Sample AAC project profile for India Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected]) 1 Name Of the Project Autclaved Areated Concrete (AAC) Blocks Unit Preparation Date 1 st March, 2011 Project Report Version: 001:001 Presented to Shandong Dongyue Building Machines Co Ltd, Linyi City, Shandng province, China Proposed Project site Multi Location, Pan India Prepared by N.Gangadhar Reddy Project Consultant, Product Quality Reassurance Services [email protected] , [email protected]
Transcript
Page 1: AAC Sample Prject Profile-Complete

Sample AAC project profile for India

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

1

Name Of the Project

Autclaved Areated Concrete (AAC) Blocks Unit

Preparation Date 1st March, 2011

Project Report Version: 001:001

Presented to

Shandong Dongyue Building Machines Co Ltd,

Linyi City, Shandng province, China

Proposed Project site

Multi Location, Pan India

Prepared by

N.Gangadhar Reddy

Project Consultant, Product Quality Reassurance Services

[email protected], [email protected]

Page 2: AAC Sample Prject Profile-Complete

Sample AAC project profile for India

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

2

1. Project at a Glance 1 Product Details :

Type : BIS Code :

AAC light weight Blocks Fly Ash Based or sand based IS 2185 : 1984 …..Part 3

Technology Area Infrastructure & Green-Tech Capacity Utilization :

80%

2. Assumptions The following assumptions have been made while preparing this Project Report.

a. Land of 3 Acres is Required b. Fly to be provided free of cost by power plants. Only transportation to be

arraigned by Project. Average distance of 100 KM

c. Production is estimated at 80% capacity,

d. 300 working days is considered in a year during the first year. e. Boundary wall to be constructed from trail production bricks of Unit.

f. Carbon Credit is estimates are for reference purpose. The Project owner must

handle his part of CDM project to get Carbon credits, through independent consultants.

g. Carbon credit can be transacted on registration. The PCN preparation &

presentation, the PDD preparation & presentation, host country approval and the UNFCCC Registration might take somewhat 6 months to 2 years year. So it may be wise to start early.

h. Sale price at site is estimated a conservative Rs 2500/- per cubic meter. An

almost at par price of regular bricks.

i. AAC Blocks of all sizes will be manufactured according to the market requirement, though mainly stipulated sizes as per the BIS standards.

Page 3: AAC Sample Prject Profile-Complete

Sample AAC project profile for India

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

3

3. Introduction AAC is Autoclaved Aerated Concrete. The blocks are made to aerate by creating a reaction between silica in base material such as fly ash or sand, active lime, and aluminum power. The block hardness is being achieved by cement strength, and instant curing mechanism by autoclaving. Gypsum acts as a long term strength gainer. The finished product is a 2.5 times lighter Block compared to conventional Bricks, while providing the similar strengths. The specific gravity stays around 0.6 to 0.65. This is one single most USP of the AAC blocks, because by using these blocks in structural buildings, the builder saves around 30 to 35 % of structural steel, and concrete, as tese blocks reduce the dead load on the building significantly. The major raw material………..Fly-Ash, an indispensable by-product of Thermal Power Plants, is an environmental threat across the globe. Power plants are facing an ever increasing challenge disposal of this polluting agent. This unit is proposed to manufacture AAC Bricks & Blocks by consuming the Fly-Ash as one of the prime raw material. Secondly, it also helps environment by saving the invaluable top soil by not using them in brick making like conventional brick making. Thirdly, they need no burning, thus further enhancing their Eco-Friendly Brand. The steam curing requires far less fuel, compared to the backing for each cubic meter of Bricks. This is the reason these bricks are also referred as Eco Bricks or popularly Green Bricks, (though the color is gray). AAC Blocks are largely used in various constructions, such as load bearing and pillar structure Buildings, Boundary walls, Roads, Culverts, Pavements, and wherever conventional bricks can be used. The general AAC blocks fall in the strength zone of 30-60 Kg/Cm2, thus is having comparable strength as conventional Bricks, and hollow concrete blocks. These Blocks gain strength over a period of time up to 2 years, where as the conventional bricks tend to lose strength over a period of time. These green bricks can attain very regular and uniform shapes. As no burning is involved, so the shape also remains unchanged. As a result, the final Brick work with these green bricks consumes less mortar to build, less mortar to plaster. Further, the AAC being a concrete itself, it forms a more uniform bond with cement mortar, giving almost a homogeneous structure. Not only this, even exposed brickwork (without plastering) is a good durable structure. So people prefer to leave the Green Bricks Brickworks in garages, boundary walls etc. un-plastered.

