COMPANY PRESENTATION Analyst Meeting Full Year 2011 Jakarta, 3 April 2012
Transcript
Page 1: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

COMPANY PRESENTATION

Analyst Meeting Full Year 2011Jakarta, 3 April 2012

Page 2: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

Introduction & FY 2011 Highlight

SBU: PT Reswara Minergi Hartama (Reswara) – Coal Production

SBU: PT. Cipta Kridatama (CK) – Contract Mining Services

SBU: PT. Sumberdaya Sewatama (SS) – Power Solutions

SBU: PT.Sanggara Sarana Baja (SSB) – Engineering Services

SBU: PT. Cipta Krida Bahari (CKB)- Integrated Logistic

p.3

p.18

p.28

p.36

p.42

p.45

Table of Contents

2

Operational Overview p.17

Financial Overview p.8

Page 3: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

INTRODUCTION & FY 2011 HIGHLIGHT

3

Page 4: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

SAMPLE SLIDES

• Leading temporary power

provider, with 42% market share in

Indonesia

• Electricity generation capacity of

934MW

• 12.% of Meppogen, an IPP with an

installed capacity of 80MW

• Among the top 5 mining

contractors in Indonesia.

• Provides full end-to-end “pit to

port” contract mining services

• Estimated 221 million tons of coal

reserves and 561 million tons of coal

resources

• Ability to leverage services offered

by the ABM Group

• SSB and CKB to provide engineering services and integrated logistics

support to the ABM and TMT groups

• The Group subsidiaries provide substantial intragroup services, thereby

reducing costs and increasing business support

Business Strategies

4

ABM is an integrated energy company with three key business units in contract mining services, coal production, and power solutions,

supported by two crucial components of engineering services and integrated logistics

Page 5: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

ABM’s Five SBUs

Engineering

Services

Integrated

Logistics

Power

Solutions

Contract

Mining

Services

Coal

Production

• Established 2010

• 7,703 hectares

concession area under

4 IUPs

• Estimated coal

reserves and resources

of 221 and 561 million

tons, respectively

• Established 1997

• Fleet of 524 heavy

equipment serving 7

customers as of Dec

31, 2011

• Estimated outstanding

contracted overburden

removal and coal of

496 million bcm and 63

million tons,

respectively, as of Dec

31, 2011

• Established 1992

• Approximately 813

gensets (934MW

capacity)

• Manages more than 70

diesel power

generation projects in

Indonesia

• 12% stake in

Meppogen, IPP with

simple cycle power

plant

• Established 2006

• Operates fleet of

vessels, trucks, loaders

and dry containers

• Provides coal logistics,

freight forwarding and

project logistics

• 35 branches and

offices located

throughout Indonesia

• Established 1977

• 10 engineering services

workshops providing

fabrication,

remanufacturing,

transport equipment

and site services

• Customers mainly in

mining, oil and gas,

petrochemical and

power sectors

5

Page 6: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

6

Financial Highlight FY 2011 (Audited)

(in Rp million) 2011 2010 Growth

Revenue 6,626,275 4,486,419 47.70%

Gross Profit 1,381,717 713,025 93.80%

Operating Profit 656,022 315,772 107.80%

Profit Before Tax 464,406 237,417 96.00%

Net Income 415,740 127,324 226.52%

EPS (Rp/saham) 176 54 224.07%

Key Financial Highlights

PT ABM Investama’s Tbk Full Year 2011 performance continued to demonstrate

increase in revenue and 226% jumped in Net Profit

Page 7: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

7

1. In Dec 2011, we made repayments company loans to Bank Permata amounting to Rp 225

billion and in January 2012 to DBS Bank in Singapore amounting to US$13 million

(approximately Rp 119 billion)

2. In Dec 2011 and January 2012 – PT Reswara Minergi Hartama (Reswara )entered into a

deal for sales of 2 million tons of coal for 2012. The agreement was between Reswara

subsidiary PT Tunas Inti Abadi (TIA) and Subham Corporation Pvt. Ltd, India.

