – Dec’06

    Panasonic Electric Works (Ayuthaya) Co.,Ltd. Main Supply for Plastic Part Machine

    (New Machine Injection No. A10) Rojana IE., Ayuthaya P,C,E,PL Jan’07 – Jan’07

    Siam S & NE Engineering Co.,Ltd. Mitsubishi Electric “MCP”

    (Electrical Control Pump Manhole Project) Amata Nakorn IE.,Chonburi D,P,C,E Apr’07 ~ Apr’07

    Inteqc Feed Co.,Ltd.

    Feed mill with Capacity of 20TPH Extrusion and 40THP

    Pelleting Feed project

    (Network and Telephone for Intake and Tower-2 Plant)

    Smutsakhorn D,P,C,T Apr’07 – Apr’07

    Siam S & NE Engineering Co.,Ltd. Mitsubishi Electric “MCP”

    (Main Power Supply for Expender Machine Line project) Amata Nakorn IE.,Chonburi D,P,C,E May’07 ~ Jul’07

    Thai Shinryo Limited TOTL Factory Renovation & Extension Project

    (Chiller and AHU Wiring Control) Amata Nakorn IE.,Chonburi D,P,C,I Jun’07 ~ Jul’07

    Panasonic Electric Works (Ayuthaya) Co.,Ltd.

    Relocate Machine for Factory 3 Project

    (Main Power and Air Supply for Machine Line ) Rojana IE., Ayuthaya P,C,E,PL Jun’07 ~ Jul’07

  • Note : D : Design & Engineering P : Procurement M : Manpower C : Construction E : Electrical I : Instrument & Control T : Tele. & Network System PL : Plumbing

    I N N O - A C E ( T H A I L A N D ) C O . , L T D

    www.inno-ace.com

    Inno-ace Job Experiences

    Name of Client Project Description Location Scope of Work Period

    Honda Automobile (Thailand) Co.,Ltd.

    (MIT Dept.)

    Line Assembly Frame Project

    (Main Power Supply for Computer Part Scan Check)

    Rojana IE., Ayuthaya D,P,C,E Jul’07 ~ Sep’07

    Siam S & NE Engineering Co.,Ltd.

    Mitsubishi Electric “MCP”

    (Main Power Supply for Expender Machine Line project) Amata Nakorn IE.,Chonburi P,C,E Oct’07 ~ Oct’07

    Thanu Thanawat Co.,Ltd.

    (Design Def-i-ni-tion Co.,Ltd.)

    Marriott Courtyard Hua-Hin

    (Electrical and Communication System) Hua-Hin , Phetcha Buri C,E,T Sep’07 ~ Dec’07

    A.J. Twin Engineering Co.,Ltd. CP Group ( , )

    (Electrical Facility and Control System) Wang Muang, Saraburi C,E,I Sep’07 ~ Nov’07

    A.J. Twin Engineering Co.,Ltd.

    (Poomsiri Engineering Co.,Ltd.)

    PTT Public Co.,Ltd. (Thappline Area)

    (Electrical Facility and Communication System) Map Ta Phut, Rayong C,E,T Oct’07 ~ Feb’08

    Siam S & NE Engineering Co.,Ltd. Thai Arrow Electric “TAP”

    (Main Power Supply and Control Motor System) Chachaengsao D,P,C,E Sep’07 ~ Oct’07

    Honda Automobile (Thailand) Co.,Ltd. Line Assembly Frame Project

    (Main Power Supply for Computer Part Scan Check)

    Rojana IE., Ayuthaya D,P,C,E Dec’07 ~ Dec’07

    Panasonic Electric Works (Ayuthaya) Co.,Ltd. Relocate Machine for EMC Factory Project

    (Main Power and Air Supply for Machine Line) Rojana IE., Ayuthaya D,P,C,E,PL Dec’07 ~ Dec’07

    Siam S & NE Engineering Co.,Ltd. Mitsubishi Electric “MCP” for (Factory 1)

    (Main Power Supply for Auto Brazing Machine Line Project) Amata Nakorn IE.,Chonburi P,C,E Dec’07 ~ Jan’08

    Siam S & NE Engineering Co.,Ltd. Mitsubishi Electric “MCP”

    (Main Power Supply and Control Pump Cooling Project) Amata Nakorn IE.,Chonburi P,C,E Dec’07 ~ Jan’08

    G.T.P. Engineering Co.,Ltd. Sukhothai Fruit Conning Industry Co.,Ltd.

