Able Street and Terrace Road Able Street and Terrace RoadImprovements ProjectImprovements Project
Neighborhood PreNeighborhood Pre--Construction MeetingConstruction MeetingTuesday, April 6, 2010Tuesday, April 6, 20107:00 p.m.7:00 p.m.Spring Lake Park City HallSpring Lake Park City Hall
Purpose of Tonight’s MeetingPurpose of Tonight’s Meeting
Project CommunicationProject Communication
Project Areas/ScheduleProject Areas/Schedule
Project DescriptionProject Description
Review Common QuestionsReview Common Questions
– – Brief overview of the construction processBrief overview of the construction process
Project Cost InformationProject Cost Information
Answer Project Questions Answer Project Questions
Project CommunicationProject Communication
Communication during the Project isCommunication during the Project isimportant to the City and theimportant to the City and the
ResidentsResidents
Multiple ways City and Residents canMultiple ways City and Residents cancommunicate during the Projectcommunicate during the Project
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 2/16
4/6/20
Project CommunicationProject Communication
Dedicated Project Voice Mail NumberDedicated Project Voice Mail Number – – Project Voice Mail Number will beProject Voice Mail Number will be
(763) 792(763) 792--72167216
– – Receive quick project updateReceive quick project update
– – Leave questions, register concerns,Leave questions, register concerns,set up appointmentsset up appointments
– – Monitored dailyMonitored daily
– – For immediate concerns, contact City Hall atFor immediate concerns, contact City Hall at(763) 784(763) 784--64916491 (business hours 8:00 to 4:30)(business hours 8:00 to 4:30)and they will contact the inspectorand they will contact the inspector
Project CommunicationProject Communication
City Website: www.ci.springCity Website: www.ci.spring--lakelake--park.mn.uspark.mn.us
Project CommunicationProject Communication
Notifications forNotifications formajor constructionmajor construction
eventsevents
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 3/16
4/6/20
Project AreasProject Areas
Able Street – OsborneRoad to CSAH 10
Terrace Road –Osborne Road toSanburnol Drive
SANBURNOL DRIVE
81ST AVENUE
OSBORNE ROAD
Project ScheduleProject Schedule
Approximate start date: April 26, 2010 Approximate start date: April 26, 2010
Likely 1 crewLikely 1 crew
General order:General order:
– – Terrace Road will be done first:Terrace Road will be done first:
Start on south half: Osborne Rd. to 81Start on south half: Osborne Rd. to 81stst Ave. Ave.
Then portion North of 81Then portion North of 81
stst
Avenue Avenue
Project ScheduleProject Schedule
– – Able Street will be done second: Able Street will be done second:
Don’t know specific order yetDon’t know specific order yet
Special schedule requirements by High SchoolSpecial schedule requirements by High School
Completion date (both streets):Completion date (both streets):
September 3September 3rdrd (substantial)(substantial)
October 8October 8thth (final)(final)
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 4/16
4/6/20
Project ScheduleProject Schedule
Schedule is subject to changeSchedule is subject to change
Notices will be delivered when there isNotices will be delivered when there iswork affecting your areawork affecting your area
Project DescriptionProject Description
Existing concrete curb and gutterExisting concrete curb and gutter
– – WillWill be left in placebe left in place
– – OnlyOnly spot replacements where neededspot replacements where needed
– – Adjacent Adjacent pedestrian curb ramps andpedestrian curb ramps andisolated sidewalk isolated sidewalk repairsrepairs
Project DescriptionProject Description
Example of curb replacementExample of curb replacement
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 5/16
4/6/20
Project DescriptionProject Description
RebuildingRebuilding street section betweenstreet section between curbscurbs – – About 11” About 11” deep (5” pavement, 6” gravel)deep (5” pavement, 6” gravel)
Project DescriptionProject Description
PrivatePrivate utilities:utilities: – – Small amount of work anticipatedSmall amount of work anticipated
City utilities:City utilities: – – Minor water main work (isolated spots)Minor water main work (isolated spots)
– – Storm sewer repairsStorm sewer repairs
Driveways:Driveways: – – Concrete apronsConcrete aprons
– – Further details later in presentationFurther details later in presentation
Project DescriptionProject Description
Able Street Able Street
Existing street condition Existing storm sewer
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 6/16
4/6/20
Project DescriptionProject Description
Terrace RoadTerrace RoadExisting street condition Existing storm sewer
Common QuestionsCommon Questions
Qwest Communications will be doing work onQwest Communications will be doing work ontheir cables and structures in the project areatheir cables and structures in the project area
Some power pole relocationsSome power pole relocations
CenterPointCenterPoint Energy may have short sectionsEnergy may have short sectionsof gas main relocationof gas main relocation
Isolated areas of relocation and adjustmentsIsolated areas of relocation and adjustmentswill have little or no impact to residentswill have little or no impact to residents
– – Some of the work will occur before City projectSome of the work will occur before City project
What are the private utilities doing?What are the private utilities doing?
