  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    1/23

    OLGA UGM Oslo 2009Mari F. Langseth, Senior Project Engineer, Integrated Operations, ABB Oil, Gas & Petrochemicals

    Flow assurance applications in aIntegrated Operations framework

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    2/23

    ABB Group

    August 13, 2013 | Slide 2

    Outline

    Introduction to ABB

    ABB Integrated Operations

    Realizing value through IO

    Flow assurance & Integrated Operations Concluding Remarks

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    3/23

    ABB Group

    August 13, 2013 | Slide 3

    Power and productivity for a better worldABBs vision

    As one of the worlds leading engineering companies, we

    help our customers to use electrical power efficiently, to

    increase industrial productivity and to lower

    environmental impact in a sustainable way.

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    4/23

    ABB Group

    August 13, 2013 | Slide 4

    ABB within Oil, Gas and Petrochemicals

    Key deliverables

    Electrical, Control, Instrumentation and

    Telecommunication (ECIT)

    Integrated Operations

    Lifecycle services

    http://stage-www.abb.com/global/gad/gad02477.nsf/vwImages/1C246B759F1F3682C12571F0007A4D10/$File/Petrochemicals.jpghttp://www300.abb.com/global/gad/gad02007.nsf/vwImages/55D4BBE5EF0FCEF0C1256DA3004730CC/$File/Controlroom-01-HR.jpg
  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    5/23

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    6/23

    ABB Group

    August 13, 2013 | Slide 6

    Realizing Value in Brown Fields

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    7/23

    ABB Group

    August 13, 2013 | Slide 7

    Challenge: Handling Process Variations

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    8/23

    ABB Group

    August 13, 2013 | Slide 8

    System Setup for Remote Support (Year 2002)

    Siemens Tele Perm (DCS)

    ABB AC 800M

    Norsk Hydro

    Brage SubnetSOIL

    TCP/IP

    ABB PC

    ABB Remote Room

    Access

    Code

    ABB Network

    OnshoreOffshore

    TCP/IP

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    9/23

    ABB Group

    August 13, 2013 | Slide 9

    Realizing Value in Green Fields

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    10/23

    ABB Group

    August 13, 2013 | Slide 10

    EIT Integrated Approach

    One supplier for:

    Electrical

    Instrumentation/Automation

    Telecommunication

    Integrated Operations

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    11/23

    ABB Group

    August 13, 2013 | Slide 11

    EIT + IO Project Model

    EPC

    E I T

    IO

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    12/23

    ABB Group

    August 13, 2013 | Slide 12

    Supplier Involvement in all the Project Phases

    Influence

    concepts

    FEEDBasic/Detail

    Design

    Commission

    Start-upConcept Operation

    Select the right

    content

    and infrastructure

    InstrumentationInfrastructure

    Framework

    Applications

    SupportTuning

    Calibration

    Set-up

    Lifecycle SupportTuning

    Optimization

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    13/23

    Flow Assurance and IntegratedOperations

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    14/23

    ABB Group

    August 13, 2013 | Slide 14

    Flow assurance & IO

    Integration of systems, applications and competency needs to be included early in

    the project phase

    Integrated flow assurance studies/concept developments:

    The layout, control and operation of the receiving facility has a significant

    impact on flow assurance in pipelines and gathering systems

    Similarly, flow assurance aspects in pipelines and wells has a significant impactin topside control and optimization

    Integration of both flow assurance and topside/control/operational competency is

    required for providing overall understanding and optimal design of pipelines and

    gathering systems

    Concept/Feed phase

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    15/23

    ABB Group

    August 13, 2013 | Slide 15

    Flow assurance & IO

    Improved accuracy of study results

    Interactions between processing facility, control systems and pipeline design

    Integrated control of pipelines and processing facility

    Slug control and mitigation

    Production Optimization

    Design and optimization of gas lift

    MEG injection

    Required changes to topside control system and HMI from new tie-in

    Condition and performance monitoring

    Etc.

    Typical benifits from integrated studies

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    16/23

    ABB Group

    August 13, 2013 | Slide 16

    Flow Assurance and IOABBs IO Compliant Topology

    Control appl

    Monitoring application

    Supervisory control

    optimization

    Monitoring

    Support

    Operation

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    17/23

    ABB Group

    August 13, 2013 | Slide 17

    Flow Assurance & IO

    Flow assurance applications from ABB

    Slug control and mitigation (AFC/AWC)

    Virtual Flow Metering (WMS)

    Gas Lift Optimization (GLO)

    Insight Erosion Management system

    Other custom-built applications

    ABB applications

    1 4 15 16 1 7 1 8 1 9 2 0days

    [ -

    ]

    Slugging, resulting in a

    loss of oil production

    Slugging eliminated,

    oil production increased by ~10%

    PipelineInletpressure

    OilproductionfromT

    or

    AWCRamp-UpConfiguration

    AWCRamp-Up

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    18/23

    ABB Group

    August 13, 2013 | Slide 18

    Flow Assurance & IOIntegration of ABB products

    AWC(AC800M)

    FieldInstrumentation

    DCS

    Gas LiftOptimizer

    GUI(forremoteaccess)

    Servers

    OPCServer

    WMSOS display

    Engineering interface

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    19/23

    ABB Group

    August 13, 2013 | Slide 19

    Flow Assurance & IOIntegration of ABB applications with OLGA Online

    Example: Subsea tie-in

    AFC

    Slug control and mitigation

    Online PMS

    Hydrate

    Leak detection

    Ramp up

    Etcroved performance

    by providing virtual

    ic measurements

    isor outputs

    ented by AFC

    OLGA

    OnlineVirtual measurements

    Advisor outputs

    WMS

    Improved virtual flow

    rates from WMS andOLGA Online

    Insight

    Improved erosion

    monitoring using process

    data and OLGA Online

    fluid velocities

    Common

    historian for easier

    data access

    Integrated flow assurance and optimization

    system

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    20/23

    ABB Group

    August 13, 2013 | Slide 20

    Flow Assurance & IO

    Structured IO framework facilitates improved support of both installed applications

    and operations itself

    Improved data access for both suppliers and operators

    Bring suppliers expertise into the loop

    Remote collaboration

    Product support might highlight operational opportunities

    e.g. tuning/support on virtual metering systems might reveal possibilities for

    optimizing production

    Improved service through Service Environment

    Operational Support

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    21/23

    The benefits of ABB Service Environment

    Modern oil and gas operations rely on advanced

    technological solutions to

    optimize production reduce operating costs

    increase safety

    extend the overall field lifecycle

    One Team

    ISO Processes

    Procedures

    IT Security

    SharingKnowledge

    Supporting toolThe unique Service Environment program is

    designed to effectively manage

    complex and integrated systems

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework

    22/23

    ABB Group

    August 13, 2013 | Slide 22

    Concluding Remarks

    Integrated operations gives significant benefits for both operators and

    suppliers

    Systems and competency are becoming more inter-dependent

    Requires an integrated approach both within consultancy and

    product deliveries

    Vendors participation through the whole life-cycle gets increasingly

    important

    2007 - 2007

    Commissioning

    Flow Assurance, Process Control and Operations Knowledge and Experience

    04.06.2007 - 19.09.2007

    Operations

    2007 - 2007

    FEED/Engineering

    2007 - 2007

    Implementation/Testing

    2007 - 2007

    Start-up

  • 7/27/2019 ABB OLGA UGM 2009 - Flow Assurance Applications in an Integrated Operations Framework