ABFII PERBANASV19
Asian Banking Finance and Informatics Institute Perbanas
Strategic Change Management Plan
1
Underlying Principles
No. Basic Principles Related Meaning Prac5cal Implica5ons
1 Purposeful Driven by: 1. Organiza8onal vision, mission and core
values;2. To sa8sfy and fulfill the needs and wants
of our internal and external customers; 3. The fundamental goals: the beFerment
of ABFII, the people and key stakeholders;
1. Always display and describe V19 before developing and communica8ng the strategic management system;
2. Always take into account the needs and wants of the key stakeholders in designing the SMS;
2 Systemic include all key success factors for the effec8ve implementa8on and achievement of the plan;
Thoroughly incorporate:1. Leadership development;2. Cultural development;3. Stakeholders interests;4. Performance Management System;5. Enablers, performance drivers and
performance outcomes; 3 Dynamic Embrace and open to: 1. Alterna8ve perspec8ves;2. Renewal and emerging ideas from every
management level
1. Must be par8cipa8ve in seWng up the goals and related SMS;
2. Budget can be open to dynamic seWng of the environment – beyond budge8ng principles.
No. Basic Principles Related Meaning Prac5cal Implica5ons
4 Balanced Considering:1. External and internal factors;2. Individual and organiza8onal goals;3. Strategic and opera8onal context;4. Structure and crea8vity (ambidextrous);
Must incorporate and embrace:1. External and internal stakeholders;2. Balance between Individual and
organiza8onal goals – rewards and recogni8on;
3. Execu8on of strategy in the most cost‐effec8ve way;
4. Crea8vity and analy8cal processWithin strategic management system process;
5 Aligned Include:1. Ver8cal alignment (from top to the
boFom layers);2. Horizontal (accross organiza8onal units
to serve the ul8mate customers of the organiza8on – consider the value chain based business process)
1. Cascading the strategy into opera8onal and communica8ve terms;
2. Cascading the higher level strategy into systemic working units and inividual performance management system;
3. Syncronize and amalgamate all strategic ini8a8ve accross diverse working units – by defining the overall business model and business process
6 Aspira8onal Embrace people aspira8on and emerging ideas.
Combine individual goals and organiza8onal goals into a single total performance management system
Underlying Principles
Change Management PlanStrategic Architecture
No. Major Elements
1 Overall Change Management Plan
2 Strategic Management System (SMS)
3 Strategic Capability Development
4 Communication Plan
1. Change Management Plan
2. Strategic Management
System (SMS)
3. StrategicCapability
Development
Change Management PlanStrategic Architecture
ABFII PERBANAS V19&
STRATEGIC INITIATIVES
4. Communication Plan
Basic Principles:
Underlying Framework of Change Management Plan – Overall Change Management Plan
No Major Elements
Description Management Level
Activities Materials Time table PIC
I. Overall Change Manage-ment Plan
The overall design and development of related change management plan and strategy which serve as guideline for the overall transformation of ABFII to achieve V19.
Higher Midle Level
Design 1. PMO guide book; 2. Budget;
Monday, 13 July 2009
PMO
Discussion Rectorate and PMO Tuesday, 14 July 2009
PMO & Rector
Rectorate, PMO and BPH Thursday, 16 July 2009
Approval Expected Outcomes:1. Proposed Change Plan
(to yayasan);2. Approved Budget;
Thursday, 23 July 2009
PMO & Rector
Implementation, evaluation and control
Stage 1: Partial Implementation Plan
Monday 13 July 2009 – 31 September 2009
PMO & Rectorate
Stage 2: Initial Stage Implementation
October 1 – 31 December 2009
PMO & Rectorate
Stage 3: Full implementation (January 2010)
1 january 2010 – 31 December 2019
PMO & all key stakeholders
Stage 1 Change Management Plan:Partial Implementation (July – September 2009)
No. Objectives Expected Outcomes
Programs Budget Time Table PIC
1 To obtain initial strategic momentum for change management process through creating: (i) strategic awareness; (ii) sense of urgency and;(iii) capability required to
execute the strategic initiatives.
Completion of Book 3 (Initiative flow chart)
Complete the flow chart of project definition and dimension
Appendix A August 15 2009 Rectorate and PMO
Change Management Guide Book
Design and develop change management Guide Book
Appendix B Monday 13 July 2009 Rectorate and PMO
SMS related Design and develop SMS guide book
Appendix C Monday 20 July 2009 Rectorate and PMO
Implement and enhance SMS for July – Dec 2009 period
See SMS slide Rectorate, PMO and working units.
Strategic Capability Development
Design and Develop Strategic Capability Development Materials
Appendix D See Strategic Capability Development Slide
Rectorate and PMO
Execute Learning and Development Activities
See Strategic Capability Development Slide
Rectorate and PMO
Communication Plan Design and development Appendix E See communication plan Slide
Rectorate and PMO
Partial Execution of the plan
See Rectorate, PMO and working unitsControl and
Feedback Constant monitoring and evaluation about the progress
Appendix F Weekly discussion and sharing
Rectorate level and PMO level
Stage 2 Change Management Plan:Initial Implementation (October – December 2009)
No. Objectives Expected Outcomes
Programs Budget Time Table PIC
2 To maintain and improve the momentum in order to levers the achivement of the change management efforts and the achievements of ABFII Perbanas V19 and strategic initiatives.
Celebrational Spirit of Change
Kick Off Meeting Appendix G October 2009 Rectorate and PMO
Improved SMS execution and capability
Evaluation of SMS July – December 2009 implementation
None 1 – 2 October 2009 Rectorate and PMO
Workshop for 2010 Programs & Budget Preparation
Appendix H Oct 5 – Oct 26 2009 Rectorate and PMO
2010 Program Consolidation, Refinement and Discussion
None Oct 26 – Oct 30 2009 Rectorate and PMO
Budget Approval and Program Initiation
None Oct 30 – 11 November 2009
Rectorate and PMO
Enhanced Strategic Capability to achieve V19
Higher Level Appendix I October – December 2009(see presentation slide)
Rectorate and PMO
GM and M Level
Operartional Staff
More effective Communication proccess
Higher Level Appendix J October – December 2009
Rectorate and PMOGM and M Level
Operational Staff
Other Key Stakeholders
Evaluation and Control
Periodic Evaluation and Constant Monitoring
None Weekly and Monthly Discussion
Rectorate and PMO
Stage 3 Change Management Plan:Full Implementation (Jan 2010 – Dec 2019)