3. In February 2012, PT Cipta Kridatama, signed a new contract with PT Riau Bara Harum

(RBH) with value of around US$ 300 million secured for 5 years.

4. In March , 2012 PT Cipta Krida Bahari built a Warehouse in Banjarmasin with investment

of USD 4 Million.

5. In March, 2012PT Cipta Krida Bahari order 7 tug and barges , the 2 set tug and barges

have been delivered, the remaining will be delivered in 2012 with investment USD26

million

6. In year 2012, We plan to implement the Functional Currency to USD as PSAK regulation.

Business Update after IPO Dec 6, 2011

Page 8: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

FINANCIAL REVIEW

8

Page 9: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

9

Income Statement

Consolidated (Rp mn)2011 2010

REVENUE 6.626.275 4.486.419

GROSS PROFIT 1.381.717 713.025

Gross Profit Margin 20,9% 15,9%

OPERATING PROFIT656.022 315.772

Operating Profit Margin 9,9% 7,0%

EBITDA 1.209.095 747.414

Ebitda Margin 18,2% 16,7%

Profit Before Tax 464.406 237.417

7,0% 5,3%

NET INCOME 415.740 127.324

NP Margin 6,27% 2,84%

Income Statement Consolidation & Margins

Page 10: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

10

Balance Sheet

Consolidated2011 2010

TOTAL ASSET 9.883.180 4.959.956

Cash & Cash Equivalent 1.668.670 433.039

Total Equity 3.023.006 369.140

Gross Debt 4.928.352 2.681.186

Net Debt 3.259.682 2.248.147

Net Debt to Ebitda Ratio 269,6% 300,8%

Current Ratio 1,36 0,7

DER 1,6 7,3

Cash Ratio 0,53 0,18

Balance Sheet & Key Ratios

Page 11: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

3.235

3.926

4.486

6.626

1.000

3.000

5.000

7.000

2008 2009 2010 2011

Revenue CAGR 2008-2011

11

Page 12: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

12

491316

656

13% 7%

10%

(15%)

0%

15%

02009 2010 2011

Income / (Loss) from Operations Margin

Income from Operations– in Rp bn - Year Ended Dec 31

Strong Net Income & Income from Operations

(11) 127

415

(0%)

3%

6%

(4%)

0%

4%

8%

(150)

0

150

300

450

2009 2010 2011

Net Income Margin

Net Income- Year Ended Dec 31- IDR bn

(4)

Page 13: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

13

3.338

1.006 1.006 912 820

0

1.000

2.000

3.000

CK SSB SS Reswara CKB

Revenue by SBU exclude elimination- Year Ended Dec 31, 2011)

Income from Operations by SBU- Exclude Elimination Year Ended Dec 31, 2011)

47% 14% 14% 13% 11%

362

286

86 51 46

(50)

50

150

250

350

450

CK SS CKB Reswara SSB

44% 34% 10% 6% 6%

Breakdown by Subsidiaries

Page 14: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

14

463 713 1.3631.216 1.211

3.565

0

2.000

4.000

6.000

2009 2010 2011

Short Term Long Term

281%

334%

227%

0%

100%

200%

300%

400%

500%

2009 2010 2011

NM

Total Debt – IDR bn - Year Ended Dec 31

Total Debt / Equity - Year Ended Dec 31

Consolidated Balance Sheet

Page 15: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

15

Capital Expenditure in 2012-2013

Capital Expenditure per SBU (in USD) 2012 F 2013F

Reswara 62 37

CK 119 62

SS 62 66

CKB 73 40

SSB 19 12

Capital Expenditure (in USD) 2012 F 2013F

Mesin dan Peralatan 317 203

Gedung da Perbaikan 16 13

Hak Atas Tanah .3

Infrastruktur Jalan 0.5 0.5

Lain-lain 1.1 0.5

Total 335 217

Page 16: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

OPERATIONAL OVERVIEW

16

Page 17: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

TIA Operations Reswara

• Coal mining conducted through Reswara’s 2

subsidiaries

• PT Tunas Inti Abadi (“TIA”, 99.99% ownership),

located in South Kalimantan Province.