4. Advantages of using AAC Blocks. The advantages are as follows

1. Environmental friendly : Consumes Fly ash 2. Environmental friendly : Saves invaluable top soil

3. Environmental friendly: needs no burning/backing.

Page 4: AAC Sample Prject Profile-Complete

Sample AAC project profile for India

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

4

4. Strength: Higher Strength Bricks.

5. Uniform Shape: Easier and faster Brick working.

6. Uniform Shape: Less Mortar in Brick work.

7. Uniform Shape: Less Mortar in Plaster.

8. Natural Concrete: Gains strength over time.

9. Natural Concrete: Walls can be left exposed/un plastered.

10. Better heat & sound insulation compared to red Bricks

11. Far Lesser brakeage during handling & transportation.

12. Better Vibration resistance compared to red Bricks.

13. Light weight : Faster and easier transportation

14. Light weight : Faster and easier brickwork

15. Light weight : saves structural concrete by 35%

5. Market Shelter is third skin, according to a German Concept, which implies it’s importance next to human Skin and Clothing. This also shows the attachment of human race to this fundamental requirement. Building Material accounts for major component of the construction cost. Depending on the location they can contribute to 60 - 70 % of the cost of construction. With the ever increasing population, the demand for housing increases. This directly creates demand for this prime commodity of building.

Add to the above fact the nearby area of this project site is undergoing a major infrastructure revolution. As Residential, Commercial, IT companies, and Industrial establishments are coming in, we can conclude that the Blocks unit will prosper and flourish in this environment. There is a central government gadget notification mandating government departments and CPWD to use 100% Fly Ash based Bricks in their all constructions- directly of through contractors. This factor will help the marketability of this product immensely. Fly Ash policy of the Government also mandates that 20% of Fly ash Generated by a power plant must be given free of cost to SME sector on a priority basis.

Page 5: AAC Sample Prject Profile-Complete

Sample AAC project profile for India

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

5

6. Carbon Credits Estimates

AAC blocks are being seriously considered for CDM projects in India for

earning Carbon Credits. As the CER Generated is also relatively less, four or five such units can be bundled together to make a Group CDM in the same sactors.

This project is likely to generate 1 CER per each 7 or 8 Cubic Meter of Blocks

production, depending on, and subject to the CDM methodology adopted, and the interpretation of additionality and baseline parameters by the validating authority.

Just for a rough estimate of CERS, for an annual production of average size

AAC plant, that is 100000CM/Annum, we are likely to get around 12500 CERs on full capacity Production. At present market rate of 11.5 Euros per CER and @ Rs. 60 per Euro, we can expect to get additional revenue on CER. But we must expect to take a cut of around 20 to 30% of CERs, if we want to forward sell the CERs and get the CDM part sponsored by the buyer.

Page 6: AAC Sample Prject Profile-Complete

Sample AAC project profile for India

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

6

7. Raw Materials, Sources and Availability. Fly-Ash: A lot has been said about this raw material in this Project Profile itself. But this Raw material is freely available in Thermal Power plants. There are no taxes on this item whatsoever. Transportation charges are only to be attended by the entrepreneur.

