7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 1/89
D.I.Y. PRODUCT GUIDE
It’s not an expense - it’s an investment
waterproofing coatings adhesives
sealants generalG
Edition 2 (April 2010)
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 2/89
USES:• Suitable for solving the most difcult waterproong problems on: - Flat roofs. - Sloping and pitched roofs. - Reinforced concrete. - Prefabricated concrete. - masonry cement - metal and timber decks and terraces, with or without thermal insulation.• For renovation purposes
SURFACE PREPARATIONAll surfaces to be clean, dry, sound with a minimum fall of 1:50.abedex should NOTbe applied over a foam cement screeds.
BONDING/PRIMINGAll cementitous surfaces must be primed with a.b.e. bituprime at a rate ofapproximately 3,5 m2/l. Depending on the porosity of the surface a second coatof primer may be required.
APPLICATIONDepending on the different construction types, the sheets must be fully bonded tothe substrate. See Index publications ‘Technical Specications’ or ‘Applicationmanual’ which also describe other methods of application such as mechanical xing, hot air welding and bonding with adhesives. The substratemust be clean, dry, smooth and free of roughness or dips. The cast concrete surface must be allowed to dry before the sheet is applied. Dryingdepends on the weather and may take from 8 days to 3 weeks. To protect timber oors from the ame, either sheets of ROLLBASE or a.b.e.malthoid 5-ply must be nailed before application of the membrane.
Torch-bonding is carried out with a suitable gas torch burner connected to a propane gas cylinder. To bond the sheet to the substrate and on theoverlaps, use the torch ame to melt the aming lining on the lower face of the membrane while the membrane is being unrolled. The sheets areoverlapped longitudinally by 100 mm, while the head laps of the polyester reinforced membrane should not be less than 150 mm.
Bonding is carried out by torch application in such a way that a continuous bead of melted bitumen comes out from the overlap. So as not toremove the protective top layer, the use of a trowel is to be avoided.
When overlaying mineral nished membranes., the mineral surface must be heated so that the slate granules are completely embedded in theoverlap.
The correct temperature for bonding the membrane on the substrate and the overlaps is indicated when the protective aming burns off. Howeverthe membrane must not be overheated and a further sign of correct application is that an excessively large bead of melted compound does notcome out from the overlap. overlaying mineral nished membranes, the mineral surface must beheated so that the slate granules are completely
COVERAGE:Effective coverage: 8,9m2 / roll.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-lowed by washing with soap and water.
PROTECTION ON COMPLETIONabedex should be allowed to weather for a minimum of 8-10 weeks before overcoating with 2 coats of a.b.e. silvakote the system to dry for 7 -
10 days and then overcoat exposed area with a.b.e. silvakote.
PACKAGING COLOURSabedex is supplied in rolls of 10m x 1m . Black.
Waterproong torch-on membrane.abedex
1
a.b.e. was founded in 1932 and the company established in 1939 in Durban as a supplier of bitumen to
municipalities in KwaZulu-Natal. a.b.e. has grown in both size and diversity to become a major supplier of
specialised construction products to the building, civil engineering and building maintenance industries
supplying product directly to its customers through its branch network as well as through builders’ merchants
and hardware stores, with manufacturing plants in Johannesburg (Boksburg)
and Durban (Isipingo).
Supported by a network of branches and distributors throughout South Africa, sub-Saharan
Africa, the Indian Ocean Islands and Pakistan a.b.e. is ideally positioned to service its customers.
The a.b.e. range of products fall into the following broad categories:
• waterproong
• ooring
• specialised adhesives
• silicone and sealants
• concrete repair products
• roong products
Auburn, a BEE company, acquired a 26% shareholding in a.b.e. with effect from 12 July 2007.
a.b.e. listed on ALTX on the 17th of August 2007.
Company prole
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 3/89
Index
1
duralatex 57dura spalling repair 58epidermix 60epidermix crack repair system 62oor joint nosing repair 63grouting of bases 64non-slip oor nishes 66precast manhole rings 67preparation of surfaces 68safety precautions 70shower waterproong 71formulae 72conversion tables 73factor to calculate volumes 74trigonometry tables 76
supporting notes
a.b.e. product overview 77
D.I.Y. brushable adhesives product selector 78D.I.Y. coatings product selector 79D.I.Y. epoxy 80D.I.Y. waterproong product selector 81D.I.Y. sealants product selector 82D.I.Y. sealant ranges 83notes 84
product selectors
a.b.e. acrylic 37a.b.e. silicone 38all purpose silicone 39multipurpose silicone 39DC 781 40DC 785 41DC 794 F 42DC 813 C 43ller foam 44exothane 1 45
painters mate 46quickgrip 47
sealants
bitubond 27bitugrip 28duralatex 29epidermix 318 30epidermix 344 31epidermix 372 32epidermix 395 33epidermix 396 34grip-a-bloc 35plastergrip 36
adhesives
4-metal primer 18abecote WD337 19autokote 20bituprime 21bituseal liquid 22carbolineum & creosote 23provonite 24ravenol 25silvakote 26
coatings
G
a.b.e. super brush cleaner 48duracord 49duragrout 50durarep FR 51durarep QS 52duraslurry 53ashpack/bidim 54rock bitumen 55tree seal pruning grade 56
generalabedex 3a.b.e. membrane 4bituseal plastic 5brixeal 6duraex 7brated super laycryl 8intkote 3 9hydroproof 10malthoid 2, 3 & 5 ply 11slatex 12stick it 13super laycryl 14super laykold 15super laykold tape 16wallseal 17
waterproong
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 4/89
• b i t u b o n d
• d u r a f l e x
• D C
7 8 5 s a n i t a r y s i l i c o n e
• a b e s i l i c o n e / A P S / M P S / D C
7 8 1
• a b e f l e x o t h a n e 1 / D C
8 1 3 / D
C 7 9 4
• a b e a c r y l i c
• p a i n t e r s m a t e
• f i l l e r f o a m
• c a r b o l i n e u m
• c r e o s o t e
• p r o v o n i t e
• d u r a c u r e Q S
• s u p e r b r u s h c l e a n e r
• d u r a c o r d
• d u r a g r o u t
• r o c k b i t u m e n
• d u r a r e p
F R
• d u r a s l u r r y
• b i d i m ( g e o t e x t i l e f a b r i c
) U 1 4
• f l a s h p a c k b i d i m
• a b e f l e x o t h a n e 1 /
D C
8 1 3 / D C
7 9 4
f l o o r v i n y l t i l e a d h e
s i v e
s h o w e r
s e a l a n t s
w o o d
p r e s e r v a t i v e s
g e n e r a l
d r a i n a g e
w a l l d a m p p r o o f i n g
• w a l l s e a l
• b r i x e a l
• f l i n t k o t e 3
• s u p e r l a y c r y l
• s u p e r l a y k o l d t a p e
• p a t c h i t
• b i t u s e a l p l a s t i c
• f i b r a t e d s u p e r l a y c r y l
• h y d r o p r o o f
• s t i c k i t
r i d g i n g s
• f i b r a t e d s u p e r l a y c r y l
• h y d r o p r o o f
• s t i c k i t
p a r a p e t w a l l s
• s u p e r l a y c r y l & m e m b r a n e
• s u p e r l a y k o l d t a p e
• b i t u s e a l p l a s t i c
• p a t c h i r t
• s u p e r l a y k o l d
• h y d r o p r o o f
• s t i c k i t
v a l l e y g u t t e r s
• s u p e r
l a y c r y l & m e m b r a n e
• s u p e r
l a y k o l d t a p e
• b i t u s e
a l p l a s t i c
• p a t c h
i t
r o o f i n g s c r e w s
• s u p e r l a y c r y l & m e m b r a n e
• s u p e r l a y k o l d t a p e
• b i t u s e a l p l a s t i c
• p a t c h i t
• s u p e r l a y k o l d
• f i b r a t e d s u p e r l a y c r y l
• h y d r o p r o o f
• s t i c k i t o
v e r l a p s
• b i t u s e a l p l a s t i c
• p a t c h i t
• s u p e r l a y c r y l & m e m b r a n e
• s u p e r l a y k o l d t a p e
• f i b r a t e d s u p e r l a y c r y l
• h y d r o p r o o f
• s t i c k i t f l a
s h i n g s
v e h i c l e
u n d e r b o d y / c h a
s s i s
• a u t o k o t e
• r a v e n o l
• b i t u s e a l p l a s t i c
• p a t c h i t
• r a v e n o l
• s u p e r l a y k o l d
w a t e r t a n k s
w i n d o w
/ c a n o
p y
s e a l a n t
• s u p e r l a y k o l d
• d u r a f l e x
d a m s a n d
k o i p o n d s
• a b e c o t e 3 3 7
c e m e n t f l o o r c o a
t i n g
• e p i d e r m i x 3 7 2
• e p i d e r m i x 3 1 8
• e p i d e r m i x 3 4 4
• e p i d e r m i x 3 9 5
• e p i d e r m i x 3 9 6
e p o x y a d h e s i v e
w o o d b l o c k
f l o o r a d h e s i v e
• g r i p - a - b l o c
• p r u n i n g
t r e e s e a l
• q u i c k g r i p
s k i r t i n g
•
s l a t e x 2 0 0 0
u n d e r r o o f i n g t i l e s
• 4 - m e t a l p r i m e r
m e t a l p r i m e r
• m a l t h o i d
d a m p p r o o f c o u
r s e
• p l a s t e r g r i p
• d u r a l a t e x
p l a s t e r b o n d i n
g
1 . P r i m e r
b i t u p r i m
e
2 . a ) C o v e r i n g : m a l t h o i d
A d h e s i v e : b i t u g r i p
b ) C o v e r i n g : a b e d e x
4 m m
3 . C o a t i n g
s i l v a k o t e
4 . F l a s h i n g
s u p e r l a
y c r y l
f l a t r o o f i n g
• b i t u s e a l l i q u i d
h e a v y d u t y p r o t e c t o r
g u t t e r l e a k s
• b i t u s e a l p l a s t i c
• p a t c h i t
• s u p e r l a y k o l d t a p e
• s u p e r l a y k o l d
w a t e r p r o o f i n g
c o a t i n g s
a d h e s i v e s
s e
a l a n t s
g e n e r a l
G
a . b . e .
C o n s t r u c t i o
n C h e m i c a l s L i m i t e d
w
w w . a b e . c o . z a
I t ’ s n o t a n
e x p e n s e - i t ’ s a n i n v e s t m e n t
2
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 5/89
USES:• Suitable for solving the most difcult waterproong problems on: - Flat roofs. - Sloping and pitched roofs. - Reinforced concrete. - Prefabricated concrete. - masonry cement - metal and timber decks and terraces, with or without thermal insulation.• For renovation purposes
SURFACE PREPARATIONAll surfaces to be clean, dry, sound with a minimum fall of 1:50.abedex should NOTbe applied over a foam cement screeds.
BONDING/PRIMING
All cementitous surfaces must be primed with a.b.e. bituprime at a rate of approximately 3,5 m2/l.Depending on the porosity of the surface a second coat of primer may be required.
APPLICATIONDepending on the different construction types, the sheets must be fully bonded to the substrate. See Indexpublications ‘Technical Specications’ or ‘Application manual’ which also describe other methods of applicationsuch as mechanical xing, hot air welding and bonding with adhesives. The substrate must be clean, dry,smooth and free of roughness or dips. The cast concrete surface must be allowed to dry before the sheet isapplied. Drying depends on the weather and may take from 8 days to 3 weeks. To protect timber oors fromthe ame, either sheets of ROLLBASE or a.b.e. malthoid 5-ply must be nailed before application of the membrane.
Torch-bonding is carried out with a suitable gas torch burner connected to a propane gas cylinder. To bond the sheetto the substrate and on the overlaps, use the torch ame to melt the aming lining on the lower face of the membranewhile the membrane is being unrolled. The sheets are overlapped longitudinally by 100 mm, while the head laps of the polyester reinforced mem-brane should not be less than 150 mm.
Bonding is carried out by torch application in such a way that a continuous bead of melted bitumen comes out from the overlap. So as not toremove the protective top layer, the use of a trowel is to be avoided.
When overlaying mineral nished membranes., the mineral surface must be heated so that the slate granules are completely embedded in theoverlap.
The correct temperature for bonding the membrane on the substrate and the overlaps is indicated when the protective aming burns off. Howeverthe membrane must not be overheated and a further sign of correct application is that an excessively large bead of melted compound does notcome out from the overlap. overlaying mineral nished membranes, the mineral surface must beheated so that the slate granules are completely
COVERAGE:Effective coverage: 8,9m2 / roll.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleanerfollowed by washing with soap and water.
PROTECTION ON COMPLETIONabedex should be allowed to weather for a minimum of 8-10 weeks before overcoating with 2 coats of a.b.e. silvakote the system to dry for 7 -10 days and then overcoat exposed area with a.b.e. silvakote.
PACKAGINGabedex is supplied in rolls of 10m x 1m .
COLOURSBlack.
Waterproong torch-on membrane. abedex
3
BLACK
HOW TO
Step 1 Step 2 Step 3 Step 4 Step 5 Step 6
roofs reservoirs earth dams
2ndlayer
sheets get torchedonto substrates
45ºcut
area to be
heated 15cm water outlet
double layer covering 45º cut on thehead-to-tail overlap
fully bonded application side-to-side andhead-to-tail overlaps
arrangement of sheetsfor water outlets
3cm
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 6/89
USES:• Suitable for solving the most difcult waterproong problems on: - Flat roofs. - Sloping and pitched roofs. - Reinforced concrete. - Prefabricated concrete. - masonry cement - metal and timber decks and terraces, with or without thermal insulation.• For renovation purposes
SURFACE PREPARATIONAll surfaces to be clean, dry, sound with a minimum fall of 1:50.abedex should NOTbe applied over a foam cement screeds.
BONDING/PRIMINGAll cementitous surfaces must be primed with a.b.e. bituprime at a rate ofapproximately 3,5 m2/l. Depending on the porosity of the surface a second coatof primer may be required.
APPLICATIONDepending on the different construction types, the sheets must be fully bonded tothe substrate. See Index publications ‘Technical Specications’ or ‘Applicationmanual’ which also describe other methods of application such as mechanical xing, hot air welding and bonding with adhesives. The substratemust be clean, dry, smooth and free of roughness or dips. The cast concrete surface must be allowed to dry before the sheet is applied. Dryingdepends on the weather and may take from 8 days to 3 weeks. To protect timber oors from the ame, either sheets of ROLLBASE or a.b.e.malthoid 5-ply must be nailed before application of the membrane.
Torch-bonding is carried out with a suitable gas torch burner connected to a propane gas cylinder. To bond the sheet to the substrate and on theoverlaps, use the torch ame to melt the aming lining on the lower face of the membrane while the membrane is being unrolled. The sheets areoverlapped longitudinally by 100 mm, while the head laps of the polyester reinforced membrane should not be less than 150 mm.
Bonding is carried out by torch application in such a way that a continuous bead of melted bitumen comes out from the overlap. So as not toremove the protective top layer, the use of a trowel is to be avoided.
When overlaying mineral nished membranes., the mineral surface must be heated so that the slate granules are completely embedded in theoverlap.
The correct temperature for bonding the membrane on the substrate and the overlaps is indicated when the protective aming burns off. Howeverthe membrane must not be overheated and a further sign of correct application is that an excessively large bead of melted compound does notcome out from the overlap. overlaying mineral nished membranes, the mineral surface must beheated so that the slate granules are completely
COVERAGE:Effective coverage: 8,9m2 / roll.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-lowed by washing with soap and water.
PROTECTION ON COMPLETIONabedex should be allowed to weather for a minimum of 8-10 weeks before overcoating with 2 coats of a.b.e. silvakote the system to dry for 7 -
10 days and then overcoat exposed area with a.b.e. silvakote.
PACKAGING COLOURSabedex is supplied in rolls of 10m x 1m . Black.
Waterproong torch-on membrane.abedex
1
USESSuitable for use with abe waterproong and ashing systems. BENEFITS• high strength• reinforce waterproong systems• will not shrink or perish• bridges cracks and gaps
SURFACE PREPARATIONSurface must be clean and free from dust and grease. Must be used in accordance with thewaterproong or ashing specication. COVERAGEAs required. APPLICATIONFollow the waterproong or ashing specication of the product it gets used with. PROTECTION ON COMPLETIONabe membrane will not perish, but need to be over coated as specied by the waterproong sytem. COLOURWhite
PACKAGINGabe membrane is supplied in the following sizes: 1m x 1m 10m x 1m 100mm x 10m 100mm x 20m 200mm x 2,5m 200mm x 10m 200mm x 12,5m 200mm x 20m 250mm x 10m 250mm x 20m 300mm x 20m 500mm x 10m Thickness: 0,8 – 1,2mm
High strength polyesterreinforced membraneabe membrane
4
parapet walls, roof laps, ashings
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 7/89
USES:
• Heavy duty bitumen mastic sealer and repair compound.
• May be used to seal most roong defects: sheeting overlaps, valleys,
gutters, downpipes and enlarged screw holes.
• To repair roof cracks, ashings, cracked roof tiles and patch repair
tanks.
SURFACE PREPARATION
All surfaces to be clean, dry, sound, free of alllaitance, grease, oil, fungal growth and loose
and aking particles.
BONDING/PRIMING
Prime with a coat of a.b.e. bituprime, which
should be allowed to dry prior to the
application of bituseal plastic, except for
steel which must be coated with a suitable
anti-corrosion primer like a.b.e. 4-metal primer.
APPLICATION
bituseal plastic may be applied by trowel, putty knife, extrusion
gun or gloved hand. bituseal plastic can be used in conjunction with
glass bre membrane . The membrane must be set into the still
wet lm of bituseal plastic.
COVERAGE
Application thickness: As needed up to 30mm
Practical coverage for estimating purposes:
Full overlap and screw head treatment on corrugated iron roof 150mm wide roof ashing - 1l /2,2m run.
In general - 1l /m2 per mm thickness.
CLEANING
Tools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-
lowed by washing with soap and water.
PROTECTION ON COMPLETION
Where the bituseal plastic is to be exposed to the effects of sunlight and ultra-violet radiation, it is recommended that 3 - 4 weeks after being ap-
plied, it may be coated with a.b.e. silvakote.
PACKAGING
1l, 5l, 25l containers.
COLOURS
Black.
General purpose bitumen mastic. bituseal plastic
5
roof lapsbroken tiles tanks & reservoirs gutters
BLACK
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 8/89
USES:
• Waterproong the faces of concrete beams and pillars
where they come into contact with exterior walls.
• Prevention of a bond developing between two adjoining
concrete faces.
• Waterproong between the two faces of 230mm thick wall.
• Concrete curing agent.
BENEFITS• Single pack ready to use.
• Quick drying.
• Economical.
SURFACE PREPARATION
All surfaces to be clean, dry, sound, free of all laitance,
fungal growth, grease, oil or loose and aking particles.
BONDING/PRIMING
No priming required.