No. Objectives Expected Outcomes
Programs Budget Time Table PIC
3 To create full momentum of the ABFII Perbanas V19 and strategic initiatives execution and effectiveness.
Effective execution of SMS and Further Development;
SMS Dashboard Development (integrated)
TBA January – December 2010
PMO & Rectorate
Integrated Value Chain and SMS development
TBA January – July 2010 PMO and Rectorate
Periodic Workhops TBA January – December 2010
PMO and Rectorate
Constant Monitoring and Evaluation
TBA Monthly – semesterly - yearly
PMO and Rectorate
Yearly SMS based Development for 2011 (base on V19)
TBA September – December 2010
PMO and Rectorate
Periodic Development of Strategic Capability Development
Rectorate TBA Bi-weekly; Monthly and Annually (base on training needs assesment and V19 achievements)
PMO and Rectorate
GM and M
Operational Staff
Improved Communication Effectiveness
Higher Level Program s TBA Weekly, Bi-weekly, Monthly, Semesterly and annually;
PMO and Rectorate
GM and M Level Program
GM and M Level Programs
Other Key Stakeholders
Evaluation and Control
Constant and periodic monitoring and evaluation program
TBA Constant monitoring PMO and Rectorate
Detailed TBA
(to be advised)
Underlying Framework of Change Management Plan – Strategic Management System
No Major Elements
Description Objectives Management Level
Activities Detailed Programs Time Table PIC
II. Strategic Manage-ment System
The process of setting up strategic goals with related performance indicators, performance target, relevant programs, budget, report and feedback mechanism
To develop a solid and comprehensive SMS architecture and effectiveness in every level owithin the organization
1. Top Level (Rector and Warek)
Workshops SMS Workshop 1 Tuesday, 14 July 2009: 9 – 11 AM
PMO
SMS Workshop 2 Tuesday, 21 July 2009: 9 – 11 AM
Discussions (learning and sharing forum)
SMS enhancement consultations
Every Tuesday and Thursday 9.30– 11.30 AM
PMO
Refinement and Consolidation of working units SMS to higher level SMS
Consolidate, refining and coaching activitivities
Monday 13 July up to Friday 31 July 2009;
PMO
2. Midle Level (GM and M)
Workshops GM SMS workshop 1 Wednesday 15 July 2009: 10 – 11.30 AM
PMO
GM SMS workshop 2 Wednesday 22 July 2009: 10 – 11.30 AM
PMO
Discussions (learning and sharing forum)
SMS enhancement consultations
Every Tuesday and Thursday 9.30– 11.30 AM
PMO and Warek
3. Operational (Staff)
Training and discussion (learning and sharing forum)
Building Personal TPS (total performance scorecard which is aligned to SMS)
Per warek working units schedule TBA
Warek & PMO
Underlying Framework of Change Management Plan – Strategic Capability Development
No. Major Elements Description Objectives Management level
Activities Materials Time Table PIC
II Strategic Capability Development
The development of key and fundamental capabilities for the effective implementation of change management plan and achievements of ABFII V19, vision and missions
To develop the fundamental strategic capability for every level of management (higher to operational level) which is needed to achieve ABFII Perbanas V19 and strategic initiatives in effective way.
Higher Level discussion., Learning and sharing
New competitive setting; Leadership and people management ;
Bi – weekly Every Monday odd week: 8 – 9 AM begin (August 3 and August 10) – tentatively
PMO and Rector
Discussion, Learning and sharing
Strategic Thinking, Stakeholders Management and SMS
Refreshment 1(Thursday 13 August 2009) – 10 – 12 AM Refreshment 2 (Thursday 27 August 2009) – 10 – 12 AM
PMO & Rector
Discussion, Learning and sharing
Budgeting and Beyond budgeting and SMS
Thursday 20 August 2009 10 – 12 AM
Discussion, learning and sharing
Performance Management System
Thursday September 3 2009 10 – 12 AM
Underlying Framework of Change Management Plan – Strategic Capability Development (cont.)
No. Major Elements Description Objectives Management level
Activities Materials Time Table PIC
II Strategic Capability Development
The development of key and fundamental capabilities for the effective implementation of change management plan and achievements of ABFII V19, vision and missions
To develop the fundamental strategic capability for every level of management (higher to operational level) which is needed to achieve ABFII Perbanas V19 and strategic initiatives in effective way.
Middle Level Training New competitive setting; Leadership and goal setting
Wednesday August 5 2009 10 – 11.30 AM
PMO & Warek
Training Building Stakeholder based SMS and Budgeting System
Refreshment 1Wednesday August 12 2009 10 – 11.30 AMRefreshment 2Wednesday August 26 200910 – 11.30 AM
Training Setting Up Performance Management System
Wednesday August 19 2009: 10 – 11.30 AMOperational
LevelTraining Total Performance
Management Tuesday, August 11 2009: 10 – 11.30 AM
PMO, GM
Training Goals setting Tuesday August 18 2009: 10 – 11.30 AM
PMO, GM & M
Underlying Framework of Change Management Plan – Communication Plan
No. Major Elements
Description Objectives Management level
Activities Materials Time table PIC
IV. Communi-cation Plan
To disseminate, socialize, internalize and embrace constructive conversation about ABFII Perbanas V19 and strategic intents
Create an in-depth understanding of ABFII Perbanas V19 and Strategic Initiatives.
Higher Level (Rektor and Warek)
Meeting, Learning and Sharing
1. V19, Mission and Core values;
2. V19 project definition and dimension;
3. V19 Detail Plan & Flow Chart
Bi-weekly meeting and discussion (week 1 and 3 every month)
PMO and Rectorate
Create an in-depth understanding of ABFII Perbanas V19 and strategic initiatives for GM (general managers) and managers (M).
Middle Level (GM and M)
Periodic meeting with Warek & PMO
1. V19, Mission and Core values;
2. V19 project definition and dimension;
3. V19 Detail Plan & Flow Chart
Bi-weekly meeting (week 2 and 4 every month)
PMO and Warek
Learning and discussion inter-working units
Monthly meeting and discussion
PMO and Warek
Learning and discussion intra working units
To be determined by working units
PMO and Warek
Underlying Framework of Change Management Plan – Communication Plan (cont.)
No. Major Elements
Description Objectives Management level
Activities Materials Time table PIC
IV. Communi-cation Plan(cont.)
To disseminate, socialize, internalize and embrace constructive conversation about ABFII Perbanas V19 and strategic intents
Create an in-depth understanding of ABFII Perbanas V19 and Strategic Initiatives for operational staff
Lower Level (Staff)
Town Hall Meeting As above Monthly basis (schedule TBA)
PMO, GM & Manager
Within their own working unit
As above TBA by head of working units
PMO, GM & Manager
Create brand association of ABFII Perbanas in accordance with ABFII Perbanas V19 and Strategic
External Mass Media As above Coordinated with brand and presence div.
PMO & related divisionStudents As above Coordinated with
Warek IIIPMO and related division Public Events As above Based on each
individual PMO and related
ABFII Perbanas Strategic Management System (SMS)
What is SMS? Why we need SMS? What to do? How about the proccess? How to make sure its effectiveness?
What is SMS?
Is a system which safe guard the previously established strategy (like ABFII Perbanas V19 and Related Strategy Initiatives);
A system which drives the deployment and alignment of resources and efforts to achieve the strategic objectives;
Why We Need SMS?
No. Expected Benefit Remarks
1 Balanced 1. Between financial and non-financial perspectives; 2. between internal and external factors; 3. between short-term and long-term goals; 4. between enablers, performance drivers and performance outcomes; 5. between lead and lag indicators;
2 Closing the Gap Bridge the gap between higher level strategy and implementation or execution
3 Encourage Execution Help the organization to allocate resources and to focus on implementation based on expected performance;
4 Alignment 1. Vertically between overall organization goals, working units and individual goals;
2. Vertically between enablers , performance drivers and performance outcomes;
3. Horizontally between working units within the entire value chain; 5 Focus Help the organization to focus on strategy and strategy achievements
6 Transformational Change Purposes
Help the organization to change transformationally and purposely
What to do?