Lime: Active powered lime is a requirement for giving the real aeration to the product. In phase 1 we can aim to buy the active lime directly. In phase -2 we can think of having backward integration and making a lime powering unit at site to have a more competitive advantage, We can also think of a lime burning klin inside the factory premises. The project financials however have not considered the costs of powering unit, and the lime kiln in this project. Different qualities of lime are available, and depending on the raw materials, the mix design can be chosen to get the optimal quality of production. OPC. This Project aims to utilize OPC cement as main binder material. It will give faster strength to the bricks, besides giving improved consistent quality. It also ensures a better cost effectiveness for the same. Using OPC will be a standardized practice. The other prime advantages of using OPC (compared to other binders) is it’s easy availability locally through nationwide Retail Network of Cement Companies. Gypsum: This too is an industrial waste. This is available as an industrial byproduct of Fertilizer Plant. Gypsum is responsible to give long term strength to the Blocks. Aluminum Power. Finely ground Aluminum power is used in very limited quantity ( less than 0.5%), so that it reacts with active lime, and silica in base material to make the aeration, and swell the product, making it very light weight product.

Page 7: AAC Sample Prject Profile-Complete

Sample AAC project profile for India

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

7

8. Process The Process of manufacture is simple t follow, and complex to implement. First, the Fly Ash is mixed with water, and made Slurry in a slurry mixture. If Sand is used as a base material, we need a ball mill to grind the sand to fine power. The slurry making process is same sand. After Slurry is made, the slurry is stored in slurry storage tank, where the slurry is constantly agitated. Care is taken to run the slurry storage tank all the time, so that is never settles down the particles. Then a weigh batcher weighs the Slurry, lime, OPC, Gypsum and aluminum power in preset quantities, and mixes thoroughly. The mixture also pours the mix into the Mould carried n the mould cart. The full pouring of the mixture is just enough to fill around 50% of the mould. Then the mould is kept in a warm chamber for 2 hours, so that the aeration and the light initial setting takes place. Next process is de-molding process of the big block, in which a sophisticated overhead hoist takes the mould, demoulds the block. Next process is the level wire cutting of the Block, while the block passes on the cutting trolley through the series of wires. This process follows a vertical wire cutting where as the block remains stationary, and the cutter cuts the block vertically. The final cut blocks are Steam cured in autoclaves for 8 hours at 12 KG/Sq cm pressure, and 200D C The product is ready on the same date to go into the market.

Please refer the Process Flowchart Drawing, 3D Layout Drawing, and the Pictorial Sketch Drawing given in following pages.

Page 8: AAC Sample Prject Profile-Complete

Sample AAC project profile for India

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

8

9. Process Flow Chart.

Eco-Bricks Ready for Sale

Fly Ash

Gypsum

Lime

OPC

Main Raw Materials

Water Flyash Slurry Batched

Weight Batched

Weight Batched

Quantity

Aluminum pouring Mixture

to mix ingredients

Bricks Casting on Mould

Hi Pressure Steam Curing for 8 Hours

De-molding and Wire Cutting

Page 9: AAC Sample Prject Profile-Complete

Sample AAC project profile for India

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

9

10. Layout Drawing (3D) Please follow the real 3D graphical layout drawing, and its prospective pictorial Sketch description

Page 10: AAC Sample Prject Profile-Complete

Sample AAC project profile for India

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

10

11. Photographs Just for technical clarity some of the photos of the real working are provided here. Please ask for a free video CD explaining complete working condition.

Page 11: AAC Sample Prject Profile-Complete

Sample AAC project profile for India

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

11

11. Raw Material Suitability Almost 95% of the raw materials can be made suitable for AAC line through proper mix design. Also we can have many different mix designs for the same denicity…same strength of Blocks. We will help you to get the Best quality blocks at optimal cost by means of designing proper Mix as per your input raw materials. The following are basic guidelines (certainly not the final call) on the suitability of basic raw materials for AAC.

1. Fly ash (65-70%)

Index Item Grade (%) Gr-I Gr-II

Degree of fineness

(0.045 square hole sieve left amount) ≤ 30 45 (0.080 square hole sieve left amount) ≤ 15 25

Ignition loss ≤ 5.0 10.0 SiO2 ≥ 45-55 40 SO3 ≤ 1 2

Reference : The fineness can be 0.045 or 0.080 square sieve left amount.