MIXING
Stir well before use.
APPLICATIONTwo coats are recommended to ensure full coverage.
When brush applied, make sure strokes are used ensuring
the total surface is covered. brixeal may be applied directly
onto stock brick walls as a waterproong barrier. Better
results will be obtained if the surface is “bagged” with sand/
cement/water slurry in the usual way. When brixeal is used for curing of concrete, a coating is brushed or sprayed onto the surface of the
concrete, and by virtue of the waterproof qualities of the lm, water is prevented from evaporating from the concrete. To allow trafc onto the
concrete, the brixeal lm can be blinded with clean sand after setting.
Drying time @ 25º C - Touch dry: ± 1 hour, Hard dry: ± 12 hours, Full cure: ± 7 days as a waterproof barrier.
COVERAGE
Brushed coated on unbagged brickwork
1st coat 2m2/ l, 2nd coat 4m2/l.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-
lowed by washing with soap and water.
PACKAGING
1l , 5l and 20l
COLOUR
Black.
Brickwork waterproofcoating.brixeal
6
roof beams concrete curing agent between brick walls
BLACK
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 9/89
Flexible waterproong slurry. duraex
7
waterproof shower before tiling waterproof reservoirs waterproof structuresand bridges waterproof balconiesand terraces
USES:• Protection and repair of balconies, terraces and
haunching concrete structures and bridges.• Waterproong of new and old buildings (internal and external).• Waterproong of showers, tanks, containers & water reservoirs• Can be painted and covered with tiles.
BENEFITS• Excellent waterproof barrier.• Effective on negative or positive side.
• High bond strength.• Excellent freeze/thaw resistance.• Excellent resistance to chloride on penetration.• Brush, trowel, or spray applied.• Reliable application• Self-curing• Low in lace cost.• Non-toxic• Good abrasion resistance.• Approved for use in potable water systems.
SURFACE PREPARATIONAll surfaces to be clean, dry, sound, free of all laitance, grease, oil,fungal growth and loose and aking particles that might affectadhesion. Concrete may require grit blasting. Cracks less than 3mmin width can be coated as long as the crack is not likely to openup more than 3mm. Cracks greater than 3mm in width should be chased-out to 4mm in width and ±15mm in depth. This should be lled withduraex applied using less liquid providing a thicker consistency. When material in the crack has hardened the coatingshould be applied over the crack.
BONDING/PRIMINGNo priming required.
MIXINGIt is essential to use a mechanical mixer, such as a slow speed electric drill tted with a suitable paddle. Fill approximately three quarters of com-ponent A (milky liquid) into a pail and, with continuous stirring, slowly add component B (grayish powder). Mixing must be continued until the mix ishomogeneous and free of lumps.
For horizontal surfaces such as the base of reservoirs, add the remaining component A. for other applications add only sufcient component A toprovide a suitable consistency. When the two components are mixed together, a plastic thixotropic liquid results which is easy to apply.
APPLICATIONduraex may be applied with a short bristled brush, rubber squeegee, trowel or spray. Brush: should be applied in 3 coats to provide a nal dry thickness of 2mm - 3mm on surfaces. Alternate coats should be applied at right angles
to each other, allowing 16 hours between coats. Trowel: 1st coat should be applied at a thickness of 1mm - 1.5mm using a normal trowel. Allow to cure for 16 hours.2nd coat should be applied by using a notched trowel and levelled immediately by using a spiked roller.
Pot life @ 10ºC : 2 hrs, @ 20ºC : 1 hour, @ 30ºC : 0,5 hoursRecoatable: 16 hours. Resistant to mechanical stress : 3 days Full cure : 7 daysResistance to water pressure : Attained after 7 days cure pressure : 20 atmospheres, Negativepressure : 4 atmospheres
COVERAGE8m2/15kg per coat (requires 2 coats).
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and beforematerial has set with a.b.e. super brush cleaner followed by washing with soap and water.
PROTECTION ON COMPLETIONduraex may be left as is, be tiled over or overcoated with a high quality PVA/acrylic paint.
PACKAGING15kg (2 part).
COLOURSGrey.
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 10/89
USES:• Suitable for solving the most difcult waterproong problems on: - Flat roofs. - Sloping and pitched roofs. - Reinforced concrete. - Prefabricated concrete. - masonry cement - metal and timber decks and terraces, with or without thermal insulation.• For renovation purposes
SURFACE PREPARATIONAll surfaces to be clean, dry, sound with a minimum fall of 1:50.abedex should NOTbe applied over a foam cement screeds.
BONDING/PRIMINGAll cementitous surfaces must be primed with a.b.e. bituprime at a rate ofapproximately 3,5 m2/l. Depending on the porosity of the surface a second coatof primer may be required.
APPLICATIONDepending on the different construction types, the sheets must be fully bonded tothe substrate. See Index publications ‘Technical Specications’ or ‘Applicationmanual’ which also describe other methods of application such as mechanical xing, hot air welding and bonding with adhesives. The substratemust be clean, dry, smooth and free of roughness or dips. The cast concrete surface must be allowed to dry before the sheet is applied. Dryingdepends on the weather and may take from 8 days to 3 weeks. To protect timber oors from the ame, either sheets of ROLLBASE or a.b.e.malthoid 5-ply must be nailed before application of the membrane.
Torch-bonding is carried out with a suitable gas torch burner connected to a propane gas cylinder. To bond the sheet to the substrate and on theoverlaps, use the torch ame to melt the aming lining on the lower face of the membrane while the membrane is being unrolled. The sheets areoverlapped longitudinally by 100 mm, while the head laps of the polyester reinforced membrane should not be less than 150 mm.
Bonding is carried out by torch application in such a way that a continuous bead of melted bitumen comes out from the overlap. So as not toremove the protective top layer, the use of a trowel is to be avoided.
When overlaying mineral nished membranes., the mineral surface must be heated so that the slate granules are completely embedded in theoverlap.
The correct temperature for bonding the membrane on the substrate and the overlaps is indicated when the protective aming burns off. Howeverthe membrane must not be overheated and a further sign of correct application is that an excessively large bead of melted compound does notcome out from the overlap. overlaying mineral nished membranes, the mineral surface must beheated so that the slate granules are completely
COVERAGE:Effective coverage: 8,9m2 / roll.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-lowed by washing with soap and water.
PROTECTION ON COMPLETIONabedex should be allowed to weather for a minimum of 8-10 weeks before overcoating with 2 coats of a.b.e. silvakote the system to dry for 7 -
10 days and then overcoat exposed area with a.b.e. silvakote.
PACKAGING COLOURSabedex is supplied in rolls of 10m x 1m . Black.
Waterproong torch-on membrane.abedex
1
USES:
• For waterproong all types of stable ashings.
• For waterproong parapet walls.
• Flat roof waterproong.
• Re-waterproong over existing waterproong systems.
• Sealing of joints, laps and roong screws on corrugated roofs.
SURFACE PREPARATION
Ensure all surfaces are free from all laitance, fungal growth, grease, oil or loose and aking particles.
BONDING/PRIMING
(All surfaces except metal)
• Mix 1 part a.b.e. brated super laycryl to 1 part water.
•Allow to dry.
METAL SURFACES:
• Use a.b.e. 4-metal primer (water-based metal etched primer).
• Drying time 4hours.
COVERAGE
1l / m2 (minimum 2 coats).
APPLICATION
• Apply with a brush.
• Apply a thick base coat and allow to dry for 2-3 hours.• Once rst coat is dry, apply a nishing coat working at right angles to the rst coat
• Full cure: 7 days.
CLEANING
Whilst still wet, clean equipment with water. If a.b.e. brated super laycryl has dried use a.b.e.
super brush cleaner.
CAUTION
Membrane must be used on all non-stable gaps and joints exceeding 3mm.
Always ensure that a.b.e. brated super laycryl is applied to well drained roofs.
PROTECTION ON COMPLETION
Whilst a.b.e. brated super laycryl is designed for an extended life, it is important to apply a maintenance coat (a.b.e. brated super laycryl) every
3 to 4 years.
PACKAGING
Available in 1l & 5l.
COLOURS
Red, grey, charcoal, burgundy, white, green, terracotta and brown.
Water-based, bre-reinforcedacrylic, seamless waterproofer.
brated super laycryl
8
recoat ashingsparapet walls roof screws roof laps
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 11/89
USES:
intkote 3 is a general purpose bituminous coating and vapour
barrier and ooring system binder. See abeco and tank base
mastic.
BENEFITS
• Waterproof coating and vapour barrier
• Easy, cost effective.
• Non-toxic when dry• Potable water containment
• Service temperature:
Maximum dry: + 60º C, Minimum: -10º C
SURFACE PREPARATION
Steel – must never be coated directly with intkote 3. abe
bituprime should be used as a rst coat and preparation of the
steel must be as specied for the primer.
Galvanised steel – must be free of oil, grease and anti-white rust
treatment. Scrub the surface thoroughly with a paste made from
abe super brush cleaner and an abrasive soap. This
may be applied with a cleaning pad (e.g. Scotchbrite). Thoroughly
wash away all residues using clean water.
Concrete and other porous surfaces – must be free of all dust
and laitance. The rst coat of intkote 3 should be’ diluted1 : 1 with clean water. See data sheet ‘Preparation of Surfaces
BONDING / PRIMING
Dilute 1:1 with water for porous surfaces. Use bituprime on steel.
MIXING
Stir intkote 3 well before use, using a at paddle.
COVERAGE
1 m2/litre/mm.
APPLICATION
intkote 3 is normally applied by brush and generally should not be applied thicker than specied. A coat should be thoroughly dry before applica-
tion of a second coat. This can be easily
determined by rubbing the surface with a wet nger. If the nger remains clean, the surface is dry enough to overcoat. intkote 3 can be used inconjunction with a glass bre membrane to build up and reinforce thicker coats. The membrane must be set into the still wet lm of
intkote 3 and ideally all bubbles and wrinkles should be removed by means of a laminating roller. The lm is allowed to dry and then a second
coat is applied at a sufcient thickness to
completely obliterate the weave and pattern of the membrane.
Where the intkote 3 lm is nally to be exposed to the effects of sunlight and ultra-violet radiation, it is recommended that, some 3 - 4 weeks
after being applied, it be overcoated with silvakote.
Overcoating time @ 25º C : 24 hours
Drying time @ 25º C : 24 hours
CLEANING
Ordinary clean water or abe super brush cleaner.
PROTECTION ON COMPLETION
Protect against trafc and spillage until cured. If exposed to direct extensive sunlight, overcoat with abe silvakote.
PACKAGING
intkote 3 is supplied in 5 l, 25 l and 200 l yield metal containers.
COLOUR
Black.
Binder for abeco ooring systemand heavy duty bituminous coating intkote 3
9
BLACK
roof beams concrete curing agent between brick walls
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 12/89
hydroproof Economical, water-based acrylicwaterproofer - used with a.b.e. membrane.
recoat ashingsparapet walls roof screws roof laps
110
USES:
• For waterproong all types of stable ashings.
• For waterproong parapet walls.
• Sealing of joints, laps and roong screws on corrugated roofs & gutters
BENEFITS
• hydroproof is an all-in-one system.
• There is no need for separate primers on porous surfaces.
• hydroproof has excellent weathering properties, adhesion and is tough, exible and non-toxic.• hydroproof comes in a wide range of colours.
SURFACE PREPARATION
Ensure all surfaces are clean dry, sound and free from all laitance, fungal growth,
grease, oil or loose and aking particles.
BONDING/PRIMING
Prime porous surfaces with a neat coat of hydroproof.
Prime metal surfaces with a.b.e. 4-metal primer.
MIXING
Stir well before use.
COVERAGE
Coverage: 2.1l/m2 full system.
APPLICATION
1st coat (after priming): apply by brush/roller using 1l/m2.
Embed membrane into wet coat, avoiding bubbles or wrinkles.
Membrane overlaps minimum 100mm on end laps and 75mm on
side laps.
2nd coat: once 1st coat has dried (2 - 3 hours), apply 2nd coat by brush/roller using 0,5l/m2
and ensure membrane is fully saturated.
3rd coat: once 2nd coat has dried, apply 3rd coat at different angle to 2nd coat using 0,5l/m2 .
Drying time @ 25ºC, Touch dry: 1 hour, Hard dry: 24 hours, Full cure: 7 days
CLEANING
Whilst still wet, clean equipment with water. If a.b.e. hydroproof has dried use a.b.e. super
brush cleaner followed by washing with soap & water.
CAUTION
Membrane must be used.
Always ensure that a.b.e. hydroproof is applied to well drained roofs.
PROTECTION ON COMPLETION
Whilst a.b.e. hydroproof is designed for an extended life, it is important to apply a maintenance coat of a.b.e. hydroproof every 3 to 4 years.
PACKAGING
Available in 5 litre.
COLOURS
Red, grey, charcoal, burgundy, white, green and terracotta.
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 13/89
USES:• Suitable for solving the most difcult waterproong problems on: - Flat roofs. - Sloping and pitched roofs. - Reinforced concrete. - Prefabricated concrete. - masonry cement - metal and timber decks and terraces, with or without thermal insulation.• For renovation purposes
SURFACE PREPARATIONAll surfaces to be clean, dry, sound with a minimum fall of 1:50.abedex should NOTbe applied over a foam cement screeds.
BONDING/PRIMINGAll cementitous surfaces must be primed with a.b.e. bituprime at a rate ofapproximately 3,5 m2/l. Depending on the porosity of the surface a second coatof primer may be required.
APPLICATIONDepending on the different construction types, the sheets must be fully bonded tothe substrate. See Index publications ‘Technical Specications’ or ‘Applicationmanual’ which also describe other methods of application such as mechanical xing, hot air welding and bonding with adhesives. The substratemust be clean, dry, smooth and free of roughness or dips. The cast concrete surface must be allowed to dry before the sheet is applied. Dryingdepends on the weather and may take from 8 days to 3 weeks. To protect timber oors from the ame, either sheets of ROLLBASE or a.b.e.malthoid 5-ply must be nailed before application of the membrane.
Torch-bonding is carried out with a suitable gas torch burner connected to a propane gas cylinder. To bond the sheet to the substrate and on theoverlaps, use the torch ame to melt the aming lining on the lower face of the membrane while the membrane is being unrolled. The sheets areoverlapped longitudinally by 100 mm, while the head laps of the polyester reinforced membrane should not be less than 150 mm.
Bonding is carried out by torch application in such a way that a continuous bead of melted bitumen comes out from the overlap. So as not toremove the protective top layer, the use of a trowel is to be avoided.
When overlaying mineral nished membranes., the mineral surface must be heated so that the slate granules are completely embedded in theoverlap.
The correct temperature for bonding the membrane on the substrate and the overlaps is indicated when the protective aming burns off. Howeverthe membrane must not be overheated and a further sign of correct application is that an excessively large bead of melted compound does notcome out from the overlap. overlaying mineral nished membranes, the mineral surface must beheated so that the slate granules are completely
COVERAGE:Effective coverage: 8,9m2 / roll.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-lowed by washing with soap and water.
PROTECTION ON COMPLETIONabedex should be allowed to weather for a minimum of 8-10 weeks before overcoating with 2 coats of a.b.e. silvakote the system to dry for 7 -
10 days and then overcoat exposed area with a.b.e. silvakote.
PACKAGING COLOURSabedex is supplied in rolls of 10m x 1m . Black.
Waterproong torch-on membrane.abedex
11
USES:malthoid 2 ply: Damp-proof coursing in brickwork (DPC) 1,7mmmalthoid 3 ply: Damp-proof coursing in brickwork (DPC) 2mm Damp-proof coursing under oor screedsmalthoid 5 ply: Damp-proof coursing in brickwork (DPC) 2.8mm Damp-proof coursing under oor screeds
• Flat roof waterproong when an asphalticmembrane may be used.( min. falls 2%)
• In accordance with SABS Code of practice
021/1973 - using either hot or cold bondingmethod.
• As an underlay on timber decks. • As a protection layer over a.b.e. index torch-on
waterproong membranes priorto the application of screeds and tiles.
BENEFITS• High resistance to puncture.• Easy to apply.• Economical.
SURFACE PREPARATIONAll surfaces must be clean, dry and free from sharpprotrusions.
BONDING/PRIMING• Prime concrete surfaces with a.b.e. bituprime and
allow to dry.• Use a.b.e. bitugrip as an adhesive to bond malthoid 5 ply to primed concrete.
APPLICATIONTear off the paper wrapper and merely roll out product on surface. Use sharpknife to cut to required length. Overlaps: 75 mm side & end laps 100 mm
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use andbefore material has set with a.b.e. super brush cleaner followed by washing with soapand water.
PROTECTION ON COMPLETIONIn the event of the malthoid being exposed, coat with a.b.e. silvakote for protection against UV rays. Allow malthoid 5 ply to weather for 6 weeksbefore overcoating.
CAUTION• 2 & 3 ply not for exposed roof waterproong.• Do not use on completely at roofs.• Stack full rolls on end no more than 2 layers high.• Stack cut rolls no more than 1,8m high.
PACKAGINGmalthoid 2 & 3 ply is supplied in various roll sizes:20m x 900mm20m x 112mm20m x 225mm20m x 300mm20m x 450mmmalthoid 5 ply is supplied in 20m x 900mm rolls.
SURFACE FINISHFine washed sand.
BENEFITS• High resistance to puncture.• Easy to apply.• Protection of torch on membranes.• Rot proof.• Economical
COLOURSBlack
Asphaltic waterproong membrane malthoid 2, 3 & 5 ply
use under roof tilesuse on at roofs use for dog houses use for wendy houses
BLACK
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 14/89
USES:• Waterproong layer laid under slate roong tiles.
BENEFITS• Long lasting.• Prevent ingress of dust.• Waterpoofs.
SURFACE PREPARATION
All surfaces to be clean, dry, sound, free from all laitance,fungal growth, grease, oil or loose and aking particles.
BONDING/PRIMING No priming required
APPLICATIONStarting at the lowest point of the slope, roll slatex 2000 out across the roof parallel to the eaves.The aluminium foil strip must face upward on the lower half of the slatex. The slatex 2000 is then nailed,with large-headed copper clout nails, through the unprotected felt, onto a batten. In aggressive coastalenvironments it is safer to use Muntz metal (63 copper, 36 zinc, 1 tin) clout nails if available. After slatingover the aluminium area the next strip of slatex 2000 is applied in similar fashion so that the aluminiumfoil coated area of the second sheet overlaps the uncoated strip of the rst sheet.
Work proceeds up the slope of the roof until the entire area has been slated. End laps in the felt must beoverlapped by a minimum of 150 mm.
COVERAGE:Effective coverage per roll: 4,0m2
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material hasset with a.b.e. super brush cleaner followed by washing with soap and water.
PROTECTION ON COMPLETIONApply slate tiles, which will act as the nal nish.
PACKAGINGslatex 2000 is supplied in rolls of 20 m x 450 mm (2.2 mm thick)
CAUTIONRolls should be stacked upright, nomore than three high.
