6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
Prof. Dr.-Ing. Christian Hopmann
Dipl.-Ing. Marc Linus Fecher
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, STADE
12th of June 2012
Resin Transfer Prepregging – Process chain for large
scale production of structural composite parts
INS
TIT
UT
F
ÜR
K
UN
ST
ST
OF
FV
ER
AR
BE
ITU
NG
- A
AC
HE
N
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
Institut für Kunststoffverarbeitung (IKV) an der
RWTH Aachen
Founded in 1950, supported by a Sponsors'
Society (actually ~240 members)
Associated with RWTH Aachen University
4 scientific departments
Composites
Extrusion
Injection Molding /PU
Part Design / Materials Technology
Staff
80 scientific employees
50 employees in laboratories,
workshops and administration
~220 student workers
Location Pontstr. 49
Location Seffenter Weg 201
INS
TIT
UT
F
ÜR
K
UN
ST
ST
OF
FV
ER
AR
BE
ITU
NG
- A
AC
HE
N
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
Outline
Introduction and motivation
Functional principle of the Resin Transfer Prepregging (RTP)
Fully automated RTP manufacturing center
Determination of the laminate quality
Conclusion and outlook
INS
TIT
UT
F
ÜR
K
UN
ST
ST
OF
FV
ER
AR
BE
ITU
NG
- A
AC
HE
N
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
Introduction and motivation
An economic high volume production of functional integrated structural
composite parts with endless fibre reinforcement is not realisable with currently
available processes.
Example of a structural composite part:
[EADS]
stringer
hull
INS
TIT
UT
F
ÜR
K
UN
ST
ST
OF
FV
ER
AR
BE
ITU
NG
- A
AC
HE
N
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
Structure of the DFG Research Unit 860
New process chains for production of continuous fibre reinforced plastic parts:
Integration of preforming, impregnation, forming and curing
Testbild
1
2
3
process-
chain
TP 4 (IKV)
Resin Spray
Prepregging
TP 5 (IKV)
Resin Transfer
Prepregging
TP 8 (IKV)
Forming and
curing
TP 3 (IPT) Handling
ITA: Institute for Textile Technology
IPT: Fraunhofer Institute for Production Technology
IKV: Institute of Plastics Processing
TP 1 (ITA)
One-step
Preforming
TP 2 (ITA)
Multiple-step
Preforming
TP 6 (IKV)
Gap-Impregnation
INS
TIT
UT
F
ÜR
K
UN
ST
ST
OF
FV
ER
AR
BE
ITU
NG
- A
AC
HE
N
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
Approach: Process chain Resin Transfer Prepregging
Resin Transfer Moulding (RTM)
+ parts with a high complexity
+ high fibre volume contents
Resin Transfer Prepregging (RTP)
Separation of the RTM-process in two isothermal sub processes „impregnation“
and „forming and curing“
No heating and cooling cycles necessary
Reduction of cleaning expenses
- long heating and cooling rates
- high cleaning expenses
INS
TIT
UT
F
ÜR
K
UN
ST
ST
OF
FV
ER
AR
BE
ITU
NG
- A
AC
HE
N
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
sub process „impregnation“
Process chain Resin Transfer Prepregging
sub process: „forming and curing“
structural composite part
series production of
near-net-shape preforms
storage subsequent processing
resin feeding
cooled RTP-mould
injection unit
vent
F
heated compression mould
adjacent
mould cavity
INS
TIT
UT
F
ÜR
K
UN
ST
ST
OF
FV
ER
AR
BE
ITU
NG
- A
AC
HE
N
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
Steps of the sub process „impregnation“
closing of the mould and
evacuation of the cavity
injection of preheated resin
into the cooled mould
impregnation of the fibres
and freezing of the resin
F
injection unit resin feeding
vent preform cooled mould
INS
TIT
UT
F
ÜR
K
UN
ST
ST
OF
FV
ER
AR
BE
ITU
NG
- A
AC
HE
N
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
RTP manufacturing center
mould carrier
RTP-mould
cooling system
metering unit
control panel
INS
TIT
UT
F
ÜR
K
UN
ST
ST
OF
FV
ER
AR
BE
ITU
NG
- A
AC
HE
N
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
Materials and process parameters
materials:
epoxy resin: Huntsman XB 3585
curing agent: Huntsman Aradur 22962
preforms built up with quadraxial glass
fibre non-crimp fabrics: Saertex 984 g/m²
process parameters for impregnation:
resin temperature: 50 °C
mould temperature: 0 °C
injection pressure: 4 bar
vacuum: 100 mbar
fibre volume content: 50 %
0 1 2 3 4 5
cycle time
time [min]
preform insertion / mould closing
evacuation
resin injection
freezing / demoulding
∆tcycle= -40 %
initial RTP-
process
optimised
RTP-process
INS
TIT
UT
F
ÜR
K
UN
ST
ST
OF
FV
ER
AR
BE
ITU
NG
- A
AC
HE
N
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
500 mm
Structural composite parts manufactured in the
RTP-process
cut out element Ø 75 mm cut out element 40 x 80 mm² insert
INS
TIT
UT
F
ÜR
K
UN
ST
ST
OF
FV
ER
AR
BE
ITU
NG
- A
AC
HE
N
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
Determination of the laminate quality
480 mm
480 m
m
500 mm
500 m
m
ultrasonic imaging technique RTP-part
-20 0 -10 [dB]
INS
TIT
UT
F
ÜR
K
UN
ST
ST
OF
FV
ER
AR
BE
ITU
NG
- A
AC
HE
N
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
Flexural properties of the RTP-parts
(DIN EN ISO 14125)
0
100
200
300
400
500
600
initial RTP-process
optimisedRTP-process
flexura
l str
ess
[M
Pa]
0
5
10
15
20
25
initial RTP-process
optimised RTP-process
flexura
l m
odulu
s
[G
Pa
]
INS
TIT
UT
F
ÜR
K
UN
ST
ST
OF
FV
ER
AR
BE
ITU
NG
- A
AC
HE
N
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
Conclusion und Outlook
Structural composite parts with fibre volume contents of 50 % can be
manufactured in the Resin Transfer Prepregging process in less than 10 min.
The RTP-parts exhibit low porosity and high mechanical properties.
Functional elements can be integrated into the parts during the process.
Manufacturing of parts with integrated stiffening profiles and combinations of the
three investigated functional elements.
Implementation of an online quality control system
INS
TIT
UT
F
ÜR
K
UN
ST
ST
OF
FV
ER
AR
BE
ITU
NG
- A
AC
HE
N
6th INTERNATIONAL CFK-VALLEY STADE CONVENTION, Resin Transfer Prepregging - Process chain for large scale production of structural
composite parts, Marc Linus Fecher, IKV Aachen
Thank you for your attention!
The presented investigations have been funded by the Deutsche
Forschungsgemeinschaft (German Research Foundation, DFG) within the research
unit Forschergruppe 860 “New process chains for production of continuous fibre
reinforced plastic parts: integration of preforming, impregnation, forming and curing”.
This support is gratefully acknowledged by the authors.
Contact:
Dipl.-Ing. Marc Linus Fecher
Seffenter Weg 201
D - 52074 Aachen
Tel: +49 241 80 28330
Email: [email protected]