2. Lime (8-25%) Item Grade

Super Gr. 1st Gr. 2nd Gr A(CaO+MgO) Quality Fraction % ≥ 90 75 65 MgO Quality Fraction % ≤ 2 5 8 SiO2 Quality Fraction % ≤ 2 5 8 CO2 Quality Fraction % ≤ 2 5 7 Digestion speed ,min ≤ 5-15 Digestion temperature , ℃ ≥ 60-90 Undigested residue quality fraction ,% ≤ 5 10 15 Fineness (0.080 square hole sieve left amount) % ≤ 10 15 20

3.Cement (6-15%)

SiO2 Al2O3 Fe2O3 CaO MgO C3S C2S C3A C4AF 21-23 5-7 3-5 64-48 4-5 44-59 18-30 5-12 10-18

5. Aluminum Power (about 0.08%)

Type and recommendation for supply depend on raw materials and mix formula Metal Content Approx. >=65% Powder 粉铝

4. Gypsum/Plaster (3-5%) CaSO4 > 70% MgO < 2% Chloride( 化化氯 ) < 0.05% Preferably ground residue 90µm( 可可可可可) < 10-15%

Page 12: AAC Sample Prject Profile-Complete

Sample AAC project profile for India

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

12

12. Indian Standard for AAC blocks Bureau of Indian Standard Code no- 2185(Part-3):1984 discusses in details regarding the AAC blocks specifications in India. The prime requirements for AAC blocks (of ISI standards) in India as per the above said code are as follows.

A. ON PHISICAL SIZES OF AAC BLOCKS

B. ON TOLERANCES OF AAC BLOCK SIZES

C. ON DENCITY, STRENGTH & THERMAL CONDUCTIVITY TABLE-1

Page 13: AAC Sample Prject Profile-Complete

Sample AAC Project for Dongyue-India Clients

AUTOCLAVED AREATED CONCRETE BLOCKS PROJECT EXECUTION SUMMERY

All figures in Rs. Lakhs

Items

(Fly ash Based AAC lines

)

Phase-1 (First

executions-

Gestation

period-6

Months

min)

Phase-2 (2nd

executions-

Gestation

period-2

Months

min)

Phase-1 (3rd

executions-

Gestation

period-2

Months

min)

Semi Auto

Total

Project

Fixed costs

Auto

Module

AddON-

landing

Automatic

Module

Project Fixed

Costs

50000 CM/Annum AAC Plant 718.52 0.00 0.00 718.52 60.00 778.52

100000 CM/Annum AAC Plant 732.92 133.10 0.00 866.02 60.00 926.02

150000 CM/Annum AAC Plant 747.32 133.10 133.10 1013.53 60.00 1073.53

Working Capital Rs. Lakhs

50000 CM/Annum AAC Plant 44.37

100000 CM/Annum AAC Plant 88.75150000 CM/Annum AAC Plant 133.12

Please see the fixed inner sheets for details

Assumptions for Sample Project Profile

As land costs vary widely, this has been excluded

Customs duties considered as per rates applicable during 2010-11

10% depreciations of Land & Buildings considered & 15% on machinery

USD exchange rate taken as Rs. 45/-

Sea Fare, Truck charges, C/F charges as per the prevailing charges is considered

The shed area and office area for guidelines only. Clients can have their own luxury as per the needs.

The work shed and office space and fabrication charges considered as CPWD averages.

The Machinary Commissioning and Civil charges are considered @ 5% of its landing price

For clarity Phase 2 expansion is considered in Year 2 and Phase 3 expansion in Year-3

The raw material rates pertains to a specific place and may vary from place to place

Block sale price indicated in this Project is exfactory. All taxes and transport extra as applicable

Intrest and oppurtunity cost is considered at 13% as per the Prevailing rates

Disclaimer

This Project Profile is supplied free of cost to all prospective AAC clients

This FULL document can be distributed free of cost to any one, without any sort of permission

This Document cannot be sold to anyone for any purpose( neither soft copy nor hard copy)

This Project Profile is A GENERALISED profile and do not represent any one unit in particular.

