ABENER TEYMA MOJAVE
1
14522 South Outer Forty Road Phone: 314-275-1100 Chesterfield, MO 63017 Fax: 314-275-2408
Subject: 09-AFC-5C (Mojave Solar Plant)
Condition Number: SOIL&WATER-1
Description: Drainage Erosion and Sedimentation Control Plan
Submittal Number: SWAT1-01-01
March 4, 2011
Mr. Joe Douglas, CPM California Energy Commission 1516 Ninth Street (MS-2000) Sacramento, CA 95814 [email protected]
Dear Mr. Douglas,
The following submittal is in response to the comments issued by Mr. Chris Dennis and Ms. Ann Crisp.
Should you have any questions or need any additional information, please do not hesitate to contact me.
Sincerely, Juan G. Lozano TEYMA USA INC. 14522 South Outer Forty Road Chesterfield, MO 63017 Office: (314) 275-1135 Cell: (480) 455-8278 Attachments: Desert Tortoise Exclusion Fencing Plans
Tortoise Exclusion Fence Construction, Erosion, and Sediment Control Technical Memorandum
----- Forwarded by Kathleen Sullivan/Solar/Abengoa on 03/03/2011 01:39 PM -----
ABENGOA SOLAR Abengoa Solar Inc. Erin Bradley 03/03/2011 01:38 PM
Send To: "Kathleen Sullivan" <[email protected]>
cc:
Subject: Fw: Abengoa S&W-1 tortoise fence DESCP
From: Christopher Dennis [[email protected]] Sent: 03/03/2011 12:22 PST To: Erin Bradley Cc: Joseph Douglas <[email protected]>; Paul Marshall <[email protected]> Subject: Abengoa S&W-1 tortoise fence DESCP
Hi Erin, the technical memorandum you submitted looks fine except that it is missing BMPs. At minimum, the following CASQA BMPs should be briefly discussed and referenced in the text of the document and added as an attachment. NS-9 Vehicle and Equipment Fueling. During fence trenching the backhoe(s) will have to be refueled. NS-10 Vehicle and Equipment Maintenance. BMPs should be in place for vehicle and equipment maintenance SE-5 Fiber Rolls. Should be on hand and installed immediately downstream of any washes crossed during a storm event. TC-1 Stabilized Construction Entrance-Exit. The soil is very dusty out there and sticks to shoes and tires. BMPs should be in place to reduce the amount of dust brought on to the public roads. TC-3 Entrance-Outlet Tire Wash. Necessary if there is a storm event. WM-4 Spill Control and Prevention. This is simply good planning. Hydraulic leaks on backhoes are frequent enough. Leaks can occur during refueling events also. WM-9 Sanitary-Septic Waste Management. Necessary for the onsite workers. Once these BMPs have been added to the document, we make a final review and can approve S&W-1 as ongoing and in compliance. Thanks, Chris _________________________ Christopher B. Dennis, PG
Engineering Geologist California Energy Commission 1516 Ninth Street, MS 46 Sacramento, CA 95814 (916) 654-4399 wk (916) 651-8868 fax
Kathleen Sullivan/Solar/Abengoa
TEYMA USAKathleen Sullivan03/03/2011 09:59 PM
Para: Erin Bradley/Solar/Abengoa, "Juan Guillermo Lozano Varona" <[email protected]>cc:bcc:Asunto: Fw: Abengoa SW-1
Historial: Este mensaje ha sido remitido.
Please see below.Thank you!
----- Original Message -----From: Joseph Douglas [[email protected]]Sent: 03/03/2011 19:00 PSTTo: Kathleen SullivanSubject: Fw: Abengoa SW-1
Fyi ----- Message from Andrea Martine <[email protected]> on Thu, 3 Mar 2011 12:17:56 -0800 -----
To:Ann Crisp <[email protected]>, Joseph Douglas <[email protected]>
Subject:Re:
Joe,
Abengoa will need to have desert tortoise exclusion fencing around any construction yard or laydown area. They should include this language in the details of their proposed work.
Andrea
>>> Joseph Douglas 3/2/2011 2:42 PM >>>Hi all, Please look at SW-1 for the laydown area, or anything else. thanks Joe D
EannettFleming GANNETT FLEMING, INC.