    (SFI New Factory Project) Sukhothai P,C,E

  • Note : D : Design & Engineering P : Procurement M : Manpower C : Construction E : Electrical I : Instrument & Control T : Tele. & Network System PL : Plumbing

    I N N O - A C E ( T H A I L A N D ) C O . , L T D

    www.inno-ace.com

    Inno-ace Job Experiences

    Name of Client Project Description Location Scope of Work Period

    Tonan Engineering Co.,Ltd.

    (Hydrotek Co.,Ltd.)

    Map Ta Phut Olefine Co.,Ltd. (MOC)

    MOC Cracker Project (Wastewater Treatment System Plant) Map Ta Phut, Rayong D,E,I Jan’08 ~ May’08

    Siam S & NE Engineering Co.,Ltd.

    Thai Arrow Electric “TAP”

    (Main Power Supply and Control Pump System)

    Chachaengsao D,P,C,E Feb’08 ~ Apr’08

    Honda Automobile (Thailand) Co.,Ltd.

    (MIT Dept.)

    Line Assembly Frame 13 Station Project

    (Main Power Supply for Computer Part Scan Check)

    Rojana IE., Ayuthaya D,P,C,E Mar’08 ~ Apr’08

    Siam S & NE Engineering Co.,Ltd.

    Mitsubishi Electric “MCP”

    (Main Power Supply Control Pump and Ventilator Project)

    Amata Nakorn IE.,Chonburi P,C,E Apr’08 ~ May’08

    Nimitmai Honda Automobile Co.,Ltd.

    Showroom Honda Car Nimitmai Project

    (Electrical System)

    Nimitmai Rod. , Bangkok D,P,C,E,T Apr’08 ~ Dec’08

    Siam S & NE Engineering Co.,Ltd.

    Thai Arrow Electric “TAP”

    (Electrical MDB Panel)

    Chachaengsao D,P,C,E Jun’08 ~ Jul’08

    Siam S & NE Engineering Co.,Ltd.

    (Saensuk Eastern Supply Ltd., Part.

    Jelly Belly Candy Company (Thailand) Ltd.

    (Electrical and Air Supply of Machine)

    Eastern Seabord, Rayong D,P,C,E,PL Jul’08 ~ Aug’08

    Aoyama (Thailand) Co.,Ltd.

    Relocation Line A Assy. Jack Screw TMT, AAT (Step-1)

    (Power Supply and Air, CO2 Supply of Machine Line)

    Samrong, Samutparkarn D,P,C,E,PL Aug’08 ~ Aug’08

    Nimitmai Honda Automobile Co.,Ltd.

    Showroom Honda Car Nimitmai Project

    (Air Supply for Machine)

    Nimitmai Rod. , Bangkok P,C,PL Aug’08 ~Sep’08

    Aoyama (Thailand) Co.,Ltd.

    Relocation for DIE Maintenance Room (Step-2,3)

    (Power Supply and Air Supply of Machine Line)

    Samrong, Samutparkarn D,P,C,E,PL Aug’08 ~ Sep’08

    P&P Electric System Ltd.,Part.

    (Maki Denki (Thailand) Co.,Ltd. (SATO Project))

    Hiruta Asteer Summit Co.,Ltd. (New Warehouse)

    (Electrical and Communication System for New Warehouse)

    Pinthong IE. (PIP-2) ,

    Laem Chabang

    C,E

  • Note : D : Design & Engineering P : Procurement M : Manpower C : Construction E : Electrical I : Instrument & Control T : Tele. & Network System PL : Plumbing

    I N N O - A C E ( T H A I L A N D ) C O . , L T D

    www.inno-ace.com

    Inno-ace Job Experiences

    Name of Client Project Description Location Scope of Work Period

    Built Master Co.,Ltd.

    KM.7 Office Renovate

    (MEA Incoming Main Feeder for Under Ground)

    . .7,

    D,P,C,E,T Dec’08 ~ Dec.08

    Built Master Co.,Ltd.

    (Design & Built Exhibition Studio 07 Co.,Ltd.)

    U-Boat Italo Fontana@Central World

    (New Showroom for U-Boat)

    A110/1room, Central World,

    Bangkok

    P,C,E,T,PL Nov’08 ~ Dec.08

    QTC Engineering Co.,Ltd.

    (Sino-Thai Engineering & Construction Public Co.,Ltd.)