COLOURSBlack
Reective waterproongmembrane under slate roofs.slatex 2000
use under slate roof tiles
BLACK
12
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 15/89
recoat ashingsparapet walls roof screws roof laps
USES:
• For waterproong all types of stable ashings.
• For waterproong parapet walls.
• Sealing of joints, laps and roong screws on corrugated roofs & gutters
BENEFITS
• stick it is an all-in-one system.
• There is no need for separate primers on porous surfaces.
• stick it has excellent weathering properties, adhesion and is tough,exible and non-toxic.
• stick it comes in a wide range of colours.
SURFACE PREPARATION
Ensure all surfaces are clean dry, sound and free from all laitance, fungal growth,
grease, oil or loose and aking particles.
BONDING/PRIMING
Prime porous surfaces with a neat coat of waterproofer
Prime metal surfaces with a.b.e. 4-metal primer.
MIXING
Stir well before use.
COVERAGECoverage: 0.5m2 full system or 5m of 100 mm overlaps or ashings.
APPLICATION
1st coat (after priming): apply by brush/roller
Embed membrane into wet coat, avoiding bubbles or wrinkles.
Membrane overlaps minimum 100mm on end laps and 75mm on
side laps.
2nd coat: once 1st coat has dried (2 - 3 hours), apply 2nd coat by brush/roller
and ensure membrane is fully saturated.
3rd coat: once 2nd coat has dried, apply 3rd coat at different angle to 2nd coat
Drying time @ 25ºC, Touch dry: 1 hour, Hard dry: 24 hours, Full cure: 7 days
CLEANING
Whilst still wet, clean equipment with water. If stick it waterproofer has dried use a.b.e. super
brush cleaner followed by washing with soap & water.
CAUTION
Use membrane supplied
Waterproofer is always applied to well drained roofs.
PROTECTION ON COMPLETION
Whilst stick it is designed for an extended life, it is important to apply a maintenance coat of an a.b.e. waterproofer every 3 to 4 years.
PACKAGING
Available in 1 litre kit .
COLOURS
Red, grey, charcoal, burgundy, white, green and terracotta.
Complete, water-based acrylicwaterproong kit - complete with membrane stick it
13
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 16/89
USES:• Suitable for solving the most difcult waterproong problems on: - Flat roofs. - Sloping and pitched roofs. - Reinforced concrete. - Prefabricated concrete. - masonry cement - metal and timber decks and terraces, with or without thermal insulation.• For renovation purposes
SURFACE PREPARATIONAll surfaces to be clean, dry, sound with a minimum fall of 1:50.abedex should NOTbe applied over a foam cement screeds.
BONDING/PRIMINGAll cementitous surfaces must be primed with a.b.e. bituprime at a rate ofapproximately 3,5 m2/l. Depending on the porosity of the surface a second coatof primer may be required.
APPLICATIONDepending on the different construction types, the sheets must be fully bonded tothe substrate. See Index publications ‘Technical Specications’ or ‘Applicationmanual’ which also describe other methods of application such as mechanical xing, hot air welding and bonding with adhesives. The substratemust be clean, dry, smooth and free of roughness or dips. The cast concrete surface must be allowed to dry before the sheet is applied. Dryingdepends on the weather and may take from 8 days to 3 weeks. To protect timber oors from the ame, either sheets of ROLLBASE or a.b.e.malthoid 5-ply must be nailed before application of the membrane.
Torch-bonding is carried out with a suitable gas torch burner connected to a propane gas cylinder. To bond the sheet to the substrate and on theoverlaps, use the torch ame to melt the aming lining on the lower face of the membrane while the membrane is being unrolled. The sheets areoverlapped longitudinally by 100 mm, while the head laps of the polyester reinforced membrane should not be less than 150 mm.
Bonding is carried out by torch application in such a way that a continuous bead of melted bitumen comes out from the overlap. So as not toremove the protective top layer, the use of a trowel is to be avoided.
When overlaying mineral nished membranes., the mineral surface must be heated so that the slate granules are completely embedded in theoverlap.
The correct temperature for bonding the membrane on the substrate and the overlaps is indicated when the protective aming burns off. Howeverthe membrane must not be overheated and a further sign of correct application is that an excessively large bead of melted compound does notcome out from the overlap. overlaying mineral nished membranes, the mineral surface must beheated so that the slate granules are completely
COVERAGE:Effective coverage: 8,9m2 / roll.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-lowed by washing with soap and water.
PROTECTION ON COMPLETIONabedex should be allowed to weather for a minimum of 8-10 weeks before overcoating with 2 coats of a.b.e. silvakote the system to dry for 7 -
10 days and then overcoat exposed area with a.b.e. silvakote.
PACKAGING COLOURSabedex is supplied in rolls of 10m x 1m . Black.
Professional liquidwaterproong compound.
super laycryl
14
USES:• All types of stable ashings.• Parapet walls.• Flat roof waterproong.• Re-waterproong over existing waterproong
systems.• Sealing of joints, laps and roong screws on
corrugated roofs.• The system is for non-trafcable roofs.
BENEFITS• super laycryl is an all-in-one system.• There is no need for separate primers (apart from metal surfaces)
or top coats.• It has excellent weathering properties, adhesion and is tough, exible
and non-toxic.• 10-year conditional guarantee.
SURFACE PREPARATIONAll surfaces to be clean, dry, sound, free of alllaitance, grease, oil and loose aking particles.
BONDING/PRIMINGAll surfaces: Mix 1 part super laycryl with 1 part clean water and prime (except metal) the total area to be covered. As a guide 0,1l of super laycrylmixed with 0,1l of water will prime an area of 0,75m2.Allow to dry for 30 min. Metal surfaces only: Prime with a.b.e. 4-metal primer. This not only
gives excellent adhesion but resists rust. Allow to dry for 4 hours.
NOTE: DO NOT USE SOLVENT BASED BITUMINOUS SOLUTIONS AS A PRIMER.
COVERAGE:2,1l/m2 for total system.
MIXING Stir well before use.
APPLICATIONFirst coat (all surfaces after priming):Brush or roll on a fairly thick coat of super laycryl (1l/m2). Bed the membrane into the wet coat by using a roller or stiff brush, avoiding the forma-tion of bubbles or wrinkles. On at surfaces it is recommended to use a uted aluminium roller. Membrane overlaps should be a minimum of100mm on end laps and 75mm on side laps.Second coat: once the rst coat has dried sufciently to take working trafc (2 - 3 hours depending upon weather), apply a second coat of superlaycryl (0,5l/m2) to ensure the membrane is completely saturated.
Third and nal coat: When the second coat is dry, apply a nishing coat of super laycryl at right angles to the second coat (0,5l/m2).Drying time @ 25º C, Touch dry: 1 hour, Hard dry: 24 hours, Full cure: 7 days
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-lowed by washing with soap and water.
PROTECTION ON COMPLETIONWhilst super laycryl is designed for an extended life, it is important to apply a maintenance coat (super laycryl) every 3 to 4 years.
PACKAGINGAvailable in 1l , 5l & 20l containers & 5l kits.
COLOURSRed, grey, charcoal, burgundy, white, green,terracotta and brown.
parapet wallsrecoat ashings roof screws roof laps
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 17/89
USES:• Flashings.• Parapet walls.• Flat roof waterproong areas.• Sealing of joints, laps and roong screws on
corrugated roofs.• May be use in areas of total water immersion.• Suitable for use in potable water conditions.• Ideal for water proong of koi ponds.
BENEFITS• super laykold is an all-in-one system. There is no need for separate primers
(apart from metal surfaces).• It has excellent adhesion and is tough, exible and non-toxic.• Suitable for use in potable water conditions.• Ideal for use in koi ponds.
• Non-toxic.
SURFACE PREPARATIONAll surfaces to be clean, dry, sound, free from alllaitance, fungal growth, grease, oil or loose andaking particles.
BONDING/PRIMING All surfaces (except metal):
Mix 1 part super laykold with 1 part clean water and primethe total area to be covered. As a guide 0,25l of diluted primer will cover1m2. Allow to dry.Metal surfaces only:New galvanised iron - prime with a.b.e. bituprime solvent-based primer and allow to dry. Old galvanised iron and steel to be primed with solvent-based metal etch primer.
MIXING Stir well before use.
APPLICATIONFirst coat (all surfaces after priming): Brush or roll on a fairly coat (0,75l/m2) and embed a.b.e. membrane well into the wet coating. On at sur-faces, it is recommended to use a uted aluminium roller for this purpose. Membrane overlaps should be a minimum of 100mm on end laps and75mm on side laps.Second coat: When the rst coat has dried sufciently to take working trafc (2 - 3 hours), apply a second coat of super laykold (0,75l/m2) toensure the membrane is completely saturated and allow to dry.Third coat: Apply a nal coat of super laykold (0,6l/m2) to give a smooth nish.
Drying time @ 25º C - Touch dry: 1 hour, Hard dry: 24 hours, Full cure: 7 days
Note: If super laykold is used in a koi pond or dam, allow to dry for 14 days. Flush with clean water before lling pond.
COVERAGE:2,1l/m2 full system.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-lowed by washing with soap and water.
PROTECTION ON COMPLETIONAllow the system to dry for 7 - 10 days and then overcoat exposed area with a.b.e. silvakote.
PACKAGING1l , 5l & 20l containers.
COLOURSBlack.
super laykoldRubberised bitumenwaterproong emulsion.
15
BLACK
parapet walls roof laps roof screws dams & ponds
suitable for Koi ponds
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 18/89
USES:
• Seals and repairs leaky, galvanised roof sheeting, holes and
overlaps, valley gutters, downpipes, roof screws, pipe vents,
ridging and capping.
SURFACE PREPARATION
Surfaces to be covered must be clean, sound, dry
and free of grease, oils and loose materials.
Allow material to warm in sun before application.
BONDING/PRIMING
Prime surfaces with a.b.e. bituprime.
a.b.e. bituprime must be to a dry substrate. Allow 4 hours
for drying before applying super laykold tape.
APPLICATION
Cut to size before removing plastic wrapping and apply super laykold tape to the required area.
Sealing: overlaps need to be a minimum of 50mm. As ashing between a wall and a corrugated roof, the gaps must be lled with a.b.e. bituseal
plastic, or cement.
CLEANING
Tools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-
lowed by washing with soap and water.
PROTECTION ON COMPLETION
super laykold tape is to be left with the aluminium protection layer as is after application.
PACKAGING
2,5m x 50mm
2,5m x 75mm
2,5m x 100mm
2,5m x 150mm
5m x 100mm
5m x 150mm
10m x 75mm
10m x 100mm
10m x 150mm
10m x 225mm
COLOURS
Aluminium.
Self adhesive waterproong tape.super laykold tape
16
roof screws parapet walls ashings
SILVER
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 19/89
Siloxane water repellent. wallseal
17
brick workgarden statues stone work plastered walls
CLEAR
WHITE
USES:• wallseal is designed to deposit a non-ammable, dry water-repellent lm of silicone with in
the capillaries of porous surfaces that would otherwise discolour through moisture uptake and stain as a result of deposition of water-borne contaminants and dirt. This water-repellent lm permits the substrate to “breathe”. wallseal will assist in stabilising lime in plaster
surfaces
BENEFITS• Brush or spray applied directly from container.
• Equally effective on new or old surfaces.• Preserves natural colour and texture of treated material.• Allows surface to breathe.• Reduces the risk of eforescence and frost spalling.• Inhibits penetration of soot and grime.• Reduces unsightly staining unaffected by salt laden atmosphere.
SURFACE PREPARATIONThe surface to be treated must be clean, sound and dry. It should be free from dust dirt, looseparticles and oily or greasy deposits. The surface should be dry to allow maximum penetrationof wallseal. No application should be made for at least 4 day after rain. Plaster should be7 days old before coating and concrete should cure for at least 28 days. BONDING/PRIMINGNo special primer required.
MIXINGStir well before use.
APPLICATIONwallseal should be applied by brush or through a low pressure knapsack sprayer. Application should commence from the highest point of thesurface and work down the surface. Some run-down of the coating is permissible but should not exceed 250mm - 300mm. A second coat may begiven but only after sufcient drying time is allowed between coats (± 2 hours).Drying time @ 25º C - Touch dry: ±1 hour, Hard dry: ± 24 hours, Full cure ± 5 days.
COVERAGE:3 - 5m2 / litre depending on porosity of substrate (minimum 2 coats)
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner followed by washing with soap and water.
PROTECTION ON COMPLETION
May be overpainted with high quality PVA/acrylic coating.
PACKAGING1l, 5l and 25l containers.
COLOURSClear - water white.
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 20/89
USES:• Suitable for solving the most difcult waterproong problems on: - Flat roofs. - Sloping and pitched roofs. - Reinforced concrete. - Prefabricated concrete. - masonry cement - metal and timber decks and terraces, with or without thermal insulation.• For renovation purposes
SURFACE PREPARATIONAll surfaces to be clean, dry, sound with a minimum fall of 1:50.abedex should NOTbe applied over a foam cement screeds.
BONDING/PRIMINGAll cementitous surfaces must be primed with a.b.e. bituprime at a rate ofapproximately 3,5 m2/l. Depending on the porosity of the surface a second coatof primer may be required.
APPLICATIONDepending on the different construction types, the sheets must be fully bonded tothe substrate. See Index publications ‘Technical Specications’ or ‘Applicationmanual’ which also describe other methods of application such as mechanical xing, hot air welding and bonding with adhesives. The substratemust be clean, dry, smooth and free of roughness or dips. The cast concrete surface must be allowed to dry before the sheet is applied. Dryingdepends on the weather and may take from 8 days to 3 weeks. To protect timber oors from the ame, either sheets of ROLLBASE or a.b.e.malthoid 5-ply must be nailed before application of the membrane.
Torch-bonding is carried out with a suitable gas torch burner connected to a propane gas cylinder. To bond the sheet to the substrate and on theoverlaps, use the torch ame to melt the aming lining on the lower face of the membrane while the membrane is being unrolled. The sheets areoverlapped longitudinally by 100 mm, while the head laps of the polyester reinforced membrane should not be less than 150 mm.
Bonding is carried out by torch application in such a way that a continuous bead of melted bitumen comes out from the overlap. So as not toremove the protective top layer, the use of a trowel is to be avoided.
When overlaying mineral nished membranes., the mineral surface must be heated so that the slate granules are completely embedded in theoverlap.
The correct temperature for bonding the membrane on the substrate and the overlaps is indicated when the protective aming burns off. Howeverthe membrane must not be overheated and a further sign of correct application is that an excessively large bead of melted compound does notcome out from the overlap. overlaying mineral nished membranes, the mineral surface must beheated so that the slate granules are completely
COVERAGE:Effective coverage: 8,9m2 / roll.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-lowed by washing with soap and water.
PROTECTION ON COMPLETIONabedex should be allowed to weather for a minimum of 8-10 weeks before overcoating with 2 coats of a.b.e. silvakote the system to dry for 7 -
10 days and then overcoat exposed area with a.b.e. silvakote.
PACKAGING COLOURSabedex is supplied in rolls of 10m x 1m . Black.
Single-pack, water-bsed metaletch primer.4-metal primer
18
USES:
• As a corrosion inhibitor on clean iron and steel such as gates,
fences, garden furniture, air-conditioning units and
galvanised surfaces.
BENEFITS
• Easy to apply.
• Increases the protection of steel against corrosion.
• May be overcoated.• Economical.
SURFACE PREPARATION
Iron or steel surfaces should be free of loose rust. Exposed
metal should be thoroughly wire-brushed to reach as clean
a state as possible. Galvanised steel should be degreased
and completely free of white rust and preventative compounds.
MIXING
Stir well before use.
APPLICATION
4-metal primer may be applied by brush or roller straight from
the tin. For spray application thinning of up to 10% with water
may be necessary.Drying time @ 25º C - Touch dry: 30 min, Hard dry: 2 hours
Overcoating time @ 25º C - Minimum 4 hours for water-based coating. Minimum 24 hours for solvent-based coating.
COVERAGE
Practical coverage for estimating purposes: 12 m²/ l (minimum of 2 coats).
CLEANING
Tools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e.
super brush cleaner followed by washing with soap and water.
PROTECTION ON COMPLETION
4-metal primer may be overcoated with water-based acrylics or alkyd enamels.
PACKAGING
500ml, 1l, 5l and 25l containers.
COLOUR
Red oxide and grey.
air conditioner metal chair fence steps
RED
OXIDE GREY
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 21/89
Water-dispersed epoxyemulsion paint with smooth nish. abecote WD 337
USES:abecote WD 337 is a protective, decorative and oil-resistant coating (only for indoor use)for cementitious, masonry and asphaltic surfaces, as a well as oor and wall coatings in: - shopping areas
- factories & warehouses- parking facilities i.e. garages- dairies & milking parlours- non-skid coating used with ne aggregate.
BENEFITS• May be applied to damp surfaces.• Easily over coated at any time for maintenance.• Tough protective and decorative coating.• Oil resistant.• Petrol resistant.• Economical.• Maximum service temperature: + 60º C.• Internal use only.• Chemical resistance: 40% caustic soda, 5% lactic acid, 5% acetic acid, vegetable and
animal fats. Not recommended for continuous conditions.
SURFACE PREPARATIONConcrete surfaces must be clean and mechanically soundand free of laitance, nibs, dust, grease and oil. Wet abrasiveor water blasting is the preferred method of surface
preparation. Moisture content tests must be conducted priorto application of the priming system. Maximum moisturecontent should be between 4 - 5% (e.g. Protimeter SurveyMaster or equivalent). Any holes should be lled with an adequate mortar.
BONDING/PRIMINGabecote WD 337 is self priming. The rst coat should be dilutedwith up to 10 - 15% clean water and pre dampen the surface to obviate suction.
MIXING Pre-stir base and activator. Add the entire base to the activator and stir for at least 5 minutes using a at paddle. It has been found thatmechanical mixing gives better dispersion than manual mixing. A suitable mixing method would be a slow-speed electric drill (approximately 200 r/min) tted with a paddle. Mixing ratio 1:1 by volume. Pot life: @ 20º C : 90 min / 5 litre, @ 30º C : 45 min / 5 litre.
APPLICATIONMixed abecote WD 337 may be applied to the dampened substrate by water pre-moistened brush or roller. Ideally any rst coat should be appliedby brush. As soon as a coat is touch dry, a subsequent coat may be applied. Unless the treatment is required to provide chemical resistance, anadditional two coats over and above the rst primer coat is normally sufcient. Chemical resistant work or oors always requires three coats. Dry-ing time will depend upon temperature, humidity and ventilation. If working indoors or in conned spaces, ensure adequate ventilation. Outdoors,the wet lm is liable to wash off in rain or be damaged by frost. abecote WD 337 may be overcoated at any time. Ensure that the surface is cleanand free of contamination and chalking. Overcoating, without intercoat adhesion problems, may be carried out with abecote WD 337 itself orsolvent-borne or solvent-free epoxies or other compatible coatings.Drying time @ 25º C : Touch dry – 4 - 6 hours, Hard dry - 24 hours, Full cure – 3 days.Over coating time @ 25º C : Minimum 4 - 6 hours.