Common QuestionsCommon Questions What are the private utilities doing?What are the private utilities doing?
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 7/16
4/6/20
Common QuestionsCommon Questions How do I get my mail?How do I get my mail?
Existing MailboxesExisting Mailboxes – – Most existing mailboxes will remain inMost existing mailboxes will remain in
place throughout constructionplace throughout construction
Will be baggedWill be bagged – – no deliveryno delivery
– – Mailboxes conflicting with constructionMailboxes conflicting with constructionwill be salvaged by City and left withwill be salvaged by City and left withthe property owner for safe keepingthe property owner for safe keeping
Common QuestionsCommon Questions How do I get my mail?How do I get my mail?
During ConstructionDuring Construction
– – All mail will be delivered to temporary All mail will be delivered to temporarylocations that are easily accessiblelocations that are easily accessiblethroughout constructionthroughout construction
– – Temporary mailbox bank locations willTemporary mailbox bank locations willbe determined by the Post Masterbe determined by the Post Master
Common QuestionsCommon Questions How do I get my mail?How do I get my mail?
If prefer, can makeIf prefer, can make
private arrangementprivate arrangementwith Post Officewith Post Office
7440 University Ave7440 University AveFridley, MN 55432Fridley, MN 55432(763) 571(763) 571--20162016
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 8/16
4/6/20
Common QuestionsCommon Questions What will happen to my landscaping andWhat will happen to my landscaping and
sprinklers within the Right of Way?sprinklers within the Right of Way?
– – Property owner may salvage ahead of timeProperty owner may salvage ahead of time – – Contractor remove during constructionContractor remove during construction
– – No trees anticipated to be removedNo trees anticipated to be removed
Common QuestionsCommon Questions What are the stakes in my yard?What are the stakes in my yard?
– – Survey stakes for utility constructionSurvey stakes for utility construction
– – Staking done by City’s engineering firmStaking done by City’s engineering firm
Common QuestionsCommon Questions What are they doing to the street?What are they doing to the street?
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 9/16
4/6/20
Common QuestionsCommon Questions Will I be able to drive to my house?Will I be able to drive to my house?
Common QuestionsCommon Questions Will I be able to drive to my house?Will I be able to drive to my house?
Daily access on streetDaily access on street – – 7:00 p.m. to 7:00 a.m. minimum7:00 p.m. to 7:00 a.m. minimum
Some isolated shortSome isolated short--term interruptionsterm interruptions – – For items such as utility installationsFor items such as utility installations
– – Mostly during the dayMostly during the day – – avoiding rush hoursavoiding rush hours
Common QuestionsCommon Questions Will I be able to drive to my house?Will I be able to drive to my house?
Some temporary street closuresSome temporary street closures
– – Only portions of streetsOnly portions of streets
– – Example: during work at intersectionsExample: during work at intersections
– – Most for less than one full dayMost for less than one full day
– – Signs will be put up in advanceSigns will be put up in advance
Concrete slabs at south endsConcrete slabs at south ends
– – Will require 1 week closureWill require 1 week closure
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 10/16
4/6/20
Common QuestionsCommon Questions Will I always have access to my driveway?Will I always have access to my driveway?
Common QuestionsCommon Questions Will my Garbage Service be Interrupted?Will my Garbage Service be Interrupted?
No impact to residents anticipatedNo impact to residents anticipated
Common QuestionsCommon Questions Is the City replacing any utilities?Is the City replacing any utilities?
Water MainWater Main
Isolated service interruptionsIsolated service interruptions
Temporary durationTemporary duration
(less than 1 day)(less than 1 day)
Will avoid peak use timesWill avoid peak use times
Written notices will beWritten notices will bedelivered in advancedelivered in advance
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 11/16
4/6/20
Common QuestionsCommon Questions Is the City replacing any utilities?Is the City replacing any utilities?
Storm SewerStorm Sewer
Common QuestionsCommon Questions What kind of curb are we getting?What kind of curb are we getting?
Concrete, 6” highConcrete, 6” high
Matches existing typeMatches existing type
Depressed back atDepressed back atdriveways and rampsdriveways and ramps
Common QuestionsCommon Questions How will my driveway be restored?How will my driveway be restored?