    ( 2)

    A N2 2nd ~ 9th

    (Main Power Supply for FCU & BAS Control)

    , P,C,E,I Jan’’09 ~ Mar’09

    QTC Engineering Co.,Ltd.

    (Sino-Thai Engineering & Construction Public Co.,Ltd.)

    ( 2)

    A S2, S3 2nd ~ 9th

    (Main Power Supply for FCU & BAS Control)

    , P,C,E,I Jan’’09 ~ Jul’10

    QTC Engineering Co.,Ltd.

    (Sino-Thai Engineering & Construction Public Co.,Ltd.)

    ( 2)

    A S1, N1, W1 2nd ~ 9th

    (Main Power Supply for FCU & BAS Control)

    , P,C,E,I Fer’’09 ~ Sep’09

    Tonan Engineering Co.,Ltd.

    (RCS Heavy Industries Co.,Ltd.)

    Trans Thai – Malaysia (Thailand) Limited (TTM)

    (TTM GRF Expansion Project)

    Talingchan, Chana,

    Songkhla

    D,E,I Mar’09 ~ Jun’09

    (8888)

    ( - )

    (Main Communication for Cable TV System)

    , D,P,C,T Jun’09 ~ Jul’09

    Aoyama (Thailand) Co.,Ltd.

    Relocation Line Jack A Screw Assy.

    (Power Supply and Air, CO2 Supply of Machine Line)

    Samrong, Samutparkarn D,P,C,E,PL Jun’09 ~ Jun’09

    (8888)

    ( )

    (Main Communication for Cable TV System)

    ( ), D,P,C,T Jul’09 ~ Aug’09

  • Note : D : Design & Engineering P : Procurement M : Manpower C : Construction E : Electrical I : Instrument & Control T : Tele. & Network System PL : Plumbing

    I N N O - A C E ( T H A I L A N D ) C O . , L T D

    www.inno-ace.com

    Inno-ace Job Experiences

    Name of Client Project Description Location Scope of Work Period

    (8888)

    (Main Communication for Cable TV System)

    19, D,P,C,T Aug’09 ~ Aug’09

    Tonan Engineering Co.,Ltd.

    Tonan New Office

    (Electrical and Communication System)

    Bangna Complex KM.3,

    Bangkok

    D,P,C,E,T Aug’09 ~ Oct’09

    K.T. Tawan Co.,Ltd. (Thai Nippon Plant Co.,Ltd.)

    KTT New Office

    (Electrical and Communication System)

    Bangna Complex KM.3,

    Bangkok

    D,P,C,E,T Oct’09 ~ Nov’09

    EDA International Ltd. (UN Asia Pacific (Thailand))

    The United Nations Economic and Social Commission for

    Asia and The pacific (Power Utility Monitoring System)

    Rajadamnoen Nok Avenue,

    Bangkok, Thailand

    D,P,C,E,I Oct’09 ~ Dec’09

    (8888)

    (Main Communication for Cable TV System)

    21, D,P,C,T Dec’09 ~ Jul’10

    QTC Engineering Co.,Ltd.

    Glow Energy Public Company Limited (GLOW SPP3)

    (New Warehouse, Workshop, Office)

    I-5 Rd., Map-Ta Phut, Rayong P,C,E,I,T Jan’10 ~ May’10

    Tonan Engineering Co.,Ltd.

    THAI SOLAR ENERGY CO., LTD.

    (SOLAR THERMAL POWER PLANT 5 MWe)

    Kanchanaburi Province,

    Thailand

    D,E,I Jan’10 ~ Dec’10

    Honda Automobile (Thailand) Co.,Ltd. (MIT Dept.)

    HATC GPCS/GALC for FAC. No.1 Project

    (Computer Rack for GPCS/GALC System)

    Rojana IE., Ayuthaya D,P,C,T Feb’10 ~ Aug’10

    NTT Communication (Thailand) Co.Ltd.

    (Honda Automobile (Thailand) Co.,Ltd.)

    HATC GPCS/GALC for FAC. No.1 Project

    (Main Power Supply (UPS) for Computer GPCS/GALC System)

    Rojana IE., Ayuthaya D,P,C,E Mar’10 ~ Aug’10

  • Note : D : Design & Engineering P : Procurement M : Manpower C : Construction E : Electrical I : Instrument & Control T : Tele. & Network System PL : Plumbing

    I N N O - A C E ( T H A I L A N D ) C O . , L T D

    www.inno-ace.com

    Inno-ace Job Experiences

    Name of Client Project Description Location Scope of Work Period

    (8888)

    ( )

    (Main Communication for Cable TV System)

    ( ), D,P,C,T Jul’09 ~ Aug’09

    Thai Nippon Plant Co.,Ltd.