4722 N. 24th StreetPhoenix, AZ 85016-4852
Office: (602) 553-8817Fax: (602) 553-8816www.gannettfleming.com
TECHNICAL MEMORANDUM
SUBJECT: Abengoa Mojave Solar ProjectTortoise Exclusion Fence Construction and Erosion and Sediment Control
COPIES:
TORTOISE EXCLUSION FENCE CONSTRUCTION:
The tortoise exclusion fence will be constructed two feet inside the Mojave Solar Plant projectboundary and around the tortoise exclusion fence installer’s lay-down area(s) as shown on theattached plans. The galvanized fence shall be of 16 gauge or heavier material. It will consist of1-inch horizontal by 2-inch vertical galvanized welded wire, 36-inches in width. Other materialsinclude hog-rings, steel T-posts or #4 rebars with safety caps and smooth livestock wire. Thematerial shall conform to standards approved by the U.S. Fish and Wildlife Service. The fencematerial will be buried a minimum of 12 inches below the ground surface while 24-36 inches ofthe fence material will be above ground. A trench will be excavated in order to place the fencematerial below the ground. The excavated earth will be backfllled and compacted to minimizeerosion. The fence will be secured through T-posts or rebars that will be driven into the ground.Hog rings will further secure the fence to the T-posts or rebars.
Temporary sanitary facilities will be provided on-site for construction workers. These facilitieswill be located away from drainage facilities, watercourses, and from traffic circulation. Whensubjected to risk of high winds, they will be secured to prevent overturning. These facilities willbe serviced and pumped,and no wastewater will be discharged or buried within the project site.Please refer to the attached California Stormwater Quality Association (CASQA) BestManagement Practice (BMP) WM-9 for further details.
A construction yard or laydown area is designated on the project site within the Alpha West areaand along the west side of Harper Lake Road for storing the construction materials andequipment. The construction yard or laydown area is within the project boundary. Fueling ofequipment will be done off-site at the closest regulated gas station if practical. If fueling isnecessary on-site, it will be done at a designated location within the fenced staging area. Thisarea was selected because it was the previous site of a gas station and has the necessary level,impervious surface for fueling operations. If refueling is necessary at this location, allrequirements noted in the attached CASQA BMP NS-9 will be followed. As with fueling, allefforts will be made to perform equipment maintenance and repairs off-site at a permittedservice station. If maintenance service is required on-site, it will be conducted in the stagingarea at the aforementioned abandoned gas station site, and all requirements for on-site vehiclemaintenance and repair noted in the attached CASQA BMP NS-1O will be followed. While all
DATE: March 3, 2011
FROM: Stewart S. Vaghti, RE.Project Civil EngineerGannett Fleming, Inc.
Nasir Raza and Byron Dixon (Gannett Fleming, Inc.)
L~ann~ttFleming Abengoa Mojave Solar ProjectMarch 4, 2011
Page 2 of 2
efforts will be made to limit potential for hazardous spills on-site, the attached CASQA BMPWM-4 will be implemented to address need to prepare for the unlikely event of a minor spill.
TORTOISE EXCLUSION FENCE EROSION AND SEDIMENT CONTROL:
The tortoise exclusion fence construction will involve minimal excavation of soil (12 inch deepand approximately 2 feet wide trench). The excavated soil, temporarily placed along the side ofthe trench, will be backfilled and compacted in-place. Excavated material will be backfilled andcompacted within 48 hours and before a predictable rainfall event. Weather and stormpredicting can be obtained via the internet at www.wrh.noaa.qov. A separate stockpile will beavoided in order to efficiently excavate and backfill the material after installation of the fence andits appurtenances such as the posts/rebars.
It should be noted that the storm water runoff flows in a northeasterly to easterly direction inaccordance with the general terrain of the watershed. With regards to the project site, the majorflow from the south enters the depressed Lockhart Road at the west end of the Alpha projectarea and flows east along this dirt roadway to ultimately discharge at Harper Lake Road orfurther east at the east end of the project. Most of the remaining offsite flow is similarlyintercepted by the depressed perimeter dirt roads or the powerline corridor along the west andsouth sides of the Alpha and Beta project areas and diverted away from the project site and thetortoise fences that are built on relatively higher ground (a few inches to 2 feet higher than theadjacent roadways or powerline corridor). During larger storm events (such as the 100-yearstorm) the flow can potentially pass through the tortoise fence and sheet northeasterly acrossthe site towards Harper Lake. Work is planned to be suspended during a storm event, but fiberrolls will be kept on-hand in the event that any washes are crossed with fence excavation duringa storm event. Should this situation occur, the fiber rolls will be installed downslope of theexposed wash area in accordance with the attached CASQA BMP SE-5.
