Summer Training Report on Power Transformer Presented by : Dheeraj Upadhyay Electrical & Electronics Engineering
Transcript
Page 1: about transformer

Summer Training Report on

Power Transformer

Presented by : Dheeraj Upadhyay Electrical & Electronics Engineering

Page 2: about transformer
Page 3: about transformer

POWER TRANSFORMER

They have rating above 200 Kva and used in generating station and

substation used for power transmission line for stepping up and stepping down the voltage.

Page 4: about transformer

Stages of Power Transformers manufacturing are :

Design & DrawingWinding ManufacturingCore BuildingUnlacing of Core Fitting Bottom

insulationCore Coil AssemblyFitting of Top insulation

Relacing of core Terminal Gear

MountingFinal Tanking TestingDespatch

Page 5: about transformer

Design & Drawing : 1 Φ

Phase 3 Φ MVARating KVA

66 kvVoltage Class

11 kv

Page 6: about transformer

50 HzFrequency

60 Hz Δ Connection

Y Generating

Purpose Substation Distribution

Page 7: about transformer

Winding Used :

R-S Coil : reverse section winding.

Helical coil : winded in shape of spring.

Spiral coil : simply wounded on the base.

Interleaved coil : winding current rotates in same conductor

Composite winding : more than one conductor winded with each other.

Page 8: about transformer

Helical winding

Interleaved

Page 9: about transformer

Core of Transformer :Material Used :

CRGO : Cold rolled grain oriented silicon steel is used to build the core.

Purpose of using CRGO is to reduce the Hysteresis losses. Laminations of these sheets minimizes eddy current loss.

Page 10: about transformer

Unlacing of core :

This is basically the phenomena of

removal of top end frame of the core assembly so that the coils can be mounted on the core.

Page 11: about transformer
Page 12: about transformer

Core – Coil Assembly :

Core coil assembly consists of assembling the windings to the core assembly. Core assembly is placed on a suitable leveled platform.Tighten the three limbs with webbing tape. Top channels and top yoke laminations are removed and placed on a table in the same sequence. Bottom insulation items like pressboard rings, petals; perma wood rings are placed on bottom yoke on each core limb. Core wraps as specified in the design details are covered to the core limbs and tightened with cotton tape.

L.V Coil : primary coil for step down transformer, made in order to allow the flow of large current through it .

H.V Coil : Secondary coil for step down transformer, made in order to allow high voltage and hence small current through it.

T.V Coil : this is known as the tertiary voltage coil.

Page 13: about transformer

Relacing Of Core :The top yoke is again attached toThe Rest of the Core, the sheets Are attached one by one or inPackets (generally 2 to 4 innumbers) to the core limb in erect position. Then the job is dipped in oil and then heated toremove any kind of moisture in it. After that the job iscompressed i.e. pressure is applied from the top to compress the coil and achieve the required CD of the coil as specified in design.

Page 14: about transformer

Processing and DRY OUT :

The presence of the moisture brings about thereduction in the electric strength of material andalso increases its volume.

Dry out is necessary in this condition.The final drying out is commenced either when the core and winding are placed or when they are fitted in to there tank, all main connectionsmade and the tank placed in an oven andconnected to the drying system

Page 15: about transformer
Page 16: about transformer

Final Tanking :Tanking means…..assembling the core coilassembling job intotransformer tank withall necessary accessoriesaccording to bill of material and design diagram.

Page 17: about transformer
Page 18: about transformer

Testing of Power Transformer

Tests during manufacture : Core plate checksCore frame insulation

resistanceCore loss measurementWinding copper checksTank tests

Page 19: about transformer

Final Testing :Routine TestsVoltage ratio and polarity. winding resistance. impedance voltage, short-circuit

impedence and load loss dielectric tests. (a) separate source AC voltage. (b) Induced voltage.no-load losses and current.on-load tap changers, where appropriate.

Page 20: about transformer

TYPE Tests :Temperature rise test.noise level test.lightning impulse tests.

Page 21: about transformer

EQIPMENTS USED FOR THE PROTECTION OF POWER TRANSFORMER

• Lightning Arrester.• Over Current Relay.• Buccholz relay.• Earth fault relay.• Oil level indicator.• Over fluxing relay.

Page 22: about transformer