No. Major Elements Remarks
1 Understand the mission, vision, core values and overall strategic initiatives of our organization;
Your SMS must be aligned with your organization mission, vision, core values and strategy;
2 Understand who our stakeholders are; We must understand:1. Who are our stakeholders (we must identify it – from
the value chain perspective);2. What are the needs and wants of our stakeholders –
to set relevant strategy to satisfy them;3 Make sure that you have strategic goals
(strategy); That we have strategic goals that have to be achieved (based on the mission, vision, core values and our identified stakeholders)
4 Make sure that we completely understand the process of developing SMS;
The entire proccess of SMS;
5 Make sure that we have appropriate communication plan;
To ensure effective execution of the strategy we need to develop appropriate communication with the people who are affected and who implement the program;
6 Make sure that we have proper control, evaluation and feedback system in place
To evaluate the progress in order to improve the overall implementation of SMS
How about the process?(a Step by Step Approach)
No. Major Steps Remarks
1 Understand the ABFII V19 and Strategy Initiatives Thoroughly;
See ABFII Perbanas V19 and Strategic Initiatives;
2 Understand the ALIGNMENT between ABFII Perbanas V19 and STRATEGIC THEMES of Each WAREK;
See the relationship between ABFII Perbanas V19 and Each Warek Strategic Themes;
3 Identify and Understand Our STAKEHOLDERS
1. Analyze the needs and wants of the stakeholders;2. Consider the value chain;3. Develop appropriate strategy;
4 Define and Develop the STRATEGIC GOALS (into four perspective)
To meet the needs and wants of your stakeholders and to achieve each warek strategic themes what we need to achieve within four (4) strategic perspectives?FINANCIAL What do we want to achieve to be success
financially?
CUSTOMERS (STAKEHOLDERS)
What do we want to achieve in order to satisfy our stakeholders?
INTERNAL PROCESS What kind of internal process that we want to achieve to serve our customers/stakeholders?
LEARNING AND GROWTH What kind of people, strategic asset, leadership and organizational development that we want to
How about the process?(a Step by Step Approach) - Continued
No. Major Steps Remarks
5 Identify what PERFORMANCE MEASSURES which is appropriate to determine our performance in achieving the goals
Determine what are the meassures which can be used to evaluate the progress and performance of achieving the strategic goals within each perspectives.
6 Set the PERFORMANCE TARGETS for each strategic goals based performance measures that have been chosen
Set the target that we want to achieve within each performance meassures;
7 Develop RELEVANT PROGRAMS to achieve the performance targets
Develop appropriate and more detailed program to achieve the previously determined performance targets;
8 Prepare the BUDGET; Prepare the budget which is required to run the program effectively;
9 Determine CONTROL SYSTEM, EVALUATION and FEEDBACK SYSTEM to ensure the effective implementation of SMS;
Reporting, evaluating and learning mechanism to improve the effective implementation of SMS in sustainable ways;
10 CASCADE DOWN this process FROM TOP to MID and INDIVIDUAL in a SYSTEMIC and CONTINOUS way
To make sure proper vertical alignment from Top (Rector & Warek) to Mid (GM & M) to Individual;
Cascading SMS from Rectorate toGM to Individual – Planning Process
No Major Steps Remarks
No Major Steps Remarks
No Major Steps Remarks
Rector and Warek
GM & MWorking units
Individuals
Communicate & Share
Communicate & Share
Propose & Discuss
Propose & Discuss
1
1
2
2
SMS Rectorate – IndividualImplementation and Feedback System
No Major Steps Remarks
No Major Steps Remarks
No Major Steps Remarks
Rector and Warek
GM & MWorking units
Individuals
Monitor, Empower , Coach and Evaluate
Feedback And Learning
Monitor, Empower , Coach and Evaluate
Feedback And Learning
1
1
2
2
SMS Forms & Example Jajaran: 1 (satu) Akademik
Core Initiative: Innovative Program of Studies and Curriculum
Strategic Theme: Mengembangkan program studi dan kurikulum yang bersifat inovatif
Working Units: International Class Program (ICP)
No. Strategic Goals Performance Meassures
Performance Target
Programs Budget Reff Control and Feedback System
1 To achieve sustainable financial performance
% Growth in Investment Fee
Launch a progressive marketing campaign and marketing communication strategy
Attachment I 1. Weekly and Monthly Enrollment Report;
2. Analysis and discussion;
% Growth in Tuition FeeNumber of Student Enrolled & Paid
2 To satisfy the key customers and stakeholders
Public Recognition ≥ 3 Market Survey Attachment II 1. Survey Result Analysis;
2. Discussion with other units and rectorate;
Users Satisfaction N/A N/A
Students Satisfaction
≥ 3 Develop student satisfaction survey
Attachment III
Course Facilitators Satisfaction
≥ 3 Develop course facilitators satisfaction survey
Attachment IV
SMS Forms & Example - Continued Jajaran: 1 (satu) AkademikCore Initiative: Innovative Program of Studies and Curriculum
Strategic Theme: Mengembangkan program studi dan kurikulum yang bersifat inovatif
No. Strategic Goals Performance Meassures
Performance Target Programs Budget Reff Control and Feedback System
3 To develop effective and lean management process which is needed to satisfy and meet the needs and wants of our key stakeholders
Administrative Proccess Performance
1. 90 % on schedule of Course Facilitators attendance;
2. 90 % Students Attendance;
3. 90% Course Syllabi Available;