CLEANINGDuring brief interruptions of work, equipment should be immersed in clean water. At major stoppages it must be washed with soap and water orwith a.b.e. super brush cleaner. Cured abecote WD 337 is almost impossible to remove.
PROTECTION ON COMPLETION
Protect against trafc and spillage until cured. Most epoxies chalk and degrade in extensive sunlight.
PACKAGINGAvailable in 5 litre (2 part).
COVERAGE8 - 10m2 / litre on smooth surface. (Minimum 2 coats)
COLOUR
19
internal oors
GREEN IVORY LIGHT
STONE
MEDIUMSEA
GREY
PALE
GREY
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 22/89
USES:• Suitable for solving the most difcult waterproong problems on: - Flat roofs. - Sloping and pitched roofs. - Reinforced concrete. - Prefabricated concrete. - masonry cement - metal and timber decks and terraces, with or without thermal insulation.• For renovation purposes
SURFACE PREPARATIONAll surfaces to be clean, dry, sound with a minimum fall of 1:50.abedex should NOTbe applied over a foam cement screeds.
BONDING/PRIMINGAll cementitous surfaces must be primed with a.b.e. bituprime at a rate ofapproximately 3,5 m2/l. Depending on the porosity of the surface a second coatof primer may be required.
APPLICATIONDepending on the different construction types, the sheets must be fully bonded tothe substrate. See Index publications ‘Technical Specications’ or ‘Applicationmanual’ which also describe other methods of application such as mechanical xing, hot air welding and bonding with adhesives. The substratemust be clean, dry, smooth and free of roughness or dips. The cast concrete surface must be allowed to dry before the sheet is applied. Dryingdepends on the weather and may take from 8 days to 3 weeks. To protect timber oors from the ame, either sheets of ROLLBASE or a.b.e.malthoid 5-ply must be nailed before application of the membrane.
Torch-bonding is carried out with a suitable gas torch burner connected to a propane gas cylinder. To bond the sheet to the substrate and on theoverlaps, use the torch ame to melt the aming lining on the lower face of the membrane while the membrane is being unrolled. The sheets areoverlapped longitudinally by 100 mm, while the head laps of the polyester reinforced membrane should not be less than 150 mm.
Bonding is carried out by torch application in such a way that a continuous bead of melted bitumen comes out from the overlap. So as not toremove the protective top layer, the use of a trowel is to be avoided.
When overlaying mineral nished membranes., the mineral surface must be heated so that the slate granules are completely embedded in theoverlap.
The correct temperature for bonding the membrane on the substrate and the overlaps is indicated when the protective aming burns off. Howeverthe membrane must not be overheated and a further sign of correct application is that an excessively large bead of melted compound does notcome out from the overlap. overlaying mineral nished membranes, the mineral surface must beheated so that the slate granules are completely
COVERAGE:Effective coverage: 8,9m2 / roll.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-lowed by washing with soap and water.
PROTECTION ON COMPLETIONabedex should be allowed to weather for a minimum of 8-10 weeks before overcoating with 2 coats of a.b.e. silvakote the system to dry for 7 -
10 days and then overcoat exposed area with a.b.e. silvakote.
PACKAGING COLOURSabedex is supplied in rolls of 10m x 1m . Black.
Automotive underbodyprotective coating.autokote
20
USES:
• autokote is a corrosion resistant coating on automotive
underbodies (car, truck etc.) and farming implements.
BENEFITS
• Impact and abrasion resistant.
• Corrosion resistant.
• Waterproof.
• Sound deadening.• Dilution: Benzine
• Maximum service temperature: 70º C
SURFACE PREPARATION
Surfaces must be clean, mechanically sound and dry.
BONDING/PRIMING
While autokote may be applied directly to any properly prepared
surface, better corrosion resistance will be obtained over suitable
primers. Steel may be primed with a.b.e. 4-metal primer.
MIXING
Stir well before use
APPLICATIONautokote may be applied by brush but this is normally reserved for
small areas. Most commercial applications are made with a splutter
gun having a nozzle of 6mm diameter.
Overcoating time @ 25º C : 24 hours
Drying time @ 25º C : 24 hours
COVERAGE
±0,7m2/ l on smooth surfaces. (Less on textured surfaces). (Minimum 2 coats).
CLEANING
Tools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-
lowed by washing with soap and water.
PROTECTION ON COMPLETION
None.
PACKAGING
1l, 5l and 25l containers.
COLOUR
Black.
trailerscommercial tractor cars
BLACK
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 23/89
USES:
Suitable for sealing and priming of all porous and non-porous surfaces
prior to treatment with
• Cold applied, lled bituminous compounds.
• Hot or cold applied bituminous sealants.
• Torch-on membranes.
BENEFITS
• Versatile bituminous primer for porous or non-porous surfaces.• Used on concrete or metal.
• Economical.
• Easy to apply.
• Dilution: white spirits / turps.
SURFACE PREPARATION
The surface to be treated should be clean, sound and dry.
BONDING/PRIMING
bituprime is used as a primer.
MIXING
Stir well before use.
APPLICATIONbituprime may be applied by brush or spray.
The applied lm must be allowed to dry before being
over coated with any waterproong compound, or coating.
Overcoating time @ 25º C : Minimum 24 hours
Drying time @ 25º C : 4 hours
COVERAGE:
5m2/ l
CLEANING
Tools, brushes and mixing equipment should be cleaned
immediately after use and before material has set with
a.b.e. super brush cleaner followed by washing with soap
and water.
PROTECTION ON COMPLETION
bituprime is used as a primer and is covered by a waterproong compound or coating.
PACKAGING
1l , 5l & 25l containers.
COLOUR
Black.
Bituminous priming & sealingsolution with petroleum solvents. bituprime
21
bituprime as primer for torch-on membranes
BLACK
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 24/89
USES:
• A heavy duty coating for protection of steel, wood, brick and
cementitious surfaces.
SURFACE PREPARATION
The surface to be treated should be clean, sound and dry.
• Steel - should be free of rust and loose material as well as oil
and grease.
• Galvanised steel - should be free of loose paint and grease andin the case of new material, free of white anti rust treatment which
should be removed by scrubbing with a mixture of a.b.e. super
brush cleaner and abrasive soap. All residues must be washed
off atious surfaces - must be free of dust and laitance.
• Timber - must be clean and fairly smooth.
BONDING/PRIMING
Prime with a coat of a.b.e. bituprime, which should be allowed to dry before over coating,
except in the case of steel, which should be primed with a.b.e. 4-metal primer.
APPLICATION
May be applied with a stiff brush. Can be applied in conjunction with bre glass membrane
to build and reinforce thicker coats.
COVERAGE:1l / m2 (minimum 2 coats).
CLEANING
Tools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-
lowed by washing with soap and water.
PROTECTION ON COMPLETION
Where the coating is exposed to UV it is recommended after 3 - 4 weeks of weathering it is over coated with a.b.e. silvakote.
PACKAGING
Available in 1l , 5l & 25l containers.
COLOURS
Black.
Solvent borne mineral & bre lledheavy-duty bituminous coating.bituseal liquid
22
BLACK
protective coating for corrugated roofs
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 25/89
Wood preservative carbolineum& creosote
USES:
carbolineum and creosote is intended for use in the
preservation of timber and is for exterior use only.
The toxicity and strong odour prohibit the interior use
of carbolineum and creosote for both human and
animal habitation. It should not come into contact with
food or potable water.
e.g. wooden poles, wooden fences, eaves and rafters.
SURFACE PREPARATION
All surfaces must be clean, dry and sound
BONDING/PRIMING
No primer required.
COVERAGE
2m2 - 6m2/l
MIXING
Stir well before use.
APPLICATIONApplication by brush or dipping
CLEANING
Tools, brushes and mixing equipment should be
cleaned immediately after use and before material
has set with a.b.e. super brush cleaner followed by
washing with soap and water.
PROTECTION ON COMPLETION
None.
PACKAGING
1l, 5l and 25l containers.
COLOURSBlack.
23
wooden fencestrellises
BLACK
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 26/89
USES:
provonite is a multi-purpose coating that retards the
rusting of metal and the degradation of wood. It is for
use on all structural steel, tanks and fences. It should
not be used with equipment in the food industry and
should not come into contact with drinking water.
SURFACE PREPARATION
All surfaces to be clean, dry and sound.
BONDING/PRIMING
No primer required.
MIXING
Stir well before use.
APPLICATION
provonite may be applied directly from the container by
brush or roller.
Drying time @ 25º C : Touch dry - 6 hrs
Hard dry - 24 hrs
COVERAGE
6 m2 / litre ( minimum 2 coats).
CLEANING
Tools, brushes and mixing equipment should be cleaned immediately after use
and before material has set with abe super brush cleaner followed by washing with soap and water.
PROTECTION ON COMPLETION
None.
PACKAGING
1l , 5l & 25l containers.
COLOUR
Black.
1
Black coal tar paint.provonite
wooden shedsfencing poles windmills iron sheds
BLACK
24
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 27/89
USES:
• ravenol is a protective coating for metallic and cementitious
surfaces.
• Suitable for water tanks and piping.
• Economical protective coating for vehicle chassis.
BENEFITS
• Economical
• Provides protection• Easy to apply.
• Solvent based
• Good water resistance.
• Non water tainting
• Chemical resistance: 10% ammonium hydroxide, 40% sodium hydroxide, 10% hydrochloric
acid, 10% sulphuric acid. domestic bleach.
SURFACE PREPARATION
All surfaces must be clean, mechanically sound, dry and free
of oil, grease, loose material and old paint.
BONDING/PRIMING
No primer required.
MIXING Stir well before use. For spray application, some 10 - 15% by volume dilution with white spirits / turps
will be needed.
APPLICATION
ravenol can be applied by brush, spray or dipping. ravenol may be applied directly from the container.
Drying time @ 25º C - Touch dry: 1 hour, Hard dry: 24 hours. Overcoating time @ 25º C - Minimum 2 hours.
Maximum service temperature: Dry Immersion 60º C.
COVERAGE
8 - 10m2/ l on smooth surfaces. A minimum of 2 coats must be applied.
CLEANING
Tools, brushes and mixing equipment should be cleaned
immediately after use and before material has set with abe super brush cleaner followed by washing with soap and water.
PROTECTION ON COMPLETION
None.
PACKAGING
1l , 5l & 25l containers.
COLOUR
Black.
Black bituminous paint. ravenol
25
BLACK
vehicle chassis tanks & piping
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 28/89
USES:• silvakote is a general-purpose reective aluminium
paint for metallic surfaces,as well as bituminous and concrete surfaces.
BENEFITS• It is UV resistant.• It is highly reective• Easy to apply.
SURFACE PREPARATIONAll surfaces must be clean, sound and dry. It is recommendedthat surfaces be checked with a moisturemeter before coating.
• Steel - should be free of rust and loose material as well asoil and grease.
• Galvanised steel - should be free of loose paint and greaseand in the case of new material, free of white anti rusttreatment.
• Bituminous surfaces - should be free of dust chalking andother loose material. New bituminous surfaces should beleft to weather for 8 weeks before coating.
BONDING/PRIMINGsilvakote is applied directly to the surface as a protective coating.
• Steel - use an etch primer.• Galvanised - steel no primer needed.• Bituminous - surfaces no primer needed.
MIXING Stir well before use, and keep stirred during use.
APPLICATIONMay be applied by conventional spraying, brush or roller.Drying time @ 25º C - Touch dry: 1 hour, Hard dry: 2 hoursOvercoating time @ 25º C - Minimum: 2 hoursMax. service temperature: Dry 70º C.
COVERAGE(Dependant on the porosity of the surface) Steel and galvanised steel: 14 m2 /litre, Bituminous surfaces: 6 - 8 m2 /litre (minimum 2 coats)
CLEANING
Tools, brushes and mixing equipment should be cleaned immediately after use and beforematerial has set with abe super brush cleaner followed by washing with soap and water.
PROTECTION ON COMPLETIONIt may be necessary to apply a further coat of silvakote after 3 years.
PACKAGING1l , 5l & 25l containers.
COLOURBright aluminium.
Bitumen-based aluminium paint.silvakote
26
steel tanksat bitumen roofs galvanized roofs galvanized roofs
SILVER
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 29/89
USES:
• Bitubond is used for bonding vinyl tiles or similar thermoplastic
oor coverings to cement screeds and rm even wooden
sub-oors.
SURFACE PREPARATION
All surfaces to be clean, sound & dry. All dust & loose material removed.
If the sub-oor is porous, it must be primed with abe bituprime,
which should dry before application of bitubond.
APPLICATION
Expose containers of bitubond to room temperature for 24 hours.
Spread well-stirred bitubond by means of a triangular notched
trowel at 1.5mm x 1.5mm x 4mm centres. When bitubond is
ready to accept the tile, this is determined by the (nger tip) test,
namely touch the adhesive lightly with dry nger. No staining is to
be evident. Press rmly into the adhesive lm. If staining is found
bitubond has become too dry. Scrape off and re-apply more
bitubond.
Drying time: Will accept tiles 25 - 40 minutes after spreading.
COVERAGE
3,5m2 -7m2/l depending on surface quality.
CLEANING
Tools, brushes and mixing equipment should be cleaned immediately after use and before
material has set with abe super brush cleaner followed by washing with soap and water.
PROTECTION ON COMPLETION
None.
PACKAGING
1l, 5l and 25l containers.
COLOUR
Black.
Semi-exible vinyl tile adhesive. bitubond
27
BLACK
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 30/89
USES:
• bitugrip is used as an adhesive for cold bonding roong
membranes (malthoids) to substrates and to themselves.
• Used to rejuvenate sound old roong felt.
SURFACE PREPARATION
All surfaces must be clean, sound and dry. It is recommended
that surfaces be checked with a moisturemeter before coating.
BONDING/PRIMING
Cementitious surface must be primed with abe bituprime. Allow
to dry before applying membranes.
APPLICATION
bitugrip may be applied with a stiff brush. Membrane must be
laid into wet bitugrip. The rst layer of membrane must only
be spot bonded but subsequent layers are to be fully bonded
to the rst layer.
COVERAGE:
1.2 m2/ l
CLEANING
Tools, brushes and mixing equipment should be cleaned immediately after use and beforematerial has aset with abe super brush cleaner followed by washing with soap and water.
PROTECTION ON COMPLETION
When using bitugrip to rejuvenate old roong felts, the felt should be protected with abe silvakote after weathering for 4 -6 weeks.
PACKAGING
1l, 5l and 25l containers.
COLOUR
Black.
Fibre lled bituminous adhesivefor roong felt.bitugrip
28
BLACK
used as an adhesive for cold bonding malthoids
apply by brush lay membrane into wet coat
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 31/89
USES:• Improving adhesion of thin sections of cement patches,
mortars and screeds to their substrates.• Improving tensile and exural strengths of sand and cement
mix permitting thinner layers to be used.
BENEFITS• Single-component liquid can be easily gauged as required.• Improves cohesion and workability.• Improves mortars to provide waterproof repairs, renders and toppings that are highly
resistant to freeze/thaw cycling.• Improves tensile and exural properties allowing thin applications.• Excellent bond to concrete, masonry, stonework, plaster and blockboard.• Contains no chlorides.• Can be applied to damp substrates.• Tensile strength improved by ± 40 % and exural strength by ± 45 % using 3:1 sand cement mortar.
COVERAGEDependant on application and thickness of application.
SURFACE PREPARATIONSurfaces screeded, plastered or patched must be thoroughly clean and sound. These surfacesmust be free from grease, oil and other foreign matter. Laitance, dust, loose particles and anyspalling or aking surfaces must be removed. Porous surfaces such as brickwork must bethoroughly dampened before application to prevent suction.
BONDING/PRIMING1. Adhesive slurry is made from equal parts of dry sand and cement.2. Gauging liquid is made from equal parts of duralatex and clean water3. Mix the gauging liquid and powder into a paintable solution and paint onto the surface. While adhesive slurry is wet screed must be applied.
MIXING Stir well before use.
APPLICATION As an ADHESIVE SLURRY: ±500 ml duralatex/m² (gures are approximate as quantity of duralatex used to produce workability willdepend on variations in mix’s water demand).
As a mortar or cement screed the following ratios of duralatex apply:• 1,50l duralatex / m2 @ 12mm thick• 1,75l duralatex / m2 @ 15mm thick• 2,00l duralatex / m2 @ 20mm thick• 2,25l duralatex / m2 @ 25mm thick• 2,50l duralatex / m2 @ 30mm thick
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with abe super brush cleaner fol-
lowed by washing with soap and water.
PROTECTION ON COMPLETIONThe newly applied mortar must be protected from rain, direct strong sunlight and wind since too rapiddrying will produce shrinkage, cracking and reduce cohesion. The newly laid surface must be kept damp for at least 5 days to promote goodcuring of the Portland cement.
PACKAGING1l, 5l and 25l containers.
COLOURWhite.
Synthetic resin polymer, which is used as amortar / screed improver and adhesive. duralatex
29
WHITE
for mortar
for oor screeds
as an admixture
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 32/89
Two component epoxy adhesive /repair compound.epidermix 318
30
1:1 ratiooor holes mix well apply
epidermix 318
GREY
USES:
epidermix 318 is used for:
• Repairing and patching defects in concrete such as honey
comb and spalls.
• Fabricating components and repairing defects in bre cement
products.
BENEFITS
• Maximum service temperature: 60º C• Compressive strength @ 25º C: 60MPa in 24 hours, 75MPa in 7 days
• Tensile strength @ 25º C: 17MPa
• Lap shear on grit plasted steel: 8MPa using 2mm bond line thickness
• Non-toxic after cured.
• Excellent water resistance.
• Resists aliphatic solvents, oils, petrol, diesel fuel.
• Resists dilute inorganic acids and dilute alkalis.
SURFACE PREPARATION
All surfaces treated must be clean, sound and dry.
Concrete should be chipped to expose main aggregate.
BONDING/PRIMING
No priming is required.
MIXING
Set up equal volumes of Base and Activator side by side on a
clean board. Do not take more than about 250 ml of each compound.
Mix thoroughly with a trowel or spatula. Mixing ratio - 1 base : 1 activator.
APPLICATION
Mixed epidermix 318 should be pressed into place in the repair area using a small amount rst to wet out the surface and then building up the
required thickness. The viscosity of epidermix 318 is sufcient to hold its place in soft repairs and on vertical faces. If the volume is too big to
repair in one placing, leave the contact surface rough to act as a key for a subsequent placing once the rst one has set. A nal smooth nish may
be obtained by trowelling off the surface of the still uncured epidermix 318 with water dampened steel trowel. Application by gloved hand or steel
trowel .