This is for guiding prospective client, and helping them to understand the project well

This can also serve a basis for Clients Chartered Account for making a DPR for them

This template with a little variation can be used to get the DIC EM-1, Pollution control NOC, and other Docs

This document do not in any way bind, restrict or force any data on Dongyue Company or N.G.Reddy

The AAC project being Modular, there can be client specific needs, which may not be mentioned herein.

As the raw materials vary widely, so also does the mix designs we suggest. So final costing may vary.

The Price basics for China Machinery, and Indian side machinery is just for reference purpose.

Even the quantity of items is approximate, and can vary from case to case basis

The civil costs can vary depending location, and the clients rapport and grasp on the field

The fabrication costs can depend a lot on clients ability to handle the things on his own, and Steel Prices

The speed of execution of project totally depends on Clients skills to Coordinate the Indian suppliers

We can take up the client specific Project profile on a Nominal Payment basis

We are attempting to get the AAC units bundled in a group for CDM benefit to earn Carbon Credits

If we need sand base AAC add on, we need to add a 150 KW

ball mill and a block separator Extra. Even we may need 2 more

autoclaves to reach max production of 1,5 Lakhs CM as the

steam curing period is at least 25% more

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

Page 14: AAC Sample Prject Profile-Complete

Sample AAC Project for Dongyue-India Clients

A ������������������ ������������� ������������������� ������������� ������������������� ������������� ������������������� ������������� �

������������ ������������ ������������ ������������

��� ��� ��� ��� ����� �������� ����� �������� ����� �������� ����� �������� �������������������������������� �������������������������������� ��������������������������������1 Pre curing Room 24.00 16.50 3960

2 Mould Turning Ares 6.00 16.50 990

3 Cutting Area 18.00 16.50 2970

4 Boiler Area 16.00 8.00 1280

5 Total Mandatory workshed Areas 9200

��������������������������������������������������������������������������������������������������������6 Raw Material Handling Section 12.00 16.67 2000

��������� ���!�������"����������� ���!�������"����������� ���!�������"����������� ���!�������"��7.a For 50000 CM/annum plant 30.00 8.00 2400

7.b For 100000 CM/annum plant 30.00 14.00 4200

7.c For 150000 CM/annum plant 30.00 20.00 6000

B ��������������� ��� ������������������������������� ��� ������������������������������� ��� ������������������������������� ��� ����������������

#��! ���$%���������������#��! ���$%���������������#��! ���$%���������������#��! ���$%���������������Total Area

(acers )Shed Area (sft)

Plant Area

(sft)

1. Minimum Area for 50000CM Plant 2.50 13600 18400

2. Minimum Area for 100000CM Plant 3.00 15400 23800

3. Minimum Area for 150000CM Plant 3.50 17200 29200

����&����&����&����&

����������� ������ ������� ������� ������ ������������ ��

������� ������ ������������� ������� ���� ������ �� ��

������� �������� �� ������� ������� ����� ���� ������ �� ��

!�����"���#� ��� �� ���"�������� ������� ��

C Installation Schedule

Installation Schedule for 150000 CM/Year capacity AAC plant on autoclaves & Major Items

Sl. No Items Phase-1 Phase-2 Phase-3

1

Autoclaves Complete Kit along with

Body, Steam Pipes, Cyllinder and

Insulation, safety devices, Rails

2 2 2

2 Moulds 12 4 4

3 Side Pallets 50 50 50

4 Steam Traullies 25 25 25

D Indian Total Duty Obligation Calculations1 CIF Price (=FOB Price+Sea Fright+ Sea Insurance) % value 100.00

2 Landing Overheads by Indian Costoms 1% 101.00

3 Basic Customs Duty (84708410) 7.50% 7.58

4 sub total-1 108.58

5 CVD (Counter Valing Duty) 10% 10.86

6 Deducational cess 3% 0.33

7 Sub total-2 119.76

8 Customs cess on total duty 3% 0.56

9 sub Total-3 120.32

10 Aditional customs cess 4% 4.81

11 Grand Total 125.1312 EFFECTIVE Percentage of tax on imports over CIF price 25.13%

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

Page 15: AAC Sample Prject Profile-Complete

Sample AAC Project for Dongyue-India Clients

EDetails of Machinary From (Both India and China ) Installation in a 3 Phase Split