    TNP Office Renovate 4th and 5th Floor for

    (Electrical and Communication System)

    Bangna Complex KM.3,

    Bangkok

    D,P,C,E,T Jun’10 ~ Jun’10

    Jardine Engineering Company Limite

    Central Pattaya Beach

    (Electrical and Communication System)

    Pattaya, Chonburi M,C,E,T Aug’10 ~ Sep’10

    Tanasan Trading (2003) Co.,Ltd.

    (Transitions Optical Thailand Ltd.)

    Modifily for MCC Panel and Control AHU (VSD)

    Amata Nakorn IE.,Chonburi D,P,C,I Apr’10 ~ Jun’10

    (8888)

    ( - )

    (Main Communication for Cable TV System)

    , D,P,C,T Jun’10 ~ Jul’10

    Thai Shinryo Limited (TKL)

    (Thai Takenaka International Ltd.)

    Majend Makcs Factory Renovation ‘2010 Project

    (Chiller and AHU Wiring Control)

    Hi-Tech IE.,Ayuthaya P,C,I Oct’10 ~ Nov’10

    Thai Nippon Plant Co.,Ltd.

    TNP Office Renovate 6th Floor for

    (Electrical and Communication System)

    Bangna Complex KM.3,

    Bangkok

    D,P,C,E,T Oct’10 ~ Oct’10

    Mechanical System Engineering Co.,Ltd. (Japan)

    (Cannon (Thailand) Ltd.)

    Sharp New Factory

    (Electrical and Control for PU Foaming Machine Package)

    Bangna-Trad rd., KM.36

    Bangpakong, Chachoengsao

    P,C,E,I Sep’10 ~ Nov’10

    Siam S & NE Engineering Co.,Ltd.

    Daikin Industries (Thailand) Ltd.

    (Electrical Lighting and Fan System for R-7 areal)

    Amata Nakorn IE.,Chonburi

    D,P,C,E

    Oct’10 ~ Octl’10

  • Note : D : Design & Engineering P : Procurement M : Manpower C : Construction E : Electrical I : Instrument & Control T : Tele. & Network System PL : Plumbing

    I N N O - A C E ( T H A I L A N D ) C O . , L T D

    www.inno-ace.com

    Inno-ace Job Experiences

    Name of Client Project Description Location Scope of Work Period

    Thai Shinryo Limited (TKL)

    (Thai Kajima Co. Ltd.)

    (HMT 3RD Factory Project (Hitachi)

    (Electrical and Control for Clean Room System)

    Rojana IE.,Ayuthaya P,C,E,I Dec’10 ~ Jan’11

    General Business Engineering Co.,Ltd.

    Circular Knitting Factory

    (Electrical Syastem)

    Rama 2 rd., Bangkok P,C,E,PL Nov’10 ~ Dec’10

    Siam S & NE Engineering Co.,Ltd.

    Thai Arrow Electric “TAP”

    (Electrical Renovation for Machine Room )

    Bangkla, Chachaengsao D,P,C,E Nov’10 ~ Nov’10

    Thai Mitsui Specialty Chemicals Co.,Ltd.

    (Wellgrow IE.)

    Warehouse UU-WH3

    (Electrical for New High-bay Fluorescent T5-54W)

    Bangna-Trad rd., KM.36

    Bangpakong, Chachoengsao

    D,P,C,E Nov’10 ~ Dec’10

    Thai Shinryo Limited (BPK)

    (CH. Karnchang-Tokyu Construction Co.,Ltd.)

    Mitsubishi Electri Consumer Product (Thailand) Co.,Ltd.

    (Electrical Renovation for MCP FAC.2 Machine Room )

    Amata Nakorn IE.,

    Chonburi

    P,C,E Dec’10 ~ Dec’10

    General Business Engineering Co.,Ltd.

    (Thai Escrop (Thailand) Co.,Ltd.)

    TYC Factory

    (Air Compressure Relocation Room)

    Bangpee IE. ,Samutparkarn D,P,C,E,PL Dec’10 ~ Dec’10

    Outside-in Approach Co.,Ltd.

    (Transitions Optical Thailand Ltd.)

    Transitions Optical Thailand Ltd.