• PT Media Djaya Bersama (“MDB”, 70%

ownership), located in Aceh Province

• Port to be owned and managed through PT

Pelabuhan Buana Reja (“PBR”) (99.99%

shareholding).

• Reswara in 2012 utilizes services of PBR when it

achieves full commercial capability, subject to

construction completion and license approval

• TIA mine utilizes open cut mining methodology,

producing low rank coal with low ash and low

sulphur content

• Coal mined from TIA’s mines are marketed as “TIA

Compliant Coal”; coal bought from third parties are

sold as “TIA Traded Coal”

PT. Reswara Minergi Hartama (Reswara) – Coal Production

17

Page 18: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

18

TIA (Parent) – Income Statement 2011 2010

REVENUE 912.257 393.589

GROSS PROFIT 229.180 14.372

Gross Profit Margin 25,1% 3,7%

OPERATING PROFIT 51.424 (49.692)

Operating Profit Margin 5,6% -12,6%

EBITDA 59.450 (44.186)

Ebitda Margin 6,5% -11,2%

Profit Before Tax 37.495 (52.737)

4,1% -13,4%

NET INCOME 28.029 (40.185)

Net Profit Margin 3,1% -10,2%

PT. Tunas Inti Abadi- Income Statement

Page 19: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

19

‘000 tons

Reswara’s Coal Sales and Productions Volume

69,5

1179

2163

0

500

1000

1500

2000

2500

2009 2010 2011

Page 20: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

20

4,5 5,0 5,0 5,0

1,0

7,5

10,0

12,5

-

2,0

4,0

6,0

8,0

10,0

12,0

14,0

16,0

18,0

20,0

2012e 2013e 2014e 2015e

MDB (Aceh)

TIA (S-Kalimantan)

5,5

12,5

15

17,5

Projection 2012-2015 Coal Productions

Million Tons

Page 21: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

TIA MDB Total

Coal Reserves

(MT)

Proved Reserves 13 7 20

Probable

Reserves

39 162 201

Total Reserves 52 169 221

Coal Resources

Measured 32 18 50

Indicated 39 289 328

Inferred 35 148 183

Total 106 455 561

Concession (Ha) 3,074 4,629 7,703

TIA

23.5%

MDB

76.5%

TIA

18.9%

MDB

81.1%

Total Resources: 561 Million Tons

Total Reserves: 221 Million Tons

Coal Resources, Reserves and Concession

21

* JORC Report

Page 22: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

22

Balikpapan

South Kalimantan

Central Kalimantan

Palangkaraya

Banjarmasin

Indonesia

Kalimantan

Tunas Inti Abadi Project Area

Balikpapan

South Kalimantan

Central Kalimantan

Palangkaraya

Banjarmasin

Indonesia

Kalimantan

Tunas Inti Abadi Project Area

MDB Site (Aceh Province) TIA Site (South Kalimantan Province )

Location: Aceh and South Kalimantan

Page 23: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

PT Tunas Inti Abadi

• TIA was acquired in Dec 2007, commenced commercial

production in Aug 2009 and coal sales in Oct 2009

• Coal mining is contracted to ABM subsidiary, CK

• 25 km from pit to port at Bunati

• 26 km from port to anchorage point at Muara Satui

• 8,000 ton barge loading capacity at jetty

• 120,000 tons temporary pile facility at the mining

pit

• Logistic advantages: Close to the Ocean

PT Media Djaya Bersama

• 70% ownership in MDB

• To begin coal production in 2012 by using existing

infrastructure and begin construction of own

infrastructure in 2012

• Intends to sell coal to Indian power plants for

blending

• Logistic advantages: Close to the Ocean – 12.3 km

pit to port

• Plan to build land conveyer belt for logistic

Site Layout – Concession Area

Expected PBR Port Capacity

Loading Conveyor5 mtpa

900 meters long

Barge300 feet barge (8,000 tons)