Pot life @ 25º C: 80 – 100mins/500ml
Curing time @ 25º C - Touch dry : 2 hours, Practical cure : 12 hours, Full cure : 7 days
Overcoating time @ 25º C - Min : 4 hours, Max : 23 hours
COVERAGE
1m2/litre per 1mm thickness (max. recommended thickness 25mm)
CLEANING
Tools, brushes and mixing equipment should be cleaned immediately after use and before material has set with abe super brush cleaner fol-
lowed by washing with soap and water.
PROTECTION ON COMPLETION
None.
PACKAGING
200ml, 500ml, 1l two component containers.
COLOUR
Grey (mixed material).
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 33/89
USES• As an adhesive: bonding fresh concrete to existing concrete, plaster or brickwork.• Provide a damp-proof barrier within concrete matrix.
BENEFITS• May be used in structural situations.• Excellent bond to damp or dry surfaces.• High ultimate tensile strengths.• High ultimate lap sheer strengths.
• Bonds to rock.• Maximum service temperature: 90º C• Compressive strength: 100MPa• Tensile strength: 18 MPa
SURFACE PREPARATIONAll surfaces treated must be clean, mechanically sound and dry. It must befree of foreign matter such as oil, grease, paint, dust, debris of preparation and any otherform of contamination, also cracked or loose stone.Maximum bond strength is only achievedif main aggregate of existing concrete is exposed. This may be done by scabbling, grinding,abrasive blasting or manual chipping. All cracked or loose aggregate must be removed.
BONDING/PRIMINGNo priming is required.
MIXING
Stir well the contents of both containers individually and ideally use a can opener to remove the lip fromboth cans. Add the entire contents of the activator tin to the base material and stir with a at paddle until an even, streak-free, grey mixture results.This takes at least ve minutes.If only a small quantity of material is required, pre-stir contents of each can using separate clean paddles. Removetwo volumes of base and one volume of activator into a clean, separate container and mix together, to obtainan even grey colour.
APPLICATIONMix activator with base and stir well. (2 base : 1 activator) epidermix 344 should be spread onto the surface as soon as possible after completemixing. Apply the compound in a thin rough layer and only once the can is emptied should an attempt be made to spread to working thickness.epidermix 344 is best spread by means of a stiff bristle brush such as a kitchen scrubbing brush. A paint brush with bristles shortened by 50 %may also be used. If the original lm has over-cured it must be roughened before application of the new layer of epoxy. Where a feather-edge isneeded, the aggregate size of the concrete must be adjusted accordingly.Full cure: 14 days.
Pot life (minutes):500 ml kit @ 15º C - 60 min, @ 20º C - 45 min, @ 25º C - 30 min, @ 30º C - 18 min, @ 35º C - 15 min.
1l kit @ 15º C - 50 min, @ 20º C - 37 min, @ 25º C - 25 min, @ 30º C - 18 min, @ 35º C - 12 min.2l kit @ 15º C - 40 min, @ 20º C - 30 min, @ 25º C - 20 min, @ 30º C - 15 min, @ 35º C - 10 min.
COVERAGE1litre/1.7 - 2m2 (Recommended wet lm thickness 500 - 600 µm)
CLEANINGepidermix 344 is water missable and tools may be cleaned directly after mixing with clean water. Do not allow material to dry. abe super brushcleaner followed by soap and water is recommended.
PACKAGING500ml, 1l, 2l
COLOUR
Blue-grey (mixed material)
Structural wet-to-dryconcrete adhesive epidermix 344
31
BLUE-
GREY
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 34/89
USES:epidermix 372 is used:• As a general epoxy adhesive for most materials, excluding
certain plastics and stainless steel.• As a ller. It may be lled with ne material such as wood oor,
silica sand and talc, to match the materials being lled.• As a grouting medium for xing dowels and bolts, horizontally
into concrete and rock.
BENEFITS• Solvent-free. • Non-toxic• Non-slump. • Compressive strength @ 25º C: 70MPa• Easy to mix. • Tensile strength @ 25º C: 30MPa• Bonds most materials. • Maximum service temperature 60º C• Can be lled for use as a grout. • Excellent water resistance• Resists solvent like: aliphatic • Economical.
solvents, vegetable mineral oils, greases and petroleum fuels
SURFACE PREPARATIONAll surfaces treated must be clean, sound and dry. It must befree of foreign matter such as oil, grease, paint, dust, debrisof preparation and any other form of contamination.
BONDING/PRIMING
No priming is required.
MIXINGMixing ratio: 2 base to 1 activator by volume. Carry out mixing on a at clean surface, such as a board or plate. Set up carefully measuredquantities (2 volumes base and 1 volume activator) of each component, side by side on the mixing plate. Do not mix until application siteoperations are ready.Use separate tools to remove each component from its container thus preventing contamination. With putty knives, paint scrapers orsimilar at tools, mix the two components until a completely homogeneous material results. The larger the volume of the mix the longer should bethe mixing time. If a lled material is required, add the ller only after complete mixing of the base and activator has been achieved.
APPLICATIONApplication by putty knife, trowel or mastic gun.As an adhesive: Mixed material should be spread onto the face of one adherent, thickly enough to extrude when both faces are mated. Bondedmating faces must be kept under compression until the adhesive layer has set.As a ller: Mixed material should be smoothed into place using a trowel or similar tool.Pot life: @ 15°C - 120 min, @ 20°C - 90 min, @ 25°C - 60 min, @ 30°C - 45 min, @ 35°C - 30 minCuring time @ 25ºC - Touch dry: 6 hrs, Practical use: 24 hrs, Full cure: 7 days
Sanding time @ 25° C - If used as a ller requiring smoothing, sand after 24 hours cureOvercoating time @ 25° C - Minimum :12 hrs, Maximum 48 hrs if being over-coated with an epoxy system.
COVERAGEAs an adhesive: 1m2/litre per 1mm thickness. Maximum application rate: 1mmAs a grout : 1 litre epidermix 372 by 1 volume sand (yield 1.3 litre mortar)Max hole: 1,5 times bar diameterAs a ller: max. application rate is up to 15 mm.
CLEANINGa.b.e. super brush cleaner can ease cleaning before material has set.
PROTECTION ON COMPLETIONIf used as a ller, an epoxy coating is required. Allow a minimum of 12 hours and a maximum of 48 hours before commencing with epoxy coating.
PACKAGING
90ml, 500ml, 1l, 5l containers.
COLOURCreamy yellow. (mixed material)
epidermix 372 Two component epoxy adhesive, ller & grout.
grouting anchor point adhere basins for boat building
CREAMY
YELLOW
adhere pool mosaics
32
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 35/89
USES• As a grout: as supplied or converted into a mortar, for xing
dowel bars, bolts vertically down into concrete or rock.• As a owable grout or bedding.• As a fast-setting crack repair compound.
BENEFITS• Stronger than surrounding concrete and steel• Easy pouring for upstanding bolts and concrete road/slab cracks
• Easy access to narrow gap horizontal areas• Maximum service temperature: 70º C• Excellent water resistance• Compressive strength @ 25º C unlled: 34MPa• Solvent resistance to: aliphatic solvents, vegetable and mineral oils and greases, petroleum fuels.• Overlap shear strength after 1 day: 17,3MPa, 7 days: 17MPa, 14 days: 19,8MPa
SURFACE PREPARATIONAll surfaces treated must be clean, sound and dry. It must befree of foreign matter such as oil, grease, paint, dust, debrisof preparation and any other form of contamination.
BONDING/PRIMINGNo priming is required.
MIXING
Stir both containers individually and ideally use a can opener to remove the lip of the containers.Add the entire contents of the activator tin to the base and stir with a at paddle until an even streak-freemixture results. This takes at least ve minutes. If a mortar is required, premix the base and activator and then add silica gritaggregate. Up to two volumes may be used and the whole mixture must be stirred until the aggregate is evenlywetted.
APPLICATION: Application by pouring or injection gun. Mix 1 part activator with 1 part base and stir well. As a mortar, add silica sand up to 2 volumes to the mix.For best results, mixed material should be poured into the hole to such a level that when the bar is inserted, material displaced just reaches thetop of the hole. Do not grout with unlled epidermix 395 into a hole larger than 1,5 times bar diameter.Pot life (as mortar -500ml) @15º C: 80 mins, @20º C: 60 min, @25º C: 40 min, @30º C: 30 min, @35º C: 20 min.Cure time @25º C: touch dry - 6 hrs, Practical cure - 12 hrs, Full cure - 7 days.
COVERAGE:Grouting with epidermix 395 – Quantity Calculations: The quantity of grouting material can be calculated from the formula:0,8 (D + d) (D - d)HN = litres of grout required
1000
WhereD = diameter of hole in cmd = diameter of bar in cmH = depth of hole in cmN = number of holes
A lled grout will require ± 0,6 of this quantity of liquid when lled 1,5:1.
CLEANINGClean with abe super brush cleaner, before the epoxy has set, after which rinse well with clean water.
PACK SIZE:500ml,1l, 2l
COLOUR
Clear Amber (mixed material)
Liquid epoxy groutingcompound - vertically epidermix 395
33
CLEAR
AMBER
for vertical grouting
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 36/89
Epoxy paste groutingcompound - horizontallyepidermix 396
USES• As a grout: as supplied or converted into a mortar, for xing
dowel bars, bolts horizontally into concrete or rock.• As a fast-setting non-ow adhesive.
BENEFITS• Will not drain from hole, including overhead.• Stronger than surrounding concrete and steel.• Maximum service temperature: 70º C
• Compressive strength @25º C: 90 MPa• Solvent resistance: aliphatic solvents, vegetable and mineral oils and greases, petroleum fuels• Excellent water resistance• Tensile strength: 21 MPa• Overlap shear strength after: 1 day = 12.5 MPa, 7 days = 13.8 MPa, 14 days = 14.1 MPa.
SURFACE PREPARATIONAll surfaces treated must be clean, sound and dry. It must befree of foreign matter such as oil, grease, paint, dust, debrisof preparation and any other form of contamination.
BONDING/PRIMINGNo priming is required.
MIXINGMix both containers individually and ideally use a can opener to remove the
lip of the containers. Transfer complete contents of both containers to a large clean board orplate, setting up the components side by side and not one on top of the other.Do not combine the components until other aspects of the job are ready. When ready to mix, combine the ingredients together and blend, usingat least two trowels or spatula, until the compound is completely mixed. If a mortar is required, add an equivalent volume of silica grit andcontinue mixing until a homogeneous material is obtained.
APPLICATION If grouting horizontally or overhead, a mastic gun is required with a length of plastic tubing of sufcient diameter to t tightly over the gun’s nozzle.The tube must be long enough to reach the back of the hole. Fill the gun with the mixed epoxy compound or mortar and pump material into theback of the hole, slowly withdrawing the tube until sufcient material has been deposited to ll the hole once the bar has been introduced.The bar should be introduced with a rotary motion to ensure wetting of both bar and concrete, if it is important that the bar is truly horizontal a jigor template must be used until the compound has set. Do not grout unlled epidermix 396 into a hole larger than 1,5 times bar diameter.Pot life/ 500ml: @15º C 80 min, @20º C 60 min, @25º C 40 min, @30º C 30 min, @35º C 20 minPot life/ litre: @15º C 60 min, @20º C 45 min, @25º C 30 min, @30º C 22 min, @35º C 15 min
COVERAGE: If mixed, unlled epidermix 396 is sufcient for 1l annulus volume, and lled with silica sand (1:1) for 1.3l annulus volume.
Grouting with epidermix 396 – Quantity Calculations: The quantity of grouting material can be calculated from the formula:0,8 (D + d) (D - d)HN = litres of grout required
1000
WhereD = diameter of hole in cmd = diameter of bar in cmH = depth of hole in cmN = number of holes
If the dimensions are taken in centimeters, dividing the answer by 1 000 will give the number of litres of grout required, at a 2:1 lling ratio, halfof this volume of epidermix will be needed. At 1:1 lling ratio, three quarters of this volume of epidermix will be needed. These gures make noallowance for site wastage of material.
CLEANING Clean with abe super brush cleaner, before the epoxy has set, after which rinse well with clean water.
PACK SIZE:500ml, metal container
COLOURLight cream
34
LIGHT
CREAM
for horizontal grouting
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 37/89
USES:• For xing 22mm woodblock ooring. (Do not use for miniature mosaic blocks).
BENEFITS• Solvent free• Ready to use• Easy application• Economical
SURFACE PREPARATIONIt is important that sub-oors are rm, non-yielding, smooth,even, clean, dry and free from foreign material. On contactoors i.e. oors on ground, check for rising damp by placingsquares of roong felt or plastic sheet (approximately 1 metrex 1 metre) at various points and leave overnight. If dry, nomoisture will be present on underside of membrane whenlifted the following morning.
BONDING/PRIMING No special primer is required.
APPLICATIONSpread adhesive evenly using a notched trowel held at anangle of 60 degrees. When laying 22 mm woodblocks, notchesshould be cut 5 mm deep at an angle of 45 degrees at a
12 mm centres. Do not allow adhesive to set before laying blocks.Blocks must be laid immediately into wet adhesive. For individual blocks,it is convenient to dip the blocks. Pour about 6mm of adhesive into a shallow dish.Do not sand blocks for 48 hours after completion.Dry in approximately 60 minutes.
COVERAGE±1m2/litre (Spread abe grip-a-bloc evenly, using a notched steel trowel (or similar to a Vicker 24B courseserrated trowel) held at an angle of 60º.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and beforematerial has set with abe super brush cleaner followed by washing with soap and water.
PACKAGING1l, 5l and 25l containers.
COLOURBlack.
Woodblock adhesive grip-a-bloc
35
BLACK
ridged trowelcracks 45º grooves dip blocks ingrip-a-bloc
for parque ooring
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 38/89
USES:
• Bonding of cement screeds, concrete, masonary and
brickwork.
• Surfaces already painted with PVA or acrylic can also be
rendered using abe plastergrip as a bonding agent, provided
the existing coat is sound and rmly adhered.
BENEFITS
• Improves non-structural bond of cement screeds, renders and gypsum plasters.• Bonds to sound PVA / acrylic surfaces.• Good spread rate.• Economical.• Easy to apply.• Non-toxic.
SURFACE PREPARATION
All surfaces must be clean, sound free of all dust, grease, oil, fungal growth or loose and
aking particles. Suspect surfaces may be mechanically keyed down to virgin surfaces
(randomly), which will ensure good bonding.
MIXING Stir well before use.
APPLICATION
• Horizontal surfaces i.e. oors: Apply a.b.e. plastergrip to the prepared surfaces by means
of a brush or roller and apply screed directly onto the wet
a.b.e. plastergrip.
• Vertical surfaces i.e. walls or ceilings: Should be coated by
brush or roller and a scratch coat should be applied whilst the
a.b.e. plastergrip is still wet.
• In screed mix substitute ±25% of water with plastergrip
• Crack repairs - mix one part of plastergrip with one part fresh OPC and trowel into the the pre-cleaned cracks. The consistency of the slurry
may be adjusted by small etra additions of OPC or clean water, as required.
COVERAGE
10m2- 15m2/l depending on the surface porosity.
CLEANING
Tools, brushes and mixing equipment should be cleaned immediately after use and beforematerial has set with abe super brush cleaner followed by washing with soap and water.
PROTECTION ON COMPLETION
The newly applied mortar / screed or plaster must be left damp for at least 5 days to promote good curing.
PACKAGING
5l, 25l containers.
COLOUR
White.
Plaster adhesive / mortar andscreed improver.plastergrip
36
WHITE
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 39/89
USES:
Joiners Mate Mitre Bond is a two part professional instant bonding system comprising anadhesive and aerosol activator. It is simple to use and bonds in 10 seconds.Joiners Mate Mitre Bond is ideal for use on all cornice and prole mitres, trims, picture frames,skirting and architrave joints, worktop end strips, PVCu trims and much more.Suitable for bonding:
• MDF (Medium Density Fibreboard)• Wood & timber
• Rubber• PVCu (Window Plastics)• Metal• Most Plastics
BENEFITS
• Simple to use• Bonds in 10 seconds• Super fast adhesion• Service temperature: -60ºC to +80ºC
SURFACE PREPARATION
The surfaces to be glued should be clean, free from dust, grease and TOTALLY DRY.
BONDING/PRIMING
No priming is required.
LIMITATIONS Do not use externally on PVCu when moisture is present in the atmosphere or the PVCu is nottotally dry. Contact with moisture during application can cause discolouration of the PVCu.This product is not suitable for permanent glass bonding or applications where the bonded jointmay be immersed in water.
APPLICATION
Ensure surfaces are close tting. Spray activator onto one surface only and allow to evaporate.Apply adhesive onto the other surface. Assemble and hold for 10 seconds, curing will be almostinstantaneous so exercise care when aligning.
PACKAGING
Joiners Mate Mitre Bond is supplied in a kit comprising of 50g adhesive and 200ml activator packed in boxes of 12.
COLOURClear
joiners mate mitre bond Two part professional instant bonding system
CLEAR
32
ideal for kitchen & counter facia strips suitable for narrow & small joints
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 40/89
USES:
• Suitable for interior use to ll gaps between most surfaces including glass ,
wood ceilings, plaster board, metals, ceramic tiles, plastics, painted
surfaces, ceilings, cornices and joints.
BENEFITS
• Fast cure
• Flexible
• 10% joint movement• Excellent adhesion
• Paintable in one hour at 25º C
• Chemical resistance: Very good resistance to weathering, ageing, salt solution and diluted alkalis.
Not resistant to acids, fuels, oils or solvents.
SURFACE PREPARATION
All surfaces must be clean, dry and free from loose matter, oil, grease and
anything that may affect the performance of the product.
BONDING/PRIMING
Excellent bonding to most substrates. No priming required
unless specied otherwise.
APPLICATION
Cut the tip of the nozzle at the angle required. Applyabe acrylic sealant from a caulking gun using sufcient
pressure to ensure adequate contact with sides of joint.
The surface of the joint may be smoothed over with a little
liquid soap and water.
Cure time @25º C - Touch dry: 1 hour, Full cure: 3 - 7 days
COVERAGE
Depending on joint size, but should do approximately 7m per 250ml cartridge on a 6mm X 6mm joint.
CLEANING
Tools, brushes and mixing equipment should be cleaned
immediately after use and before material has set with
abe super brush cleaner followed by washing with
soap and water.
PROTECTION ON COMPLETION
abe acrylic may be left neat on the interior walls with a PVA/acrylic paint. It is possible to coat abe acrylic
within 1 hour of application.
PACKAGING
250ml.
COLOURS
White.
A premium quality, fast cure, exible, paintablesmooth white ller that can be painted over in 1 hour. abe acrylic
37
WHITE
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 41/8938
USES:
• Suitable for interior and exterior use on most surfaces including glass, ferrous
metal, porcelain, ceramic tiles, plastic, painted surfaces and rubber.
BENEFITS
• Flexible
• 25% joint movement
• UV resistant
• Excellent adhesion• It is fast cure single component, high performance sealant with anti fungicidal properties.
• Acetoxy cure.