4. Student Learning Guide;
5. Student Administrative Guide.
1. To design and develop ICP Integrated Management System;
2. Design and develop student learning guide;
3. Design and develop student administrative guide;
Attachment V 1. Integrated SMS Report;
2. Learning, feedback and sharing mechanism
Achievements of Learning objectives
Average Course Facilitators Performance index ≥ 3
Survey course facilitators performance;
Attachment VINumber of Creative Learning Delivery Improvement
1. CEO Talks or visiting guest lecturer once a month;
2. CV every two month;
3. Structured Contextual Assignment;
4. Number Improvement in program substance
1. Develop and implement monthly CEO talks;
2. Develop and implement monthly guest lecturer;
3. Monitor and evaluate course contextual assignment;
4. Executed collaboration activities;
5. Periodic course facilitators meeting
Attachment VII
SMS Forms & Example - Continued Jajaran: 1 (satu) Akademik
Core Initiative: Innovative Program of Studies and Curriculum
Strategic Theme: Mengembangkan program studi dan kurikulum yang bersifat inovatifNo. Strategic Goals Performance
Meassures Performance Target Programs Budget Reff Control and
Feedback System
4 To develop strategic enabler which is required to achieve internal process objectives of ICP
People 1. At least once month staff learning activities;
2. Recruitment and
1. Develop bi-weekly disucssion and learning program:
2. Welfare of Task Force;3. Regeneration and
recruitment;
None 1. SMS report;
2. Disucssion, learning and sharing
Strategic Assets 1. 2 additional PC;2. 2 LCD
projectors;3. 2 (two)
renovated
Develop Tender and Procurement Proposal
Attachment IX (through sponsorship)IT Related 1. Web site;
2. WiFI facilities;3. Integrated DBMS
Develop integrated ICT architecture and application
Attachment X
Leadership and Climate for Action
Solid organization structure
Develop strategy map based org. structure
None
Continuous Professional Education & Certification
Executive/ Professional Development Programs & certification Including SyariahCustomize in house training & certification program
Active participation in
Community Services &
Industrial Linkage
Creation of Business
Development Organization &
Taskforce
ContinueDevelopmentInternationalEducationalCapability
Value added Research Activities
Banking & Finance Based Curriculum & Program Study
Development of focus organization unit Development of marketing communi- cation &Sales task force.Brand Image Improvement
Asian Most reputable Education Institute
VISION 2019
Physical Infrastructure & Technology System Development# Future Oriented & Integrated Campus. # On demand technology architecture
Goals
Asian top 5 Bankers Center of Excellence 80% alumni employed within 6 months after graduation
Creative Fund Raising Development# Donation Based Funding Scheme # Multi Option on Financing Scheme
Redesigning curriculum and study programs including syariah.Various Degree programsDevelop I nnovative course deliverye-Library & Learning
Initial stage into internationali- zat ion
Inter-University Collaboration.
International exchange program.
Innovative community assistant Services
Banking/Finance field orientation for teachers & students
Value & Goals Based Human Capital Development#Mission Based Organization Structure # Performance & Career Management System
Applied Banking / Finance Researches & Case Studies
Based line Researches
1. Mempersiapkan agenda kerja strategis:a. Sasaran Kerja 2009 dan 2010 (sesuai visi ABFII Perbanas 2019);b. Ukuran dan target kinerja 2009 dan 2010;c. Program kerja 2009 dan 2010;d. Anggaran yang dibutuhkan.
2. Mengkomunikasikan agenda kerja kepada stakeholders dan unit-unit kerja yang ada di bawah koordinasinya;
3. Menajamkan dan mengimplementasikan agenda kerja;4. Evaluasi dan umpan baik (dari yayasan, pimpinan dan stakeholders)
Struktur dan Agenda Kerja Pimpinan
Warek 1
REKTOR
Warek 2 Warek 3 Warek 4 Warek 5 Warek 6
Mengembangkan program studi dan
kurikulum yang bersifat inovatif
Mengembangkan modal manusia secara sistemik
Mengembangkan potensi kreatif
mahasiswa dan keterkaitan
dengan industri
Mengembangkan program
konsultasi dan pendidikan profesi dan
Mengembangkan sistem anggaran,
pengelolaan keuangan dan
manajemen aset
Mengembangkan program Magister
dan Doktoral
AGENDA KERJA
27
Codification System
Codification Number
Core and Supporting Initiatives
1 Innovative Banking & Finance Based on Program and Curriculum (Lead schedule document – alignment between 1.1, 1.2, 1.3 and 1.4)1.1 Curriculum & study program redesign – supporting
schedule document1.2 Various Degree Program – supporting schedule document
1.3 Innovative Course Delivery Development - supporting schedule document
1.4 E-library and e-learning – supporting schedule document
Initiative 1: Innovative Banking & FinanceBased Curriculum (alignment between initiatives)Strategy Map
1. Innovative and Broad Core Banking& Finance Based Program of Studies
1.2 Various Degree Program
1.1 Dynamic Curriculum Development And Design
1.3 Innovative Course Delivery Development
1.3 E-Learning and E-Library
Principles Strategic Analysis
Basic Framework
Strategic Map & Alignment
Development Framework
Graduate Qualities
Competency Level
Courses
Learning Approach
Assignment
Feedback System
E-Learning & LibraryArchitecture
E-Learning & Library Application
E-Learning & Library Infratructure
Strategic Objectives &
Strategic Objectives, Map and Structure
Design and DevelopmentFramework
Program Management & Control
Innovative and CreativeLearning Approach &
Environment
Alignment System
VISION : "THE ASIAN MOST REPUTABLE BANKING EDUCATION INSTITUTE"
GOALS : TOP 5 ASIAN BANKERS LEARNING CENTER OF EXCELLENCE
80% OF ALUMNY TO BE EMPLOYED NOT MORE THAN 6 MONTHS AFTER THEIR GRADUATION
KSF 1: INNOVATIVE BANKING & FINANCE BASED PROGRAM
CURRICULUM & STUDY PROGRAM REDESIGN
OBJECTIVES OUTPUT
To develop innovative banking and finance based curriculum which support the achievement of ABFII mission and vision to be the Asian Most Reputable Banking Education Institute through the development of systemic academic model for the entire program and curriculum.
A dynamic competency based, systemic and aligned program of studies and the related curriculum which consist of:Book 1 Program of Studies Strategic and Road Map:
Strategic priorities and basis for program of study development
Book 2Program Detail: (a) Program Study Rationale (Analysis); (b) Taxonomi and or Approach of Curriculum
Development;(c) Expected Graduate qualities;(d) Expected Competency Level;(e) Expected Behavior (Facilitators and
Students);(f) Courses;(g) Learning Approach;(h) Assignment and Feedback System;(i) Grading Policy;(j) Contact address; Book 3Operational Plan(i) Flow chart, PM and WBS;(ii) Governance System;(iii) Budgeting System
ABFI INSTITUTE V19INITIATIVE DEFINITION & DIMENSION INFORMATION (IDDI)
1
2
3
Varied Degree Program
Innovative Core Banking & Finance Based Curriculum
Design & Redesign
Strategic Analysis
1. Development Framework
2. Graduate Qualities
3. Competency Level
4. Courses
5. Learning Approach
6. Assignment
7. Feedback System
Unique Value Proposition
4
5
1.3 Innovative Course Delivery Development
1.1
INIT
IATI
VE
VISION : "THE ASIAN MOST REPUTABLE BANKING EDUCATION INSTITUTE"
GOALS : TOP 5 ASIAN BANKERS LEARNING CENTER OF EXCELLENCE
80% OF ALUMNY TO BE EMPLOYED NOT MORE THAN 6 MONTHS AFTER THEIR GRADUATION
KSF 1: INNOVATIVE BANKING & FINANCE BASED PROGRAM
CURRICULUM & STUDY PROGRAM REDESIGN
ACTIVITIES TIME FRAME
•.Industry Analysis • Competency Analysis • Curriculum Design and Development• Rough drafting• Communication and Information (socialization) – senate , stakeholders and marketing• Course Facilitator Development • Implementation
M1 = up to 2012 M2 = 2013 - 2015 M3 = 2016 – 2019
LEGENDKSF = Key Success FactorWBS = Work Break Down StructurePM = Project Management
ABFI INSTITUTE V19INITIATIVE DEFINITION & DIMENSION INFORMATION (IDDI)
1
2
3
Varied Degree Program
Innovative Core Banking & Finance Based Curriculum
Design & Redesign
Strategic Analysis
1. Development Framework
2. Expected Graduate
3. Competency Level
4. Courses
5. Learning Approach
6. Assignment
7. Feedback System
Unique Value Proposition
4
5
1.3 Innovative Course Delivery Development
1.1
INIT
IATI
VE (C
ont.)