2 loading facilities

Crusher Up to 750 tons / hour

Stockpile 120,000 tons

23

Page 24: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

Coal Productions

View of TIA Operations, South Kalimantan

24

14,6

4,7 4,74

1

10

100

2009 2010 2011

TIA - Average Strip Ratio

Page 25: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

TIA MDB

Calorific Value (Adb) 5,370 kcal/kg 5,310 kcal/kg

Caloric Value (GAR) 3,960 kcal/kg 3,440 kcal/kg

Total Moisture (AR) 37.4% 43.8%

Ash Content (Adb) 5.7% 4.6%

Sulfur (Adb) 0.15% 0.16%

Coal Characteristics

Concession Breakdown and Coal Charracteristic

25

Entity

Concession

Holding Company

Type of

Concession Location

Current

Concession Area

(ha)

Expiry Date

of Current

Phase

TIA TIA IUP(1) South Kalimantan 2,355 Mar 16, 2021

TIA TIA IUP(1) South Kalimantan 719Mar 5,

2021

BEL BEL IUP(1) Aceh 1,495 Sep 26, 2017

Mifa Mifa IUP(1) Aceh 3,134 Apr 13, 2025

Concession Breakdown

Page 26: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

26

28,4

37,1

48,1

0

25

50

2009 2010 2011

Year Ended Dec 31

TIA - Average Selling Price US$ / ton

43,439,4 38,6

0

25

50

2009 2010 2011

Year Ended Dec 31

TIA - Total Cash Cost

Cash Cost – Average Selling Price (ASP)

Page 27: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

Contract Mining Operations Brief as of Dec 2011

• Top 5 contract mining service in Indonesia by overburden

removal

• Full end-to-end “pit to port” contract mining services from

exploration(2), mine planning, overburden removal, coal

extraction and loading, transportation and processing,

rehabilitation and reclamation

• Experienced management having worked in major

companies .

• As of 31 Dec 2011, CK employs over 3,300 employees

• Provides services to seven Indonesian coal producers for

nine different projects. The contract mining agreements

have terms ranging from three years to life of the mine

• Fleet of 524 heavy vehicles and mining equipment,

including bulldozers, excavators, cranes and drilling

machines

• Equipment manufactured by Caterpillar, Liebherr,

Hitachi, and Terex

PT. Cipta Kridatama (CK)- Contract Mining Services

27

Page 28: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

28

CK- Income Statement 2011 2011

REVENUE 3.338.738 2.222.356

GROSS PROFIT 415.648 185.583

Gross Profit margin 12,4% 8,4%

OPERATING PROFIT 361.833 108.074

Operating Profit Margin 10,8% 4,9%

EBITDA 570.171 327.234

Ebitda Margin 17,1% 14,7%

Profit Before Tax 295.861 107.283

NET INCOME 298.286 78.839

Net Profit Margin 8,9% 3,5%

PT Cipta Kridatama (CK)- Income Statement

Page 29: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

73,8

104,2100,0

118,0

25

50

75

100

2008 2009 2010 2011

Million BCM

CK’s Overburden Removal

29

Page 30: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

144,0

172,0

206,0

248,0

70

95

120

145

170

195

220

245

2012e 2013e 2014e 2015e

Million BCM

Projection 2012-2015 CK’s Overburden Removal

30

Page 31: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

CK’s Type of Heavy Equipment & Average Age

31

Type of equipment

Dec 31, 2011 Capacity Number of units Average age (in years)

Excavator 250 - 350 tons 15 4– 4.6

20 - 100 tons 95 1 - 6.3

Truck 30 - 100 tons 279 1 - 6.6

Dozer 76 3.8

Grader 14 - 16 feet 38 1.3-5.4

Wheel loader 8 2.6

Compactor 12 7.1

Drill machine 1 7

Total 524

Page 32: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

32

Operating Agreements

12

3

4

6

7

Kalimantan

Sumatra

Concession Holder

Mining Project Sites Expected Contract Duration

Estimated Outstanding Contracted Volume of Coal /

Overburden (Million Tons / Million BCM) as of

Dec 31, 2011(3)

MahakanSumber Jaya

Samarinda, East Kalimantan

From Jun 14, 2004 – Aug 31, 2015 10/105

Gema RahmiPersada

Kotabangun, Kutai Kertanegara, East Kalimantan

From Dec 2007 – Completion of all work< 42 months from the commencement of overburden removal