���������������� ���������������� ������������ ���� ����� ����� ����� � ���� ����� ����� ����� � ���� ����� ����� ����� �

Items imported from China…FOB

price ( Fully Automatic Module )US$ 613,556 89,018 89,018

Containers needed nos 12 2 2

Avg Sea frieght + Insurance 1500 US$ 18,000 3,000 3,000

CIF price US$ 631,556 92,018 92,018

Customs + CVD + Surcharge, and

other taxes25.13% US$ 158,710 23,124 23,124

Landing Price US$ 790,265 115,142 115,142

Landing price in INR 45 Rs. 35,561,943 5,181,396 5,181,396

Clearing and liasoning charges per

B/LRs. 12,000 12,000 12,000

Destuffing and road frieght charges

on trawler basis30000 Rs. 360,000 60,000 60,000

����������������������������������������������������������������������������������������

���������������������������������������� ���������������������������������������� ������������������������������������ ������������������������������������

Total Indian Machines FOR

Prices (approxmate USD

equvalent)

USD 364,896 164,960 164,960

����������������� ���������������������� ���������������������� ���������������������� �����

���!��"���!��"���!��"���!��"�������� ������������ �����#���#�����#���#�����#���#�����#���# $������##$������##$������##$������## $������##$������##$������##$������##

%������������������&%������������������&%������������������&%������������������& ������������ ���������������������������������������� ����$���������$���������$���������$����� ����$���������$���������$���������$�����

������������'�������������'�������������'�������������'�

���������(����)��(����������(����)��(����������(����)��(����������(����)��(�

�*��+��,��*��+��,��*��+��,��*��+��,�

�-�-�-�- ������������ ����$�$������$�$������$�$������$�$�� ����.�#����.�#����.�#����.�# ����.�#����.�#����.�#����.�#

�������������&��������������&��������������&��������������&�

���������������(���������������������(���������������������(���������������������(������

������������

������������ ����$���$�����$���$�����$���$�����$���$� �����#���������#���������#���������#���� �����#���������#���������#���������#����

�������������&��������������&��������������&��������������&�

����������������������������������������������������������������������������

/�,����!�/�,����!�/�,����!�/�,����!�

/�,������/�,������/�,������/�,������ ����$�����$�����$�����$� �����#�����#�����#�����# �����#�����#�����#�����#

* India Side Procurement includes Boiler, Autoclaves, Surrry Tank Body, Loader, Forklift, and Other unfabricated MS items