The contractor shall provide erosion and sediment control for the project by placing theexcavated dirt along the fence trench (and above the depressed dirt roadways which behave asstorm water conveyance channels) and backfilling the trench expeditiously after installation ofthe fence and prior to any rainfall event. The backfilled material will be compacted to minimizeerosion. In order to control track-out of sediment and dust in the paved roads within the publicright-of-way, equipment will be blasted with a high pressure air compressor to remove sedimentbefore exiting onto these roads. Work is planned to be suspended during storm events.However, any equipment on-site during the rain events will be washed with a high pressurewater sprayer atop a gravel blanket before exiting the site onto the paved roads within the publicright-of-way. These methods are in-lieu of CASQA BMP TC-1 and TC-3, which are not practicalfor this linear perimeter construction effort.
G
GG
GG
G
G
G
E
E
E
E
EE
EE
EE
E
E
E
Alpha East
Alpha West
E
EE E E E E E E E E E E E E E E E E E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E
E
E
E EE E E E E E E E
EE
EE E
Beta East
Beta West
1"= 1,200'- 15
Civil Works . General
Urban Development and Buildings
Checked
Sheets:
Pass
Sheet No:
DescriptionRev. DateDrawn
Plan No:
Plan No. int:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A
B
C
D
E
G
H
I
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ANSI D
A
B
C
D
E
G
H
I
JScale:
Situation:
Signature
Checked PassDrawn
Signature Signature
F F
J
THIS DRAWING IS THE PROPERTY OF
A partnership of Teyma USA andAbener Engineering and Construction Services, LLC
Abener Teyma Mojave General Partnership
Checked PassDrawn
Checked PassDrawn
MOJAVE SOLARPLANT
ABENER TEYMAMOJAVE
MOJAVE SOLAR LLC
6-30-11Dig AlertDial toll free
1-800-227-2600At least two days before you dig
6007-PLN-GFE-00-50-C001
Desert Tortoise Exclusion Fencing Plans
For
MOJAVE SOLAR PLANT
California state plane coordinate systemnad 83, zone 5
Basis of Bearings:
Sheet No.
Sheet Index:Plan No. Description
1
2
3
4
5
6007-PLN-GFE-00-50-C001
6007-PLN-GFE-00-50-C002
6007-PLN-GFE-00-50-C003
6007-PLN-GFE-00-50-C004
6007-PLN-GFE-00-50-C005
Sheet Index and Key Map
Enlarged Plan
Enlarged Plan
Enlarged Plan
Fence Details
Key Map
Har
per
Lak
e R
oad
Lockhart Road
Roy Street
HarperLake
Sheet 2 Sheet 3
Sheet 4
Barstow
SiteProject
o395
Old Hwy 58
p15
p15Bakersfield
Har
per
Lake
Rd
Lockhart Rd
p
To
HarperLake
Hinkley
40
Location Map
Project Boundary
Sheet Index and Key MapDesert Tortoise Exclusion Fencing Plans
North
North
Fence Linear Feet:Fence Area 1
Fence Area 2
Fence Area 3
18,640
22,524
26,199
Total 67,363
N. L
ock
har
t R
oad
0 01/26/11 Issued for bid.
1 03/01/11 Respond to comments by CEC/BV.
289.338'
86.9
63'
116.
132'
110.304' 61.342' 260.100'
162.