Con
cent
ratio
n c
ours
es
Con
cent
ratio
n c
ours
es
Con
cent
ratio
n c
ours
es
Con
cent
ratio
n c
ours
es
VISION : "THE ASIAN MOST REPUTABLE BANKING EDUCATION INSTITUTE"
GOALS : TOP 5 ASIAN BANKERS LEARNING CENTER OF EXCELLENCE
80% OF ALUMNY TO BE EMPLOYED NOT MORE THAN 6 MONTHS AFTER THEIR GRADUATION
KSF 1 : INNOVATIVE BANKING & FINANCE BASED CURRICULUM
VARIOUS DEGREE PROGRAMS
OBJECTIVES OUTPUTDevelop various degree program which can meet the overall mission of ABFII Perbanas to become the most reputable banking education institute and the attainment of its strategic initiatives through considering stakeholders and market dynamic needs and wants, financial sustainablity of the institution and social transformational objectives.
Book 1(i) Road Map for Various Degree Program;(ii) Program of study Architecture
Development ;(iii) Technical Framework for Program of
Study Development (iv) Feedback system for the Program ‘s
Continuous Improvement Book 2Degree Program Development Guideline - Alignment Framework and Academic Model for the Study Program;Book 3(i) Flow chart, PM and WBS;(ii) Governance System;(iii) Budgeting System
ACTIVITIES TIME FRAME
•.Analysis • Development of Various Degree Program Strategy Architecture and Fundamental Framework;• The development of Degree Program Guideline;• Senate Approval;• Implementation Plan;• Feedback and Control
M1 = up to 2012 M2 = 2013 - 2015 M3 = 2016 – 2019
LEGEND
KSF = Key Success FactorPM = Project ManagementWBS = Work Breakdown Structure;
ABFI INSTITUTE V19INITIATIVE DEFINITION & DIMENSION INFORMATION (IDDI)
1
5
Basic Principles
Systemic Thinking
Architecture
Fundamental
Strategy Road Map
Structure & Model
2
3
1.1 Curriculum Development and design
1.2
INIT
IATI
VE
Various Degree
Mission, Vision, Values and StrategyInterconnectedness
and Alignment between
Study Programs Resource Sharing
Mechanism Market Dynamic
Compatibility Financial
Sustainability Non-financial Consideration
Core Inisiative 1 Innovative Banking & Finance Based
VISION : "THE ASIAN MOST REPUTABLE BANKING EDUCATION INSTITUTE"
GOALS : TOP 5 ASIAN BANKERS LEARNING CENTER OF EXCELLENCE
80% OF ALUMNY TO BE EMPLOYED NOT MORE THAN 6 MONTHS AFTER THEIR GRADUATION
KSF 1: INNOVATIVE BANKING & FINANCE BASED CURRICULUM
INNOVATIVE COURSE DELIVERY DEVELOPMENT
OBJECTIVES OUTPUT
To Develop innovative, challenging, experiential, flexible and creative learning environment and approach to the student by capitalizing ABFII Perbanas strategic and market based assets to substantiate the organization’s academic process model and to support the overall program objectives as the sustainable competitive advantage basis.
I. Book 1 – Blue Print for Innovative Course Delivery Development Strategy:
(a) Fundamental Values;(b) Strategic Objectives and Strategic
Map;(c) Organizational Structure;(d) KPI, Role and a broad Job-
Description
II. Book 2 – Innovative Course Delivery Framework:
(a) Course Facilitators Guide;(b) Student Guide;(c) Course Complete Information -
Guide for Design and Development;(d) Socialization and Training;(e) Communication and Feedback
System with Related Program of Studies;
(f) Lecturer and Student Assistance Framework for Learning Capabilities Development
III. Book 3 – Operational Plan (i) Flow chart, PM and WBS;(ii) Governance System;(iii) Budgeting System
ABFI INSTITUTE V19INITIATIVE DEFINITION & DIMENSION INFORMATION (IDDI)
1
2
3
1.4 Learning Infrastructure (e-learning and e-library)
Role, Job-Description and KPI
Lecturer & Student’sAssistance
Strategic Analysis
1.1 Curriculum & Program Study Redesign
1.3
INIT
IATI
VE
CCI GuideStudents’ Learning GuideCourse Facilitators Guide
Learning Value Proposition
Structure
Strategic Map
Fundamental Objectives
Underlying Architecture
Communication, socialization & Information
VISION : "THE ASIAN MOST REPUTABLE BANKING EDUCATION INSTITUTE"
GOALS : TOP 5 ASIAN BANKERS LEARNING CENTER OF EXCELLENCE
80% OF ALUMNY TO BE EMPLOYED NOT MORE THAN 6 MONTHS AFTER THEIR GRADUATION
KSF 1: INNOVATIVE BANKING & FINANCE BASED CURRICULUM
INNOVATIVE COURSE DELIVERY DEVELOPMENT
ACTIVITIES TIME FRAME
•Strategic Analysis•Design and Development of innovative Course Delivery architecture and Framework;•Design and development of I innovative Course Delivery Supporting Capabilities and Materials
M1 = up to 2012 M2 = 2013 - 2015 M3 = 2016 – 2019
LEGEND
KSF = Key Success Factor
PM = Project Management
WBS = Work Breakdown Structure
ABFI INSTITUTE V19INITIATIVE DEFINITION & DIMENSION INFORMATION (IDDI)
1
2
3
1.4 Learning Infrastructure (e-learning and e-library)
Role, Job-Description and KPI
Lecturer & Student’sAssistance
Strategic Analysis
1.1 Curriculum & Program Study Redesign
1.3
INIT
IATI
VE
CCI GuideStudents’ Learning GuideCourse Facilitators Guide
Learning Value Proposition
Structure
Strategic Map
Fundamental Objectives
Underlying Architecture
Communication, socialization & Information
VISION : "THE ASIAN MOST REPUTABLE BANKING EDUCATION INSTITUTE"
GOALS : TOP 5 ASIAN BANKERS LEARNING CENTER OF EXCELLENCE
80% OF ALUMNY TO BE EMPLOYED NOT MORE THAN 6 MONTHS AFTER THEIR GRADUATION
KSF 1: INNOVATIVE BANKING & FINANCE BASED CURRICULUM
E-LIBRARY AND E-LEARNING DEVELOPMENT
OBJECTIVES OUTPUT
To create dynamic e-learning and e-library architecture in order to support the development of innovative course delivery , curriculum as well as core banking and finance based program of studies through considering the dynamic landscape of organizational environment and ABFII Perbanas vision, mission and core initiatives.