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

Page 16: AAC Sample Prject Profile-Complete

Sample AAC Project for Dongyue-India Clients

F Fixed Cost Calculations

Sl No DetailsFixed Cost

Promoter's

Margin in %

Seed Funding

Bank Loan

1 Land 4 Acers @ Rs. Own Land 0.00 100.00 0.00 0.00

2 Land Devolopment @ Rs. 3 Lakhs/Acer 15.00 50.00 7.50 7.50

3 Stores & workShed 17200 sft @ Rs.800/- 137.60 30.00 41.28 96.32

4 office 1000 sft 8.00 30.00 2.40 5.60

5 500 sft x 3 floor rcc or MS struct 15.00 30.00 4.50 10.50

6 Mis fixed assets 5.00 40.00 2.00 3.00

7Transformer/geneset/Electric Installations & charges 50.00 25.00 12.50 37.50

8 Water Source--Boor Well with Pump 2.00 25.00 0.50 1.50

9

Plant & Machinary(with Installation)-

Phase-1 (1st Year) 549.72 25.00 137.43 412.29

10

Plant & Machinary(with Installation)-

Phase-2 (2nd yr) 133.10 25.00 33.28 99.83

11

Plant & Machinary(with Installation)-

Phase-3 (3nd yr) 133.10 25.00 33.28 99.83

12 Prilimnary exp 5.00 40.00 2.00 3.00

13 Preoperative 15.00 40.00 6.00 9.00

14 Contingency 5.00 40.00 2.00 3.00

15 Total 1073.53 284.66 788.87

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

Page 17: AAC Sample Prject Profile-Complete

Sample AAC Project for Dongyue-India Clients

G Working Capital Calculation1st Year Capacity 50000

Costing Per Month at 80% production 40000 24000 Tons

1 Raw materials/ CM in Rs. in Rs.

particulars Quantity T rate/tonne Amount

a Fly Ash 0.45 150 67.50Rs.

b lime 0.09 5000 450.00Rs.

c OPC Cement (Tanker load) 0.07 5000 350.00Rs.

d Aluminium power 0.0005 230000 115.00Rs. e Gypsium 0.005 550 2.75Rs.

f RM/CM 0.62 985.25Rs.

g Power(KWH) 9.00 6 54.00Rs.

h Coal (Kg) 30.00 4 120.00Rs.

Other Consumables 50.00Rs.

i Total 1,209.25Rs. j add Wastage @ 1% 12.09Rs.

k Raw material per CM 1,221.34Rs.

L Raw Materials per month CM 3333.33 4,071,141.67Rs.

at 80% capacity

2 Labour/Month Nos Lab/Month Tot sal/day

a Skilled Labour 5 6000 30,000.00Rs.

b Semi Skilled Labour 5 5000 25,000.00Rs. c Un skilled Labour 10 4000 40,000.00Rs.

d Total Labour/Month 95,000.00Rs. 95,000.00Rs.

3 Officeial staff/Month Nos Lab/Month Tot sal/day

a Managers & accounts 2 10000 20,000.00Rs.

b Supervisors 4 8000 32,000.00Rs. c Other staff 4 6000 24,000.00Rs.

d Total Labour/Month 76,000.00Rs. 76,000.00Rs.

5 Insuraance per Month ( at 0.3% per annum ) 20,182.99Rs. 20,182.99Rs.

6 Maintainance per Month ( at 2% per annum ) 91,619.96Rs. 91,619.96Rs. 7 Office Overheads(Post+phone+Net+travel+stanry) @ Rs. 25/CM 83,333.33Rs. 83,333.33Rs.

8 Total Expences per Month 4,437,277.95Rs.

9 Working Capital for 1 Cycle

a Curing Line 2 days

b Cerdit Period 14 days

c Stock holding 14 days

d Total = 30 Days

10 Working Capital for 1 Cycle (30 days=1 month)- 1st year 4,437,277.95Rs.

11 Working Capital for 1 Cycle (30 days=1 month)- 2nd year 8,874,555.91Rs.

12 Working Capital for 1 Cycle (30 days=1 month)- 3nd year 13,311,833.86Rs.

* Note

i Installed Capacity in phase-1 (1st Year ) is 50000 CM/annum

ii capacity adition in phase-2 (2nd Year ) is 50000 CM/annum

iii capacity adition in phase-3 (3rd Year ) is 50000 CM/annum

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

Page 18: AAC Sample Prject Profile-Complete

Sample AAC Project for Dongyue-India Clients

H DEPREATIATIONItem 1st Yr 2nd year 3rd Year 4th Year 5th Year Remarks

1 Block Land & Building 165.60 149.04 134.14 120.72 108.65

2 Added Land & Buildi ngs 0.00 0.00 0.00 0.00 0.00

3Depreaciation on building/shed and other constructions except land 10% 16.56 14.90 13.41 12.07 10.87

4 Year end Block 149.04 134.14 120.72 108.65 97.79

1 Block Machinary 601.72 511.46 567.85 615.77 523.41

2 Block Added in the Year 0.00 133.10 133.10 0.00 0.00

3 Depreaciation on machinary & equipments 15% 90.26 76.72 85.18 92.37 78.51

4 Year end Block 511.46 567.85 615.77 523.41 444.90

I Debt Service Coverage Ration ( D.S.C.R )1 Bank Loan 689.04 689.04 616.61 444.35 272.092 Intrest on Bank Loan 89.57 89.57 80.16 57.77 35.373 Repayment 0.00 172.26 172.26 172.26 172.264 Aditional Loan in Year 0.00 99.83 0.00 0.00 0.00