SURFACE PREPARATION
Surfaces must be clean dry and free from dust and grease. Non-porous surfaces
such as aluminium, glass and metal should be cleaned using a suitable solvent
for the substrate.
BONDING/PRIMING
Silicone sealants adhere to a variety of non-porous
surfaces such as glass-glazed ceramic and aluminium.
Priming for specic substrates may be needed to improve
adhesion.
APPLICATIONThe use of abe duracord is recommended as backing
material. To create correct join depth and to use correct
amounts of adhesive, areas adjacent to the joints should
be masked with tape to prevent contamination and to
ensure a neat sealant line. The masking tape should be
removed immediately after tooling. Cut the top of the
nozzle at the angle required. Apply the abe silicone from
a caulking gun using sufcient pressure to ensure
adequate contact with sides of the joint. The surface of
the joint may be smoothed over with a little liquid soap
and water to ensure good contact between the sealant and the substrate.
Cure time @25º C - 24 hours.
Skinover time 15 minutes @ 23º C, 50% RH.
COVERAGE
Depending on joint size, but should do approximately 7m per 250ml cartridge on a 6mm X 6mm joint.
CLEANING
abe universal wipes are recommended for cleaning.
Tools, brushes and mixing equipment should be cleaned immediately after use and before
material has set with abe super brush cleaner followed by washing with soap and water.
PROTECTION ON COMPLETION
abe silicone is UV resistant. It must not be coated, with any other material.
PACKAGING
250ml.
COLOURS
White, clear and black.
Is a premium quality multi -purpose silicone sealant.abe silicone
BLACKWHITE CLEAR
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 42/89
USES• For internal and external sealing of sanitary and kitchen ttings, including baths, sinks, vinyl and
ceramic tile joints.• Sealing gaps around doors and window frames.• Has excellent adhesion to metals, glass, ceramic, woods, tiles and painted surfaces. BENEFITS• 100% silicone
• Excellent weathering properties• Easy to apply• Contains a fungicide to prevent mould growth• No maintenance required.• High gloss nish• Fast cure• Non-slump• Joint movement capability of 25%• Temperature range: -55ºC to +200ºC SURFACE PREPARATIONSurfaces must be clean, dry and free of grease and dust. Non-porous surfaces such as aluminium,glass and metals should be cleaned using a suitable solvent for the substrate. BONDING/PRIMINGSilicone sealants adhere on a variety of non-porous substrates such as glass, glazed ceramic and
aluminium. Priming may be needed to improve adhesion. COVERAGEApproxiametly 8,6m per 310ml cartridge on a 6 x 6mm joint. APPLICATIONThe use of abe duracord is recommended as a back-up material. Areas adjacent to the joints should bemasked with tape to prevent contamination and to ensure a neat sealant line. The masking tape should be removed immediately after tooling.Cut tip of nozzle at angle required. Apply the sealant from a caulking gun using sufcient pressure to ensure adequate contact with sides ofthe joint. The surface of the joint may be smoothed over with a little liquid soap and water to ensure good contact between the sealant and thesubstrate.Working time/tooling: 3 – 5 minutes.Cure time @ 25ºC – touch dry: 1 hour, full cure: 24 hours.The minimum width for joints should be 6mm. For joints between 6 – 12mm wide, a seal depth of 6mm is required. For joints above 12mm wide,a width to depth ratio of 2:1 should be used, up to a maximum depth of 12mm.
CLEANINGTools should be cleaned immediately after use and before material has set with abe super brush cleaner followed by washing with soap and water. PROTECTION ON COMPLETIONNo protection required and must no be overcoated.
PACKAGING:Multi purpose silicone: 310mlAll purpose silicone: 280ml
COLOUR RANGE:Clear, Black, Grey and White
One-component exible silicone rubber sealant all purpose and multipurpose
39
CLEAR BLACK GREY WHITE
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 43/89
USES:• Suitable for solving the most difcult waterproong problems on: - Flat roofs. - Sloping and pitched roofs. - Reinforced concrete. - Prefabricated concrete. - masonry cement - metal and timber decks and terraces, with or without thermal insulation.• For renovation purposes
SURFACE PREPARATIONAll surfaces to be clean, dry, sound with a minimum fall of 1:50.abedex should NOTbe applied over a foam cement screeds.
BONDING/PRIMINGAll cementitous surfaces must be primed with a.b.e. bituprime at a rate ofapproximately 3,5 m2/l. Depending on the porosity of the surface a second coatof primer may be required.
APPLICATIONDepending on the different construction types, the sheets must be fully bonded tothe substrate. See Index publications ‘Technical Specications’ or ‘Applicationmanual’ which also describe other methods of application such as mechanical xing, hot air welding and bonding with adhesives. The substratemust be clean, dry, smooth and free of roughness or dips. The cast concrete surface must be allowed to dry before the sheet is applied. Dryingdepends on the weather and may take from 8 days to 3 weeks. To protect timber oors from the ame, either sheets of ROLLBASE or a.b.e.malthoid 5-ply must be nailed before application of the membrane.
Torch-bonding is carried out with a suitable gas torch burner connected to a propane gas cylinder. To bond the sheet to the substrate and on theoverlaps, use the torch ame to melt the aming lining on the lower face of the membrane while the membrane is being unrolled. The sheets areoverlapped longitudinally by 100 mm, while the head laps of the polyester reinforced membrane should not be less than 150 mm.
Bonding is carried out by torch application in such a way that a continuous bead of melted bitumen comes out from the overlap. So as not toremove the protective top layer, the use of a trowel is to be avoided.
When overlaying mineral nished membranes., the mineral surface must be heated so that the slate granules are completely embedded in theoverlap.
The correct temperature for bonding the membrane on the substrate and the overlaps is indicated when the protective aming burns off. Howeverthe membrane must not be overheated and a further sign of correct application is that an excessively large bead of melted compound does notcome out from the overlap. overlaying mineral nished membranes, the mineral surface must beheated so that the slate granules are completely
COVERAGE:Effective coverage: 8,9m2 / roll.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-lowed by washing with soap and water.
PROTECTION ON COMPLETIONabedex should be allowed to weather for a minimum of 8-10 weeks before overcoating with 2 coats of a.b.e. silvakote the system to dry for 7 -
10 days and then overcoat exposed area with a.b.e. silvakote.
PACKAGING COLOURSabedex is supplied in rolls of 10m x 1m . Black.
One part, high strength and elasticitymulti purpose silicone sealant.
DOW CORNING 781
40
USES:
- Adheres well to a range of non-porous surfaces including glass, aluminium, painted surfaces and composite boards.
- Has excellent resistance to aging, shrinkage, cracking and discolouring and UV resistant.
FEATURES:
• High strength
• Good elasticity
• 100% silicone
• Solvent free• Resistant to ozone, UV radiation and temperature extremes
• Joint movement capability of 20%
SURFACE PREPARATION:
Ensure that surfaces to be sealed are clean, dry, sound and free from frost, release agents, old sealants and other
contaminants which could impair adhesion. All surfaces should be cleaned and degreased by wiping with a suitable
solvent before application of the sealant.
BONDING/PRIMING:
Special priming for specic substrates may be needed to improve adhesion.
APPLICATION:
Application temperature: +5 to +40ºC.
Cure rate at 23 ºC: 1 day = 3mm, 3 days = 5mm.
Areas adjacent to the joints should be masked with tape to prevent contamination of the substrates and to ensure aneat sealant line. Masking tape should be removed immediately after tooling.
When back-up material is required, a.b.e. duracord is recommended. Back-up materials provide back pressure and
prevent 3-sided adhesion that limits sealant movement capability.
The joint should be tooled within 5 minutes of application to ensure good contact
between the sealant and the substrate. It also gives a smooth, professional nish.
COVERAGE:
Sealant can be used in a minimum 6mm width joint, for joints between 6 – 12mm wide
a depth of 6mm is required. For joints above 12mm wide a depth ratio of 2:1 should be
kept, i.e. 16mm wide x 8mm deep. Do not use for joint dimensions greater than 25mm.
CLEANING:
Excess sealant may be cleaned off tools and non-porous surfaces whilst uncured with
a wet cloth. If cured it may be removed by peeling, cutting or other mechanical means.
abe super brush cleaner can be used to ease cleaning.
PACK SIZE:
310ml
COLOUR RANGE:
Black, bronze, clear, grey and white
BLACK BRONZE CLEAR GREY WHITE
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 44/89
USES:• For the sealing of sanitary ttings, including baths, showers, sinks, urinals and ceramic tile joints. FEATURES:• Mildew and fungus resistant• 100% silicone• Gloss nish• Solvent free• Resistant to ozone, UV radiation and temperature extremes
• Joint movement capability of 20% SURFACE PREPARATION:Ensure that surfaces to be sealed are clean, dry, sound and free from frost, release agents, old sealants and othercontaminants which could impair adhesion. All surfaces should be cleaned and degreased by wiping with a suitablesolvent before application of the sealant. BONDING/PRIMING:Special priming for specic substrates may be needed to improve adhesion. APPLICATION:Application temperature: +5 to +40ºC.Cure rate at 23 ºC: 1 day = 3mm, 3 days = 5mm.Areas adjacent to the joints should be masked with tape to prevent contamination of the substrates and to ensure aneat sealant line. Masking tape should be removed immediately after tooling.When back-up material is required, a.b.e. duracord is recommended. Back-up materials provide back pressure andprevent 3-sided adhesion that limits sealant movement capability.
The joint should be tooled within 5 minutes of application to ensure good contact between the sealant and the substrate.It also gives a smooth, professional nish. COVERAGE:Sealant can be used in a minimum 6mm width joint, for joints between 6 – 12mm wide a depth of 6mm is required. For joints above 12mm wide adepth ratio of 2:1 should be kept, i.e. 16mm wide x 8mm deep. Do not use for joint dimensions greater than 25mm. CLEANING:Excess sealant may be cleaned off tools and non-porous surfaces whilst uncured with a wet cloth. If cured it may be removed by peeling, cuttingor other mechanical means. abe super brush cleaner can be used to ease cleaning. PACK SIZE:310ml COLOUR RANGE:Clear and white
One part, sanitary silicone sealant. DOW CORNING 785
41
CLEAR WHITE
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 45/89
USES:• For the glazing and weathersealing of all types of windows (PVC, wood and aluminium).• Adheres to most porous and non-porous substrates including masonry, brick, aluminium,
metals, PVC, polyacrylate, polycarbonate, impregnated, varnished or painted wood, glassand glazed surfaces.
FEATURES:• Low modulus, high elasticity• Non-corrosive to metals
• Mold and mildew resistant• Easy to apply and tool• Low odor• Resistant to ozone, UV radiation and temperature extremes• Contains fungicide SURFACE PREPARATION:Ensure that surfaces to be sealed are clean, dry, sound and free from frost, release agents, old sealants and othercontaminants which could impair adhesion. All surfaces should be cleaned and degreased by wiping with a suitablesolvent before application of the sealant. BONDING/PRIMING:Priming is not required APPLICATION:Application temperature: +5 to +40ºC.
Cure rate at 23 ºC: 1 day = 1,8mm.Areas adjacent to the joints should be masked with tape to prevent contamination of the substrates and to ensure a neat sealant line. Maskingtape should be removed immediately after tooling.The sealant should be gunned into place and tooled within 5 – 10 minutes, using a spatula dipped in soapy water. COVERAGE:Sealant can be used in a minimum 6mm width joint, for joints between 6 – 12mm wide a depth of 6mm is required. For joints above 12mm wide adepth ratio of 2:1 should be kept, i.e. 16mm wide x 8mm deep. Do not use for joint dimensions greater than 25mm. CLEANING:Uncured material can be removed by using a.b.e. super brush cleaner, while cured material may be removed by abrasion or other mechanicalmeans. PACK SIZE:310ml COLOUR RANGE:
Clear
One part neutral curing, glazeand go sealant.
DOW CORNING 794 F
42
CLEAR
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 46/89
USES:• Suitable for interior and exterior application, such as external weather seals, expansion joints and joints in buildings and
other types of construction.• Adheres to a range of porous and non-porous surfaces including concrete, masonry, brick, PVC-U, wood, glass and
glazed surfaces and some metals. FEATURES:• Low odor• Resistant to ozone, UV radiation and temperature extremes
• Joint movement capability of 50% SURFACE PREPARATION:Ensure all surfaces are clean, dry sound and grease-free. Porous surfaces must be mechanically cleaned of looseparticles using a steel brush or sanding. BONDING/PRIMING:No priming required. APPLICATION:Application temperature: -25ºC to +50ºC.Cure rate at 23 ºC: 1 day = 2mm, 3 days = 4mm.Areas adjacent to the joints should be masked with tape to prevent contamination of the substrates and to ensure aneat sealant line. Masking tape should be removed immediately after tooling.When back-up material is required, a.b.e. duracord is recommended. Back-up materials provide back pressure andprevent 3-sided adhesion that limits sealant movement capability.
The joint should be tooled within 5 minutes of application to ensure good contact between the sealant and the substrate.It also gives a smooth, professional nish. COVERAGE:Sealant can be used in a minimum 6mm width joint, for joints between 6 – 12mm wide a depth of 6mm is required. For joints above 12mm wide adepth ratio of 2:1 should be kept, i.e. 16mm wide x 8mm deep. Do not use for joint dimensions greater than 25mm. CLEANING:Uncured material can be removed by using a.b.e. super brush cleaner, whilecured material may be removed by abrasion or other mechanical means. PACK SIZE:310ml COLOUR RANGE:Black, bronze, grey and white
One part, neutral curing constructionand concrete silicone sealant
DOW CORNING 813 C
43
BLACK BRONZE GREY WHITE
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 47/89
USES:• For internal and external applications.• For xing and sealing gaps around door and window frames.• For general lling of cavities, cracks and holes i.e. where pipes
have been fed through walls.• As effective insulator against damp and draught and is water resistant.• Can be cut and painted.
BENEFITS
• Excellent adhesion to most construction materials.• Expands up to 50 times its original volume.• Fast curing.• Self moulding to surface irregularities.• Gives effective insulation against damp and draught and is completely water resistant.• Flexible applicator nozzle allows easy access into difcult areas.• Ozone friendly
SURFACE PREPARATIONClean surfaces of dust, loose particles and grease. It is important to notethat moisture assists the foam adhesion, therefore moisten surfacesthoroughly but do not allow standing water to occur. If required, areasadjacent to the joint should be masked with tape to prevent contaminationof substrates. Masking tape should be removed once the material hasfully cured.
BONDING/PRIMINGNo priming is required.
MIXINGShake the contents of the can for about 30 seconds to mix the material thoroughly.
APPLICATION:Ensure adequate ventilation and hands are gloved. Screw applicatornozzle onto valve, holding can upside down, press trigger on nozzle toextrude foam. Shake well for about 30 seconds before use. Expands50 times its original volume. Prevent blockage of valve by insertingmoistened match stick or screw. Clean with cellulose thinners or acetone while uncured.
COVERAGE:When air temperature is below 0º C stand the can in warm water, not exceeding 30º C, to assist in the ow of foam. Do not use warmer water oropen ame as this might affect the expansion qualities of the foam. foam will expand + 50 times its original volume.Foaming yield per 500 ml can ±24,6 litres.
Tack free time @ 25º C - 10 minutes.Cutable time @ 25º C - 38 minutes.
PROTECTION ON COMPLETIONCured material can be cut, sawn or sanded. In areas where material is to be over painted, the foam should be cut ush with adjoining substratesprior to painting. In situations where plastering or capping with sealant is required, the foam should be sufciently recessed to allow for this. Wheresealants are to be used in conjunction with the foam the adjacent substrates should be free from contamination by the foam. abe pu ller foam isnot resistant to UV radiation and should be covered if exposed to prolonged sunlight anticipated
CLEANINGCellulose thinners or acetone may be used in the uncured state.
PACK SIZE:500ml
COLOUR RANGE:
Creamy yellow
Polyurethane xing ller foamller foam
44
CREAMY
YELLOW
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 48/8938
USES:
ecoSEAL Painters Mate Flexible Acrylic Filler is a highly exible acrylic sealant for use oninternal and external surfaces including skirting boards, door and window frames,oorboards, ceilings, walls and plasterboard.
BENEFITS
• Resists cracking• High performance acrylic• For internal and external use• Can be overpainted in 1 hour after application.• No sanding required
SURFACE PREPARATION
Surfaces must be clean dry and free from dust and grease. Non-porous surfaces
such as aluminium, glass and metal should be cleaned using a suitable solvent
for the substrate.
APPLICATION
To be applied using a ecoSEAL Sleeve and aCox Powerow CARTRIDGE Heavy Duty SkeletonGun. Surfaces to be sealed should be clean and dry.Smooth surface within 5 minutes.Sealant application between +5°C to +30°C. Store indry conditions above 4°C.
Skin Time 30 – 45 minutes
COVERAGE
Depending on joint size, but should do approximately 8 m per
300ml cartridge on a 6mm X 6mm joint.
PACKAGING
ecoSEAL Painters Mate Flexible Acrylic Filleris supplied in 300ml sausages packed in boxes of 12.
ANCILLARY MATERIALS & EQUIPMENTCox Powerow CARTRIDGE gunecoSEAL SleeveecoSEAL Spare NozzlesecoSEAL Spare Lid
COLOURS
White
Eco-friendly exible acrylic llerecoseal painters mate
WHITE
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 49/89
USES:• exothane 1 is used to seal expansion and contraction joints.• Caulking of joints of facades, curtain wall panels, sealing of window and door joints.• Sealing of connecting joints between wall and window.• Typical substrates include concrete, brickwork, natural and synthetic stone, steel,
aluminium, wood, ceramic tiles and rigid plastic such as UPVC and polycarbonate.
BENEFITS• One-part easy to use.• Good UV resistance.
• Tolerates high joint movement (25%)• May be overpainted with high quality PVA/acrylic paint.• Service temperature: -40º C - +80º C
SURFACE PREPARATIONSuitable back-up materials must be used to adjust sealant depth in the joint e.g. abe duracord.The surface to be treated should be clean, sound and dry. It should be freefrom dust, dirt, loose particles and oily or greasy deposits and any previous sealant.exothane 1 displays excellent unprimed adhesion to most surfaces. Plaster shouldbe at least 7 days old before sealing and concrete should cure for at least 28 days.
BONDING/PRIMINGNo special primer required.
APPLICATIONexothane 1 should be applied by inserting the tube into a skeleton gun andcutting the nozzle at the correct angle for application. Apply at a 45-degreeangle to the surface, always ensuring the joint is full. Tool sealant while wetwith a tooling applicator or tool with index nger.
Tack free time @ 25º C and 50% RH: Approx 130 minutes.Cure time @ 25º C: 24 hours.