.1

Kaltim BatuManunggal

Desa Batuah (Air Panas), Kecamatan Loa Janan, Kabupaten Kutai Kartanegara, East Kalimantan

From Mar 18, 2005 – Target of 54.2 million BCM of overburden and/or 7.7 MT coal ROM is reached

1.9 / 3.4

Multi HarapanUtama

Jonggong, Busangand Loa Kulu, East Kalimantan

From Nov 29, 2007 – Oct 18, 2015 7/ 110

Tunasi IntiAbadi (TIA)

Satui and Kusan Hulu, Tanah Bumbu,East Kalimantan

From Jun 25, 2009 – Later of Life of mine, or Jun 30, 2020

25 / 145

ArutminIndonesia

Batulicin,South Kalimantan

From Jul 1, 2006 – Life of mineSungkai site: From start of operations or by Aug 2008 – Earlier of Jul 2011 or when the pit coal reserve is considered to be un-economical to mine

4 / 38

Titan WijayaTanjung Dalam Village,Bengkulu Province

From Mar 18, 2011 – 72 months from start of operations, or completion of obligations, whichever is earlier

14/ 93

Total 63 / 496

1

2

3

4

5

6

7

5

CK’s Current Customers & Outstanding Contract Value

Page 33: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

SS Operations- PLTD Bitung Menado Services Offer

Temporary Power

Pillar and

Operations and

Maintenance

(“O&M”)

Independent

Power Generation

• Provides power solutions mainly to utility sector customers

• 934 MW of electricity generation capacity as of Dec 31, 2011

• Main customer is PT PLN (Persero) (“PLN”),

• Utility customers contributed 80.6% of Temporary Power

division’s revenue for 6 months ended June 30, 2011

• Pillar business provides dewatering management services,

rental of centrifugal pumps, load bank, temperature control

units, and intends to provide optimization and consultation

services

• O&M provides end-to-end power plant operations,

maintenance services and specific repair and maintenance

services

• Thermal Energy

– 20% stake in Meppogen, a 80MW simple cycle power plant

in South Sumatra.

– Mepoggen to convert to a 110MW combined cycle

power plant

– Entered into a PPA in 2005 with PLN Kitlur Sumbagsel to

sell 80MW of power for 20 years

– Subsidiary PAS to acquire 2 independent power producers

• Renewable Energy

– SS and NBS to invest / acquire to develop independent

power production through renewable energy

PT Sumber Daya Sewatama (SS) – Power Solutions

33

As of 31 Dec 2011, SS employs more than 1,300 employees

Page 34: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

34

SS- Income Statement 2011 2010

REVENUE 1.006.469 802.965

GROSS PROFIT 388.963 190.414

Gross Profit Margin 38,6% 23,7%

OPERATING PROFIT 286.524 115.314

Operating PM 28,5% 14,4%

EBITDA 561.343 271.621

Ebitda Margin 55,8% 33,8%

Profit Before Tax 213.426 96.523

21,2% 12,0%

NET INCOME 158.210 77.383

Net Profit Margin 15,7% 9,6%

PT Sumberdaya Sewatama(SS)- Income Statement

Page 35: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

Key Customers

Year Ended Dec 31, 2010 Year Ended Dec 31, 2011

Temporary

Power

94.5%

Other Services(2)

5.5%

Revenue Contribution from PLN to SS

PT PLN (Persero)

Temporary

Power

95.7%

Other Services(2)

4.3%

Revenue By Division and Key Customers

35

78,2% 81,8% 84,2%

0%

25%

50%

75%

100%

2009 2010 2011

Page 36: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

Model

Number of Units as

of Dec 31, 2011

Capacity

(kW)

Average

Useful Life

(Yrs) (2)

Average Age as of

Dec 31, 2011

(Yrs)

Diesel

Generator Sets808 925,159 10 5.6

Gas Generator

Sets5 8,662 15 2

Total 813 933,821

Diesel Genset is the majority of Generators

36

Page 37: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

Electricity Generation Capacity and Average – Utilization Rate Utilization Rate in MW