    (CCTV and RFID Access Door Control)

    Amata Nakorn IE.,Chonburi D,P,C,I Dec’10 ~ Jun’11

    Tonan Engineering Co.,Ltd.

    Thai Mitsui Specialty Chemicals Co.,Ltd.

    (Steam Boiler and Hot Oil Boiler Relocate Project )

    Bangna-Trad rd., KM.36

    Bangpakong, Chachoengsao

    D,E,I Jan’11 ~ Feb’11

    (8888)

    ( – ) A, B

    (Main Communication for Cable TV System)

    , D,P,C,T Jan’11 ~ Mar’11

    Siam S & NE Engineering Co.,Ltd.

    VTA Factory

    (Electrical and Control for AHU)

    Bangkla, Chachaengsao D,P,C,E Feb’11 ~ Mar’11

    QTC Engineering Co.,Ltd.

    (Sino-Thai Engineering & Construction Public Co.,Ltd.)

    2

    ( (HVAC) BAS )

    Ramkumhane Rd., Bangkok P,C,E,I,T Feb’11 ~ Jan’12

  • Note : D : Design & Engineering P : Procurement M : Manpower C : Construction E : Electrical I : Instrument & Control T : Tele. & Network System PL : Plumbing

    I N N O - A C E ( T H A I L A N D ) C O . , L T D

    www.inno-ace.com

    Inno-ace Job Experiences

    Name of Client Project Description Location Scope of Work Period

    Mechanical System Engineering Co.,Ltd. (Japan)

    (YAMAMOTO POWER SERVICE CO.,LTD.)

    ICP New Factory

    ( AUTO KAULKING TAPPING M/C (MSD-01) )

    Amata City IE,

    Rayong

    P,C,E,I Feb’11 ~ Jun’11

    (8888)

    ( – ) C, D

    (Main Communication for Cable TV System)

    , D,P,C,T Mar’11 ~ Aug’11

    Mechanical System Engineering Co.,Ltd.

    (Japan)

    SHARP APPLIANCES (Thailand) LIMITED

    (Renovate for Cabinet A Line PU Machine Control Panel) Bangna-Trad rd., KM.36

    Bangpakong, Chachoengsao

    P,C,E,I Mar’11 ~ Apr’11

    Mechanical System Engineering Co.,Ltd.

    (Japan)

    HITACHI CONSUMER PRODUCT (THAILAND) LTD.

    ( Renovate KCF2 Loader & Unload Servo Panel )

    Kabinburi, Prachinburi P,C,E,I Mar’11 ~ Apr’11

    Thai Shinryo Limited (TKL)

    (Thai Obayashi Corporation Ltd.)

    (Canon Hi-Tech (Thailand) Ltd.

    (Electrical and Control for AHU System)

    Navanakorn Indus. ,

    Nakorn Ratchasima

    P,C,E,I May’11 ~ Aug’11

    Azbil (Thailand) Co.,Ltd.

    (Taikisha (Thailand) Co.,Ltd.)

    (Canon Hi-Tech (Thailand) Ltd.

    (Electricl and BAS Control System)

    Navanakorn Indus. ,

    Nakorn Ratchasima

    P,C,E,I Aug’11 ~ Dec’11

    Thai Shinryo Limited

    (Ramaland Development Co.,Ltd.)

    (Ramaland 21st FLR. Renovation)

    (Electrical and Communication System)

    Crowne Plaza. ,

    Silom, Bangkok

    P,C,E,T Aug’11 ~ Oct’11

    Mechanical System Engineering Co.,Ltd.

    (Japan)

    HITACHI CONSUMER PRODUCT (THAILAND) LTD.

    ( Renovate KDF3 Refrigerator Door PU.Foaming Line)

    Kabinburi, Prachinburi P,C,E,I Aug’11 ~ Aug’11

    Tonan Engineering Co.,Ltd.

    (SIEMENS LTD.)

    Khmer Brewery Ltd.

    (COMPLETE WASTE WATER TREATMENT PLANT PROJECT)

    Charn Issara Tower II

    Bangkok

    D,E,I Aug’11 ~ Sep’11

    Taikisha (Thailand) Co.,Ltd.

    Seagate Factory

    (Electrical and Communication System)

    Nakhon-Ratchasima C,E Oct’11 ~ Nov’11

  • Note : D : Design & Engineering P : Procurement M : Manpower C : Construction E : Electrical I : Instrument & Control T : Tele. & Network System PL : Plumbing

    I N N O - A C E ( T H A I L A N D ) C O . , L T D

    www.inno-ace.com

    Inno-ace Job Experiences

    Name of Client Project Description Location Scope of Work Period

    M’s Design (Thailand) Co.,Ltd.