5 Profits before TAX 249.99 709.64 1147.13 1256.72 1387.226 Profits after Tax (33%) 33% 82.50 234.18 378.55 414.72 457.787 Profit After Tax 167.49 475.46 768.57 842.00 929.44

8 D.S.C.R 4.06 2.51 3.75 4.37 5.08

9 Average DSCR 3.95

Note D.S.C.R = ( Profit After Tax + Depreciation + Intrest on Trrm Loan ) / (Intrest on Term Loan + Term Loan Repayment )

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])

Page 19: AAC Sample Prject Profile-Complete

Sample AAC Project for Dongyue-India Clients

J Project Cost, Profitability Calculation & Ratios J1 Project Cost 1st Yr 2nd year 3rd Year 4th Year 5th Year

1 Total Fixed Capital 807.32 940.42 1073.53 1073.53 1073.532 Total Working Capital (30 days) 44.37 88.75 133.12 144.21 155.30

3 Project Cost 851.69 1029.17 1206.65 1217.74 1228.83

J2

Machinary Utilisation

assumed/production 40000 80000 120000 130000 140000

CM/

year

E Cost of production per year

1 Working capital for 12 months 532.47 1064.95 1597.42 1730.54 1863.66

2

Depreaciation on building/shed and

other constructions except land 10 percent 16.56 14.90 13.41 12.07 10.87

3 equipments 15 percent 90.26 76.72 85.18 92.37 78.51

4 Intrest and Oppurtunity Cost 13 percent 110.72 133.79 156.86 158.31 159.75

5 Total cost of production 750.01 1290.36 1852.87 1993.28 2112.78

J3 Sales per year @ Rs. 2500/CM 1000.00 2000.00 3000.00 3250.00 3500.00

Note : Sales inclusive of VAT & Excise 2808.00

Expected CER Generated 5000.00 10000.00 15000.00 16250.00 17500.00

J4 Carbon Credit Revenue (Apprx) 25.88 51.75 77.63 84.09 90.56

Note :

CERs @8 CM=1 CER, 50000

CM=6666 CER @ 11.5 Euros@60

INR

Analisis

J5 Total Revenue 1000.00 2000.00 3000.00 3250.00 3500.00

J6 Net Profit/year 249.99 709.64 1147.13 1256.72 1387.22

J7 Net Profit Ratio 25.00 35.48 38.24 38.67 39.63 %

J8 Rate of return on investment 29.35 68.95 95.07 103.20 112.89 %

J9 Fixed cost (Per annum)

1 Depreatiation (Full) 106.82 91.62 98.59 104.44 89.38

2 Insurance (0.3% on Fixed costs) 2.42 2.82 3.22 3.22 3.22

3 Intrest on investment (Full) 110.72 133.79 156.86 158.31 159.75

4 25% Power 5.40 10.80 16.20 17.55 18.90

5 30% of wages &50% salary 7.98 15.96 23.94 25.94 27.93

6 Other Overheads (Full) 10.00 20.00 30.00 32.50 35.00

7 Total fixed cost 243.34 275.00 328.82 341.95 334.18

J10 Break Even Point (B.E.P) 49.33 31.66 22.28 21.01 19.41 %

Note :

1 Net Profit Ratio = (Net Profit / Net Sales) x100

2 Rate of Return on Investment = (Net Profit / Project Cost) x 100

3 Break Even Point ( B.O.P )= (Fixed Cost / (Fixed Cost + Net Profit)) x 100

25% of CERs deducted as transactional and operational costs. CER

revenues for Guidelines only. Not computed in Profitability of this

report

Prepared by Project Consultant. N.Gangadhar Reddy (Ph-9437123235, [email protected])