638758 792

934

72%70%

74% 74%

60%

65%

70%

75%

80%

0

200

400

600

800

1.000

2008 2009 2010 2011

Electricity Generation Capacity Average Utilization Rate

Electricity Generations Capacity & Lease Rate

37

Average Lease Rate per kWh (IDR/kWh)

196 199235

255

0

50

100

150

200

250

300

2008 2009 2010 2011

Page 38: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

1.274,0

1.663,0

1.814,0

2.387,0

500

700

900

1.100

1.300

1.500

1.700

1.900

2.100

2.300

2.500

2012e 2013e 2014e 2015e

In MW

Projection 2012-2015 SS’s Power Solution Business

38

Page 39: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

SSB Operations- Site SErvices SSB –Remanufacturing Business

Transport

Equipment

Division

Designing, manufacturing and distributing

products for transportation and material

handling business

Site Services

Division

On-site repair, process plant maintenance

and construction services

Fabrication

Division

Design and manufacture of process

equipment, general fabrication, site

construction and installation solutions

Re-

Manufacturing

Division

Salvaging, remanufacturing and

manufacturing of heavy equipment core

components

PT. Sanggar Sarana Baja (SSB) – Engineering Services

39

As of 31 Dec 2011, SSB employs more than 2,480 employees

Page 40: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

40

SSB- Income Statement 2011 2010

REVENUE 1.006.083 844.208

GROSS PROFIT 214.596 184.741

Gross Profit Margin 21,3% 21,9%

OPERATING PROFIT 46.438 56.326

Operating Profit Margin 4,6% 6,7%

EBITDA 91.766 92.461

Ebitda Margin 9,1% 11,0%

Profit Before Tax 15.253 43.458

1,5% 5,1%

NET INCOME 17.975 29.268

Net Profit Margin 1,8% 3,5%

PT Sanggar Sarana Baja (SSB) - Income Statement

Page 41: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

SSB –Transportation Operations SSB Re-manufacturing Operations

41

SSB –Fabrication

PT. Sanggar Sarana Baja (SSB) – Operations

Page 42: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

Business Overview

• Integrated logistics provider offering freight forwarding,

project logistics, industrial / offshore and coal logistics

shipping, warehouse and shorebase management services

• Freight forwarding services: Integrated logistics services

via owner and third party operated freight services

• Project logistics: Transportation of over weight and

over size cargo (heavy equipment, machines and

engines)

• Energy related logistics: Industrial, offshore and coal

logistics shipping and warehouse and shorebase

management services

• PT Baruna Dirga Dharma (BDD) is our coal logistic.

• Provides through CKB and a third-party sub-contractor,

barging services to TIA as a part of its coal logistics chain

—ISO 9001: 2008 and OHSAS 18001: 2007

PT. Cipta Krida Bahari (CKB) – Integrated Logistic

42

As of 31 Dec 2011, CKB employs over 480 employees and

operates integrated sea, air and road networks from 35

branches and offices in Indonesia

Page 43: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

43

CKB (Parent )– Income Statement 2010 2011

REVENUE 819.917 511.404

GROSS PROFIT 182.541 116.297

Gross Profit Margin 22,3% 22,7%

OPERATING PROFIT 85.989 38.882

Operating Profit Margin 10,5% 7,6%

EBITDA 92.775 48.227

Ebitda Margin 11,3% 9,4%

Profit Before Tax 79.645 37.881

9,7% 7,4%

NET INCOME 58.916 28.591

Net Profit Margin 7,2% 5,6%

PT Cipta Krida Bahari (CKB) - Income Statement

Page 44: ABMM Analyst Meeting FY 2011 - 2012-04-03 Final · Crusher Up to 750 tons / hour Stockpile 120,000 tons 23. Coal Productions View of TIA Operations, South Kalimantan 24 14,6 4,7 4,74

44

Contact

Investor Relations

Errinto Pardede

Tel:6221-2997-6767 Ext.1874

Fax : 6221-2997-6768

Email : [email protected]

Email : [email protected]

Website : www.abm-investama.com