– – Curb cut (drop the back of the curb)Curb cut (drop the back of the curb)
– – Concrete apronConcrete apron
– – Patch to transition to existing drivewayPatch to transition to existing driveway
Same material as existing drivewaySame material as existing driveway
– – Not all driveways will be disturbedNot all driveways will be disturbed
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 12/16
4/6/20
Common QuestionsCommon Questions How will my driveway be restored?How will my driveway be restored?
– – In general, will match your existing driveway widthIn general, will match your existing driveway width
(within City Code requirements) unless you request(within City Code requirements) unless you requestotherwiseotherwise
Common QuestionsCommon Questions
Can I change the width of my driveway?Can I change the width of my driveway?
–– Yes, the City has a process for this Yes, the City has a process for this
– – Property owner must make written request,Property owner must make written request,and sign agreement with Cityand sign agreement with City
Forms available at City HallForms available at City Hall
– – If widening, property owner is responsible forIf widening, property owner is responsible forpart of the cost beyond the existing widthpart of the cost beyond the existing width
Project installs only the apronProject installs only the apron
Property owner is required to finish the extraProperty owner is required to finish the extradriveway area within 1 yeardriveway area within 1 year
Common QuestionsCommon Questions Will I be able to have my entireWill I be able to have my entire
driveway redriveway re--done?done?
– – City has discussed with theCity has discussed with the contractorcontractor
– – ContractorContractor is willing to constructis willing to construct
– – Concrete or Bituminous drivewaysConcrete or Bituminous driveways
Private contract between resident and Private contract between resident and contractor contractor – – not part of City project not part of City project
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 13/16
4/6/20
Common QuestionsCommon Questions If you want to look into having yourIf you want to look into having your
driveway redriveway re--done:done:
CallCall Brent @ Valley Paving (952) 445Brent @ Valley Paving (952) 445--86158615
CallsCalls preferred before April 26preferred before April 26thth
Private contract between resident and Private contract between resident and contractor contractor – – not part of City project not part of City project
Common QuestionsCommon Questions How long until I can use my new driveway?How long until I can use my new driveway?
•1 week curing period
Common QuestionsCommon Questions Where’s the pavement?Where’s the pavement?
Base CourseBase Course
Binder Course & Binder Course &
Wear CourseWear Course
– – Placed in three layers:Placed in three layers:
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 14/16
4/6/20
Common QuestionsCommon Questions How will my lawn be restored?How will my lawn be restored?
– – Sod with topsoilSod with topsoil
City maintains for 60City maintains for 60--daysdays
Property owner is responsible for maintenanceProperty owner is responsible for maintenanceafter thatafter that
NonNon--Conforming DrivewaysConforming Driveways
MoreMore than one drivewaythan one driveway
Width greater than City CodeWidth greater than City Codemaximum (24 feet)maximum (24 feet)
Within City Code minimum setback Within City Code minimum setback
– – These These require approval from the City require approval from the City
Project FundingProject Funding
Sources of fundingSources of funding
– – Federal Funds (ARRA Program)Federal Funds (ARRA Program)
– – Municipal State Aid Funds (MSA)Municipal State Aid Funds (MSA)
– – City FundsCity Funds
– – Assessments Assessments
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 15/16
4/6/20
Project Cost InformationProject Cost Information
Assessments Assessments – – Determined per Pavement ManagementDetermined per Pavement Management
Policy (Resolution 98Policy (Resolution 98--48)48)
– – Estimated assessment rates:Estimated assessment rates:
Single family home $3,106.83Single family home $3,106.83
NonNon--residential propertiesresidential properties $67.92/foot$67.92/foot
– – Same values shown in June 2009Same values shown in June 2009
Project Cost InformationProject Cost Information
Assessments (continued) Assessments (continued)
– – Final assessments determined: Fall 2010Final assessments determined: Fall 2010
– – Public Hearing held for assessmentsPublic Hearing held for assessments
All property owners notified by US Mail All property owners notified by US Mail
– – Final rates will be determined based onFinal rates will be determined based onactual project costsactual project costs
Could go up or down from estimateCould go up or down from estimate
Thank you for your Thank you for your
attention! attention!
We We ’ ’ re looking forward to re looking forward to
a successful project! a successful project!
8/7/2019 Able-Terrace Presentation HANDOUT 4-6-10
http://slidepdf.com/reader/full/able-terrace-presentation-handout-4-6-10 16/16
4/6/20
Questions?Questions?