606'
N: 2192466.0E: 6761721.1
N: 2192466.0E: 6761831.4
N: 2192425.5E: 6761877.5 N: 2192425.5
E: 6762137.6
N: 2192349.9E: 6761721.1
N: 2192349.9E: 6762102.1
N: 2192262.9E: 6762102.1
N: 2192262.9E: 6762138.5
36.407'
Alpha West2
2
2
N: 2194884.0E: 6756731.6 N: 2194864.9
E: 6760843.9
N: 2193536.2E: 6760854.2
N: 2193531.1E: 6762131.0
N: 2190936.5E: 6762149.4
N: 2190923.0E: 6762136.0
N: 2190936.4E: 6756781.4
N: 2190949.4E: 6756768.4
N: 2193555.0E: 6756743.9
N: 2194878.6E: 6758191.6
N: 2194871.1E: 6759524.0
N: 2190929.5E: 6759558.0
N: 2192998.5E: 6762134.8
N: 2194858.6E: 6762213.9
N: 2194852.6E: 6763487.4
N: 2193525.4E: 6763496.6
N: 2190922.7E: 6762241.5
N: 2191528.2E: 6762237.3
N: 2192998.5E: 6762227.0
2070
2080
20902100
2050
2060
2070
2080
2080
2090
2100
2060
2070
2050
2060
2040
2040
0
GRAPHIC SCALE
(IN FEET)
400400 200
1"= 400' 025
Urban Development and Buildings
Checked
Sheets:
Pass
Sheet No:
DescriptionRev. DateDrawn
Plan No:
Plan No. int:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A
B
C
D
E
G
H
I
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ANSI D
A
B
C
D
E
G
H
I
JScale:
Situation:
Signature
Checked PassDrawn
Signature Signature
F F
J
THIS DRAWING IS THE PROPERTY OF
A partnership of Teyma USA andAbener Engineering and Construction Services, LLC
Abener Teyma Mojave General Partnership
Checked PassDrawn
Checked PassDrawn
MOJAVE SOLARPLANT
ABENER TEYMAMOJAVE
MOJAVE SOLAR LLC
6-30-11Dig AlertDial toll free
1-800-227-2600At least two days before you dig
6007-PLN-GFE-00-50-C002
Har
per
Lak
e R
oad
Lockhart Road
Key Notes:
Place new desert tortoise exclusion fence 2' from property line.See detail A on sheet 5.
Install new 24' wide pipe frame gate. See detail C on sheet 5.
Place new desert tortoise exclusion fence at designated location.
Available contractor lay-down area - maximum area = 40,063 sf
1
2
1
1
1 1
02 03
04
1
1
11
-Civil Works . General
Enlarged PlanDesert Tortoise Exclusion Fencing Plans
North
1 3
3 3 3
Fence Area 1
Fence Area 2
Notes:
1. The existing drainage comprises sheet flow ina northeasterly to easterly direction.
2. Tortoise fence construction shall involve anapproximate one foot deep excavation.
3. The excavated dirt shall be backfilled afterfence and fence posts installation prior to anyrainfall event.
4. Tortoise fence to be installed around allcontractor lay-down areas.
No
rth
Lo
ckh
art
Ro
ad
Major offsite flows enter the depressed dirt road(4,400 ft west of Harper Lake Rd) and are conveyedeast as shown by flow direction arrows. Tortoisefence is located along the north side of thisdepressed dirt road.
Overhead power lines (typ)
Alpha East
Overhead power lines
Overhead power lines
Legend:
Flow direction
Overhead power lines
4
4
See detailthis sheet
0 01/26/11 Issued for bid.
1 03/01/11 Respond to comments by CEC/BV.
22
Alpha East
N: 2193504.7E: 6768298.1 N: 2193406.7
E: 6768298.2
N: 2193405.2E: 6768628.2
N: 2192898.9E: 6768628.3
N: 2192898.9E: 6769071.9
N: 2192748.1E: 6769734.4
N: 2192175.3E: 6769453.4
N: 2190905.9E: 6769462.4
N: 2193510.5E: 6767463.2
N: 2190899.7E: 6767482.5
N: 2190911.4E: 6764838.8
N: 2190823.6E: 6772729.4
N: 2190815.6E: 6769990.9
N: 2190807.7E: 6767482.9
N: 2190819.2E: 6764873.7
2040
2050
2060
2050
2060
2030
2040
2030
2030
2040
2030
0
GRAPHIC SCALE
(IN FEET)
400400 200
1"= 400' 035
Urban Development and Buildings
Checked
Sheets:
Pass
Sheet No:
DescriptionRev. DateDrawn
Plan No:
Plan No. int:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A
B
C
D
E
G
H
I
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ANSI D
A
B
C
D
E
G
H
I
JScale:
Situation:
Signature
Checked PassDrawn
Signature Signature
F F
J
THIS DRAWING IS THE PROPERTY OF
A partnership of Teyma USA andAbener Engineering and Construction Services, LLC
Abener Teyma Mojave General Partnership
Checked PassDrawn
Checked PassDrawn
MOJAVE SOLARPLANT
ABENER TEYMAMOJAVE
MOJAVE SOLAR LLC
6-30-11Dig AlertDial toll free
1-800-227-2600At least two days before you dig
6007-PLN-GFE-00-50-C003
Lockhart Road
02 03
04
1
1
1
1
1
-Civil Works . General
Enlarged PlanDesert Tortoise Exclusion Fencing Plans
North
Key Notes:
Place new desert tortoise exclusion fence 2' from property line.See detail A on sheet 5.