Book 1(a) Strategy Road Map for e-learning and e-library
development;(b) Strategy Architecture for E-learning and E-library
Development;(c) Strategic Map;(d) Organizational Structure Design and Development
– with role, KPI and job-description Book 2 Operational Plan for e-learning and e-library architecture;(i) Key Stakeholders Analysis;(ii) Design and development of e-learning and e-
library architecture;(iii) Design an develpment of e-learning and e-
library application;(iv) Vertical and horizontal alignment framework Book 3(i) Flow chart, PM and WBS;(ii) Governance System;(iii) Budgeting SystemACTIVITIES TIME FRAME
• Analysis and design;• Architeture Development;• Application Framework;• Leadership Approval;• Operationalization
M1 = up to 2012 M2 = 2013 - 2015 M3 = 2016 - 2019
LEGEND
KSF = Key Success FactorWBS = Work Break Down StructurePM = Project Management
ABFI INSTITUTE V19INITIATIVE DEFINITION & DIMENSION INFORMATION (IDDI)
1
2
3
Analysis and Design Approach
Fundamental Architecture
Alignment
1.3 Innovative course delivery
1.4
INIT
IATI
VE
Application Framework & Model
IT Architecture
Stakeholders Analysis and Human capital Development
Framework
Implementation Framework
Role, KPI 7 Broad job-des
Structure
Strategy Map
Strategy Road-Map
Development Blue-Print
Codification System
Codification Number
Core and Supporting Initiatives
4 International Education Capability Development – Lead Schedule
4.1 Initial Stage to Internationalization and Program Development – supporting schedule document
4.2 International universities Collaboration – supporting schedule document
4.3 International Exchange Program – supporting schedule document
Core Initiative 4International Education CapabilityStrategic Map
Strategy Architecture
Roles, KPI and Job-Description
Strategic Objectives, Road Map and Strategy Map Organization Structure
Operational Architecture
4.1 International Class Program Strengthening, Strategic Positioning &
Transitional Phase
4.3 International Business Collaboration
& Development
4.2 Innovative Program Based Foreign-
Universities Collaboration
4. Dynamic International Education Capability
Transitional Phase to Core Initiative 3 Executive
Transitional Phase to Core Initiative 5 Business
Development
4.3.1 Certifications4.3.2 Continues Professional
Education (CPE)4.3.3 Exe. Business
Development4.3.4 Other International Business Collaboration
VISION : "THE ASIAN MOST REPUTABLE BANKING EDUCATION INSTITUTE"
GOALS : TOP 5 ASIAN BANKERS LEARNING CENTER OF EXCELLENCE
80% OF ALUMNY TO BE EMPLOYED NOT MORE THAN 6 MONTHS AFTER THEIR GRADUATION
KSF : INTERNATIONAL EDUCATION CAPABILITY
STRENGTHENING, POSITIONING AND TRANSITIONAL PHASE
OBJECTIVES OUTPUT
To build a clear strategic positioning and transformational change foundation and program strengthening for developing ABFII Perbanas international education capability in a sustainable way.
Book 1Strategic Architecture:(i) Align Strategic Map, road map and
strategic goals;(ii) Organizational structure and
fundamental principles;(iii) KPI, strategic role and job-description
Book 2Operational Architecture:(i) Periodic Systemic based Curriculum
Refinement;(ii) International Class Course Facilitators
Guide; (iii) International Class Students Guide and
Marketing Materials;(iv) International Faculty Member
Recruitment, Capitalization and Development Guide and Framework;
(v) International Student Affairs Operating System;
(vi) International Class Supporting Infrastructure (ICT and Strategic Assets);
(vii) International Class Marketing and Public Relations
ABFI INSTITUTE V19INITIATIVE DEFINITION & DIMENSION INFORMATION (IDDI)
1
2
4
3
Strategic Analysis
KPI, role & job-description
Marketing and public relations
4.2 4.3
5
4.1
INIT
IATI
VE
Strategic Asset and Infrastructure
International Student Afairs Operating system design and
development
Internationalization of Faculty Member & Capability
Development
Int. Student guide
Int. Course facilitator guide
Periodic systemic based
Operational Architecture
Organizational Structure
Strategic Map, Road Map & Goals
Strategic Transformation
Strategic Architecture
VISION : "THE ASIAN MOST REPUTABLE BANKING EDUCATION INSTITUTE"
GOALS : TOP 5 ASIAN BANKERS LEARNING CENTER OF EXCELLENCE
80% OF ALUMNY TO BE EMPLOYED NOT MORE THAN 6 MONTHS AFTER THEIR GRADUATION
KSF : INTERNATIONAL EDUCATION CAPABILITY
STRENGTHENING, POSITIONING AND TRANSITIONAL PHASE
OBJECTIVES OUTPUT
To build a clear strategic positioning and transformational change foundation and program strengthening for developing ABFII Perbanas international education capability in a sustainable way.
Book 3 Transformational change framework :(i) Stakeholders Analysis ;(ii) Design and development of
transformational change plan;(iii) Human Capital development
Strategy;(iv) Communication and socialization
Strategy;(v) Implementation
Book 4 Implementation Plan (i) Flow chart, PM and WBS;(ii) Governance System;(iii) Budgeting System
ACTIVITIES TIME FRAME
• Analysis and initial drafting;• book 1 design and development;•Book 2 design and development ;•Book 3 design and development ;• discussion and refinement;• finalizing the draft;• meeting and discussion with leaders;• senate approval;•implementation
M1 = up to 2012 M2 = 2013 - 2015 M3 = 2016 – 2019
LEGEND
KSF = Key Success FactorPM = Project ManagementWBS = Work break down structure
ABFI INSTITUTE V19INITIATIVE DEFINITION & DIMENSION INFORMATION (IDDI)
1
2
4
3
Strategic Analysis
Strategic Architecture
KPI, role & job-description
Marketing and public relations
Strategic Transformation
4.2 4.3
5
4.1
INIT
IATI
VE (C
ont.)
Strategic Asset and Infrastructure
International Student Afairs Operating system design and
development
Internationalization of Faculty Member & Capability
Development
Int. Student guide
Int. Course facilitator guide
Periodic systemic based
Operational Architecture
Organizational Structure
Strategic Map, Road Map & Goals
VISION : "THE ASIAN MOST REPUTABLE BANKING EDUCATION INSTITUTE"
GOALS : TOP 5 ASIAN BANKERS LEARNING CENTER OF EXCELLENCE
80% OF ALUMNY TO BE EMPLOYED NOT MORE THAN 6 MONTHS AFTER THEIR GRADUATION
KSF : INTERNATIONAL EDUCATION CAPABILITY
FOREIGN UNIVERSITIES COLLABORATIVE EFFORT
OBJECTIVES OUTPUT
To design and develop strategic collaborative framework with foreign universities in order to achieve ABFII Perbanas mission to become the Asian Most Reputable Banking Education Institute.