COVERAGE:Theoretical coverage for estimating purposes: Cross section of joint (mm) 25 x 12 - 1,03 m / 310ml cartridge Cross section of joint (mm) 20 x 12 - 1,29 m / 310ml cartridge Cross section of joint (mm) 12 x 12 - 2.15m / 310ml cartridge Cross section of joint (mm) 6 x 6 - 8.61 m / 310ml cartridge Cross section of joint (mm) 3 x 3 - 34,44 m / 310ml cartridge
CLEANINGTools, brushes and mixing equipment should be cleaned immediately afteruse and before material has set with abe super brush cleaner followed bywashing with soap and water.
PROTECTION ON COMPLETION
May be painted with a high quality water-based PVA/acrylic coating.PACKAGING310ml.
COLOURSWhite and grey.
Elastometric moisture-curingpolyurethane sealant. exothane 1
45
WHITE GREY
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 50/89
USES:• Suitable for solving the most difcult waterproong problems on: - Flat roofs. - Sloping and pitched roofs. - Reinforced concrete. - Prefabricated concrete. - masonry cement - metal and timber decks and terraces, with or without thermal insulation.• For renovation purposes
SURFACE PREPARATIONAll surfaces to be clean, dry, sound with a minimum fall of 1:50.abedex should NOTbe applied over a foam cement screeds.
BONDING/PRIMINGAll cementitous surfaces must be primed with a.b.e. bituprime at a rate ofapproximately 3,5 m2/l. Depending on the porosity of the surface a second coatof primer may be required.
APPLICATIONDepending on the different construction types, the sheets must be fully bonded tothe substrate. See Index publications ‘Technical Specications’ or ‘Applicationmanual’ which also describe other methods of application such as mechanical xing, hot air welding and bonding with adhesives. The substratemust be clean, dry, smooth and free of roughness or dips. The cast concrete surface must be allowed to dry before the sheet is applied. Dryingdepends on the weather and may take from 8 days to 3 weeks. To protect timber oors from the ame, either sheets of ROLLBASE or a.b.e.malthoid 5-ply must be nailed before application of the membrane.
Torch-bonding is carried out with a suitable gas torch burner connected to a propane gas cylinder. To bond the sheet to the substrate and on theoverlaps, use the torch ame to melt the aming lining on the lower face of the membrane while the membrane is being unrolled. The sheets areoverlapped longitudinally by 100 mm, while the head laps of the polyester reinforced membrane should not be less than 150 mm.
Bonding is carried out by torch application in such a way that a continuous bead of melted bitumen comes out from the overlap. So as not toremove the protective top layer, the use of a trowel is to be avoided.
When overlaying mineral nished membranes., the mineral surface must be heated so that the slate granules are completely embedded in theoverlap.
The correct temperature for bonding the membrane on the substrate and the overlaps is indicated when the protective aming burns off. Howeverthe membrane must not be overheated and a further sign of correct application is that an excessively large bead of melted compound does notcome out from the overlap. overlaying mineral nished membranes, the mineral surface must beheated so that the slate granules are completely
COVERAGE:Effective coverage: 8,9m2 / roll.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-lowed by washing with soap and water.
PROTECTION ON COMPLETIONabedex should be allowed to weather for a minimum of 8-10 weeks before overcoating with 2 coats of a.b.e. silvakote the system to dry for 7 -
10 days and then overcoat exposed area with a.b.e. silvakote.
PACKAGING COLOURSabedex is supplied in rolls of 10m x 1m . Black.
High quality exible acrylic crackand gap ller.painters mate
46
USES:
• Ideal for use on door and window frames, skirting boards, ceiling, walls and
plasterboard.
SURFACE PREPARATION
All surfaces to be clean, dry sound, free of dust, grease, oil, fungal growth,
loose and aking particles.
BONDING/PRIMING No special priming required. On damp surfaces painters mate can be applied
a as 1st coat when diluted (1 part painters mate, 1/2 part water).
APPLICATION
Remove the nozzle and cut off the end of the cartridge. Cut the nozzle to the
required width of bead and screw it back on to the cartridge. Place cartridge
into a gun. Use sufcient pressure to ensure adequate contact with sides of joint.
COVERAGE
Depending on the thickness applied painters mate will do approximately 8,6m
per 310ml cartridge on a 6mm x 6 mm application.
CLEANING
Tools, brushes and mixing equipment should be cleaned immediately after
use and before material has set with abe super brush cleaner followed bywashing with soap and water.
PROTECTION ON COMPLETION
No special protection required.
May be coated with high quality PVA acrylic paint.
PACKAGING
310ml.
COLOURS
White.
WHITE
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 51/89
USES:• Suitable for solving the most difcult waterproong problems on: - Flat roofs. - Sloping and pitched roofs. - Reinforced concrete. - Prefabricated concrete. - masonry cement - metal and timber decks and terraces, with or without thermal insulation.• For renovation purposes
SURFACE PREPARATIONAll surfaces to be clean, dry, sound with a minimum fall of 1:50.abedex should NOTbe applied over a foam cement screeds.
BONDING/PRIMINGAll cementitous surfaces must be primed with a.b.e. bituprime at a rate ofapproximately 3,5 m2/l. Depending on the porosity of the surface a second coatof primer may be required.
APPLICATIONDepending on the different construction types, the sheets must be fully bonded tothe substrate. See Index publications ‘Technical Specications’ or ‘Applicationmanual’ which also describe other methods of application such as mechanical xing, hot air welding and bonding with adhesives. The substratemust be clean, dry, smooth and free of roughness or dips. The cast concrete surface must be allowed to dry before the sheet is applied. Dryingdepends on the weather and may take from 8 days to 3 weeks. To protect timber oors from the ame, either sheets of ROLLBASE or a.b.e.malthoid 5-ply must be nailed before application of the membrane.
Torch-bonding is carried out with a suitable gas torch burner connected to a propane gas cylinder. To bond the sheet to the substrate and on theoverlaps, use the torch ame to melt the aming lining on the lower face of the membrane while the membrane is being unrolled. The sheets areoverlapped longitudinally by 100 mm, while the head laps of the polyester reinforced membrane should not be less than 150 mm.
Bonding is carried out by torch application in such a way that a continuous bead of melted bitumen comes out from the overlap. So as not toremove the protective top layer, the use of a trowel is to be avoided.
When overlaying mineral nished membranes., the mineral surface must be heated so that the slate granules are completely embedded in theoverlap.
The correct temperature for bonding the membrane on the substrate and the overlaps is indicated when the protective aming burns off. Howeverthe membrane must not be overheated and a further sign of correct application is that an excessively large bead of melted compound does notcome out from the overlap. overlaying mineral nished membranes, the mineral surface must beheated so that the slate granules are completely
COVERAGE:Effective coverage: 8,9m2 / roll.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and before material has set with a.b.e. super brush cleaner fol-lowed by washing with soap and water.
PROTECTION ON COMPLETIONabedex should be allowed to weather for a minimum of 8-10 weeks before overcoating with 2 coats of a.b.e. silvakote the system to dry for 7 -
10 days and then overcoat exposed area with a.b.e. silvakote.
PACKAGING COLOURSabedex is supplied in rolls of 10m x 1m . Black.
Water-based neoprene adhesive. quickgrip
47
USES:
• quickgrip is a multipurpose gap-ling adhesive, which is suitable for
bonding most porous and non-porous surfaces, including plastic, wood,
concrete, brick, plasterboard, GRP, carpets and metals.
BENEFITS
• quickgrip has instant grab properties and cures to form a high-strength bond,
which makes it ideal for xing plasterboard to timber panels, dado rails, door
surrounds, worktops, ceramics, skirting boards, general DIY, and repairs.• It is also ideal for lling gaps between uneven surfaces.
• Shrinkage Approx. 16%.
• Tack-free time 5 minutes.
• Water resistance good when fully cured.
• Bond strength 1000 kPa
SURFACE PREPARATION
All surfaces must be clean, dry, sound, free of all dust, grease, oil,
fungal growth, loose and aking particles.
BONDING/PRIMING
No special priming is required.
APPLICATION
Remove nozzle and cut off end of cartridge. Cut nozzle to required widthof bead and screw back on to cartridge. Place cartridge into gun. After
application surfaces must be rmly pressed together. The weight of the
panels must be supported while curing. For heavier objects, or while
surfaces are uneven, it may be necessary to support the xture initially
with panel pins. quickgrip should only be used on sealed surfaces.
PROTECTION ON COMPLETION
No special protection required.
COVERAGE
Depending on the thickness applied quickgrip will do approximately 8,6m
per 310ml cartridge on 6mm x 6mm application.
CLEANING
Tools, brushes and mixing equipment should be cleaned immediately afteruse and before material has set with abe super brush cleaner followed by
washing with soap and water.
PACKAGING
310ml cartridge.
COLOUR
White.
WHITE
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 52/89
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 53/89
USES:
• abe super brush cleaner can be used for removing
most types of wet coating from brushes, rollers,
mixing tools and other application equipment.
• It also removes hardened bituminous, alkyd, chlorinated
rubber and vinyl coating from equipment.
BENEFITS
• Water rinseable.• Economical.
APPLICATION
• To clean brushes dip them into the abe super brush
cleaner, working the bristles well to achieve full wetting.
Allow to stand a few moments, shake out well and then
wash with soap and water. Repeat if necessary.
• abe super brush cleaner can be used to remove oil
and grease deposits from oors.
• abe super brush cleaner can be used to degrease
metal surfaces prior to
painting. Using a clean cloth, wipe the surface with
abe super brush cleaner and then wash with clear water.
• abe super brush cleaner can be made into a paste by mixing with a propriety
abrasive cleaner.• abe super brush cleaner can be used to clean engines and other machinery.
Using brush , paint all oily areas with abe super brush cleaner.
• abe super brush cleaner can be used to remove stubborn spots of epoxy and
similar materials from the skin. Moisten a cloth with a little cleaner.
COVERAGE
Use copious amounts as required.
PACKAGING
1l, 5l and 25l containers.
COLOUR
Blue.
WARNING
• Flashback along vapour trail may occur.
• Vapour may explode if ignited in enclosed areas.
• Extinguish re with foam, dry chemical or carbon dioxide.
• Water may be ineffective on re.
Water-soluble cleaner.abe superbrush cleaner
48
for use on all tools and surfaces to ensure a good clean
BLUE
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 54/89
USES
As a permanent preformed polyethylene joint ller and back-up material, for lling and dimensioning joints prior to sealing with an appropriate
exible sealant.
BENEFITS
• highly exible and compressible
• excellent recovery properties and tensile strength
• rot proof
• non-absorbent
APPLICATION
duracord should be compressed into the joint to ±70% of its original size. It should be inserted into the joint to a depth that will accommodate
the depth of the sealant. For example, for joints of 6 – 12mm wide, width and depth must be equal. For 12 – 24mm wide joints, depth should be
12mm.
PACKAGING
Supplied per metre in various diameters: 6mm to 50mm.
COLOUR
Grey
Bond-breaker and closed-cell back-upmaterial for use with joint sealants. duracord
49
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 55/89
USESBEDDING: column base plates, machinery base plates, bearing plates, crane rails.GROUTING: anchor bolts, cables, starter bars, top steel.REPAIRING: cavities in concrete. cavities in conned spaces.
BENEFITS• Quickly develops placeable consistency.• Remains cohesive and does not segregate.• Does not shrink.
SURFACE PREPARATIONA minimum clearance of 50 mm is required between bed and base. For smaller areas where the owwill not be restricted, a limited minimum thickness of 25 mm is recommended. When groutinganchor bolts, three times the bolt diameter is necessary. Smaller clearances should be grouted withone of the epidermix range of epoxy compounds.
Provision for the escape of entrapped air must always be made. Contact surfaces must be clean, sound,free from dust and shutter release oils. Concrete surfaces must be thoroughly pre-wetted but excesssurface water (free water) must be removed prior to placing the grout. Surface temperatures should notbe less than 5º C. Always ensure that the shutters are watertight and sealed to prevent suction of waterfrom the product.
Ensure that the grout delivery head is of adequate height in order to accommodate the distance thegrout must ow. Always pour from one side thus ensuring that the grout lls the voidwithout entrapping air.
BONDING/PRIMINGNo primer required but in certain instances abe epidermix 344 should be used.
MIXINGAll water contents apply to 25 kg pockets of duragrout. Water quantities must be adjusted to match size of mw. Mixes must always use completepockets, but more than one pocket may be used.Mixing of grout may be carried out in a pan mixer, drum mixer or by using a slow-speed electric drill tted with a suitable paddle. Using thestandard 25 kg pocket of grout, add 3,5 litres of water to the mixing vessel. WHile stirring continuously, add the dry powder until the mixture is freefrom lumps. Then add further water (500ml to 1 litre), continuine mixing until a smooth, creamy consistency is obtained. Total mixing time shouldbe approximately three minutes. APPLICATIONMixed grout should be poured into the cavity at one point only to avoid entrapping air. For best results, mixed grout should be poured within 10minutes of mixing and denitely within30 minutes. If grout is not placed immediately after mixing, keep the material agitated.Grouting mixture more than 30 minutes old must be discarded. duragrout can be compacted by gentle rodding or punning. It may also be appliedby means of standard low pressure grouting pumps. Do not re-temper the grout should the consistency drop due to time lapse.Workability time @ 25º C : 30 min.
PHYSICAL PROPERTIESSETTING TIME @ 20º CWater Content Flow Cone Initial Set Final Set
4 litres / 25kg 50 sec 1 hr 55 min 2 hr 55 min4,5 litres / 25kg 25 sec 2 hr 30 min 3 hr 55 min
COMPRESSIVE STRENGTH using 100 mm cubes - MPaWater Content 1 Day 3 Days 7 Days 28 Days4 litres / 25kg 20 45 55 674,5 litres / 25kg 13 35 45 60
TENSILE STRENGTH by splitting 70 mm diameter specimens - MPaWater Content 7 Day 28 Days4 litres / 25kg 5,4 5,94,5 litres / 25kg 4,5 5,2
duragrout USED AS A RAM CONSISTENCYPowder Mass - 25 kgWater Demand - 3 litresWet density - 2,327 kg/litreYield - ± 12 litres
TYPICAL COMPRESSIVE STRENGTHS1 day - 44 MPa3 days - 58 MPa7 days - 62 MPa28 Days - > 70 MPa
COVERAGEOne bag of duragrout will yield +12,5 l of mortar.
CLEANINGTools, brushes and mixing equipment should be cleaned immediately after use and beforematerial has set with abe super brush cleaner followed by washing with soap and water.
PROTECTION ON COMPLETIONGrout surfaces should be protected from wind or high temperature, which can cause rapiddrying. Cover the surface with damp sacks. Do not allow the sacks to dry out; alternativelyapply duracure SBS or abe duracure WBC curing compound.
PACKAGING COLOURDuragrout is supplied in 25 kg polyethylene lined paper bags. Grey
Non-shrink cementitious groutduragrout
50
GREY
duragrout
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 56/89
Polymer modied, bre-reinforcedStructural repair mortar durarep FR
USES• Potable water retaining structures.• Repairing voids and honeycombed areas.• Also applied by gunning (wet or dry process).• Bedding mortar for concrete planks i.e. seats at sports stadiums, suspended ooring.• Water cooling towers.• Harbour wharf repairs.
BENEFITS• Ready to use.
• Easy to work.• High ultimate strength.• Resistant to frost and thawing salt.• Chlorine free.• Non-shrink.• Good bonding concrete.• Increased abrasion resistance over plainrendering (4 - 6 times).• Constant quality /performance (pre-blended).• Non-toxic.
SURFACE PREPARATIONThe substrate must be sound, rm and clean, free of oil, grease, loose particles and cement laitance,old layers of paint, or other contaminants. All edges to be repaired must besquare cut to a minimum of 10 mm deep, perpendicular to the surface, followed by the removal of allunsound material. When using compressed air for cleaning, the air must be clean andoil free. Never feather edge the product. Absorbent substrates must be thoroughly wetted, to reduce suction,which causes shrinkage, resulting in loss of bond. This must be carried out at least 12 hours prior to the application of durarep FR. The substrateis required to be well dampened, with no free water on the surface. All metal to be coated must be clean, mechanically sound and dry. Expose allcorroded reinforcing steel and grit blast. A clean bright nish is required ensuring that all corrosion products are removed, particularly behind thesteel. The anchor pattern should be approximately 40 to 60 microns from peak to valley. Prime before ash rusting occurs, seedata sheet durarep ZR primer.
BONDING / PRIMINGUse epidermix 344 wet to dry epoxy as a primer for structural applicatiowhere the bond strength must be equal or greater than the parent mate-rial. All exposed reinforcing bars must be primed by applying durarep ZR primer (see relevant data sheets).
MIXINGAdd approximately 2/3 of the mrequired mixing water and while stirring, preferably mechanically, slowly add the powder and mix until lump free .The plastic-thixotropic mortar can now be applied by trowel, spatula or oat. The mortar can be made up to a stiffer consistency by using lesswater. Note: High speed mixing entraps an excessive amount of air and therefore should be avoided.
APPLICATIONdurarep FR is used for repair and restoration of large horizontal areas and vertical surfaces, such as worn concrete road surfaces and bridges, aswell as for repairing concrete, renderings, natural and articial stone, and erosion damage to sewer tunnel structures. On vertical surfaces,durarep FR is suitable for surface repairs, remoulding large breakaway at the edges (on pillars and chords). Rubber gloves should be wornbecause of the material’s high cementitious content (alkaline). Application may be carried out in layers or applied up to 70 mm in one pass. Whenstriking off thick sections care should be taken in terms of timing as the material below may not have set sufciently and due to its thixotropic
properties hogging may occur (slumping) resulting in surface cracking.
COVERAGE25 kg of durarep FR powder with 4,2 litres of water yields approximately 13 litres.
PHYSICAL PROPERTIESCompressive Strengths24 hours 16 MPa3 days 25 MPa7 days 35 MPa28 days > 45 MPa CLEANING Clean tools with water before the mortar hardens. Hardened material can only be removed by mechanical means.
PROTECTION ON COMPLETIONLike all cement based materials durarep FR must be cured immediately, as soon as the surfacewill not be marred. This is carried out by applying, by brush or spray, a suitable curing compound like duracure SBC or as recommended bya.b.e. Construction Chemicals Limited. In rapid drying conditions caused by high winds or direct sunlight additional precautions should be in-cluded like sealing with polythene sheeting having the edges taped down. This may include damp hessian behind the sheeting to prevent moistureloss. Similarly in cold conditions, the repaired area must be protected from freezing.
PACKAGINGdurarep FR is supplied in 25 kg polyethylene lined paper bags.
COLOURGrey
51
GREY
durarep FR
repairing and bedding concrete
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 57/89
USESdurarep QS is a non-shrink material. Its slight expansive qualities are benecial to grouting, anchoringand patching procedures. durarep QS will bond to almost any material such asconcrete, masonry, wood or steel.• Concrete pavement joint repairs.• Airport runway light installations.• Expansion device nosing.• Anchoring bridge railings.• Truck dock repairs.• Large balustrades.
• Parking deck and ramp repairs.• Heavy industrial repairs.• Do not use if it will come into contact with galvanised steel or aluminium.