Install new 24' wide pipe frame gate. See detail C on sheet 5.
Place new desert tortoise exclusion fence at designated location.
1
2
3
Fence Area 2
Fence Area 3
3
3
Notes:
1. The existing drainage comprises sheet flow ina northeasterly to easterly direction.
2. Tortoise fence construction shall involve anapproximate one foot deep excavation.
3. The excavated dirt shall be backfilled afterfence and fence posts installation prior to anyrainfall event.
4. Tortoise fence to be installed around allcontractor lay-down areas.
Legend:
Flow direction
Flow is conveyed east in depressed dirt road asshown by flow direction arrows. Tortoise fence islocated along both north and south sides of thisdepressed dirt road as shown on these plans.
Overhead power linesOverhead power lines
Overhead power lines
Overhead power lines
0 01/26/11 Issued for bid.
1 03/01/11 Respond to comments by CEC/BV.
Beta East
Beta West
N: 2188243.2E: 6767547.8
N: 2188248.3E: 6764907.2
N: 2185566.4E: 6767579.8
N: 2185567.9E: 6770185.6
N: 2185569.6E: 6772779.5
N: 2188218.2E: 6772754.3
2060
2070
2080
2070
2080
2090
2100
2110
2050
2060
2040
2050
2060
2070
2080
2090
2030
2040
2050
2060
2070
2080
2090
2100
0
GRAPHIC SCALE
(IN FEET)
400400 200
1"= 400' 045
Urban Development and Buildings
Checked
Sheets:
Pass
Sheet No:
DescriptionRev. DateDrawn
Plan No:
Plan No. int:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A
B
C
D
E
G
H
I
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ANSI D
A
B
C
D
E
G
H
I
JScale:
Situation:
Signature
Checked PassDrawn
Signature Signature
F F
J
THIS DRAWING IS THE PROPERTY OF
A partnership of Teyma USA andAbener Engineering and Construction Services, LLC
Abener Teyma Mojave General Partnership
Checked PassDrawn
Checked PassDrawn
MOJAVE SOLARPLANT
ABENER TEYMAMOJAVE
MOJAVE SOLAR LLC
6-30-11Dig AlertDial toll free
1-800-227-2600At least two days before you dig
6007-PLN-GFE-00-50-C004
Roy Street
02 03
04
1
1
1
1
-Civil Works . General
Enlarged PlanDesert Tortoise Exclusion Fencing Plans
North
Key Notes:
Place new desert tortoise exclusion fence 2' from property line.See detail A on sheet 5.
Install new 24' wide pipe frame gate. See detail C on sheet 5.
Place new desert tortoise exclusion fence at designated location.
1
2
3
Fence Area 3
Notes:
1. The existing drainage comprises sheet flow ina northeasterly to easterly direction.
2. Tortoise fence construction shall involve anapproximate one foot deep excavation.
3. The excavated dirt shall be backfilled afterfence and fence posts installation prior to anyrainfall event.
4. Tortoise fence to be installed around allcontractor lay-down areas.
Legend:
Flow direction
Overhead transmission lines
Overhead power lines
0 01/26/11 Issued for bid.
1 03/01/11 Respond to comments by CEC/BV.