Book 1Strategic Plan for Foreign Universities Collaboration:(i) Strategic Management Road map;(ii) Strategic Map for Foreign
universities Collaboration;(iii) KPI, strategic role and job-
description ;
Book 2 Operation framework to materialize the collaborative framework and effort :(i) Proposal for international based
collaborative joint research projects;
(ii) Proposal for collaborative program of studies development;
(iii) Proposal for students exchange programs
Book 3Implementation plan:(i) Flow chart, PM and WBS;(ii) Governance System;(iii) Budgeting System
ABFI INSTITUTE V19INITIATIVE DEFINITION & DIMENSION INFORMATION (IDDI)
4.2
INIT
IATI
VE
1
2
4
3
Preparation
4.1 Elaborative Foreign Universities Network
Development
Cross-functional industrial based
Collaborative Research
Opportunities
Collaborative Programs
Development
Students Exchange –
business experience Programs
Development
MoU
Operation and Control Framework
Project management Structure
International Collaboration Blue Print
Action Plan
VISION : "THE ASIAN MOST REPUTABLE BANKING EDUCATION INSTITUTE"
GOALS : TOP 5 ASIAN BANKERS LEARNING CENTER OF EXCELLENCE
80% OF ALUMNY TO BE EMPLOYED NOT MORE THAN 6 MONTHS AFTER THEIR GRADUATION
KSF : INTERNATIONAL EDUCATION CAPABILITY
FOREIGN UNIVERSITIES COLLABORATIVE EFFORT
ACTIVITIES TIME FRAME
• Preparation and Analysis for Strategic Collaboration;• Stakeholders analysis;• building the strategic framework;• Proposal design, development and drafting;• discussion and communication with key stakeholders • Building and utilizing the networks; • Developing strategic and transformational relationship;• Communicating the proposal ;• materializing the proposed international collaboration;• Implementing the proposed collaboration;• Marketing and public relations.
M1 = up to 2012 M2 = 2013 - 2015 M3 = 2016 – 2019
LEGEND
KSF = Key Success Factor
ABFI INSTITUTE V19INITIATIVE DEFINITION & DIMENSION INFORMATION (IDDI)
4.2
INIT
IATI
VE (C
ont.)
1
2
4
3
Preparation
4.1Elaborative
Foreign Universities Network Development
Cross-functional industrial based
Collaborative Research
Opportunities
Collaborative Programs
Development
Students Exchange –
business experience Programs
Development
MoU
Operation and Control Framework
Project management Structure
International Collaboration Blue Print
Action Plan
Project Based Structure and Governance
VISION : "THE ASIAN MOST REPUTABLE BANKING EDUCATION INSTITUTE"
GOALS : TOP 5 ASIAN BANKERS LEARNING CENTER OF EXCELLENCE
80% OF ALUMNY TO BE EMPLOYED NOT MORE THAN 6 MONTHS AFTER THEIR GRADUATION
KSF : INTERNATIONAL EDUCATION CAPABILITY
INTERNATIONAL BUSINESS COLLABORATION AND DEVELOPMENT
OBJECTIVES OUTPUT
To develop strategic and operational framework for international business collaboration that can support the ABFII Perbanas positioning as globally and the regionally recognized education insitute as stated within its mission , vision and core initiatives.
Book 1Strategic Framework(i) Strategic map, road map and
fundamental principles;(ii) Business Collaboration Structure and
governance system;(iii) KPI, Strategic Role and job-description
Book 2Operational Framework;(i) Detailed proposal for foreign
government cooperation;(ii) Detailed proposal for professional
bodies collaboration;(iii) Detailed proposal for periodic based
annual international seminar and workshops;
(iv) Detailed proposal for international business community based collaborative effort.
Book 3Implementation Plan :(i) Flow chart, PM and WBS;(ii) Governance System;(iii) Budgeting System
ABFI INSTITUTE V19INITIATIVE DEFINITION & DIMENSION INFORMATION (IDDI)
2
1
43
Preparation& Analysis
4.1 Building Strategic Framework for International Business Collaboration
Operational Framework
Strategic Map , road map and values
Business Project Structure
KPI, strategic role and job-description
Collaborative Opportunities, vision, mission and values
4.3
INIT
IATI
VE
Action Plan Proposal
Professional Bodies
Collaboration (CMA, ABA, AIM
etc):- CPE;- Exe. Dev.
Program
Non-governmental Bodies
Collaboration (AIBC, ECONIT,
Amcham) including int. Seminar & workshop
Foreign Government Collaboration
(Aus Embassy, US Embassy etc)
Project Based Structure and Governance
VISION : "THE ASIAN MOST REPUTABLE BANKING EDUCATION INSTITUTE"
GOALS : TOP 5 ASIAN BANKERS LEARNING CENTER OF EXCELLENCE
80% OF ALUMNY TO BE EMPLOYED NOT MORE THAN 6 MONTHS AFTER THEIR GRADUATION
KSF : INTERNATIONAL EDUCATION CAPABILITY
INTERNATIONAL BUSINESS COLLABORATION AND DEVELOPMENT
ACTIVITIES TIME FRAME
• Strategic Analysis;• Design and develop strategic architecture;• Build operational a rchitecture for International business collaboration;• Develop detailed proposal for government based collaboration;• Develop detailed proposal for internationalprofessional bodies collaboration;• Develop detail proposal for annual periodic based international workshop and seminar;• Discussion and refinement with ABFII leaders;• implementation of the plan.
M1 = up to 2012 M2 = 2013 – 2015 M3 = 2016 – 2019
LEGEND
KSF = Key Success Factor;PM = Project Management WBS = Work breakdown structure
ABFI INSTITUTE V19INITIATIVE DEFINITION & DIMENSION INFORMATION (IDDI)
2
1
43
Preparation& Analysis
4.1
Operational Framework
KPI, strategic role and job-description
Collaborative Opportunities, vision, mission and values
4.3
INIT
IATI
VE (C
ont.)
Action Plan Proposal
Professional Bodies
Collaboration (CMA, ABA, AIM
etc):- CPE;- Exe. Dev.
Program
Non-governmental Bodies
Collaboration (AIBC, ECONIT,
Amcham) including int. Seminar & workshop
Foreign Government Collaboration
(Aus Embassy, US Embassy etc)
Business Project Structure
Strategic Map , road map and values
Building Strategic Framework for International Business Collaboration
Program of Studies Architecture
Expected Graduate QualitiesFor All Programs
Action Competency Level
Organizational Competency Level
Interpersonal Competency Level
Informational Competency Level
Individual Competency LevelUnd
er G
radu
ate
Pro
gram
Gra
duat
e Pr
ogra
m
Curriculum Taxonomy
Environmental Scanning & Analysis
PESTLE Analysis
Industry and Business Analysis
Workforce Analysis
Expected Graduate Qualities
Und
er G
radu
ate
Pro
gram
Gra
duat
e P
rogr
am
Action Competency Level
Organizational Competency Level
Inter-personal Competency Level
Informational Competency Level
Individual Competency Level
Expected Graduate Qualities
1 Strategic , systemic and synthesizing skills
2 Creative Skills
3 Leadership and People Skills
4 Core Professional, Banking and Finance Skills
5 Ethical and Good Citizen
6 Open Mindedness, diversity and international Perspectives
7 Tranformational Change Agents
What?
1. What subjects?2. What graduate qualities?3. What level of competency?4. What content?
Who?
1. Who’s gonna be the course facilitators?
2. Whos gonna be thaufgt?
Where
1. In class?2. At lab?3. Outside campus;4. On-the job?
When
1. Gonna be offered?2. Gonna be evaluated?
How?1. How is gonna be
facilitated?2. How’s gonna be
structured?3. How is gonna be
assessed?4. How is gonna be
developed?