    M’s New Office

    (Electrical and Communication System)

    MD Bulg. ,

    Bangna-Tard Km.3 , Bangkok

    E,P,C,E,T Oct’11 ~ Nov’11

    Thai Shinryo Limited

    (Thai Kajima Co. Ltd.)

    Sumitomo Rubber (Thailand) no. 4

    (Control (HVAC) for Clean Room System)

    Amata City IE. ,

    Rayong

    P,C,E,I Nov’11 ~ Dec’11

    QTC Engineering Co.,Ltd.

    (PRECISE)

    ( BAS )

    Nonthaburi Rd., Nonthaburi P,C,E,I,T Dec’11 ~ Present

    Thai Shinryo Limited

    (Thai Kajima Co. Ltd.)

    TNP RAMP-7 PROJECT

    (Control (HVAC) for Clean Room System)

    Bangpoon – Rungsit Rd.,

    Pathumtani

    P,C,E,I Dec’11 ~ Present

    Tonan Asia Co.,Ltd.

    Thai Mitsui Specialty Chemicals Co.,Ltd. (TMSC)

    ( MANOMER TANK FARM PROJECT )

    Bangna-Trad rd., KM.36

    Bangpakong, Chachoengsao

    D,P,C,E,I Dec’11 ~ May’12

    NTT Communication (Thailand) Co.Ltd.

    (Honda Automobile (Thailand) Co.,Ltd.)

    HATC RECOVERY for FAC.1, 2 Project

    (Main Power Supply (UPS) for Computer System)

    Rojana IE., Ayuthaya D,P,C,E Jan’12 ~ Mar’12

    Honda Automobile (Thailand) Co.,Ltd. (MIT Dept.)

    HATC RECOVERY for FAC.1, 2 Project

    (Computer Rack)

    Rojana IE., Ayuthaya D,P,C,T Jan’12 ~ Mar’12

    Honda Automobile (Thailand) Co.,Ltd. (AF1 Dept.)

    HATC RECOVERY for FAC.1 Project

    (Power Supply for Torque Machine)

    Rojana IE., Ayuthaya D,P,C,T Mar’12 ~ Mar’12

    Thai Shinryo Limited

    (Thai Takenaka International Ltd.)

    Mitsubishi Electric Thai Auto-Parts Co.Ltd. (META FACTORY 4)

    (Control (HVAC) for Clean Room System)

    Siam Eastern IE,

    Rayong

    P,C,E,I Apr’12 ~ Present

    Mechanical System Engineering Co.,Ltd. (MSE)

    (Japan)

    New MSE Factory and Warehouse

    (Electrical and Communication System)

    Chonburi D,P,C,E,I Apr’12 ~Jun’12

    (8888)

    - A, B , C, D

    (Main Communication for Cable TV System)

    , D,P,C,T Jun’12 ~ Present

  • Note : D : Design & Engineering P : Procurement M : Manpower C : Construction E : Electrical I : Instrument & Control T : Tele. & Network System PL : Plumbing

    I N N O - A C E ( T H A I L A N D ) C O . , L T D

    www.inno-ace.com

    Inno-ace Job Experiences

    Name of Client Project Description Location Scope of Work Period

    MITSUBISHI TURBO CHARGER CO.,LTD. ADDITION LINE MAIN ASSEMBY

    (LINE BUSDUCT MAIN POWER)

    D,P,E Nov’13-Dec’12

    YS PUND CO.,LTD. MAIN POWER LINE TR-MDB WELLGROG D.P.E Jan’14-Present

    SANKO THAI AUTOMOTIVE CO.,LTD. RNEEW MAIN POWER HV & LV.BUSDUCT BANPHO D.P.E.T.PL DEC 2015

    SIAM TOYOTA MANUFACTURING CO.,LTD. RENEW MAIN POWER HV & LV. BUSDUCT D.P.E.T.PL DEC 2015

    S & D INSDUSTRIES CO.,LTD. RENEW MAIN POWER HV & LV. OVERALL FACTORY D.P.E.T.PL Oct’11-Present

    SIAM DENSO MANUFACTURING CO.,LTD. RENEW MAIN POWER HV & LV. OVERALL FACTORY D.P.E.T.PL Oct13-Present