NTS 55
Urban Development and Buildings
Checked
Sheets:
Pass
Sheet No:
DescriptionRev. DateDrawn
Plan No:
Plan No. int:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A
B
C
D
E
G
H
I
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ANSI D
A
B
C
D
E
G
H
I
JScale:
Situation:
Signature
Checked PassDrawn
Signature Signature
F F
J
THIS DRAWING IS THE PROPERTY OF
A partnership of Teyma USA andAbener Engineering and Construction Services, LLC
Abener Teyma Mojave General Partnership
Checked PassDrawn
Checked PassDrawn
MOJAVE SOLARPLANT
ABENER TEYMAMOJAVE
MOJAVE SOLAR LLC
6-30-11Dig AlertDial toll free
1-800-227-2600At least two days before you dig
6007-PLN-GFE-00-50-C005
General Notes:
1. Ensure that fence posts and material conform to the standardsapproved by the U.S. Fish and Wildlife Service.
2. Ensure that the height above ground level is no less than 24 inchesand no higher than 36 inces.
3. Attach fence material to all gates. Ensure that clearance at base ofgate achieves zero ground clearance.
Fence Installation:
4. Prior to ground disturbance, the entire project site shall be fencedwith desert tortoise exclusion fence.
5. To avoid impacts to desert tortoise during fence construction, theproposed fence alignment shall be flagged and the alignmentsurveyed within 24 hours prior to fence construction.
Timing and Supervision of Fence Installation:
6. The exclusion fencing shall be installed prior to site clearing andgrubbing.
7. The fence installation shall be supervised by the Designated Biologistand monitored by the Biological Monitors..
10 feet
Ground level
4-strand wirefence
Galvanized fence material16 ga. or heavier
24"-
36"
30"
Detail BNTS
Detail A - New FenceNTS
A
A
Section ANTS
1"
2"Galvanizedfence material
Strand wire Hog rings12" intervals
Hog rings,See detail B
Galvanized fence material16 ga. or heavier
30"
24"
- 36
"
Detail C - Pipe Frame GateNTS
2'-6
"4'
-6"
Flus
h
Galvanized fence material16 ga. or heavier attached
to gate with hog rings.See detail B
-Civil Works . General
Fence DetailsDesert Tortoise Exclusion Fencing Plans
4'-0
"
12"
Option 1
12"
Steel post support
Ground level
Typ.
Compacted apron
5 feet
Galvanized fence material16 ga. or heavier
24"-
36"
30"
Attach fence with hog rings
B
B
#4 Rebar w/safety cap
12"
Option 3Rebar support
Typ.Ground level
Ground level
10 feetSteel T post
Ground level
Galvanized fence material16 ga. or heavier
24"-
36"
30"
Steel T post
B
B
Option 2
12"
Steel post support
Ground level
Typ.
Attach fence with hog rings
Steel T post
Steel T post
Attach fence withhog rings, See Detail B
Sim.
Section BNTS
Hog rings
Galvanized fence material16 ga. or heavier
30"
24"
- 36
"12
"
Notes:
1. 2 - 12' galvanized tube gates to be 72" tall, constructed with 2", 16 guage galvanized pipe with 7 horizontal rails.
2. Hinges and hardware to be compatible with gate (per gate manufacturer) and to be installed per manufacturer's specifications and recommendations.
3. All concrete for gate and fence footings shall be class a (3,000psi) or greater.
4. Standard fencing shall consist of galvanized woven wire (farm fence) and metal posts with Tortoise fencing attached.
5. Manufacture steel line posts (T-Sec) to tolerances and workmanship as provided in AASHTO M281.
Post
Brace rail
Brace clamp
Detail ENTS
Detail DNTS
38" galv. rod
716" Ø hole
716" Ø hole
38" X 1" galv.
iron strap
Hex nut
Washer
12'-0" 12'-0"
24'-0" Gate Opening
Overlap 24" oppositedirection of sweep
Overlap 24" oppositedirection of sweep
5'-0
"2'-6
"4'
-6"
24"Ø (min.) concrete footing
12"Ø (min.)concrete footing
Turnbuckle, see Detail D
38"Ø galv. rod
Turnbuckle
5'-0" Woven Wire
158"Ø galv. pipe
Padlock and chain
5'-0" Woven Wire
5'-0
"
24"Ø (min.) concrete footing
Gate post6"Ø (18.97 lbs/LF)Gate post
6"Ø (18.97 lbs/LF)
Galvanized tubecattle gate
2"Ø galv. pipe
Brake clamp,See Detail E
3" (typ.)
0 01/26/11 Issued for bid.
1 03/01/11 Respond to comments by CEC/BV.