Hint: Terminology, Related Meanings and Implications
No. Major Elements of the Curriculum
Related Meanings Implications
i. Expected Graduate Qualities/Characteristics
Relates to the overall characteristics that ABFII Perbanas graduates must have in general after completing their program;
1 Individual Competency Level Distinctive graduate competency at the very individual level i.e: leadership and team skills, expected mental attitude, strategic and systemic thinkers, being creative and innovative, open-mindedness,, diversity and International Perspective;2 Informational Competency Level Relates to how the graduates be able to capitalize massive flow of information i.e: Management Information System; ICT Management
3 Interpersonal Competency Level Relates to how the graduates can develop and capitalize genuine relationship with others to achieve common goals i.e: People Management, Organizational Behavior ;
4 Organizational Competency Level Relates to how graduates understand the dynamic complexities of the organization environment i.e: Competitive Landscape in Globalization; Business Environment Analysis;
5 Action Competency Level Relates to core professional skills of the graduates i.e: core accounting or management subjects, project management, concentration subjects
How the Curriculum Designed and Realized?A Step by Step Proccess
No. Major Steps Description Remarks
1 Analyze the Environment Analyze the dynamic of PESTLE, business industry and organization as well as workforce environment to identify key trends of the future human capital;2 Determine the Expected
Graduate CharacteristicsDefine and determine the expected graduate characteristics derived from the dynamic environment analysis;
3 Develop Learning Objectives
Define what competency level which are expected to be achieved within the overall program and each subjects;
4 Define and Determine What Subjects , Content and structure to be delivered within each competency levels
1. Define and determine what subjects to be offered within each competency level;
2. Define how the subjects are going to be structured (when)5 Define how to facilitate the
learning Process
6 Define how to assess the students performance
7 Define how to give the feedback to the students
Agenda Kerja per Jajaran
Jajaran Sasaran Kerja Ukuran Kinerja Program Kerja
Warek 1 Mengembangkan program studi dan kurikulum secara inovatif;
Arsitektur program studi; Karakteristik kualitatif lulusan; Level kompetensi lulusan; Konsep pengembangan kurikulum; Konsep pengembangan
pendekatan pembelajaran; Konsep pengembangan dosen dan
karyawan akademik;
1. Program pengembangan arsitektur program studi, program studi dan kurikulum;
2. Program pengembangan pendekatan pembelajaran dan Administrasi akademik;
3. Program Pengembangan dosen dan karyawan akademik.
Warek 2 1. Program pengembangan arsitektur program studi, program studi dan kurikulum;
2. Mengembangkan sistem pengembangan modal manusia ;
3. Mengembangkan sistem kesejahteraan karyawan
Sistem Pengembangan Modal Manusia ABFII Perbanas;
Sistem Pengembangan Kesejahteraan Karyawan;
Peraturan Karyawan yang bersifat menyeluruh;
Program pengembangan kesehatan, keselamatan dan kenyamanan kerja.
1. Program Pengembangan Modal Manusia lembaga secara menyeluruh;
2. Program Pengembangan Peraturan Karyawan;
3. Program Pengembangan Sistem Manajemen Kinerja (Remunerasi berbasiskan kinerja) ;
4. Program pengembangan keselamatan, kesehatan dan
48
Agenda Kerja per Jajaran
Jajaran Sasaran Kerja Ukuran Kinerja Program Kerja
Warek 3 Mengembangkan potensi kreatif mahasiswa dan hubungan strategis dengan industri;
Sistem Pengembangan Potensi Kreatif dan Karakteristik Kualitatif Lulusan;
Sistem Kerjasama Industrial yang bersifat saling menguntungkan.
1. Program Pengembangan Cetak Biru Potensi Kreatif mahasiswa;
2. Program Pengembangan Kerjasama industrial;
Warek 4 Mengembangkan potensi-potensi usaha baru dan pendidikan profesi; serta strategi pemasarannya
Mengembangkan arsitektur ICT guna menunjang
Pengembangan in-house training; Pengembangan Modul Pelatihan
Perbankan; Pengembangan Unit Konsultasi
Bisnis dan Pusat Kajian; Pengembangan Program
Pendidikan Profesi;
1. Program pengembangan arsitektur jasa konsultasi dan pelatihan ABFII Perbanas;
2. Program Pengembangan Pendidikan Profesi (Akuntansi, Pajak dsbnya)
3. Program pengembangan strategi
49
Agenda Kerja per Jajaran
Jajaran Sasaran Kerja Ukuran Kinerja Program Kerja
Warek 5 Mengembangkan Sistem Pengelolaan Anggaran dan Sistem Anggaran yang efektif;
Mengembangkan sistem pembagunan, pengadaan, dan pengelolaan Aset.
Sistem Anggaran yang efefktif dan mendukung pencapaian kinerja;
Sistem pengelolaan keuangan yang fleksibel dan efektif;
Sistem perencanan pembangunan, pengadaan, dan pengelolaan aset
1. Program Pengembangan Sistem Pelaporan Akuntansi Keuangan dan Manajemen secara terpadu;
2. Program pengembangan sistem anggaran yang bersifat simple, mudah dimengerti, fleksibel dan mendukung pencapaian sasaran kinerja;
3. Program perencanaan dan pengedalian AsetWarek 6 Mengembangkan program
studi dan kurikulum pascasarjana secara inovatif;
Mengembangkan strategi pemasaran yang progressive
Arsitektur program studi; Karakteristik kualitatif lulusan; Level kompetensi lulusan; Konsep pengembangan kurikulum; Konsep pengembangan
pendekatan pembelajaran; Konsep pengembangan dosen dan
karyawan akademik; Peningkatan jumlah mahasiswa
program pascasarjana yang
1. Program pengembangan arsitektur program studi, program studi dan kurikulum S2 dan S3;
2. Program pengembangan pendekatan pembelajaran dan Administrasi akademik;
3. Program pemasaran yang progressive.
50
51
Agenda Kerja Warek
No. Agenda Kerja Jangka Waktu Batas Waktu Catatan
I. Penyusunan Sasaran Kerja 2009
1 minggu Rabu 8 Juli 2009 Mencakup: Sasaran Kerja 2009; Org. Structure rightsizing
plan; Ukuran kinerja; Target Kinerja; Program Kerja; Anggaran
II. Komunikasi dengan stakeholders (untuk mempertajam rumusan sasaran kerja yang telah disusun)
1 Minggu Selasa 14 Juli 2009 Komunikasi dengan dosen dan unit-unit kerja yang ada di jajarannya.
III. Perbaikan dan Penajaman oleh Rektor dan Warek
1 Minggu Selasa 21 Juli 2009 Revisi sasaran kerja 2009
IV. Finalisasi dan Penandatanganan Kontrak Kinerja antara Rektor dan Warek
1 Minggu Senin 27 Juli 2009 Perikatan kinerja antara rektor dengan Warek agar dapat dipakai sebagai dasar untuk mengevaluasi kinerja warek;
V. Sosialisasi Terus Menerus Start 28 Juli 2009 Sosialisasi dan komunikasi dengan segenap stakeholders ABFII Perbanas