BENEFITS• Requires only addition of water.• Cold room application (NB - where material, substrate and surrounding temperatures are elevated to 25º C
in a ‘tent’ - quick setting properties).• No pre-saturation.• No curing required• No bonding agents required.• Water soluble for easy cleaning of equipment.• Self levelling matrix (owable).• Hardens in 15 minutes - ready for trafc in 45 minutes.• Yield per bag extended by addition of course aggregate (9 - 13 mm stone).• Ideal for repair work in coastal regions (prevents corrosion of re-bars) and aggressive environments such as mining, heavy industry, sewerage.• Bonds to concrete, masonry, steel, wood.
Compressive strengths
Period durarep QS Typical concrete1 hour 8 MPa -3 hours 20 MPa -24 hours 30 MPa 3,53 days 38 MPa 1328 days 50 MPa 25 SURFACE PREPARATIONThe substrate must be sound, rm and clean, free of oil, grease, loose particles and cement laitance, old layers of paint, or other contaminants.The surface may be damp or dry but dust free prior to placing durarep QS.
All edges to be repaired must be square cut to a minimum of 10 mm deep, perpendicular to the surface, followed by the removal of all unsoundcleaning, the air must be clean and oil free.Never feather edge the product. All metal to be coated must be clean, mechanically sound and dry. Expose all corroded reinforcing steel and gritblast. A clean bright nish is required ensuring that all corrosion products are removed particularly behind the steel. The anchor patternshould be approximately 40 to 60 microns from peak to valley.
MIXINGA suitable size mixing vessel that will accommodate full bag lots using a pan mixer or a heavy duty mechanical drill type mixer and a spiral pad-dle stirrer that operates around 400 - 500 r/min is recommended. After adding clean water to the mixing vessel, preferably mechanically, slowlyadd the durarep QS powder to and mix for approximately 1,5 to 2 minutes, until the mortar is homogeneous and lump free. Never exceed theprescribed amount of water. Place the material immediately before setting occurs. Set/stiffened material must be discarded. Never re-temper theproduct - dicard and use a fresh batch. When adding course aggregate never exceed the powder water ratio recommended - workability will bereduced by the addition of aggregate. Note: High speed mixing entraps an excessive amount of air and therefore should be avoided. The yield perbag can be extended by the addition of 15 kg of clean, dry, dust free coarse aggregate (9 -13 mm). It is important that the water demand per 25 kgof durarep QS must not change or be increased due to the addition of stone. Never contaminate or add Portland cement to durarep QS, this willdestroy the product’s performance.
APPLICATIONEnsure that all preparation, shutters and other equipment and tools are ready and in place to receive durarep QS prior to mixing as the materialsets quickly. The owable-thixotropic mortar can be poured into place and nished by trowel or oat.Use neat material for repairs between 25 mm to 50 mm in depth and 100 mm width - joint repair edges should not be less than 50 mm deep. Fordeeper repairs, > 50 mm, a 25 kg bag ofdurarep QS concrete may be extended by adding up to 15 kg of properly prepared aggregate (not larger than 13 mm). Application may be carriedout in layers or applied up to 250 mm in one pass. As durarep QS bonds to most building materials, ensure that all surfaces where bonding is notrequired, i.e. shuttering, be coated with a high quality release agent.
COVERAGE25 kg of durarep QS with 2,2 litres of water yields approximately 13 litres.
CLEANINGClean tools with water before the mortar hardens. Hardened material can only be removed by mechanical means.
PROTECTIONON COMPLETIONdurarep QS should air-dry for proper cure. Do not use a curing compound or wet cure.
PACKAGINGdurarep QS is supplied in 25 kg polyethylene lined paper bags.
COLOUR PRECAUTIONSGrey • durarep QS is a pre-blended formula and must be used as supplied. No further sands, cements or components must
be added. Mix only with the prescribed quantity of water. • The addition of clean water must be carefully gauged and controlled as this ratio is critical to the correct functioning of
durarep QS.
• Ideally durarep QS should be placed to a thickness of 25 mm or more. Never use where the thickness will be less than15 mm. • Due to it’s alkaline nature durarep QS must never be used in direct contact with aluminium or galvanised steel. • durarep QS is designed as a rapid setting mortar for concrete repair and patchwork and should not be used as a
precision mortar.
Fast-setting chemical-actionconcretedurarep QS
52
GREY
durarep QS
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 58/89
USES
duraslurry is an economical, easily applied method of providing a permanent waterproof skin on concrete,
plaster and brick surfaces. It may be used on both new and existing structures on either the wet or the dry side.
duraslurry is recommended for:
• Foundations • Basements
• Tunnels • Supporting walls
• Dams • Reservoirs
• Ponds • Pools
• Silos • Sewage plants• Underground structures
duraslurry acts by the conversion of the free lime in the concrete to insoluble calcium compounds. These seal
against capillary ingress of water into the dry slurry lm. Water soluble materials in the slurry penetrate the
substrate surface where they in turn crystallize, thus anchoring the coating to the substrate. duraslurry must not
be exposed to backwater pressure, running water or rain, until it has fully set. The treated surface must be
protected from heat and wind. Drying should be as slow as possible. Note: Since the duraslurry system is
based on a chemical reaction taking place inside the concrete, some moisture penetration can be expected
until voids are sealed by the crystallization process.
BENEFITS
• Easy to use
• Economical
• Wide rande of applications.
• Service temperature (fully cured): -40º C - +80º C.
MIXING
duraslurry only needs the addition of water to be ready for use. Gauge duraslurry with water to produce a viscous creamy consistency
(1 volume clean water to 2,25 -3 volumes duraslurry). Mixing may be done by hand or mechanical mixer and should be continued until a homo-
geneous, lump-free product results. In manual mixing. lumps may be broken down with the gloved hand. on completion of mixing, material must
be used within 30 minutes. Never attempt to reconstitute by further dilution, mixed material that has become too stiff to apply.
SURFACE PREPARATION
duraslurry is designed for use on porous, absorbent surfaces. Highly porous surfaces such as common bricks should be plaster rendered before
waterproong. All surfaces must be clean and sound. They must be free of laitance, shutter release oil, dust, loose particles and any other foreign
matter including fungal growth. Large cracks and honeycomb should be given a thin coating of duraslurry, mixed as described in this data sheet.
They should then be lled with 3:1 - 4:1 sand/cement mortar prior to applying the overall duraslurry system. Floor/wall joints should be cut sand/
cement mortar, prior to applying the duraslurry system.
BONDING / PRIMING
No primer required.
APPLICATION
Any surface to be treated with duraslurry must be fully saturated beforehand, preferably the day before. Surfaces such as oors must be free
of ponded water and verticals must be free of water running down the face. Apply duraslurry by hand using either a medium-hard block brush
or a notched trowel. Treatment must be applied in two or three coats. A second coat must be applied as soon as the rst coat can no longer be
disturbed by brushing. If a third coat is requiredit must follow.within 24 hours, with the surface having again been pre-dampened. On horizontal
surfaces duraslurry is normally applied by brush, although the second coat of a three-coat system may be notch trowelled. Vertical surfaces,
except for the nal coat of the system are usually applied by notch trowel. The nal coat of a system must be applied by brush and left as smooth
as possible.
COVERAGE
1. Waterproong externally against damp earth and moist ground. 2 COATS using 2-3 kg/m²
2. Waterproong internally against rising damp or up to 1 m head of underground water.
2.COATS using 4-5 kg/m². Treated oor surfaces must be protected against subsequent
trafc with a cement rendering.
3. Waterproong internally to retain water as in reservoirs. Waterproong externally against
more than 1 head of underground water; water pressure; surfaces below the water table;
earth covered slabs.
3 COATS using 6-7 kg/m²
CLEANING
Tools, brushes and mixing equipment should be cleaned immediately after
use and before material has set with abe super brush cleaner followed by washing with soap and water.
PROTECTION ON COMPLETION
duraslurry may be overpainted with a high quality PVA/acrylic paint.
PACKAGING
duraslurry is supplied in 25 kg polyethylene lined paper bags.
COLOUR
Grey
Cementitious waterproong slurry duraslurry
53
GREY
duraslurry
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 59/89
Non woven, continuous lament,needle-punched, polyester geotextile.
USES:• Drainage behind retaining walls.• Filtration in sub-soil drains.• Separation of aggregate on driveways, paths and
storage areas.• Protection of plastic waterproof membranes in garden
or structural applications.• As a waterproong membrane when saturated with
bitumen.• Filter under riprap retaining river banks.
• Roof gardens/Atriums.• Window boxes.• Drainage pipe.• Underground waste disposal and soak away.• Perimeter Sub-soil drain.• Stabilization of the above mentioned.
BENEFITS• Paving: ensures correct drainage and prevents risk of subsidence.• Garden paths: prevents the natural soil from mixing with the sand or gravel and reduces
maintenance.• Drainage: envelops the drain trench and improves the efciency of the drain by holding
back the ne particles of soil.• Roof gardens & window boxes: separates the drainage course from the top soil and
prevents particles entering the outlet system.
SURFACE PREPARATIONBidim ashpack is a rugged material and can be placedupon most soil or stone surfaces around the home within reason.
BONDING/PRIMINGNo priming required unless specied otherwise (dependent on the a.b.e. productit gets used with).
APPLICATIONFor separation / stabilization, place the Bidim ashpack onto prepared subgrade,overlapping the material by 100mm where necessary. Place the base on top of theBidim ashpack. PACKAGINGBidim ashpack is supplied in packs of 10m x 1m or 10m x 1,3m.bidim U14 rolls are also available in 1.32m, 1.76m and 2.65m wide.
COLOURSGrey
ashpack/bidim
54
GREY bidim used undergarden paths
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 60/89
Hot-melt bituminous compound rock bitumen
USES:Anti-corrosion protection of metal punchings and steel plate llings used in marine keel ballastapplications, wood block adhesive and other applications.
NOTE: For hot applied roong membrane bonding use hot-mop bitumen
BENEFITS• Very rapid drying ller and adhesive• Water impervious• Non-toxic
SURFACE PREPARATIONThe surface to be treated must be CLEAN, DRY and SOUND.
BONDING / PRIMING Use abe bituprime if a primer is specied.
APPLICATION Surfaces to be bonded must be laid immediately into the hot bitumen whilst still liquid.The rock bitumen should be cut into small pieces using a heated shovel blade. Melta few pieces of rock bitumen and gradually add more pieces to the molten material,stirring until the bitumen reaches the recommended 170° C application temperature,when it should be used as soon as possible.
Do not melt more bitumen than can be used immediately, since cooling overnight andthen reheating can cause degradation. Care must be excercised when meltingrock bitumen to ensure that overheating does not occur, as temperatures in excessof 190º C will cause decomposition of the bitumen. Oil jacketed melters are preferable.rock bitumen should also not be maintained at elevated temperatures for longer than two hours.
Softening point: 80 - 90º CPouring point: 170 - 180º C
COVERAGE:1kg/m2/1mm thick.
CLEANINGUse abe super brush cleaner.
PROTECTION ON COMPLETIONNot required unless exposed to extensive sunlight, in which case coat with abe silvakote intwo coats.
PACKAGINGRock bitumen is supplied in 25 kg silicone lined paper sacks.
COLOURBlack.
55
BLACK
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 61/89
USES:• In order for trees and shrubs to remain healthy and continue
to grow and produce fruit it is necessary to ensure thatthese plants are regularly pruned. Correct shaping ofplants can help produce more economic fruit crops. It isimportant to remove dead or diseased wood, as plantsneed light to grow well.
BENEFITS:
Does not contain fungicidal ingredients.
SURFACE PREPARATIONPruning cuts should be made immediatelyabove buds or side branches at an angleof approximately 45 degrees to allow waterto run off. Ensure cuts are clean by usingsharp tools and avoid damaging or bruisingthe plant whilst cutting. Apply tree seal pruninggrade immediately to the freshly cut and trimmedplant ensuring surface area is completely andthoroughly sealed.
BONDING/PRIMINGNo bonding or priming is necessary.
APPLICATIONtree seal pruning grade is applied by brush ensuring the entiresurface area is completely covered.
COVERAGEUse as required. CLEANINGTools, brushes and mixing equipment should be cleaned immediatelyafter use and before material has set with abe super brush cleanerfollowed by washing with soap and water.
PROTECTION ON COMPLETIONNo further protection is needed.
PACKAGING500g tubes, 1l, 5l and 20l containers.
COLOURSBlack.
Prune wound protectant.tree seal
56
BLACK
fruit treesroses
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 62/89
supporting notes
57
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 63/8958
supporting notes
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 64/89
supporting notes
59
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 65/8960
supporting notes
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 66/89
supporting notes
61
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 67/8962
supporting notes
epidermix crack repair systemFor the repair of cracks in concrete by injecting them with epidermix pumped in under pressure asa well tried and tested process.
A properly executed crack injection will restore strength to the concrete and will seal it against entry of moisture and chemicals. Cores taken from
injection repaired concrete will often be found to have a higher crushing strength than the parent concrete. This is due ot the reinforcing effect ofthe resin. Crushing facture should not occur on the plane of the injected crack. Often it will occur at right angles to the cracked plane. IMPORTANTBefore attempting a crack repair the cause of racking must be found. If the crack is working the amount of movement must be determined. The isno point in repairing a crack oif the structure is still subject to the stresses that caused the crack. The structure will simply crack again at the nextweakest point. If it is proved that the crack is moving it should be cut out and sealed with a fully exible sealant. This will exclude moisture but willgive no strength. (See data sheet on durakol in the sealants section.) epidermix COMPOUNDS USED IN THE CRACK INJECTION SYSTEMepidermix 365 – if crack width exceeds 0,10mmepidermix 389 – if crack width lies between 0,10 and 0,05mmepidermix 395 – used in crack repair of concrete roadsepidermix 314/372 – for surface sealing prior to the injection process. EQUIPMENT NEEDED TO CARRY OUT CRACK INJECTION SYSTEM- Long shanked grease nipples (±30mm long).- Manually operated pump type grease gun.- Power drill with 6mm mansonry bit.- Wire brush.- Fine stiff wire.- Pins.- Cold chisel and hammer.- Rubber or plastic tubing – 6mm I.D.- Flat paddles for mixing injection resins.- Putty knives for mixing epidermix 314/372. METHOD OF CARRYING OUT CRACK INJECTION SYSTEM• The surface over the entire length of the crack should be wire brushed to remove laitance from the concrete.• If the surface of the concrete is unsound chase a V-cut at least 10mm deep and 20mm wide into the crack.• Remove all debris.• Drill into the crack using the 6mm bit. Drill at least 50mm deep. Ensure that the crack lies within the sides of the hole. Using ne stiff
wire scratch out dust that may block the crack in the sides of the hole. Holes should be between 250 and 300mm centres. The ner the
crack the less the centres.• Seal the grease nipples into the holes with a collar of epidermix 314. Cover the head of the nipple with a short length of rubber or
plastic tubing to ensure the inlet is kept free of epoxy. Also ensure that the outlet is kept free of epoxy.• Having sealed the nipples into the crack, seal the entire face of the crack with epidermix 314 applied about 3mm thick and
approximately 50mm wide. Where the crack is chased out the chase should be lled with epidermix 314 and nished ush with theconcrete surface.
• Allow to cure overnight.• Next day, open the non-return ball valves of the nipples by forcing in pins.• Fill the injection gun with correctly mixed epidermix liquid.• Starting at the lowest point of the crack or at one end, if the crack runs horizontally, pump in liquid resin. Continue pumping until resin
exudes from the next nipple. Remove pin and carry on pumping for a few more strokes of the gun.• Disconnect the gun from the inlet and attach it to the nipple from which resin exuded.• Continue this sequence working either up or along the crack. After about 30 minutes, return to the rst nipple that was lled. Reopen
the ball valves with pins and try to pump in further resin. This ca usually be done as the resin may have seeped away into ner cracksor pockets of honeycomb. If foamy resin extrudes, continue lling until clear resin is in evidence.
• Once injection of the crack has been started, work must continue until the crack has been lled. Before injection work starts, a rough calculation should be made as to the amount of resin that will be needed to ll the crack.The calculation is as follows for litres of resin required: length of the crack (cm) X width of the crack (cm) 1000If usage exceeds this gure by more than 4 times, the matter should be referred to the engineer as excessive internal honeycombing may bepresent. If the crack is in a contact slab or in the wing wall of an abutment it is likely that the resin is going straight through the member into theground. 24 hours after injection, the surface seal and protruding nipples may be cut off with a grinding wheel. REPAIR OF HONEYCOMB CONCRETEEssentially, the process is the same as outlined with the following exceptions:
a) holes must be drilled right through the member and not merely 50mm deep. They should be spaced not more than 150mm verticallyand horizontally apart.
b) the entire honeycomb area must be surface sealed with epidermix 314.c) on the day after the injection process has been done, a second set of holes should be drilled moving the matrix 50% horizontally and
vertically, and repeating the entire nipple and injection process.
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 68/89
supporting notes
1 53
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 69/8964
supporting notes
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 70/8965
supporting notes
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 71/8966
supporting notes
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 72/8967
supporting notes
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 73/8968
supporting notes
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 74/8969
supporting notes
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 75/8970
supporting notes
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 76/8971
supporting notes
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 77/89
formulae
How to calculate the area you need to cover.
72
formulae
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 78/8973
conversion tables
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 79/8974
factor to calculate volumes
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 80/8975
factor to calculate volumes
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 81/89
trigonometry tables
76
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 82/89
product selector
product selector
77
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 83/89
78
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 84/8979
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 85/8980
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 86/8981
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 87/8982
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 88/8983
7/21/2019 Abe DIY Booklet
http://slidepdf.com/reader/full/abe-diy-booklet 89/89
a.b.e. BRANCH ADDRESSES & CONTACT NUMBERS
DURBAN7 Wilcox Road P.O. Box 23053 Tel: (031) 913 5400Isipingo Isipingo Fax: (031) 902 88614133 4110
JOHANNESBURG 101 Main Reef Road P.O. Box 5100 Tel: (011) 306 9000Boksburg North Boksburg North Fax: (011) 306 91001459 1461
CAPE TOWN18 Benbow Ave P.O. Box 144 Tel: (021) 505 2800Epping Eppingdust Fax: (021) 534 67257460 7475
BLOEMFONTEIN6 Coro Street P.O. Box 4336 Tel: (051) 448 3851Old Industrial Area Bloemfontein Fax: (051) 448 38509301 9300
EAST LONDONShop No. 5 Frame Park P.O. Box 39 Tel: (043) 726 0115Phillip Frame Road East London Fax: (043) 726 0141Cambridge 52005247
PORT ELIZABETHWoodpecker Street P.O. Box 4238 Tel: (041) 365 1355Cotsworld Industrial Park Korsten Fax: (041) 365 1505Cotsworld Port ElizabethPort Elizabeth, 6001 6000 GEORGE
5 Rand Street P.O.Box 10704 Tel: (044) 874 0690George George Fax: (044) 874 0691
6530 6529
EXPORTS